WATER MANAGEMENT INFRASTRUCTURE - UON
Transcript of WATER MANAGEMENT INFRASTRUCTURE - UON
uon.com.au
WATER MANAGEMENT INFRASTRUCTUREBHP Iron Ore Case Study 1
UON was engaged by BHP as the head contractorto Design, Supply, Install and Commission thirteen downhole bore packages, GMC Generator and Headworks Trailers, Fuel Tanks and associated equipment including UON’s (Patent Pending) PROPOWER™ GMC Generator Technology.
1OTeam members
58Items of equipment
46,000Hours worked LTI-free
KEY SUCCESSUON minimised the loss of dewatering across these BHP sites during the removal of existing infrastructure and replacement with new infrastructure. This project required a high level of planning from our Projects and Production and Fabrication Facilities. UON achieved this safely and on time with zero recordable incidents for the duration of the project.
UON Project Case Study
PILBARARegion
BHPClient
IRON ORECommodity
PURCHASEContract
Completed with RSK Contracting
DELIVERABLES• 11 x 300kvA GMC Generator on Trailer
• 4 x 200kvA UON GMC Generator on Trailer
• 6 x 250kvA UON GMC Generator on Trailer
• 3 x 150kvA UON GMC Generator on Trailer
• 18 x 4000L UON Fuel Tanks
• 16 x 92 to132kW Downhole Bore Pump Packages
• 6km of HDPE
• Steel Manifold Pipework and Valves
• Hydro Testing, Installation & Commissioning
• Delivered on-time and in-budget
UON Project Case Study