Report of the Pyrite Panel (June 2012) - Pyrite Resolution Board
Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)
8
Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)
-
Upload
clinton-harrison -
Category
Documents
-
view
216 -
download
1
Transcript of Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)
![Page 1: Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f115503460f94c24135/html5/thumbnails/1.jpg)
Waste Rock Storage AreaNAG/HPAG/PAG/Pyrite Pond
(Total Disturbance 8.6 ha)
![Page 2: Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f115503460f94c24135/html5/thumbnails/2.jpg)
NAG/HPAG/PAG/Pyrite Pond
Facility
Rogers Creek
![Page 3: Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f115503460f94c24135/html5/thumbnails/3.jpg)
PAG
Pyrite Pond HPAG
Cleared/grubbed area of PAG and Pyrite Pond during construction of HPAG
![Page 4: Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f115503460f94c24135/html5/thumbnails/4.jpg)
Pyrite Pond and PAG areas
Pyrite PondPAG
![Page 5: Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f115503460f94c24135/html5/thumbnails/5.jpg)
Access Road to Rogers Creek & Bridge
HPAG Cell Earthworks
HPAG under construction
![Page 6: Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f115503460f94c24135/html5/thumbnails/6.jpg)
HPAG Cell Earthworks
HPAG under construction – borrow used for dam construction
![Page 7: Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f115503460f94c24135/html5/thumbnails/7.jpg)
Access to Plant site
HPAG Cell Earthworks
HPAG under construction
Liner ready to be placed
![Page 8: Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)](https://reader036.fdocuments.in/reader036/viewer/2022062517/56649f115503460f94c24135/html5/thumbnails/8.jpg)
NAG Area – soil stockpile was re-vegetated after being stripped prior to construction of waste rock storage area
Borrow area