Waste Discharge Requirements (WDR)
Waste Discharge Requirements (WDR)
Orange County Sanitation DistrictWDR Awareness Training
Revision September 30, 2005
Orange County Sanitation DistrictWDR Awareness Training
Revision September 30, 2005
What is the WDR?Why was It Created?
What is the WDR?Why was It Created?
Prevent Sanitary SewerOverflows (SSOs)Prevent Sanitary SewerOverflows (SSOs)
Protect Waterways from Sewage into Storm DrainsProtect Waterways from Sewage into Storm Drains
Ocean Water Closures
Ocean Water Closures PostingsPostings AdvisoriesAdvisories
Long-TermPostings
Long-TermPostings
OCSD WDR Service Area471 square miles239 million gallons per day2.4 million population17 cities, 8 special districts
Military Bases
OCSD WDR Service Area471 square miles239 million gallons per day2.4 million population17 cities, 8 special districts
Military Bases
PacificOcean
Outfall Pipe
ReclamationReclamationPlant No. 1Plant No. 1
TreatmentTreatmentPlant No. 2Plant No. 2
NewportNewport Beach Beach
Fountain ValleyFountain Valley
Santa AnaSanta Ana
Buena Buena ParkPark
FullertonFullerton
Tustin - OCSDTustin - OCSD
Garden GroveSanitary DistrictGarden Grove
Sanitary District
La HabraLa HabraBreaBrea
PlacentiaPlacentia
AnaheimAnaheim
OrangeOrange
La PalmaLa Palma
CypressCypress
IRWD &IRWD &
StantonStanton
VillaVillaParkPark
Costa MesaCosta Mesa Sanitary District Sanitary District
HuntingtonBeach
HuntingtonBeach
SealSealBeachBeach
OrangeCountyOrangeCounty
IrvineIrvine
Sunset BeachSanitary DistrictSunset Beach
Sanitary District
Midway CitySanitary District
Midway CitySanitary District
Yorba LindaYorba LindaYLWD &YLWD &
UnincorporatedAreas - OCSD
UnincorporatedAreas - OCSD
Rossmoor/Los AlamitosRossmoor/Los Alamitos Area Sanitary District Area Sanitary District
WDR Will AffectAll DepartmentsWDR Will AffectAll Departments
Update existing procedures & programs
Implement new policies & procedures
Provides integration and focus
Update existing procedures & programs
Implement new policies & procedures
Provides integration and focus
Monthly Steering CommitteeMonthly Steering Committee
OCSD (lead)
Anaheim
Placentia
Orange
Huntington Beach
OCSD (lead)
Anaheim
Placentia
Orange
Huntington Beach
Garden Grove Sanitary District
Costa MesaSanitary District
Garden Grove Sanitary District
Costa MesaSanitary District
Departmental LiaisonsDepartmental Liaisons Regional Assets &
ServicesNick ArhontesPatrick McNelly
Tech ServicesDindo CarrilloJerry Evangelista Becky Brooks (Auditor)
EngineeringJim Burror
HR & TrainingRich Spencer
Regional Assets & ServicesNick ArhontesPatrick McNelly
Tech ServicesDindo CarrilloJerry Evangelista Becky Brooks (Auditor)
EngineeringJim Burror
HR & TrainingRich Spencer
CommunicationsIngrid Hellebrand
Info TechPatrick Miles
Records Mgmt Juanita Skillman
FinanceBob Geggie
LegalPaula YoostOmar Sandoval
CommunicationsIngrid Hellebrand
Info TechPatrick Miles
Records Mgmt Juanita Skillman
FinanceBob Geggie
LegalPaula YoostOmar Sandoval
General ProvisionsGeneral Provisions
Develop a Sewer System Mgmt Plan (SSMP) – update, continuously improve
RWQCB inspections and compliance enforcement
Training for affected jobs
Inform, educate, communicate and keep public updated
Develop a Sewer System Mgmt Plan (SSMP) – update, continuously improve
RWQCB inspections and compliance enforcement
Training for affected jobs
Inform, educate, communicate and keep public updated
WDR OverviewWDR Overview
Capacity Assurance
Engineering
Fats, Oils, andGrease (FOG)
System O&M
Records Mgmt
Capacity Assurance
Engineering
Fats, Oils, andGrease (FOG)
System O&M
Records Mgmt
SSO Response PlanSSO Response Plan
SSO
Contact & NotifyContact & Notify ContainContain ControlControl
Clean UpClean Up Calculate & ReportCalculate & Report
Key DeliverablesKey Deliverables
Completed:
Apr. 26, 2002 – SSO Monitoring and –ongoing– Reporting Program
Sep. 30, 2002 – Plan and Schedule for SSMP
Jan. 1, 2003 – SSO Emergency ResponsePlan
June 15, 2003 – Preventative MaintenanceProgram
Completed:
Apr. 26, 2002 – SSO Monitoring and –ongoing– Reporting Program
Sep. 30, 2002 – Plan and Schedule for SSMP
Jan. 1, 2003 – SSO Emergency ResponsePlan
June 15, 2003 – Preventative MaintenanceProgram
Key Deliverables (cont’d)Key Deliverables (cont’d)
Completed:
July 30, 2004 – Legal Authority to control I/I, sewer design,
installation and testing, FOG ordinance
Dec. 30, 2004 – FOG Disposal Alternatives– Grease Control Program
Completed:
July 30, 2004 – Legal Authority to control I/I, sewer design,
installation and testing, FOG ordinance
Dec. 30, 2004 – FOG Disposal Alternatives– Grease Control Program
Key Deliverables (cont’d)Key Deliverables (cont’d)
Completed:
July 30, 2005 – Capacity Evaluation
Sep. 30, 2005 – Sewer Rehabilitation Plan– Final SSMP
Completed:
July 30, 2005 – Capacity Evaluation
Sep. 30, 2005 – Sewer Rehabilitation Plan– Final SSMP
WDRWDRProgram of continuous audit and improvement
Keep public informed
“We do it right”
Program of continuous audit and improvement
Keep public informed
“We do it right”
Patrick McNelly(714) 593-7163Division: Regional Assets and ServicesE-mail: [email protected]
Patrick McNelly(714) 593-7163Division: Regional Assets and ServicesE-mail: [email protected]
Orange County Sanitation Districtwww.ocsd.comOrange County Sanitation Districtwww.ocsd.com
Questions?Questions?