WARNING WORK COMPLETED / FIELD BOOK€¦ · hv cable trench lv cable trench install 40mm pvc...

7
908442 135159 135160 34259 3 702 701 700 699 698 697 696 695 694 693 744 756 743 745 746 737 728 727 738 739 726 725 741 742 720 721 722 723 724 689 690 691 692 688 687 686 685 684 135093 135090 ROAD TWENTYSIX ROAD TWENTYFIVE ROAD 794 RESERVE 1 795 RESIDUE FUT. SUBDIVISION URS 15911 789 RESERVE 8952 PECKS 2 17 STAPYLTON ST. 313 314 NORTH RICHMOND ZONE SUBSTATION 33KV TRANSMISSION EASEMENT 33KV TRANSMISSION EASEMENT 415 691 794 RESERVE 47 382 383 384 309 308 307 306 305 304 303 302 301 50 49 48 47 46 45 44 43 1 151 152 14 13 12 11 10 SLCP: 7384 IN SUB 8952 10 1 2 3 4 5 2 6 3 4 310 5 1 RESERVE 1 RESERVE 311 312 69 689 % % % & 792 RESIDUE FUT. SUBDIVISION & ONE 740 TOWNSEND RD ROAD PHILLIP DRIVE 47105 47106 135092 135094 908375 135095 45796 45795 908374 45799 135091 45798 908440 45797 908373 908439 45794 908372 47110 908441 793 RESIDUE FUT. SUBDIVISION URS 19510 148618 'S'149617 149616 149658 149657 'S'149656 149655 149654 149659 'S'149661 149682 149653 149620 149619 'S'149685 'S'149660 149660A 149662 149626 149656A 938356 938351 938357 938358 938350 938364 938349 938432 938431 938399 938398 938397 938407 938406 938402 938400 938401 938348 938354 938355 938353 938352 938404 938405 938403 938429 # # # # * # # # 791 RESIDUE FUT. SUBDIVISION URS 20169 791 SIDUE BDIVISION S 20169 SUBSTATIONS UNDERGROUND OVERHEAD GENERAL REFERENCE DRAWING'S ORIGINAL LOCAL GOV AREA CH'D HV OP DIAGRAM UBD/PENGUIN REF HV SWITCHING AM PROJ. No. CAP / SAMP No. WORK ORDERS GIS MAP No DRAWN DATE DESIGN DO NOT SCALE METRES DIMENSIONS SCALE IN SHEET No OF SHEETS A1 C THIS DRAWING AND THE COPYRIGHT THEREIN IS THE PROPERTY OF ENDEAVOUR ENERGY AND MAY NOT BE COPIED, REPRODUCED, DISTRIBUTED, LOANED OR USED WITHOUT THE WRITTEN CONSENT OF ENDEAVOUR ENERGY EPD REFERENCE No. ABN 69 002 331 142 TEL:(02) 4731-8333 FAX (02) 4731-1594 P.O. BOX 1872, PENRITH BC, 2751 ELECTRICAL RETICULATION CONSULTANTS EMAIL: [email protected] A AMENDMENTS ISSUE ORIGINAL 5 6 7 8 9 10 11 12 H G F E D C 8 7 10 9 12 11 H G F E D C B A 6 5 2 4 3 1 B 4 3 2 1 EPD 1.6 06.02.18 505307 A 1 7 B.H. E.C. B.H. 1:1000 URS 18621 MAP 63 REF.G13 6482.94 NORTH RICHMOND:J4 HAWKESBURY 505306 DUCT, EASEMENT & TRENCH REQ'S 10/233/ER11NA Cadastre: Land and Property Information 2016 INSPECTED BY ..................................................... WORKS COMPLETED .......................................... WORK COMPLETED / FIELD BOOK ASSET RECORDING I ................................................................................ OF .......................................................................... CONTACT No .......................................................... SIGNATURE .............................. DATE ................ SIGNATURE .............................. DATE ................ HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT ON THIS DRAWING HAVE BEEN RECORDED AS PER ENDEAVOUR ENERGY STANDARD SAD 0004. CONSTRUCTED BY ............................................... SIGNATURE .............................. DATE ................ 0 10 20 30 40 50M WARNING LIVE ENDEAVOUR ENERGY CABLES AND OTHER SERVICES EXIST IN THIS AREA. PLEASE CONTACT - 'DIAL BEFORE YOU DIG' ON TEL:-1100 FOR SEARCH INFORMATION A MINIMUM TWO DAYS PRIOR TO EXCAVATION ALL WORKS TO BE CONSTRUCTED ARE TO BE COMPLETED IN ACCORDANCE WITH ENDEAVOUR ENERGY'S GENERIC ENVIRONMENTAL PLAN - EMS 0001. ALL SL. COLUMNS ARE TO BE INSTALLED 350mm FROM THE FRONT PROPERTY BOUNDARIES UNLESS SHOWN OTHERWISE. AMENDMENT..................................................................... DATE APPROVED : .......................................................... EXAMINER'S SIGNATURE : ............................................. THIS CERTIFICATION IS ISSUED SUBJECT TO ENDEAVOUR ENERGY'S STANDARD CERT. TERMS. PRINT NAME : ................................................................... BRIAN JUDE DESIGN COMPLIANCE AND INDEMNITY This design complies with the Endeavour Energy's relevant standards as current at this time and as listed on the Endeavour Energy Accredited Service Provider's Internet site. These standards include, but are not limited to: ESTATE POWER DESIGN 1033 Service Provider Number.....................Date......../......../.......... Name................................................................................... Signed................................................................................. Additionally, where relevant, the design complies with AS/NZS 7000 "Overhead Line Design - Detailed Procedures" published by the Australian Standards. ................................................................(Company name) indemnifies Endeavour Energy for any loss or damage resulting from non-compliance of the design with the above standards. 06 02 2018 : : : MCI EMS MDI : : : : SMI SDI MMI SAD 0001 PDI : Environmental Management Standard Mains Construction Instruction Mains Design Instruction Substation Maintenance Instruction Substation Design Instruction Mains Maintenance Instruction Design Drawing Standard Protection Design Instruction : LDI 0001 Public lighting Electrical Design Element EDI Earthing Design Instruction : CP Connection Policy '$7(«««««««««««««««« AUTHORISATION OF ESTIMATED VALUE OF FUNDING AMOUNT $ ................................................ 6(59,&( 180%(5««««««««« 35,17 1$0(«««««««««««« 6,*1('«««««««««««««« ENDEAVOUR ENERGY FUNDED ASSETS THIS APPROVAL IS ISSUED SUBJECT TO ENDEAVOUR ENERGY'S GENERAL TERMS & CONDITIONS FOR CONNECTION OF APPROVAL TO CONNECT TO PUBLIC LIGHTING REVIEWERS SIGNATURE : .................................................. DATE APPROVED : ............................................................... PUBLIC LIGHTING PIONEER COST SHARE REIMBURSEMENT SCHEME - EXPIRY DATE: N/A PRO-RATA REIMBURSEMENT FOR CUSTOMER'S LOAD OVER 50kVA ASSET ASSET COST ESTIMATE ($) UNIT QUANTITY NET ASSET CAPACITY (kVA) ORIGINAL CUSTOMER UTILISATION (kVA) MAXIMUM REIMBURSEMENT AMOUNT ($) HV. MAINS (km) N/A LV. MAINS (km) SUBSTATION NOTES 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ENDEAVOUR ENERGY'S MCI 0006, MDI 0028, THE RELEVANT SDI & EDI 100 & THE DUCT, EASEMENT AND TRENCH REQUIREMENTS DRAWING . 2. ENDEAVOUR ENERGY CONTACT PHONE No. 131081. 3. DESIGN CERTIFICATION SHALL LAPSE WHERE :- (I) NOTICE OF INTENT HAS NOT BEEN RECEIVED WITHIN SIX (6) MONTHS OF THIS CERTIFICATION, OR (II) CONSTRUCTION HAS BEEN INTERRUPTED FOR MORE THAN SIX (6) MONTHS. WHERE DESIGN CERTIFICATION HAS LAPSED, THE DESIGN MUST BE RESUBMITTED FOR CERTIFICATION BY THE ACCREDITED DESIGNER. 4. ATTENTION - PERMANENT SURVEY MARKS MAY EXIST IN THIS AREA. THESE ARE TO BE LOCATED BY A SURVEYOR PRIOR TO THE COMMENCEMENT OF WORK. 5. ATTENTION - ALL SERVICES SEARCHES MUST BE CHECKED BEFORE CONSTRUCTION. 6. WARNING - LIVE ENDEAVOUR ENERGY CABLES AND OTHER SERVICES IN THIS AREA. PLEASE CONTACT - 'DIAL BEFORE YOU DIG' ON TEL:-1100 FOR SEARCHES A MINIMUM TWO DAYS PRIOR TO EXCAVATION 7. ATTENTION - SERVICE PROVIDER TO NOTIFY ENDEAVOUR ENERGY'S ASSET DATA CUSTOMER DEPT. DAILY WHEN CABLE WORKS IS IN PROGRESS. TELEPHONE 131 081. 8. OPERATIONAL LIMITS - UNLESS APPROVED OTHERWISE, INTERRUPTIONS TO ANY CUSTOMER'S SUPPLY MUST BE AVOIDED. THE FOLLOWING ALTERNATIVES SHOULD BE CONSIDERED: - MOBILE GENERATORS OR SUBSTATIONS. - LIVE LINEWORK. - DESIGN ALTERNATIVES. - LOW VOLTAGE PARALLELS. - WORK PRACTICES / STANDARDS. THE COST IS TO BE FUNDED BY THE CUSTOMER / DEVELOPER. 9. REIMBURSEMENTS WILL BE CREDITED TO THE DEVELOPER ONLY FOR LENGTHS AND QUANTITIES SHOWN IN THE SCOPE OF WORKS. ANY DISCREPANCIES SHOULD BE RESOLVED PRIOR TO THE CONTRACT AGREEMENT. 10. HAVE ALL THE EXISTING ASSETS BEEN FIELD CHECKED AND ARE ACCURATE AT THE TIME OF DESIGN: YES / NO. 11. ALL NEW LANTERNS TO BE CONTROLLED BY PHOTO ELECTRIC CELLS. 12. HATCHED LOTS MUST NOT BE CONNECTED UNTIL APPROPRIATE PAYMENTS ARE RECEIVED BY ENDEAVOUR ENERGY. PROPOSED PADMOUNT SUBSTATION EXISTING PADMOUNT SUBSTATION PROPOSED LV PILLAR EXISTING LV PILLAR HV CABLE TRENCH LV CABLE TRENCH INSTALL 40mm PVC SERVICE CONDUIT EXISTING UNDERGROUND CABLE PILLAR EARTHING LOCATIONS .')'0& PROPOSED S.L. COLUMN (REFER TO SCHEDULE) EXISTING S.L. COLUMN EXISTING DUCT LOCATIONS LV ISOLATION SWITCH (CLOSED) LV ISOLATION SWITCH (OPEN) ALL COLUMNS INDICATED THUS , ARE TO BE INSTALLED 3 METRES BEHIND REAR OF KERB & GUTTER ALIGNMENT (REFER TYPICAL COLUMN EASEMENT DIAGRAM ON THE DUCT, TRENCH & EASEMENT REQ'S DRAWING). & THIS DRAWING SUPPLIES 104 LOTS & 53 FUT. LOTS CAP No. FILE No. LOT No. No OF LOTS DEVELOPER DEVELOPER'S REP. TEL. No. URS 18621 2016/04943/001 684 - 787 104 NORTH RICHMOND JOINT VENTURE ANDREW FLAHERTY 4760 1502 URS 20169 2017/04224/001 791 FUT. 3 NORTH RICHMOND JOINT VENTURE ANDREW FLAHERTY 4760 1502 URS 19510 2017/01705/001 793 FUT. 7 NORTH RICHMOND JOINT VENTURE ANDREW FLAHERTY 4760 1502 URS 19511 2017/01707/001 795 FUT. 12 NORTH RICHMOND JOINT VENTURE ANDREW FLAHERTY 4760 1502 URS 19509 2017/01704/001 796 FUT. 31 NORTH RICHMOND JOINT VENTURE ANDREW FLAHERTY 4760 1502 X1 RELOCATE EX. SL. COLUMN TO NEW COMMON BOUNDARY ALIGNMENT AS SHOWN. REMOVE REDUNDANT RAGBOLT. RELOCATE EXISTING SL. COLUMN RELOCATED SL. COLUMN LOCATION. X2 A B E F G H J T U V S R Q R1 P P1 N1 N C7 C8 & THE CERTIFICATION OF THIS PRODUCT IS SUPPORTED BY THE FOLLOWING KEY DOCUMENTS - DOCUMENT NAME NOTATION DATE SUMMARY ENVIRONMENTAL REPORT (EMS 0001) - FAT0038 09.10.17 AGREEMENT FOR ENTRY, GRANT AND CREATION OF EASEMENT - FPJ5013. - EQUIPMENT TO BE RETURNED TO ENDEAVOUR ENERGY - FPJ4252 (SWITCH GEAR TRANSFORMERS & BARE COPPER CONDUCTOR). - EQUIPMENT TO BE RETURNED TO ENDEAVOUR ENERGY - FPJ4253 (TREATED TIMBER POLES AND CONCRETE POLES). - TELECOMMUNICATION ASSET AGREEMENT - FPJ4184. - PROJECT DEFINITION. - ESTATE POWER DESIGN SAFETY REPORT. 09.10.17 FUTURE COLUMN LOCATION ALL COLUMNS INDICATED THUS ARE TO BE INSTALLED 3.8 METRES BEHIND REAR OF KERB & GUTTER ALIGNMENT (REFER TYPICAL COLUMN EASEMENT DIAGRAM ON THE DUCT, TRENCH & EASEMENT REQ'S DRAWING). % HV, LV & SL CABLES ARE DUCTED BETWEEN 'N' - 'Q' PROVIDE 15MPA CONCRETE PROTECTION TO DUCTS & CABLES BETWEEN NODES N - Q. FUNDING ARRANGEMENTS FOR SCOPE OF WORKS ASP LEVEL 1 ELECTRICAL WORKS CUSTOMER ENDEAVOUR ENERGY SUPPLIED MATERIALS CUSTOMER FUNDED NON-CONTESTABLE WORKS CUSTOMER FUNDED NIL INCLUDES BUT NOT LIMITED TO: - PEGGING OF EASEMENTS, PROPERTY BOUNDARIES AND INFRASTRUCTURE LOCATIONS. - REGISTRATION OF EASEMENTS. - PROVIDING ACCESS. - OWN SERVICE & SERVICE CONNECTION. - CONFIRM FINISHED GROUND LEVELS. SWITCHING, INSPECTION AND COMMISSIONING COSTS. - 1 x ZONE SUB ACCESS & SUPERVISION - $3,663.418. - 1 x PROTECTION SETTING - $4,767.873 - 1 x TESTING PRIOR TO COMMISSIONING - $5,412.440 - 1 x ZONE SUB 11KV CB TERMINATION - $4,300.252 TOTAL = $18,143.98. INCL. GST ENDEAVOUR ENERGY FUNDED & CONSTRUCTED CUSTOMER FUNDED - CONTESTABLE WORKS REQUIRED PRIOR TO COMPLETION OF CUSTOMER CONTESTABLE PROJECT. WORKS REQUIRED IN ASSOCIATION WITH CUSTOMER CONTESTABLE PROJECT. ALL OTHER WORKS & MATERIALS INCLUDING BUT NOT LIMITED TO: - INSTALLATION & ESTABLISHMENT OF THE PM. SUBSTATION. - TRENCHING. - DUCT INSTALLATIONS. - CABLE LAYING AND / OR INSTALLATIONS. - JOINTING. NIL URS 18621Q EXISTING DUCT USAGE CHARGE EX. DUCTS UTILISED ON THIS PROJECT WERE DEVELOPER FUNDED AND INSTALLED UNDER URS 17794 DRG. 501447. (REFER TO PVC DUCT SCHEDULE ON SHEET FOUR FOR BREAK-UP). ENDEAVOUR ENERGY FUNDED & ASP L1 CONSTRUCTED - REIMBURSED COORDINATION SUPPLY REQUIRED DATE (TO BE CONFIRMED WITH PROJECT MANAGER) TRENCHING & DUCTS: - (T&R) HV LIGHT TRENCHING & REINSTATEMENT - 163m = $16,463 - (LD) LAY HV. 125mm DUCTS IN TRENCH - 414 m = $2,484 - (D) LAY HV. DUCTS IN SL/LV TRENCH - 2004 m = $46,092 - 1 x EXCAVATE FOR HV. JOINT (@'X1') = $692. LAY CABLE: - (PC) LAY CABLE PULL CONDUCTOR THROUGH DUCTS - 699m = $2,796 - (LC) LAY HV CABLE (DIRECTLY BURIED) IN TRENCH - 1681m = $16,810 - (C) 11kV 240mm2 AL 3C XLPE - 2105m = $69,465 - (C) 11kV 240mm2 CU 3C XLPE - 275m = $23,100 JOINTS: - 4 x STJ IN TRENCH (HV) = $5,908 - 7 x PM SUB TERMINATION (HV) = $21,357 PADMOUNT SUBSTATION: - INSTALL 3 x NEW PM SUBSTATION = $8,580 - INSTALL 3 x SUB CULVERT = $6,960 - 3 x VALUE OF 500kVA 11kV TRANSFORMER ONLY = $40,791 - 1 x SIEMENS RTRR-C HV SWITCHGEAR = $17,154 - 2 x SIEMENS RTR HV SWITCHGEAR = $21,490 - 3 x CAT 1 FFIFF = $20,391 - 3 x SIZE 14 FIBREGLASS CUBICLE = $11,784 - 3 x SIZE 14-16 CONCRETE PLINTH = $3,699 - 3 x PM SUBSTATION CULVERT = $3,669 - 1 x ZONE SUB ACCESS & SUPERVISION - $3,663.418. - 1 x PROTECTION SETTING - $4,767.873 - 1 x TESTING PRIOR TO COMMISSIONING - $5,412.440 - 1 x ZONE SUB 11KV CB TERMINATION - $4,300.252 TOTAL EE CAPITAL CONTRIBUTION = $357,828.98 (EXCLUDING PM & DESIGN) TOTAL EE CAPITAL CONTRIBUTION = $ 392,539. (HV REIMBURSED) DAY: 26 MONTH: 03 YEAR: 2018 ASSETS TO BE RETURNED TO THE NEAREST ENDEAVOUR ENERGY DEPOT BY LEVEL 1 ASP. NIL PROPOSED ROAD CROSSING DUCT LOCATIONS (INSTALLED BY CIVIL CONTRACTOR)

Transcript of WARNING WORK COMPLETED / FIELD BOOK€¦ · hv cable trench lv cable trench install 40mm pvc...

Page 1: WARNING WORK COMPLETED / FIELD BOOK€¦ · hv cable trench lv cable trench install 40mm pvc service conduit existing underground cable pillar earthing locations.')'0& proposed s.l.

908442

135159

135160

34259

703

702

701

700

699

698

697

696

695

694

693

744

756

743

745

746

737

728

727

738

739

726

725

741

742

720

721

722

723

724

689

690

691

692

688

687

686

685

684

135093

135090

R

O

A

D

T

W

E

N

T

Y

S

I

X

R

O

A

D

T

W

E

N

T

Y

F

I

V

E

R

O

A

D

794

RESERVE

1

795

RESIDUE

FUT. SUBDIVISION

URS 15911

789

RESERVE

8952

P

E

C

K

S

2

17

S

T

A

P

Y

L

T

O

N

S

T

.

313

314

NORTH

RICHMOND

ZONE

SUBSTATION

3

3

K

V

T

R

A

N

S

M

I

S

S

I

O

N

E

A

S

E

M

E

N

T

3

3

K

V

T

R

A

N

S

M

I

S

S

I

O

N

E

A

S

E

M

E

N

T

415

691

794

RESERVE

47

382

383

384

309

308

307

306

305304

303

302

301

50

49

48

47

46

45

44

43

1

151

152

14

13

12

11

10

SLCP: 7384

IN SUB 8952

10

1

2

3

4

5

2

6

3

4

310

5

1

RESERVE

1

RESERVE

311

312

69

689

%

%

%

&

792

RESIDUE

FUT.

SUBDIVISION

&

O

N

E

740

T

O

W

N

S

E

N

D

R

D

R

O

A

D

PHILLIP

D

R

I

V

E

47105

47106

135092

135094

908375

135095

45796

45795

908374

45799

135091

45798

908440

45797

908373

908439

45794

908372

47110

908441

793

RESIDUE

FUT. SUBDIVISION

URS 19510

148618

'S'149617

149616

149658

149657

'S'149656

149655

149654

149659

'S'149661

149682

149653

149620

149619

'S'149685

'S'149660

149660A

149662

149626

149656A

938356

938351

938357938358

938350

938364

938349

938432

938431

938399

938398

938397

938407

938406

938402

938400

938401

938348

938354

938355

938353

938352

938404

938405

938403

938429

#

#

#

#

*

#

#

#

791

RESIDUE

FUT. SUBDIVISION

URS 20169

791

RESIDUE

FUT. SUBDIVISION

URS 20169

SUBSTATIONS

UNDERGROUND

OVERHEAD

GENERAL

REFERENCE DRAWING'S

ORIGINAL

LOCAL GOV AREA

CH'D

HV OP DIAGRAM

UBD/PENGUIN REF

HV SWITCHING

AM PROJ. No.

CAP / SAMP No.

WORK ORDERS

GIS MAP No

DRAWN

DATE

DESIGN

DO NOT

SCALE

METRES

DIMENSIONS

SCALE

IN

SHEET No OF SHEETS

A1

C THIS DRAWING

AND THE

COPYRIGHT

THEREIN IS THE

PROPERTY OF

ENDEAVOUR ENERGY AND

MAY NOT BE COPIED,

REPRODUCED,

DISTRIBUTED, LOANED OR

USED WITHOUT THE

WRITTEN CONSENT OF

ENDEAVOUR ENERGY

EPD REFERENCE No.

ABN 69 002 331 142

TEL:(02) 4731-8333 FAX (02) 4731-1594

P.O. BOX 1872, PENRITH BC, 2751

ELECTRICAL RETICULATION CONSULTANTS

EMAIL: [email protected]

A

AM

EN

DM

EN

TS

IS

SU

E

OR

IG

IN

AL

5 6 7 8 9

10

11 12

H

G

F

E

D

C

87 109 1211

H

G

F

E

D

C

B

A

652 431

B

4321

EPD 1.6

06.02.18 505307A

1 7

B.H.

E.C.

B.H.

1:1000

URS 18621

MAP 63 REF.G13

6482.94

NORTH RICHMOND:J4

HAWKESBURY

505306 DUCT, EASEMENT & TRENCH REQ'S

10/233/ER11NACadastre: Ⓒ Land and Property Information 2016

INSPECTED BY .....................................................

WORKS COMPLETED ..........................................

WORK COMPLETED / FIELD BOOK

ASSET RECORDING

I ................................................................................

OF ..........................................................................

CONTACT No ..........................................................

SIGNATURE .............................. DATE ................

SIGNATURE .............................. DATE ................

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT

ON THIS DRAWING HAVE BEEN RECORDED AS PER

ENDEAVOUR ENERGY STANDARD SAD 0004.

CONSTRUCTED BY ...............................................

SIGNATURE .............................. DATE ................

0

10

20

30

40

50M

WARNING

LIVE ENDEAVOUR ENERGY CABLES AND OTHER SERVICES

EXIST IN THIS AREA.

PLEASE CONTACT - 'DIAL BEFORE YOU DIG' ON TEL:-1100

FOR SEARCH INFORMATION A MINIMUM TWO DAYS PRIOR

TO EXCAVATION

ALL WORKS TO BE CONSTRUCTED ARE TO BE

COMPLETED IN ACCORDANCE WITH ENDEAVOUR

ENERGY'S GENERIC ENVIRONMENTAL PLAN - EMS 0001.

ALL SL. COLUMNS ARE TO BE INSTALLED

350mm FROM THE FRONT PROPERTY

BOUNDARIES UNLESS SHOWN OTHERWISE.

AMENDMENT.....................................................................

DATE APPROVED : ..........................................................

EXAMINER'S SIGNATURE : .............................................

THIS CERTIFICATION IS ISSUED SUBJECT TO

ENDEAVOUR ENERGY'S STANDARD CERT. TERMS.

PRINT NAME : ...................................................................

BRIAN JUDE

DESIGN COMPLIANCE AND INDEMNITY

This design complies with the Endeavour Energy's relevant

standards as current at this time and as listed on the

Endeavour Energy Accredited Service Provider's Internet

site. These standards include, but are not limited to:

ESTATE POWER DESIGN

1033

Service Provider Number.....................Date......../......../..........

Name...................................................................................

Signed.................................................................................

Additionally, where relevant, the design complies with

AS/NZS 7000 "Overhead Line Design - Detailed

Procedures" published by the Australian Standards.

................................................................(Company name)

indemnifies Endeavour Energy for any loss or damage

resulting from non-compliance of the design with the above

standards.

06 02 2018

:

:

:MCI

EMS

MDI

:

:

:

:SMI

SDI

MMI

SAD 0001

PDI:

Environmental Management Standard

Mains Construction Instruction

Mains Design Instruction

Substation Maintenance Instruction

Substation Design Instruction

Mains Maintenance Instruction

Design Drawing Standard

Protection Design Instruction

:LDI 0001 Public lighting Electrical Design Element

EDI Earthing Design Instruction

:CP Connection Policy

DATE……………………………….......……….......…....

AUTHORISATION OF ESTIMATED VALUE OF

FUNDING AMOUNT $ ................................................

SERVICE NUMBER………………………....................

PRINT NAME……………………………......…..............

SIGNED……......……………………………........….......

ENDEAVOUR ENERGY FUNDED ASSETS

THIS APPROVAL IS ISSUED SUBJECT TO ENDEAVOUR ENERGY'S

GENERAL TERMS & CONDITIONS FOR CONNECTION OF

APPROVAL TO CONNECT TO PUBLIC LIGHTING

REVIEWERS SIGNATURE : ..................................................

DATE APPROVED : ...............................................................

PUBLIC LIGHTING

PIONEER COST SHARE REIMBURSEMENT SCHEME - EXPIRY DATE: N/A

PRO-RATA REIMBURSEMENT FOR CUSTOMER'S LOAD OVER 50kVA

ASSET

ASSET COST

ESTIMATE ($)

UNIT QUANTITY

NET ASSET

CAPACITY

(kVA)

ORIGINAL

CUSTOMER

UTILISATION

(kVA)

MAXIMUM

REIMBURSEMENT

AMOUNT ($)

HV. MAINS

(km)

N/ALV. MAINS

(km)

SUBSTATION

NOTES

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ENDEAVOUR

ENERGY'S MCI 0006, MDI 0028, THE RELEVANT SDI & EDI 100 & THE DUCT,

EASEMENT AND TRENCH REQUIREMENTS DRAWING .

2. ENDEAVOUR ENERGY CONTACT PHONE No. 131081.

3. DESIGN CERTIFICATION SHALL LAPSE WHERE :-

(I) NOTICE OF INTENT HAS NOT BEEN RECEIVED WITHIN SIX (6) MONTHS

OF THIS CERTIFICATION, OR

(II) CONSTRUCTION HAS BEEN INTERRUPTED FOR MORE THAN SIX (6)

MONTHS. WHERE DESIGN CERTIFICATION HAS LAPSED, THE DESIGN

MUST BE RESUBMITTED FOR CERTIFICATION BY THE ACCREDITED

DESIGNER.

4. ATTENTION - PERMANENT SURVEY MARKS MAY EXIST IN THIS AREA.

THESE ARE TO BE LOCATED BY A SURVEYOR PRIOR TO THE

COMMENCEMENT OF WORK.

5. ATTENTION - ALL SERVICES SEARCHES MUST BE CHECKED BEFORE

CONSTRUCTION.

6. WARNING - LIVE ENDEAVOUR ENERGY CABLES AND OTHER SERVICES IN

THIS AREA. PLEASE CONTACT - 'DIAL BEFORE YOU DIG' ON TEL:-1100

FOR SEARCHES A MINIMUM TWO DAYS PRIOR TO EXCAVATION

7. ATTENTION - SERVICE PROVIDER TO NOTIFY ENDEAVOUR ENERGY'S

ASSET DATA CUSTOMER DEPT. DAILY WHEN CABLE WORKS IS IN

PROGRESS. TELEPHONE 131 081.

8. OPERATIONAL LIMITS - UNLESS APPROVED OTHERWISE,

INTERRUPTIONS TO ANY CUSTOMER'S SUPPLY MUST BE AVOIDED. THE

FOLLOWING ALTERNATIVES SHOULD BE CONSIDERED:

- MOBILE GENERATORS OR SUBSTATIONS.

- LIVE LINEWORK.

- DESIGN ALTERNATIVES.

- LOW VOLTAGE PARALLELS.

- WORK PRACTICES / STANDARDS.

THE COST IS TO BE FUNDED BY THE CUSTOMER / DEVELOPER.

9. REIMBURSEMENTS WILL BE CREDITED TO THE DEVELOPER ONLY FOR

LENGTHS AND QUANTITIES SHOWN IN THE SCOPE OF WORKS. ANY

DISCREPANCIES SHOULD BE RESOLVED PRIOR TO THE CONTRACT

AGREEMENT.

10. HAVE ALL THE EXISTING ASSETS BEEN FIELD CHECKED AND ARE

ACCURATE AT THE TIME OF DESIGN: YES / NO.

11. ALL NEW LANTERNS TO BE CONTROLLED BY PHOTO ELECTRIC CELLS.

12. HATCHED LOTS MUST NOT BE CONNECTED UNTIL APPROPRIATE

PAYMENTS ARE RECEIVED BY ENDEAVOUR ENERGY.

PROPOSED PADMOUNT SUBSTATION

EXISTING PADMOUNT SUBSTATION

PROPOSED LV PILLAR

EXISTING LV PILLAR

HV CABLE TRENCH

LV CABLE TRENCH

INSTALL 40mm PVC SERVICE CONDUIT

EXISTING UNDERGROUND CABLE

PILLAR EARTHING LOCATIONS

PROPOSED S.L. COLUMN (REFER TO SCHEDULE)

EXISTING S.L. COLUMN

EXISTING DUCT LOCATIONS

LV ISOLATION SWITCH (CLOSED)

LV ISOLATION SWITCH (OPEN)

ALL COLUMNS INDICATED THUS , ARE

TO BE INSTALLED 3 METRES BEHIND

REAR OF KERB & GUTTER ALIGNMENT

(REFER TYPICAL COLUMN EASEMENT DIAGRAM

ON THE DUCT, TRENCH & EASEMENT REQ'S

DRAWING).

&

THIS DRAWING SUPPLIES 104 LOTS & 53 FUT. LOTS

CAP

No.

FILE

No.

LOT

No.

No

OF LOTS

DEVELOPER

DEVELOPER'S

REP.

TEL. No.

URS 18621 2016/04943/001 684 - 787 104

NORTH RICHMOND

JOINT VENTURE

ANDREW FLAHERTY 4760 1502

URS 20169 2017/04224/001 791 FUT. 3

NORTH RICHMOND

JOINT VENTURE

ANDREW FLAHERTY 4760 1502

URS 19510 2017/01705/001 793 FUT. 7

NORTH RICHMOND

JOINT VENTURE

ANDREW FLAHERTY 4760 1502

URS 19511 2017/01707/001 795 FUT. 12

NORTH RICHMOND

JOINT VENTURE

ANDREW FLAHERTY 4760 1502

URS 19509 2017/01704/001 796 FUT. 31

NORTH RICHMOND

JOINT VENTURE

ANDREW FLAHERTY 4760 1502

X1

RELOCATE EX. SL. COLUMN TO NEW

COMMON BOUNDARY ALIGNMENT AS

SHOWN. REMOVE REDUNDANT RAGBOLT.

RELOCATE EXISTING SL. COLUMN

RELOCATED SL. COLUMN LOCATION.

X2

A

B

E

F

G

H

J

T

U

V

S

R

Q

R1

P

P1

N1

N

C7

C8

&

THE CERTIFICATION OF THIS PRODUCT IS SUPPORTED BY

THE FOLLOWING KEY DOCUMENTS -

DOCUMENT NAME

NOTATION

DATE

SUMMARY ENVIRONMENTAL REPORT (EMS 0001) - FAT0038

09.10.17

AGREEMENT FOR ENTRY, GRANT AND CREATION OF EASEMENT - FPJ5013.-

EQUIPMENT TO BE RETURNED TO ENDEAVOUR ENERGY - FPJ4252 (SWITCH

GEAR TRANSFORMERS & BARE COPPER CONDUCTOR).

-

EQUIPMENT TO BE RETURNED TO ENDEAVOUR ENERGY - FPJ4253

(TREATED TIMBER POLES AND CONCRETE POLES).

-

TELECOMMUNICATION ASSET AGREEMENT - FPJ4184. -

PROJECT DEFINITION. -

ESTATE POWER DESIGN SAFETY REPORT. 09.10.17

FUTURE

COLUMN

LOCATION

ALL COLUMNS INDICATED THUS ARE

TO BE INSTALLED 3.8 METRES BEHIND

REAR OF KERB & GUTTER ALIGNMENT

(REFER TYPICAL COLUMN EASEMENT DIAGRAM

ON THE DUCT, TRENCH & EASEMENT REQ'S

DRAWING).

%

HV, LV & SL CABLES ARE

DUCTED BETWEEN 'N' - 'Q'

PROVIDE 15MPA CONCRETE

PROTECTION TO DUCTS &

CABLES BETWEEN NODES N - Q.

FUNDING ARRANGEMENTS FOR SCOPE OF WORKS

ASP LEVEL 1 ELECTRICAL WORKS CUSTOMER

ENDEAVOUR ENERGY SUPPLIED MATERIALS

CUSTOMER FUNDED

NON-CONTESTABLE WORKS

CUSTOMER FUNDED

NIL

INCLUDES BUT NOT LIMITED TO:

- PEGGING OF EASEMENTS, PROPERTY

BOUNDARIES AND INFRASTRUCTURE

LOCATIONS.

- REGISTRATION OF EASEMENTS.

- PROVIDING ACCESS.

- OWN SERVICE & SERVICE CONNECTION.

- CONFIRM FINISHED GROUND LEVELS.

SWITCHING, INSPECTION AND COMMISSIONING

COSTS.

- 1 x ZONE SUB ACCESS & SUPERVISION -

$3,663.418.

- 1 x PROTECTION SETTING - $4,767.873

- 1 x TESTING PRIOR TO COMMISSIONING -

$5,412.440

- 1 x ZONE SUB 11KV CB TERMINATION - $4,300.252

TOTAL = $18,143.98. INCL. GST

ENDEAVOUR ENERGY FUNDED & CONSTRUCTED CUSTOMER FUNDED - CONTESTABLE

WORKS REQUIRED PRIOR TO

COMPLETION OF CUSTOMER

CONTESTABLE PROJECT.

WORKS REQUIRED IN

ASSOCIATION WITH

CUSTOMER CONTESTABLE

PROJECT.

ALL OTHER WORKS & MATERIALS INCLUDING BUT NOT

LIMITED TO:

- INSTALLATION & ESTABLISHMENT OF THE PM.

SUBSTATION.

- TRENCHING.

- DUCT INSTALLATIONS.

- CABLE LAYING AND / OR INSTALLATIONS.

- JOINTING.

NIL URS 18621Q

EXISTING DUCT USAGE CHARGE

EX. DUCTS UTILISED ON THIS PROJECT WERE

DEVELOPER FUNDED AND INSTALLED UNDER

URS 17794 DRG. 501447.

(REFER TO PVC DUCT SCHEDULE ON SHEET FOUR

FOR BREAK-UP).

ENDEAVOUR ENERGY FUNDED & ASP L1

CONSTRUCTED - REIMBURSED

COORDINATION SUPPLY REQUIRED DATE

(TO BE CONFIRMED WITH PROJECT MANAGER)

TRENCHING & DUCTS:

- (T&R) HV LIGHT TRENCHING & REINSTATEMENT -

163m = $16,463

- (LD) LAY HV. 125mm DUCTS IN TRENCH - 414 m = $2,484

- (D) LAY HV. DUCTS IN SL/LV TRENCH - 2004 m = $46,092

- 1 x EXCAVATE FOR HV. JOINT (@'X1') = $692.

LAY CABLE:

- (PC) LAY CABLE PULL CONDUCTOR THROUGH DUCTS -

699m = $2,796

- (LC) LAY HV CABLE (DIRECTLY BURIED) IN TRENCH -

1681m = $16,810

- (C) 11kV 240mm2 AL 3C XLPE - 2105m = $69,465

- (C) 11kV 240mm2 CU 3C XLPE - 275m = $23,100

JOINTS:

- 4 x STJ IN TRENCH (HV) = $5,908

- 7 x PM SUB TERMINATION (HV) = $21,357

PADMOUNT SUBSTATION:

- INSTALL 3 x NEW PM SUBSTATION = $8,580

- INSTALL 3 x SUB CULVERT = $6,960

- 3 x VALUE OF 500kVA 11kV TRANSFORMER ONLY = $40,791

- 1 x SIEMENS RTRR-C HV SWITCHGEAR = $17,154

- 2 x SIEMENS RTR HV SWITCHGEAR = $21,490

- 3 x CAT 1 FFIFF = $20,391

- 3 x SIZE 14 FIBREGLASS CUBICLE = $11,784

- 3 x SIZE 14-16 CONCRETE PLINTH = $3,699

- 3 x PM SUBSTATION CULVERT = $3,669

- 1 x ZONE SUB ACCESS & SUPERVISION - $3,663.418.

- 1 x PROTECTION SETTING - $4,767.873

- 1 x TESTING PRIOR TO COMMISSIONING - $5,412.440

- 1 x ZONE SUB 11KV CB TERMINATION - $4,300.252

TOTAL EE CAPITAL CONTRIBUTION = $357,828.98

(EXCLUDING PM & DESIGN)

TOTAL EE CAPITAL CONTRIBUTION = $392,539.

(HV REIMBURSED)

DAY: 26 MONTH: 03 YEAR: 2018

ASSETS TO BE RETURNED TO THE NEAREST

ENDEAVOUR ENERGY DEPOT BY LEVEL 1 ASP.

NIL

PROPOSED ROAD CROSSING DUCT LOCATIONS

(INSTALLED BY CIVIL CONTRACTOR)

Ebrahw
Stamp
Ebrahw
Stamp
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
A
Ebrahw
Typewritten Text
7/02/2018
Ebrahw
Typewritten Text
WAHEED EBRAHIMI
Page 2: WARNING WORK COMPLETED / FIELD BOOK€¦ · hv cable trench lv cable trench install 40mm pvc service conduit existing underground cable pillar earthing locations.')'0& proposed s.l.

34259

256594

256642

769

714

713

719

717

716

715

718

712

711

710

709

708

707

706

705

704

703

702

701

700

699

698

697

696

695

694

693

771

772

770

774

773

768

767

775

766

776

778

777

765

764

779

761

763

780

762

781

782

757

760

783

784

759

758

786

787

785

752

749

750

751

748

753

747

754

755

744

756

743

745

732

746

731

733

735

734

730

729

736

737

728

727

738

739

726

725

741

742

720

721

722

723

724

689

690

691

692

R

O

A

D

T

W

E

N

T

Y

O

N

E

R

O

A

D

T

W

E

N

T

Y

O

N

E

ROAD

T

W

E

N

T

Y

S

I

X

R

O

A

D

T

W

E

N

T

Y

F

I

V

E

R

O

A

D

T

W

E

N

T

Y

F

O

U

R

794

RESERVE

796

RESIDUE

FUT. SUBDIVISION

URS 19509

796

RESIDUE

FUT. SUBDIVISION

URS 19509

795

RESIDUE

FUT. SUBDIVISION

URS 15911

256593

313

3

3

K

V

T

R

A

N

S

M

IS

S

IO

N

E

A

S

E

M

E

N

T

691

794

RESERVE

309

308

310

311

312

3

3

K

V

T

R

A

N

S

M

IS

S

IO

N

E

A

S

E

M

E

N

T

69

689

&

T

W

E

N

T

Y

T

H

R

E

E

740

T

O

W

N

S

E

N

D

R

D

RO

AD

TW

EN

TY

SE

VE

N

P

A

TH

W

A

Y

R

O

A

D

135094

908375

135095

908374

908439

#

#

'S'149663

'S'149642

'S'149644

'S'149645

149647

149658

149657

'S'149656

149655

149654

149659

'S'149661

'S'149665

'S'149684

149683

149682

'S'149681

'S'149680

149652

149653

149648

149649

149650

149679

149678

149676

149672

'S'149670

'S'149685

'S'149660

149660A

'S'149668

149671

149673

149675

'S'149666

149677

149664

'S'149643

149674

'S'149651

149662

149626

149656A

149669

149667

149646

938364

938349

938384

938426

938423

938425

938421

938419

938417

938418

938420

938422

938424

938416

938414

938411

938412

938409

938413

938433

938415

938432

938431

938399

938398

938430

938397

938396

938395

938394

938393

938391

938392

938388

938389

938387

938386

938385

938428

938408

938407

938406

938402

938400

938401

938404

938427

938405

938403

938429

938410

940768

#

#

*

*

#

#

#

#

*

#

#

*

#

#

#

#

#

#

#

#

#

#

#

#

*

791

RESIDUE

FUT. SUBDIVISION

URS 20169

791

RESIDUE

FUT. SUBDIVISION

URS 20169

149642A

149666A

SUBSTATIONS

UNDERGROUND

OVERHEAD

GENERAL

REFERENCE DRAWING'S

ORIGINAL

LOCAL GOV AREA

CH'D

HV OP DIAGRAM

UBD/PENGUIN REF

HV SWITCHING

AM PROJ. No.

CAP / SAMP No.

WORK ORDERS

GIS MAP No

DRAWN

DATE

DESIGN

DO NOT

SCALE

METRES

DIMENSIONS

SCALE

IN

SHEET No OF SHEETS

A1

C THIS DRAWING

AND THE

COPYRIGHT

THEREIN IS THE

PROPERTY OF

ENDEAVOUR ENERGY AND

MAY NOT BE COPIED,

REPRODUCED,

DISTRIBUTED, LOANED OR

USED WITHOUT THE

WRITTEN CONSENT OF

ENDEAVOUR ENERGY

EPD REFERENCE No.

ABN 69 002 331 142

TEL:(02) 4731-8333 FAX (02) 4731-1594

P.O. BOX 1872, PENRITH BC, 2751

ELECTRICAL RETICULATION CONSULTANTS

EMAIL: [email protected]

A

AM

EN

DM

EN

TS

IS

SU

E

OR

IG

IN

AL

5 6 7 8 9

10

11 12

H

G

F

E

D

C

87 109 1211

H

G

F

E

D

C

B

A

652 431

B

4321

EPD 1.6

06.02.18 505307A

2 7

B.H.

E.C.

B.H.

1:1000

URS 18621

MAP 63 REF.G13

6482.94

NORTH RICHMOND:J4

HAWKESBURY

505306 DUCT, EASEMENT & TRENCH REQ'S

10/233/ER11NA

INSPECTED BY .....................................................

WORKS COMPLETED ..........................................

WORK COMPLETED / FIELD BOOK

ASSET RECORDING

I ................................................................................

OF ..........................................................................

CONTACT No ..........................................................

SIGNATURE .............................. DATE ................

SIGNATURE .............................. DATE ................

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT

ON THIS DRAWING HAVE BEEN RECORDED AS PER

ENDEAVOUR ENERGY STANDARD SAD 0004.

CONSTRUCTED BY ...............................................

SIGNATURE .............................. DATE ................

AMENDMENT.....................................................................

DATE APPROVED : ..........................................................

EXAMINER'S SIGNATURE : .............................................

THIS CERTIFICATION IS ISSUED SUBJECT TO

ENDEAVOUR ENERGY'S STANDARD CERT. TERMS.

PRINT NAME : ...................................................................

0

10

20

30

40

50M

ESTABLISH NEW PADMOUNT SUBSTATION 36104.

TRANSFORMER SIZE: 11KV 433V, 500 KVA.

HV. SWITCHGEAR: 'RTR' (SIEMENS).

HV. FUSES: 12KV, 63A HRC.

LV. SWITCHGEAR: 4 FEEDER CAT. 1

LV. FUSE SIZES: LV 250A (DIN).

SUBSTATION CUBICLE: FIBREGLASS SIZE 14.

EARTHING: COMMON EARTHING TO EDI 100.

ESTABLISH NEW PADMOUNT SUBSTATION 36105.

TRANSFORMER SIZE: 11KV 433V, 500 KVA.

HV. SWITCHGEAR: 'RTR' (SIEMENS).

HV. FUSES: 12KV, 63A HRC.

LV. SWITCHGEAR: 4 FEEDER CAT. 1

LV. FUSE SIZES: LV 250A (DIN).

SUBSTATION CUBICLE: FIBREGLASS SIZE 14.

EARTHING: COMMON EARTHING TO EDI 100.

ESTABLISH NEW PADMOUNT SUBSTATION 36106.

TRANSFORMER SIZE: 11KV 433V, 500 KVA.

HV. SWITCHGEAR: 'RTRR-C' (SIEMENS).

HV. FUSES: 12KV, 63A HRC.

LV. SWITCHGEAR: 4 FEEDER CAT. 1

LV. FUSE SIZES: LV 250A (DIN).

SUBSTATION CUBICLE: FIBREGLASS SIZE 14.

EARTHING: COMMON EARTHING TO EDI 100.

INSTALL SERVICE CONDUIT

CLEAR OF PROPOSED

EASEMENTS, DRIVEWAYS

DRAINAGE LINE ETC.

WHERE INDICATED THUS #

C5

C6

E7

E6

E5

E4

E3

E2

F2

F1

E9

E8

K5

K4

K3

K2

K1

J9

J8

J7

J6

J5

J4

J3

J2

J1

H9

H8

H7

K6

K7

K9

L1

L2

L3

L4

L5

L6

L7

L8

L9

M1

M2

M3

M4

M5

M6

M7

M8

M9

N2

N3

N4

N5

N6

Z3

N7

N8N9

P2

P3

P4

P5

P6

P7

P8

P9

Q2

Q3

Q4

Q5

T9

U2

Q6

Q7

Q8

Q9

R2

R3

R4

R5

R6

R7

S9

R8

R9

S2

S3

S4

S5

S6

S7

S8

T2

T3

T4

T5

T6

T7

T8

Z5

BEWARE - DRAINAGE

LINE IN THESE AREAS.

WHERE INDICATED THUS

*

NOT TO SCALE.

ADDITIONAL EARTHING MAY BE REQUIRED TO MEET THE REQUIRED MAXIMUM EARTH

THIS EARTHING DIAGRAM IS A GUIDE ONLY AND SHOWS A MINIMUM REQUIREMENT.

RESISTANCE MEASUREMENTS AS STATED IN ENDEAVOUR ENERGY'S EDI 100

SUBSTATION No. 36104 COMMON EARTHING LAYOUT

CABLE CU. ANNEALED 19/2.14 BARE

CABLE CU. ANNEALED 19/2.14 660V PVC/PVC

LEGEND

EARTH ELECTRODE LOCATION & LENGTH.

(LENGTH SHOWN IN METRES).

0

.5

m

2

.5

m

3

m

M

IN

.

P

M

C

'L

IN

E

H

V

. E

N

D

.

L

I

N

E

R

O

A

D

T

W

E

N

T

Y

F

I

V

E

P

R

O

P

E

R

T

Y

B

O

U

N

D

A

R

Y

K

E

R

B

SUBSTATION

PADMOUNT

EASEMENT

TO HV. EARTH BAR

INSIDE LV. SWITCH.

TO NEUTRAL /

EARTH BAR

LV. SWITCHGEAR

COMPARTMENT.

HV. SWITCHGEAR

COMPARTMENT.

TO HV. EARTH BAR.

SUPPLEMENTARY

4.8m EARTH ROD.

2

.

4

m

4

.

6

m

(

M

I

N

.

)

B

A

R

E

COMMON EARTH

ELECTRODE SYSTEM

LAID IN CABLE

TRENCH OR

SEPARATE TRENCH.

S

ID

E

P

R

O

P

E

R

T

Y

B

O

U

N

D

A

R

Y

F

R

O

N

T

2

.

4

m

2

.

4

m

L

V

. E

N

D

.

NOT TO SCALE.

ADDITIONAL EARTHING MAY BE REQUIRED TO MEET THE REQUIRED MAXIMUM EARTH

THIS EARTHING DIAGRAM IS A GUIDE ONLY AND SHOWS A MINIMUM REQUIREMENT.

RESISTANCE MEASUREMENTS AS STATED IN ENDEAVOUR ENERGY'S EDI 100

SUBSTATION No. 36105 COMMON EARTHING LAYOUT

CABLE CU. ANNEALED 19/2.14 BARE

CABLE CU. ANNEALED 19/2.14 660V PVC/PVC

LEGEND

EARTH ELECTRODE LOCATION & LENGTH.

(LENGTH SHOWN IN METRES).

0

.

5

m

2

.

5

m

3

m

M

I

N

.

P

M

C

'

L

I

N

E

H

V

.

E

N

D

.

L

I

N

E

R

O

A

D

T

W

E

N

T

Y

T

H

R

E

E

P

R

O

P

E

R

T

Y

B

O

U

N

D

A

R

Y

K

E

R

B

SUBSTATION

PADMOUNT

EASEMENT

TO HV. EARTH BAR

INSIDE LV. SWITCH.

TO NEUTRAL /

EARTH BAR

LV. SWITCHGEAR

COMPARTMENT.

HV. SWITCHGEAR

COMPARTMENT.

TO HV. EARTH BAR.

SUPPLEMENTARY

4.8m EARTH ROD.

2

.

4

m

4

.6

m

(

M

IN

.)

B

A

R

E

COMMON EARTH

ELECTRODE SYSTEM

LAID IN CABLE

TRENCH OR

SEPARATE TRENCH.

S

I

D

E

P

R

O

P

E

R

T

Y

B

O

U

N

D

A

R

Y

F

R

O

N

T

2

.

4

m

2

.

4

m

L

V

.

E

N

D

.

H5

H6

PILLAR 149666A IS FOR

FUTURE FUTURE SUPPLY

TO A TEMPORARY SEWER

PUMP (LOCATION TO BE

CONFIRMED).

Z6

ZZ

H3

E

A

S

E

M

E

N

T

6

6

0

0

M

IN

. x

2

7

5

0

INFORMATION UPDATED AFTER COMMISSIONING ON __________.

EARTHING CONSTRUCTION TO EDI-0006.

INFORMATION UPDATED AFTER COMMISSIONING ON __________.

EARTHING CONSTRUCTION TO EDI-0006.

E

A

S

E

M

E

N

T

5

5

0

0

M

I

N

.

x

2

7

5

0

EARTHING DATA TO BE CAPTURED TO GIS

SOIL RESISTIVETY

(ohms.m)

LAYER 1 268.46

DEPTH

(m)

0.93

LAYER 2 62.98 INFINITY

DESIGNED EARTH RESISTANCE LIMIT (ohms)

21.36

MEASURED EARTH RESISTANCE (ohms)

NUMBER OF ELECTRODES 2

LENGTH OF BARE ELECTRODES (m)

2.4

CONNECTOR TYPE (CAD OR CRIMP)

CRIMP

EARTHING DATA TO BE CAPTURED TO GIS

SOIL RESISTIVETY

(ohms.m)

LAYER 1 268.46

DEPTH

(m)

0.93

LAYER 2 62.98 INFINITY

DESIGNED EARTH RESISTANCE LIMIT (ohms)

21.36

MEASURED EARTH RESISTANCE (ohms)

NUMBER OF ELECTRODES 2

LENGTH OF BARE ELECTRODES (m)

2.4

CONNECTOR TYPE (CAD OR CRIMP)

CRIMP

Ebrahw
Typewritten Text
A
Ebrahw
Typewritten Text
7/02/2018
Ebrahw
Typewritten Text
WAHEED EBRAHIMI
Page 3: WARNING WORK COMPLETED / FIELD BOOK€¦ · hv cable trench lv cable trench install 40mm pvc service conduit existing underground cable pillar earthing locations.')'0& proposed s.l.

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

R

S

T

U

V

R

S

T

U

V

Z

Z

Z

Z

Z

R

S

T

U

V

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

SUBSTATIONS

UNDERGROUND

OVERHEAD

GENERAL

REFERENCE DRAWING'S

ORIGINAL

LOCAL GOV AREA

CH'D

HV OP DIAGRAM

UBD/PENGUIN REF

HV SWITCHING

AM PROJ. No.

CAP / SAMP No.

WORK ORDERS

GIS MAP No

DRAWN

DATE

DESIGN

DO NOT

SCALE

METRES

DIMENSIONS

SCALE

IN

SHEET No OF SHEETS

A1

C THIS DRAWING

AND THE

COPYRIGHT

THEREIN IS THE

PROPERTY OF

ENDEAVOUR ENERGY AND

MAY NOT BE COPIED,

REPRODUCED,

DISTRIBUTED, LOANED OR

USED WITHOUT THE

WRITTEN CONSENT OF

ENDEAVOUR ENERGY

EPD REFERENCE No.

ABN 69 002 331 142

TEL:(02) 4731-8333 FAX (02) 4731-1594

P.O. BOX 1872, PENRITH BC, 2751

ELECTRICAL RETICULATION CONSULTANTS

EMAIL: [email protected]

A

AM

EN

DM

EN

TS

IS

SU

E

OR

IG

IN

AL

5 6 7 8 9

10

11 12

H

G

F

E

D

C

87 109 1211

H

G

F

E

D

C

B

A

652 431

B

4321

EPD 1.6

06.02.18 505307A

3 7

B.H.

E.C.

B.H.

1:1000

URS 18621

MAP 63 REF.G13

6482.94

NORTH RICHMOND:J4

HAWKESBURY

505306 DUCT, EASEMENT & TRENCH REQ'S

10/233/ER11NA

INSPECTED BY .....................................................

WORKS COMPLETED ..........................................

WORK COMPLETED / FIELD BOOK

ASSET RECORDING

I ................................................................................

OF ..........................................................................

CONTACT No ..........................................................

SIGNATURE .............................. DATE ................

SIGNATURE .............................. DATE ................

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT

ON THIS DRAWING HAVE BEEN RECORDED AS PER

ENDEAVOUR ENERGY STANDARD SAD 0004.

CONSTRUCTED BY ...............................................

SIGNATURE .............................. DATE ................

C 938356

L 272780

C 938357

L 272781

C 938358

L 272782

C 938355

L 272779

C 938350

L 272774

C 938351

L 272775

C 938348

L 272772

149618

VD = 4.2v

'S' 149617

VD = 4.8v

C 938354

L 272778

C 938352

L 272776

C 938353

L 272777

INSTALL 250A FUSES.

RELABEL FUSESTRIP

'PILLAR 'S' 149685'.

34259

TO PILLAR

'S' 135094

TO PILLAR

'S' 135095

C 908440

L 256643

C 908441

L 256644

135159

TO PILLAR

'S' 135160

C 938349

L 272773

149616

VD = 6.3v

NEW COLUMN No.

NEW LANTERN No.

OLD COLUMN No.

OLD LANTERN No.

C 1234

L 1234

C 1234

L 1234

VD = VOLTAGE DROPS FOR NORMAL SUPPLY FROM PM.

SUBSTATIONS @ 6.5 KVA.

VDe1 = VOLTAGE DROPS FOR EMERGENCY / BACKUP FROM PM.

SUB. 36104 TO PM. SUB. 36104 @ 3.9 KVA.

VDe2 = VOLTAGE DROPS FOR EMERGENCY / BACKUP FROM PM.

SUB. 36104 TO PM. SUB. 36105 @ 3.9 KVA.

VDe3 = VOLTAGE DROPS FOR EMERGENCY / BACKUP FROM PM.

SUB. 36105 TO PM. SUB. 36104 @ 3.9 KVA.

VDe4 = VOLTAGE DROPS FOR EMERGENCY / BACKUP FROM PM.

SUB. 36105 TO PM. SUB. 36106 @ 3.9 KVA.

VDe5 = VOLTAGE DROPS FOR EMERGENCY / BACKUP FROM PM.

SUB. 36106 TO PM. SUB. 36105 @ 3.9 KVA.

LAY 240 SQmm 4 CORE 1KV AL XLPE/PVC CABLE -

RL. 2870m CL. 3400m

LAY 2 x 16 SQmm 1 CORE CU PVC/PVC IN 50mm PVC CONDUIT OR ROAD CROSSING

RL. 1375m CL. 3250m

EXISTING UG. CABLE

Z

LAY 50 SQmm 4 CORE CU XLPE/PVC CABLE -

RL. 140m CL. 160m

AMENDMENT.....................................................................

DATE APPROVED : ..........................................................

EXAMINER'S SIGNATURE : .............................................

THIS CERTIFICATION IS ISSUED SUBJECT TO

ENDEAVOUR ENERGY'S STANDARD CERT. TERMS.

PRINT NAME : ...................................................................

ITEM I.D. LUMINAIRE

RATE

CODE

RAGBOLT FOUNDATION POLE

RATE

CODE

OUTREACH

RATE

CODE

UPCAST

POLE

QTY

LANTERN

QTY

LTG CAT. CHARGE TO

18W SLA STREET LED JLB99G01L22 885 TYPE 2 TYPE 2 4.5m STANDARD IE / EB 4.5 995 1.5m STANDARD IE 1.5 PCS/25 990 5° 15 15 P4

HAWKESBURY

COUNCIL

18W SLA STREET LED JLB99G01L22 885 TYPE 2 TYPE 2 4.5m STANDARD IE / EB 4.5 995 3.0m STANDARD IE 3.0 PCS/25 991 5° 35 35 P4

HAWKESBURY

COUNCIL

18W SLA STREET LED JLB99G01L22 885 TYPE 2 TYPE 2 6.0m HINGED

REFER IE.

DRG.074569/C

995 0.5m STANDARD

REFER IE.

DRG.074569/C

990 5° 2 2 P4

HAWKESBURY

COUNCIL

150W MH SLI ROADSTER PR42G35 860 TYPE 2 UNIVERSAL

8.5m IMPACT

ABSORBING

IE / IA 8.5 995 3.0m STANDARD IE 3.0 PCS/32 991 5° 10 10 V5

HAWKESBURY

COUNCIL

149620

VD = 2.1v

'S'149685

VD = 0.6v

VDe1 = 8.0v

36104

'R' - SPARE

'S' - PILLAR 'S'149665

'T' - TRANSFORMER

'U' - PILLAR 'S'149661

'V' - PILLAR 'S'149663

NEW LABELS

SUB 36104

NEW LABELS

SUB 36105 36105

'R' - PILLAR 'S'149645

'S' - PILLAR 'S'149644

'T' - TRANSFORMER

'U' - PILLAR 'S'149643

'V' - PILLAR 'S'149642

NEW LABELS

SUB 36106

36106

'R' - PILLAR 'S'149668

'S' - PILLAR 'S'149670

'T' - TRANSFORMER

'U' - PILLAR 'S'149680

'V' - PILLAR 'S'149681

'S'149665

VD = 1.7v

'S' 149661

VD = 1.2v

'S'149680

VD = 0.1v

'S'149670

VD = 2.1v

'S'149660

VD = 3.6v

'S'149663

VD = 1.0v

VDe1 = 4.1v

'S'149666

VD = 6.3v

'S'149668

VD = 4.0v

VDe8 = 4.3v

'S'149681

VD = 0.8v

'S' 149642

VD = 2.2v

'S'149644

VD = 0.2v

VDe4 = 4.0v

'S' 149645

VD = 1.5v

VDe4 = 5.2v

'S' 149651

VD = 5.3v

149662

VD = 1.9v

149664

VD = 2.6v

VDe3 = 7.6v

149671

VD = 4.3v

149673

VD = 5.7v

149675

VD = 6.9v

149677

VD = 7.5v

VDe5 = 13.1v

149674

VD = 6.9v

149672

VD = 7.2v

149678

VD = 4.9v

149679

VD = 4.1v

149647

VD = 2.0v

149649

VD = 3.5v

149650

VD = 4.5v

149652

VD = 5.4v

149654

VD = 2.3v

VDe2 = 9.0v

149682

VD = 5.4v

149660A

VD = 5.7v

'S' 149643

VD = 2.5v

VDe4 = 6.0v

149646

VD = 2.6v

149648

VD = 4.1v

149653

VD = 2.0v

149657

VD = 4.7v

VDe5 = 9.4v

149655

VD = 3.5v

149656A

VD = 6.2v

149658

VD = 7.9v

VDe1 = 7.4v

149626

VD = 6.9v

C 938384

L 272808

C 938385

L 272809

C 938387

L 272811

C 938389

L 272813

C 938391

L 272815

C 938394

L 272818

C 938396

L 272820

C 938398

L 272822

C 938400

L 272824

C 938402

L 272826

C 938404

L 272828

C 938401

L 272825

C 938403

L 272827

C 938405

L 272829

'S'149656

VD = 5.6v

C 938406

L 272830

C 938407

L 272831

C 938408

L 272832

C 938412

L 272836

C 938409

L 272833

C 938410

L 272834

C 938411

L 272835

C 938414

L 272838

C 938413

L 272837

C 938433

L 272857

C 938415

L 272839

C 938430

L 272854

C 938429

L 272853

C 938399

L 272823

C 938431

L 272855

C 938432

L 272856

C 938397

L 272821

C 938395

L 272819

C 938393

L 272817

C 938392

L 272816

C 938388

L 272812

C 938386

L 272810

C 938428

L 272852

C 938427

L 272851

C 938426

L 272850

C 938425

L 272849

C 938423

L 272847

C 938421

L 272845

C 938419

L 272843

149669

VD = 2.1v

C 938416

L 272840

C 938418

L 272842

C 938420

L 272844

C 938422

L 272846

C 938424

L 272848

C 938417

L 272841

F

U

T

U

R

E

R

O

A

D

R

O

A

D

R

O

A

D

T

W

E

N

T

Y

O

N

E

R

O

A

D

T

W

E

N

T

Y

O

N

E

ROAD

T

W

E

N

T

Y

S

I

X

R

O

A

D

T

W

E

N

T

Y

F

I

V

E

R

O

A

D

T

W

E

N

T

Y

F

O

U

R

A

R

T

H

U

R

S

T

A

P

Y

L

T

O

N

S

T

.

O

N

E

P

H

I

L

L

I

P

RO

AD

TW

EN

TY

SE

VE

N

T

O

W

N

S

E

N

D

R

D

T

W

E

N

T

Y

T

H

R

E

E

R

O

A

D

P

A

TH

W

A

Y

D

R

I

V

E

TO PILLAR

135161

C 908442

L 256645

C 908439

L 256642

DISCONNECT &

REMOVE REDUNDANT

SL CABLES.

DISCONNECT &

REMOVE REDUNDANT

SL CABLES.

REDUNDANT UNDERGROUND CABLE

LEAVE FUSES OUT.

RETAIN IN KIOSK.

'S'149684

VD = 3.4v

149667

VD = 3.2v

149683

VD = 4.8v

E

A

S

E

M

E

N

T

149619

VD = 2.9v

149659

VD = 2.9v

149676

VD = 6.2v

C 938364

L 272788

C 940768

L 274459

0

.

5

m

2

.

5

m

3

m

M

I

N

.

P

M

C

'

L

I

N

E

H

V

.

E

N

D

.

L

I

N

E

R

O

A

D

T

W

E

N

T

Y

S

I

X

P

R

O

P

E

R

T

Y

B

O

U

N

D

A

R

Y

K

E

R

B

SUBSTATION

PADMOUNT

EASEMENT

TO HV. EARTH BAR

INSIDE LV. SWITCH.

TO NEUTRAL /

EARTH BAR

LV. SWITCHGEAR

COMPARTMENT.

HV. SWITCHGEAR

COMPARTMENT.

TO HV. EARTH BAR.

SUPPLEMENTARY

4.8m EARTH ROD.

2

.

4

m

4.6m

(M

IN

.)

B

A

R

E

COMMON EARTH

ELECTRODE SYSTEM

LAID IN CABLE

TRENCH OR

SEPARATE TRENCH.

S

I

D

E

P

R

O

P

E

R

T

Y

B

O

U

N

D

A

R

Y

F

R

O

N

T

2

.

4

m

NOT TO SCALE.

ADDITIONAL EARTHING MAY BE REQUIRED TO MEET THE REQUIRED MAXIMUM EARTH

THIS EARTHING DIAGRAM IS A GUIDE ONLY AND SHOWS A MINIMUM REQUIREMENT.

RESISTANCE MEASUREMENTS AS STATED IN ENDEAVOUR ENERGY'S EDI 100

SUBSTATION No. 36106 COMMON EARTHING LAYOUT

CABLE CU. ANNEALED 19/2.14 BARE

CABLE CU. ANNEALED 19/2.14 660V PVC/PVC

LEGEND

EARTH ELECTRODE LOCATION & LENGTH.

(LENGTH SHOWN IN METRES).

2

.

4

m

L

V

.

E

N

D

.

149642A

VD = 3.3v

149666A

VD = 7.4v

TEMPORARILY CLOSED

FUTURE OPEN POINT.

TEMPORARILY CLOSED

FUTURE OPEN POINT.

INFORMATION UPDATED AFTER COMMISSIONING ON __________.

EARTHING CONSTRUCTION TO EDI-0006.

E

A

S

E

M

E

N

T

5

5

0

0

M

I

N

.

x

2

7

5

0

EARTHING DATA TO BE CAPTURED TO GIS

SOIL RESISTIVETY

(ohms.m)

LAYER 1 268.46

DEPTH

(m)

0.93

LAYER 2 62.98 INFINITY

DESIGNED EARTH RESISTANCE LIMIT (ohms)

21.36

MEASURED EARTH RESISTANCE (ohms)

NUMBER OF ELECTRODES 2

LENGTH OF BARE ELECTRODES (m)

2.4

CONNECTOR TYPE (CAD OR CRIMP)

CRIMP

Ebrahw
Typewritten Text
A
Ebrahw
Typewritten Text
7/02/2018
Ebrahw
Typewritten Text
WAHEED EBRAHIMI
Page 4: WARNING WORK COMPLETED / FIELD BOOK€¦ · hv cable trench lv cable trench install 40mm pvc service conduit existing underground cable pillar earthing locations.')'0& proposed s.l.

P

S

8

D

J

H

R

T

R

R

-

C

E8063

E

8

0

5

9

E

8

0

6

0

E8064

E8065

E

8

0

6

1

E8066

E

8

0

6

2

E

8

0

5

3

E

8

0

5

4

E8057

E

8

0

4

9

E8058

E

8

0

5

5

P

S

8

D

J

H

R

T

R

E8052

P

S

8

D

J

H

R

T

R

E

8

0

4

7

E8056

E8051

E8050

E

8

0

4

8

P

S

S

L

P

S

S

L

B

9

8

0

2

B

9

7

9

9

P

S

S

L

B

9

8

0

1

B

9

8

0

0

SUBSTATIONS

UNDERGROUND

OVERHEAD

GENERAL

REFERENCE DRAWING'S

ORIGINAL

LOCAL GOV AREA

CH'D

HV OP DIAGRAM

UBD/PENGUIN REF

HV SWITCHING

AM PROJ. No.

CAP / SAMP No.

WORK ORDERS

GIS MAP No

DRAWN

DATE

DESIGN

DO NOT

SCALE

METRES

DIMENSIONS

SCALE

IN

SHEET No OF SHEETS

A1

C THIS DRAWING

AND THE

COPYRIGHT

THEREIN IS THE

PROPERTY OF

ENDEAVOUR ENERGY AND

MAY NOT BE COPIED,

REPRODUCED,

DISTRIBUTED, LOANED OR

USED WITHOUT THE

WRITTEN CONSENT OF

ENDEAVOUR ENERGY

EPD REFERENCE No.

ABN 69 002 331 142

TEL:(02) 4731-8333 FAX (02) 4731-1594

P.O. BOX 1872, PENRITH BC, 2751

ELECTRICAL RETICULATION CONSULTANTS

EMAIL: [email protected]

A

AM

EN

DM

EN

TS

IS

SU

E

OR

IG

IN

AL

5 6 7 8 9

10

11 12

H

G

F

E

D

C

87 109 1211

H

G

F

E

D

C

B

A

652 431

B

4321

EPD 1.6

06.02.18 505307A

4 7

B.H.

E.C.

B.H.

1:1000

URS 18621

MAP 63 REF.G13

6482.94

NORTH RICHMOND:J4

HAWKESBURY

505306 DUCT, EASEMENT & TRENCH REQ'S

10/233/ER11NA

INSPECTED BY .....................................................

WORKS COMPLETED ..........................................

WORK COMPLETED / FIELD BOOK

ASSET RECORDING

I ................................................................................

OF ..........................................................................

CONTACT No ..........................................................

SIGNATURE .............................. DATE ................

SIGNATURE .............................. DATE ................

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT

ON THIS DRAWING HAVE BEEN RECORDED AS PER

ENDEAVOUR ENERGY STANDARD SAD 0004.

CONSTRUCTED BY ...............................................

SIGNATURE .............................. DATE ................

AMENDMENT.....................................................................

DATE APPROVED : ..........................................................

EXAMINER'S SIGNATURE : .............................................

THIS CERTIFICATION IS ISSUED SUBJECT TO

ENDEAVOUR ENERGY'S STANDARD CERT. TERMS.

PRINT NAME : ...................................................................

36105

36104

36106

LAY 240 SQmm 3 CORE 11KV AL XLPE/COMPOSITE SHEATHED CABLE -

RL. 1375m CL. 2245m

EXISTING UG. CABLE

LAY 240 SQmm 3 CORE 11KV CU XLPE/COMPOSITE SHEATHED CABLE -

RL. 275m CL. 295m

34259

A

R

T

H

U

R

PH

ILLIP

D

R

I

V

E

8952

P

E

C

K

S

TO SW. 14407

IN SUB. 9528

TO SW. B9842

IN SUB. 34266

R

O

A

D

NORTH

RICHMOND

ZONE

SUBSTATION

TO CB. 27447.

TO CB. 10287.

TO CB. 27446.

TO CB. 27454.

TO CB. 10286.

TERMINATE @ CB. 27459 NORTH

RICHMOND ZONE SUBSTATION

( TO BE COMPLETED BY ENDEAVOUR

ENERGY STAFF). THIS CB WILL BE

DOUBLE CABLED AS THERE IS A CAP

BANK CONNECTED TO IT.

TO ABS 34496

& ABS E521.

TO ABS 9746.

TO ABS 42674.

TO ABS 29830.

X1

CUT EX. CABLE @ 'X1',

MAKE STJ & EXTEND

AS SHOWN.

DISCONNECT EX.

CABLE FROM HV SW.

B9801 IN SUB 8952.

JOINT / TERMINATION TYPE: _____________________

NETWORK ACCESS AUTHORISATION: _____________

JOINT / TERMINATION KIT #: _____________________

JOINT / TERMINATION BATCH #: __________________

DATE OF MANUFACTURE: _______________________

REDUNDANT UNDERGROUND CABLE

JOINT / TERMINATION TYPE: _____________________

NETWORK ACCESS AUTHORISATION: _____________

JOINT / TERMINATION KIT #: _____________________

JOINT / TERMINATION BATCH #: __________________

DATE OF MANUFACTURE: _______________________

JOINT / TERMINATION TYPE: _____________________

NETWORK ACCESS AUTHORISATION: _____________

JOINT / TERMINATION KIT #: _____________________

JOINT / TERMINATION BATCH #: __________________

DATE OF MANUFACTURE: _______________________

JOINT / TERMINATION TYPE: _____________________

NETWORK ACCESS AUTHORISATION: _____________

JOINT / TERMINATION KIT #: _____________________

JOINT / TERMINATION BATCH #: __________________

DATE OF MANUFACTURE: _______________________

JOINT / TERMINATION TYPE: _____________________

NETWORK ACCESS AUTHORISATION: _____________

JOINT / TERMINATION KIT #: _____________________

JOINT / TERMINATION BATCH #: __________________

DATE OF MANUFACTURE: _______________________

JOINT / TERMINATION TYPE: _____________________

NETWORK ACCESS AUTHORISATION: _____________

JOINT / TERMINATION KIT #: _____________________

JOINT / TERMINATION BATCH #: __________________

DATE OF MANUFACTURE: _______________________

JOINT / TERMINATION TYPE: _____________________

NETWORK ACCESS AUTHORISATION: _____________

JOINT / TERMINATION KIT #: _____________________

JOINT / TERMINATION BATCH #: __________________

DATE OF MANUFACTURE: _______________________

F

U

T

U

R

E

R

O

A

D

R

O

A

D

T

W

E

N

T

Y

O

N

E

RO

AD

T

W

E

N

T

Y

S

I

X

R

O

A

D

T

W

E

N

T

Y

F

I

V

E

R

O

A

D

T

W

E

N

T

Y

F

O

U

R

T

W

E

N

T

Y

T

H

R

E

E

R

O

A

D

R

O

A

D

O

N

E

DISCONNECT EX. HV

CABLE FROM SW.

B9772, MAKE STJ @

'X2' & EXTEND AS

SHOWN.

X2

JOINT / TERMINATION TYPE: _____________________

NETWORK ACCESS AUTHORISATION: _____________

JOINT / TERMINATION KIT #: _____________________

JOINT / TERMINATION BATCH #: __________________

DATE OF MANUFACTURE: _______________________

REMOVE REDUNDANT

DUCTED HV CABLE

WHERE POSSIBLE.

JOINT / TERMINATION TYPE: _____________________

NETWORK ACCESS AUTHORISATION: _____________

JOINT / TERMINATION KIT #: _____________________

JOINT / TERMINATION BATCH #: __________________

DATE OF MANUFACTURE: _______________________

JOINT / TERMINATION TYPE: _____________________

NETWORK ACCESS AUTHORISATION: _____________

JOINT / TERMINATION KIT #: _____________________

JOINT / TERMINATION BATCH #: __________________

DATE OF MANUFACTURE: _______________________

L9

MAKE STJ TO 500m

CABLE END @ 'L9' &

EXTEND AS SHOWN.

ZZ

JOINT / TERMINATION TYPE: _____________________

NETWORK ACCESS AUTHORISATION: _____________

JOINT / TERMINATION KIT #: _____________________

JOINT / TERMINATION BATCH #: __________________

DATE OF MANUFACTURE: _______________________

MAKE STJ TO 500m

CABLE END @ 'ZZ' &

EXTEND AS SHOWN.

240mm² 3 AL

3C XLPE/PVC.

240mm² 3 CU

3C XLPE/PVC.

Ebrahw
Typewritten Text
A
Ebrahw
Typewritten Text
7/02/2018
Ebrahw
Typewritten Text
WAHEED EBRAHIMI
Ebrahw
Typewritten Text
Page 5: WARNING WORK COMPLETED / FIELD BOOK€¦ · hv cable trench lv cable trench install 40mm pvc service conduit existing underground cable pillar earthing locations.')'0& proposed s.l.

SUBSTATIONS

UNDERGROUND

OVERHEAD

GENERAL

REFERENCE DRAWING'S

ORIGINAL

LOCAL GOV AREA

CH'D

HV OP DIAGRAM

UBD/PENGUIN REF

HV SWITCHING

AM PROJ. No.

CAP / SAMP No.

WORK ORDERS

GIS MAP No

DRAWN

DATE

DESIGN

DO NOT

SCALE

METRES

DIMENSIONS

SCALE

IN

SHEET No OF SHEETS

A1

C THIS DRAWING

AND THE

COPYRIGHT

THEREIN IS THE

PROPERTY OF

ENDEAVOUR ENERGY AND

MAY NOT BE COPIED,

REPRODUCED,

DISTRIBUTED, LOANED OR

USED WITHOUT THE

WRITTEN CONSENT OF

ENDEAVOUR ENERGY

EPD REFERENCE No.

ABN 69 002 331 142

TEL:(02) 4731-8333 FAX (02) 4731-1594

P.O. BOX 1872, PENRITH BC, 2751

ELECTRICAL RETICULATION CONSULTANTS

EMAIL: [email protected]

A

AM

EN

DM

EN

TS

IS

SU

E

OR

IG

IN

AL

5 6 7 8 9

10

11 12

H

G

F

E

D

C

87 109 1211

H

G

F

E

D

C

B

A

652 431

B

4321

EPD 1.6

06.02.18 505307A

5 7

B.H.

E.C.

B.H.

1:1000

URS 18621

MAP 63 REF.G13

6482.94

NORTH RICHMOND:J4

HAWKESBURY

505306 DUCT, EASEMENT & TRENCH REQ'S

10/233/ER11NA

INSPECTED BY .....................................................

WORKS COMPLETED ..........................................

WORK COMPLETED / FIELD BOOK

ASSET RECORDING

I ................................................................................

OF ..........................................................................

CONTACT No ..........................................................

SIGNATURE .............................. DATE ................

SIGNATURE .............................. DATE ................

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT

ON THIS DRAWING HAVE BEEN RECORDED AS PER

ENDEAVOUR ENERGY STANDARD SAD 0004.

CONSTRUCTED BY ...............................................

SIGNATURE .............................. DATE ................

AMENDMENT.....................................................................

DATE APPROVED : ..........................................................

EXAMINER'S SIGNATURE : .............................................

THIS CERTIFICATION IS ISSUED SUBJECT TO

ENDEAVOUR ENERGY'S STANDARD CERT. TERMS.

PRINT NAME : ...................................................................

PR

OP

. B

DY

.

K &

G

K &

G

132KV TR LINE 1

SECTION AT CH. 322.00

(COLUMN 938421)

1:100

MEDIAN

132KV TR LINE 1

SECTION AT CH. 503.5

(COLUMN 938415)

1:100

CH. 236 CH. 286 CH. 336 CH. 386 CH. 436 CH. 486 CH. 536 CH. 586

RL. 29

RL. 34

RL. 39

RL. 44

RL. 49

Circuit ID L pole L att ht R pole R att ht Conductor Sag Span Temperature MES/RS Tension Tension Units Segment Actual no wind tens Min clearance @ Ch Blowout

cold A401 11.64 A403 12.18 COY 2.12 151.95 5 204.37 15 %CBL 132KVL1 6.96 9.94 @ 320.12 2.574

standard A401 11.64 A403 12.18 COY 2.32 151.95 18 204.37 15 %CBL 132KVL1 6.339 9.74 @ 319.12 2.708

hot A401 11.64 A403 12.18 COY 3.46 151.95 100 204.37 15 %CBL 132KVL1 4.258 8.61 @ 317.12 3.472

cold A403 12.18 A405 13.93 COY 4.95 232.34 5 204.37 15 %CBL 132KVL1 6.96 9.89 @ 463.07 6.025

standard A403 12.18 A405 13.93 COY 5.43 232.34 18 204.37 15 %CBL 132KVL1 6.339 9.47 @ 466.07 6.339

hot A403 12.18 A405 13.93 COY 8.1 232.34 100 204.37 15 %CBL 132KVL1 4.258 7.01 @ 478.07 8.131

ID Conductor RS Tension Temperatures Poles

132KVL1 1 x COY - Coyote 204.37 15 (%CBL) uplift (0); cold (5); standard (18); hot (100) A401, A403, A405

CH. 234 CH. 284 CH. 334 CH. 384 CH. 434 CH. 484 CH. 534 CH. 584

RL. 29

RL. 34

RL. 39

RL. 44

RL. 49

Circuit ID L pole L att ht R pole R att ht Conductor Sag Span Temperature MES/RS Tension Tension Units Segment Actual no wind tens Min clearance @ Ch Blowout

cold A867464 11.45 A402 12.24 COY 2.07 150.45 5 204.74 15 %CBL 132KVL3 6.96 9.56 @ 306.97 2.522

standard A867464 11.45 A402 12.24 COY 2.28 150.45 18 204.74 15 %CBL 132KVL3 6.341 9.35 @ 306.97 2.652

hot A867464 11.45 A402 12.24 COY 3.39 150.45 100 204.74 15 %CBL 132KVL3 4.263 8.24 @ 307.97 3.399

cold A402 12.24 A404 14.9 COY 4.98 233.16 5 204.74 15 %CBL 132KVL3 6.96 10.25 @ 459.42 6.065

standard A402 12.24 A404 14.9 COY 5.47 233.16 18 204.74 15 %CBL 132KVL3 6.341 9.82 @ 463.42 6.379

hot A402 12.24 A404 14.9 COY 8.15 233.16 100 204.74 15 %CBL 132KVL3 4.263 7.31 @ 477.42 8.179

ID Conductor RS Tension Temperatures Poles

132KVL3 1 x COY - Coyote 204.74 15 (%CBL) uplift (0); cold (5); standard (18); hot (100) A867464, A402, A404

PR

OP

. B

DY

.

MEDIAN

K &

G

K &

G

3

.

4

6

m

B

L

O

W

O

U

T

8.6m

G

ND

. C

LE

AR

EN

CE

STREETLIGHT COLUMN

4.5m ENLARGE BASE,

1.5m STANDARD OUREACH

WITH AN 18W STREET LED.

132KV TR CONDUCTOR

WITHOUT SAG.

132KV TR CONDUCTOR

SAG & BLOWOUT.

3.46m

S

AG

@ 100°C

APPROX.

2m

AP

PR

OX

. 6.570m

9

.

5

1

1

m

C

L

E

A

R

E

N

C

E

5.45m VERGE 4.6m ROADWAY

14.347m

8

.

1

m

B

L

O

W

O

U

T

7.28m

G

ND

. C

LE

AR

EN

CE

STREETLIGHT COLUMN

4.5m ENLARGE BASE,

1.5m STANDARD OUREACH

WITH AN 18W STREET LED.

132KV TR CONDUCTOR

WITHOUT SAG.

132KV TR CONDUCTOR

SAG & BLOWOUT.

8.1m

S

AG

@ 100°C

APPROX.

2m

AP

PR

OX

. 6.570m

6

.

2

3

6

m

C

L

E

A

R

E

N

C

E

5.45m VERGE 4.6m ROADWAY

13.72m

132KV TR LINE 3

SECTION AT CH. 295.5

(COLUMN 938422)

1:100

PR

OP

. B

DY

.

MEDIAN

K &

G

K &

G

3

.

3

9

m

B

L

O

W

O

U

T

8.24m

G

ND

. C

LE

AR

EN

CE

STREETLIGHT COLUMN

4.5m ENLARGE BASE,

1.5m STANDARD OUREACH

WITH AN 18W STREET LED.

132KV TR CONDUCTOR

WITHOUT SAG.

132KV TR CONDUCTOR

SAG & BLOWOUT.

3.39m

S

AG

@ 100°C

APPROX.

2m

AP

PR

OX

. 6.570m

6

.

2

6

7

m

C

L

E

A

R

E

N

C

E

5.45m VERGE4.6m ROADWAY

10.5m

132KV TR LINE 3

SECTION AT CH. 471

(COLUMN 938416)

1:100

PR

OP

. B

DY

.

MEDIAN

K &

G

K &

G

8

.

1

5

m

B

L

O

W

O

U

T

7.31m

G

ND

. C

LE

AR

EN

CE

STREETLIGHT COLUMN

4.5m ENLARGE BASE,

1.5m STANDARD OUREACH

WITH AN 18W STREET LED.

132KV TR CONDUCTOR

SAG & BLOWOUT.

8.15m

S

AG

@ 100°C

APPROX.

2m

AP

PR

OX

. 6.570m

5

.

2

0

8

m

C

L

E

A

R

E

N

C

E

5.45m VERGE4.6m ROADWAY

12.231m

POLE A401

132KV TR LINE 1 MAINS PROFILE BETWEEN POLES A401 & A405

SCALE 1:1000 (H)

SCALE 1:200 (V)

POLE A403

POLE A405

DESIGN

GND. LEVEL

132KV TR

SL COLUMN

938425

SL COLUMN

938421

SL COLUMN

938419

SL COLUMN

938417

SL COLUMN

938415

SL COLUMN

938413

SL COLUMN

938412

CONDUCTOR

SURVEYED

@ 18°C

CONDUCTOR

@ 5°C

CONDUCTOR

@ 100°C

POLE A867464POLE A402

POLE A404

SL COLUMN

938424

SL COLUMN

938422

SL COLUMN

938420

SL COLUMN

938418

SL COLUMN

938414

SL COLUMN

938411

SL COLUMN

938416

132KV TR LINE 1 MAINS PROFILE BETWEEN POLES A867464 & A404

SCALE 1:1000 (H)

SCALE 1:200 (V)

CH

. 240.000

CH

. 280.000

CH

. 320.000

CH

. 360.000

CH

. 400.000

CH

. 440.000

480.000

CH

. 520.000

CH

. 560.000

CH

. 600.000

774 775 776 777 778 779 780 781 782 783 784 785 786 749 750 751 752 731 732 733 734

POLE A401

POLE A400

POLE A867464

POLE A403

POLE A402

POLE A404

POLE A405

EE TRANSMISSION EASEMENT

830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 861 860 859 858 857 856

938425

938424

938422

EE TRANSMISSION LINE 3

EE TRANSMISSION LINE 1

938420 938418 938416 938414 938411

938421 938419 938417 938415 938413 938412

SITE PLAN EXISTING 132KV TR MAINS A401 & A405

SCALE 1:500

DESIGN

GND. LEVEL

132KV TR

CONDUCTOR

SURVEYED

@ 18°C

CONDUCTOR

@ 5°C

CONDUCTOR

@ 100°C

132KV TR CONDUCTOR

WITHOUT SAG.

EE TRANSMISSION EASEMENT

Ebrahw
Typewritten Text
A
Ebrahw
Typewritten Text
7/02/2018
Ebrahw
Typewritten Text
WAHEED EBRAHIMI
Page 6: WARNING WORK COMPLETED / FIELD BOOK€¦ · hv cable trench lv cable trench install 40mm pvc service conduit existing underground cable pillar earthing locations.')'0& proposed s.l.

URBAN SUBDIVISION RELATED REIMBURSEMENT - DUCT & HV. CABLE SCHEDULE

NOTE - ALL TRENCH SECTIONS ARE TO BE READ & VIEWED FROM NODE TO NODE AS NOMINATED.

DUCT & CABLE SCHEDULE CODE

T & R: - HV LIGHT TRENCHING & REINSTATEMENT

LC: - LAY HV. CABLE - DIRECTLY BURIED IN TRENCH

C: - CABLE - MATERIALS

LD: - LAY HV. 125mm DUCTS IN TRENCH

PC: - LAY CABLE - PULL CABLE THROUGH DUCTS

D: - LAY HV. DUCT IN SL/LV TRENCH

* ALL LENGTHS ENTERED IN METRES (m)

NODES

DUCT

CONFIG.

ROUTE

LENGTH

(m)

CUSTOMER

FUNDED DUCTS

CAPITAL CONTRIBUTION - HV CABLE & DUCT CONSTRUCTION IN

URBAN SUBDIVISIONS (m)

OTHER DUCT

REIMBURSEMENT

(m) x ($)

EXISTING DUCT

USAGE

(m) x ($)

T & R LD LC PC

C (AL) C (CU)

D

K4 - K5

NEW

33m 1 x 125mm - - - - - - - - -

K6 - K9

NEW

104m 1 x 125mm - - - - - - - - -

K7 - N5

NEW ROAD

CROSSING

15m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

K9 - L1

NEW

30m

1 x 50mm

1 x 125mm

- - 30m - 30m - 30m - -

L1 - L2

NEW

40m

1 x 50mm

1 x 125mm

- - 40m - 40m - 40m - -

L2- L3

NEW

27m 2 x 125mm - - 27m - 27m - 81m - -

L2 - R9

NEW ROAD

CROSSING

45m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - 135m - -

L3 - L4

NEW

20m 1 x 125mm - - 20m - 20m - 20m - -

L4 - L5

NEW

15m

1 x 50mm

1 x 125mm

- - 15m - 15m - 15m - -

L5 - L6

NEW

30m 1 x 125mm - - 30m - 30m - 30m - -

L6 - L7

NEW

45m

1 x 50mm

1 x 125mm

- - 45m - 45m - 45m - -

L7 - L8

NEW

62m 1 x 125mm - - 62m - 62m - 62m - -

L8 - E9

NEW ROAD

CROSSING

33m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - 66m 66m - 99m - -

L8 - L9

NEW

35m

1 x 50mm

1 x 125mm

- - 35m - 35m - 35m - -

L9 - M1

NEW

17m 1 x 125mm - - 17m - 17m - 17m - -

M1- M2

NEW

37m 1 x 50mm - - 37m - 37m - 37m - -

M2 - M3

NEW ROAD

CROSSING

25m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

25m 50m - 25m 25m - - - -

M3 - M4

NEW

29m 1 x 50mm - - 29m - 29m - 29m - -

M4 - M5

NEW

33m

1 x 50mm

1 x 125mm

- - 33m - 33m - 33m - -

URBAN SUBDIVISION RELATED REIMBURSEMENT - DUCT & HV. CABLE SCHEDULE

NOTE - ALL TRENCH SECTIONS ARE TO BE READ & VIEWED FROM NODE TO NODE AS NOMINATED.

DUCT & CABLE SCHEDULE CODE

T & R: - HV LIGHT TRENCHING & REINSTATEMENT

LC: - LAY HV. CABLE - DIRECTLY BURIED IN TRENCH

C: - CABLE - MATERIALS

LD: - LAY HV. 125mm DUCTS IN TRENCH

PC: - LAY CABLE - PULL CABLE THROUGH DUCTS

D: - LAY HV. DUCT IN SL/LV TRENCH

* ALL LENGTHS ENTERED IN METRES (m)

NODES

DUCT

CONFIG.

ROUTE

LENGTH

(m)

CUSTOMER

FUNDED DUCTS

CAPITAL CONTRIBUTION - HV CABLE & DUCT CONSTRUCTION IN

URBAN SUBDIVISIONS (m)

OTHER DUCT

REIMBURSEMENT

(m) x ($)

EXISTING DUCT

USAGE

(m) x ($)

T & R LD LC PC

C (AL) C (CU)

D

A - B

EXISTING

235m

EXIST.

- - - - 235m - 235m - -

NIL.

EE FUNDED

B - X1

EXISTING

40m

EXIST.

- - - - 40m - 40m - -

NIL.

DEV. FUNDED

URS 16032

DRG. 404605/B

X2 - E

NEW

18m 1 x 125mm - - 36m - 36m - 18m - -

E - F

NEW

18m

1 x 50mm

1 x 125mm

- - 36m - 36m - 18m - -

F - G

NEW

54m 1 x 125mm - - 108m - 108m - 54m - -

G - H

NEW

45m

1 x 50mm

1 x 125mm

- - 90m - 90m - 45m - -

H - J

NEW

7m 1 x 50mm - - - - - - - - -

H - T

NEW ROAD

CROSSING

25m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - 50m 50m - 75m - -

N - N1

NEW ROAD

CROSSING

16m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

P - P1

NEW ROAD

CROSSING

16m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

R - R1

NEW ROAD

CROSSING

16m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

N - Q

NEW

60m

1 x 50mm

2 x 125mm

- - - 120m 120m - 180m - -

Q - S

NEW

35m

1 x 50mm

1 x 125mm

- - 70m - 70m - 35m - -

S - T

NEW

24m 1 x 125mm - - 48m - 48m - 24m - -

T - U

NEW

8m

1 x 50mm

1 x 125mm

- - - - - - - - -

U - V

NEW

16m 2 x 125mm - - - - - - - - -

C5 - C6

NEW

18m 1 x 125mm - - 36m - 36m - 18m - -

C6 - C7

NEW

28m

1 x 50mm

1 x 125mm

- - 56m - 56m - 28m - -

C7 - C8

NEW

7m 1 x 50mm - - - - - - - - -

C7 - N

NEW ROAD

CROSSING

23m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - 46m 46m - 69m - -

E2 - E3

NEW

39m 1 x 50mm - - - - - - - - -

E3 - F1

NEW ROAD

CROSSING

16m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

E4 - E6

NEW

150m 1 x 125mm - - - - - - - - -

E6 - E7

NEW

19m 1 x 125mm - - - - - - - - -

E5 - Z3

NEW ROAD

CROSSING

16m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

E6 - L3

NEW ROAD

CROSSING

16m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

URBAN SUBDIVISION RELATED REIMBURSEMENT - DUCT & HV. CABLE SCHEDULE

NOTE - ALL TRENCH SECTIONS ARE TO BE READ & VIEWED FROM NODE TO NODE AS NOMINATED.

DUCT & CABLE SCHEDULE CODE

T & R: - HV LIGHT TRENCHING & REINSTATEMENT

LC: - LAY HV. CABLE - DIRECTLY BURIED IN TRENCH

C: - CABLE - MATERIALS

LD: - LAY HV. 125mm DUCTS IN TRENCH

PC: - LAY CABLE - PULL CABLE THROUGH DUCTS

D: - LAY HV. DUCT IN SL/LV TRENCH

* ALL LENGTHS ENTERED IN METRES (m)

NODES

DUCT

CONFIG.

ROUTE

LENGTH

(m)

CUSTOMER

FUNDED DUCTS

CAPITAL CONTRIBUTION - HV CABLE & DUCT CONSTRUCTION IN

URBAN SUBDIVISIONS (m)

OTHER DUCT

REIMBURSEMENT

(m) x ($)

EXISTING DUCT

USAGE

(m) x ($)

T & R LD LC PC

C (AL) C (CU)

D

E8 - E9

NEW

7m 1 x 50mm - - - - - - - - -

E9 - F1

NEW

30m

1 x 50mm

1 x 125mm

- - 60m - 60m - 30m - -

F1 - F2

NEW

27m 2 x 125mm - - 54m - 54m - 27m - -

F2 - C5

NEW ROAD

CROSSING

26m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

26m 78m - 52m 52m - - - -

H5 - H6

NEW

14m 1 x 125mm - - - - - - - - -

H6 - H7

NEW ROAD

CROSSING

16m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

H7 - H8

NEW

30m 1 x 125mm - - - - - - 60m - -

H8 - H9

NEW

26m

1 x 50mm

1 x 125mm

- - - - - - 52m - -

H9 - Q3

NEW ROAD

CROSSING

26m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - 78m - -

H9 - J1

NEW

25m

1 x 50mm

1 x 125mm

- - - - - - - - -

J1 - J2

NEW

30m 1 x 125mm - - - - - - - - -

J2 - J3

NEW

15m

1 x 50mm

1 x 125mm

- - - - - - - - -

J3 - J4

NEW

12m 1 x 125mm - - - - - - - - -

J4 - J6

NEW ROAD

CROSSING

25m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

H3 - J5

NEW

32m - 32m 96m - - - - - - -

J5 - P8

NEW ROAD

CROSSING

30m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

30m 90m - - - - - - -

J5 - J6

NEW

7m 1 x 50mm - - - - - - - - -

J6 - J7

NEW

30m

1 x 50mm

1 x 125mm

- - - - - - - - -

J7 - J8

NEW

48m 1 x 125mm - - - - - - - - -

J8 - J9

NEW

49m

1 x 50mm

1 x 125mm

- - - - - - - - -

J9 - K1

NEW

25m 1 x 125mm - - - - - - - - -

K1 - K2

NEW

7m 1 x 125mm - - - - - - - - -

K1 - N8

NEW ROAD

CROSSING

30m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

K2 - K3

NEW

32m 1 x 125mm - - - - - - - - -

K3 - K4

NEW

66m

1 x 50mm

1 x 125mm

- - - - - - - - -

SUBSTATIONS

UNDERGROUND

OVERHEAD

GENERAL

REFERENCE DRAWING'S

ORIGINAL

LOCAL GOV AREA

CH'D

HV OP DIAGRAM

UBD/PENGUIN REF

HV SWITCHING

AM PROJ. No.

CAP / SAMP No.

WORK ORDERS

GIS MAP No

DRAWN

DATE

DESIGN

DO NOT

SCALE

METRES

DIMENSIONS

SCALE

IN

SHEET No OF SHEETS

A1

C THIS DRAWING

AND THE

COPYRIGHT

THEREIN IS THE

PROPERTY OF

ENDEAVOUR ENERGY AND

MAY NOT BE COPIED,

REPRODUCED,

DISTRIBUTED, LOANED OR

USED WITHOUT THE

WRITTEN CONSENT OF

ENDEAVOUR ENERGY

EPD REFERENCE No.

ABN 69 002 331 142

TEL:(02) 4731-8333 FAX (02) 4731-1594

P.O. BOX 1872, PENRITH BC, 2751

ELECTRICAL RETICULATION CONSULTANTS

EMAIL: [email protected]

A

AM

EN

DM

EN

TS

IS

SU

E

OR

IG

IN

AL

5 6 7 8 9

10

11 12

H

G

F

E

D

C

87 109 1211

H

G

F

E

D

C

B

A

652 431

B

4321

EPD 1.6

06.02.18 505307A

6 7

B.H.

E.C.

B.H.

1:1000

URS 18621

MAP 63 REF.G13

6482.94

NORTH RICHMOND:J4

HAWKESBURY

505306 DUCT, EASEMENT & TRENCH REQ'S

10/233/ER11NA

INSPECTED BY .....................................................

WORKS COMPLETED ..........................................

WORK COMPLETED / FIELD BOOK

ASSET RECORDING

I ................................................................................

OF ..........................................................................

CONTACT No ..........................................................

SIGNATURE .............................. DATE ................

SIGNATURE .............................. DATE ................

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT

ON THIS DRAWING HAVE BEEN RECORDED AS PER

ENDEAVOUR ENERGY STANDARD SAD 0004.

CONSTRUCTED BY ...............................................

SIGNATURE .............................. DATE ................

AMENDMENT.....................................................................

DATE APPROVED : ..........................................................

EXAMINER'S SIGNATURE : .............................................

THIS CERTIFICATION IS ISSUED SUBJECT TO

ENDEAVOUR ENERGY'S STANDARD CERT. TERMS.

PRINT NAME : ...................................................................

SLV.

HV.

HV.

HV.

SLV.

HV.

SL.

SLV.

HV.

SL.

SSLV.

SLV.

EHV.

SLV.

EHV.

SL.

SL.

SLV.

S S

LV.

SL.

SLV.

SL.

SL.

SLV.

EHV.

SSLV.

EHV.

SHV.

LV.

S

SLV.

E

SLV.

HV.E

SLV.

HV.E

SL.

SLV.

HV.E

SL.

E

SLV.

HV.E

SLV.

HV.E

SL.

SLV.

SL.

E

S

LV.

SLV.

EHV.

E

SLV.

EHV.

E

SL.

EE E

LV.

SLV.

SL.

SLV.

SLV.

SL.

SLV.

SLV.

SLV.

SL.

SL.

SLV.

SLV.

SL.

SLV.

SLV.

SLV.

SLV.

SL.

SLV.

S

LV.

SLV.

S

LV.

SL.

SLV.

EHV.

SLV.

HV.E

SL.

SLV.

E

S

HV.E E

S

EE E

SLV.

SLV.

EHV.

SL.

SLV.

EHV.

SLV.

EHV.

SL.

SLV.

EHV.

SLV.

EHV.

LV.

SLV.

EHV.

E E

SLV.

HV.E

SL.

SL.

SL.

SL.

HV.

EHV.

E E

HV.

S

LV.

HV.

SLV.

SL.

E

EHV.

SLV.

EHV.

EHV.

SL.

EHV.

EHV.

SL.

SL.

SLV.

EHV.

PLAN SYMBOLS

DIRECT BURIED CABLE

SPARE 50mm DUCT

SPARE 125mm DUCT

DUCT WITH EXISTING CABLE

DUCT WITH NEW CABLE

E S

E S

Ebrahw
Typewritten Text
A
Ebrahw
Typewritten Text
7/02/2018
Ebrahw
Typewritten Text
WAHEED EBAHIMI
Ebrahw
Typewritten Text
Page 7: WARNING WORK COMPLETED / FIELD BOOK€¦ · hv cable trench lv cable trench install 40mm pvc service conduit existing underground cable pillar earthing locations.')'0& proposed s.l.

SUBSTATIONS

UNDERGROUND

OVERHEAD

GENERAL

REFERENCE DRAWING'S

ORIGINAL

LOCAL GOV AREA

CH'D

HV OP DIAGRAM

UBD/PENGUIN REF

HV SWITCHING

AM PROJ. No.

CAP / SAMP No.

WORK ORDERS

GIS MAP No

DRAWN

DATE

DESIGN

DO NOT

SCALE

METRES

DIMENSIONS

SCALE

IN

SHEET No OF SHEETS

A1

C THIS DRAWING

AND THE

COPYRIGHT

THEREIN IS THE

PROPERTY OF

ENDEAVOUR ENERGY AND

MAY NOT BE COPIED,

REPRODUCED,

DISTRIBUTED, LOANED OR

USED WITHOUT THE

WRITTEN CONSENT OF

ENDEAVOUR ENERGY

EPD REFERENCE No.

ABN 69 002 331 142

TEL:(02) 4731-8333 FAX (02) 4731-1594

P.O. BOX 1872, PENRITH BC, 2751

ELECTRICAL RETICULATION CONSULTANTS

EMAIL: [email protected]

A

AM

EN

DM

EN

TS

IS

SU

E

OR

IG

IN

AL

5 6 7 8 9

10

11 12

H

G

F

E

D

C

87 109 1211

H

G

F

E

D

C

B

A

652 431

B

4321

EPD 1.6

06.02.18 505307A

7 7

B.H.

E.C.

B.H.

1:1000

URS 18621

MAP 63 REF.G13

6482.94

NORTH RICHMOND:J4

HAWKESBURY

505306 DUCT, EASEMENT & TRENCH REQ'S

10/233/ER11NA

INSPECTED BY .....................................................

WORKS COMPLETED ..........................................

WORK COMPLETED / FIELD BOOK

ASSET RECORDING

I ................................................................................

OF ..........................................................................

CONTACT No ..........................................................

SIGNATURE .............................. DATE ................

SIGNATURE .............................. DATE ................

HEREBY CERTIFY THAT ASSETS MARKED AS-BUILT

ON THIS DRAWING HAVE BEEN RECORDED AS PER

ENDEAVOUR ENERGY STANDARD SAD 0004.

CONSTRUCTED BY ...............................................

SIGNATURE .............................. DATE ................

AMENDMENT.....................................................................

DATE APPROVED : ..........................................................

EXAMINER'S SIGNATURE : .............................................

THIS CERTIFICATION IS ISSUED SUBJECT TO

ENDEAVOUR ENERGY'S STANDARD CERT. TERMS.

PRINT NAME : ...................................................................

URBAN SUBDIVISION RELATED REIMBURSEMENT - DUCT & HV. CABLE SCHEDULE

NOTE - ALL TRENCH SECTIONS ARE TO BE READ & VIEWED FROM NODE TO NODE AS NOMINATED.

DUCT & CABLE SCHEDULE CODE

T & R: - HV LIGHT TRENCHING & REINSTATEMENT

LC: - LAY HV. CABLE - DIRECTLY BURIED IN TRENCH

C: - CABLE - MATERIALS

LD: - LAY HV. 125mm DUCTS IN TRENCH

PC: - LAY CABLE - PULL CABLE THROUGH DUCTS

D: - LAY HV. DUCT IN SL/LV TRENCH

* ALL LENGTHS ENTERED IN METRES (m)

NODES

DUCT

CONFIG.

ROUTE

LENGTH

(m)

CUSTOMER

FUNDED DUCTS

CAPITAL CONTRIBUTION - HV CABLE & DUCT CONSTRUCTION IN

URBAN SUBDIVISIONS (m)

OTHER DUCT

REIMBURSEMENT

(m) x ($)

EXISTING DUCT

USAGE

(m) x ($)

T & R LD LC PC

C (AL) C (CU)

D

M5 - M6

NEW

33m 1 x 125mm - - - - - - - - -

M5 - N9

NEW ROAD

CROSSING

25m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

25m 50m - 25m 25m - - - -

M6 - M7

NEW

12m 1 x 125mm - - 12m - 12m - 12m - -

M7 - M8

NEW

16m

1 x 50mm

1 x 125mm

- - 16m - 16m - 16m - -

M8 - M9

NEW

65m 1 x 125mm - - 65m - 65m - 65m - -

M9 - N2

NEW

16m

1 x 50mm

1 x 125mm

- - 16m - 16m - 16m - -

N2 - N3

NEW

13m 1 x 125mm - - 13m - 13m - 13m - -

N3 - K9

NEW ROAD

CROSSING

25m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

25m 50m - 25m 25m - - - -

N3 - N4

NEW

35m 1 x 125mm - - - - - - - - -

N4 - N5

NEW

33m

1 x 50mm

1 x 125mm

- - - - - - - - -

N5 - N6

NEW

16m 1 x 50mm - - - - - - - - -

M6 - N7

NEW ROAD

CROSSING

15m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - 15m 15m - 30m - -

N7 - N8

NEW

30m 1 x 125mm - - 30m - 30m - 30m - -

N8 - N9

NEW

7m 1 x 125mm - - 7m - 7m - 7m - -

N9 - P2

NEW

30m

1 x 50mm

1 x 125mm

- - 60m - 60m - 30m - -

P2 - P3

NEW

33m 1 x 125mm - - 66m - 66m - 33m - -

P3 - P4

NEW

16m

1 x 50mm

1 x 125mm

- - 32m - 32m - 16m - -

P4 - P5

NEW

33m 1 x 125mm - - 66m - 66m - 33m - -

P5 - P6

NEW

35m

1 x 50mm

1 x 125mm

- - 70m - 70m - 35m - -

P6 - P7

NEW

5m 1 x 50mm - - - - - - - - -

P6 - P8

NEW

26m 1 x 125mm - - 52m - 52m - 26m - -

P8 - P9

NEW

17m

1 x 50mm

1 x 125mm

- - 34m - 34m - 17m - -

P9 - Q2

NEW

41m 1 x 125mm - - 82m - 82m - 41m - -

Q2 - Q3

NEW

23m

1 x 50mm

1 x 125mm

- - 46m - 46m - 23m

Q3 - Q4

NEW

20m

1 x 50mm

1 x 125mm

- - - - - - - - -

URBAN SUBDIVISION RELATED REIMBURSEMENT - DUCT & HV. CABLE SCHEDULE

NOTE - ALL TRENCH SECTIONS ARE TO BE READ & VIEWED FROM NODE TO NODE AS NOMINATED.

DUCT & CABLE SCHEDULE CODE

T & R: - HV LIGHT TRENCHING & REINSTATEMENT

LC: - LAY HV. CABLE - DIRECTLY BURIED IN TRENCH

C: - CABLE - MATERIALS

LD: - LAY HV. 125mm DUCTS IN TRENCH

PC: - LAY CABLE - PULL CABLE THROUGH DUCTS

D: - LAY HV. DUCT IN SL/LV TRENCH

* ALL LENGTHS ENTERED IN METRES (m)

NODES

DUCT

CONFIG.

ROUTE

LENGTH

(m)

CUSTOMER

FUNDED DUCTS

CAPITAL CONTRIBUTION - HV CABLE & DUCT CONSTRUCTION IN

URBAN SUBDIVISIONS (m)

OTHER DUCT

REIMBURSEMENT

(m) x ($)

EXISTING DUCT

USAGE

(m) x ($)

T & R LD LC PC

C (AL) C (CU)

D

Q4 - Q7

NEW

80m 1 x 125mm - - - - - - - - -

Q5 - T9

NEW ROAD

CROSSING

15m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

Q7 - Q8

NEW

33m 1 x 125mm - - - - - - - - -

Q8 - Q9

NEW

16m

1 x 50mm

1 x 125mm

- - - - - - - - -

Q9 - R3

NEW

23m 1 x 125mm - - - - - - - - -

R2 - R3

NEW

5m 1 x 50mm - - - - - - - - -

R3 - R4

NEW

34m

1 x 50mm

1 x 125mm

- - - - - - - - -

R4 - R5

NEW

65m 1 x 125mm - - - - - - - - -

R5 - R6

NEW

16m

1 x 50mm

1 x 125mm

- - - - - - - - -

R6 - R7

NEW

45m 1 x 125mm - - - - - - - - -

R7 - N7

NEW

60m 1 x 125mm - - - - - - - - -

R7 - S9

NEW ROAD

CROSSING

38m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

R8 - R9

NEW ROAD

CROSSING

14m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - 42m - -

R9 - S2

NEW

6m

1 x 50mm

2 x 125mm

- - - - - - - - -

S4 - Z6

NEW ROAD

CROSSING

12m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

S3 - Z5

NEW

28m 1 x 50mm - - - - - - - - -

Z5 - S4

NEW

28m

1 x 50mm

2 x 125mm

- - - - - - - - -

S4 - S5

NEW

7m 2 x 125mm - - - - - - - - -

S4 - S6

NEW ROAD

CROSSING

24m

EXIST.

INSTALLED

UNDER CIVIL

WORKS

- - - - - - - - -

S6 - S7

NEW

27m 1 x 125mm - - - - - - - - -

S7 - S8

NEW

14m

1 x 50mm

1 x 125mm

- - - - - - - - -

S8 - T2

NEW

40m 1 x 125mm - - - - - - - - -

T2 - T3

NEW

27m

1 x 50mm

1 x 125mm

- - - - - - - - -

T3 - T4

NEW

54m 1 x 125mm - - - - - - - - -

T4 - T5

NEW

54m

1 x 50mm

1 x 125mm

- - - - - - - - -

URBAN SUBDIVISION RELATED REIMBURSEMENT - DUCT & HV. CABLE SCHEDULE

NOTE - ALL TRENCH SECTIONS ARE TO BE READ & VIEWED FROM NODE TO NODE AS NOMINATED.

DUCT & CABLE SCHEDULE CODE

T & R: - HV LIGHT TRENCHING & REINSTATEMENT

LC: - LAY HV. CABLE - DIRECTLY BURIED IN TRENCH

C: - CABLE - MATERIALS

LD: - LAY HV. 125mm DUCTS IN TRENCH

PC: - LAY CABLE - PULL CABLE THROUGH DUCTS

D: - LAY HV. DUCT IN SL/LV TRENCH

* ALL LENGTHS ENTERED IN METRES (m)

NODES

DUCT

CONFIG.

ROUTE

LENGTH

(m)

CUSTOMER

FUNDED DUCTS

CAPITAL CONTRIBUTION - HV CABLE & DUCT CONSTRUCTION IN

URBAN SUBDIVISIONS (m)

OTHER DUCT

REIMBURSEMENT

(m) x ($)

EXISTING DUCT

USAGE

(m) x ($)

T & R LD LC PC

C (AL) C (CU)

D

T5 - T6

NEW

27m 1 x 125mm - - - - - - - - -

T6 - T7

NEW

8m 1 x 50mm - - - - - - - - -

T7 - T8

NEW

20m 1 x 50mm - - - - - - - - -

Q6 - U2

NEW

52m 1 x 50mm - - - - - - - - -

TOTAL NEW (m)

3519m

50mm = 1301m

125mm = 2808m

163m 414m 1681m 699m 2105m 275m 2004m - -

TOTAL ($) $3,232 $576 $0 $2,796 $0 $23,100 $0 - -

SLV.

SL.

SLV.

SLV.

LV.S

SLV.

SL.

SLV.

SL.

SLV.

SL.

SLV.

SLV.

SL.

SLV.

SLV.

LV.S

LV.

E E E

S S

SLV.

SL.

SL.

SSLV.

S

LV.

SLV.

SLV.

SL.

SLV.

SLV.

SL.

SLV.

SLV.

SL.

SLV.

SL.

SL.

SLV.

SL.

S

SL.

SL.

SLV.

EHV.

SLV.

EHV.

SL.

SLV.

EHV.

S

LV.S

SLV.

EHV.

SL.

SLV.

EHV.

SLV.

EHV.

SL.

SLV.

EHV.

SLV.

EHV.

HV.E

SLV.

SLV.

SL.

SL.

SLV.

E

HV.

SLV.

EHV.

SLV.

EHV.

SL.

SLV.

EHV.

SL.

SLV.

EHV.

SLV.

EHV.

SL.

SLV.

EHV.

SLV.

EHV.

SL.

SLV.

EHV.

SLV.

EHV.

HV.

LV.

PLAN SYMBOLS

DIRECT BURIED CABLE

SPARE 50mm DUCT

SPARE 125mm DUCT

DUCT WITH EXISTING CABLE

DUCT WITH NEW CABLE

E S

E S

Ebrahw
Typewritten Text
A
Ebrahw
Typewritten Text
7/02/2018
Ebrahw
Typewritten Text
WAHEED EBRAHIMI
Ebrahw
Typewritten Text
Ebrahw
Line
Ebrahw
Line
Ebrahw
Line
Ebrahw
Line
Ebrahw
Line
Ebrahw
Line
Ebrahw
Line
Ebrahw
Line
Ebrahw
Line
Ebrahw
Line
Ebrahw
Typewritten Text
$16,463
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
$2,484
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
$16,810
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
$69,465
Ebrahw
Typewritten Text
$46,092
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
Ebrahw
Typewritten Text
WE
Ebrahw
Typewritten Text