Washington Energy Star and Built Green Homes Measure
UpdateNew Measure Proposal
August 12th, 2014
2
Measure background
• Measure Name: Energy Star Homes and WA Built Green
Homes• Measure Type: UES• Measure Category: Proven• Measure Sector: Residential• Sunset Date: August, 2017 • Reason for Update: Change in State Code and
Energy Star Standard
3
Staff Highlighted Areas
• Cost of infiltration reduction. Should these differ from infiltration reduction on existing homes?• Assumption $ 250 / 0.1 ACHn
4
Specs Development Background• WA 2012 residential code allows a builder to choose one of
many paths• RTF staff worked with WA department of Commerce, NW Energy
Star and Ecotope Consulting to define typical code compliance paths
• RTF Subcommittee formed to help draft Energy Star and Built Green home specs for WA• Built Green 3 or 4 star will use same specs as Energy Star
• These specs provide a Reference Home that may be built to prescriptively or used as an energy use modeling target. Builders to use NW REMRate as a Energy Star compliance tool for RTF approved trade-offs.
5
Measure Summary: Gas Heated Homes gfac_3a_2a_5a
(40%)gfac_4_5a (40%) gfac_5b (20%)
Above Grade WallsR 21/ R 21+5 for
hz3R 21/ R 21+5 for
hz3R 21/ R 21+5
for hz3R 21 adv. / R 21+5 for hz3
Above Grade Floors R 30 R 30 R 30 R-38
CeilingsR 49 R 49 R 49
R-49 + 21 heel (R 49 adv.)
Glazing U Value 0.3 0.3 0.3 0.28
Infiltration 4 ACH 50 5 ACH 50 PA 5 ACH 50 PA 3 ACH
Heating System 95% AFUE 80% AFUE78 % AFUE
(Federeal Std)95% AFUE
Ventilation Fan 0.35 W/ CFM0.03942 * CFA + 29.565 (Nbr + 1)
0.03942 * CFA + 29.565 (Nbr +
1)0.35 W/ CFM
Water Heater 0.62 EF 0.62 EF 0.82 EF 0.62 EF
Water Fixtures Low Flow Low Flow NA Low Flow
Duct Location - Ducts Inside - Ducts Inside
Lighting 75% efficient 75% efficient 75% efficient 90% efficient
Code OptionEnergy StarBuilt Green
6
Measure Summary: Electric Homes
Above Grade WallsR 21/ R 21+5 for z6
R 21 adv. / R 21+5 for hz3
Above Grade Floors R 30 R-38
Ceilings R 49R-49 + 21 heel (R
49 adv.)
Glazing U Value 0.3 U Value 0.28
Infiltration 5 ACH 50 PA 3 ACH
Heating System 8.5 HSPF 9 HSPF
Ventilation Fan0.03942 * CFA + 29.565 (Nbr + 1)
0.35 W/ CFM, High Efficacy
Water Heater 0.93 EF 0.93 EF
Water Fixtures Low Flow Low Flow
Duct Location - Ducts Inside
Lighting 75% efficient 90% efficient
Code Option: hp85_3b_5a
Energy StarBuilt Green
7
Energy Savings Calculations• Simulations conducted in SEEM 96
• RTF approved new construction heating calibration applied
• Staff proposed cooling calibration applied
8
Incremental Cost
• Incremental cost derived from the following sources:• Standard Information Workbook• 6th Power Plan Appendix• Existing RTF workbooks• Energy Trust Resource Assessment
• Cost of infiltration reduction. Should these differ from infiltration reduction on existing homes?• Assumption $ 250 / 0.1 ACHn
9
Estimated Useful Life
• EUL of new construction measure is set at 45 years
• Measures with EUL < 45 years have recurring cost at EUL
• Source for EUL:• Existing measure workbooks• DEER• EUL consistent with new construction measures in other
states
10
Energy Savings Comparison
Note: Existing kWh are an average of all Existing Energy Star New Construction measures. There were three different paths to Energy Star: Envelope, Equipment and Ducts Inside path.
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
HZ1
_CZ1
HZ1
_CZ2
HZ1
_CZ3
HZ2
_CZ1
HZ2
_CZ2
HZ2
_CZ3
HZ3
_CZ1
HZ3
_CZ2
HZ3
_CZ3
HZ1
_CZ1
HZ1
_CZ2
HZ1
_CZ3
HZ2
_CZ1
HZ2
_CZ2
HZ2
_CZ3
HZ3
_CZ1
HZ3
_CZ2
HZ3
_CZ3
Gas Furnace With CAC Heat Pump
Proposed kWh Existing kWh
11
Incremental Cost Comparison
Note: Existing Cost are an average of all Existing Energy Star New Construction measures. There were three different paths to Energy Star: Envelope, Equipment and Ducts Inside path.
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000H
Z1_C
Z1
HZ1
_CZ2
HZ1
_CZ3
HZ2
_CZ1
HZ2
_CZ2
HZ2
_CZ3
HZ3
_CZ1
HZ3
_CZ2
HZ3
_CZ3
HZ1
_CZ1
HZ1
_CZ2
HZ1
_CZ3
HZ2
_CZ1
HZ2
_CZ2
HZ2
_CZ3
HZ3
_CZ1
HZ3
_CZ2
HZ3
_CZ3
Gas Furnace With CAC Heat Pump
Proposed Cost ($) Existing Cost ($)
12
Cost Effectiveness Comparison
Note: Existing TRC are an average of all Existing Energy Star New Construction measures. There were three different paths to Energy Star: Envelope, Equipment and Ducts Inside path.
-
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
HZ1
_CZ1
HZ1
_CZ2
HZ1
_CZ3
HZ2
_CZ1
HZ2
_CZ2
HZ2
_CZ3
HZ3
_CZ1
HZ3
_CZ2
HZ3
_CZ3
HZ1
_CZ1
HZ1
_CZ2
HZ1
_CZ3
HZ2
_CZ1
HZ2
_CZ2
HZ2
_CZ3
HZ3
_CZ1
HZ3
_CZ2
HZ3
_CZ3
Gas Furnace With CAC Heat Pump
Proposed TRC Existing TRC
13
RTF Proposed Motion:
“I _________ move that the RTF:
• Adopt the WA Energy Star and Built Green measures and set the sunset date to August 2017