Volume, Mass & Density

7
Carpentry & Joinery Phase 4 Module 1 Unit 20 Volume, Mass & Density Volume, Mass & Density kg kg Sample Sample Questions Questions & & Solutions Solutions

description

Volume, Mass & Density. m³. kg. Sample Questions & Solutions. 4.5m. 1.8m. 38m. 5m. 2.4m. 55m. 7.5m. Volume. Calculate the volume of the shapes below in m 3. Volume of cuboid = L x B x H Volume of large cuboid = 7.5 x 2.4 x 4.5 = 81m³ Volume of small cuboid - PowerPoint PPT Presentation

Transcript of Volume, Mass & Density

Page 1: Volume, Mass & Density

Carp

en

try &

Join

ery

Ph

ase 4

M

od

ule

1 U

nit

20

Volume, Mass & DensityVolume, Mass & Density

m³m³

kgkgSample Sample Questions & Questions & SolutionsSolutions

Page 2: Volume, Mass & Density

Carp

en

try &

Join

ery

Ph

ase 4

M

od

ule

1 U

nit

20

VolumeVolumeCalculate the volume of the shapes below in m3

Volume of cuboid = L x B x H

Volume of large cuboid

= 7.5 x 2.4 x 4.5 = 81m³

Volume of small cuboid

= 5 x 2.4 x 1.8= 21.6m³

Shape volume = 81 – 21.6 = 59.4m³59.4m³

38m

55m

Volume = πr² x h

= 3.14 x (38 x 38 )x 55

= 3.14 x 1,444 x 55

= 249,379 m249,379 m33

7.5m2.

4m

4.5

m

5m

1.8

m

Page 3: Volume, Mass & Density

Carp

en

try &

Join

ery

Ph

ase 4

M

od

ule

1 U

nit

20

VolumeVolume• Find the volume of concrete required to fill twenty

timber shutters measuring 2.5 meters in height and having a cross sectional area of 0.35m x 0.3m ?

• Answer = 20 (L x B x H)

= 20 (0.35 x 0.3 x 2.5)

= 5.25m5.25m33 of concrete of concrete

2.5m

0.35m0.3m

Page 4: Volume, Mass & Density

Carp

en

try &

Join

ery

Ph

ase 4

M

od

ule

1 U

nit

20

VolumeVolume• Calculate the volume of concrete required in order to pour a

concrete raft foundation 9.3m x 2.7m, having a depth of 300mm and with a perimeter edge beam support of 300mm x 300mm

Volume of main slab = L x B x H = 9.3 x 2.7 x 0.3

= 7.533m³7.533m³• Volume of edge beam = 2(9.3 x 0.3 x 0.30 = 2(2.1* x 0.3 x 0.3)

So total = 7.533 + 2(9.3 x 0.3 x 0.3) + 2(2.1 x 0.3 x 0.3 )

= 9.585m³ of concrete9.585m³ of concrete **Note: edge beam measured full length on long sides so short sides are reduced by 2 x 0.3m to 2.1mNote: edge beam measured full length on long sides so short sides are reduced by 2 x 0.3m to 2.1m

Section through foundation

2.7m

300mm

300mm

300mm

edge beam

Page 5: Volume, Mass & Density

Carp

en

try &

Join

ery

Ph

ase 4

M

od

ule

1 U

nit

20

Volume, Mass & DensityVolume, Mass & Density

• Calculate the density of a load of hardwood with a total volume of 1.85m3 and a mass of 975Kg.

Density =Density = Mass Mass

VolumeVolume

Answer; Density = 975 ÷ 1.85

= = 527Kg/m527Kg/m33

Page 6: Volume, Mass & Density

Carp

en

try &

Join

ery

Ph

ase 4

M

od

ule

1 U

nit

20

Volume, Mass & DensityVolume, Mass & Density• Calculate the volume of timber from the cutting list below.

• Calculate the total weight of the timber if the density of the timber is 430kg/m3.

• Mass (Weight ) = Volume x Density)Mass (Weight ) = Volume x Density)

Mass = 0.0756 x 430

= 32.508kg 32.508kg

No. Off Length Width Thickness

1 7.2m 100mm 35mm

2 4.8m 75mm 35mm

2 1.8m 75mm 35mm

2 3m 75mm 35mm

Total = 0.0756m0.0756m33

Volume (m3)

0.0252

0.0252

0.00945

0.01575

xxxx

xxxx

====

xxxx

Page 7: Volume, Mass & Density

Carp

en

try &

Join

ery

Ph

ase 4

M

od

ule

1 U

nit

20

Volume, Mass & DensityVolume, Mass & DensityCalculate the total mass (weight) of a load of 2 types of timber of the following density:

(a) European Spruce 430kg/m3

(b) Douglas Fir 527kg/m3

If 20 planks 4.8m x 225mm x 75mm of each species are to be carried on a lorry•Answer:

Volume of each stack = 20(4.8 x 0.225 x 0.075)

= 1.62m1.62m33

Mass of European Spruce = 1.62 x 430 = 696.6 kg696.6 kg

Mass of Douglas Fir = 1.62 x 527 = 853.74kg 853.74kg Total = 1,550.34kg1,550.34kg