Water Plant #3 Concentrate Pre-treatment Project

6
Water Plant #3 Concentrate Pre-treatment Project

description

Water Plant #3 Concentrate Pre-treatment Project. Regulatory Requirements: Wtp#3 has a discharge permit limit for iron of 0.3 mg/L Wtp#3 Concentrate is greater than 0.3 mg/L FLDEP AO 154NE provides a schedule to meet the iron discharge limitation - PowerPoint PPT Presentation

Transcript of Water Plant #3 Concentrate Pre-treatment Project

Page 1: Water Plant #3 Concentrate Pre-treatment Project

Water Plant #3Concentrate Pre-treatment

Project

Page 2: Water Plant #3 Concentrate Pre-treatment Project
Page 3: Water Plant #3 Concentrate Pre-treatment Project

Water Plant #3 Concentrate Pre-treatment

Project Regulatory Requirements: Wtp#3 has a discharge permit limit for iron of 0.3

mg/L Wtp#3 Concentrate is greater than 0.3 mg/L FLDEP AO 154NE provides a schedule to meet the iron discharge limitation Concentrate is permitted as a source water at Wtp#1 Color compliance at Wtp#1 is dependent on color

reduction treatment by ozone treatment at Wtp#3

Page 4: Water Plant #3 Concentrate Pre-treatment Project

Water Plant #3 Concentrate Pre-treatment

Project

Process Components:Primary Systemo Ozone system for color reduction o Recovers up to750,ooo gals/daySecondary Systemo Cartridge filtration system for iron reduction

Page 5: Water Plant #3 Concentrate Pre-treatment Project

Water Plant #3 Concentrate Pre-treatment Project

Funding: Total Project Cost - $1,580,000 Design & Permitting - $162,345 Construction Cost including contingency -

$1,407,680 Source of Funds: 5 Year CIP bond funds SJRWMD Cooperative Cost Share Grant - $494,800 Florida Legislative Funding Grant - $375,000

(waiting for Governor’s signature)o

Page 6: Water Plant #3 Concentrate Pre-treatment Project

Questions?

Water Plant #3 Concentrate Pre-treatment Project