Federal Aviation Administration Presented to: Aeronautical Charting Forum, ACF 12-02 Presented by: Navigation Program Engineering Date: October 24, 2012 VOR Minimum Operational Network (MON) Implementation

Transcript of VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation...

Page 1: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

Federal AviationAdministration

Presented to: Aeronautical Charting Forum, ACF 12-02

Presented by: Navigation Program Engineering

Date: October 24, 2012

VOR Minimum Operational Network

(MON) Implementation

Page 2: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

2Federal AviationAdministration

VOR MON ImplementationOctober 2012

Background• The FAA will transition from VOR-defined route structures

as the primary means of navigation to Performance-Based Navigation (PBN) – PBN uses Area Navigation (RNAV) and Required Navigation

Performance (RNP)

• VORs must give way to a safer, more reliable, and efficient means of air navigation– Objective is to provide improved accuracy, availability, integrity, and

continuity to support PBN

Page 3: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

3Federal AviationAdministration

VOR MON ImplementationOctober 2012

• The VOR Minimum Operational Network (MON) Implementation Program is a collaborative effort to provide management oversight, and tactical and strategic implementation guidance– Focuses on safety and coordination across organizational lines

of business (LOBs) – Transitions from a legacy network of 967 VORs to a MON of

approximately 500 VORs by a target date of January 1, 2020– This is one of a myriad of complex activities required to shift

resources from the legacy NAS into NextGen

• A Business Case is being developed for FAA approval

Objectives

Page 4: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

4Federal AviationAdministration

VOR MON ImplementationOctober 2012

Current Operating EnvironmentVOR-Based Federal Airways

• VORs do not support RNAV/RNP• 87% of VORs are beyond their service life• Annual operating costs and recap costs are an

issue in the tight budget environment

967 VORs

Page 5: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

5Federal AviationAdministration

VOR MON ImplementationOctober 2012

• Most Aircraft will have Performance Based Navigation (PBN) capability by 2020:– Majority of Aircraft will have GPS/WAAS capability

• In compliance with 2020 ADS-B Mandate – Air Carrier/Cargo/High-end GA will have DME/DME/Inertial Capability– Low-end GA may need VOR for backup when GPS is unavailable

Changing Environment

StreamlinedDepartures

Vector-FreeArrivals All-Weather

Approaches

Efficient, Flexible Routing

Page 6: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

6Federal AviationAdministration

VOR MON ImplementationOctober 2012

• As the FAA transitions to RNAV and PBN, aircraft reliance on VORs will decrease significantly

• This will allow the FAA to transition to a VOR MON, which will provide backup coverage, if needed, during a GPS outage– A majority of the Part 121/135 carriers will have GPS and

Distance Measuring Equipment/Inertial Reference Unit (DME/DME/IRU) or DME/DME and Instrument Landing System (ILS)

– For all other aircraft, the MON will provide sufficient back-up coverage to enable aircraft to proceed safely VOR-to-VOR and/or to a suitable landing destination with a GPS-independent approach within approximately 77 nm of any location in CONUS

Reducing Dependencies on VORs

Page 7: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

7Federal AviationAdministration

VOR MON ImplementationOctober 2012

Attributes of VOR MON Capability

• The VOR Minimal Operational Network (MON) will provide:– A backup capability for lower end GA IFR aircraft in the

event of a widespread GPS outage– An operational contingency, and not the robust network of

current VORs– A transitional network of VORs to allow users time to

equip with new avionics to transition to RNAV and RNP

Page 8: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

8Federal AviationAdministration

VOR MON ImplementationOctober 2012

• Federal Register Notice (FRN) published on proposed navigation strategy to inform external stakeholders of FAA intent

• Second notice published to provide FAA feedback to 330 comments received in response to the initial notice

• Notional VOR MON list developed for initial coordination

• Preliminary Operational Safety Assessment developed

• Strategy meetings with Service Areas and Service Centers conducted

• Separate briefings provided to external stakeholders: – AOPA, DOD, A4A

Steps Taken to Date

Page 9: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

9Federal AviationAdministration

VOR MON ImplementationOctober 2012

Concurrent Strategy Moving ForwardMethodology

• Program Activities– Business Plan

• In development • MON Cost /Benefits analysis

- Service Volume Engineering Analysis- Service Area Working Group

- AJV – Airspace and Procedures- AJE/ AJT/AJR – Involved- Full Coordination of Candidate

prioritization in Working Group - National Discontinuance Strategy

- MON Implementation Plan- Waterfall Schedule

- Safety Management / Risk Management

• OSA• PSP

Investment Planning• Major Milestones

– Investment Analysis Review Decision (IARD) JRC June 2013

• Initial Business Case• CONOPS• Shortfall Analysis• Requirements

Documentation• OSA

– Final Investment Decision (FID) JRC June 2014

– MON Achieved by January 2020

Page 10: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

10Federal AviationAdministration

VOR MON ImplementationOctober 2012

Next Steps

1) VOR MON list is being vetted in the FAA (HQ and Service Areas)– FAA Working Group (WG) will modify list, as appropriate (WG

composition: PMO, AJV, AJE, AJT, AJW, AFN, and ANG membership, others will be added as identified.)

– Once the list is finalized in the FAA, results will be shared with external stakeholders

2) External stakeholder working group (including AOPA, A4A, DoD, others) will further scrub list – List will be modified, as appropriate

– Fully coordinated list will be finalized

Page 11: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

11Federal AviationAdministration

VOR MON ImplementationOctober 2012

Next Steps (cont.) 3) Develop implementation plan and waterfall schedule

– VOR MON implementation plan will take all other PBN transition plans into account:

• Instrument Flight Procedures Cancellation Plans; • Optimization of Airspace and Procedures in the Metroplexes; and• Development of high and low altitude RNAV Routes

– Development of VOR MON waterfall schedule will correlate with removal and/or replacement of Instrument Flight Procedures

4) Achieve FAA approval of Business Case (JRC FID)5) Discontinue VORs according to the plan

– Starting in FY-14, VORs will be discontinued according to the waterfall schedule

– Each VOR identified to be discontinued will go through formal rule-making that will result in new procedures as appropriate

– Achieve the VOR MON by January 1, 2020

Page 12: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

12Federal AviationAdministration

VOR MON ImplementationOctober 2012

MON Implementation

VOR

FY2016 FY2020FY2013

967

497

FY2025

VOR MON achieved

APNT full operationalcapability

Num

ber o

f Fac

ilitie

s

0

ADS-B equipage mandate takes

effect

• Objective: Reduce dependence on VORs– Near-term: Discontinue approximately half of the VORs to a Minimum

Operational Network (MON) by 2020– Longer-term: Re-evaluate MON once full operational capability has been

achieved for Alternate Positioning Navigation and Timing (APNT) service

?

Page 13: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

13Federal AviationAdministration

VOR MON ImplementationOctober 2012

Back-up Materials

Page 14: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

14Federal AviationAdministration

VOR MON ImplementationOctober 2012

Notional MON Airports

14

Coverage for Approaches and Landings

Green: GA ILS Airports (153)Red: GA VOR Airports (53)Purple Line: No change

Page 15: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

15Federal AviationAdministration

VOR MON ImplementationOctober 2012

Notional VOR MON at 5000 ft. AGL

15

En route Coverage

Page 16: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012  · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight

16Federal AviationAdministration

VOR MON ImplementationOctober 2012

Past and Current DME Coverage