VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and...
Transcript of VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and...
![Page 1: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/1.jpg)
VTrans Better Roads Program
Rachel Beauregard, Project Supervisor June 2017
![Page 2: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/2.jpg)
VTrans and the Better Roads Program
• VTrans’ Strategic Goals and Agency-wide Objectives• Preserve, maintain and operate the transportation system in a cost effective and environmentally responsible manner.
• Minimize the environmental impacts of the transportation system
• History• Program’s 20th year• 5th year at VTrans, previously at Northern VT RC&D
• Funding• Approx. $3 million in funding (up from $300k 2 years ago)• Approximately 225 projects each year
• Grants• Category A – Road Erosion Inventory & Budget Plan ($8,000)• Category B – Correction of a Road Related Erosion Problem OR Stormwater Mitigation/Retrofits ($20,000)• Category C – Bank Stabilization ($40,000)• Category D – Culvert Upgrade/Replacement ($40,000)
2
![Page 3: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/3.jpg)
Better Roads Program Goals and Guiding Principles• Goals
• Promote the use of erosion control and maintenance techniques to:• Save money on maintenance• Provide lasting fixes to erosion issues• Enhance and protect water quality
• Guiding Principles• Get water off the road quickly• Stabilize and revegetate disturbed areas• Divert runoff/sediment from surface waters• Save money by decreasing maintenance and repairs• Good maintenance and infrastructure reduces
susceptibility to flash flood damage
3
![Page 4: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/4.jpg)
It takes a village
Community support and collaboration with funding and permitting agencies
is essential for a successful project!
VTrans Better Roads
Program
ANR DEC
Regional Planning
Commissions
VTrans Maintenance
Districts
Vermont League of Cities and
TownsNatural Resource
Conservation Districts
Municipalities
Road Foremen Selectboards
Town Managers
Community Members
Local volunteer groups &
organizations
VTrans Hydraulics
4
![Page 5: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/5.jpg)
Best Management Practices(BMP’s)
![Page 6: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/6.jpg)
Better Roads Manual
http://vtrans.vermont.gov/sites/aot/files/highway/2009%20Better%20Backroads%20Manual.pdf6
![Page 7: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/7.jpg)
Ditch Installation ProjectsBefore & After
7
Groton, VT Eden, VT
![Page 8: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/8.jpg)
Ditch Installation BMP’s
• Diagrams are ideal, adjust according to field conditions.
• Vegetative measures wherever possible.
• Seed and mulch at the end of each day.• Recommend hydroseed if possible.
• Work from the top of the hill down to the bottom.
• Size stone depends on the flow through the ditch at any given point.
8
![Page 9: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/9.jpg)
Bank Stabilization
9
![Page 10: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/10.jpg)
• Vegetated if possible, stone as a last resort.• Plant selection makes a huge difference!
• Vigorous growers.• Strong, long, aggressive roots.• Above ground growth shouldn’t be large/heavy.
• Emphasize chinking and using appropriately sized stone.
• Consider drainage.
• Trees provide structure.• Pay attention to roots when cutting. If you’re under
the crown of the tree then you’re into the roots.• Trees may be holding a wet hill together.
• Permits usually required! Plan ahead!
10
Bank Stabilization BMP’s
![Page 11: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/11.jpg)
Culverts: Replacement, Upgrade, Inlet/Outlet Stabilization
11
![Page 12: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/12.jpg)
Culvert BMP’s
• Importance of hydraulic study• VTrans does these for towns for culverts over 36”
• Bed profile• Streams will make their own smooth bed profile if you don’t
make it!
• Compaction & cover• One of the biggest reasons plastic culverts fail• Poor compaction is a recipe for disaster
• Headers & footers• Prevent high velocity erosion before it starts• Many different options depending on your budget
12
![Page 13: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/13.jpg)
Green Stormwater Infrastructure
13
• Newer practice for many road foremen• Start small and provide education• Will be incorporated into new manual• Consider maintenance on dirt roads
• Pretreatment is key!
![Page 14: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/14.jpg)
Remember, there’s NEVER just one solution to a problem!
• Cost• Maintenance• Safety• Community perception & support• Importance of education & training
14
![Page 15: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/15.jpg)
Case Study: Charlotte, VT East Thompson’s Point Rd.
15
![Page 16: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/16.jpg)
Background• Surrounding area
• Thorp Brook watershed• Neighboring farm (Mack Farm)
• Problems• Overall sediment problem
• Nitrogen• Phosphorus• TSS
• Farm field erosion• Overwhelmed ditches• Sharp bend in swale• Undersized culvert
16
![Page 17: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/17.jpg)
Options, options, options!
17
• Look at the whole road• Surrounding land use• Crown• Ditches• Culverts• Treatment area
• Options• Winter sand use & testing
• Maintains integrity of road surface material
• Grass vs. stone lined ditch• Check dams• Turnouts• Realignment
• Stormwater treatment• Settling ponds• Bioretention
• Crown• Culvert replacement• Alterations to surrounding
land use
![Page 18: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/18.jpg)
Solutions
18
Realigned swale Reshaped grass swale Upsized culvert & stabilized access
![Page 19: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/19.jpg)
19
Solutions
Stone lined swale and check dams Bioretention Town constructing project
![Page 20: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/20.jpg)
Community Collaboration
• Town constructed
• Hired engineer for design and construction support (Milone & MacBroom)
• Mack Farm donated land & agreed to provide buffer
• Lewis Creek Association – Ahead of the Storm
• VTrans Better Roads
• VT ANR
• VT Nature Conservancy
• VT Land Trust
• US NRCS
Total Project cost (w/o engineering) ~$35,00020
![Page 21: VTrans Better Roads Program - Lake Champlain Basin Program · Better Roads Program Goals and Guiding Principles • Goals • Promote the use of erosion control and maintenance techniques](https://reader034.fdocuments.in/reader034/viewer/2022042217/5ec085f2d4d8c77c91243e75/html5/thumbnails/21.jpg)
Questions?
VTrans Better Roads Websitehttp://vtrans.vermont.gov/highway/better-roads
Rachel Beauregard, Project Supervisor
(802) 828-5608
Linda Blasch, Program Coordinator
(802) 498-7216
Alan May, Program Coordinator
(802) 828-4595
21