Wartsila SP Ppt 2012 Sailing on LNG.

download Wartsila SP Ppt 2012 Sailing on LNG.

of 28

Transcript of Wartsila SP Ppt 2012 Sailing on LNG.

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    1/28

    Sailing on LNG

    From Concept to Reality

    Gas Fuelled Ships Conference 2012 Bergen1 Wrtsil

    Terje NordtunWrtsil

    Gas Fuelled Ships Conference 2012

    Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    2/28

    Complete marine offering

    2

    Power drivesPower

    distribution

    Communicationand control

    Automation

    Propulsion

    Seals &bearings

    Engines

    Serviceagreements

    Ship Design

    Flow & GasSolutions

    EnvironmentalSolutions

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    3/28

    DUAL-

    FUEL (DF)

    GAS-DIESEL

    (GD)

    Gas burning technologies

    SPARK-IGNITION

    GAS (SG)

    1987 1992 1995

    3 Wrtsil Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    4/28

    * **** ***

    **

    ****

    ** **

    ***

    **

    Intake ofair and gas

    Compression ofair and gas

    Ignition bypilot diesel fuel

    Otto principle

    Low-pressure gas admission

    Pilot diesel injection

    Gas mode: Ex. In. Ex. In.Ex. In.

    Intake ofair

    Compression ofair

    Injection ofdiesel fuel

    Diesel principle

    Diesel injection

    Diesel mode:Ex. In. Ex. In.Ex. In.

    Dual-fuel engine - operating principle

    4 Wrtsil Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    5/28

    Onboard Installation

    Gas Fuelled Ships Conference 2012 Bergen5 Wrtsil

    GVU

    GVU

    LNGPac

    GVU

    DF engine

    LNG tank

    4-STROKE PURE GAS

    Pure gas engine

    4-STROKE DUAL-FUEL

    Gas processing isabout 25% of gasfuel system cost

    Gas processing isabout 25% of gasfuel system cost

    How do you c r eat e yo ur r edundanc y?

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    6/28

    Dual-Fuel The Preferred Ship Solution

    Redundancy, backup without interruptions in power or speed.

    Able to operate on liquid fuel outside ECA-areas Simple system, no PTI/take me home or double gas system needed.

    DP class fulfilled with single tank/gas supply system

    Operational flexibility - Vessel re-routing possible, gas supply not alimitation

    6 Wrtsil Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    7/28

    Bit Viking Conversion

    7 Wrtsil Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    8/28

    Background: main engine conversion

    bef or e2 x W6L46B

    5850 kW each

    WRTSIL 8L20 1200 kW

    CPP

    CPP

    PTO 1500 kW

    PTO 1500 kW

    WRTSIL 8L20 1200 kW

    after2 x W6L50DF

    5700 kW each

    8 Wrtsil Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    9/28

    LNG system in Principal

    LNG filling line

    LNG tank

    Pressure build-upcircuit

    Water /glycol

    Evaporator

    Stop and Master valve

    Gas Valve Unit (GVU)

    Tank room/ Cold Box

    9 Wrtsil Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    10/28

    LNGPac Transportation

    10 Wrtsil

    Road and barge transportation

    Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    11/28

    LNGPac onboard installation

    11 Wrtsil Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    12/28

    LNGPac onboard installation

    LNGPacLNGPac

    Cold-boxCold-box

    Bunkering stationsBunkering stations

    Vent mastsVent masts

    12 Wrtsil Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    13/28

    Engine conversion

    13 Wrtsil

    Double-walled

    gas manifold

    Exhaust gas

    manifold

    Gas-admission

    valves

    Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    14/28

    Gas Valve Unit (GVU) in enclosure

    14 Wrtsil Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    15/28

    20.10.2011 First LNG Bunkering

    Gas Fuelled Ships Conference 2012 Bergen15 Wrtsil

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    16/28

    DF mechanical propulsion - Operational experience

    Date 1.12.2011

    Time 22:15

    Vessel speed 14,3 knotsLatitude N 57 58

    Longitude E 6 4'

    Heading 100

    Wind speed 10,5 m/s

    Wind direction 290

    Wave height (avg.) 4-5 mDraught 8 m

    NORWAY

    Waves direction

    290

    16 Wrtsil Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    17/28

    Engine load/speed variations in 5m waves

    17 Wrtsil

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    1000

    30

    40

    50

    60

    70

    80

    90

    100

    Engineload[%]

    Engineload

    Engine

    speed

    Enginespee

    d[rpm]

    500 100 150 200

    Time [s]

    Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    18/28

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    1000

    30

    40

    50

    60

    70

    80

    90

    100

    Engineload[%]

    Engineload

    Engine

    speed

    Enginespee

    d[rpm]

    500 100 150 200

    Time [s]

    Engine load/speed variations in 5m waves

    18 Wrtsil

    83%83%85%85%

    37%37%

    514rpm

    514rpm

    486rpm

    486rpm

    8 s8 s

    Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    19/28

    DF mechanical propulsion

    The vessel is able to run constantly andcontinuously in gas mode

    LNG bunkering every second week or less

    Constant load cycles due to heavy sea state

    sailing in Norwegian waters.

    Engine performance has never been alimitation for vessel operations

    Load variations between 37% and 83%

    MCR in 8 seconds

    Average load 65% MCR with 79% PropellerPitch

    Highest wind speed encountered 25 m/s

    19 Wrtsil

    Operational Experience

    Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    20/28

    Viking Line 2800Pax Cruise Ferry

    Gas-related equipment

    4 x Wrtsil 8L50DF (DE)GVU in enclosureLNGPac200 : 2 x 200 m3Bunkering systemSafety systemsCold recovery for HVAC

    Gas-related equipment

    4 x Wrtsil 8L50DF (DE)GVU in enclosureLNGPac200 : 2 x 200 m3Bunkering systemSafety systemsCold recovery for HVAC

    Gas Fuelled Ships Conference 2012 Bergen20 Wrtsil

    Non-gas-related equipment

    2 x FPP (Stainless Steel)Shaft linesSeals & BearingsBow ThrustersStern ThrusterCompact Silencer System (CSS)

    Non-gas-related equipment

    2 x FPP (Stainless Steel)Shaft linesSeals & BearingsBow ThrustersStern ThrusterCompact Silencer System (CSS)

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    21/28

    Dual-Fuel update Combi International

    Gas Fuelled Ships Conference 2012 Bergen21 Wrtsil

    110 meters Inland waterway cargo vessel

    First reference for 20DF Mechanical (2x6L20DF)

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    22/28

    Dual-Fuel update Guide ship

    Gas Fuelled Ships Conference 2012 Bergen22 Wrtsil

    Incheon Port Authority South Korea

    Main generatingset 9L20DF Dual-Fuel engine

    Gas Valve Unit(GVU) in enclosure

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    23/28

    First mechanical drive LNG Carrier

    Project details

    15600 m LNG carrier

    1+1+1 vessel

    Scope of supply (per vessel)

    1* Wrtsil 8L50DF

    2 * Wrtsil 6L20DF

    1 * CPP 4E1415

    1 * TT FT175-H

    Project schedule

    Contract signature: J une 2011

    Vessel delivery: October 2012

    Yard: Meyer Werft

    Owner: Anthony VederRederijzakenBV

    Gas Fuelled Ships Conference 2012 Bergen23 Wrtsil

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    24/28

    24 Wrtsil

    Wrtsi l LNG PSV

    Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    25/28

    Stril Pioneer - 2003

    Normand Arctic- 2012

    Viking Energy - 2003

    Viking Queen - 2008

    Viking Lady - 2009

    Skandi Gamma - 2011

    LNG DF Powered OSVs in Operation

    Viking Prince - 2012

    25 Wrtsil Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    26/28

    LNG OSVs on Order with Wrtsil DF

    4 x PSVs for Harvey Gulf

    1 x PSV for Eidesvik Offshore

    1 x PSV for REM Offshore

    26 Wrtsil

    1 x PSV for Remy Shipping

    Gas Fuelled Ships Conference 2012 Bergen

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    27/28

    Dual-Fuel applications - References

    4 segments ~180 installations > 6000000 running hours

    Power

    Plants

    DF Power Plant

    51 installations 186 engines Online since1997

    Merchant

    LNGC

    110 vessels437 engines

    Conversion1 Chem. Tanker2 engines conv.Complete gastrain

    Complete design

    Offshore

    PSVs/FPSOs

    20 vessels93 engines

    Online from 1994

    New orders:

    Harvey Gulf; thefirst 4 LNG-PSVto be operated inthe Gulf of

    Mexico!

    Cruise

    and Ferry

    LNG ferries

    1+1 vessels4 engines pervessels

    Complete gastrain

    2800 passengers

    In service in 2013

    Navy

    Coastal Patrol

    New in March

    27 Wrtsil

    G G

  • 7/29/2019 Wartsila SP Ppt 2012 Sailing on LNG.

    28/28

    Go For Gas!

    www.wartsila.comwww.wartsila.com