w w w . h m r . g o v . i n NVS Reddy Managing Director Hyderabad Metro Rail Ltd. Hyderabad Metro Rail in PPP Mode Presentation to the 6 th Global Infrastructure Leadership Forum

Transcript of W w w. h m r. g o v. i n NVS Reddy Managing Director Hyderabad Metro Rail Ltd. Hyderabad Metro Rail...

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

NVS ReddyManaging Director

Hyderabad Metro Rail Ltd.

Hyderabad Metro Rail in PPP Mode

Presentation to the 6th Global Infrastructure Leadership Forum

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

A completely elevated MRT project in Hyderabad, Southern India

3 Corridors/Lines (72 km) taken up in Phase I

UMT sector - World’s largest Metro Rail project in PPP mode

Main project cost : USD 2.66 b + Property Devpt. ph.I (USD 0.41b) + Land + other costs (USD 0.37 b) = USD 3.44 b

Implementing Entity:

● Concessioning Authority: Hyderabad Metro Rail Limited (Govt. of AP) 

● Concessionaire (Pvt. Sector): L&T Metro Rail (Hyderabad) Limited, an SPV of USD 12 b L&T

Hyderabad Metro Rail Project

1

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

India

India

Hyderabad

Hyderabad city – geographical location

2

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

Hyderabad, a city of 8m pop

Capital of the Southern State of Telangana

Historical City – now hub of pharma industry, research institutes, IT/ITES Service Sector Economy

Severe traffic congestion & increasing pollution levels

Lack of efficient, reliable & comfortable PTS increase in personal vehicles: 3.0 million vehs + addition of 0.3 m p.a

Total motorized trips: 7 m per day – Bus + local rail: 44%; Two wheelers: 30%; Autos: 16%; cars: 10%

Traffic & Transportation Scenario in Hyderabad

3

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

Phase I: 3 corridors; 72 km; 66 stations & 3 Depots

Integration/Interchange with Main rail terminals & Bus Depots

‘Transit +’ concept: Last mile connectivity with Feeder Buses, NMT, Pedestrian Facilities & Street Furniture

Not a simple Metro, but an urban redesign & rejuvenation effort to transform Hyderabad into a people friendly green city

Eco-friendly stations with natural ventilation, skywalks, bicycle stations & tracks and other commuter friendly facilities

Expected to generate about INR 500 b (USD 8.06 b) investments in Hyderabad & it’s surroundings

Hyderabad Metro Rail as “ Transit + ”

4

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

35 yr concession, extendable by another 25 yrs

World’s largest Metro in ppp mode

Main project cost : USD 2.28 b (INR 14,132 Cr.) + Property Devpt. ph.I USD 0.36b (INR 2,243 Cr.) + Land & other costs USD 0.32 b (INR 1,980 Cr.) = USD 2.96 b (INR 18,355 Cr.)

Commercial risk by Concessionaire & no traffic guarantees

Well balanced & bankable Concession Agreement; transparent global bid process

Technology–neutral & performance based ‘output’ oriented MSS (tech specs)

RfQ & RfP stages – DCA; MSS & SHA

PPP Format

5

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

Scope for design innovation & reduction in life cycle costs

269 acres (109 Ha) land; commercial exploitation of air space to create 18.5 m SFT – lease rentals

Prefixed tariff & fare escalation formula; differential tariff (peak vs off peak hours)

Stations as hubs of activity – shopping malls, multiplexes & leisure; hotels & eateries; hospitals, clinics, office space etc

Ridership & property development boosting each other financial viability

PPP Format

6

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

Project cost : USD 2.73 b (INR 16,375 Cr.)(MRT : 2.36 b (INR 14,132 Cr.) + Property Devpt : 0.37 b (INR 2,243 Cr.))

Senior Debt : USD 1.91 b (INR 11,478 Cr.) Subordinate Debt : USD 0.17 b (INR 1,000 Cr. ) Equity : USD 0.41 b (INR 2,439 Cr.) Other Sources (VGF) : USD 0.24 b (INR 1,458 Cr.)

Total : USD 2.73 b (INR 16,375 Cr.)

Financial Closure achieved in March 2011

Revenue Model: 50% from Fare box; 45% from Property devpt; 5% Misc (Ads + Parking fee)

IRR

Project IRR : 13.89%

Equity IRR : 17.50%

Funding Pattern & Financial model

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

Lenders’ Engineer

Consultants for Carbon Credits

• Independent Engineer : Louis Berger, USA • Safety Consultant : Eptisa, Spain

Programme Manager

Concessionaire’s Engineer(CE)

Independent Safety and RAM Assessor

Lenders Insurance Consultant-Marsh India Pvt. Ltd.

Operation & Maintenance Contractor

The Team (Authority, Concessionaire, Consultants etc.,)

Concessionaire : L&TMRHL

Authority : Hyderabad Metro Rail Limited (GoT)

8

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

Engineering, Procurement & Construction contractors

Packages Vendors

Viaduct, Stations & Depots L&T Construction

Rolling Stock Hyundai Rotem, South Korea

Power supply + SCADA L&T Construction

Traction L&T Construction

Signaling & Train Control Thales, Canada (French company)

Communication Thales, Portugal (French company)

Track works(Turnouts / Rails / Fastening system)

L&T Construction along with(Voest Alpine, Austria + Tata Corus, France + Vossloh, Germany)

O&M Operator Keolis France

Automatic Fare Collection (AFC)

Samsung, South Korea

9

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

Contact Information

Name : Mr N.V.S.Reddy

Company : Hyderabad Metro Rail Ltd.

Role in Project : Managing Director

Phone : +91 40 2338 8580 / 81 (Fax 82)

Email : [email protected]

Website : www.hmr.gov. in

Name : Mr V.B.Gadgil

Company : L&T Metro Rail (Hyderabad) Ltd.

Role in Project : Managing Director

Phone : +91 40 67295500 | Fax: +91 40 23123015

Email : [email protected]

Website : www.ltmetro.in

10

w w w . h m r . g o v . i nw w w . h m r . g o v . i n 11

w w w . h m r . g o v . i nw w w . h m r . g o v . i n 12

w w w . h m r . g o v . i nw w w . h m r . g o v . i n

N.V.S.Reddy