17/11/2015 Springfield Depot Meter Shop
Water Meter Pressure Testing
AimThe aim of this test was to determine whether or not a batch of meters would be able to withstand the desired pressure subjected to it.
Equipment Required A sample of meters for testing Shifting spanner x2 Pressure inducing hand pump with a gauge attached An elbow fitted to a ball valve Fresh water supply A camera
Method 1. Gather all samples to be tested and record their serial numbers, name, the company that
submitted the meters and take pictures of each meter before testing.2. Begin by preparing the hand pump contraption by filling the pump reservoir with water.3. We can now start testing the water meters. Attach the hand pump to the upstream side of the
water meter and the elbow fitted to a ball valve to the downstream side of the water meter.4. Start pumping while the ball valve is opened completely to allow the water meter to be rid of all
air inside the meter and only be filled with water.5. Once you are satisfied that there is no air in the water meter close the ball valve completely to
ensure nothing passes through it.6. Pump until the internal pressure gauge on the hand pump reads 4.8 bars.7. Makes sure to take pictures of the meters after the test.8. Repeat steps 2-7 until all meters are tested.
17/11/2015 Springfield Depot Meter Shop
Tenderer Supplier Serial No. Pressure (Bar) ResultEast of Eden
TradingPrecision Meters PM150105614 4.8-5 Passed
Precision Meters Precision Meters PM150101098 4.8-5 PassedPPD Engineering Hibrid 110040972 4.8-5 Tread FailedPPD Engineering Hibrid 110024928 4.8-5 Meter failed
BC Industrial Engineering
Amanzi Meters 15A014612 4.8-5 Passed
Chopper Technologies
Amanzi Meters 15A014634 4.8-5 Passed
Kush J Trading Amanzi Meters 15A014884 4.8-5 PassedDinonex Amanzi Meters 15A014676 4.8-5 Failed
Results
17/11/2015 Springfield Depot Meter Shop
Findings
The following meters submitted by the tenderers passed;
East of Eden, Precision Meters, 150105614 Precision Meters, Precision Meters,150101098 BC Industrial Engineering, Amanzi Meters,15A014612 Chopper Technologies, Amanzi Meters, 15A014634 Kush J Trading, Amanzi meters, 15A014884
The Following Meters Submitted by the tenderers failed the test;
PPD Engineering, Hibred Meters, 110040972 – The thread on the downstream side failed PPD Engineering, Hibred Meters, 110024928 – There was a crack on the circumference of the
upstream side of the meter Dinonex, Amanzi Meters, 15A014676 – There was a crack diagonally across the dial towards the
underside of the meter