WASTE MANAGEMENT SITUATION AND PERSPECTIVES IN BOSNIA AND HERZEGOVINA dr Mehmed Cero, Ministry of Environment and Tourism of Federation of Bosnia and Herzegovina dr Irem Silajdžić, ENOVA d.o.o. Sarajevo dr Sanda Midžić Kurtagić, Mechanical Faculty University of Sarajevo

Transcript of WASTE MANAGEMENT SITUATION AND PERSPECTIVES IN BOSNIA … · WASTE MANAGEMENT SITUATION AND...

WASTE MANAGEMENT SITUATION AND PERSPECTIVES IN BOSNIA AND HERZEGOVINAdr Mehmed Cero, Ministry of Environment and Tourism of Federation of Bosnia and Herzegovina

dr Irem Silajdžić, ENOVA d.o.o. Sarajevo

dr Sanda Midžić Kurtagić, Mechanical Faculty University of Sarajevo

Institutional set-up

Legal set-up

Policies

� Law on Waste Management in the Republic of Srpska (2015)

� Law on Waste Management in the Federation of BiH (2003)

� Law on Waste Management in BD (2009)

� Set of entity bylaws that regulate different aspects including waste categories with lists, permitting for small-scale activities on waste management, extended producers responsibility (EPR), transboundary movement of waste, etc.

Strategies

� Environmental Protection Strategy of FBiH 2008-2018 including Waste Management Strategy of FBiH & Federal Waste Management Plan 2012-2017 (FBIH)

� Solid Waste Management Strategy 2017-2026 (RS)

� Environmental Protection Strategy of BD for the period 2016-2026 which includes waste management strategy

Waste quantities and composition

Waste generation rates

Source Average MSW generation

(kg/cap/day)Agency for Statistics BiH 0.89

Federal Waste Management Plan (2012-2017)

0.87

Solid Waste Management Strategy RS (2017-2026)

0.76

Environmental Protection Strategy of BD (2016-2026)

1

Waste composition

� Organic waste = 25% (cantonal average) up to 50% (municipal average).

� Dry recyclables (plastic, glass, paper, metals, al. cans, PET) accounts for 24-38% of the total waste.

� The percentage is lower in rural municipalities and higher in the urban cantons, especially Sarajevo Canton.

Financing

� Main financing is from tariffs

� Tariffs for households might be based on m² usable surface, fixed amount per person per household, fixed amount per household, number of waste removals, etc.

� The weighted average tariff/year for the served inhabitants is EUR 51/household/year assuming a family size of 3.09 persons (Census 2013) and a waste generation rate of 0.8 kg/cap/day.

� The average tariff for waste management is 0.5% of the spendable income.

� The commercial/institutional sector can also be charged per container and the tariff per 1,100-litre container is in general BAM 35/container, which would correspond with approx. EUR 80/ton (assuming 185 kg/m³ and 90% filling)

� Other sources of financing are municipality subsidies, grants from Environmental funds, EPR scheme, and loans by IFIs (WB, EBRD).

Available technologies and existing plants

� 6 active regional sanitary landfills that serve 36 municipalities (out of 141 + BD) and 2 under construction that will serve 6 more municipalities

� 93 noncompliant municipal landfills

� 12000 wild dumps

� 5 sorting lines

� no other options for waste (pre)treatment are available in the country

Milestones of development in the waste management sector

National SWM Strategy

2000

LAW on WM: FBIH 2003

RS 2002, 2013

BD 2009

Strategies: FBIH 2008 RS 2017

DB 2016

WM Plan:

FBiH 2012

EAP and DSIP 2017

POLICIES AND STRATEGIES

Milestones of development in the waste management sector

Fund for Environmental protection FBiH 2006

Fund for Environmental Protection and Energy Efficiency RS

2011INSTITUTIONS

Milestones of development in the waste management sector

EPR System

FBIH 2011

RS 2015

Development of studies on rehabilitation and closure of non-compliant municipal landfill

FBiH 2011

SYSTEM MEASURES

Milestones of development in the waste management sector

• 6 RL build • 145 wild dumpsites were cleaned and closed• Sarajevo and Banja Luka established recycling

arrangements• The collection rate increased from 40% to 70%

WB Solid Waste Management Project in BiH

2002-2009

• 13 inter-municipal districts established• 8 RL operational• Regular monitoring at 9 operational landfills• Reduction in waste not disposed in sanitary landfills from

72% to 40%

WB Second Solid Waste Management

Project

2009-2017

• Improvement of the quality and availability of solid waste services in 44 municipalities and 4 regional landfills in BiH.

• Purchase of trucks and solid waste containers and bins for 44 municipalities.

• 44 Municipal Waste Management Plans were prepared

SIDA Municipal Solid Waste Management

Project in BiH

2010-2014

INFRASTRUCTURE DEVELOPMENT

Current projects, plans and outlooks

Bosnia and Herzegovina

FBIH RS BD

Development of policies and strategies

Laws

Amendments to the Law on Waste management

New Law on Environmental Protection

New Law on Environmental Fund

Strategies and plansSWM Strategy

SWM Plan SWM Plan SWM Plan

Institutional measures

Restructuring institutions

Reorganisation of Fund for Environmental Protection

/ /

Current projects, plans and outlooks

Bosnia and HerzegovinaFBIH RS BD

System measuresMunicipal landfills Development of studies

on rehabilitation and closure of non-compliant municipal landfills

Development of studies on rehabilitation and closure of non-compliant municipal landfills

Development of studies on rehabilitation and closure of non-compliant municipal landfill in BD

Regional landfills Putting in operation the RL in Livno

Finalisation of RL in Prijedor and Zvornik

Finding solution for waste disposal in BD

Upgrade of existing RLs in Zenica, Sarajevo and Mostar

Upgrade of existing RL in Bijeljina

/

Development of project documents for new RLs

Development of project documents for new RLs

/

Infrastructure development WB - SIDA project on Building Long-term Sustainability for Integrated Solid Waste Management

Preparation of two public outreach workshops, Review of the solid wastemanagement system in BiH towards preparing a SWM sector assessment inBiH, Recommendations and sector investment plan; the Extended ProducerResponsibility in BiH; the extended capacity building program in BiH; thepreparation of a communication campaign; and the identification of priorityinvestments for further assessment (pre-feasibility assessments).