November 21, 2011 Wastewater Master Plan – Status Update City of Portsmouth, New Hampshire

Transcript of Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status...

Page 1: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

November 21, 2011

Wastewater Master Plan – Status Update

City of Portsmouth, New Hampshire

Page 2: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Topics for Discussion

• Review of Master Plan Effort

• Regulatory Status

• Pilot Effort to Verify Technology Selection

• Regional Cooperation

Page 3: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Wastewater Master Plan Components

Collection System CSO LTCP

Wastewater Treatment Facilities

Page 4: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Combined Sewer Overflow Long Term Control Plan

Page 5: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Combined Sewer Overflow Long Term Control Plan - Contract 3B

Page 6: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Combined Sewer Overflow Long Term Control Plan - Cass Street Area

Page 7: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Secondary Treatment on Peirce Island – Within Fence Line

Page 8: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Phased Compliance Strategy Peirce Island/Pease

• Secondary treatment at Peirce Island within existing fence line by late 2016

• WMP team identified innovative technologies with potential to reduce footprint of upgrade requirements

• Preliminary engineering, including on-site testing of potential technologies will be completed to assist with final technology selection

• Expanding Pease over time as regulatory and economic conditions permit

Page 9: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Regulatory Status

• Current EPA Consent Decree- Wastewater Master Plan - Completed- Upgrade Peirce Island According to Schedule in Wastewater Master Plan- Complete Targeted Long Term Control Plan Sewer Separation Project- EPA Requires a Modification to the Existing Consent Decree to

Incorporate Wastewater Master Plan Schedule

• Peirce Island NPDES Permit Renewal Application Due December 31, 2011. Anticipating Secondary only however pressure is building to add Nutrient Removal to the Permit

• Pease Wastewater Treatment Facility NPDES Permit is pending. Anticipating Secondary only however pressure is building to add Nutrient Removal to the Permit

Page 10: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Regulatory Status (cont.)

• Modified EPA Consent Decree Schedule

• CSO- LTCP Completion by 2014- Contract 3A – Lincoln, Spring, Willow, Miller, Broad- Contract 3B – Richards, Rockland, Highland, Miller, Merrimac- Contract 3C – Streets off of Lincoln, Union, Wibird, Park- Cass Street Area

• Upgrade Peirce Island Completion 2016- Pilot Potential Technologies- Preliminary Design Vender Selection- Final Design- Construction

Page 11: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Pilot Study

Page 12: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Pilot Program Flow ChartWWMP Piloting EffortWWMP Piloting Effort

Pilot TechnologySelection Workshop

Review/Evaluate Potential

Treatment Technologies

WastewaterCharacterization

DataCollection

InitialPilotingPhase

Vendor Demonstration/

VerificationPhase

InitialPilotingReview

Potential Secondary Treatment

Technologies

WastewaterCharacterization

Needs

Demonstration Phase Data

Review (and Vendor Selection if Needed)

Preliminary Design

Page 13: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

List of technologies

1. Biological Aerated Filter (BAF)

2. Sequencing Batch Reactor (SBR) with BioMag

3. Conventional Activated Sludge (CAS) with BioMag

4. Moving Bed Bioreactor (MBBR) & ActiFlo

5. Moving Bed Bioreactor (MBBR) & CoMag

6. Moving Bed Bioreactor (MBBR) & DAF

7. Membrane Bioreactor (MBR)

8. Conventional Activated Sludge (CAS)

Page 14: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Non-Monetary Evaluation Criteria

• Operational Track Record/Established Process

• Operability (No. of Processes/Complexity of Processes)

• Ability to Retrofit Conv. Secondary Treatment to Meet Future Nitrogen Limits of 8 mg/l

• Ability to Retrofit TN 8 to Meet Future Nitrogen Limits of 5/3 mg/l

• Constructability

• Site Layout Hydraulic Complexity

• Ability to Stay Within Fence Line for Secondary Treatment

• Ability to Stay Within Fence Line for Future TN Treatment

• Ability to Treat High FOG Levels

Page 15: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Table 11 – Option Evaluation Matrix

Option 1 - BAF

Option 2 - SBR w/

BioMag (Not Feasible)

Option 3 - CAS w/ BioMag

Option 4 - MBBR & ActiFlo

Option 5 - MBBR & CoMag

Option 6 - MBBR & DAF

Option 7 - MBR

Option 8 - Conventional

Activated Sludge

Evaluation Criteria Weight Rating Score Rating Score Rating Score Rating Score Rating Score Rating Score Rating Score Rating Score

Operational Track Record/Established Process 18 3 54 2 36 2 36 1 18 2 36 4 72 5 90Operability (No. of Processes/Complexity of Processes) 22 3 66 3 66 2 44 2 44 3 66 2 44 4 88Ability to Retrofit Conv. Secondary Treatment Meet Future Nitrogen Limits of 8 mg/l 20 1 20 5 100 1 20 1 20 1 20 3 60 4 80Ability to Retrofit TN 8 to Meet Future Nitrogen Limits of 5/3 mg/l 2 5 10 3 6 4 8 4 8 4 8 2 4 4 8Constructability 4 4 16 2 8 4 16 4 16 4 16 3 12 1 4Site Layout Hydraulic Complexity 8 4 32 3 24 4 32 3 24 4 32 4 32 1 8Ability to Stay Within Fence Line for Secondary Treatment 14 5 70 5 70 5 70 5 70 5 70 5 70 1 14Ability to Stay Within Fence Line for Future TN Treatment 4 2 3 3 3 5 1Ability to Treat High FOG Levels 14 3 42 4 56 3 42 3 42 3 42 4 56 3 42Total Weighted Criteria 310 366 268 242 290 350 334Capital Cost (estimated - in millions) $33.0 $37.0 $32.0 $34.0 $32.0 $42.0 $39.0Value Ratio (criteria/capital cost) 9.4 9.9 8.4 7.1 9.1 8.3 8.6Life Cycle Cost (in millions) $40.8 $46.7 $41.2 $47.4 $39.7 $53.3 $46.8Value Ratio (criteria/ life cycle cost) 7.6 7.8 6.5 5.1 7.3 6.6 7.1

Page 16: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Technologies Selected For Piloting

• Biological Aerated Filter (BAF)

• Conventional Activated Sludge (CAS) with BioMag

• Moving Bed Bioreactor (MBBR) & DAF

Page 17: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Physical Pilot

• Construct/Assemble Side by Side Pilot Units

• Treat Primary Effluent in Dry Weather, CEPT Effluent in Wet Weather

• Initial Focus on Secondary Treatment testing, then modify to achieve Total Nitrogen Removal

• Initial Pilot – 6 Month Period

Page 18: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Pilot Unit Construction Photos

Page 19: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Pilot Unit Construction Photos

Page 20: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Pilot Unit Construction Photos

Page 21: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Pilot Unit Construction Photos

Page 22: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Comparison of Consent Decree Estimated Costs

Cost Item

Opt

ion

1 -B

AF

Opt

ion

2 -S

BR

w

/Bio

Mag

Opt

ion

3 –

CA

S w

/Bio

Mag

Opt

ion

4 -M

BB

R

& A

ctiF

lo

Opt

ion

5 -M

BB

R

& C

oMag

Opt

ion

6 -M

BB

R

& D

AF

Opt

ion

7 -M

BR

Opt

ion

8 -C

AS

Capital $33.00

Not

Fea

sibl

e$37.00 $32.00 $34.00 $32.00 $42.00 $39.00

20 Year Present Worth O&M

$7.77 $9.71 $9.19 $13.37 $7.67 $11.32 $7.81

20 Year Life Cycle

$40.77 $46.71 $41.19 $47.37 $39.67 $53.32 $46.81

Note: All Costs in $ millions

Page 23: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Projected Sewer Rate ($ per Unit)

* Imposition of nutrient limits will require additional capital investment

02468

101214161820

Sew

er R

ate

($/U

nit)

2011

2017

$40M

2017

$60M

2017

$80M

WWTF Adder

Future Rate w/oWWTFCurrent Rate

One Unit = 748 gallons

Page 24: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Regional Cooperation

• Why Participate in Regional Cooperation– Pending City Permits will be impacted by the decisions the

Regulators make relative to the Great Bay and the Piscataqua River

– Recognition that complex environmental challenges are regional in nature

– As a Coalition we leverage resources and are more likely to have input in regulatory decision process

• Southeast Watershed Alliance

• Great Bay Municipal Coalition– Memorandum of Agreement with DES to improve scientific

understanding and ensure scientifically based, cost effective, community minded solutions are selected

– Adaptive Management Plan – Allows for an alternative approach to meeting water quality

Page 25: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Proposed Adaptive Management Plan

• The Proposed adaptive management plan allows new information to be incorporated into a watershed management plan. Allows for scientific research, monitoring, and implementation that provides an opportunity to build and measure. Specifically:

– Commits the communities of Exeter, Dover, Newmarket to a Total Nitrogen limit of 8 mg/L which will reduce DIN to pre-1990 levels

– Commits communities to participate in water quality monitoring program to improve scientific understanding of the issues

– Commits communities to participate in eelgrass and shellfish restoration efforts.

– Commits communities to participate in non-point pollutions reduction

• Proposed Adaptive Management Plan is Currently being Reviewed by the Regulators

Page 26: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Plan of Action

• Complete Targeted Sewer Separation – Underway

• Continue Regional Cooperation – On-going

• Pilot Emerging Technology - Underway

• Preliminary Design & Vender Selection- Completion 2013

• Final Design Completion - 2014

• Construction Completion - Aug 2016

Page 27: Wastewater Master Plan – Status Update council meeting pilot...Wastewater Master Plan – Status Update. City of Portsmouth, ... -Preliminary Design Vender Selection ... MBBR & CoMag

Questions & Answers