1
Volusia County Septic System Reduction Plan 1.0 Introduction According to the Florida Department of Environmental Protection, septic systems, when properly designed, constructed and maintained, perform well in sparsely populated rural areas where large tracts of lands are available for wastewater disposal. However, in urban and coastal areas, septic systems can have a significant impact on resources, particularly in residential communities interspersed with tidal canals.
It is estimated there are approximately 90,000 individual on-site septic systems in Volusia County. Septic systems do not adequately remove nutrients such as nitrogen and phosphorus, which result in aquatic growth such as algal blooms in our waterways, which shade out marine vegetation and deplete fish life. Septic system effluent migrates from our yards into our waterways. It also seeps into the groundwater which can ultimately migrate to the Floridan Aquifer, resulting in high nutrients levels in our springs and drinking water supply.
Reducing the number of septic systems by connecting to a central sewer system will allow for advanced wastewater treatment at a County or municipal wastewater plant. Some county/municipal wastewater plants treat wastewater to public access reclaimed water standards, which allows for beneficial use of the wastewater effluent and reduces demands for potable water.
Volusia County has established a long term goal of eliminating all septic systems in areas where they are an inappropriate method of effluent disposal. Due to the costs of retrofitting these areas with central wastewater collection systems, the County must prioritize the elimination of septic systems. This plan focuses on elimination of septic systems near key water bodies such as the Mosquito Lagoon and Halifax River, located along the east coast of the county, the St. Johns River located along the west boundary of the county, and within the basins of significant springs such as Blue Spring and Gemini Spring located in southwest Volusia County.
2
2.0 Collection System Alternatives There are three different alternatives for providing central sewer collection as follows:
Alternative 1 - Low pressure, small diameter sewer system with individually owned effluent pumps or grinder pumps
Alternative 2 - Conventional gravity sewer system Alternative 3 - Vacuum sewer system
2.1 Alternative 1 - Low Pressure Small Diameter Sewer System A low pressure small diameter sewer system consists of a small diameter (minimum 2 inches) force main that is typically installed within the road right-of-way (ROW). The system requires installing a septic tank effluent pump or a grinder pump at each residence to convey wastewater to the low pressure sewer system. Advantages
pipe sizes from 2 inches to 6 inches
layout independent of topography
reduced excavation compared to gravity
sewer system infiltration greatly reduced
eliminates manholes
requires less power than vacuum system
lower construction costs than other alternatives Disadvantages
effluent pump or grinder pump needed at each residence
electrical power required
air release valves needed
flushing connections required
periodic pumping of septic tank for effluent pump system
power outage disturbs service 2.2 Alternative 2 - Conventional Gravity System This alternative allows for gravity flow of wastewater to a central gravity sewer line located in the road right of way. The gravity collection systems flow to county or municipal wastewater pump station that pump wastewater to the wastewater treatment plant. Nearly all communities with central sewer service have gravity collection systems. Gravity systems have the highest construction cost but the lowest operational cost. Advantages
effluent or grinder pump not required at each residence
lower operational cost compared to low pressure system or vacuum system
most reliable collection system alternative Disadvantages
higher initial construction costs
3
2.3 Alternative 3 - Vacuum Sewer System A vacuum sewer system utilizes a partial vacuum to transport sewage through the collection system. Vacuum sewer systems include a central vacuum station, which maintains the system at a sub-atmospheric pressure, with small diameter vacuum pipelines located in the road ROW. Service connections are made to each residence and a holding tank replaces the septic tank. A vacuum valve located in the holding tank allows rushing air from the service connection to transport the sewage to the central vacuum station. The central vacuum station operates 24-hours a day. Advantages
effluent or grinder pump not required at each residence
reduced excavation compared to gravity sewer system
grade and depth not critical Disadvantages
electrical power required at central vacuum station
vacuum valves have a shorter life than pumps
higher energy consumption than other alternatives
major odor problem at central vacuum station
vacuum loss will render the system non-operational, requiring immediate repair 2.4 Selected Alternative Low pressure / effluent pump systems may be appropriate for rural or low density developments. For most urban, medium to high density applications, gravity collection systems are preferred by most communities. The planning level costs provided in this plan are based on the use of Alternative 2 conventional gravity sewer collection.
4
3.0 Planning Level Costs For the purpose of this planning document, the design, permitting and construction costs for gravity sewer retrofit projects have been estimated based on the density of developments as follows:
High density: $15,000 per lot Medium density: $20,000 per lot Low density: $25,000 per lot
The primary elements of a gravity sewer retrofit project are:
Installation of gravity sewer piping and manholes
Acquisition of land for utility owned pump stations
Installation of utility owned pump stations and force mains
Dewatering as needed and proper disposal of water
Installation/replacement of water distribution system as required
Rebuild and pave roadways
Maintenance of traffic
Survey, engineering design and permitting Additional costs for connection to central sewer include the following on a per lot basis:
Impact fee for sewer: $2,900
Septic tank/drain field abandonment: $1,000
Connection of home sewer plumbing to central sewer: $1,100 Estimated Total = $5,000 Many residential developments with individual on-site septic systems also have individual on-site wells for water service. Additional costs for connection to the central water system include the following on a per lot basis:
Impact fee for potable water: $1,500
Connection of home plumbing to central water: $ 500 Estimated Total = $2,000
5
3.1 Design, Permitting and Construction Time Frames The time frame required to complete design, permitting and construction of a gravity sewer retrofit project via the design-bid-build procurement process is approximately 3 to 4 years depending on the size of the project. The primary components of the design-bid-build procurement process are as follows:
Advertisement of a Request for Statement of Qualifications (RSQ) for engineering design and permitting services, bidding assistance and construction phase services
Establishment of a selection committee for review of RSQ’s
Short listing and selection of an engineering consulting firm by the selection committee
County Council approval of an engineering consulting firm
Issuance of a Notice To Proceed to the Council approved engineering consulting firm
Completion of survey, geotechnical services, engineering design and permitting, preparation of construction bid documents by the engineering consulting firm
Advertisement of bid documents
Construction bid opening
Review of bids by the engineering consulting firm
County Council award of a construction contract to the responsive and responsible low bidder
Notice to Proceed issued to the low bidder
Construction
Construction closeout The time needed for project initiation through issuance of the Notice To Proceed with construction should be approximately 24 to 26 months, regardless of project size. The time needed to complete construction may vary from 16 months to 24 months depending on the project size. A typical project timeline for a gravity sewer retrofit construction project is depicted Figure 3.1-1 below. This timeline assumes that all necessary rights of way / easements exist, that land acquisition is not required.
Figure 3.1-1
6
4.0 Priority Areas for Central Sewer Retrofit This plan prioritizes the following four (4) water bodies for elimination of septic systems:
Mosquito Lagoon Watershed
Halifax River Watershed
Blue Spring Basin
Gemini Springs Basin 4.1 The Mosquito Lagoon Watershed, located in Southeast Volusia County, north of and connected to the Indian River Lagoon, is an Outstanding Florida Water. Much of the existing development along the US Highway 1 corridor south of Edgewater receives sewer service via individual on-site septic systems. In recent years, Mosquito Lagoon and the Indian River Lagoon have experienced algal blooms that have resulted in a decline of aquatic grass beds, fish kills and higher than normal dolphin and Manatee deaths. Abnormally high nutrient loads to the lagoon, from both direct and indirect discharges, are believed to be contributing to the algal blooms. Effluent from septic systems located in the Mosquito Lagoon watershed is a significant contributor to the nutrient overloading. Figure 4.1-1 depicts the developments in Southeast Volusia, within the Mosquito Lagoon Watershed, that are priority areas for elimination of septic systems, and how the developments could potentially be broken out into sub-areas for incremental completion as cost share grant funding becomes available. The sub-areas have been established based on each development’s location relative to the lagoon and/or tidal canals that discharge to the lagoon. The highest priority has been given to those developments located east of US Highway 1, adjacent to the lagoon, with tidal canals connected to the lagoon. Wastewater flows from these areas would be pumped to Volusia County’s Southeast Regional Water Reclamation Facility for treatment. The following is a description of each of the priority areas identified in Figure 4.1-1: Area 1 Indian Harbor Estates This area contains approximately 304 lots. It is bounded by Indian Creek Road, US Highway 1, Ariel Road and the Mosquito Lagoon. The development is characterized as high density. The majority of lots in the development are located on canals that lead to Mosquito Lagoon. The area receives potable water service from Volusia County. Due to its high density and location relative to canals leading directly to the lagoon, it is ranked as top priority for retrofit with a central sewer collection system. The planning level costs to retrofit the area with central sewer are as follows: Construction: $4.15 million Engineering: $0.41 million Subtotal, public improvements: $4.56 million ($15,000/parcel) Sewer impact fee and on-site improvements: $1.52 million ($5,000/parcel) Total: $6.08 million ($20,000/parcel)
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2 !!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2 !!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
37STP
[ä
[ä
[ä
[ä[ä
[ä[ä
[ä
[ä
[ä
[ä
[ä
Indian Harbor Estates Area 1
Area 2Jackson Hole RV ParkMosquito Lagoon RV Parkand Seminole Rest State Park
Cory Estates (Edgewater) Area 4
Waterway Estates (Edgewater) Area 3
Waterfront Park Area 5
Lyon Subdivision Area 6
Jones Fish Camp Area 7
Oak Hill East Area 8
Mobile Village Area 9
Oak Hill West Area 10
Jackson Hole RV Park
Seminole Rest State Park
Mosquito Lagoon RV Park
18" PVC
15" PVC
8" PVC
8" PVC
8" PVC
8" PVC
8" PVC
8" PVC
8" PVC
8" PVC
8" PVC
8" PVC
SE13SE21
SE09
SE11
SE15
SE18SE17
SE19SE20
SE14
SE08
SE10
4"
10"
12"
2"
3" PVC
4"
4"
4"
10"
4"
4"
RIV
ER
DR
W ARIEL RD
JUN
IPE
R D
R
E HALIFAX AV
BILLS HILL RD
KU
MQ
UA
T D
RIN
DIA
PA
LM
DR
N G
AIN
ES
ST
LIM
E T
RE
E D
R
N B
RO
OK
S C
IR
35TH ST
SA
ND
AV
CANAL AV
DEHARO RD
28TH ST
GARY AV
MA
NG
O T
RE
E D
R
N PUTNAM GROVE RD
S CORY DR
ARBOR LN
LEWIS ST
S AT
LA
NTIC
AV
GODFREY RD
NE
ED
LE
PA
LM
DR
H H BURCH RD
MA
PL
E L
N
ROBERTS RD
RIO GRANDE
RANDLE AV
LAGOON AV
LA
ZY
Z L
N
HIB
ISC
US
DR
30TH ST
AZALEA RD
WHALER WAY
PACKWOOD RD
LIZ
A C
LIN
TON
RD
HIG
HL
AN
DE
R D
R
PALM AV
CL
INT
ON
CE
ME
TE
RY
RD
INDIAN CREEK RD
AM
ES
HA
VE
N R
D
W BROOKS CIR
PINE ST
WILLIAM ST
FLAMINGO RD
S G
AIN
ES
ST
OR
AN
GE
TR
EE
DR
WARD DR
TR
EE
TO
P L
N
HIBISCUS RD
CASA GRANDE
BELLA VISTA
CA
NA
L R
D
ST
AR
BO
AR
D A
V
COSTA RICA
BL
INN
ST
OAK ST
EL
DO
RA
RD
PIN
E T
RE
E D
R
MA
E S
T
BL
AIR
RD
HANN ST
POINCIANA RD
ADAMS RD
CENTER ST
SOUTH ST
SH
AD
Y O
AK
S L
N
HO
WE
S S
T
CE
DA
R C
HA
SE
RD
AD
MIR
ALT
Y C
T
SIO
UX
BLV
D
PIT BULL RD
HICKORY AV
AN
GE
LIA
DR
DIX
IE L
N
SHILOH RD
VA
LE
NC
IA D
R
N INDIAN RIVER DR
GATOR BAIT LN
WOOD AV
PUBLIC SAFETY BLVD
OM
NI C
IR
AL
ICE
ST
BE
EH
IVE
DR
MY
RT
LE
ST
EL TIGRE
CLIN
TON
DR
VARNADORE PL
ENG
RA
M R
D
BIANCA RD
LA
JAR
DIN
BARBERRY DR
STEWART DR
WILLOW AV
OMNI DR
PRICE ACRES RD
HANN ST
EN
GR
AM
RD
N U
S 1
S U
S 1
S R
IDG
EW
OO
D A
V
TUR
TLEM
OU
ND
RD
BE
AC
ON
LIG
HT
RD
VOLC
O R
D
MAYTOWN RD W HALIFAX AV
Legend
[ä Lift Station
37STP Sewer Plant
!!2 Manholes
Gravity Mains
Force Mains
Indian Harbor EstatesIHE Area 1
Seminole Rest State ParkSRSP Area 2
Jackson Hole RV ParkLFC Area 2
Mosquito Lagoon RV ParkMLRVP Area 2
Waterway ParkWE Area 3
Cory EstatesCE Area 4
Water FrontWF Area 5
Lyon SubdivisionLS Area 6
Mobile VillageMV Area 7
Oak Hill EastOHE Area 8
Jones Fish CampJFC Area 9
Oak Hill WestOHW Area 10
Parcel
Southeast VolusiaMosquito Lagoon WatershedSeptic Tank Elimination Plan Ü
Prepared by: Volusia County Public Works/RJ Date: 9/24/2014File: G:/OnGoing/WaterUtil//Septic/OakHillParcels_092314.mxd
Figure 4.1-1
7
Area 2 Jackson Hole RV Park, Mosquito Lagoon RV Park and Seminole Rest State Park The area described as Jackson Hole RV Park is located on the east side of River Road, at its intersection with Canal Street, adjacent to the Mosquito Lagoon. The area is characterized by high density with a mixture of single family homes and RV/trailer sites. The development receives water service via a privately owned well(s) although central water service is available. Due to its high density and location relative to the Mosquito Lagoon, it is ranked high for retrofit with a central sewer collection system. The area described as Mosquito Lagoon RV Park is located on the east side of River Road, at the east end of Halifax Avenue. It is on a peninsula that extends into Mosquito Lagoon. The area is characterized as high density with a mixture of single family homes and RV/trailer sites. The development receives water service via a privately owned well(s). Sewer service is provided by approximately 25 on-site septic systems. Due to its high density and location relative to the Mosquito Lagoon, it is ranked high for retrofit with a central sewer collection system. Seminole Rest State Park is located on the east side of River Road, adjacent to Mosquito Lagoon, halfway between Canal Street and Halifax Avenue. The park receives water service via the county’s potable water system. The planning level costs to retrofit the area are as follows: Sewer Construction: $1.27 million Engineering: $0.13 million Subtotal, public improvements: $1.40 million Sewer impact fees and on-site improvements: $0.70 million Total: $2.10 million Water Service to Mosquito Lagoon RV Park Construction: $0.20 million Engineering: $0.02 million Subtotal, public improvements: $0.22 million Water impact fees and on-site improvements: $0.20 million Total: $0.42 million
8
Area 3 Waterway Estates This area contains approximately 240 lots. It is bounded by Poinciana Road, Godfrey Road, US Highway 1 and the Mosquito Lagoon. The development is characterized as medium density. The majority of lots in the development are located on canals that lead to Mosquito Lagoon. The area receives potable water service from the City of Edgewater. Due to its medium density and location relative to canals leading directly to the lagoon, it is ranked as high priority for retrofit with a central sewer collection system. The planning level costs to retrofit the area with central sewer are as follows: Construction: $4.38 million Engineering: $0.44 million Subtotal, public improvements: $4.82 million ($20,000/parcel) Sewer impact fee and on-site improvements: $1.21 million ($5,000/parcel) Total: $6.03 million ($25,000/parcel) Area 4 Cory Estates This area contains approximately 180 lots. It is bounded by North Cory Drive, Arbor Lane, US Highway 1 and the Mosquito Lagoon. The development is characterized as medium density. Approximately one third of homes in the development are located on a canal that leads to Mosquito Lagoon. The area receives potable water service from the City of Edgewater. Due to its medium density and location relative to a canal leading directly to the lagoon, it is ranked as high priority for retrofit with a central sewer collection system. The planning level costs to retrofit the area with central sewer are as follows: Construction: $3.42 million Engineering: $0.34 million Subtotal, public improvements: $3.76 million ($20,000/parcel) Sewer impact fee and on-site improvements: $0.94 million ($5,000/parcel) Total: $4.70 million ($25,000/parcel)
9
Area 5 Waterfront Park This area contains approximately 40 lots. The lots are located along William Street and Myrtle Street, between US Highway 1 and the Mosquito Lagoon. The development is characterized as low density. Approximately one quarter of homes in the development are located adjacent to Mosquito Lagoon. The area receives potable water service from Volusia County. Due to its location east of US Highway 1, adjacent to the Mosquito Lagoon, it is ranked as medium priority for retrofit with a central sewer collection system. The planning level costs to retrofit the area with central sewer are as follows: Construction: $0.91 million Engineering: $0.09 million Subtotal, public improvements: $1.00 million ($25,000/parcel) Sewer impact fee and on-site improvements: $0.20 million ($5,000/parcel) Total: $1.20 million ($30,000/parcel) Area 6 Lyon Subdivision This area contains approximately 47 lots. The lots are located along Barberry Drive, Eaglewatch Road and HH Birch Road, between US Highway 1 and the Mosquito Lagoon. The development is characterized as low density. Approximately one half of homes in the development receive potable water service from Volusia County. Due to its location east of US Highway 1, near the Mosquito Lagoon, it is ranked as medium priority for retrofit with a central sewer collection system. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $1.07 million Engineering: $0.11 million Subtotal, public improvements: $1.18 million ($25,000/parcel) Sewer impact fee and on-site improvements: $0.24 million ($5,000/parcel) Water impact fee and on-site improvements: $0.05 million ($2,000/parcel) Total: $1.47 million ($30,000 to 32,000/parcel)
10
Area 7 Jones Fish Camp This area contains approximately 66 lots. The lots are located along Jones Fish Camp Road and Alice Street, between US Highway 1 and the Mosquito Lagoon. The development is characterized as low density. Water service is provided by individual, on-site wells. Due to its location east of US Highway 1, near the Mosquito Lagoon, it is ranked as medium priority for retrofit with a central sewer collection system. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $1.50 million Engineering: $0.15 million Subtotal, public improvements: $1.65 million ($25,000/parcel) Sewer impact fee and on-site improvements: $0.33 million ($5,000/parcel) Water impact fee and on-site improvements: $0.13 million ($2,000/parcel) Total: $2.11 million ($32,000/parcel) Area 8 Oak Hill East This area contains approximately 230 lots. It is bounded by Lagoon Avenue/Palm Avenue, East Church Street, US Highway 1 and the Mosquito Lagoon. The development is characterized as medium density. Water service is provided by individual, on-site wells. Due to its location east of US Highway 1, near the Mosquito Lagoon, it is ranked as medium priority for retrofit with a central sewer collection system. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $4.16 million Engineering: $0.42 million Subtotal, public improvements: $4.58 million ($20,000/parcel) Sewer impact fee and on-site improvements: $1.15 million ($5,000/parcel) Water impact fee and on-site improvements: $0.46 million ($2,000/parcel) Total: $6.19 million ($27,000/parcel)
11
Area 9 Mobile Village This area contains approximately 175 lots. It is bounded by North Second Street, South Street, West Loop Road and US Highway 1. The development is characterized as medium density. Water service is provided by individual, on-site wells. Because of its medium density and location west of US Highway 1, it ranks as low priority for retrofit with a central sewer collection system. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $3.18 million Engineering: $0.32 million Subtotal, public improvements: $3.50 million ($20,000/parcel) Sewer impact fee and on-site improvements: $0.88 million ($5,000/parcel) Water impact fee and on-site improvements: $0.35 million ($2,000/parcel) Total: $4.73 million ($27,000/parcel) Area 10 Oak Hill West This area contains approximately 170 lots. It is bounded by West Halifax Avenue, Hickory Avenue, Wyatt Street and US Highway 1. The development is characterized as medium density. Water service is provided by individual, on-site wells. Because of its medium density and location west of US Highway 1, it ranks as low priority for retrofit with a central sewer collection system. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $3.09 million Engineering: $0.31 million Subtotal, public improvements: $3.40 million ($20,000/parcel) Sewer impact fee and on-site improvements: $0.85 million ($5,000/parcel) Water impact fee and on-site improvements: $0.34 million ($2,000/parcel) Total: $4.59 million ($27,000/parcel) The total planning level cost to retrofit the identified areas within the Mosquito Lagoon Watershed with central sewer is estimated at $49 million.
12
4.2 The Halifax River Watershed covers the remaining coast line of Volusia County north of the Mosquito Lagoon Watershed, from the New Smyrna Beach area north to the county line. The Halifax River Watershed is one of the most urbanized watersheds in Volusia County. Although most of the area is served by central sewer, there are pockets of older development in the watershed that are served by individual septic systems. One of the most significant of these areas is the north peninsula, north of the city limits of Ormond Beach where there are approximately 5,000 high density residences located on the relatively narrow peninsula between the Halifax River and the Atlantic Ocean. Due to poor tidal flushing, water quality is poor in this portion of the Halifax River. Figure 4.2-1 depicts developments in the unincorporated area of the North Peninsula that have been identified for elimination of septic systems, and how these developments could potentially be broken into projects for incremental completion as cost share grant funding becomes available. The following is a description of each of the priority areas identified in Figure 4.2-1 along with planning level costs to retrofit each area with central sewer: Area 1 River Breeze Estates This area contains approximately 1,010 lots. It is bounded by Plaza Drive, Longwood Drive, John Anderson Drive and A1A. The development is characterized as high density. Potable water service is provided by City of Ormond Beach. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $13.77 million Engineering: $1.38 million Subtotal, public improvements: $15.15 million ($15,000/parcel) Sewer impact fee and on-site improvements: $5.05 million ($5,000/parcel) Total: $20.20 million ($20,000/parcel) Area 2 Sunny Shores This area contains approximately 780 lots. It is bounded by Hibiscus Drive, Seaside Drive, John Anderson Drive and A1A. The development is characterized as high density. Potable water service is provided by City of Ormond Beach. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $10.64 million Engineering: $1.06 million Subtotal, public improvements: $11.70 million ($15,000/parcel) Sewer impact fee and on-site improvements: $3.90 million ($5,000/parcel) Total: $15.60 million ($20,000/parcel)
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
37STP
37STP
37STP
37STP
37STP
[ä
[ä
[ä
[ä
[ä
[ä
[ä
Avalon by the Sea Area 7
Fairwinds Area 8
Ormond Beach Plaza Area 9
Imperial Heights Area 6
Ormond Shores Estates Area 5
Aqua Vista Circles Area 4
Roberta Heights Area 3
Sunny Shores Area 2
River Breeze Estates Area 1
8" PVC
8"
8" PVC
8" PVC
8" PVC
NE09
NE08
NE07
NE06
NE05
NE04
NE03
8" PVC
JOH
N A
ND
ER
SO
N D
R
OA
K F
OR
ES
T D
R RIVER DR
PALM DR
PLAZA DR
ESSEX DR
KATHY DR
LAURIE DR
SANDRA DR
CAROL RD
BRIGGS DR
BROOKS DR
ROBERTA RD
HOLLAND RD
CAPRI DR
SUNRISE AV
SEAVIEW DR
PO
PL
AR
DR
RIVOCEAN DR
HIBISCUS DR
SEACREST DR
BERKLEY RD
SUNSET BLVD
WISTERIA DR
MARLIN DR
SEABREEZE DR
AQUA VISTA DR
MARGARET RD
AZALEA DR
LYNNHURST DR
CONCORD DR
SAN JOSE DR
AVALON DR
TROPICAL DR
SANDCASTLE DR
SEASIDE DR
JUNIPER DR
AN
CH
OR
DR
SILK OAKS DR
SURFSIDE DR
SUNNY SHORE DR
RIVERSHORE DR
JULIE DR
PALMETTO DR
ALAMANDA DR
CAMELLIA DR
RIV
ER
LN
LONGWOOD DR
RIVERBREEZE BLVD
POINSETTIA DR
SHOCKNEY DR
VIA MADRID DR
SAND DUNES DR
BEAU RIVAGE DR
SUNNY BEACH DR
SEA GULL DR
PIERSIDE DR
OCEAN CREST DR
BRENDALE DR
BEECHWOOD DR
TARPON AV
OCEAN GROVE DR
CAPISTRANO DR
SAN JOSE CIR
OCEAN SHORE DR
OAKVIEW CIR
LONGFELLOW CIR
MARINERS DR
SEABRIDGE DR
SA
ND
DO
LL
AR
DR
DOLPHIN AV
BARRIER ISLE DR
RAYMONDE CIR
VALHALLA AV
SANDPIPER RIDGE DR
MARDEN DR
EA
ST
ER
LY DR
BUTTENHEIM DR
INGLESA AV
PINE TREE D
R
SYCAMORE CIR
SE
A H
AW
K D
R
OVERBROOK DR
S OCEAN AIRE TER
N OCEAN AIRE TER
BUCKINGHAM DR
W S
EA
HA
RB
OR
DR
SEAFARERS DR
ST JOHNS PL
FAIRWINDS CIR
BO
NN
IE V
IEW
DR
HEATHER LN
E S
EA
HA
RB
OR
DR
MORNING STAR AV
STARLIGHT DR
EL
OIS
E C
IR
WATCHTOWER DR
S SEA ISLAND DR
N SEA ISLAND DR
NO
RT
HS
IDE
DR
OCEAN BREEZE CIR
RED BUD LN
EILEEN TER
DU
NE
S C
IR
WE
ST
ER
LY D
R
OC
EA
N C
IR
OCEAN DR
SE
A S
WA
LL
OW
TE
R
MIL
L R
UN
CT
CO
RI W
AY
SEA SHORE DR
WILLOW CT
OC
EA
N S
HO
RE
BLV
D
BE
AC
H S
T
N B
EA
CH
ST
OL
D D
IXIE
HW
Y
Legend[ä Lift Station
37STP Sewer Plant
!!2 Manholes
Gravity Mains
Force Mains
Ormond Beach Plaza Area 9
Fairwinds Area 8
Avalon by the Sea Area 7
Imperial Heights Area 6
Ormond Shores Estates Area 5
Aqua Vista Circles Area 4
Roberta Heights Area 3
Sunny Shores Area 2
River Breeze Estates Area 1
Parcel
Northeast VolusiaHalifax River Watershed
Septic Tank Elimination Plan ÜPrepared by: Volusia County Public Works/RJ Date: 9/24/2014File: G:/OnGoing/WaterUtil//Septic/NorthPennParcels_111314.mxd
Figure 4.2-1
13
Area 3 Roberta Heights This area contains approximately 860 lots. It is bounded by Rivershore Drive, Rivocean Drive, John Anderson Drive and A1A. The development is characterized as high density. Potable water service is provided by City of Ormond Beach. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $11.73 million Engineering: $1.17 million Subtotal, public improvements: $12.90 million ($15,000/parcel) Sewer impact fee and on-site improvements: $4.30 million ($5,000/parcel) Total: $17.20 million ($20,000/parcel) Area 4 Aqua Vista This area contains approximately 470 lots. It is bounded by Sandra Drive, Marden Drive, John Anderson Drive and A1A. The development is characterized as high density. Potable water service is provided by City of Ormond Beach. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $6.41 million Engineering: $0.64 million Subtotal, public improvements: $7.05 million ($15,000/parcel) Sewer impact fee and on-site improvements: $2.35 million ($5,000/parcel) Total: $9.40 million ($20,000/parcel) Area 5 Ormond Shores Estates This area contains approximately 700 lots. It is bounded by Starlight Drive, San Jose Circle, John Anderson Drive and A1A. The development is characterized as high density. Potable water service is provided by City of Ormond Beach. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $9.55 million Engineering: $0.95 million Subtotal, public improvements: $10.50 million ($15,000/parcel) Sewer impact fee and on-site improvements: $3.50 million ($5,000/parcel) Total: $14.0 million ($20,000/parcel)
14
Area 6 Imperial Heights This area contains approximately 340 lots. It is bounded by Island Cay Drive, Pierside Drive, John Anderson Drive and A1A. The development is characterized as high density. Potable water service is provided by City of Ormond Beach. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $4.64 million Engineering: $0.46 million Subtotal, public improvements: $5.10 million ($15,000/parcel) Sewer impact fee and on-site improvements: $1.70 million ($5,000/parcel) Total: $6.80 million ($20,000/parcel) Area 7 Avalon By The Sea This area contains approximately 490 lots. It is bounded by Ocean Grove Drive, Via Madrid Drive, John Anderson Drive and A1A. The development is characterized as high density. Potable water service is provided by City of Ormond Beach. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $6.68 million Engineering: $0.67 million Subtotal, public improvements: $7.35 million ($15,000/parcel) Sewer impact fee and on-site improvements: $2.45 million ($5,000/parcel) Total: $9.80 million ($20,000/parcel) Area 8 Fairwinds This area contains approximately 190 lots. It is bounded by Capistrano Drive, North Ocean Aire Terrace, John Anderson Drive and A1A. The development is characterized as high density. Potable water service is provided by City of Ormond Beach. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $2.59 million Engineering: $0.26 million Subtotal, public improvements: $2.85 million ($15,000/parcel) Sewer impact fee and on-site improvements: $0.95 million ($5,000/parcel) Total: $3.80 million ($20,000/parcel)
15
Area 9 Ormond Beach Plaza This area contains approximately 110 lots. It is bounded by Dolphin Avenue, Tarpon Avenue, John Anderson Drive and A1A. The development is characterized as high density. Potable water service is provided by City of Ormond Beach. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $1.50 million Engineering: $0.15 million Subtotal, public improvements: $1.65 million ($15,000/parcel) Sewer impact fee and on-site improvements: $0.55 million ($5,000/parcel) Total: $2.20 million ($20,000/parcel) The total planning level cost to retrofit the identified areas within the Halifax River Watershed with central sewer is estimated at $99 million.
16
4.3 The Blue Spring Basin is the groundwater/drainage basin that contributes to water flow in Blue Spring, a first magnitude spring located along the St. Johns River, west of Orange City. The Blue Spring Basin, as established by the St. Johns River Water Management District, is identified on Figure 4.3-1. A Total Maximum Daily Load (TMDL) has been established by the Florida Dept. of Environmental Protection (FDEP) for excess nutrients in Blue Spring and the Blue Spring run. A significant contributor of nutrients to Blue Spring is septic systems located within the spring basin. Figure 4.3-2 depicts the developments in Southwest Volusia, within Volusia County’s utility service area, that have been identified for elimination of septic systems. Due to the high costs associated with central sewer retrofit, the developments have been broken out into projects to take advantage of state and/or of federal funding as it becomes available. The project areas are numbered based on their proximity to Blue Spring. There are several developments on the map with relatively large (one acre or greater) lots that are not a high priority for central sewer retrofit in this plan. The following is a description of each of the priority areas identified in Figure 4.3-2 along with planning level costs to retrofit each area with central sewer: Area 1 Orange City Terrace This area contains approximately 610 lots. It is bounded by Fern Street, Shirley Street, Live Oak Avenue, and the FEC Railroad to the west. The development is characterized as medium density. Water service is provided by individual, on-site wells. The development is located within the Blue Spring Basin. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $11.09 million Engineering: $1.11 million Subtotal, public improvements: $12.20 million ($20,000/parcel) Sewer impact fee and on-site improvements: $3.05 million ($5,000/parcel) Water impact fee and on-site improvements: $1.22 million ($2,000/parcel) Total: $16.47 million ($27,000/parcel)
!!2!!2 !!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2 !!2 !!2
!!2
!!2 !!2!!2
!!2!!2 !!2!!2!!2 !!2
!!2
!!2 !!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2 !!2
!!2
!!2
!!2 !!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2 !!2
!!2
!!2
37STP
[ä[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
Breezewood Area 8
Orange City Hills Area 7
Orange City Hills Area 6
Orange City Terrace Area 1
Orange City Terrace Area 2
West Highlands Area 4
West Highlands Area 5
West Highlands Area 3
Blue Springs
St Johns River
6"
8" PVC
6" P
VC
4"
4" P
VC
8" PVC
8" PVC
10" PVC
8"
8" VCP
6" PVC
8" PVC
8" PVC
8" V
CP
8" P
VC
8" PVC
8" P
VC
8" P
VC
8" PVC 8" V
CP
SW57
SW43
SW44
SW71
SW46
SW45
SW12
SW09SW07
PA
RK
AV
CY
PR
ES
S A
V
WIL
LIA
MS
AV
1ST ST
19TH ST
16TH ST
17TH ST
15TH ST
18TH ST
13TH ST
12TH ST
20TH ST
14TH ST
N L
EA
VIT
T A
V
S C
ED
AR
AV
W BLUE SPRINGS AV S L
EA
VIT
T A
V
PIN
E A
V
W NEW YORK AV
N S
PA
RK
MA
N A
V
MILLER RD
E MINNESOTA AV
WA
LN
UT
AV
BU
FO
RD
AV
BIS
HO
P A
V
S C
AR
PE
NT
ER
AV
DE
LA
ND
AV
W FRENCH AV
CE
NT
RA
L A
V
CH
AR
LE
S A
V
4TH ST
5TH ST
6TH ST
9TH ST
8TH ST
7TH ST
3RD ST
2ND ST
BR
OA
DW
AY
AV
S S
PA
RK
MA
N A
V
ADELINE ST
HIC
KO
RY
AV
GR
AN
D A
V
W HOLLY DR
W MINNESOTA AV
10TH ST
N C
AR
PE
NT
ER
AV
WE
RL
EY
TR
LA
NC
AS
TE
R A
V
DORIS ST
W ROBERTS ST
E WISCONSIN AV
E FRENCH AV
S T
HO
RP
E A
V
DOGWOOD AV
E RHODE ISLAND AV
BIRCH AV
W WISCONSIN AV
LO
LIT
A S
T
E OHIO AV
E UNIVERSITY AV
W FERN DR
ILLINOIS AV
BE
CK
ER
BL
VD
SHADICK DR
W GRAVES AV
N O
RA
NG
E A
V
DU
RF
EY
AV
W LANSDOWNE AV
BE
NH
AM
AV
PETERSON RD
MAY ST
W CENTRAL AV
RA
CIN
E R
D
E HOLLY DR
S H
OL
LY
AV
2ND AV
E NEW YORK AV
MONTROSE AV
SU
MN
ER
AV
MAGNOLIA AVSO
UTHLAKE DR
W GARDENIA DR
E ELM DR
DIXSON ST
AL
MO
ND
ST
IOW
A A
V
LISKEARD AV
N T
RA
FF
OR
D A
V
S O
RA
NG
E A
V
E C ST
CH
ES
TN
UT
AV
OLD MILL DR
E ROBERTS ST
S L
AW
TO
N A
V
E FERN DR
N O
AK
AV
FERN ST
E BLUE SPRINGS AV
IND
IAN
A A
V
E GARDENIA DR
N T
HO
RP
E A
V
JU
NIO
R S
T
W ELM DR
S O
AK
AV
BL
UE
RID
GE
AV
PATLIN AV
GRAND PLAZA DRS
PA
RK
AV
E ROSE AV
HOLLOWRIDGE DR
N P
AR
K A
V
BROWN AV
TEMPLE AV
W OHIO AV
SCHAUB AV
JAR
VIS
AV
LIV
E O
AK
AV
JAS
MIN
E A
V
FRENCH AV E
PE
RR
Y S
T
DIV
ISIO
N A
V
OR
AN
GE
AV
E IRIS DR
HOWARD AV
JAM
ES
ST
HIL
LS
IDE
AV
NAVEL ORANGE DR
HE
AT
HE
R L
N
TANGELO AV
GL
EA
SO
N S
T
VALENCIA AV
N S
TA
RK
AV
IVE
Y L
AK
E D
R
LAKEVIEW AV
HARRISON AV
N L
AW
TO
N A
V
BO
NN
IE L
N
BROOKLYN AV
WATERSIDE OAKS DR
JO
HN
SO
N L
N
ARLINE ST
RE
DW
OO
D A
V
PE
AR
L A
V
COLUMBUS AV
BE
AU
CT
LEE AV
CATHERINE ST
MONASTERY RD
MO
NT
CL
AIR
AV
ABBEYVIEW DR
E OAKWOOD AV
LOOMIS ST
CANOPY LN
NIA
GA
RA
ST
E CHEROKEE AV
E PINEAPPLE AV
PE
CA
N D
R
BRIARCLIFF DR
PA
LM
ET
TO
AV
SC
HO
LA
RS
PA
TH
PA
RK
VIE
W D
R
BRIGHTWOOD AV
BA
NY
AN
ST
PA
RK
DR
FRANCES ST
PIN
E H
ILL
PL
SHERMAN ST
WA
LD
OR
AV
IRIS DR
S A
DA
AV
PLUM DR
AZ
AL
EA
DR
TR
EN
IA A
NN
LN
LYNN AV
TEAL WING DR
PE
AR
L S
T
WH
ITE
DO
VE
AV
PINELAND CT
DALEY ST
N P
INE
AV
ELNA TER
MASSACHUSETTS AV
POINSETTIA DR
E LANSDOWNE AV
SM
ITH
ST
N SILVERSTONE CT
W L
AK
E D
R
E MICHIGAN AV
SHIRLEY ST
OA
K L
N
S SILVERSTONE CT
BL
UE
WA
TE
R A
V
SE
2N
D S
T
RE
D L
AU
RE
L R
D
THELMA AV
AZ
AL
EA
LN
OA
K L
AN
DIN
G D
R
STRAWBERRY OAKS DR
MA
RIL
EA
CT
NA
TU
RA
L O
AK
S D
R
FRENCH AV
LANSDOWNE AV
TR
AF
FO
RD
AV
TA
NG
LE
WO
OD
DR
N H
OL
LY
AV
OAK TER
BIRCHMONT DR
ALBERTUS WAY
SU
NS
ET
AV
TA
YL
OR
DR
PRISTINE TR
ASTERBROOKE DR
TA
PP
AN
CIR
HO
RIZ
ON
RID
GE
DR
ANDYS CT
E A ST
GA
RD
EN
LN
BRIARWOOD CT
KUMQUAT CT
PA
RK
VIE
W A
V
TR
AC
TO
R W
AY
CA
MP
HO
R L
N
GOLF OAK DR
SWEETGUM DR
CL
EM
EN
TS
AV
MARSHALL LN
AC
E P
AR
K D
R
AMHURST DR
FRIAR TUCK LN
CO
TT
ON
WO
OD
ST
HE
AR
T P
INE
DR
JE
TS
KE
CIR
SUNSET BLVD
FRANCES DICKINSON DR
LAUREL PARK CT
ORANGE OAK DR
W OAKWOOD AV
BA
UM
AN
AV
SANDY PINES DR
KRISTIN LN
JULIA AV
THREE ACRES LN
ST
ON
EB
RID
GE
LN
SP
RIN
G C
AV
ER
N A
V
BIR
D R
D
LAUREL OAKS LN
ELM DR
PR
IOR
E L
N
BERNICE ST
EDGEWILD CT
IRIS CT
NEW YORK AV E
HARP AV
LAKEVIEW LN
CO
LL
INS
CT
MA
ND
AR
IN O
RA
NG
E C
T
MC CARTY WAY
BL
UE
HA
MM
OC
K C
T
CR
YS
TA
L S
PR
ING
S C
TARLINE ST
LIV
E O
AK
AV
PLUM DR
OAK LN
TR
AF
FO
RD
AV
BO
NN
IE L
N
E LANSDOWNE AV
CATHERINE ST
3R
D S
T
CATHERINE ST
W OHIO AV
SU
NS
ET
AV
S S
PA
RK
MA
N A
V
GR
AN
D A
V
E IRIS DR
E UNIVERSITY AV
FRANCES ST
SHIRLEY ST
E ROSE AV
W FRENCH AV
E WISCONSIN AV
W NEW YORK AV
WE
RL
EY
TR
SHIRLEY ST
CH
ES
TN
UT
AV
MO
NA
ST
ER
Y R
D
2N
D S
T
N T
HO
RP
E A
V
MAY ST
1S
T S
T
I-4
SR 472
N V
OL
US
IA A
VS
VO
LU
SIA
AV
BE
CK
ER
BLV
D
MAGNOLIA AV
S V
OL
US
IA A
V
E GRAVES AV
HA
MIL
TO
N A
V
VE
TE
RA
NS
ME
MO
RIA
L P
KW
Y
W RHODE ISLAND AV
W FRENCH AV
WE
ST
SID
E P
KW
Y
EN
TE
RP
RIS
E R
D
FRENCH AV
Legend
[ä Lift Station
37STP Sewer Plant
!!2 ManholesGravity MainsForce MainsService Area
Breezewood Park AreaBW Area 8
Orange City Hills Area OCH Area 6 OCH Area 7
Orange City Terrace AreaOCT Area 1OCT Area 2
West Highlands AreaWH Area 3WH Area 4WH Area 5Parcel
Southwest VolusiaBlue Springs Basin
Septic Tank Elimination Plan Ü
Prepared by: Volusia County Public Works/RJ Date: 9/24/2014File: G:/OnGoing/WaterUtil//Septic/SouthwestNorthParcels_11x17_092314.mxd
Figure 4.3-2
17
Area 2 Orange City Terrace This area contains approximately 540 lots. It is bounded by Shirley Street, Adeline Street, Division Avenue, and South Cedar Avenue. The development is characterized as medium density. Water service is provided by individual, on-site wells. The development is located within the Blue Spring Basin. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $9.82 million Engineering: $0.98 million Subtotal, public improvements: $10.80 million ($20,000/parcel) Sewer impact fee and on-site improvements: $2.70 million ($5,000/parcel) Water impact fee and on-site improvements: $1.08 million ($2,000/parcel) Total: $14.58 million ($27,000/parcel) Area 3 West Highlands This area contains approximately 490 lots. It is bounded by West New York Avenue, 1st Street, Hamilton Avenue, and Bishop Avenue. The development is characterized as medium density. Water service is provided by individual, on-site wells. The development is located within the Blue Spring Basin. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $8.91 million Engineering: $0.89 million Subtotal, public improvements: $9.80 million ($20,000/parcel) Sewer impact fee and on-site improvements: $2.45 million ($5,000/parcel) Water impact fee and on-site improvements: $0.98 million ($2,000/parcel) Total: $13.23 million ($27,000/parcel) Area 4 West Highlands This area contains approximately 500 lots. It is bounded by 20th Street, Brown Avenue, Bishop Avenue, and the FEC Railroad to the west. The development is characterized as medium density. Water service is provided by individual, on-site wells. The development is located within the Blue Spring Basin. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $9.09 million Engineering: $0.91 million Subtotal, public improvements: $10.00 million ($20,000/parcel) Sewer impact fee and on-site improvements: $2.50 million ($5,000/parcel) Water impact fee and on-site improvements: $1.00 million ($2,000/parcel) Total: $13.50 million ($27,000/parcel)
18
Area 5 West Highlands This area contains approximately 450 lots. It is bounded by West Minnesota Avenue, West New York Avenue, Hamilton Avenue and Bishop Avenue. The development is characterized as medium density. Water service is provided by individual, on-site wells. The development is located within the Blue Spring Basin. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $8.18 million Engineering: $0.82 million Subtotal, public improvements: $9.00 million ($20,000/parcel) Sewer impact fee and on-site improvements: $2.25 million ($5,000/parcel) Water impact fee and on-site improvements: $0.90 million ($2,000/parcel) Total: $12.15 million ($27,000/parcel) Area 6 Orange City Hills This area contains approximately 150 lots. It is bounded by Sparkman Avenue, University High School on the north and west sides, and vacant property to the south. The development is characterized as medium density. Potable water service is provided by Volusia County. The development is located within the Blue Spring Basin. The planning level costs to retrofit the area with central sewer are as follows: Construction: $2.72 million Engineering: $0.27 million Subtotal, public improvements: $3.00 million ($20,000/parcel) Sewer impact fee and on-site improvements: $0.75 million ($5,000/parcel) Total: $3.75 million ($25,000/parcel) Area 7 Orange City Hills This area contains approximately 400 lots. It is bounded by South Sparkman Avenue, US Hwy 17/92, West Rhode Island Avenue and undeveloped land to the south. The development is characterized as medium density. Approximately one half of the development receives potable water service from Volusia County, and the remaining parcels receive water service by individual, on-site wells. The development is located within the Blue Spring Basin. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $7.27 million Engineering: $0.73 million Subtotal, public improvements: $8.00 million ($20,000/parcel) Sewer impact fee and on-site improvements: $2.00 million ($5,000/parcel) Water impact fee and on-site improvements: $0.40 million ($2,000/parcel, ½ of parcels) Total: $10.40 million ($25,000 to 27,000/parcel)
19
Area 8 Breezewood This area contains approximately 450 lots. It is bounded by US Hwy 17/92, Junior Street, East Roberts Street and East Elm Drive. The development is characterized as medium density. Potable water service is provided by Volusia County. The development is located within the Blue Spring Basin. The planning level costs to retrofit the area with central sewer are as follows: Construction: $8.18 million Engineering: $0.82 million Subtotal, public improvements: $9.00 million ($20,000/parcel) Sewer impact fee and on-site improvements: $2.25 million ($5,000/parcel) Total: $11.25 million ($25,000/parcel) The total planning level cost to retrofit the identified areas within the Blue Spring Basin with central water and sewer is estimated at $95 million.
20
4.4 The Gemini Springs Basin is the groundwater/drainage basin that contributes to water flow in Gemini Springs, a second magnitude spring located south of Dirksen Drive, east of 17/92 and west of I-4 in the City of DeBary. Gemini Springs discharges to the DeBary Bayou, which empties into Lake Monroe, a water body along the along the St. Johns River. A significant contributor of nutrients to Gemini Springs is septic systems located within the spring basin. Figure 4.4-1 depicts the developments in the Gemini Springs Basin, within Volusia County’s utility service area, that have been identified for elimination of septic systems. Due to the high costs associated with central sewer retrofit, the developments have been broken out into projects to take advantage of state and/or of federal funding as it becomes available. The project areas are numbered based on their proximity to Gemini Springs. There are several developments on the map with relatively large (one acre or greater) lots that are not a high priority for central sewer retrofit in this plan. The following is a description of each of the priority areas identified in Figure 4.4-1 along with planning level costs to retrofit each area with central sewer and water (where currently not available): Area 1 Plantation Estates This area contains approximately 480 lots. It is bounded by Plantation Road, Dirksen Drive, Buena Vista Street, and Margarita Road. The development is characterized as medium density. Water service is provided by individual, on-site wells. The development is located relatively close to Gemini Springs. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $8.73 million Engineering: $0.87 million Subtotal, public improvements: $9.60 million ($20,000/parcel) Sewer impact fee and on-site improvements: $2.40 million ($5,000/parcel) Water impact fee and on-site improvements: $0.96 million ($2,000/parcel) Total: $12.96 million ($27,000/parcel)
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2 !!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2 !!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2 !!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
!!2
37STP
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä
[ä[ä
[ä[ä
[ä [ä
[ä
Summerhaven Area 12 Lake Marie Estates Area 9
Plantation Estates Area 6
Plantation Estates Area 4
Plantation Estates Area 5
Plantation Estates Area 3
Plantation Estates Area 2
Plantation Estates Area 1
Gemini Springs
St. Johns River
St. Johns River Estates Area 11
Florida Power and Light Cooling Pond
DeBary Plantation/Surrey Run Area 10
Lake Marie Estates Phase 8
Lake Marie Estates Area 7
8" PVC
12"
8"
6"
4"
2" HDPE
14" DI 12" PVC
6" PVC
8" D
I
2" PVC
4" D
I
4" PVC
14"
6" DI
8"
4"
4"
8"
4" DI
8"
8" PVC
12" P
VC
4" PVC
8" PVC
4"
8"
4"
6"
6"
4" PVC
8" PVC
4" PVC
6"
8"
8" PV
C
4"
8"
8"
6"
8"
4"
6"
4"
8"
10"
8"
8" D
I
6" PV
C
8" PVC
10" P
VC
12" PVC
8" PVC
8"
8"
6" PV
C
8" PV
C
8" PVC
8" PVC
8" PV
C
8" PV
C
8" PVC
8" PV
C
8"
6" PV
C
8" PV
C
8" PV
C
8" PVC
8" PVC
8" PV
C
8" PVC
8" PVC
8" PVC
8" PV
C
8" PV
C
8" PV
C
8" PV
C
8" PVC
8" PVC
8" PVC
6" PVC
8" PVC
6" PV
C
6" PVC
8" PVC
8"
6" PVC
8" PVC
8" PVC
8" PV
C
10" P
VC
10" PVC
10" P
VC
8" PVC
8" PV
C
8" PV
C6" PV
C
8" PVC
8" PVC
8" PVC
8" PV
C
8" PVC
8"
8" PVC
8" PVC
8" PVC
8" PVC
8" PV
C
8" PVC
8" PV
C
8" PVC
6" PVC
8"
8"
8" PVC
6" PV
C
8" PVC
8" PVC8" PV
C 8" PVC
8" PVC
8" PVC
8" PVC8" PVC
8" PV
C
8" PV
C
8" PV
C
8" PVC
8" PVC
6" PVC
8"
8" PVC
SW83
SW77SW78
SW79SW80
SW81
SW82
SW38
SW76
SW74
SW75SW18
SW73
SW66SW60
SW58
SW56
SW55
SW51
SW48
SW40 SW39
SW36SW35
SW34
SW33
SW31
SW30
SW29
SW28
SW27
SW26
SW24
SW23
SW22
SW21
SW20
SW19
SW17
SW16
SW15
SW14
W HIGHBANKS RD
DELTONA BLVD
DEBARY DR
LAKE DR
FO
RT
FL
OR
IDA
RD
SANFORD AV
COLOMBA RD
S S
HE
LL
RD
CATALINA DR
SUNRISE BLVD
DU
TC
HM
AN
S B
EN
D R
D
DELEON RD
SMYRNA DR
BO
NIT
A R
D
SA
CK
ET
T R
D
GL
EN
AB
BE
Y L
NA
MIG
OS
RD
CL
OV
ER
LE
AF
BL
VD
VALENCIA RD
MA
TAN
ZA
S R
D
NO
RT
H R
D
CADDIE DR
DIA
L A
V
W E
MB
AS
SY
DR
AF
TO
N A
V
FO
UN
TA
INH
EA
D D
R
PLANTATION RD
VOLUSIA DR
CL
AR
K S
T
ELDORADO DR
LAKEWOOD DR
WIL
SO
N R
D
COLLINS AV
ES
TR
EL
LA
RD
LUCERNE DR
MA
DE
RA
RD
N PINE MEADOW DR
FL
OR
IDA
NA
RD
PA
LM
RD
RIV
ER
DR
NA
RA
NJA
RD
SEMINOLE DR
DOGWOOD TR
HA
ZE
LT
INE
DR
JEN
A D
R
KE
EB
LE
AV
MONROE AV
GR
AC
IE R
D
WIS
TE
RIA
DR
SYCAMORE DR
ALT
A V
ISTA
ST
AG
UA
VIS
TA
ST
PALMETTO DR
W G
AU
CH
O C
IR
BENSON JUNCTION RD
BE
LL
TO
WE
R A
V
AL
ICA
NT
E R
D
CA
LL
AV
W W
EL
LIN
GT
ON
DR
SO
FT
SH
AD
OW
LN
SA
NC
TU
AR
Y A
V
HAVERSHAM R
D
BU
EN
A V
IST
A S
T
CALDWELL AV
MAPLEHURST AV
CO
LU
MB
INE
TR
RIV
ER
BL
UF
F T
R
LILAC D
R
AN
NE
Z W
AY
EL
IZA
BE
TH
ST
PLUMOSA RD
E F
AIR
BA
IRN
DR
RIVIERA DR
LA
GO
VIS
TA
ST
SUNSET DR
KINGSLAKE DR
W AZALEA DR
AL
AN
O R
D
BA
YOU
VIS
TA
ST
AZ
AL
EA
RD
LIN
DA
VIS
TA
ST
BR
OW
AR
D A
V
KETTERING RD
GR
AN
DE
VIS
TA S
T
VERONA RD
DAHLIA DR
FLORIDA AV
DA-ROSA AV
SANTIAGO RD
MAGNOLIA PL
FOX RUN
ASTER DR
FLORENCE BLVD
ANGELES RD
E FO
WLER D
R
RIVIERA BELL A DR
JASMINE DR
GARDENIA AV
SE
PP
RD
PALMIRA RD
AC
AC
IA R
D
S P
INE
ME
AD
OW
DR
E L
AC
Y C
IR
HIGHTOWER DR
QUAIL LAKE DR
SP
RIN
G L
AK
E D
R
MA
RTA
RD
WH
ITE
WO
OD
DR
EL
EA
NO
R A
V
LA
UR
IAN
NE
RD
SHADY LN
LUIS LN
AZALEA DR
BU
CC
AN
EE
R A
V
ALEMANDER AV
LANTANA DR
GAYNOR CT
LASH DR
ENGLENOOK DR
COMMUNITY DR
E CONSTANCE RD
HINSDALE D
R
WO
OD
AL
L R
D
JACOB BROCK AV
TH
RE
AD
GIL
L P
L
SUMMERHAVEN DR
GA
MS
DR
HIG
HL
AN
D A
V
SHER LN
E G
AU
CH
O C
IR
HAMMOCK OAK CIR
PINE DR
WH
ITE
MA
RS
H A
V
RUTH JENNINGS DR
I-4 E
B S
AX
ON
EB
OF
F R
AM
P
HIB
ISCU
S D
R
PINE ST
DIAMOND ST
W F
INL
AN
D D
R
WILDWOOD DR
GO
DD
AR
D D
R
OR
CH
ID D
R
15TH ST
FIN
LA
ND
DR
WO
OD
FO
RD
DR
3RD ST
DA
N R
IVE
R A
V
SU
RR
EY
RD
AL
ICE
DR
MA
YF
LO
WE
R A
V
ADMIRAL LN
SPUR RD
JUA
N R
D
IVY
LN
SE
RE
NA
RD
HAWKCREST CT
RE
D C
OA
CH
AV
HA
ZE
LW
OO
D R
D
MAGNOLIA DR
HAM
PTON
HILLS C
T
RIV
ER
BL
UF
F C
IR
COMMED BLVD
PE
PP
ER
WO
OD
AV
AN
CO
NA
AV
MELLON DR
AB
AD
AN
DR
DA
WS
ON
DR
DR
AY
TO
N A
V
CR
AY
CR
OF
T A
V
CA
T TA
IL L
N
MO
NR
OE
ST
JUN
IPE
R R
D
BE
AC
ON
CL
UB
DR
VA
LL
EY
VIE
W R
D
HO
LL
OW
PIN
E D
R
ARAB ST
W 1ST ST
EM
ER
AL
D A
V
ELISSAR DR
WALROCK ST
SUNDOWN RD
CA
RD
INA
L D
R
QUAIL HILL DR
W C
ON
ST
AN
CE
RD
MA
PL
E A
V
CASCADE ST
BRASSINGTON DR
JAMAICA ST
E P
AR
KT
ON
DR
CADDIE CT
KONOMAC LAKE DR
HA
RR
Y A
V
CARIBBEAN ST
DAVENTRY DR
BRAYTON CIR
BALI TER
N FO
WLER
DR
LINCOLN ST
RA
NC
H T
RA
IL R
D
CAMELIA DR
RO
CK
NE
DR
NARCISSUS DR
FY
FE
AV
ROSITA RD
PA
DD
OC
K C
T
PLANTATION AV
CANTERCLUB CT
CARACAS RD
N GAUCHO C
IR
TAYLORVILLE ST
SUNNYDALE DR
DA
RT
FO
RD
CT
S ANCHOR DR
FE
RN
CR
ES
T D
R
PERIWINKLE DR
PO
ND
CT
RIVERDALE DR
LEYBURN DR
PIN
EH
ILL
RD
MAR
IGO
LD L
N
LANDMARK ST
PL
UM
TR
EE
DR
ME
DIC
AL
CE
NT
ER
DR
NE
WH
AL
L L
N
JEFFERS ST
HUMMINGBIRD ST
S PARKTON DR
BREEZEWOOD DR
CAS
SIA L
N
LARKSPUR LN
LAKE LN
AB
AD
Y C
T
HY
DR
AN
GE
A L
N
FERNHILL D
R
SAN LUCIA DR
HIC
KO
RY
SP
RIN
GS
CT
HAZELCREST ST
CO
UR
T S
T
MORNING GLORY DR
LULLWATER ST
SA
BA
L S
PR
ING
S C
T
ASHBO
URNE WAY
TRADERS CO
VE BLVD
MARSELLA RD
AMBERGATE CT
TOWN CENTER DR
MA
DIS
ON
PL
OLEANDER LN
HEATHERTON CT
OAKLEY CT
RO
BE
RT
SO
N L
N
QUAIL MEADOW CT
DREXEL LN
SE
RE
NIT
Y C
IR
FORT FLORIDA POINT RD
N EVANS CIR
CIRO ST
FERN SPRINGS ST
SW
IFT
RD
UPPER CAPE RD
DU
VAL
LN
EAGLE BROOK CT
W F
OW
LER D
R
LAKEFRONT CT
FK LITTLE DR
ALESSANDRA CIR
DRAKE TER
CAMDEN ST
BL
OS
SO
MW
OO
D D
R
S LACY CIR
BARCLAY CT
MIL
LE
R A
V
HOMEWOOD AV
FOXH
ILL CT
BANNER TER
CO
AS
TAL
BA
Y D
R
MAPLE LN
KINLOCK ST
FAIR
BA
IRN
CT
BRISTO
L CT
SKY HIGH LN
COLOMBA RD
FLO
RID
A A
V
ANGELES RD
VALENCIA RD
FLORIDA AV
NA
RA
NJA
RD
VALENCIA RD
PL
UM
OS
A R
D
AL
ICA
NT
E R
D
FY
FE
AV
SMYRNA DR
I-4
SAXON BLVD
DIRKSEN DR
EN
TE
RP
RIS
E R
D
SAXON BLVD
DEBARY AV MA
IN S
T
CH
ILD
RE
NS
WA
Y
VE
TE
RA
NS
ME
MO
RIA
L P
KW
Y
ENTE
RPR
ISE RD
Legend
[ä Lift Station
37STP Sewer Plant
!!2 ManholesGravity MainsForce Mains
Plantation Estates AreaPEA Area 1PEA Area 2PEA Area 3PEA Area 4PEA Area 5PEA Area 6
Lake Marie AreaLM Area 7LM Area 8LM Area 9
Debary PlantationDP Area 10
St. Johns River EstatesSJR Area 11
SummerhavenSH Area 12Service AreaParcel
Southwest VolusiaGemini Springs Basin
Septic Tank Elimination Plan Ü
Prepared by: Volusia County Public Works/RJ Date: 9/24/2014File: G:/OnGoing/WaterUtil//Septic/SouthwestNorthParcels_11x17_092314.mxd
Figure 4.4-1
21
Area 2 Plantation Estates This area contains approximately 405 lots. It is bounded by Angeles Road, Plantation Road, US Hwy 17/92 and Matanzas Road. The development is characterized as medium density. Water service is provided by individual, on-site wells. The development is located relatively close to Gemini Springs. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $7.36 million Engineering: $0.74 million Subtotal, public improvements: $8.10 million ($20,000/parcel) Sewer impact fee and on-site improvements: $2.03 million ($5,000/parcel) Water impact fee and on-site improvements: $0.81 million ($2,000/parcel) Total: $10.94 million ($27,000/parcel) Area 3 Plantation Estates This area contains approximately 360 lots. It is bounded by Valencia Road, Dirksen Drive, Margarita Road and Palm Road. The development is characterized as medium density. Water service is provided by individual, on-site wells. The development is located relatively close to Gemini Springs. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $6.55 million Engineering: $0.65 million Subtotal, public improvements: $7.20 million ($20,000/parcel) Sewer impact fee and on-site improvements: $1.80 million ($5,000/parcel) Water impact fee and on-site improvements: $0.72 million ($2,000/parcel) Total: $9.72 million ($27,000/parcel) Area 4 Plantation Estates This area contains approximately 350 lots. It is bounded by Valencia Road, DeLeon Road, Bonita Road and Interstate 4. The development is characterized as medium density. Water service is provided by individual, on-site wells. The development is located relatively close to Gemini Springs. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $6.36 million Engineering: $0.64 million Subtotal, public improvements: $7.00 million ($20,000/parcel) Sewer impact fee and on-site improvements: $1.75 million ($5,000/parcel) Water impact fee and on-site improvements: $0.70 million ($2,000/parcel) Total: $9.45 million ($27,000/parcel)
22
Area 5 Plantation Estates This area contains approximately 580 lots. It is bounded by Columba Road, East Highbanks Road, US Hwy 17/92 and Amigos Road. The development is characterized as medium density. Water service is provided by individual, on-site wells. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $10.55 million Engineering: $1.05 million Subtotal, public improvements: $11.60 million ($20,000/parcel) Sewer impact fee and on-site improvements: $2.90 million ($5,000/parcel) Water impact fee and on-site improvements: $1.16 million ($2,000/parcel) Total: $15.66 million ($27,000/parcel) Area 6 Plantation Estates This area contains approximately 460 lots. It is bounded by, DeLeon Road, East Highbanks Road, Amigos Road and Bass Lake Drive. The development is characterized as medium density. Approximately one half of the parcels have central water service. The remaining parcels receive water service by individual, on-site wells. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $8.36 million Engineering: $0.84 million Subtotal, public improvements: $9.20 million ($20,000/parcel) Sewer impact fee and on-site improvements: $2.30 million ($5,000/parcel) Water impact fee and on-site improvements: $0.46 million ($2,000/parcel, ½ parcels) Total: $11.96 million ($25,000 to 27,000/parcel) Area 7 Miller Acres This area contains approximately 380 lots. It is bounded by Sanford Avenue, Lake Drive, Pinedale Road and US Hwy 17/92. The development is characterized as medium density. Water service is provided by individual, on-site wells. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $6.91 million Engineering: $0.69 million Subtotal, public improvements: $7.60 million ($20,000/parcel) Sewer impact fee and on-site improvements: $1.90 million ($5,000/parcel) Water impact fee and on-site improvements: $0.76 million ($2,000/parcel) Total: $10.26 million ($27,000/parcel)
23
Area 8 Lake Marie Estates This area contains approximately 390 lots. It is bounded by Lake Drive, West Highbanks Road, Pinedale Road and US Hwy 17/92. The development is characterized as medium density. Water service is provided by individual, on-site wells. The planning level costs to retrofit the area with central sewer and water are as follows: Construction: $7.09 million Engineering: $0.71 million Subtotal, public improvements: $7.80 million ($20,000/parcel) Sewer impact fee and on-site improvements: $1.95 million ($5,000/parcel) Water impact fee and on-site improvements: $0.78 million ($2,000/parcel) Total: $10.53 million ($27,000/parcel) Area 9 Lake Marie Estates This area contains approximately 410 lots. It is bounded by West Highbanks Road, Dogwood Trail, Columbine Trail and US Hwy 17/92. The development is characterized as medium density. Potable water service is provided by Volusia County. The planning level costs to retrofit the area with central sewer are as follows: Construction: $7.45 million Engineering: $0.75 million Subtotal, public improvements: $8.20 million ($20,000/parcel) Sewer impact fee and on-site improvements: $2.05 million ($5,000/parcel) Total: $10.25 million ($25,000/parcel) Area 10 DeBary Plantation This area contains approximately 300 lots. It is bounded by Sundown Road, Rosedown Blvd., Ranch Trail Road and a power line corridor to the west. The development is characterized as medium density. Potable water service is provided by Volusia County. The planning level costs to retrofit the area with central sewer are as follows: Construction: $5.45 million Engineering: $0.55 million Subtotal, public improvements: $6.00 million ($20,000/parcel) Sewer impact fee and on-site improvements: $1.50 million ($5,000/parcel) Total: $7.50 million ($25,000/parcel)
24
Area 11 St. Johns River Estates This area contains approximately 250 lots. It is bounded by Walrock Street, West Highbanks Road, Keeble Avenue and the FEC railroad corridor to the east. The development is characterized as medium density. Potable water service is provided by Volusia County. The planning level costs to retrofit the area with central sewer are as follows: Construction: $4.55 million Engineering: $0.45 million Subtotal, public improvements: $5.00 million ($20,000/parcel) Sewer impact fee and on-site improvements: $1.25 million ($5,000/parcel) Total: $6.25 million ($25,000/parcel) Area 12 Summerhaven This area contains approximately 160 lots. It is bounded by Springleaf Drive, Interstate 4, Hufford Drive and Hayman Drive. The development is characterized as medium density. Potable water service is provided by Volusia County. The planning level costs to retrofit the area with central sewer are as follows: Construction: $2.91 million Engineering: $0.29 million Subtotal, public improvements: $3.20 million ($20,000/parcel) Sewer impact fee and on-site improvements: $0.80 million ($5,000/parcel) Total: $4.00 million ($25,000/parcel) The total planning level cost to retrofit the identified areas within the Gemini Springs Basin with central water and sewer is estimated at $120 million.
25
The following is summary of the planning level costs to retrofit the four (4) priority water body areas with central sewer.
Priority Area Number of Septic
Systems Cost in Millions
Mosquito Lagoon Watershed 1,416 $ 39.6
Halifax River Watershed 4,950 $ 99.0
Blue Spring Basin 3,590 $ 95.33
Gemini Spring Basin 4,525 $ 119.48
TOTAL 14,481 $ 353.43
Table 4 - 1
Septic Tank Elimination Plan
Summary by Service Area
Service Sub # Service New Total Per Parcel
Area Area Description Lots Provider Service Engineering Construction Connection (millions) Average
Southeast 1 Indian Harbor Estates 304 V.C. Sewer Only 0.410$ 4.150$ 1.520$ 6.080$ 20,000$
Volusia 2 River Rd RV Parks (3) N/A V.C. Water/Sewer 0.150 1.470 0.900 2.520 N/A
3 Waterway Estates 204 V.C. Sewer Only 0.440 4.380 1.210 6.030 29,559$
4 Cory Estates 180 Edgwtr Sewer Only 0.340 3.420 0.940 4.700 26,111$
5 Waterfront Park 40 Edgwtr Sewer Only 0.090 0.910 0.200 1.200 30,000$
6 Lyon Subdivision 47 V.C. Water/Sewer 0.110 1.070 0.290 1.470 31,277$
7 Jones Fish Camp 66 V.C. Water/Sewer 0.150 1.500 0.460 2.110 31,970$
8 Oak Hill East 230 V.C. Water/Sewer 0.420 4.160 1.610 6.190 26,913$
9 Mobile Home Village 175 V.C. Water/Sewer 0.320 3.180 1.230 4.730 27,029$
10 Oak Hill West 170 V.C. Water/Sewer 0.310 3.090 1.190 4.590 27,000$
Subtotal - Southeast 1,416 2.740$ 27.330$ 9.550$ 39.620$ 27,980$
Halifax River 1 River Breeze Estates 1,010 O.B Sewer Only 1.380$ 13.770$ 5.050$ 20.200$ 20,000$
Watershed 2 Sunny Shores 780 O.B Sewer Only 1.060 10.640 3.900 15.600 20,000$
3 Roberta Heights 860 O.B Sewer Only 1.170 11.730 4.300 17.200 20,000$
4 Aqua Vista 470 O.B Sewer Only 0.640 6.410 2.350 9.400 20,000$
5 Ormond Shore Estates 700 O.B Sewer Only 0.950 9.550 3.500 14.000 20,000$
6 Imperial Heights 340 O.B Sewer Only 0.460 4.640 1.700 6.800 20,000$
7 Avalon by the Sea 490 O.B Sewer Only 0.670 6.680 2.450 9.800 20,000$
8 Fairwinds 190 O.B Sewer Only 0.260 2.590 0.950 3.800 20,000$
9 Ormond Beach Plaza 110 O.B Sewer Only 0.150 1.500 0.550 2.200 20,000$
Subtotal - Halifax 4,950 6.740$ 67.510$ 24.750$ 99.000$ 20,000$
Blue Spring 1 Orange City Terrace 610 V.C. Water/Sewer 1.110$ 11.090$ 4.270$ 16.470$ 27,000$
Basin 2 Orange City Terrace 540 V.C. Water/Sewer 0.980 9.820 3.780 14.580 27,000$
3 West Highlands 490 V.C. Water/Sewer 0.890 8.910 3.430 13.230 27,000$
4 West Highlands 500 V.C. Water/Sewer 0.910 9.090 3.500 13.500 27,000$
5 West Highlands 450 V.C. Water/Sewer 0.820 8.180 3.150 12.150 27,000$
6 Orange City Hills 150 V.C. Sewer Only 0.275 2.725 0.750 3.750 25,000$
7 Orange City Hills 400 V.C. Water/Sewer 0.730 7.270 2.400 10.400 26,000$
8 Breezewood 450 V.C. Sewer Only 0.820 8.180 2.250 11.250 25,000$
Subtotal - Blue Spring 3,590 6.535$ 65.265$ 23.530$ 95.330$ 26,554$
Gemini Springs 1 Plantation Estates 480 V.C. Water/Sewer 0.870$ 8.730$ 3.360$ 12.960$ 27,000$
Basin 2 Plantation Estates 405 V.C. Water/Sewer 0.740 7.360 2.840 10.940 27,012$
3 Plantation Estates 360 V.C. Water/Sewer 0.650 6.550 2.520 9.720 27,000$
4 Plantation Estates 350 V.C. Water/Sewer 0.640 6.360 2.450 9.450 27,000$
5 Plantation Estates 580 V.C. Water/Sewer 1.050 10.550 4.060 15.660 27,000$
6 Plantation Estates 460 V.C. Water/Sewer 0.840 8.360 2.760 11.960 26,000$
7 Miller Acres 380 V.C. Water/Sewer 0.690 6.910 2.660 10.260 27,000$
8 Lake Marie Estates 390 V.C. Water/Sewer 0.710 7.090 2.730 10.530 27,000$
9 Lake Marie Estates 410 V.C. Sewer Only 0.750 7.450 2.050 10.250 25,000$
10 DeBary Plantation 300 V.C. Sewer Only 0.550 5.450 1.500 7.500 25,000$
11 St. Johns River Estates 250 V.C. Sewer Only 0.450 4.550 1.250 6.250 25,000$
12 Summerhaven 160 V.C. Sewer Only 0.290 2.910 0.800 4.000 25,000$
Subtotal - Gemini Springs 4,525 8.230$ 82.270$ 28.980$ 119.480$ 26,404$
GRAND TOTAL 14,481 24.245$ 242.375$ 86.810$ 353.430$ 24,406$
($ millions)