Voltaje Regulador Tapcon 230

download Voltaje Regulador Tapcon 230

If you can't read please download the document

  • date post

    28-Dec-2015
  • Category

    Documents

  • view

    47
  • download

    6

Embed Size (px)

Transcript of Voltaje Regulador Tapcon 230

  • Voltage Regulator TAPCON 230Operating Instructions

  • 2 225/01/01/0

    Contents

    Contents

    1 General .............................................................................................................................................................................................................. 4

    1.1 Safety instructions ............................................................................................................................................................................ 4

    1.2 Specified application ....................................................................................................................................................................... 4

    1.3 Design and performance features of the TAPCON 230 ...................................................................................................... 5

    2 Technical Data ................................................................................................................................................................................................ 6

    3 Operation ......................................................................................................................................................................................................... 9

    3.1 Input and output of data; functions .......................................................................................................................................... 9

    3.2 Description of the front panel ...................................................................................................................................................... 10

    3.2.1 Display .................................................................................................................................................................................................. 12

    4 Parametering .................................................................................................................................................................................................. 11

    4.1 Normset setting ................................................................................................................................................................................. 11

    4.2 Setting the desired voltage level 1 .............................................................................................................................................. 11

    4.3 Setting the bandwidth .................................................................................................................................................................... 11

    4.4 Setting the delay time T1 or T2 (DELAY 1/DELAY 2) .............................................................................................................. 12

    4.5 Setting the overvoltage detection (U>) with automatic return control ......................................................................... 12

    4.6 Setting the undervoltage blocking (U) ......................................................................................................................................... 13

    4.8 Measuring transformers (VT, CT configuration) ....................................................................................................................... 14

    4.9 Setting the desired voltage levels DVL2 and DVL3 ................................................................................................................. 14

    4.10 Line compensation ............................................................................................................................................................................ 14

    4.10.1 Line drop compensation (LDC) ........................................................................................................................................ 14

    4.10.2 Z-Compensation .................................................................................................................................................................. 15

    4.11 Analog remote position indication (option) ............................................................................................................................. 15

    4.12 Voltage regulator identification ................................................................................................................................................... 16

    4.13 Setting the unit to V or kV ............................................................................................................................................................. 16

    4.14 Selection of the display in the 4th line of the display ........................................................................................................... 16

    4.15 Language selection ........................................................................................................................................................................... 16

  • 3225/01/01/0

    Contents

    NOTE

    Data contained herein may differ in details from the equipment delivered. We reserve the right to make alterations withoutnotice.

    5 Commissioning ............................................................................................................................................................................................... 17

    5.1 Installation .......................................................................................................................................................................................... 17

    5.2 Connection .......................................................................................................................................................................................... 17

    5.3 Easy setting of operating modes with Normset ...................................................................................................................... 18

    5.4 Function tests; operational settings ............................................................................................................................................ 18

    5.5 Manual control of the on-load tap-changer ........................................................................................................................... 18

    6 Parallel control without system topology (Option) ........................................................................................................................ 19

    6.1 Parallel operation .............................................................................................................................................................................. 19

    6.1.1 Parallel operation with Minimum Circulating Reactive Current Method ...................................................... 206.1.2 System configuration; settings ....................................................................................................................................... 206.1.3 Setting the interference variable (CIRCUL. REAC. CURR. STABILITY) .................................................................. 206.1.4 Setting the bandwidth for circulating reactive current (blocking threshold) ................................................. 20

    6.1.5 Function tests, commissioning ...................................................................................................................... 216.1.5.1 Preliminary settings .......................................................................................................................................... 216.1.5.2 Setting the interference variable (CIRCUL. REAC. CURR. STABILITY) ................................................ 216.1.5.3 Setting the circulating reactive current monitoring

    (CIRCUL. REAC. CURR. MON. BANDWIDTH) ............................................................................................... 21

    6.2 Parallel operation according to synchronized tap-change operation Master/ Follower ............................................ 21

    6.2.1 System configuration, settings ..................................................................................................................... 226.2.1.1 Setting the tapping position range ............................................................................................................. 226.2.1.2 Selecting the Master/Follower operation .................................................................................................. 22

    6.2.2 Function tests, commissioning and preliminary settings ........................................................................................ 22

    6.3 Parallel operation with an existing parallel control unit SKB 30 to the principle ofminimum circulating reactive current .................................................................................................................................... 23

    6.4 Disturbances during parallel operation ...................................................................................................................................... 23

    7 Appendix ........................................................................................................................................................................................................... 23

  • 4 225/01/01/0

    1 General

    1.1 Safety instructions

    All personnel involved in installation, commissioning,maintenance or repair of this equipment must:

    - be suitably qualified and- strictly observe these operating instructions.

    Improper operation or misuse can lead to- serious or fatal injury,- damage