WALES - SP Energy Networks · proposed 132 kv pole positions preferred line route (of the 132 kv...
Transcript of WALES - SP Energy Networks · proposed 132 kv pole positions preferred line route (of the 132 kv...
WALESRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
01 OF 1
A3 (420 mm x 297 mm)1:55,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.1.mxd
Scheme Name:
0 1 20.5
Kilometres
PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWN
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED CHAPTER 1: INTRODUCTION
FIGURE 1.1 PROPOSED PROJECT BOUNDARYOVERVIEW
KEY
Chapter:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
Document Title:
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
CON
TIN
UES
ON
PAG
E2
OF
6
1 2 3 4 5 6 7 89
10 1112
13
1415
1617
1819
2021
22 23
2 3 4 5 61
KEYRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
01 OF 6
A3 (420 mm x 297 mm)1:10,000
°
PAGE 1 OF 6
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWN
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd
Scheme Name:
CHAPTER 1: INTRODUCTION
FIGURE 1.2 PROPOSED PROJECT BOUNDARY
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 150 30075
Metres
CON
TIN
UES
ON
PAG
E1
OF
6
CON
TIN
UES
ON
PAG
E3
OF
6
1819
2021
22
23
24 25 2627
2829
30
31 32 33 34 35 36 37 38 39 40 41 42 43 44
45
4647 48 49
50 51 52
13 4 5 6
2
KEYRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
02 OF 6
A3 (420 mm x 297 mm)1:10,000
°
PAGE 2 OF 6
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWN
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd
Scheme Name:
CHAPTER 1: INTRODUCTION
FIGURE 1.2 PROPOSED PROJECT BOUNDARY
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 150 30075
Metres
CON
TIN
UES
ON
PAG
E2
OF
6
CON
TIN
UES
ON
PAG
E4
OF
6
45 4647 48 49
50 51
52
53
54 55 56 57 58 59 60 61 62 63 64
65
66
67
68
69 70 71 72
7374
75
76
77
78
79
80
81
82
1 24 5 63
KEYRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
03 OF 6
A3 (420 mm x 297 mm)1:10,000
°
PAGE 3 OF 6
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWN
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd
Scheme Name:
CHAPTER 1: INTRODUCTION
FIGURE 1.2 PROPOSED PROJECT BOUNDARY
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 150 30075
Metres
CON
TIN
UES
ON
PAG
E3
OF
6
CON
TIN
UES
ON
PAG
E5
OF
6
76
77
78
79
80
81
82
83
84
8586
8788
8990
9192
9394
9596
97 98 99100 101 102 103 104 105 106 107 108
1 2 35 64
KEYRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
04 OF 6
A3 (420 mm x 297 mm)1:10,000
°
PAGE 4 OF 6
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWN
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd
Scheme Name:
CHAPTER 1: INTRODUCTION
FIGURE 1.2 PROPOSED PROJECT BOUNDARY
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 150 30075
Metres
CON
TIN
UES
ON
PAG
E4
OF
6
CON
TIN
UES
ON
PAG
E6
OF
6
104 105 106 107 108 109 110 111
112
113
114
115
116117
118119
120121
122
123
124 125126
127128
129
130
131
132
133
134
135
136137
138
1 2 3 4 65
KEYRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
05 OF 6
A3 (420 mm x 297 mm)1:10,000
°
PAGE 5 OF 6
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWN
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd
Scheme Name:
CHAPTER 1: INTRODUCTION
FIGURE 1.2 PROPOSED PROJECT BOUNDARY
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 150 30075
Metres
CON
TIN
UES
ON
PAG
E5
OF
6
134
135
136137
138
139140
141
142
143
144
145
146
147
148 149 150 151 152 153 154 155 156 157 158159
160161
162
163164
165
166
167
168
169
170
171172
173
174
175
176
1 2 3 4 5 6
KEYRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
06 OF 6
A3 (420 mm x 297 mm)1:10,000
°
PAGE 6 OF 6
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWN
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd
Scheme Name:
CHAPTER 1: INTRODUCTION
FIGURE 1.2 PROPOSED PROJECT BOUNDARY
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 150 30075
Metres