Washington Phase 1 Construction Restart – Contractor Information from a Construction Management Representative Chuck Green, PE, Senior Project Manager May 1, 2020

Transcript of Washington Phase 1 Construction Restart Contractor Information … · Architecture Civil...

Page 1: Washington Phase 1 Construction Restart Contractor Information … · Architecture Civil Engineering & Site Design Landscape Architecture PM/CM & Owner Representation Planning & Entitlements

Washington Phase 1 Construction Restart –Contractor Information from a Construction

Management Representative

Chuck Green, PE, Senior Project Manager

May 1, 2020

Page 2: Washington Phase 1 Construction Restart Contractor Information … · Architecture Civil Engineering & Site Design Landscape Architecture PM/CM & Owner Representation Planning & Entitlements

What We Do

Architecture Civil Engineering& Site Design

Landscape Architecture

PM/CM & Owner Representation

Planning &Entitlements

Survey & Mapping Transportation Urban Design &Site Master Plans

Water & Natural Resources

Federal International

Page 3: Washington Phase 1 Construction Restart Contractor Information … · Architecture Civil Engineering & Site Design Landscape Architecture PM/CM & Owner Representation Planning & Entitlements

Phase 1 Contractor Requirements Highlights

• 30 Requirement Items- Proclamation 20-25

o COVID-19 Site Health & Safety Plan

o COVID-19 Training Before Restarting

o PPE to include eye coverings, masks

• Social Distancing: 6’ Minimum Required

o Instances where not possible, hazard assessment &

control plan plus proper PPE required

• Post COVID Safety & Health Plan on-site

• Sanitation/ Hand Washing Stations On-Site & Stocked

• Workers exhibiting symptoms must stay home or be sent

home

• Currently operating projects (essential) must be in compliance

by May 1

• Enforcement by Labor and Industries

o Except Items 28 (14-day quarantine) and 30 (daily

attendance log for at least four weeks), submitted

through Governor’s reporting site.

Page 4: Washington Phase 1 Construction Restart Contractor Information … · Architecture Civil Engineering & Site Design Landscape Architecture PM/CM & Owner Representation Planning & Entitlements

Phase 1 Restart

“Heads Up” Items

• COVID-19 Rapid Testing Availableo Vancouver Clinic: Columbia Tech Center, Ridgefield

o Check SWCA website for others as they come on-line

• Include protocols as part of COVID H&S Plans

• Communicating on Site

o Construction sites can be noisy

o Hand signals, cell phones to vibrate, etc. to signal need

to talk

o Maintain minimum 6’ separation

o Don’t share cell phones

• Equipment movement: don’t forget about safety

• Transporting materials to and around site

o Be aware that delivery/truck drivers may not be

wearing masks or other COVID-required PPE

o Establish procedures if crews <6’ apart

o Training & practice likely needed

• Subcontractors

o Generals responsible for training and ensuring subs

have/adhere to COVID H&S Plan

o Strong scheduling and shift management

o Need to communicate when inspections ordered

• Don’t Forget about dust control

Page 5: Washington Phase 1 Construction Restart Contractor Information … · Architecture Civil Engineering & Site Design Landscape Architecture PM/CM & Owner Representation Planning & Entitlements

Phase 1 Restart

More “Heads Up” Items

• Consider bottled water instead of water

coolers

• Make sure portable toilet suppliers restock

hand sanitizer when they service the units

• Arrange on-site portable wash stations

with plenty of soap & water (hand washing

preferred over hand sanitizer)

• Health services continue to request

priority for N-95 masks; consider using

fabric masks (many local suppliers)

• Organized, daily site attendance roster

& daily briefings

• Daily sanitizing of work surfaces

Page 6: Washington Phase 1 Construction Restart Contractor Information … · Architecture Civil Engineering & Site Design Landscape Architecture PM/CM & Owner Representation Planning & Entitlements

Site Inspections: Special Phase 1 Requirements in Place

6

Clark County

Also, inspectors:

• Require a 24-foot social distance separation; and

new homes/structures must be vacated during

inspection;

• Doing many inspections by Sherlook video

inspections;

• Will not enter occupied homes – video inspection;

• All “push-pull” and repair mechanical and plumbing

inspections must be done by the installer via video;

• Will only communicate over the phone;

• No longer be doing same-day concrete pour

inspections;• Have authority to leave or cancel the inspection if

they feel unsafe.

Page 7: Washington Phase 1 Construction Restart Contractor Information … · Architecture Civil Engineering & Site Design Landscape Architecture PM/CM & Owner Representation Planning & Entitlements

Site Inspections: Special Phase 1 Requirements in Place

7

City of Vancouver

(Note: current as of 4/30/20)

Page 8: Washington Phase 1 Construction Restart Contractor Information … · Architecture Civil Engineering & Site Design Landscape Architecture PM/CM & Owner Representation Planning & Entitlements

Construction Layout – COVID-19 Safety Planning Considerations

GENERALIZED EXAMPLE

Mask,

goggles &

gloves

station

Site Super/

COVID

compliance

Monitor

Health

check

station

Portable toilet w/

hand sanitizer,

wash & gloves

station

Worker

parking –

delineated for

separation

Page 9: Washington Phase 1 Construction Restart Contractor Information … · Architecture Civil Engineering & Site Design Landscape Architecture PM/CM & Owner Representation Planning & Entitlements

COVID-19 Worker Social Distancing – Think in Three Dimensions Inside and Out

GENERALIZED EXAMPLE

Cloth/ Fabric/ Health

Grade Mask (cover

both nose and mouth)

Eye covering–

discourages eye

scratching

Plus gloves, other

L&I Required PPE

Transporting materials: 6’

separation not always possible–

make sure all COVID- and site-

required PPE are properly worn,

limit time, separate handling crews

Check Information Sources

• Federal OHSA

• WA State L&I

• WA State Business Response

Center

• Jurisdiction COVID-19 Page

• Jurisdiction Building &

Development Inspection

Pages

Page 10: Washington Phase 1 Construction Restart Contractor Information … · Architecture Civil Engineering & Site Design Landscape Architecture PM/CM & Owner Representation Planning & Entitlements

I’ll Work to Get You Answers

Chuck Green, PE