Page 3: Waste Management in Shenzhen

• a city of the Guangdong province

• at the mouth of Pearl River at the southern part of mainland China

• consists of six districts: Nanshan, Futian, Luohu, Yantian, Bao’an and Longgang

Shenzhen, ChinaShenzhen, China

Page 4: Waste Management in Shenzhen

1979 – fishing village (population around 20,000)

1980 – 1st Special Economic Zone (SEZ)

1999 – population = 4.05 million

2009 – population = 8.91 million

2005 – 10731 tonnes of Municipal Solid Waste (MSW) daily

What we can do about the MSW?

Shenzhen, ChinaShenzhen, China

Page 5: Waste Management in Shenzhen

Source: Zhang et al (2010)

Waste generation

By CSB By CSB

By CSB By CSB

Collection through City Sanitation Bureau (CSB)Collection through private agency

Road cleaning refuse

HouseholdRefuse

container

Collection Site

Transfer station (Recyclable waste separation)

Waste collection and separation

Waste treatment and disposal

Institutional refuse

Commercial refuse

Industrial recycle and reuse

Sanitary landfill, composting, incineration

By residents or private collector

By each institution

By each market

MSWM in ChinaMSWM in China

Page 6: Waste Management in Shenzhen

Source: UPDIS (2005)

Collect and load garbage bin onto

truck

Transfer Station – unload garbage into

container and compress

Container attach to truck after fully

loaded

Transfer to landfill in fully enclosed

condition

Put garbage bin back to collection point Put container back to transfer center

Different bin for different type of

MSW

Collection and Transportation of MSW Collection and Transportation of MSW in Shenzhenin Shenzhen

Page 7: Waste Management in Shenzhen

Transfer StationTransfer Station

Transfer station for unload and compress garbage into

container30 nos.

Transfer station for storage of garbage bin

3756 nos.

Transfer station with

loading/unloading platform166 nos.

Page 8: Waste Management in Shenzhen

Landfill2.57 million tonne

Waste Treatment and DisposalWaste Treatment and Disposal

4.76 million tonne(2009)

Incineration1.92 million tonne

Page 9: Waste Management in Shenzhen

Sanitary Landfills in Shenzhen 2009

FacilityDesigned Capacity

(tonne/day)

Actual Capacity (

tonne/day)

Location MechanismCompliance with

National StandardService Period

Anticipated close-down

date

Xiaping

Solid

Waste

Landfill

3500 3500Luohu

district

Leveling,

compaction, cover-

up with soil daily,

collection of

leaching for

treatment and

collection of gas for

reuse

Complied with the

“Standard of

Household Garbage

Pollution Control” and

“Standard of

Household Garbage

Landfill Pollution

Control”

1997 ~

20362036

Laohuke

ng

Sanitary

Landfill

(Stage

1)

2290 2290Baoan

district

Leveling,

compaction, cover-

up with soil daily

and collection of

leaching for

treatment

Complied with the

“Standard of

Household Garbage

Pollution Control” and

“Standard of

Household Garbage

Landfill Pollution

Control”

2002 ~

20092009

Page 10: Waste Management in Shenzhen

FacilityDesigned Capacity

(tonne/day)

Actual Capacity (

tonne/day)

LocationCompliance with National

StandardCompleted

in

Urban Environmental

Integrated Treatment Plant

450 340 Luohu district

“Standard for pollution control on MSW incineration” and “Standard for permit limits of effluent for Guangdong Province”

1988

NanshanWaste Incineration Power

Plant800 800

Nanshan

district

“Standard for pollution control on MSW incineration” and “Standard for permit limits of effluent for Guangdong Province”

2003

Nantian Waste Incineration Power

Plant 450 450Yantian

district

“Standard for pollution control on MSW incineration” and “Standard for permit limits of effluent for Guangdong Province”

2003

Central CityWaste Incineration

Power Plant300 300

Longgang

district

“Standard for pollution control on MSW incineration” and “Standard for permit limits of effluent for Guangdong Province”

1999

Baoan Laohukeng Waste Incineration

Power Plant1200 1276

Bao’an

Laohukeng

“Standard for pollution control on MSW incineration” and “Standard for permit limits of effluent for Guangdong Province”

2006

Incineration Plants in Shenzhen 2009

Page 11: Waste Management in Shenzhen

FacilityDesigned Capacity

(tonne/day)

Actual Capacity (

tonne/day)

Location Compliance with National StandardConstructed

in

Pinghu

Waste

Incineration

Power Plant

Phase 1

675 700Longgang

district

“Standard for pollution control on MSW incineration” and “Standard for permit limits of effluent for Guangdong Province”

2005

Pinghu

Waste

Incineration

Power Plant

Phase 2

1000 1000Longgang

district

“Standard for pollution control on MSW incineration” and “Standard for permit limits of effluent for Guangdong Province”

2006

Incineration Plants in Shenzhen 2009 (cont’d)

Page 12: Waste Management in Shenzhen

Shenzhen Solid Waste Exchange Center• industrial waste > raw material of products

Source: Habitat Environment of Shenzhen City

Latest Approach in Industrial Reuse and Latest Approach in Industrial Reuse and RecyclingRecycling

Page 13: Waste Management in Shenzhen

• Regulations of Shenzhen Special Economic Zone on Environmental Protection – enter into effect as of December 31, 1994.

• Rules of the Shenzhen Special Economic Zone on the Implementation of Law of the People’s Republic of China on the Prevention and Control of the Environmental Pollution of Solid Wastes – in effect in June 1, 1997.

• Measures of the Shenzhen Special Economic Zone on the Management of Environmental Protection in the Service Sector – in effect in March 1, 2002.

LegislationsLegislations

Page 14: Waste Management in Shenzhen

• Regulations of the Shenzhen Special Economic Zone on Environmental Protection of Construction Projects– enter into effect as of November 1, 2006.

• Rules of Shenzhen Municipality on Collection and Use of Urban Household Waste Treatment Fee – in effect as of January 1, 2007.

LegislationsLegislations

Page 15: Waste Management in Shenzhen

• Provisional Measures of the Shenzhen Municipality on the Management of Kitchen Wastes – took effect as of October 1, 2007.

• Shenzhen Special Economic Zone Environmental Protection Regulation was enforced on January 1, 2010.

LegislationsLegislations

Page 16: Waste Management in Shenzhen

• Landfill would run out of space within 5 years.

• People awareness of pollution issues:–

protests against incinerators in spring 2009;

doubt if proper operation of incinerator

• Other problem – safe depose of ash left over

Trend of MSWM in Shenzhen

Other ways to reduce daily MSW:

• Recycling

• Reduce use of packaging

• Sort trash temperature in the furnace incinerator to burn clean

Page 17: Waste Management in Shenzhen

population increased

Conclusion

People’s awareness of pollution issues

MSW increased

Landfill resolve

problem?

latest technology in controlling emission

Demand for wte incineration facility increase

Page 18: Waste Management in Shenzhen

• Waste exchange center help reducing waste

• Assist the reuse and recycling business

• Provide opportunities

• Attract people to participate in waste reduction.

Conclusion

Page 19: Waste Management in Shenzhen

• BackgroundBackground

• Related legislations/regulationsRelated legislations/regulations

• Municipal solid waste managementMunicipal solid waste management

ContentsContents

• ConclusionConclusion

Page 20: Waste Management in Shenzhen

Thank YouThank You