Waste Splitting - Differentiating ENERGY for profitability 30 September 2014 Wealth Unearthed

description

Blasting Masterclass 30 September 2014

Transcript of Waste splitting - Differentiating energy for profitability - Riaan

Page 1: Waste splitting - Differentiating energy for profitability - Riaan

Waste Splitting - Differentiating ENERGY for profitability30 September 2014

WealthUnearthed

Page 2: Waste splitting - Differentiating energy for profitability - Riaan

Roadmap

Page 3: Waste splitting - Differentiating energy for profitability - Riaan

Geographical Location

Bambanani

Kopaneng

Simunye

K6

Kwezi

7mt/annum

475k oz

Page 4: Waste splitting - Differentiating energy for profitability - Riaan

Background

PGM Prices

Production costs

Page 5: Waste splitting - Differentiating energy for profitability - Riaan

Objective

• To optimise the blast design through effective ENERGY

distribution which will result in reef and waste separation during

blasting operations.

• To derive specific blast designs for specific reef conditions across

the 5 operating shafts and their sections.

• To maintain the ounce production of 475k oz for BP 15.

Page 6: Waste splitting - Differentiating energy for profitability - Riaan

0g/t

Main Top 12.39g/t

Main Seam 4.56g/t

Main Bot 7.62g/t

Footwall 0 g//t

Leader 2.42g/t

Internal Waste

Page 7: Waste splitting - Differentiating energy for profitability - Riaan

Methodology and Process

• Reef/Waste splitting was successfully trialled - March to May 2014.

• Safely blasted and loaded waste and reef separately during the trial

and waste packed in swept back areas.

• Logging of panels blasted (both reef & waste) completed – drilling

pattern, cast blasting, start & end time of loading, number of

buckets loaded etc. were recorded.

• A sampling & assay programme was conducted from the inception

of the trial to measure efficacy and results.

• On 30 April the K1 plant milled 8000 tons of only Kopaneng ore.

Page 8: Waste splitting - Differentiating energy for profitability - Riaan

Blast Design

NOT TO SCALE

Drill Rig 10m x 2.1 & 2.5 (61 holes)

15 cm

50 cm

40 cm

1,3m

80 cm

75 cm

NOT TO SCALE

Drill Rig 10m x 2.1 & 2.5 (56 holes)

Page 9: Waste splitting - Differentiating energy for profitability - Riaan

ENERGY Distribution

PF by 25% to 1.54kg/m³

PF by 100% to 1.10kg/m³

PF by 57% to 0.77kg/m³

Less is More !!!!

Page 10: Waste splitting - Differentiating energy for profitability - Riaan

Proposed Typical Cycle

Rig 1

Rig 1

M/S

Drill panel & blast waste

Drill panel & blast waste

Page 11: Waste splitting - Differentiating energy for profitability - Riaan

Cycle – 1st Shift - Drill Face & Blast Waste

Cast Blasting

Page 12: Waste splitting - Differentiating energy for profitability - Riaan

Proposed Typical Cycle

Clean waste & blast reef

Clean waste & blast reef

A/S

Rig 1

Rig 1

M/S

Drill panel & blast waste

Drill panel & blast waste

Page 13: Waste splitting - Differentiating energy for profitability - Riaan

Cycle – 2nd shift – Clean Waste & Blast Reef

“Drop & Pop”

Page 14: Waste splitting - Differentiating energy for profitability - Riaan

Proposed Typical Cycle

Clean waste & blast reef

Clean waste & blast reef

A/S

Clean reef & Support panel

Clean reef & Support panel

N/S

Rig 1

Rig 1

M/S

Drill panel & blast waste

Drill panel & blast waste

Page 15: Waste splitting - Differentiating energy for profitability - Riaan

Cycle – 3rd shift - Clean Reef & Support Face

Page 16: Waste splitting - Differentiating energy for profitability - Riaan

Proposed Typical Cycle

Clean waste & blast reef

Clean waste & blast reef

A/S

Clean reef & Support panel

Clean reef & Support panel

N/S

Rig 1

Rig 1

M/S

Drill panel & blast waste

Drill panel & blast waste

Rig 2

Rig 2

Rig 3

Rig 3

Drill panel & blast waste

waste

Drill panel & blast waste

Clean waste & blast reef

Clean waste & blast reef

Clean reef & Support panel

Clean reef & Support panel

Drill panel & blast waste

Drill panel & blast waste

Clean waste & blast reef

Clean waste & blast reef

Clean reef & Support panel

Clean reef & Support panel

24 Hours

waste

Drill panel & blast waste

Drill panel & blast waste

Clean waste

blast reef

Clean waste & blast reef

Drill panel & blast waste

Drill panel & blast waste

Clean reef & Support panel

Clean reef & Support panel

Clean waste & blast reef

Clean waste & blast reef

Drill panel & blast waste

waste

Drill panel & blast waste

N/SA/SM/S

24 Hours

Page 17: Waste splitting - Differentiating energy for profitability - Riaan

A Marked Blastface

Page 18: Waste splitting - Differentiating energy for profitability - Riaan

Hangingwall Parting

Page 19: Waste splitting - Differentiating energy for profitability - Riaan

Bottom Reef/Waste Parting Exposed

Page 20: Waste splitting - Differentiating energy for profitability - Riaan

Benefits

Page 21: Waste splitting - Differentiating energy for profitability - Riaan

Improved excavation integrity due to less ENERGY tr ansmitted into H/W

Page 22: Waste splitting - Differentiating energy for profitability - Riaan

Improved excavation integrity due to less ENERGY tr ansmitted into H/W

Page 23: Waste splitting - Differentiating energy for profitability - Riaan

Reef Fragmentation

Page 24: Waste splitting - Differentiating energy for profitability - Riaan

Waste to be discarded in swept areas

Page 25: Waste splitting - Differentiating energy for profitability - Riaan

Waste Packing Discipline

Page 26: Waste splitting - Differentiating energy for profitability - Riaan

Base grade Proposed Head

Grade

Kopaneng

project gradesamples

Silo grade

samples

Strike belt

samples

Plant Recovery Tail grade

2.23

2.9

3.413.57

3.88

>80% 0.77

0.47

Grade Improvement

Page 27: Waste splitting - Differentiating energy for profitability - Riaan

Reduced drilling costs and time per panelAllows for 2 additional panels to be drilled

Page 28: Waste splitting - Differentiating energy for profitability - Riaan

Reduced explosives costs – R1.5m

Page 29: Waste splitting - Differentiating energy for profitability - Riaan

Reduced hoisting costsLess pressure on maintenance

Page 30: Waste splitting - Differentiating energy for profitability - Riaan

Reduced tramming costs

Page 31: Waste splitting - Differentiating energy for profitability - Riaan

Reduced Plant costs – R45mImproved Grade

Reduced Tail grade Improved maintenance Scheduling

Page 32: Waste splitting - Differentiating energy for profitability - Riaan

Benefits

• Original BP15 ore flow per shaft was used as base.• U/G waste packing was recalculated according to blast design

and ore flow was recalculated using BP15 parameters.

BP 20157,137,795 Tonnes Blasted

475,244 ounces

BP 2015 revised6,353,438 Tonnes Blasted

485,696 ounces

10% Less Waste Tonnes sent to the plant………..

10 450 More Ounces……….

R150m

Page 33: Waste splitting - Differentiating energy for profitability - Riaan
Page 34: Waste splitting - Differentiating energy for profitability - Riaan

Acknowledgement

Wessel PumoGM Kroondal Operations

Jan StrydomManager Projects Kopaneng

Brent ParkerManager Projects

Dave StarleyGM Projects

Team