Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
-
Upload
monserrat-pruiett -
Category
Documents
-
view
218 -
download
0
Transcript of Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
History of Washington Street
• Site of the Elevated Orange Line until 1987
• Viaduct removed in 1987
• Roadway reconstructed
• Majority of land has been redeveloped
Design Goals
• Provide green space to neighborhood
• Traffic calming
• Bike connectivity for destinations and through traffic
• Safety for all road users through separation
• Provide adequate parking
Cars/Pedestrians/Bikes at
Different Roadway
Elevations
Ruys de Beerenbrouckstraat, Delft, The Netherlands
Typical Proposed Cross Section
6’ Sidewalk
5’ Cycle Track
11’ Travel Lane
11’ Travel Lane
6’ Green Space
5’ Cycle Track
6’ Sidewalk
2’ 8’ Parking in Tree Lane
Buffer
Inline Bus Stops - West side
Cycle track crossing behind bus stop
6’ Sidewalk
11’ Travel Lane
Plus 2’ Buffer
11’ Travel Lane
6’Greenspace
6’ Sidewalk
6’ Bus Platform
5’ Cycle Track
5’ Cycle Track
Inline Bus Stops - East side
6’ Sidewalk
11’ Travel Lane Plus Buffer
11’ Travel Lane Plus Buffer
6’ Sidewalk
6’ Bus
Platform
5’ Cycle Track
5’ Cycle Track
Cycle track crossing behind bus stop
2’
Buffer
6’ Sidewalk
11’ Travel Lane Plus Buffer
11’ Travel Lane Plus Buffer
6’ Sidewalk
6’ Bus
Platform
5’ Cycle Track
5’ Cycle Track
Connectivity with
Shelburne Community
Center
Two-way cycle track to provide safe access
7’ Sidewalk
8’ Two Way
Cycle Track
11’ Travel Lane
5’ Cycle Track
11’ Travel Lane
9’ Green Space
7’ Sidewalk
2’
Buffer