    FUEL GAS HANDLING SYSTEMAND BOG RELIQUEFACTION

    FOR LNG CARRIEREIRIK MELAAEN

    WRTSIL OIL & GAS SYSTEMS AS

    1 Wrtsil 12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    2/26

    Wrtsil Oil & Gas Systems

    Agenda: BOG Reliquefaction plant

    Low Pressure Gas to Engine(e.g. DFDE, 2-Stroke DFE) and BOG

    Reliquefaction System

    High Pressure Gas to Engine(Gas Diesel Engine) and BOG

    Reliquefaction System

    Future concepts

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen2 Wr ts il

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    3/26

    Our Expert ise in the Gas Value Chain

    Exploration &development

    Production

    FPSOFlare recovery

    Oil separation

    LNG carrier

    LNG liquefaction& terminal

    Distribution & transportPower generation

    Oil tankerwith VOC

    Exploration &

    Drilling

    Production &

    liquefaction

    Transport &

    storage

    Receiving

    terminals &regasification

    Distribution &

    transport to theusers

    LNG fuel gas

    systems for OSVs

    Gensets

    LNG fuel gas systems

    LPG, LEG & LNG cargo

    handling

    On- & Offshore small

    scale liquefaction

    Antiflaring/VOC

    Oil separation

    Gas FPSO

    Jetty & Floating

    regasification

    Bunkering & barges

    Receiving terminals

    Gas/LNG

    distribution/logistics

    Feed gas to Power

    plants

    LNG bunkering

    & barges

    LNG fuelled

    vessels

    Regasification(FSRU/JRU)

    Small scaleliquefaction plants

    LNG/LBG

    LNG receivingterminal

    Re-liquefaction ofBoil Off Gas,

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen3 Wr ts il

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    4/26

    First free-standing small scale

    LNG plant in Northern Europe

    delivered March 2003.

    Hamworthy EPCIC contract

    with GASNOR.

    Technology feasibility and

    robustness thoroughly and

    successfully demonstrated.

    35 LNG BOG

    Reliquefaction systems

    Kollsnes II LNG

    2 x capacity of

    existing Linde plant

    (Kollsnes I).

    Hamworthy EPCIC

    contract with

    GASNOR.

    Full production

    August 2007.

    Al Gatt ara (Hyund ai) BOG Reliquefactio nSystem (58,000 tpy )

    Kollsnes II (Gasnor) LNG Plant(84,000 tpy )

    Snurrevarden LNG Plant(22,000 tpy )

    LNG Technology Development

    Wrtsil (Hamworthy) LNG process history

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen4 Wr ts il

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    5/26

    BOG RELIQUEFACTION PLANTBOG RELIQUEFACTION PLANT

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    6/26

    BOG to Engines or Returned to Tank

    Different solutions available for LNG carrier propulsion:

    1. Use BOG & LNG as fuel e.g steam turbines, dual-fuel diesel electric, dual-fuel engines

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen6 Wr ts il

    Pattern for ships using BOG & LNG as fuel for propulsion

    Laden BallastBallast

    Maximum

    (Laden

    voyage)

    Minimum

    (Ballast

    voyage)

    LNG level

    in tanks

    Minimum heel required for cool down of tanks

    Fuel used during roundtrip

    (Natural BOG & forced)

    Additional LNG delivered

    with full BOG

    Reliquefaction System

    2. BOG reliquefaction, liquefy and sell excessive BOG or all LNG loaded onboard

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    7/26

    Boil-off gas from cargo tanks vs. Fuelgas required by the engine

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen7 Wr ts il

    Speed of the Vessel (knots)

    Boil-offGas(kg/hr)

    Available BOG

    BO

    Gconsumed

    intheengine

    Excess

    BOG

    ForcedLNG

    Balance between

    Vessel speed andBOG flow

    Av

    ailableBOG

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    8/26

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    9/26

    Mark III layout/QG

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen9 Wr ts il

    Cold box

    Typical dimensions: 30 x 22,5 x 7 m (L x W x H)Equipment weights: 240 ton

    LNG pumpskid N2

    reserviorN2 supplyskid

    BOGcompressorsPre-heater

    N2companders

    N2companders

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    10/26

    ENGINES REQUIRING LOWENGINES REQUIRING LOW

    PRESSURE GASPRESSURE GAS(DFDE, 2(DFDE, 2--STROKE DFE)STROKE DFE)

    AND BOG RELIQUEFACTIONAND BOG RELIQUEFACTIONPLANTPLANT

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    11/26

    Boil-offgas

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen11 Wrtsil

    LP-compressor

    BOG Reliquefaction System (LNGRS)Low-Pressure Fuel Gas Supply System (LP FSSS)

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    12/26

    Wrtsil Oil & Gas Systems AS

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen12 Wrtsil

    Dual-fuel propulsion system

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    13/26

    ENGINES REQUIRING HIGHENGINES REQUIRING HIGH

    PRESSURE GASPRESSURE GAS((GasGas DieselDiesel EngineEngine))

    AND BOG RELIQUEFACTIONAND BOG RELIQUEFACTIONSYSTEMSYSTEM

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    14/26

    BOG Reliquefaction System (LNGRS)High-Pressure Fuel Gas Supply System (HP FGSS)

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen14 Wrts il

    HP-pump and Optimizer

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    15/26

    PFD Vaporization System

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen15 Wrts il

    TO GAS ENGINE

    HP PUMP

    BRINE PUMP

    LNG VAPORIZER

    STEAM/HOT WATERHEATER

    HIGH PRESSURE GASOR LNG FROM CARGO TANKS

    CONDENSATE FROM BOG RS

    Temprature: 45 10C

    Pressure: Max 300 bar

    Temprature: -160C

    Pressure: 3-5 bar

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    16/26

    HP LNGpump (2)Brineheater (1)

    Brinecirculationpump (2)

    Pulsedamper (1)

    Suctiondrum (1)

    LNG vaporizer(1)

    Updated Arrangement - Gas Supply System

    Typical dimensions: 7 x 3 x 2 m (L x W x H)Equipment weights: Ca 25 ton

    HP LNGpump (2)

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen16 Wrtsil

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    17/26

    BOG Reliquefaction System (LNGRS)High-Pressure Fuel Gas Supply System (HP FGSS)

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen17 Wrts il

    HP-compressor and HP-pump

    LNGRS for excessive BOG?

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    18/26

    Wrtsil Oil & Gas Systems AS

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen18 Wrtsil

    Layout Burckhardt compressors + BOG Reliq plant

    Typical dimensions:30 x 22,5 x 7 m (L x W x H)

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    19/26

    FUTURE CONCEPTSFUTURE CONCEPTSNEW MRNEW MR

    TWO REFERENCES:TWO REFERENCES:NEW MR DEMONSTRATION PLANTNEW MR DEMONSTRATION PLANT 2,5 TON/DAY2,5 TON/DAY

    NEWMR EGE PLANTNEWMR EGE PLANT 11 TON/DAY11 TON/DAY

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    20/26

    Demonstration plant 2,5 ton/hr

    12 November 201320 Wrtsil Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    21/26

    New MR Process Overview

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen21 Wrtsil

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    22/26

    Pictures EGE - Project

    12 November 201322 Wrtsil Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    23/26

    Flow Sheet of Liquefaction Plant

    12 November 201323 Wrts il

    H2O & CO2removal

    LNG tank

    Gas

    pre-

    cooling

    Cold Box

    MR

    refrigeration

    unit

    Pre Cooling

    system

    Main biomethane flow

    Mixed refrigerant (MR) flow

    CO2 from stripper column

    Glycol cooling from pre-cooling unit

    Return gas truck loading

    Export LNG pump

    Gas return

    from trucks

    Raw gasinlet

    To flare gas

    systemExpansion

    Flare gas

    H2O

    &CO2

    Pretreatment Liquefaction process

    Storagesystem

    LBG Truck

    Filling station

    Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    24/26

    BOG Reliquefaction System (LNGRS)

    NewMR LP-Pressure Fuel Gas Supply System (LP FGSS)

    Compressor and Forcing Vaporizer

    LNGRS for excessive BOG

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen24 Wrts il

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    25/26

    Summary Wrtsil NewMR technology

    BOG reliquefaction systemon LNG vessels in the fu ture

    NewMR

    Why?

    Demonstration plant proven

    to be successful

    Robust

    Low OPEX

    Load variations

    Robust main rotating

    machinery with high

    efficiency

    Designed for unmanned

    operation

    Shorter delivery time

    Simple energy supply,

    only electric power needed

    Easy and quick start up and

    shut down of all systems

    Standardisation of

    capacities: 1,5 ton/hr, 2,5

    ton/hr etc.

    Supplied as modules

    Refrigerant process withphase changes which reduce

    the size of equipment and

    piping

    Simplified maintenance

    Reduced CAPEX compared

    to Nitrogen loop

    Two references

    12 November 201325 Wrtsil Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

  • 8/10/2019 Wartsila o e Ppt Df 2 Stroke Gas Handling

    26/26

    EIRIK MELAAENEIRIK MELAAENBusiness DevelopmentBusiness Development ManagerManager

    Tel:Tel: +47 66 10 95 66+47 66 10 95 66

    Mobile: +47 959 67 377Mobile: +47 959 67 377Fax:Fax: +47 815 48 510+47 815 48 510

    EE--mail:mail: [email protected]@hamworthy.comWeb:Web: http://www.hamworthy.comhttp://www.hamworthy.com

    Thank you for your attention!