VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation...
Transcript of VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation...
![Page 1: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/1.jpg)
Federal AviationAdministration
Presented to: Aeronautical Charting Forum, ACF 12-02
Presented by: Navigation Program Engineering
Date: October 24, 2012
VOR Minimum Operational Network
(MON) Implementation
![Page 2: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/2.jpg)
2Federal AviationAdministration
VOR MON ImplementationOctober 2012
Background• The FAA will transition from VOR-defined route structures
as the primary means of navigation to Performance-Based Navigation (PBN) – PBN uses Area Navigation (RNAV) and Required Navigation
Performance (RNP)
• VORs must give way to a safer, more reliable, and efficient means of air navigation– Objective is to provide improved accuracy, availability, integrity, and
continuity to support PBN
![Page 3: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/3.jpg)
3Federal AviationAdministration
VOR MON ImplementationOctober 2012
• The VOR Minimum Operational Network (MON) Implementation Program is a collaborative effort to provide management oversight, and tactical and strategic implementation guidance– Focuses on safety and coordination across organizational lines
of business (LOBs) – Transitions from a legacy network of 967 VORs to a MON of
approximately 500 VORs by a target date of January 1, 2020– This is one of a myriad of complex activities required to shift
resources from the legacy NAS into NextGen
• A Business Case is being developed for FAA approval
Objectives
![Page 4: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/4.jpg)
4Federal AviationAdministration
VOR MON ImplementationOctober 2012
Current Operating EnvironmentVOR-Based Federal Airways
• VORs do not support RNAV/RNP• 87% of VORs are beyond their service life• Annual operating costs and recap costs are an
issue in the tight budget environment
967 VORs
![Page 5: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/5.jpg)
5Federal AviationAdministration
VOR MON ImplementationOctober 2012
• Most Aircraft will have Performance Based Navigation (PBN) capability by 2020:– Majority of Aircraft will have GPS/WAAS capability
• In compliance with 2020 ADS-B Mandate – Air Carrier/Cargo/High-end GA will have DME/DME/Inertial Capability– Low-end GA may need VOR for backup when GPS is unavailable
Changing Environment
StreamlinedDepartures
Vector-FreeArrivals All-Weather
Approaches
Efficient, Flexible Routing
![Page 6: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/6.jpg)
6Federal AviationAdministration
VOR MON ImplementationOctober 2012
• As the FAA transitions to RNAV and PBN, aircraft reliance on VORs will decrease significantly
• This will allow the FAA to transition to a VOR MON, which will provide backup coverage, if needed, during a GPS outage– A majority of the Part 121/135 carriers will have GPS and
Distance Measuring Equipment/Inertial Reference Unit (DME/DME/IRU) or DME/DME and Instrument Landing System (ILS)
– For all other aircraft, the MON will provide sufficient back-up coverage to enable aircraft to proceed safely VOR-to-VOR and/or to a suitable landing destination with a GPS-independent approach within approximately 77 nm of any location in CONUS
Reducing Dependencies on VORs
![Page 7: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/7.jpg)
7Federal AviationAdministration
VOR MON ImplementationOctober 2012
Attributes of VOR MON Capability
• The VOR Minimal Operational Network (MON) will provide:– A backup capability for lower end GA IFR aircraft in the
event of a widespread GPS outage– An operational contingency, and not the robust network of
current VORs– A transitional network of VORs to allow users time to
equip with new avionics to transition to RNAV and RNP
![Page 8: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/8.jpg)
8Federal AviationAdministration
VOR MON ImplementationOctober 2012
• Federal Register Notice (FRN) published on proposed navigation strategy to inform external stakeholders of FAA intent
• Second notice published to provide FAA feedback to 330 comments received in response to the initial notice
• Notional VOR MON list developed for initial coordination
• Preliminary Operational Safety Assessment developed
• Strategy meetings with Service Areas and Service Centers conducted
• Separate briefings provided to external stakeholders: – AOPA, DOD, A4A
Steps Taken to Date
![Page 9: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/9.jpg)
9Federal AviationAdministration
VOR MON ImplementationOctober 2012
Concurrent Strategy Moving ForwardMethodology
• Program Activities– Business Plan
• In development • MON Cost /Benefits analysis
- Service Volume Engineering Analysis- Service Area Working Group
- AJV – Airspace and Procedures- AJE/ AJT/AJR – Involved- Full Coordination of Candidate
prioritization in Working Group - National Discontinuance Strategy
- MON Implementation Plan- Waterfall Schedule
- Safety Management / Risk Management
• OSA• PSP
Investment Planning• Major Milestones
– Investment Analysis Review Decision (IARD) JRC June 2013
• Initial Business Case• CONOPS• Shortfall Analysis• Requirements
Documentation• OSA
– Final Investment Decision (FID) JRC June 2014
– MON Achieved by January 2020
![Page 10: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/10.jpg)
10Federal AviationAdministration
VOR MON ImplementationOctober 2012
Next Steps
1) VOR MON list is being vetted in the FAA (HQ and Service Areas)– FAA Working Group (WG) will modify list, as appropriate (WG
composition: PMO, AJV, AJE, AJT, AJW, AFN, and ANG membership, others will be added as identified.)
– Once the list is finalized in the FAA, results will be shared with external stakeholders
2) External stakeholder working group (including AOPA, A4A, DoD, others) will further scrub list – List will be modified, as appropriate
– Fully coordinated list will be finalized
![Page 11: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/11.jpg)
11Federal AviationAdministration
VOR MON ImplementationOctober 2012
Next Steps (cont.) 3) Develop implementation plan and waterfall schedule
– VOR MON implementation plan will take all other PBN transition plans into account:
• Instrument Flight Procedures Cancellation Plans; • Optimization of Airspace and Procedures in the Metroplexes; and• Development of high and low altitude RNAV Routes
– Development of VOR MON waterfall schedule will correlate with removal and/or replacement of Instrument Flight Procedures
4) Achieve FAA approval of Business Case (JRC FID)5) Discontinue VORs according to the plan
– Starting in FY-14, VORs will be discontinued according to the waterfall schedule
– Each VOR identified to be discontinued will go through formal rule-making that will result in new procedures as appropriate
– Achieve the VOR MON by January 1, 2020
![Page 12: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/12.jpg)
12Federal AviationAdministration
VOR MON ImplementationOctober 2012
MON Implementation
VOR
FY2016 FY2020FY2013
967
497
FY2025
VOR MON achieved
APNT full operationalcapability
Num
ber o
f Fac
ilitie
s
0
ADS-B equipage mandate takes
effect
• Objective: Reduce dependence on VORs– Near-term: Discontinue approximately half of the VORs to a Minimum
Operational Network (MON) by 2020– Longer-term: Re-evaluate MON once full operational capability has been
achieved for Alternate Positioning Navigation and Timing (APNT) service
?
![Page 13: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/13.jpg)
13Federal AviationAdministration
VOR MON ImplementationOctober 2012
Back-up Materials
![Page 14: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/14.jpg)
14Federal AviationAdministration
VOR MON ImplementationOctober 2012
Notional MON Airports
14
Coverage for Approaches and Landings
Green: GA ILS Airports (153)Red: GA VOR Airports (53)Purple Line: No change
![Page 15: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/15.jpg)
15Federal AviationAdministration
VOR MON ImplementationOctober 2012
Notional VOR MON at 5000 ft. AGL
15
En route Coverage
![Page 16: VOR MON Brief to ACF (12-02) 10242012 as briefed.ppt · 24-10-2012 · – VOR MON implementation plan will take all other PBN transition plans into account: • Instrument Flight](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f710dbdf5f7cb56af1dce27/html5/thumbnails/16.jpg)
16Federal AviationAdministration
VOR MON ImplementationOctober 2012
Past and Current DME Coverage