WA104Aluminum Cold Vessels
A possible scenario
![Page 2: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/2.jpg)
CAVEAT
• Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions and geometry).
• All readout and pipes are assumed to be the one of today. Need to decide on final layout
For the moment (for this discussion) lets assume the layout of the existing ICARUS detector
![Page 3: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/3.jpg)
To be constructed : two cold vessels with these dimensions
![Page 4: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/4.jpg)
To be constructed : two cold vessels with these dimensions
![Page 5: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/5.jpg)
Strategy
Construction in 6 steps:
1) Prepare all technical specs2) Produce extruded Aluminum plates and corner plates of limited
dimension with a press, move the pieces to an assembly firm3) Assemble 8 x 20 m long walls with all the required holes and chamfers4) Transfer the long walls to CERN5) At CERN assemble the 2 cryostats
1 New contract with an engineering firm (we have an offer)2 & 3 can be the same contract (but not necessarily)4 Transport organized by CERN5 to be done in bldg 185, contract welding to a firm, assembly with local
manpower, contract for QA
![Page 6: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/6.jpg)
2 & 3 Scenario :
Extrusion firm produces :
350 basic panels (0.497 width) , include spares
95 ml of corner pieces (~5.5 m), include spares
Extrusion offer today ~400Keuro
Extrusion firm passes the material to a second firm which assemble:
2 x 20m welded floor assemblies + corner piece +chamfers + feet holes4 x 20m welded walls assemblies + corner piece + chamfers 2 x 20m welded roof assemblies + corner piece + chamfers + feedthrough
holes4 x 4m welded end caps + bolted flange
Transport to CERN of the 8 large panels (20m), one/two special transports
1 single contract, 1 single MS + tender : need detailed construction drawings Advantage : all geometrical parameters well defined (dimensions + planarity +
tolerances To be clarified : end doors assembly
![Page 7: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/7.jpg)
Base material: extruded Aluminum profiles ~ 5.2 euro/kg
Corner pieces : 2 x (4 x (4 x 5.5)) ~ 88 ml
@ 33.2 kg/ml -> ~ 2.95 Tons ~ 15K+31K= 46 keuro
Walls pieces : 2 x (4 x (40 )) ~ 320 panels
@ 49.3 kg/m2 ~ -> 168 kg/panel ~ 53.56 Tons = 281 +31 = 312 keuro
3.600 m
3.900 m
Total ~ 400Keuro
![Page 8: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/8.jpg)
2 & 3 & 4 Scenario summary :
Assembly workshop
- panels welding- panels machining
To CERN bldg 185
Extrusion Firm
![Page 9: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/9.jpg)
What arrives to CERN (4 pieces/vessel) ?
![Page 10: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/10.jpg)
Step 5 assembly tools
![Page 11: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/11.jpg)
Step 5 assembly step 5.1
![Page 12: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/12.jpg)
Step 5 assembly step 5.2
welding
![Page 13: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/13.jpg)
Step 5 assembly step 5.3
welding
![Page 14: WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.](https://reader035.fdocuments.in/reader035/viewer/2022081603/56649f295503460f94c43095/html5/thumbnails/14.jpg)
Step 5 assembly step 5.4
welding welding