Voltaje Regulador Tapcon 230
date post
28-Dec-2015Category
Documents
view
47download
6
Embed Size (px)
Transcript of Voltaje Regulador Tapcon 230
Voltage Regulator TAPCON 230Operating Instructions
2 225/01/01/0
Contents
Contents
1 General .............................................................................................................................................................................................................. 4
1.1 Safety instructions ............................................................................................................................................................................ 4
1.2 Specified application ....................................................................................................................................................................... 4
1.3 Design and performance features of the TAPCON 230 ...................................................................................................... 5
2 Technical Data ................................................................................................................................................................................................ 6
3 Operation ......................................................................................................................................................................................................... 9
3.1 Input and output of data; functions .......................................................................................................................................... 9
3.2 Description of the front panel ...................................................................................................................................................... 10
3.2.1 Display .................................................................................................................................................................................................. 12
4 Parametering .................................................................................................................................................................................................. 11
4.1 Normset setting ................................................................................................................................................................................. 11
4.2 Setting the desired voltage level 1 .............................................................................................................................................. 11
4.3 Setting the bandwidth .................................................................................................................................................................... 11
4.4 Setting the delay time T1 or T2 (DELAY 1/DELAY 2) .............................................................................................................. 12
4.5 Setting the overvoltage detection (U>) with automatic return control ......................................................................... 12
4.6 Setting the undervoltage blocking (U) ......................................................................................................................................... 13
4.8 Measuring transformers (VT, CT configuration) ....................................................................................................................... 14
4.9 Setting the desired voltage levels DVL2 and DVL3 ................................................................................................................. 14
4.10 Line compensation ............................................................................................................................................................................ 14
4.10.1 Line drop compensation (LDC) ........................................................................................................................................ 14
4.10.2 Z-Compensation .................................................................................................................................................................. 15
4.11 Analog remote position indication (option) ............................................................................................................................. 15
4.12 Voltage regulator identification ................................................................................................................................................... 16
4.13 Setting the unit to V or kV ............................................................................................................................................................. 16
4.14 Selection of the display in the 4th line of the display ........................................................................................................... 16
4.15 Language selection ........................................................................................................................................................................... 16
3225/01/01/0
Contents
NOTE
Data contained herein may differ in details from the equipment delivered. We reserve the right to make alterations withoutnotice.
5 Commissioning ............................................................................................................................................................................................... 17
5.1 Installation .......................................................................................................................................................................................... 17
5.2 Connection .......................................................................................................................................................................................... 17
5.3 Easy setting of operating modes with Normset ...................................................................................................................... 18
5.4 Function tests; operational settings ............................................................................................................................................ 18
5.5 Manual control of the on-load tap-changer ........................................................................................................................... 18
6 Parallel control without system topology (Option) ........................................................................................................................ 19
6.1 Parallel operation .............................................................................................................................................................................. 19
6.1.1 Parallel operation with Minimum Circulating Reactive Current Method ...................................................... 206.1.2 System configuration; settings ....................................................................................................................................... 206.1.3 Setting the interference variable (CIRCUL. REAC. CURR. STABILITY) .................................................................. 206.1.4 Setting the bandwidth for circulating reactive current (blocking threshold) ................................................. 20
6.1.5 Function tests, commissioning ...................................................................................................................... 216.1.5.1 Preliminary settings .......................................................................................................................................... 216.1.5.2 Setting the interference variable (CIRCUL. REAC. CURR. STABILITY) ................................................ 216.1.5.3 Setting the circulating reactive current monitoring
(CIRCUL. REAC. CURR. MON. BANDWIDTH) ............................................................................................... 21
6.2 Parallel operation according to synchronized tap-change operation Master/ Follower ............................................ 21
6.2.1 System configuration, settings ..................................................................................................................... 226.2.1.1 Setting the tapping position range ............................................................................................................. 226.2.1.2 Selecting the Master/Follower operation .................................................................................................. 22
6.2.2 Function tests, commissioning and preliminary settings ........................................................................................ 22
6.3 Parallel operation with an existing parallel control unit SKB 30 to the principle ofminimum circulating reactive current .................................................................................................................................... 23
6.4 Disturbances during parallel operation ...................................................................................................................................... 23
7 Appendix ........................................................................................................................................................................................................... 23
4 225/01/01/0
1 General
1.1 Safety instructions
All personnel involved in installation, commissioning,maintenance or repair of this equipment must:
- be suitably qualified and- strictly observe these operating instructions.
Improper operation or misuse can lead to- serious or fatal injury,- damage
Recommended