Wastewater Master Plan – Status Update
City of Portsmouth, New Hampshire
Topics for Discussion
• Review of Master Plan Effort
• Regulatory Status
• Pilot Effort to Verify Technology Selection
• Regional Cooperation
Wastewater Master Plan Components
Collection System CSO LTCP
Wastewater Treatment Facilities
Combined Sewer Overflow Long Term Control Plan
Combined Sewer Overflow Long Term Control Plan - Contract 3B
Combined Sewer Overflow Long Term Control Plan - Cass Street Area
Secondary Treatment on Peirce Island – Within Fence Line
Phased Compliance Strategy Peirce Island/Pease
• Secondary treatment at Peirce Island within existing fence line by late 2016
• WMP team identified innovative technologies with potential to reduce footprint of upgrade requirements
• Preliminary engineering, including on-site testing of potential technologies will be completed to assist with final technology selection
• Expanding Pease over time as regulatory and economic conditions permit
Regulatory Status
• Current EPA Consent Decree- Wastewater Master Plan - Completed- Upgrade Peirce Island According to Schedule in Wastewater Master Plan- Complete Targeted Long Term Control Plan Sewer Separation Project- EPA Requires a Modification to the Existing Consent Decree to
Incorporate Wastewater Master Plan Schedule
• Peirce Island NPDES Permit Renewal Application Due December 31, 2011. Anticipating Secondary only however pressure is building to add Nutrient Removal to the Permit
• Pease Wastewater Treatment Facility NPDES Permit is pending. Anticipating Secondary only however pressure is building to add Nutrient Removal to the Permit
Regulatory Status (cont.)
• Modified EPA Consent Decree Schedule
• CSO- LTCP Completion by 2014- Contract 3A – Lincoln, Spring, Willow, Miller, Broad- Contract 3B – Richards, Rockland, Highland, Miller, Merrimac- Contract 3C – Streets off of Lincoln, Union, Wibird, Park- Cass Street Area
• Upgrade Peirce Island Completion 2016- Pilot Potential Technologies- Preliminary Design Vender Selection- Final Design- Construction
Pilot Study
Pilot Program Flow ChartWWMP Piloting EffortWWMP Piloting Effort
Pilot TechnologySelection Workshop
Review/Evaluate Potential
Treatment Technologies
WastewaterCharacterization
DataCollection
InitialPilotingPhase
Vendor Demonstration/
VerificationPhase
InitialPilotingReview
Potential Secondary Treatment
Technologies
WastewaterCharacterization
Needs
Demonstration Phase Data
Review (and Vendor Selection if Needed)
Preliminary Design
List of technologies
1. Biological Aerated Filter (BAF)
2. Sequencing Batch Reactor (SBR) with BioMag
3. Conventional Activated Sludge (CAS) with BioMag
4. Moving Bed Bioreactor (MBBR) & ActiFlo
5. Moving Bed Bioreactor (MBBR) & CoMag
6. Moving Bed Bioreactor (MBBR) & DAF
7. Membrane Bioreactor (MBR)
8. Conventional Activated Sludge (CAS)
Non-Monetary Evaluation Criteria
• Operational Track Record/Established Process
• Operability (No. of Processes/Complexity of Processes)
• Ability to Retrofit Conv. Secondary Treatment to Meet Future Nitrogen Limits of 8 mg/l
• Ability to Retrofit TN 8 to Meet Future Nitrogen Limits of 5/3 mg/l
• Constructability
• Site Layout Hydraulic Complexity
• Ability to Stay Within Fence Line for Secondary Treatment
• Ability to Stay Within Fence Line for Future TN Treatment
• Ability to Treat High FOG Levels
Table 11 – Option Evaluation Matrix
Option 1 - BAF
Option 2 - SBR w/
BioMag (Not Feasible)
Option 3 - CAS w/ BioMag
Option 4 - MBBR & ActiFlo
Option 5 - MBBR & CoMag
Option 6 - MBBR & DAF
Option 7 - MBR
Option 8 - Conventional
Activated Sludge
Evaluation Criteria Weight Rating Score Rating Score Rating Score Rating Score Rating Score Rating Score Rating Score Rating Score
Operational Track Record/Established Process 18 3 54 2 36 2 36 1 18 2 36 4 72 5 90Operability (No. of Processes/Complexity of Processes) 22 3 66 3 66 2 44 2 44 3 66 2 44 4 88Ability to Retrofit Conv. Secondary Treatment Meet Future Nitrogen Limits of 8 mg/l 20 1 20 5 100 1 20 1 20 1 20 3 60 4 80Ability to Retrofit TN 8 to Meet Future Nitrogen Limits of 5/3 mg/l 2 5 10 3 6 4 8 4 8 4 8 2 4 4 8Constructability 4 4 16 2 8 4 16 4 16 4 16 3 12 1 4Site Layout Hydraulic Complexity 8 4 32 3 24 4 32 3 24 4 32 4 32 1 8Ability to Stay Within Fence Line for Secondary Treatment 14 5 70 5 70 5 70 5 70 5 70 5 70 1 14Ability to Stay Within Fence Line for Future TN Treatment 4 2 3 3 3 5 1Ability to Treat High FOG Levels 14 3 42 4 56 3 42 3 42 3 42 4 56 3 42Total Weighted Criteria 310 366 268 242 290 350 334Capital Cost (estimated - in millions) $33.0 $37.0 $32.0 $34.0 $32.0 $42.0 $39.0Value Ratio (criteria/capital cost) 9.4 9.9 8.4 7.1 9.1 8.3 8.6Life Cycle Cost (in millions) $40.8 $46.7 $41.2 $47.4 $39.7 $53.3 $46.8Value Ratio (criteria/ life cycle cost) 7.6 7.8 6.5 5.1 7.3 6.6 7.1
Technologies Selected For Piloting
• Biological Aerated Filter (BAF)
• Conventional Activated Sludge (CAS) with BioMag
• Moving Bed Bioreactor (MBBR) & DAF
Physical Pilot
• Construct/Assemble Side by Side Pilot Units
• Treat Primary Effluent in Dry Weather, CEPT Effluent in Wet Weather
• Initial Focus on Secondary Treatment testing, then modify to achieve Total Nitrogen Removal
• Initial Pilot – 6 Month Period
Pilot Unit Construction Photos
Pilot Unit Construction Photos
Pilot Unit Construction Photos
Pilot Unit Construction Photos
Comparison of Consent Decree Estimated Costs
Cost Item
Opt
ion
1 -B
AF
Opt
ion
2 -S
BR
w
/Bio
Mag
Opt
ion
3 –
CA
S w
/Bio
Mag
Opt
ion
4 -M
BB
R
& A
ctiF
lo
Opt
ion
5 -M
BB
R
& C
oMag
Opt
ion
6 -M
BB
R
& D
AF
Opt
ion
7 -M
BR
Opt
ion
8 -C
AS
Capital $33.00
Not
Fea
sibl
e$37.00 $32.00 $34.00 $32.00 $42.00 $39.00
20 Year Present Worth O&M
$7.77 $9.71 $9.19 $13.37 $7.67 $11.32 $7.81
20 Year Life Cycle
$40.77 $46.71 $41.19 $47.37 $39.67 $53.32 $46.81
Note: All Costs in $ millions
Projected Sewer Rate ($ per Unit)
* Imposition of nutrient limits will require additional capital investment
02468
101214161820
Sew
er R
ate
($/U
nit)
2011
2017
$40M
2017
$60M
2017
$80M
WWTF Adder
Future Rate w/oWWTFCurrent Rate
One Unit = 748 gallons
Regional Cooperation
• Why Participate in Regional Cooperation– Pending City Permits will be impacted by the decisions the
Regulators make relative to the Great Bay and the Piscataqua River
– Recognition that complex environmental challenges are regional in nature
– As a Coalition we leverage resources and are more likely to have input in regulatory decision process
• Southeast Watershed Alliance
• Great Bay Municipal Coalition– Memorandum of Agreement with DES to improve scientific
understanding and ensure scientifically based, cost effective, community minded solutions are selected
– Adaptive Management Plan – Allows for an alternative approach to meeting water quality
Proposed Adaptive Management Plan
• The Proposed adaptive management plan allows new information to be incorporated into a watershed management plan. Allows for scientific research, monitoring, and implementation that provides an opportunity to build and measure. Specifically:
– Commits the communities of Exeter, Dover, Newmarket to a Total Nitrogen limit of 8 mg/L which will reduce DIN to pre-1990 levels
– Commits communities to participate in water quality monitoring program to improve scientific understanding of the issues
– Commits communities to participate in eelgrass and shellfish restoration efforts.
– Commits communities to participate in non-point pollutions reduction
• Proposed Adaptive Management Plan is Currently being Reviewed by the Regulators
Plan of Action
• Complete Targeted Sewer Separation – Underway
• Continue Regional Cooperation – On-going
• Pilot Emerging Technology - Underway
• Preliminary Design & Vender Selection- Completion 2013
• Final Design Completion - 2014
• Construction Completion - Aug 2016
Questions & Answers