1

Onshore Pipelines

THE ROAD TO SUCCESS

An IPLOCA document – 3rd edition September 2013

VOLUME TWO

© Copyright IPLOCA 2011

Page 2: Vol 2 onshore pipelines the road to success 3rd edition

2

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2

IPLOCA OBJECTIVES

Objective 1To promote, foster and develop the science and practice of constructing onshore and offshore pipelines,and associated works.

Objective 2To make membership of the Association a reasonable assurance of the skill, integrity, performance, andgood faith of its Members, and more generally to promote good faith and professional ethics in industry.

Objective 3To maintain the standards of the contracting business for onshore and offshore pipelines and associatedworks at the highest professional level.

Objective 4To promote safety and develop methods for the reduction and elimination of accidents and injuries tocontractor’s employees in the industry, and all those engaged in, or affected by, operations and work.

Objective 5To promote protection of the environment and contribute to social, cultural and environmentaldevelopment programs, both in Switzerland and worldwide.

Objective 6To promote good and co-operative relationships amongst membership of the Association as well asbetween contractors, owners, operators, statutory and other organisations and the general public.

Objective 7To encourage efficiency amongst the Members, Associate Members and their employees.

Objective 8To seek correction of injurious, discriminatory or unfair business methods practised by or against theindustry contractors as a whole.

Objective 9To follow the established Codes of Conduct set out by the industry and others with respect to workingwithin a free and competitive market, and in doing so, to promote competition in the interests of amarket economy based on liberal principle, both in Switzerland and worldwide.

Objective 10To maintain and develop good relations with our Sister Associations as well as Associations allied to ourindustry and play a leading role in the World Federation of Pipeline Industry Associations.

DisclaimerIn the preparation of THE ROAD TO SUCCESS, every effort has been made to present current, correct andclearly expressed information. However, the information in the text is intended to offer generalinformation only and has neither been conceived as nor drafted as information upon which any person,whether corporate or physical, is entitled to rely, notably in connection with legally binding commitments.Neither its authors nor the persons mentioned herein nor the companies mentioned herein nor IPLOCAaccept any liability whatsoever in relation to the use of this publication in whatsoever manner, includingthe information contained or otherwise referred to herein, nor for any errors or omissions containedherein. Readers are directed to consult systematically with their professional advisors for adviceconcerning specific matters before making any decision or undertaking any action.

Page 3: Vol 2 onshore pipelines the road to success 3rd edition

3

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2

Executive Summary

“Onshore Pipelines: THE ROAD TO SUCCESS” was produced under the patronage of IPLOCA todescribe state-of-the-art project development and execution practices for onshore pipeline projects. It isthe collaborative result from six different working groups with the goal of covering all stages in thedevelopment of a pipeline project.

Section 1 IntroductionPipeline issues and challenges.

Section 2 Development Phases of a Pipeline ProjectSection 2 describes the key points to be addressed during the FEL (Front End Loading)phases in order to properly prepare for the project execution phase.

Much of FEL is done well before a project is sanctioned and begins construction to ensurea complete project assessment so as to fully understand the challenges and risksassociated with a proposed pipeline project. During this period, project investors and theirdesign contractors typically have due diligence obligation to themselves and theirshareholders to achieve good FEL and therefore control the work process and make thekey project decisions. A detailed review of the data requirements and activities duringthose phases is included.

Section 3 The Baseline of a Construction ContractThe next steps take place at the point of project sanction, where construction soonbegins. A baseline understanding of the project scope and its risks must be establishedwhen investors and contractors enter into mutual agreement underlying a constructioncontract.

This section offers recommendations for establishing the baseline for the Project Executionphases with four chapters: the Scope of Works, the Programme, the Cost and theContract.

Section 4 Dealing with Risks in Pipeline ProjectsAfter project sanction, irrespective of all the efforts to reduce challenges and risks throughthe FEL phases, there will inevitably be other challenges and risks that arise. These mayrepresent disruptions and changes to the established project baseline, so any pipelineconstruction contract must document how these residual risks will be addressed andmanaged.

Section 5 Best Practices in Planning and DesignBest practices are developed in this updated section for planning and design, with theprocess leading to the definition of the ROW and the information to be gathered duringthe different phases of a project.

The routing and design of a pipeline requires a disciplined and organised sequence ofactions to ensure that the most acceptable and optimised route avoiding as many hazardsas possible has been selected and that the system has been designed under acceptablestandards to satisfy fitness for purpose, environmental constraints and safety.

The Minimum Data Requirements and Activities for the Five Typical Project Stagesintroduced in section 2 are defined in this chapter.

Page 4: Vol 2 onshore pipelines the road to success 3rd edition

4

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2

Section 6 EarthworksThe terrain, soil types, and geohazards traversed by the pipeline are key factors toconsider in the design, construction, operation and maintenance of a pipeline project.Firstly, the terrain typically affects pipeline hydraulics, above ground stations and pipelineprotection. Secondly, soil types will affect heat transfer, pipeline restraint, andconstructability. Finally, geohazards often require special design and constructionconsiderations.

The Earthworks section offers guidelines on how to prepare the right of way (ROW) indifferent types of terrain, on the earthworks design, on the recommended measures toreduce the impact on the environment, and on the approach to health and safety.

Section 7 CrossingsThis new section, to be further developed, is initiated with a description and comparison ofthe different methods to execute major trenchless crossings.

Section 8 LogisticsThe risks associated with the logistics of pipe such as handling, transport, coating andstorage begin this new section.

Section 9 Welding

Section 10 Non Destructive TestingThe section starts with a review of the main concerns of the different stakeholders of thepipeline for completing the project. The second subject will be the role of codes andstandards in the design and building of pipelines. Finally the issues involved with NDT atthe various stages of the project are addressed:

• The role of NDT in the FEL/FEED stages.• Vendor inspection and NDT at the material suppliers• Girth weld inspection during the construction stage• NDT during the use of the pipeline; considerations during the construction stage for

future maintenance

Section 11 Pipeline Protection SystemsMost of the installed and currently planned onshore transmission pipelines around theworld are steel pipelines and their integrity during all the manufacturing, handling, storage,installation and service life stages is an important aspect of any pipeline project. As theexternal corrosion and the mechanical impacts have been identified as the most commoncauses of pipe damage and failure in onshore pipelines, industry’s efforts have beenfocused on addressing these issues in order to avoid potential economic, environmentaland human costs from pipeline failures. Therefore, this document reviews the passiveexternal anti-corrosion systems as well as the active cathodic protection approach.

However, onshore pipeline projects can have other specific requirements. Supplementarymechanical protection systems that protect the steel pipes and their coatings againstdamage from external impacts are reviewed, along with internal coating systems andthermal insulation. The floatability phenomenon has to be mitigated on onshore pipelinescrossing wet environments, such as lakes, rivers, or swampy areas and the industry hasdeveloped specialized buoyancy control systems which are being presented here.

Page 5: Vol 2 onshore pipelines the road to success 3rd edition

5

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2

Section 12 Pipelines and the Environment

Section 13 Future Trends and InnovationThe onshore pipeline industry involves collaborative efforts between multiple stakeholders,each of them having a key role to play at one stage or more during the project life cycle.Understanding the involvement of each of these players is a vital step towards enhancingthe operations on the pipeline project in the areas of efficiency, quality, safety, and theenvironment.

The GIS-based construction monitoring tool, the pipeline simulation tool, the EquipmentTracking System and the use of Google Earth in pipeline construction monitoring arepresented as components of a well-rounded Integrated Pipeline ConstructionManagement (IPCM) System.

Page 6: Vol 2 onshore pipelines the road to success 3rd edition

6

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2

Page 7: Vol 2 onshore pipelines the road to success 3rd edition

7

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2

Table of Contents (Volume Two)Page

Executive Summary 3

8. Logistics

8.1 Pipe Handling Operations 1

8.2 Fuel Logistics 27

9. Welding (NEW)

10. Non-Destructive Tests (NDT)

11. Pipeline Protection Systems

11.1 Review of Key Mainline External Anti-Corrosion Coatings 2

11.2 Field Joint Anti-Corrosion Coating Selection Guide 8

11.3 Bends and Fittings 15

11.4 Mechanical Protection Selection Guide 18

11.5 Internal Coating 25

11.6 Insulation 32

11.7 Buoyancy Control Systems 33

11.8 Cathodic Protection 40

Appendix 11.1.1: Comparison of Mainline External Anti-Corrosion Coatings 47

Appendix 11.1.2: Field Joint Coating Selection Table 48

Appendix 11.1.4: Supplementary Mechanical Protection SystemsSelection Table 50

12. Pipelines & the Environment (NEW)

13. New Trends and Innovation

13.1 Functional Specifications for a Near-Real-Time ConstructionMonitoring Tool 1

13.2 Conceptual Specifications for Building a Pipeline Construction SimulationTool 7

13.3 Equipment Tracking System 13

13.4 Google Earth in Construction Monitoring 23

13.5 Skidless Methodology 29

13.6 Machine Development 43

13.6.1. Features and Functional Specifications of the “Ideal Machine” 43

13.6.2. Use of Computer-based Technologies 49

13.6.2.1 GPS in Machine Control and Operation 49

13.6.2.2 Data Transfer 52

Appendix 13.1.1: Conceptual Functional Specifications for a GIS-based Near-Real-Time Construction Monitoring Tool 57

13.7 Near Real Time Automatic Data Acquisition (NEW) 111

13.8 Innovations in CO2 Pipeline Construction (NEW) 131

Page 8: Vol 2 onshore pipelines the road to success 3rd edition

8

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2

Glossary of Acronyms

Bibliography

Acknowledgements

Page 9: Vol 2 onshore pipelines the road to success 3rd edition

1

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

8. Logistics

Logistics are a key component of any cross-country pipeline project, and as such should be given thesame importance as other activities: engineering, procurement, construction, etc… A difficulty ariseshowever in defining “logistics”: do we limit it to the transportation of goods and people, or do we enlargeits perimeter by incorporating other aspects?The choice was made to incorporate into logistics all the activities that are linked to the constructionactivities, which we would consider as indirect costs. The following chapters will develop the followingtopics, which have been identified as being relevant to logistic activities:

• Line pipe supply chain

• Customs and administrative matters (visas)

• Camp, catering & communications

• Fuel management

• Goods management on site

• Transportation of goods and people on site

• Lifting as a recurrent activity throughout the supply chain

• Traceability of all items on a project

Below we list some of the key words, concepts and questions which will be developed in each chapter.

Line pipe supply chain: Handling, storage, transport; measurement by tons; traceability / tracking system; what pipe: bare /coated / special coating; where: to different locations: pipe mill, coating yard, stockpile; how: train,trucks, vessels, barge, LTA, helicopter; problems encountered: constraints due to external coating; bevelprotection; safety; weather / climate; accessibility; stockpile location / optimization; local rules (roadtransport)

Customs issues: Visas issues

Camp (temporary construction camp):How to define a camp: specs from client; specs from contractor; first aid facilities; specs from thecountry (local rules); manufacturing: location, lead time, transportation; easy relocation; utilities: watermanagement; power management; waste management; food management (kitchen, dry store, coldstore, etc), final disposal of the camp; optimization of camp location; security; communications

Catering:Population diversity; quality of food / choice; service / availability; health; local content; subcontractedwork

Fuel management:Quality / tier IV; fuel local treatment; price: refer to risk allocation; storage / security / safety;transportation & delivery; easy relocation

Goods:Equipment / incorporated materials / consumables; measurement, volume; how: train, trucks, vessels,barge, LTA, helicopter; warehouse & material management; disposal at the end of the project

On-site transportation: Cars / trucks / buses; fleet management; safety: Security

Lifting: Best practices

Traceability: RFID / tagging of valuables

Page 10: Vol 2 onshore pipelines the road to success 3rd edition

2

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

8.1 - Pipe Handling Operations

8.1.1 Introduction

When a pipeline is completed and operational, it is the result of cooperation between a number ofparties in the supply chain. These parties perform steps which are sequential and overlapping involved inthe design, manufacturing, blasting, coating, handling, storage, transport and construction of thepipeline. The supply chain is illustrated in Figure 1.

Fig. 1 Line pipe supply chain

Pipes and coatings can be damaged in each stage of this supply chain. This recommended practiceshall address the processes after manufacturing of the pipes and discuss risks and available solutionsduring logistic operation.

For every pipeline project the sequence of logistic operations and the circumstances in which they takeplace are different. It is important to have an exact overview of this logistic trail. When mapping out thistrail, the following questions need to be answered:

• What are the different stages for the pipes in a project, and where do they take placegeographically? For example:

• How are pipes transported to their next destination, by truck, train or vessel?

• How does the loading / unloading (handling) take place in every transport stage?

• Where along the trail are the pipes being stored, and in which climate conditions?

• What is the duration of each storage period

Manufacturingtransport

transport

Coating StorageHandling Handling Handling

transportHandling Pipeline construction

Field storagetransport

Storage Concrete coatingHandling Handling Handling

Page 11: Vol 2 onshore pipelines the road to success 3rd edition

3

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

These questions need to be answered to ensure a good end-quality of the pipes and coating layer. Theanswers help to make a selection of equipment and protection that is fit for purpose. Although moderncoatings such as 3 layer polyethylene and fusion-bonded epoxy are designed to resist damageassociated with ‘normal’ logistic operations, in practice numerous damages are encountered. The typesof damage that are most likely to occur are the result of forces associated with impact or abrasion. If thecoating is damaged during logistics operations it needs to be repaired. These repairs are project-specificbut due to the use of imprecise technical specifications, repairs can fail and result in many in-groundcoating problems. Damage can also remain undetected or be very difficult to detect like UV degradation.Therefore damage prevention is always the best solution.

Owners and developers often choose cheap alternatives, assuming nothing will go wrong as long asminimum requirements or specifications are followed. However specifications and requirements are notalways comprehensive. In the long run, asking specialists for advice can save considerably on costs.Often with only a small extra initial investment, one can win not only in terms of quality but also on othergrounds such as safety and efficiency. A fair cost comparison is only made when not just the buyingprice is taken in to consideration, but also the consequences of choosing for a certain product, such asthe suitability for the terrain conditions.

We shall discuss encountered damages in processes during the supply chain, root causes and ways toprevent or minimize them. This chapter is aimed to secure the quality of coated pipes and also toimprove the safety and efficiency in related processes. This chapter is relevant for all parties involved inthe line pipe supply chain, from the early phases in project management and planning to the lastconstruction operations.

8.1.2 Pipe-end protection

Pipe-end protection is advisable in case the pipe-ends are bevelled at the pipe manufacturer. In the caseof overseas transport, there is an especially increased risk of damaged pipe-ends. This is caused byextra handling procedures in ports and shifting of the pipes onboard vessels. Furthermore, it is difficult tocontrol the circumstances in ports overseas. Research and experience show that a good quality pipe-end protection can prevent 95% of the damages most likely to occur in practice.

How to select good quality pipe-end protection?• For protecting the bevel of the pipe, the most effective method is application of a bevel

protector made of steel or another hard material – we refer to steel bevel protectorsthroughout this chapter.

Important features of a good bevel protector:1. Strong clamping system that can withstand transport vibrations, and also help cope

with large diameter pipes.2. Effective protection of the bevel: Both a deformable buffer zone and materialthickness contribute to the effectiveness of the bevel protector (see example in Figure 2).

3. No parts sticking out: To promote safety and prevent damage to other pipes, it isimportant that the bevel protector has no sharp edges or parts sticking out that mightcause harm or damage.

4. No open gaps: Two overlapping ends ensure that the complete circumference of the pipeis covered.

5. Diameter tolerances of pipes: If the pipes are produced with a certain tolerance, oneshould make sure that the bevel protector chosen can deal with this tolerance.

6. Re-usability: For example if pipes are being transported from the manufacturer to acoating plant on a different location, the bevel protectors have to be removed beforecoating and re-installed after coating.

7. Fast and easy: fitting and removal.8. Suitable for hook lifting.9. Fitting and removal on stacked pipes should be possible.

Page 12: Vol 2 onshore pipelines the road to success 3rd edition

4

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Fig. 2 : Example steel bevel protector: Strongclamping system, buffer profile, no parts sticking out,no open gaps

Fig. 3 Cross-section of a steel bevel protector Fig. 4 Typical impact damage to the bevel

Tips:Rough transportation or handling procedures may lead to loss or loosening of bevel protectors. Oneshould build in checkpoints after logistic procedures to ensure that all missing bevel protectors arereplaced and loose bevel protectors are re-attached before continued handling and transportation.

Pipe ClosureOne can also choose to close off pipes after manufacturing in order to protect the internal pipe surfaceagainst contamination by sand, snow, animals and vegetation.

Contamination of the pipes is often seen, especially when pipes are stacked and stored for long periodsof time at project locations, or close to the sea. Contaminated surfaces remain moist for a longer periodof time, because the moisture evaporates less easily. Figure 5 shows pipes that have been stored foremergency repairs, which show heavy weathering and contamination both inside and outside of thepipe where the coating disbonds at the pipe-end. Other forms of contamination seen in Figures 6 and 7are foreign objects that are found inside pipes such as tools, wood, animals, cans etc.

Fig. 5 Contamination of pipes Fig. 6 Foreign objects in pipes Fig. 7 Foreign objects in pipes

Page 13: Vol 2 onshore pipelines the road to success 3rd edition

5

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

• For closing off pipes, there are different types of plastic caps available, as well ascombination possibilities of a steel bevel protector with a plastic plug. These solutionsare designed to close off pipes, however it is good to consider the followingadvantages/disadvantages.

1. Pipe end caps- Made for standard external pipe diameters

- Not hookable

- Can loosen due to temperature fluctuations, there is no clamping system (this riskincreases with larger diameters)

- Cannot be applied on stacked pipes

2. Recessed caps- Made for standard external pipe diameters, with a certain wall thickness range

- Hookable

- Can loosen due to temperature fluctuations, there is no clamping system

(Risk increases with larger diameters)

- Cannot be applied on stacked pipes

3. Steel bevel protector combined with plastic plug- Made for any internal diameter, also for non-standard external diameters

- Hookable

- No difficulties with temperature fluctuations, because of the secured clamping system (thesteel bevel protector keeps the plastic plug firmly positioned during logistic operations)

- Can be applied on stacked pipes

- Additional bevel protection

Fig.8 End cap Fig.9 Recessed cap Fig.10 Plastic plug with steelbevel protector

4. Solutions for extreme climates

Plastics can deteriorate fast in extreme climates. Both UV degradation and extreme cold / hottemperatures can cause plastic caps to become brittle and break easily under influence of wind, sand,ice, snow or rain.

The material quality and thickness is crucial when selecting end protection for demanding projectcircumstances.

It is also important to consider that pipes might come across differing climates during their logistic trail.Nowadays pipelines run through more demanding latitudes and altitudes than ever before.

Page 14: Vol 2 onshore pipelines the road to success 3rd edition

6

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Consequently one should choose a material that is fit forpurpose. The example shows a bevel protector combinedwith a plastic plug that is made from very low density poly-ethylene (VLDPE). This material is highly UV-resistant andkeeps its flexible qualities in low temperatures (-50°C).

Fig. 11 Bevel protector combined withplastic plug for extreme climates

Tips:

• In some cases it is seen that pipes are closed with thin plastic sheets that are attached to thepipe by tape. This is not a solution that is designed to close off pipes, and it is not advisable forharsh circumstances or storage periods longer than 6 months. When choosing this solution,attention must be paid to selecting the appropriate material. Due to its flexible nature, wind caneasily move the sheets back and forth repeatedly, causing them to rupture. In addition, tape isoften not UV and water resistant, resulting in failure after only a short time. What appears to be alow cost solution may cause a lot of additional costs for repair and cleaning. One must make sureto take the total exposure time of the pipe’s coating into consideration and evaluate the quality ofthe sheet material and tape carefully. For improved long term fixing, sheets can also be fixed witha steel bevel protector, offering pipe closure and bevel protection at the same time.

• When choosing a hookable end cap, one should make sure that the depth corresponds to thelength of the hooks that are used to handle the pipes.

• If there is a large altitude difference between the location where the end caps are put on the pipesand the location where the pipes are being transported to, it is advisable to apply a smallventilation hole in the end cap. Otherwise the end caps might be pushed off due to expansion ofair inside the pipe.

• The UV stability of end caps varies strongly. One must remember to check if the UV-resistance ofthe end caps corresponds with the climate in which the pipes are stored and the duration ofstorage.

• Recycling: Make sure the plastic caps can be recycled for protection of the environment.

8.1.3 Corrosion prevention of the internal pipe surfaceDesiccant material

To prevent corrosion inside the pipe, desiccant material can be added. For this purpose, a tight sealingof the pipe is necessary. A steel bevel protector in combination with a plastic plug is the best solution, asthe steel ring forces the plastic plug against the internal pipe surface. Desiccant material, which can besupplied in bags, absorbs moisture from the air. The quantity is calculated according to climateconditions and duration of storage. Not every desiccant material is suitable for applying in steel pipes.Chemical additives such as salts might even speed up corrosion instead of preventing it. It is importantto check if the desiccant is suitable for use in combination with steel products.

In case of long term pipe storage (> 6 months) it is advisable to regularly monitor if the desiccantmaterial is still active. This can be done by looking on indicator cards that change colour depending onthe relative humidity inside the pipe.

Page 15: Vol 2 onshore pipelines the road to success 3rd edition

7

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

The main features of desiccant materials are:

• Water absorption

• CO2 absorption

• Non-toxic and dust free

Fig.12 Desiccant bags inside a pipe

Volatile corrosion inhibitor) (VCI) method

The volatile corrosion inhibitor (VCI) method is an active corrosion protection method, as chemicalcorrosion processes are actively influenced by inhibitors. In simple terms, the mode of action is asfollows: due to its evaporation properties, the VCI substance (applied in a powder or spray formulation)passes relatively continuously into the gas phase and is deposited as a film onto the internal pipesurface.

This change of state proceeds largely independently of ordinary temperatures or humidity levels. Itsattraction to metal surfaces is stronger than that of water molecules, resulting in the formation of acontinuous protective layer between the metal surface and the surrounding atmosphere which meansthat the water vapour in the atmosphere is kept away from the metal surface, so preventing anycorrosion.

The attraction means VCI molecules are also capable of passing through pre-existing films of water onmetal surfaces, so displacing water from the surface. The presence of the VCI inhibits theelectrochemical processes which result in corrosion, suppressing either the anodic or cathodic half-reactions. Under certain circumstances, the period of action may extend to two years.

The main advantage of VCI is that it is a very effective corrosion inhibitor that penetrates into the smallestholes and cavities. It maintains its protective qualities for a long period of time. A possible disadvantageis that its effectiveness is difficult to monitor.

The powder or spray substrate is more difficult and time-consuming to apply compared to insertingbags or pouches containing VCI. However, when contained in bags in a closed environment without airflow, spreading of the VCI molecules is more difficult and limited up to a few meters.

Fig. 13: VCI method (source: Transport Information Service TIS Germany)

Page 16: Vol 2 onshore pipelines the road to success 3rd edition

8

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

8.1.4 Protection and efficiency during the coating process

If pipe ends are bevelled, it is advisable to protect the bevel during external blasting and coating.

During external blasting:

It is advisable to protect and close off the pipe-end during external blasting. This prevents loss of steelgrit and damage to the pipe-end and internal pipe surface. Futhermore, especially when internal coatingis done prior to external blasting, the pipe needs to be closed to prevent any steel grit from entering anddamaging the internal coating. There are specialized tools, blasting plugs, available for this purpose.

Tools that are used to protect and close off the pipe-end during external blasting should:• be easy to handle for employees

• provide strong clamping inside the pipe

• resist friction between rotating pipes

• resist the pre-heating oven

• resist impact of steel grit in the blasting cabin

• resist acid wash or chromate treatment

• take in to account the cutback of any present internal coating

• Shield the pipe’s internal coating from any temperature changes during blasting

By fine tuning the blasting process (manually or automatically), damages to the pipe-ends can beprevented. When pipes run against each other, friction forces between pipes should be minimized and aconstant line speed should be maintained. One should prevent pipes from opening up inside the pre-heating oven or blasting cabin.

Fig. 14 Blasting plug for protecting and closing off the pipe-end during external blasting

Fig. 15 Blasting plug during blasting process

Page 17: Vol 2 onshore pipelines the road to success 3rd edition

9

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

During external coating:

To improve efficiency during external coating, and the quality of the coating application, it is possible toline up and connect pipes. An unstable coating process can cause unwanted movements in the coatingline and damage to the bevelled pipe-end. Because the pipe doesn’t rotate in a straight line, thecoating thickness can vary over the length and circumference of the pipe. In the worst case scenario,unwanted movements can even cause air seals underneath the coating layer. If pipes are lined up, thereis less movement which ensures a coating application of better quality.

A coating process can be unstable due to multiple causes:• Large pipe diameter combined with thin pipe walls

• Curved or oval pipes

• Unequal support rolls

• Unstable support rolls such as air tires

• High line speed

• Long distances between support rolls

Lining up and connecting pipes stabilizes the coating process and minimizes the likely consequences ofthe abovementioned causes, such as air seals underneath the coating layer.

Lining up pipes can be achieved with a pipe coupling. Pipe couplings are ideally made for one externaldiameter and adjustable for a certain wall thickness range. There are two types of pipe couplingsavailable: Male-female pipe couplings and single side pipe couplings. The male-female pipe couplingsexist out of two parts that have to be inserted in both pipe-ends that are running against each other. Thesingle side pipe couplings have to be inserted in only one pipe-end. The upcoming pipe is automaticallylined up.

Fig. 16 Male-female pipe coupling Fig. 17 Single side pipe coupling

Which features are important for a good pipe coupling? A good pipe coupling should:• Line up pipes accurately

• Cause no permanent deformation to the pipe after fastening (especially in case of thinpipes)

• Provide bevel protection

• Not scratch the internal pipe surface (usually caused by insufficient clamping or blocking ofthe coupling when pipes move away from each other)

• Not absorb too much heat from the pipe, as this would have a negative effect on thebonding of the coating. Hence contact surfaces between the coupling and the pipe shouldbe limited

Page 18: Vol 2 onshore pipelines the road to success 3rd edition

10

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

• Be able to handle oval or curved pipes

• Be easy to adjust for a large wall thickness range

• Allow the flow of static electricity between pipes

• Be able to resist heating by gas or induction oven

• Be able to bridge thermal expansion of the pipe

• Remain strongly fixed during the entire coating process

Fig.18 Pipe coupling with automatic clamping Fig.19 Perfect line up of pipes during coatingand centering

If using pipe couplings, these have to be integrated in the coating process. It is important to choose agood position for inserting and removing the couplings. For large diameter pipe couplings a lifting craneor balancer is necessary for fitting and removal. Transport of the couplings back to the beginning of theprocess can be done by manual carts or an automatic rail system.

Tips:

• It is advisable to insert the coupling in the pipe-end of the pipe that enters the cooling street first.In that way the coupling will cool down and shrink slightly earlier than the upcoming pipe, whichallows a more easy release of the other pipe-end.

• In case of a fragile bevel or thin wall, choose softer material for rollers, such as heat resistingNylon (Nylon 6.6)

• Make sure that the coupling allows conductivity flow through the coating line to prevent sparkscaused by static electricity

8.1.5 Pipe handling

Pipes are handled multiple times in the supply chain, for example in ports and storage yards. Byhandling we mean lifting of pipes and loading to or unloading from trailers, train wagons or vessels. Mostdamages to pipe ends, surfaces and coatings occur during handling procedures due to a combinationof inadequate equipment and poor personnel awareness. This also leads to unsafe situations andaccidents. The personnel’s awareness issue is the hardest to overcome as circumstances cannot alwaysbe controlled and many different people are involved in handling the pipes during different stages in thepipeline project. Proper trainings, planning beforehand and safe equipment can help to overcome thisissue.

Page 19: Vol 2 onshore pipelines the road to success 3rd edition

11

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Practical example

In many factories and coating plants, pipes are occasionally moved by hand. Special tools are made forthis purpose that allow rolling of pipes with help of a lever arm. Generally these kind of tools are ‘homemade’ by employees. If not constructed properly these tools can cause damage to pipes and injuries topeople. That is why training and technical insight into the fragility of the bevel and internal / externalcoating are so important.

Fig.20 Pipe roller designed for safe manual handling of pipes

Pipe lifting

Lifting can be done with hooks, forklift, hydraulic spreader and vacuum equipment. Here we examinethese methods and their impact on the pipe coating.

It is commonly known that badly-designed pipe hooks could damage bevelled pipe-ends. The hookdesign and lifting angle determine if forces are spread evenly over the pipe's surface, to avoid deformingthe pipe. Bevel protectors can be applied to overcome this issue. A correct lifting angle is also veryimportant to ensure safety - a lifting angle that is either too small or too large can cause the pipe to fall.

Fig.21 Safe lifting angle

Less well-known is that hooks can also damage pipe coatings during loading operations, or if danglinghooks knock against the pipes causing impact damage to the coating. Proper handling of coated pipeswith pipe hooks is possible, but employees must be made aware of the vulnerability of pipe coatings. Awell designed pipe hook should be selected for this purpose. There are also additional protective sleevesavailable to shield pipes against hard parts from the pipe hook, such as bolts and shackles.

Page 20: Vol 2 onshore pipelines the road to success 3rd edition

12

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Fig.22 Pipe hook with protective sleeve

Features of a well-designed pipe hook:

• Covered with a softer material such as PU to prevent impact damage to the pipe coating

• Exchangeable pads

• Handgrip and rope shackle for safety of personnel

• Calculated for a prescribed lifting angle and pipe weight

• Shaped to spread lifting forces on the internal pipe surface and bevel

Fig. 23: Example of a poorly-shaped pipe hook Fig. 24: Typical damage to the pipe-end causedby unsuitable pipe hooks

Fig. 25: Example of a pipe hook without Fig. 26: Example of a well-designed pipe hookprotective exterior with protective exterior

Forklifts are frequently used for handling pipes. Damage to coated pipes is caused when the steel forksare not covered with a softer material to protect the coating. It has been known for forklifts’ forks to bedriven directly into the pipe-ends to lift them. This type of handling causes damage to the pipe andinternal coating. There are custom made forklifts available with soft covered grippers to hold the pipesduring driving – these should be used instead.

Page 21: Vol 2 onshore pipelines the road to success 3rd edition

13

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Tip:

• Grippers are appropriate if the driving area is bumpy or not straightened. If a normal forklift,carrying a pipe, drives through a hole or bump in the road, one of the pipe-ends might scrapeover the floor causing serious coating damage and deformation of the pipe. Not to mention therisk that the pipe might slide off the forks

The best way to handle coated pipes is by means of hydraulic spreaders, vacuum lifters or other newlifters. This equipment is designed to minimize the risk of damaging pipe coatings. An investment isrequired, but is well worth the effort. It not only has the advantage of needing less ground personnel, butalso allows the loading and unloading to be done in less time.

Fig. 27: Hydraulic spreader bar Fig. 28: Vacuum lifter

8.1.6 Pipe transport

Pipes need to be transported between parties involved in the supply chain. This is done by truck, trainand/or vessel.

Pipes need to be fixed during transport. To do this, wooden dunnage can be applied in combinationwith tensioning belts, however there are some risks that need to be considered. The quality of thewooden dunnage varies strongly and depends on the design and person who makes them. Variousspecifications are found for the design of wooden supports. In most cases wedges are nailed ontowooden beams. As wood is a product of nature it has widely varying material properties, and isunreliable due to hidden cracks and voids. Besides this, wood is highly subjective to weather influencessuch as drought and rain that cause fast deterioration. Most specification do not take these factors intoconsideration and only focus on the basic design.

A risk that also needs to be considered is that nails can loosen due to transport vibrations. This not onlycausea unsafe situations, but also severe coating damage as the nails intrude into the coating layer.

Fig. 29: Nail sticking out of transport system Fig. 30: Coating damage caused by nail

Page 22: Vol 2 onshore pipelines the road to success 3rd edition

14

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

If wooden dunnage is used, the following measures are advisable:

• Thorough inspection after each use

• Immediate disposal of broken supports

• Use only 1-4 times

• Always store inside

• Have the dunnage tested before use

Immediate danger for everyone involved in pipe transport occurs when the wooden supports are notconstructed with care. Plenty of examples have been found during field work. Beams are found to bebroken, wedges are too small, wedges are not made for the correct pipe diameter, wedges are poorly ornot nailed to the beam, or nailed at very unfortunate locations.

Fig. 31:

Most wooden dunnage is not adjustable for different diameters. It is very difficult to organize a stock andselect the appropriate system for a certain diameter

Alternatives to wooden dunnage

There are more specialized systems available for pipe transport. An example of this system will bepresented now. It has the following advantages:

• Safe for any coated pipe surface

• Wedges are made from one part, with a constant material quality

• No nails sticking out

• Adjustable for multiple diameters

• Durable

• Design based on static and dynamic calculations in accordance with API recommendedpractice 5L1 and VDI 2700

There is one other essential difference to consider between wooden dunnage and a system as shown infigure 26-31. With wooden dunnage the pipes are supported on the bottom. Although the pipes areblocked by wedges, almost all the weight rests on the beam underneath the pipe. With a system asshown below, the pipe doesn’t touch the bottom, but is fully supported by the wedges. This helpsmaintain the pipe’s roundness, and prevent material stresses, as we shall demonstrate in the nextchapter about pipe storage.

Page 23: Vol 2 onshore pipelines the road to success 3rd edition

15

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Fig. 32: Static pressure test (temperature 70°C) Fig. 33: Measuring coating thickness after test

This type of transport system is especially developed for safe pipe transport on truck and train:

Fig. 34: Pipe transport by train Fig. 35: Pipe transport by truck with anti-skidrubber layer added

Fig. 36: Pipe transport with System88 Fig. 37: Pipe transport of two 56” pipes on onetrailer with a pipe raiser system

The following issues should be checked prior to pipe transport to ensure safety:

• The first tier of pipes must be long enough to be positioned on all the support blocks;shorter pipes can be placed on the upper tier.

• Ensure there are no ropes caught between pipe and support blocks or support rubbers.Make sure there are no loose ropes and that zip ties on ropes are checked.

• All straps should be in straight vertical alignment over the load, without any twists or knots

• Check if hook and keepers are correctly secured, and hammer locks must not be caughtunder bolts or frames

Page 24: Vol 2 onshore pipelines the road to success 3rd edition

16

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

8.1.7 Pipe storage

Pipes are stored a number of times before they reach their destination. During storage the pipe coatingis among other things subject to high pressure, ultra-violet (UV) degradation, design of bottom support,and contamination. In this paragraph the impact of these influences on the pipe coating is examined.

Impact of storage method on coating

Pyramid stacking is the most common way to stack pipes. When pipe stacks are built layer on layer, theforces on the bottom row of pipes approaches the number of pipe layers times the weight of one pipe.These forces are transmitted by the bottom pipes to the ground. Pipes in the stack deform as a result ofthese forces. The coating is subject to these forces as well. The resulting pressure on the coating must beconsidered to avoid damage.

The maximum pressure that coating material can take is known. A careful estimation should be made ofthe area that transfers the forces. This could either be the contact area between the pipes or between thebottom pipe and the support that carries the pipe. In any case it should be avoided that the 3 and 9o’clock positions of the pipes touch each other. Because of the load on top, pipes temporarily becomeoval. When there is contact between the 3 and 9 o’clock positions of the pipe due to this out-of-roundness, the pressure on the coating becomes extreme. There should be just enough distance betweenthe pipes to make sure that pipes do not touch due to deformation after the stack has been completed.This is one of the reasons why some manufactures apply ropes around the pipes – this helps preventdeformation.

If supporting the pipes of a stack it is advised to block every pipe from rolling. Using only stops at the endof the stack is advised against. If only end-stops are used, forces add up at the end of the stack. The morethe layers of pipes, the more forces add up, as demonstrated in Figure 38. The diagonal lines represent theforces that the pipes transfer to the pipes underneath. The bottom pipes in the middle of a stackexperience the same forces from the left and from the right. They are in static balance. The forces on thepipes towards the end of the stack are not in balance, as they experience more pressure from one sidethan the other . If only end stops are used, the bottom pipes transfer the forces to each other which addup till the last pipe. This force is blocked by the end-stop only, resulting in extremely high pressure(depending on the surface of the end stop). Steel supports as shown in Figure 39 are therefore notrecommended as they only block the pipes at the end of the stack. Figure 40 shows an example of anoverloaded end stop.

Fig. 38 Forces add up towards the end of a pipe stack when using only end stops

Page 25: Vol 2 onshore pipelines the road to success 3rd edition

17

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Fig. 39: Example of a steel end stop Fig. 40: Overloaded end stop

Tip:

• Similar calculations can be made for stacks in a vessel. Inside the vessel there is an even higherchance of damage due the movements at sea. The pipes are blocked by the vessel’s cargo holdonly and sometimes pipes are stacked higher inside the vessel than on land. This needs to betaken into consideration

Risks when using sand berms for pipe storage

Sand berms and wood with wedges are commonly used for pipe storage, while steel profiles with onlyend stops are less used.

If left uncovered, sand berms are highly subjective to erosion. Erosion takes place slowly by wind andwater washing away the sand. Pipe stacks might seem stable in the beginning but they becomeunstable after a period of time. The degree of erosion is difficult to measure and monitor. Therefore baresand berms are unreliable and unsafe. This especially holds when berms are reused without rebuilding.Besides safety risks, the composition of sand and rocks for the sand berms is not specified. Althoughthe time frame for storage is relatively small compared to the time a pipeline lays in the ground, there arewell-known cases in which the sand berm was highly contaminated with salts that affected FBE-coatedpipes with pitting corrosion.

There are also better examples of sand berms, constructed following a predefined specification withpolyethylene to cover the sand and periodical examinations to assess the stability of the stacks.However, when applying sand berms a level of uncertainty always remains, as you can never tell if sandis about to shift either because it is too wet or too dry.

If sand berms are used, the following minimum measures are advisable:

• Cover the sand with PE or rubber sheets

• Pre-define the height, depth and shape of the sand berm

• Use indicators to monitor any movement in the pipe stack, such as markings on theground or on the pipes

• Use a back-up system to help support the pipe stack, such as pipe clamps

Page 26: Vol 2 onshore pipelines the road to success 3rd edition

18

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Fig. 41 Eroded sand berm, the sand is too dry

Risks when using wooden systems for pipe storage

There are three main risks when using wooden pipe supports:

1 Wood is a natural product with an inhomogeneous structure. Pipe supports can havehidden cracks and weaknesses

2 Wood deteriorates fast due to weather influences, losing its capacity to carry loads

3 Nails that stick out intrude into the pipes’ coating, causing severe damage

If wooden systems are used, the following minimum measures are advisable:

• Cover the sand with PE or rubber sheets

• Pre-define the height, depth and shape of the sand berm

• Use indicators to monitor any movement in the pipe stack, such as markings on theground or on the pipes

Fig. 42 Unstable wooden support Fig. 43 Weathered wooden support

Pipe support on wedges

A pipe storage system as shown in Figure 44 has some advantages compared to the systemsdiscussed earlier. It requires an initial investment, but pays itself back in the longer run because of itsreusability and minimized risk of coating damage or accidents. This system comprises low densitypolyethylene compound wedges that are positioned on a steel reinforced polyethylene compound gearrack. The gear racks can be connected to create the needed storage length. Pipes are raised from theground for at least 80 mm and settings can be made in such that the distance between the pipes is atleast 1% of the pipe diameter.

Page 27: Vol 2 onshore pipelines the road to success 3rd edition

19

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Fig. 44 Pipe support on wedges Fig. 45 Pipe support in the field

Advantage of wedge support

Pipe support on two wedges instead of on one bottom beam has a big advantage. Because there aretwo support surfaces instead of only one, the deformation of pipe is reduced significantly. Finite elementmethod analysis indicates 3.8 times less displacement and 1.8 to 1.9 times less von Mises stress.Figures 46 and 47 show the difference between bottom support and wedge support.

Fig. 46 FEM analysis of bottom support Fig. 47 FEM analysis of wedge support at twosurfaces

The design of these type of systems is based on calculations and pressure tests. In addition thesesystems are certified by third parties. Uncertainties and hidden weaknesses are eliminated.

Tip:

• Sometimes pipes are stored on a slope. Even a slope of only a few degrees makes a largedifference in the way forces are transmitted in a pipe stack. One should make sure that thestorage system can handle the forces when storing pipes on a slope

Position of supports

When a pipe is not supported over its full length, it is going to bend under its own mass. Because of thebending, compression and tensile stress on the pipe’s upper and underside arise, which can lead tocoating disbondment or damage and permanent deformation of the pipe.

Figure 48 shows a schematic storage situation of a pipe, using two support rails. To achieve as littledeflection of the pipe as possible it is necessary to calculate the ideal position of the supports.

Page 28: Vol 2 onshore pipelines the road to success 3rd edition

20

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Fig. 48 Bending of pipe due to support position

Calculations prove that the ideal position is at 22% (measured from the ends) of the total length of thepipe, when using two supports underneath one pipe. This results in the lowest possible displacementand thus the lowest bending stress.

This ideal position of the supports, distance a, is also determined with FEM analysis.

The results of the FEM analysis are shown in figure 49. The smallest displacement can be seen at22.15%, marked by the green line.

Fig. 49 Displacement of pipes depending on supporting position and width

If the supports are placed at 18% of the pipe length, the displacement in the middle is more comparedto the displacement at both ends.

Fig. 50 Pipe support at 0.18 x L

If the supports are placed at 25% of the pipe length, the displacement at both ends is more comparedto the displacement in the middle.

Page 29: Vol 2 onshore pipelines the road to success 3rd edition

21

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Fig. 51 Pipe support at 0.25 x L

When supporting the pipe at 22% of the pipe length, the displacement at both ends and in the middle ofthe pipe is equal. Forces are spread in an optimal way. A support position at 22% of the pipe lengththerefore gives the best result.

Fig. 52 Pipe support at 0.22 x L

UV radiation

Another vicious enemy of pipe coating is UV radiation. Damage caused by it is difficult to see with thenaked eye. Serious consequences of UV radiation are addressed by Argent & Norman. In their paper anexample is shown with severe coating embrittlement caused by UV radiation. Studies undertaken byCetiner et al on fusion-bonded epoxy (FBE) coated pipes proved a loss in coating thickness andflexibility, and a loss of gloss with chalking, occurred as a result of degradation by UV degradation.Based on their results they conclude that pipes which are stored outside for longer than one year shouldbe protected against UV degradation. This can be done by adding UV stabilizer additives to the coatingor by shielding the pipes from direct sunlight with a pipe stack cover.

Pipe Clamps

One tool that is seen at many locations is a clamp that connects pipe-ends in a stack. It is used to keepthe pipes together and to prevent the stack from collapsing. As described earlier, the heavy pipes exerthigh forces on the pipes on the bottom. The clamps must be designed to handle these forces. Manyclamps that are used in the field are not fit for purpose.

Fig. 53 Poorly-designed pipe clamp Fig. 54 Twisted pipe clamp

Page 30: Vol 2 onshore pipelines the road to success 3rd edition

22

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

The limiting factor in the design of a good pipe clamp is the resistance to twisting. With 20 mm thicksteel pipe clamps, tensile strengths over 80 kN can be reached. With a safety factor of 2 that results in asafe working load of 40 kN. An example of a well-designed pipe clamp can be found in figures 55-57.

Fig. 55 Well-designed pipe clamp Fig. 56 Well-designed pipe clamp

Fig. 57 Tensile test with pipe clamp

When applying pipe clamps, the following should be taken into consideration:

• In case of internal coating, the pipe clamp should have a soft cover to prevent coatingdamage

• For keeping a pipe stack together, one should not rely on pipe clamps only! It is essentialto make sure there is a good support system for the pipes. Pipe clamps can (accidentally)be removed, creating an unstable pipe stack and a dangerous situation

• One should choose a pipe clamp design based on calculations, rather than the feeling thatit will be strong enough

Modern pipe monitoring technology

Logistic processes in the supply chain of line pipes are becoming more complicated, demanding andglobal. With today’s high value assets, it is important to reduce uncertainties and control the total projectdata management.

A new development is the application of active radio-frequency (aRFID) technology for identification andmonitoring of pipes in the supply chain.

Page 31: Vol 2 onshore pipelines the road to success 3rd edition

23

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Small tags, that are positioned in the pipe, actively measure location, movement, humidity, temperatureand more. Other data, such as pipe numbers and production data, can also be stored. Data iscommunicated through micro routers and a gateway in a self-organizing and healing mesh network. Thecentral database is accessible by WiFi or ethernet through a connect-box. With such system all pipedata can be monitored by multiple users on any desktop computer or mobile. Integration with existingERP systems can be achieved with XML streams.

Important features of an intelligent pipe monitoring system:

• Wireless technology, no cables necessary in the field (solar powered routers), which isimportant in remote areas and to save costs for infrastructure.

• Easy to install, self-organizing, self-healing network

• Low total cost of ownership

• Long battery life of the tags (up to 5 years)

• Reprogrammable

• Uniform data output, such as XML streams, that can easily be processed in other softwareapplications

Possible functions of the pipe tag:

• Localization

• Identification

• Movement alert

• Battery alert

• Temperature measurement

• Humidity measurement

• LED-light (flashes on command)

• Additional data storage (1 MB)

• Historic log

Fig. 58 Schematic representation of a RFID pipe Fig. 59 RFID pipe tagsmonitoring system at a storage yard

Page 32: Vol 2 onshore pipelines the road to success 3rd edition

24

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

8.1.8 Effect of pipe handing on barcoding

When using handhelds (barcode scanners) barcoding is very important for inventory purposes andlogistical planning, especially when the pipes are stored in more than one laydown area:

The following should be looked at when applying barcode labels to the pipes. One should:

• Make sure the adhesive will not damage the coating.

• Make sure the label will withstand different pipe handing stages from the moment ofdespatching the pipe from the coating facility up to lowering-in without being damaged orremoved.

• Make sure the label adhesive to be used will withstand high temperatures, humidity, heavyrain and other environment and weather conditions.

• Barcoding technology to be used: this depends on the amount of information to be storedin a barcode and the physical damage that it will be able to withstand and still bereadable. There are two main technologies to be used:

• One-dimensional barcodes can store a small amount of information; they are notresistant to physical damage along the vertical axis.

• Two-dimensional barcodes are capable of holding around 2000 characters; they areable to provide readability even if the label is 50% damaged.

Another alternative is to ink-jet the labels on to the surface of the pipe.

8.1.9 Pipeline construction

Once one has gone through all the trouble of getting the pipes safely and free of damage to theconstruction site, it would be a pity to waste all this effort and risk damaging the pipes at the last moment.One should choose adequate equipment during the final stages of the project for handling and support ofpipes and prevent last-minute coating damage.

Fig. 60 Poor support of a pipeline in the field

Page 33: Vol 2 onshore pipelines the road to success 3rd edition

25

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

8.1.10 Key message

The key message of this chapter is that quality, safety and efficiency should be pursued during each step inthe supply chain of line pipes in order to build a successful pipeline.

A chain is only as strong as its weakest link. Control of the entire supply chain, including every movementof pipes is necessary. One should take active responsibility and seek cooperation with professionalpartners. Responsibility should not be rejected, it should be handed over.

The choices that one makes have consequences further along the way. One should not limit oneself toone’s own part in the supply chain. Instead, one should make choices that contribute to a good quality inthe end, by thinking ahead and feeling co-responsible for other processes in the supply chain. Goodcommunication lines with other involved parties are essential for achieving this goal.

A small extra investment in a good solution pays itself back in the long run. There are numerous exampleswhere cost savings in the wrong areas lead to more costs in the end. A conscious and well-consideredchoice for quality is always better than choosing a poor solution only because it is cheap. Costs are usuallycalculated per project, but if a solution reduces risks and can also be used for future projects, it is worthmaking an extra investment.

Page 34: Vol 2 onshore pipelines the road to success 3rd edition

26

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Page 35: Vol 2 onshore pipelines the road to success 3rd edition

27

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

8.2 - Fuel logistics

"Gain may be temporary and uncertain; but ever while you live, expense is constant and certain: and it iseasier to build two chimneys than to keep one in fuel.”

Benjamin Franklin

8.2.1 Introduction

Fuel is the blood to be pumped in the construction project, to bring the project to life.

The fuel logistics of a pipeline construction project is the discipline of evaluating and managing all thecosts and effective risks associated with the sourcing, transport, storage and delivery of fuel during thewhole project life-cycle.

Construction’s bottom line can be affected by the complex relationships between fuel stocks, the fuelsupply chain and the strategies that oil companies use to minimize working capital. The impact on priceof a weak fuel supply chain could be very high.

8.2.2 Types of fuels

The types of fuel normally used in big onshore pipeline construction projects are:• Diesel fuel

• Gasoline

• Propane

• Other less common fuels

Diesel fuel usually represents more than 90% of the total fuel used (even without taking into account thefuel for personnel and material transportation to the yard site or area)Diesel fuel is used to power up all the main construction machines (excavators, bulldozers, loaders,haulers, etc.), most portable power generators and most trucks involved in material transportation.

Diesel fuel quality is an important factor in satisfactory engine life and performance. Fuels must provideadequate combustion without producing excess contaminates that can harm the engine. Additionally,fuel selection involves economic and environmental considerations. The availability of certain grades offuels may be cost-prohibitive or inappropriate for various applications.

A variety of fuel oils, also known as middle distillates, are marketed for use in diesel engines. Theirproperties and performances depend on the refining practices used and on the nature of the crude oilsthey are produced from.

Low grade: low-grade fuels produce a higher heat value which translates into more power forthe user motor, but they also produce more contaminates that could negatively impactengine-life. The use of low-grade fuel oil in diesel engines often produces darker exhaustfumes and a more pronounced odour.

Moreover, the high sulphur content often found in low-grade fuels causes corrosion, wear anddeposits in the engine, resulting in poor starting, or running under adverse operatingconditions. The use of low-grade fuels may require the use of high priced, higher detergentlubricating oils and more frequent oil changes to yield appropriate performances and topreserve engine life.

High grade: high-grade fuels burn cleaner but they have a lower heat value. Just as anexample, aviation jet fuels and kerosene are high-grade fuels and seldom contribute to the

Page 36: Vol 2 onshore pipelines the road to success 3rd edition

28

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

formation of harmful engine deposits and corrosion. Other attributes of high-grade fuelsinclude the benefits of faster engine starting and less frequent overhauls, and the drawback ofreduced lubricity.

Experience has proven that distillate fuels meeting basic specifications will result in optimum engineperformance and durability. Depending on fuel costs and availability, the proper use of alternative fuelssuch as crude oil, blended oil or residual oil can also provide cost-competitive engine operation.

Crude oil: the term crude oil is used to describe petroleum-based oils/fuels that are notrefined yet. They are essentially in the same state as when they were pumped from earth.Certain types of crude oils can be burned in diesel fuelled equipment or generator enginesand, in some cases, it is a practical and economical fuel. Crude oils are to be evaluatedindividually and special equipment may be needed to condition the fuel (see paragraphs andtables below).

A great deal of sludge can be removed from crude oil by a proper settling system.

Residual oil or blended heavy fuel oil (HFO): residual fuel (which resembles tar and containsabrasive and corrosive substances) is composed of the remaining elements from crude oilafter the crude has been refined into diesel fuel, gasoline, or lubricating oil.

Residual fuel can be combined or diluted with a lighter fuel to produce a mixture that is calledblended or heavy fuel. Heavy fuels tend to create more combustion chamber depositformations which can cause increased cylinder and ring wear.

Blending may improve fuel density; however, adding alcohol (ethanol, methanol) or gasolinecauses an explosive atmosphere in the tank and is not recommended.

Equipment engines can be modified to run on blended fuels, but extreme preventivemeasures must be taken, including following a thorough maintenance program and usinghigh-quality fuel treatment equipment.

Blended fuels can lower fuel costs, but there are often significant trade-offs. Fuel price mustbe weighed against the following:

- Fuel containment effects

- Reduced engine component life

- Higher maintenance and personnel costs

- Reduced warranty

Ultimately, the use of blended fuels should be limited to the cases in which no other fuel is locallyavailable, i.e. in countries with poor refinery capacity or low refinery standards (see Figure 1 – countrieswith low refinery standards have high diesel fuel sulphur levels).

Fig. 1: Diesel fuel sulphur level - August 2011

Page 37: Vol 2 onshore pipelines the road to success 3rd edition

29

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Distillate fuel: distillate fuels are refined from crude oil and are commonly referred to as diesel fuel,furnace oil, gas oil or kerosene.

Marine diesel oil: many different names are used for marine diesel oil, which can often causemisunderstandings. Four types of marine diesel fuels are generally recognized and available at bunkeringports around the world. However, not all types are available in every country.

• Gas oil: this is a light distillate fuel which does not contain any residual fuel. Gas oil isapproximately ASTM No.1 diesel fuel.

• Marine diesel: this is a distillate that boils at a higher temperature than gas oil. The fuelvaries from ASTM No.2 diesel fuel to ASTM No.4 diesel fuel.

• Blended Fuel Oil: this is a blend of distillates and residual fuel. This fuel is blended to theviscosity that is requested by the operator or the engine manufacturer. Blended fuel is notrecommended as a fuel option for engines.

• Residual fuel: this is a residue from distillation of crude oil in a refinery. It should never beused as diesel fuel

Aircraft jet fuels and kerosene-type fuels: these may be used as diesel engine fuel provided they meetacceptable limits. Adequate viscosity is a major concern, particularly with kerosene-type fuels.Kerosene-type fuels have a lower energy content than diesel fuels and therefore produce less peakpower output and/or will require more fuel volume to do an equivalent amount of work.

Biodiesel: this is a fuel that can be made from a variety of sources. Soybean oil and rape seed oil are theprimary sources, but alternate base stocks may include animal tallow, waste cooking oil, or a variety ofother feedstocks.

In their original form, these oils are not suitable for use in a compression engine; they must be esterified.Without esterification, these oils will gel in the crankcase and the fuel tank. They should be avoided foruse in equipment and generators engines, and they are not cost effective.

Ultra low sulphur diesels (ULSD): these represent distillate with ≤ 15 ppm sulphur. They have beendeveloped to reduce particulate engine emissions. A new generation of diesel engines was thereforedesigned, as the sulphur content of diesel fuel worked also as an internal lubricant for engines, andtherefore additives were needed to replace it in ULSD diesel fuels. They have been specifically designedto reduce pollution in highly-industrialized countries. ULSD diesel should not be used in older engines, orin engines designed for standard fuels. Vice versa, standard diesel with sulphur content greater than 500ppm should not be used in newer engines, to avoid corrosion, the presence of residues and consequentreduction of engine life.

Diesel fuels’ general characteristics

The following information describes the basic fuel characteristics and their relation to engineperformance:

• Cetane number: this is the index of ignition quality, determined by comparing with fuelsused as standards for high and low cetane numbers. The higher the cetane number is, theshorter the ignition delay period (which affects warm-up, combustion, cold start capabilityand exhaust smoke density).

• Sulphur: sulphur is an element that occurs naturally in all crude oils, and when burned inthe combustion chamber can form oxides of sulphur. These can react with water vapourto create sulphuric acid, which can cause severe engine damage. High sulphur contentrequires usage of high total base number (TBN) oils or shortening of the oil change period.

• Gravity: this is an index of weight. Lower ratings indicate heavier fuel containing greaterheat content.

Page 38: Vol 2 onshore pipelines the road to success 3rd edition

30

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

• Viscosity: this is a time measure to resistance of flow. High viscosity causes poor fuelatomization and therefore decreased combustion efficiency. Low viscosity may not provideadequate lubrication to fuel system components.

• Flash point: this is the lowest temperature at which fuel will give off sufficient vapour toignite when a flame is applied.

• Pour point: this is the temperature 3°C (5°F) above the temperature where the fuel just failsto flow or turns solid.

• Water and sediment: this is the percentage by volume of water and foreign materialremoved by centrifuging.

• Corrosion: a polished copper strip is immersed in fuel for three hours at 50°C (122 °F).Fuel imparting more than slight discoloration should be rejected.

The diesel fuel type to be used could also be prescribed by national rules or laws regulating pollution(see Figure 2). To ensure compliance, not only should a specific type of fuel be used, but also modernengines that are able to burn that particular fuel, to reduce the pollutants released to the atmosphere.

Fig. 2: Emission requirements - 2012 update

Impact of the type and quality of fuel on modern diesel engines

Modern diesel engines are equipped with sophisticated fuel injection systems, which are electronicallyregulated and working under very high pressures. Consequently, the diesel fuels used must be of veryhigh quality.

Use of lower quality fuels can greatly impact engine life.

Fuel quality depends on the geographical location of a given country (see Figure 1) and is related to thelevel of fuel refining and also quality of storage.

Page 39: Vol 2 onshore pipelines the road to success 3rd edition

31

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Poor storage quality can lead to water content and impurities, and while existing mechanical treatments(centrifugation and filtration) can produce clean fuel, low refining levels produce fuels with high sulphurcontent.

There is no transportable system able to reduce sulphur content, consequently some engines will notaccept low quality fuels and other engines will work but with reduced intervals for filters changes. Itshould be noted that fuel filters changes should be concurrent with oil filters changes.

General recommendations for frequency of engine oil filters / fuel filters changes

Sulphur content Change interval

<0.3% 500 hours

0.3% to 0.5% 250 hours

> 0.5% 125 hours

Note: these values are for normal climate conditions down to -10°C; below -10°C these figures shouldbe divided by 2.

8.2.3 Fuel supply chain

Fuel transportation

Fuel transportation includes fuel logistics to the main camps and through the yard (from the main campsto construction site equipment).

Fuel transportation to the main camps could be managed in a variety of different ways, mixing differentmeans of transport according to the way in which storage is organized inside the camps and the nearestfuel terminal (refineries or main fuel deposit).

The main means of transport involved are:

Truck: tanker trucks could have a capacity ranging from 10,000 to 50,000 litres, and the vehicle carryingthe tanker could be provided with different type of assets to cross all type of roads (paved, unpaved,with ice, mud, etc.).

Fig. 3: Tanker trucks of different types and in different environments

Page 40: Vol 2 onshore pipelines the road to success 3rd edition

32

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

The main feature of a tanker truck is its flexibility, and trucks are the only means of transport that are ableto reach remote areas carrying a significant amount of fuel.

It is however typically the most expensive means of transport for fuel and liquid. It should be used mainlyto supply fuel to the final users on site (usually construction equipment located along the pipeline).

Rail: this is probably the cheapest among all the means of transport. It suffers from the main problemthat all railroads have: it cannot easily be distributed over a geographic area, only along the railway line.Moreover, it could not move easily to follow the camp development and movement along project areas.

Fig. 4: Tanker cars forming a long train

Its limited flexibility is not only due to the need for terminal infrastructure, but also to the costs: thesignificant logistic management of a fuel train is compensated for only by transporting a large amount offuel all together to the same location.

The capacity of a single tank car could go from 50,000 litres to 75,000 litres (standard size) up to108,000 liters (jumbo size).

A significant advantage is that facilities and tank cars usually already exist, and can be used.

Barge: this is not as cheap as rail transport, but it requires less infrastructure and it is not strictly linkedto a complicated fuel terminal. Moreover, the logistics of the whole supply chain can be easier.

The real disadvantage of this means of transport is that it requires navigable water!

Fig. 5: Fuel barge on a small channel

Page 41: Vol 2 onshore pipelines the road to success 3rd edition

33

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Ultimately, fuel transportation is always a combination of 2 or more of the previously stated means.

And trucks, are always present as the final step to bring fuel to the final users (construction equipmenton site).

Fuel storage

Fuel storage should be composed of strategic, intermediate and destination fuel storage facilities inorder to maximize the robustness of our supply chain and minimize the risk of disruption.

Each storage facilty, even smaller ones, are often subject to the stringent local regulations, and theyshould be designed well to avoid any health, safety or environment risk, not to mention the financial riskdue to fuel loss or construction delays related to fuel shortage.

Fuel storage could be done though fixed installations (the common concrete or steel fuel repositories,whether above or underground) or through mobile installation. Here below we provide some examples ofmobile installations most frequently encountered on site.

Containerized tanks: a containerized tank is mainly a cylindrical steel vessel modified (with additionalcarpentry structures) to be moved as a containerized separate unit. These systems are suitable forthe storage and dispensing of diesel fuel, as they are usually provided complete with controlsystems, safety systems and dispensing systems (pumps).

The system offers a more suitable solution for use in demanding condition (remote location,construction yards) when a high protection from weather conditions and/or other requirements(safety, easy handling) are required.

They can be moved with flat trucks or similar.

The main problem with containerized tank is the small amount of fuel they can contain (usually lessthan 50,000 litres).

Fig. 6: Containerized fuel storage vessel

Bladder tanks: these are also called pillow inflatable tanks (PIT, for the form they keep wheninflated), and are inflatable plastic containment systems. They are the simplest and fastest methodof creating a large storage area on the ground. There are two main materials used in themanufacture process, PU and rubber. PU is lightweight, easy to manufacture and repair in the fieldand is better for temporary installations, whereas rubber has an excellent track record for durability.

The tissues are fabricated specifically to guarantee that the bladder tank is self-supporting – that itcan stand alone, independent of any support.

The installation is fast and simple. It only requires a large surface on which the bladder tank will lay.The surface must be perfectly horizontal, free of rocks and it is strongly recommended that thesurface contains a fine layer of sand. The new alternative to sanding under a bladder tank is to laydown a ground cloth. Most ground cloths are made from a geotextile fabric that works in concert

Page 42: Vol 2 onshore pipelines the road to success 3rd edition

34

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

with the bladder tank to minimize the chance of abrasion causing the tank to fail. The bladder tanksensures the fuel stored is always clean, is evaporation-free, and no contamination from the exteriorcan enter and pollute the liquids stored. Moreover, there is a full containment of any smell.

Inflatable bags or depots are transportable (once emptied), and therefore can represent the idealstorage for mobile installation.

Even if they are really resistant however, extreme caution should be taken when using bladder tanks,and continuous surveillance should be provided to act immediately in case of leakages.

Fig. 7: Two examples of bladder tanks

Fuel cans (jerrycans) or barrels: usually the last fuel storage on site, fuel cans and barrels are easilytransportable and can move with the yard. Standard sizes for cans go from 5 to 20 litres, but differentsizes (both metal or plastic) can easily be found on the market. Crude oil is typically stored in barrels.These have a standard size of about 160 litres, but barrels of different capacity can also easily be found.

Fig. 8: Fuel cans and barrels

Page 43: Vol 2 onshore pipelines the road to success 3rd edition

35

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

8.2.4 Fuel management

Fuel management on site has two main purposes:

• To secure the needed fuel, when and where needed, to guarantee continuous work on thefield

• To ensure the needed Health - Safety - Environment standards are met

In the recent past, most fuel management was performed with periodical visual checks and with manualconsumption calculations.

Recently however, computerized fuel management applications have been introduced on the market.These rely on the development of portable digital instruments (installed locally on bulk fuel mobilereservoirs, or used when needed), and also on modern network communication systems (GPRS, GPS,and web-based applications)..

Computerized systems provide operators with a real-time view of inventory data, such as fuel level,temperature, density, standard density, gross volume, water volume and/or net volume. Such systemscan automatically calculate density and net volume using industry standards.

With these systems, moreover, fuel management can be easily integrated with other asset managementtools already present at the yard, significantly improving the efficiency of logistics along the constructionproject.

A recent proposal in that field is the installation of communication devices on board equipment totransfer fuel consumption data directly to the computerized system, therefore giving access to evenmore precise data on fuel needs, and also giving precious hints on how to save fuel and optimize fuellogistics.

Fuel quality control

Fuel quality is essential to ensure correct combustion inside engines, and therefore to have the powerneeded for equipment output, as well as the predicted maintenance frequency (i.e. the lowest outagetime of equipment due to engine damage or extraordinary maintenance activities).

Fuel quality should be verified with a dedicated chemical analysis performed in each of the followingsituations:

• When new fuel arrives at the strategic reservoir (base camp) from outside. This controlshould be performed also to avoid mixture of different type of fuels (or of fuel with otherliquids) in the main storage.

• Periodically on the bulk fuel reservoirs along the yard

Chemical analysis could be performed in a local laboratory (if present near the construction site) or by adedicated containerized laboratory located at the base camp.

Even if verified, fuel (especially diesel fuel) contains a naturally-high density of residual dirt deposits andwater.

Therefore, before distributing it to final users (and before delivering it to final reservoirs - cans, barrels orinflatable tanks) it should be treated by filtering it.

Usually, normal filters are present, in series, on commercial pumping systems to cover this issue.

Ultimately however, this kind of filtration does not solve the problem of sulphur or high densities beingpresent – that should be solved by bringing the correct fuel to the yard, as appropriate for the machinesused (see previous chapters).

Page 44: Vol 2 onshore pipelines the road to success 3rd edition

36

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 8

Page 45: Vol 2 onshore pipelines the road to success 3rd edition

1

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9. Welding

9.1 Introduction

This section covers the most important aspects related to vertical circumferential girth welding activitiesduring cross-country pipeline construction. A comprehensive description of each main step of theconstruction and welding stage is presented including a basic technical background and good workingpractices.

The information within this section is based on the experience of pipeline contractors, weldingtechnology companies, and welding equipment suppliers and is focused on maximizing safety, qualityand productivity.

• Governance over pipeline welding activities Section 9.2 presents how welding activities are governed during qualifications andproduction (field installation). The roles of the industrial codes, standards, governmentalinstitutions and third party authorities are also addressed.

• StakeholdersIn section 9.3 the roles of the different stakeholders involved in pipeline engineeringand construction are described.

• Welding technologySections 9.4, 9.5 and 9.6 present the pipeline welding technology, the pipeline weldingprocesses and the typical welding imperfections.

• Field construction equipmentSection 9.7 is dedicated to the description of commonly-used pipeline weldingequipment.

• Safety in pipelinesSection 9.8 is dedicated to the specific safety matters involved in welding activities.

• Engineering and construction activitiesSection 9.9 describes the sequence of activities required from qualifications to mainlinewelding production start-up. Section 9.10 describes all the field operations related tothe pipeline mainline welding.

• New welding technologyFinally section 9.11 describes the latest trends and requirements in weldingtechnologies.

9.2 Governance over pipeline welding activities

The cross country pipeline, compared to other oil & gas installations, has the significant difference thatover a long distance, it crosses public areas with various types of potential consequences in case offailure, ranging from minor to catastrophic. Maintaining the public’s safety and mitigating environmentalimpact are very high priorities in the pipeline industry.

In the pipeline construction stage, pipe welding activities are some of the most sensitive. The mostinternal pass, the root pass, is in direct contact with the fluid. Furthermore, the girth weld will havedifferent properties compared to base material of the line pipe, as will the base metal adjacent to thegirth weld, that was affected by the heat of welding.

Page 46: Vol 2 onshore pipelines the road to success 3rd edition

2

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Welding is a critical element in the construction of a pipeline. The details require strict control in order tomaintain the following:

• Mechanical properties’ “performance” for both line pipe and the weld metal

• Qualification of welding procedure specifications (WPS)

• Conformance to qualified WPS

• Qualifying of welders and welding operators.

• NDT acceptance criteria

Therefore, the welding activities are highly regulated by many different bodies, from local and projectspecifications to international regulations based on national and international standards, supplementedwith additional specifications issued for each asset.

Because of those strict regulations, welding shall not be treated as a “standard” activity. Welding needsa specific quality management based on destructive and nondestructive tests. These tests should beconducted on actual materials welded per the qualified and controlled welding procedure to be used inthe field by trained and qualified personnel.

A system that is fully traceable shall enable the retrieval of complete records of each welded joint fromline pipe material and filler metal to the final nondestructive tests. These records should be retained untilthe abandonment and dismantlement of the line.

9.2.1 International and national regulations and codes

The highest level of conformance has to be against the applicable project specific, local, national andinternational regulations. Those are enforced by law.

The welding activities for pipeline construction throughout the globe, beside regulations, arepredominately governed by one of the following recognized industry codes, but not limited to;

• American Petroleum Institute: API 1104: “Welding of Pipelines and Related Facilities”/API 5L: “Specification for Line Pipe”.

• American Society of Mechanical Engineers: ASME B31.8 Gas Transmission andDistribution Piping Systems ASME B31.4 Liquid Transmission and Distribution PipingSystems

• Det Norske Veritas: DNV OS-F101: “Submarine Pipeline Systems”

• International Standard organization: ISO 13847 “Petroleum and natural gas industries -- Pipeline transportation systems -- Welding of pipelines”

9.2.2 Company and local specifications

Each company investing in a pipeline asset (the “client”) is keen to maintain the validity of its license tooperate and reap the long-term benefits of such investment. For this reason, such companies wouldhave their own technical specifications setting the requirements and the approach to use whiledesigning a pipeline.

In the design stage the engineering contractor will, most often, issue an asset specific set of technicalspecifications based on the client’s generic corporate technical specifications, the applicable regulationsand the most suitable national or international standards.

Page 47: Vol 2 onshore pipelines the road to success 3rd edition

3

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Those will be known as “project specifications”. One or more of them would focus on the actual andvery specific requirements to be met while executing welding operations during the construction stage.

The welding crew will refer to those as “welding specifications” which are quite often to be read inconjunction with the selected national or international standards.

9.3 Stakeholders in pipeline projects

All of the below listed parties have an impact on welding activities through their mandatory requirements,declared preferences and other recommendations. Understanding how these parties work together isimportant in order to streamline and optimize the welding activities from early engineering to finalexecution and handover of documentation.

9.3.1 The regulator

Most times the regulator is a government-initiated body with experts who compose the requirements apipeline asset has to meet. Once all the requirements have been successfully addressed the client wouldreceive the “fit for service” notification and the pipeline can be legally operated.

It is also typically the government body having the authority to validate the pipe line asset before it canbe operated or at each periodic mandatory revalidation. This is achieved by reviewing all design,construction, commissioning and operations records.

9.3.2 Pipeline owner/operator

The pipeline owner/operator is typically the company that makes the investment in and operates theasset. The asset can be owned by several companies, linked by an operating contract. Depending onthe country involved, a license from the regulator or the local equivalent is needed to operate anypipeline.

9.3.3 Pipeline engineering/construction contractor

The company investing in a pipeline asset might not necessarily have the engineering and projectmanagement resources available internally. Engineering contractor parties are specialized in thoseactivities and will be contracted by the investing company to deliver the overall engineering from theearly preliminary design phase until the final commissioning and operating approval.

For constructing the pipeline a construction contractor has to be contracted either directly by theinvestor company or by the main engineering contractor.

9.4 Cross -country pipeline welding activities

9.4.1 Mainline

The pipe sections welded on the right of way, across public areas, are considered the “cross-countrypipeline”.

Main line welding is when the pipe sections are assembled on the right of way in long strings includingbends to follow the terrain relief. The mainline welds are normally produced above the ground. Each

Page 48: Vol 2 onshore pipelines the road to success 3rd edition

4

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

section would then be welded to each other after lowering down in the trench (tie-in), to finally constitutethe full pipeline.

The mainline pipe sections are welded in 5G and 6G position; this means that the welding arc(s) travelvertically down around the pipe circumference while the pipe remains stationary.

Fig. 1: Pipe positions

All the activities on the mainline are on the so-called critical path. Any delay in any activity on the right ofway could have an effect on the ultimate pipeline delivery schedule.

The mainline welding crew is, in most cases, the biggest and most expensive crew working in theconstruction of an onshore pipeline.

9.4.2 Double jointing / triple jointing

Double jointing / triple jointing are welding activities connecting two or three pipes together. Its mainpurpose is to minimize the number of main line field girth welds to be executed on the right of way. Theproduction of double/triple joint sections is also cost effective as the welding, NDT inspection and thecoating can be done off-line. Double/triple jointing is only feasible in areas with “easy” transportation inview of access roads, and where it is permitted by local regulations.

9.4.3 Special sections and tie-ins

The tie-in welds are the welds that connect two mainline pipe sections. The welding is usually performedin the trench by a crew of two welders and their support crew. The support crew assists by operatingthe side booms in order to align and maintain the proper position of the two pipe sections, inconjunction with the external clamping device to enable proper welding alignment. Tie-ins welding isperformed when the usual mainline construction cannot be performed, in cases like road crossings,rivers crossings, steep slopes and successive directional bends.

Page 49: Vol 2 onshore pipelines the road to success 3rd edition

5

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.4.4 Repair

Welding quality is controlled by monitoring the current, pass speed and temperature of the base metalduring execution to control that the essential variables of the approved procedures are within the rangesof the approved procedures. Once the welding of a pipeline girth weld is completed, the welding qualityis finally controlled by means of visual and non-destructive testing. In those cases where the weld qualityis found to be outside specified acceptance criteria, the weld is marked for repair. After removal of thedefected area, re-examination is carried out using the same inspection method as used during the initialinspection. When ultrasonic testing is used, the system may include inspection functions specificallyconfigured for testing of repairs to cope with the possible wide variation in groove shape that may limitthe detection capability. Nondestructive testing techniques to be used to check weld quality control aredefined in section 10.3 “The NDT toolbox”.

In case the repaired area is still unacceptable (incomplete removal of initial defect, or defect in the repairweld) the weld will be repaired a second time or completely removed (knows as a “cut out”), pending therequirements of the applicable specification and/or standard.

Weld repair areas may affect the overall quality of the weld. The strict adherence to a repair procedurewill help to ensure an acceptable repair is made. In most cases the repair procedure has to be qualified.Repair welds often require welders of greater skill and competency.

9.5 Welding methods and processes

9.5.1 Introduction

Welding is the primary connecting process in pipeline construction. Several different welding processescan be deployed during the construction phase of the pipeline. Each process has its advantages andlimitations when being implemented in girth welding activities. The specific welding process used mustbe considered based on its overall ease of implementation in the particular welding activity, criticality ofthe service environment and techno-economic impact. Welding of pipelines and related componentscomprise of mainline welds (i.e. line pipe-to-line pipe connections), tie-in welds (i.e. line pipe-to-line pipeconnections for specific locations), repair welding of girth welds and fabrication welding. Even with theemergence of new technology, arc welding remains the most common welding type used in pipelineconstruction. Arc-welding activities can be classified into two typical categories such asmechanized/automated welding, and manual welding. Adaptive control welding is also an advancedform of automatic welding, which is welding with a process control system that automatically determinesany changes in welding conditions and directs the equipment to take appropriate action. This shall beclassified as automatic welding for the purpose of this discussion.

This classification is in accordance with the degree of operator involvement in the performance of thewelding activity. The following is a breakdown of welding processes involved and considered for eachportion of pipeline construction and related components, discussing the advantages and limitations ofeach process.

Page 50: Vol 2 onshore pipelines the road to success 3rd edition

6

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

The table below gives a comparison of the pro and cons of the different welding processes. Thecomparison shows the criteria used for the selection of the welding method.

Manual Semi-automatic Mechanized Automatic

Level of control of welder over the High Medium Medium Lowwelding arc (voltage and amperage).

Travel speed control High High Medium Low

Wire feed control High Medium Medium Low

Welder influence over weld quality High High High Medium

Required level of welder skill High Medium Medium Medium

Flexibility1 High Medium Medium Low

Efficiency grade of the welding Low Medium Medium High

Logistic influence on welding Low Medium Medium High

Equipment maintenance influence Low Medium Medium Highon welding

Joint accessibility and design High Medium Medium Low

Effect on the accuracy of assembly High Medium Medium Low

Capacity to weld high-strength steel Low Medium Medium High

1Flexibility is defined as how easy it is to change the diameter and wall thickness of the pipe to bewelded.

As well as the criteria shown in the table, further factors in the selection of the weld method are the typeand grade of the base material (steel), specification requirements, company policy and economicaspects.

9.5.2 Choice of welding process

A detailed review of the many factors which influence the choice of the welding process is presentedbelow:

Pipe strengthThe increase in the grade of steel used for pipeline has caused some issues, especially when usingcellulosic electrodes which are sensitive to cracking on higher strength steels. It is usually recommendedto weld high-strength steel with low hydrogen electrodes for all passes. However, past experience hasshown that high-strength steel pipe can be successfully welded using a cellulosic root and hot pass withproper preheat and filling the remainder of the joint with low hydrogen electrodes.

Matching strengthMatching strength is not formally defined, and sometimes it causes the wrong interpretation when usingit either to refer to the joint strength, or to the welding consumable specified minimum strength. Thesetwo variables are completely different. The former refers to the strength of a welding joint with respect tothe pipe base metal, while the other refers to the standardized way to measure the strength of the weldmetal of a given welding consumable in certain conditions.

Joint strength is very important in pipeline construction. The welding consumable should be selected inorder that the welding joint strength matches (or overmatches) the strength of the pipe. In other words ina match or overmatch joint, the joint strength has to be equal to or greater than that of the base metalrespectively.

Page 51: Vol 2 onshore pipelines the road to success 3rd edition

7

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

In order to clarify these concepts, it is necessary to explain that most of the material designations referto the yield strength (σY), while welding consumable designations refer to ultimate strength (σU) . Forexample, API 5L Grade X70 has associated a minimum σY equal to 70 Ksi, while AWS E7018 hasassociated a minimum σU equal to 70 Ksi. Looking at those numbers, it seems that electrode willproduce an under-match joint. However, the final strength of a joint will depend on a number ofvariables, in which can be included the following variables: base material chemistry, dilution, oscillation,travel speed, and others. Consequently, it is impossible to perfectly predict the final strength of a weldedjoint.

Most of the welding consumable standards specify the minimum mechanical requirements based on aparticular welding procedure, which is completely different to a typical welding procedure for pipeline.Consequently the results obtained in those tests are just reference values, and they cannot be relateddirectly to the final strength of a joint. Furthermore, the actual yield strength σY of a welded joint is verydifficult to define; the size of a typical weld used in pipeline is not large enough to insulate the weld metalfor testing.

Consequently, the terms under/over/match applied to the joint strength are only meaningful following theresults of tensile testing: a joint that breaks on the base metal with a value over the minimum specifiedultimate strength σU of the base metal is not under-matched.

The need for very high minimum specified strength welding consumables to produce very high overmatching joints is dependent upon the joint type and loading condition, and it is generally required forcomplete penetration joint groove welds in tension applications. Matching can be used for mostapplications, but in some cases, it may not be the most economical or conservative choice. Under-match welding consumables might be used when the hardness of the root pass is a concern,even if other higher strength consumables are to be used to fill and cap the weld. This “softer” rootincreases the resistance to certain types of weld cracking.

Longitudinal and spiral seam welded pipeSteel line pipe may be manufactured using many different methods. The two most popular methods ofmanufacturing large diameter steel line pipe are longitudinal seam submerged arc welding and spiral (orhelical) seam submerged arc welding. These two types of line pipe can be discerned by locating thepipe weld seam reinforcement and determining if it runs longitudinally or helically relative to the pipe axis.

While longitudinal seam submerged arc welded pipe is the most common type of steel line pipe used forcross-country pipelines, spiral seam submerged arc welded pipe has been rapidly gaining popularity. Itis often lower cost than longitudinal welded pipe and can be supplied in longer lengths, which lowersoverall pipe laying time and costs.

1 Terms referred to tensile testing. σY is define as the stress at which plastic deformation begins tomanifest itself, while σU is the maximum stress that a material can withstand while being stretched orpulled before necking. σU is higher than σY .

Page 52: Vol 2 onshore pipelines the road to success 3rd edition

8

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

However, some spiral seam pipes have issues with pipe ends not being round (out of roundness), whichmay result in excessive offset of the pipe walls during welding. If not properly controlled, this offsetresults in difficulties welding the root pass and possible inadequate penetration. The internal line-upclamping pressure can be increased to reduce out of roundness, but this increases the risk of stresscracks, especially when using cellulosic electrodes. Facing this scenario characterized by poor fit-up,more robust welding processes and welding techniques are needed. Pulsed gas metal arc welding(GMAW-P) usually accommodates the effects of poor fit-up, producing a thick root pass with lowdiffusive hydrogen. Consequently, cracking probability is lower and penetration tends to be better thanshielded metal arc welding (SMAW).

Pipeline diameter and wall thicknessPipe diameter plays a major role in how long it will take to weld a root pass. Larger diameter pipe, suchas 1220 mm, takes longer to weld than a small diameter due to the increased circumference. Thus,larger pipe diameter results in slower pipe laying speeds. To offset this, the number of welders (or arcs)may be increased, or a faster welding process may be selected.

Increasing pipe wall thickness usually results in higher weld zone hardness, which increases thetendency of weld cracking at the root pass. This is due primarily to the following factors:

• Thicker wall pipe tends to have more alloys and a higher carbon equivalent than thinnerwall pipe to obtain the same strength. This results in harder weld and weld zone, andconsequently, lower weldability.

• The greater mass of steel cools the weld faster, which increases the weld zonehardness.

• Thicker pipe is more rigid, resulting in higher residual stress.

It is more difficult for hydrogen to diffuse from the weld zone due to faster cooling and the increaseddistance it need to travel to the surface.

Therefore, it should not be assumed that a root pass method that worked successfully on thin wall pipewould perform as well on thicker wall. Higher preheat temperatures, lower hydrogen welding electrodes,or a different welding procedure may be needed.

Also, heavy wall thickness pipes often require toughness evaluation at the root. In this case, theselection of the root pass procedure shall take into account a robust welding technique that canaccommodate base metal dilution and keep toughness properties.

When wall thickness is heavy, some codes and standard require post heat treatment of the weld. Thiswill have a strong impact on productivity and weld final properties. Toughness, in particular, could benegatively affected. Heat input has to be carefully selected, as does welding technique in terms ofwelding consumable and parameters.

Pipeline terrain and environmental conditionsPipeline laying speed is highly dependent on the terrain and environmental conditions. Fast layingspeeds are usually obtained on flat, dry plains. Pipe laying speed is slowed by conditions such as rocky,hilly or wet terrain, bad weather, as well as river and road crossings. If conditions are present for slowlaying speeds, there may be limited benefits by selecting a fast root pass method if the root passwelding crew is frequently slowed down waiting for the right-of-way to be cleared.

Page 53: Vol 2 onshore pipelines the road to success 3rd edition

9

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Extreme weather conditions like those in deserts or cold regions may affect the performance of weldingequipment and welding variables such as preheat and inter-pass temperature. In particular in coldweathers, low temperatures and fast welding process (low heat input) may present a tendency to createwelding defects such as lack of fusion; preheat temperature and particularly inter pass temperatureshould be carefully monitored.

Other conditions such as altitude may affect some welding processes, not only reducing productivity butalso increasing the tendency to produce welding defects. Additionally, this fact is increased by the dropin efficiency due to the negative effect of altitude on welder’s health and welding generators.

In all those cases, robust welding techniques that overcome the extreme conditions should be selectedsacrificing productivity but assuring weld quality.

Length of pipeGenerally, mechanized/automatic welding is more cost effective on longer, larger diameter pipelines,usually above 50 km in length and more than 24 to 48 in. in diameter. On small projects, the high initialcapital costs incurred may not be recovered. Rental of the equipment might be more appropriate;however project delays may then induce significant additional costs.

InspectionIncreasing the root pass welding speeds necessitates faster weld inspection speeds. The results of thetraditional method of radiography inspection follow production welding by approximately half to one day.This is due primarily to the health and safety precautions that must be taken when working with aradioactive material or a radiation source. This inspection delay may be satisfactory at traditional rootpass laying rates of 40 joints per day. However, automatic welding systems can lay pipe in excess of200 joints per day. This requires a faster inspection method to keep up and follow closer to theproduction welders.

Automatic ultrasonic testing (AUT) is the preferred method for inspecting automatic pipeline girth welds.Radiation hazards are eliminated. AUT inspection crews can work in close vicinity to others, includingthe welding and pipe coating crews. It is also fast, with the inspection data automatically processed bycomputer.

Radiography can have a difficult time detecting non-volumetric planar flaws, like lack-of-fusion, which ismore common with mechanized/automatic GMAW processes. AUT does an excellent job in detectingthese flaws. Also, recent advances in AUT — such as time of flight diffraction (TOFD) and phased array— allow detection of smaller defects and better defect sizing and location. With faster inspection speedsand results, the time to bury the pipe into the ground is reduced, lowering spreads costs.

LogisticsGenerally it can be stated that the more sophisticated welding systems become, the more support isneeded to ensure they function correctly (spare parts, pipe-facing equipment, etc).Many of the pipelines being constructed are in the emerging economies of the world. These projects areoften in remote, inhospitable climates and must draw on local labour pools for welders. With theshortage of experienced manual pipeline welders, automatic welding has been on the rise.

Sufficient training time should be scheduled, considering the skill level of the local labour pool.

Page 54: Vol 2 onshore pipelines the road to success 3rd edition

10

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

CostsCapital outlay and resulting rental or write off costs differ widely depending on the selected process.Good production rates and welding speed are needed to control those costs.

Manual welding offers relatively low initial cost and equipment maintenance, but requires high weldingskill, is labour intensive and repair rates can be high. The initial cost for semi-automatic welding is higherthan that for manual welding, but lower than automatic welding. Wire feeding equipment and shieldinggas bottles are required with semi-automatic welding. Automatic welding has the highest capital outlayand requires expensive logistical support. Therefore, automatic welding is typically best suited for largediameter and long length pipelines. More expensive equipment tends to be faster, but is not aseconomical for shorter pipeline distances.

9.5.3 Manual welding

The use of manual welding offers a high level of flexibility with straightforward equipment and a broadchoice of welding consumables. The welder performs the welding function and maintains continuouscontrol of the welding operations by hand.

The manual welding processes used for pipeline welding are: • Shielded Metal Arc Welding ASME process SMAW and ISO process number 111.

• Gas Tungsten Arc Welding ASME process GTAW and ISO process number 141

9.5.3.1 SMAW (stick rod)

Shielded metal arc welding (SMAW), also known as manual metal arc welding (MMA or MMAW) orinformally as stick welding, is a manual arc welding process that uses an arc between a consumableelectrode coated in flux and a weld pool to accomplish a weld.

An electric current, in the form of either alternating current or direct current from a welding power supply,is used to form an electric arc between the electrode and the metals to be joined. As the weld is made,the flux coating of the electrode gives off vapours that serve as a shielding gas and deposits a layer ofslag, both of which protect the weld area from atmospheric contamination.

Fig. 2: Process principle SMAW weldingAs welding progresses, the coated electrode becomes shorter and shorter. Finally, the welding must bestopped to remove the stub and replace it with a new electrode. This periodic changing of electrodes isthe major disadvantage of the process in production welding.

The most typical welding defects associated with SMAW are porosity and slag inclusions. The latter isusually related to an excessive high stick-out or humidity, while porosity is related to an incorrect weldingtechnique.

Page 55: Vol 2 onshore pipelines the road to success 3rd edition

11

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

The SMAW process is the simplest process, in terms of equipment requirements, but it is perhaps themost difficult in terms of welder training and skill-level requirements. Although welder skill level is aconcern, most welders entering the field start as "stick welders" and develop the necessary skillsthrough training and experience. The equipment investment is relatively small, and welding electrodes(except for very reactive metals, such as titanium, magnesium, and others) are available for virtually allmanufacturing, construction, or maintenance applications. Shielded metal arc welding has the greatestflexibility of all the welding processes, because it can be used in all positions (flat, vertical, horizontal, andoverhead), with virtually all base-metal thicknesses (1.6 mm and greater), and in areas of limitedaccessibility.

The versatility of the process and the simplicity of its equipment and operation makes shielded metal arcwelding one of the world's most common welding processes. Further, the many possible variations inthe composition of the electrode coating and the large selection of the core wire chemistry in addition toproviding a smooth arc and uniform metal transfer characteristics add to the preference for this process.

It dominates other welding processes in the maintenance and repair industry, and though flux-cored arcwelding is growing in popularity, SMAW continues to be used extensively in the construction of steelstructures and in industrial fabrications.

9.5.3.2 GTAW (TIG)

Gas tungsten arc welding (GTAW), also known as tungsten inert gas (TIG) welding, is an arc weldingprocess that uses an arc between a non-consumable tungsten electrode and the work piece toestablish a weld pool. The weld area is protected from atmospheric contamination by an inert shieldinggas (argon or helium), and a filler metal is normally used, though some welds, known as autogenouswelds, do not require it. Recently, gas mixtures have been used containing CO2 and hydrogen asshielding gases. A constant-current welding power supply provides energy which is conducted acrossthe arc through a column of highly ionized gas known as plasma.

Fig. 3: Process principle GTAW welding

GTAW is most commonly used to weld thin sections of stainless steel and non-ferrous metals such asaluminum, magnesium, and copper alloys. It is also used to put in root and hot passes when weldingpipelines in critical services. Hence, its reputation as a high integrity process. The process grants theoperator greater control over the welding arc than competing processes such as shielded metal arcwelding and gas metal arc welding, allowing for higher quality welds. The flexibility of the process isanother obvious advantage as GTAW allows the heat source and filler metal additions to be controlledindependently. Thus excellent control of root pass weld penetration can be maintained.

However, GTAW is comparatively more complex and difficult to master, and furthermore it is significantlyslower than most other welding techniques as deposition rates are lower. If welding takes place in windyor draughty environments, it can be difficult to shield the weld zone properly. A related process, plasmaarc welding, uses a slightly different welding torch to create a more focussed welding arc and as a resultis often automated.

Page 56: Vol 2 onshore pipelines the road to success 3rd edition

12

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.5.4 Semi-automatic welding

In semi-automatic welding, defined as “manual welding with equipment that automatically controls oneor more of the welding conditions” the welder manipulates the welding gun to create the weld while theelectrode is automatically fed to the arc.

The semi-automatic arc welding processes can be characterized as follows:• The welding gun is manually controlled and quality is directly related to physical

dexterity

• Wire feed is controlled by the system

• Voltage is controlled by the system

The most common semi-automatic welding processes for pipeline construction are gas metal arcwelding (GMAW) and flux-cored arc welding (FCAW) which can also be implemented as automaticwelding operations. Submerged arc welding (SAW) and plasma arc welding (PAW) are other semi-automatic welding processes finding increasing relevance in pipeline construction.

9.5.4.1 GMAW

Gas metal arc welding (GMAW) is sometimes referred to by its subtypes metal inert gas (MIG) welding ormetal active gas (MAG) welding. GMAW uses an arc between a continuous filler metal electrode and theweld pool. The electrode comes in a wire spool, which feeds the arc automatically by a mechanism ofrollers that push the wire into a liner to the end of the welding gun. The process incorporates shieldingfrom an externally supplied gas. GMAW was referred to as MIG since it was initially implemented as ahigh current density, small-diameter, bare-metal electrode process using an inert gas for arc shielding.Along with the wire electrode, a shielding gas flows through the welding gun, which shields the processfrom contaminants in the air.

For pipeline welding GMAW can be further subdivided into three metal transfer modes: short circuit,globular and spray transfer modes, depending on the energy level of the arc. At lower energy level, themetal melting rate is slow and this short circuit mode of transfer is used for root pass. Globular andspray modes using higher energy levels are used to deposit fill and cap passes

Fig. 4: Process principle GMAW welding

Page 57: Vol 2 onshore pipelines the road to success 3rd edition

13

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

GMAW is an efficient consumable-electrode process and overcomes the restriction of limited electrodelength encountered with SMAW. However, the welding equipment required for GMAW is more costlyand less portable than that of SMAW. The welding arc must be protected against winds or air draughtsin excess of 5 mph, which may disperse the shielding gas. This limits outdoor applications unlessprotective shields are placed around the welding area.

Surface tension transfer (STT) welding as a variant of GMAW, is a modified MIG process that uses highfrequency inverter technology with advanced waveform control to produce high quality welds while alsosignificantly reducing spatter and smoke. STT technology has the ability to control weld pool heatindependently of wire feed speed giving the welder more control over the pool and provides the ability toadjust the heat input to achieve the desired root bead profile.

9.5.4.2 FCAW

Flux-cored arc welding (FCAW) is a semi-automatic arc welding process. FCAW requires a continuously-fed consumable tubular electrode containing an internal flux. FCAW can be used with or without externalshielding depending on the consumable design. FCAW offers two major variations: self-shielded (FCAW-S); and gas-shielded (FCAW-G), which adds great flexibility to the process. In the gas-shielded method,the shielding gas (CO2 or a mixture of argon and CO2) protects the molten metal from the oxygen andnitrogen present in air by forming an envelope of gas around the arc and over the weld pool. Self-shielded flux core wires (FCAW-S) do not require shielding gas, which makes them more practical in fieldconstruction. They are also less sensitive to the deleterious effects of wind on weld quality as comparedto FCAW-G.

Advantages include higher productivity, high quality weld metal deposit and excellent weld appearance.Limitations include higher equipment costs and the need to remove slag in between passes.

Fig. 5: Process principle FCAW welding

9.5.4.3 Submerged arc welding (SAW)

Submerged arc welding (SAW) is an arc welding process in which the arc is concealed by a blanket ofgranular and fusible flux. Heat for SAW is generated by an arc between a bare, solid-metal (or cored)consumable-wire or strip electrode and the base metal. The arc is maintained in a cavity of molten fluxor slag, which refines the weld metal and protects it from atmospheric contamination. Alloy ingredients inthe flux may be present to enhance the mechanical properties and crack resistance of the weld deposit.

Page 58: Vol 2 onshore pipelines the road to success 3rd edition

14

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Fig. 6: Submerged arc welding

Advantages of submerged arc welding include the following: • The arc is under a blanket of flux, which virtually eliminates arc flash, spatter, and

fumes (thus making the process attractive from an environmental standpoint)

• High current densities increase penetration and decrease the need for edgepreparation

• High deposition rates and welding speeds are possible

• Cost per unit length of joint is relatively low

• The flux acts as a scavenger and deoxidizer to remove contaminants such as oxygen,nitrogen, and sulphur from the molten weld pool. This helps to produce sound weldswith excellent mechanical properties

• Low-hydrogen weld deposits can be produced

• The shielding provided by the flux is substantial and is not sensitive to wind as inshielded metal arc welding and gas metal arc welding

• The slag can be collected, reground, and sized for mixing back into new flux asprescribed by manufacturers and qualified procedures

9.5.5 Mechanized welding

Mechanized welding, also sometimes referred to automatic welding, is a method of welding in which theprinciple operations, excluding the handling of the work piece, are performed by a machine (i.e.movement of torch, wire-feed). The welder’s intervention consists of adjusting the equipment controls inresponse to visual observation of operations.

Mechanized welding uses the same welding processes as described under section 9.5.3. Parametersmay be adjusted by the welding operator in response to visual observation of the process. Mechanizedwelding can be categorized as being in between manual and fully-automatic welding methods. Thisapplies mainly for standard bevel design (refer to section 9.5.7).

9.5.6 Automatic welding

Automatic welding is using the same welding processes as described under section 9.5.3, can becharacterized as being an improved mechanized welding methodology in terms of:

• Narrow weld bevel design compared with standard API bevel

• Computer controlled process of welding parameters

• Monitoring of essential welding parameters

• Minimum intervention by the operator

Page 59: Vol 2 onshore pipelines the road to success 3rd edition

15

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

• Repeatability and integrity of the welding parameters

• Improved weld production rate

• Reduced required welder skills

• Advanced options include:

o Laser scanning of bevel

o Seam tracking of weld joint while welding

It is more difficult to achieve the highest standards of quality using manual welding. This is due to certainwelding positions, overhead and down-hand welds for example, that can lead to faulty welds due torestricted access the user has in these welding positions. In order to have complete control over theweld pool, a perfect balance must be maintained between gravitational force and surface tension atevery position of the torch. By using mechanized variants of the technique, certain parts of the weldingprocess are handled by mechanical components. Note that a welder will always be monitoring andcontrolling the process. In an ideal situation, all welding parameters would be fully programmed beforewelding is started. In practice, however, the presence of variable constraints means that it is oftennecessary for the welder to make corrective interventions. With automated welding, the computer-controlled welding process runs completely independently, without the need for any intervention fromthe operator. However, the operator plays an active role in quality control through the identification of thepresence of weld discontinuities. When discontinuities are encountered, appropriate measures must betaken on the part of maintenance or programming personnel to correct deviations.

The level of automation varies, but the influence of the welder on the weld parameters is, in most cases,limited to pressing start and stop. The most important variable in automated weld processes is theoperator. The operator has to be well trained with a lot of discipline. Because of the high welding speedslack of attention could mean an imperfection in the weld that causes the rejection of that specific weld.The drawings below (section 9.5.7) show some common used bevel designs.

High frequency resistance welding, though not an arc welding process, is an automated process and isnot adaptable to manual welding. The principal application of high-frequency welding continues to be inthe manufacture of seam-welded pipe and tube. High frequency welding processes rely on theproperties of high-frequency electricity and thermal conduction, which determine the distribution of heatin the work pieces.

9.5.7 Sequence of welding passes

A circumferential girth weld for pipeline construction is composed of a number of welding passes. Thesequence of the welding passes is visualized in the below figure. The welding configuration used istypical for the manual welding process, but the used terminology for the different welding passes alsoapplies for mechanized and automated welding techniques.

Fig 7: Welding passes terminology

Page 60: Vol 2 onshore pipelines the road to success 3rd edition

16

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.5.7.1 Root pass

The root pass is the first pass a welder makes on a pipeline girth weld and is judged to be the mostcritical weld pass for several reasons. It is generally the most difficult welding pass to make. The rootpass speed determines the speed with which the pipeline may be constructed. Any delay in the rootpass slows down the project. Repair of root defects may require removal of all weld passes, the mostcostly and time consuming type of repair.

Comparing root pass processes:• Pulsed GMAW transfer mode (GMAW-P), manual shielded metal arc welding (SMAW),

and gas tungsten arc welding (GTAW) are the most extensively welding process usedfor root pass ). Similar welding speed is obtained when comparing SMAW cellulosicwith GMAW-P, however, deposition rate is higher when using GMAW, which producesa thicker root pass.

• GTAW typically presents weld metal with excellent properties; however, the productivityis strongly affected by the low travel speed associated with it. This welding process isused when fit-up is extremely poor and root cracking is likely, or when near-perfectweld quality is required.

9.5.7.2 Hot pass

This is always the second pass and comes after the root pass. Hot pass is a terminology that has beenintroduced when using SMAW cellulosic electrodes in the root pass. The hot pass is a fast pass thatincreases the metal backing thickness to avoid burn-through when depositing the fill passes. For allother welding processes the hot pass terminology is commonly used for the second pass (first fill).

9.5.7.3 Fill & cap

The fill passes complete the joint until almost covering the whole wall thickness. These passes usuallyare deposited with high energy in order to maximize the deposition rate. There is always a difference of0.5-1 mm between the last pass of the fill and the top of the bevel. This difference is used as a referenceto guide the welder during the capping in order to deposit these passes with the correct overlap.A detailed review of this sequence of welding passes is presented in section 9.10.

Page 61: Vol 2 onshore pipelines the road to success 3rd edition

17

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6 Typical weld imperfections and pipe mill defects

Despite all the good workmanship that is put into every weld produced during pipeline construction,weld imperfections are inevitable. The welding process may be affected by the condition of the basepipe material and/or pipe end geometry.

In sections 9.6.1 through 9.6.18 examples of imperfections can be found and section 9.6.19 reviews thepipe mill defects which may induce weld imperfections.

The relevant sections will address three general classifications of discontinuities:• Procedure/process

• Metallurgical

• Base metal

The cause of a weld repair can come from many sources including:• Base material

• Welding consumable

• Shielding gas (when applicable)

• Welding machine

• Human error

• Pipe misalignment

Typical pipeline girth weld defects can be seen on the following pages:

Page 62: Vol 2 onshore pipelines the road to success 3rd edition

18

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.1 Misalignment

The term misalignment is often used to denote the amount of offset or mismatch across a butt jointbetween members of equal thickness. Many codes and specifications limit the amount of allowableoffset because misalignment can result in stress risers at the toe and the root. The misalignment(Hi/Low) of the pipe ends that have to be welded together. This misalignment is in most cases causedby pipe ends being out of roundness and often located close to the longitudinal or helical weld seams.The misalignment can be recognized on a film when an abrupt change in film density across the width ofthe weld image is found.

Fig. 8: Hi-Lo pipe misalignment

Page 63: Vol 2 onshore pipelines the road to success 3rd edition

19

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.2 Misalignment and lack of penetration (LOP)

Misalignment of pipe ends could be the cause of root lack of penetration (LOP). This is illustrated by anabrupt density change across the width of the weld image with a straight longitudinal darker density lineat the center of the width of the weld image, along the edge of the density change.

Fig. 9: Hi Lo with lack of root penetration

Page 64: Vol 2 onshore pipelines the road to success 3rd edition

20

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.3 Distortion

The welding operation commonly involves the application of heat to produce fusion of the base metal.Stresses of high magnitude will result from thermal expansion and contraction and weld metalsolidification, and will remain in the weld after the structure has cooled. Such stresses tend to causedistortion when the welding sequence is not properly controlled. Careful selection of the weldingsequence, welding processes and joint design can minimize this condition.

9.6.4 Overlap

Overlap is the condition in which weld metal protrudes beyond the weld interface at the toe of a weld.The condition tends to produce notches which can be detrimental to weld performance. Overlap isusually caused by the use of either incorrect welding or by improper welding parameter settings. Overlapcan occur at the toe of either a fillet or groove weld, as well as at the weld root of a groove weld.

9.6.5 Weld profile

The profile of a finished weld may affect the service performance of the joint. The surface profile of aninternal pass or layer of a multipass weld may contribute to the formation of incomplete fusion or slaginclusions when the next layer is deposited.

9.6.6 External concavity

An external concavity exists when the base material is thicker than the weld including the capreinforcement. On the position of the external concavity the film is darker than the density of the basematerial extending across the full width of the weld.

Page 65: Vol 2 onshore pipelines the road to success 3rd edition

21

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Fig. 10: External concavity

Page 66: Vol 2 onshore pipelines the road to success 3rd edition

22

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.7 Excessive penetration

Excessive penetration exists when the root weld material extends past the inside diameter surface and isthicker than the base material. On the position of the excessive penetration the film is lighter than thedensity of the weld.

Fig. 11: Excessive penetration

Page 67: Vol 2 onshore pipelines the road to success 3rd edition

23

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.8 Burn through (BT)

When too much energy is used, especially when the second weld pass is being used, the root pass isremoulded and a burn through (BT) will occur. This will result in a localized darker density with fuzzyedges in the center of the weld image’s width. It may be wider than the root pass image width.

Fig. 12: Burn through

Page 68: Vol 2 onshore pipelines the road to success 3rd edition

24

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.9 Lack of penetration

When insufficient energy is applied to melt both edges of the pipe ends together, will result in a lack ofpenetration defect (LOP). A darker density band, with very straight parallel edges, in the center of theweld image will occur.

Fig. 13: Lack of penetration

Page 69: Vol 2 onshore pipelines the road to success 3rd edition

25

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.10 Interpass slag inclusions

The SMAW and FCAW processes produce a slag to protect the molten weld material when it solidifies.When previous welds are not properly cleaned the slag becomes trapped between subsequent passesresulting in a slag inclusion. On a film this will result in an irregularly-shaped darker density spot, usuallyslightly elongated and randomly spaced.

Fig. 14: Interpass slag inclusions

Page 70: Vol 2 onshore pipelines the road to success 3rd edition

26

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.11 Elongated slag lines (wagon tracks)

Wagon tracks are a typical defect that can be found in SMAW cellulosic welded pipe sections. The filmwill show elongated parallel or single darker density lines, irregular in width and slightly windinglengthwise.

Fig. 15: Elongated slag lines (wagon tracks)

Page 71: Vol 2 onshore pipelines the road to success 3rd edition

27

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.12 Lack of side wall fusion

Lack of fusion occurs when the weld metal doesn’t fuse with the pipe material. This imperfection isreferred to as lack of side wall fusion (LOF). This defect can be recognized as elongated parallel, orsingle, darker density lines which are very straight in the longitudinal direction.

Fig. 16: Lack of side wall fusion (LOF)

Page 72: Vol 2 onshore pipelines the road to success 3rd edition

28

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.13 Interpass cold lap

When the previous layer is not re-melted by the covering subsequent weld pass, a lack of fusionbetween the weld passes will occur. This type of lack of fusion is called interpass cold lap or interrunlack of fusion.

Fig. 17: Interpass cold lap

Page 73: Vol 2 onshore pipelines the road to success 3rd edition

29

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.14 Scattered porosity

Rounded spots of darker densities, random in size and location, are referred to as porosity (P). Basicallythis is gas that has been trapped in the solidifying weld material. Under penetration is also classed as adefect where the opening is too small and welding current too low.

Fig. 18: Scattered porosity

Page 74: Vol 2 onshore pipelines the road to success 3rd edition

30

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.15 Cluster porosity

A group of gas pores is referred to as cluster porosity (CP). The rounded or slightly elongated darkerdensity spots in randomly-spaced clusters can easily be identified on the film.

Fig. 19: Cluster porosity

Page 75: Vol 2 onshore pipelines the road to success 3rd edition

31

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.16 Cracks

For materials that are sensitive to cracking (C) special precautions are required to prevent the weldedjoint from cracking. A crack can be recognized as feathery, twisting lines of darker density runningacross the width of the weld image. The direction of the crack basically gives the name to theimperfection in the welded joint. Cracking of welded joints results from localized stresses that exceedthe ultimate strength of the material. When cracks occur during or as a result of welding, littledeformation is usually apparent. Three different types of cracks that can occur in weld metal includetransverse, longitudinal and crater cracks.

Fig. 20: Transverse crack Fig. 21: Longitudinal root crack

Page 76: Vol 2 onshore pipelines the road to success 3rd edition

32

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.17 Tungsten inclusions

In GTAW, the weld arc is interrupted when the tungsten electrode touches the weld pool, causing thepool to solidify. When this location is grinded insufficiently tungsten will remain in the weld causing anirregularly shaped lower density spots randomly located in the film of the weld image.

Fig. 22: Tungsten inclusions

Page 77: Vol 2 onshore pipelines the road to success 3rd edition

33

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.6.18 Surface irregularities

Perfectly acceptable welds will naturally exhibit some degree of surface roughness. However, impropertechnique or equipment adjustment can result in surface irregularities that exceed specificationrequirements.

Arc strikes An arc strike is damage on the base material resulting from an accidental striking of an arc outside theweld area.

Weld ripples While depressions and variations in the weld surface are considered to be discontinuities, they may notaffect the ability of the weld to perform its intended purpose. The applicable standard should describethe degree of surface irregularity permissible to prevent the presence of high stress concentrations.

Spatter Spatter consists of metal particles expelled during fusion welding that do not form part of the weld.Spatter particles that become attached to the base metal adjacent to the weld are the most detrimental.Normally, spatter is not considered to be a serious flaw unless its presence interferes with subsequentoperations, especially nondestructive evaluations.

9.6.19 Pipe mill defects

Line pipes can be manufacturer using different methods, but in any case the pipe ends are not perfectlyround. The manufacturer is allowed to produce line pipes with some tolerance dimensions. Some ofthem may strongly affect field girth welding. In the following the main pipe mill defects and their effectson welding are listed.

9.6.19.1 Out of roundness

The main characteristic of out of roundness is an oval shape, and its main effect on welding ismisalignment (Hi-Lo) . Therefore, the welding defects associated with it are incomplete root penetration,burn through, and root undercut. For thin wall pipes, out of roundness is usually compensated for by theinternal clamp. Especially when the clamp is pneumatic or hydraulic, the even expansion force of theclamp deforms the pipe ends and make them round. Out of roundness effects are more deleterious inheavy wall line pipes, in which case the clamp may have not enough force to compensate. In thosecases, proper root pass technique selection can help to reduce the harmful effects. Typically, GMAW-Pcan overcome misalignment better than high cellulosic SMAW. Also turning around the pipes to autocompensate the out of roundness may also help

Page 78: Vol 2 onshore pipelines the road to success 3rd edition

34

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Fig. 23: Out of roundness

9.6.19.2 Different thicknesses

Welding defects similar to out of roundness can occur when welding two pipes with the same nominalpipe thickness, but with excessive difference in the actual thickness. When inspecting with automaticultrasound technique, it also can cause a false alarm, resulting in an unnecessary repair.

9.6.19.3 Flat spots

Flat spots are typically located near the seam weld. They depend on the manufacturing method, butthey are more likely to be present in heavy wall thickness line pipes. Even though this defect has effectssimilar to out of roundness, rotating the pipe to compensate for this geometric defect cannot help toreduce the deleterious effects associated with it.

Fig. 24: Flat spot

9.6.19.4 Laminations

Laminations are non-metallic inclusions embedded in the pipe, and if they are present near the pipe endthey can cause welding defects such as lack of fusion or slag inclusion.

9.6.19.5 Axial misalignment

Axial misalignment occurs when the linepipe axis is not straight but curved. This pipemill defect hasnegative consequences when the pipe rotates and the weld torch (or electrode) is fixed. This weldingposition is typically used in double joint welding plants and it is associated with automatic or weldingprocess such as SAW or GMAW.

Page 79: Vol 2 onshore pipelines the road to success 3rd edition

35

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

When the pipe rotates during welding, the arc length may vary as the pipe rotates, causing weldingdefects such as lack of fusion or lack of penetration.

Fig. 25: Straight and axially misaligned linepipe

9.7 Field construction equipment

9.7.1 Beveling equipment

9.7.1.1 Flame cutting beveling equipment

Flame cutting equipment is commonly used for preparing a standard V-bevel preparation. Flame cuttingequipment can vary in complexity from simple hand-guided machines to very sophisticated numerically-controlled systems. The mechanized equipment is analogous to the manual equipment in principle, butdiffers in design to achieve higher cutting speeds and better cutting quality.

Fig. 26: Semi manually-operated flame cutting system

Fig. 27: Mechanically-operated flame cutting system

Page 80: Vol 2 onshore pipelines the road to success 3rd edition

36

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.7.1.2 Mechanical beveling equipment

Mechanical beveling is applied for narrow gap welding. A pipe facing machine (PFM) is used formachining of the pipe ends, and is used in combination with a hydraulic power unit (HPU). The machining section of the PFM consists of a rotating faceplate with several tool holders. Tool holdersare spring-loaded, and are following the shape of the pipe end with a rolling gear. A typical mechanicalbeveling machine is shown below.

Fig. 28: Typical setup for PFM and HPU

Fig. 29: Facing operation with excavator handling and powering the PFM

Page 81: Vol 2 onshore pipelines the road to success 3rd edition

37

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.7.2 Pre-heating equipment

9.7.2.1 Flame torch heating

Radiation heating methods, such as those that employ gas torches or quartz lamps, transfer heat to thepipe material by emitting electromagnetic radiation. For radiation heating to be effective, the heat sourceneeds to be placed in close proximity to the material being heated.

Fig. 30: Flame torch heating of pipe ends

9.7.2.2 Induction heating

Induction heaters work by generating eddy currents in the pipe material, which is a very efficient methodof generating heat. The eddy currents are a result of an electromagnetic field that is generated by theinduction heater coils. The natural resistivity of the pipe material, along with the eddy currents, causesthe pipeline to increase in temperature from the inside by resistive heating. Induction heaters have thesame benefits as conduction heaters, which are easy access to the weld joint and consistent andcontinuous heating. An additional benefit of induction heating over conduction heating is that the heatingelements themselves do not heat up. The primary benefits of induction heating over conduction heatingare improved operator comfort and possibly, because of increased heating efficiency, the ability toachieve and maintain preheat temperature under extreme thermal conditions

Fig. 31: Induction heating of pipe ends

9.7.3 Line-up equipment

The line-up clamp can be either internal or external. The internal line-up clamp is used for mainlinewelding where external line-up clamps are used for special points like tie-in.

Page 82: Vol 2 onshore pipelines the road to success 3rd edition

38

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.7.3.1 Internal clamps

Pipe alignment may be maintained by any of the following machines:

9.7.3.1.1 Internal line-up clamp (ILUC)

Internal line-up clamp (ILUC) provides line-up of two pipes prior to and during welding. Typically theclamp is pneumatic and has an air tank to store energy to travel to the next joint, to break as it reachesthe next joint and to actually clamp the rear expander to be set in position to guide the arrival of the nextjoint.

In steep slopes it is common to have to pull or retain the ILUC with a steel cable attached to a tractor.ILUCs are equipped with a reach-rod allowing ILUC commands to be reached from the other end of thejoint by operating it and/or by using it as a conduit to transmit energy and command signals.

Fig. 32: Internal line-up clamp

Typically the internal expander of an ILUC is based on a mechanism that can be best compared to theway an umbrella is opened and closed, as is shown below in Figure 33.

Fig. 33: Internal line-up clamp mechanism

Page 83: Vol 2 onshore pipelines the road to success 3rd edition

39

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.7.3.1.2 Stronger internal line-up clamp (Max-ILUC)

In order to meet the requirements regarding hi-lo, special ILUCs have been developed to provideenough force to round the pipe ends, so as to be able to match the pipe ends that have to be welded.

Fig. 34: Max-internal line-up clamp

9.7.3.1.3 Internal welding machine (IWM)

The Internal Welding Machine is used to line up the pipe pieces. After the line up the first welding pass(root) is welded from the inside of the pipe with the same equipment used for the line-up.

Fig. 35: Internal welding machine (IWM)

9.7.3.2 External clamps

External clamps are used on tie-ins and in specific conditions where, due to technical or safety reasons,the use of an internal clamp is not possible. External line-up clamps are not suitable to attain highproductivity. The line-up of the pipe is more time consuming, but since the clamp is reachable it ispossible to make the necessary adjustments to get the pipe within the specified tolerances. Afterwelding a specified or qualified percentage of the root the clamp has to be removed to finish the weld.

Fig. 36: External clamp (EC)

Page 84: Vol 2 onshore pipelines the road to success 3rd edition

40

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.7.4 Welding

For the transportation of the welding equipment on the right of way a pay welder is common used.Since the lifting capacity of the pay welder crane is limited the welding shack must be kept as light aspossible. In order to achieve this, the welding equipment is mounted on the pay welder. Generally thewelding inverters, electronic control unit (ECU) and gas cylinders are on the pay welder. The wire feeder,water cooler and bug are installed in the welding shack. The power leads and gas hoses are guided bythe crane to go from the pay welder to the welding shack. A typical (automatic) welding set-up is shownbelow.

Fig. 37: Typical (automatic) welding set-up.

Fig. 38: Field pictures

9.8 Welding safety hazards

9.8.1 Introduction

Welding is associated with a number of risks, which are produced by the type of activity and physicalphenomena related to welding. Cross-country pipeline construction in particular is always in a highproductivity scenario, and is an outdoor job site, always in motion. Therefore, welded pipelineconstruction is associated with very particular requirements in terms of safety. The following sectiondiscussed the main topics related to safety.

9.8.2 Personal protection equipment

A welder’s personal protection equipment shall take into account all the hazards associated with weldingsuch as sparks, spatter radiation, etc. The selection of this protection shall be based on the level of eachhazard, which depends on a number of factors which can include welding process, shield gas, base

Page 85: Vol 2 onshore pipelines the road to success 3rd edition

41

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

metal, etc. Welder’s ergonomic comfort should be given due importance when choosing the protection.Factors such as overweight equipment, heat stress, motion and vision reduction must be taken intoaccount in order to avoid negative effects on welder performance. The personal protection system shallbalance protection and comfort for the welder.

At a minimum, a welder should wear boots (steel toes), cuff-less trousers made of natural fibres, aflame-resistant welding jacket, leather gloves with wrist and forearm coverage, safety glasses, and awelding helmet with a skull cap.

9.8.3 Main risks

The main risks associated with welding pipelines are the following:• Burns

• Radiation

• Fumes

• Hard particle projectiles

• Fire

• Explosion

• Electric shock

• Engine-powered welders

9.8.4 Burns

Burns in the welding process are caused by two sources:• Thermal: skin burns from hot metal, spattering slag and from handling hot tools or

electrodes

• Erythema: skin burns primarily by ultraviolet light

• Flash burn: caused when a surge of UV light hits the eye, causing a "sunburn"-likecondition on the cornea

Protective materialThe two most commonly-used materials for welder protective apparel are chrome-tanned leather andspecially treated, fire-resistant cotton. Leather is durable and will last several years if dry cleanedregularly whenever the garment becomes noticeably stiffened from accumulated dirt and grime. Treated-cotton garments come in a range of material weights, allowing welders a choice: when working in hotsummer environments, they can select lighter-weight materials; otherwise they can opt for heavierweight, more durable garments. All but the most inexpensive treated-cotton garments can be launderedusing normal temperatures and cycles without affecting the fire-resistant treatment.

Buyers of welder apparel should avoid garments that offer a place for sparks to land. Look to buytrousers, overalls, and coveralls with no cuffs or pockets. Welders should not roll up their sleeves either.

Other fabricsHigh-heat fabrics made of Kevlar® blended with fiberglass, which withstand temperatures of 300°C, aregaining favour for aprons, sleeves, and gloves. Another option is Zetex®, a highly-textured form of silicafabric that is inert and will not burn; it withstands temperatures to 500°C. Zetex Plus® comes coated,and is good to 1000°C. These materials also resist cuts and abrasion. Furthermore, to improveprotection from radiant heat, clothing made of any of these materials can carry an aluminized layer.Aluminized fabrics can be used in gloves, aprons, leggings, and hand pads.

Page 86: Vol 2 onshore pipelines the road to success 3rd edition

42

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Jackets offer full torso and arm protection, but may be too heavy for some working conditions. A lighter,cooler alternative is a cape sleeve, which protects the arms and chest while leaving the back open. Paira cape sleeve with a bib to protect the upper torso to the waist.

Another option is the bib apron. Specify a split-leg apron for optimum freedom of movement, useful, forexample, if the welder needs to kneel a lot. If the welder's arms are heavily exposed, use sleeves, whichcome in 18- and 23-inch lengths.

Protecting the lower body, safety trousers are usually worn over the welder's regular trousers. Chapsoffer a good alternative for welders needing the extra protection of leather without the extra weight orwarmth. Chaps protect the front of the legs, leaving the back open. They fasten to the legs with straps.Protect only the lower portion of a welder's legs with leggings, which have extensions for footprotection. Spats protect only ankles and feet. Spats, as well as the extension on leggings, keep sparksfrom falling into the openings on the top of shoes.

For one-piece, top-to-bottom protection, select either a coverall or overall. Due to the weight andexpense of these large garments, they are usually ordered in fire-resistant cotton.

Glove selection Welders can select among two types of gloves - welding gloves and gas tungsten arc welding (GTAW)gloves, the welding type being much heavier. GTAW gloves tend to be unlined for optimum feel, and areoften manufactured of leather other than cowhide, including sheepskin and pigskin. GTAW gloves,which generally wear faster than welding gloves, come sized for optimum fit and feel.

The standard length of welding gloves is 14 in., enough to cover half of the welder's forearm. Forprotection to the elbow, specify an 18-in. glove.

Most welding gloves are of varying grades of leather. Premium gloves are of side-split cowhide, a bettergrade than shoulder split. For optimum flexibility, durability, and protection, look for these features:welting, thumb strap, Kevlar thread, one-piece back, and a comfortable, durable lining.

For optimum protection from radiant heat, specify a glove with Mylar®, an aluminized material. Mylarcan be placed either between the lining and leather outer shell or on the back of the hand outside of theleather. Another option: add a Mylar-covered hand pad placed over a regular welding glove.

9.8.5 Radiation

IntroductionWelding arcs emit radiation over a broad range of wavelengths from 200 nanometers (nm) to 1,400 nm.This includes ultraviolet (UV) radiation (200 to 400 nm), visible light (400 to 700 nm), and infrared (IR)radiation (700 to 1,400 nm).

Certain types of UV radiation can produce an injury to the surface and mucous membrane (conjunctiva)of the eye called "arc eye", "welders' eye" or "arc flash." These names are common names for"conjunctivitis" - an inflammation of the mucous membrane of the front of the eye. The symptomsinclude:

• pain - ranging from a mild feeling of pressure in the eyes to intense pain in severeinstances

• tearing and reddening of the eye and membranes around the eye

• sensation of "sand in the eye" or abnormal sensitivity to light

• inability to look at light sources (photophobia)

Page 87: Vol 2 onshore pipelines the road to success 3rd edition

43

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

The amount of time required to cause these effects depends on several factors such as the intensity ofthe radiation, the distance from the welding arc, the angle at which the radiation enters the eye, andtype of eye protection that the welder or bystander is using. However, exposure to just a few seconds ofintense UV light can cause arc eye. These symptoms may not be felt until several hours after exposure.Long-term exposure to UV light can produce cataracts in some persons. The intensity of radiation of thewelding processes most extensively used in the pipeline construction is shown in Figure 39 below.

UV radiation in a welding arc will burn unprotected skin just like UV radiation in sunlight. This is true fordirect exposure to UV radiation as well as radiation that is reflected from metal surfaces, walls, andceilings. Surface finishes and certain paint colours can reduce the amount of UV radiation that isreflected.

Visible light from welding processes is very bright and can overwhelm the ability of the iris of the eye toclose sufficiently and rapidly enough to limit the brightness of the light reaching the retina. The result isthat the light is temporarily blinding and fatiguing to the eye (flash burn). Exposure to infrared light canheat the lens of the eye and produce cataracts over the long term.

Fig. 39: UV exposure comparison among some welding processes

Welder helmetThe helmet is made of a material that is an electrical and thermal insulator, noncombustible, and opaqueto visible, ultraviolet and infrared light (see Figure 40 below). The eyes are protected from the ultravioletradiation by a filter shade mounted on the welder’s helmet. The shell of the helmet is hinged so that itcan be raised and then lowered during welding. Many welders have been observed jerking their neckback to raise the helmet, rather than manually raising it. This jerking motion tends to increase theincidence of neck strain.

• Plasma arc welding (PAW)• Tubular with gas (FCAW-GS)

• Manual welding (SMAW)• MIG (GMAW)

• TIG (GTAW)

Page 88: Vol 2 onshore pipelines the road to success 3rd edition

44

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Hand shields or helmets provide eye protection by using an assembly of the following components:

• Helmet shell – this must be opaque to light and resistant to impact, heat and electricity.It has to cover all of the welder’s face in order to avoid skin exposure

• Outer cover plate made of polycarbonate plastic which protects from UV radiation,impact and scratches.

• Filter lens made of glass containing a filter which reduces the amount of light passingthrough to the eyes. Filters are available in different shade numbers ranging from 2 to14. The higher the number, the darker the filter and the less light passes through thelens.

• Clear retainer lens made of plastic prevents any broken pieces of the filter lens fromreaching the eye.

• Gasket made of heat-insulating material between the cover lens and the filter lensprotects the lens from sudden heat changes which could cause it to break. In somemodels the heat insulation is provided by the frame mount instead of a separategasket.

Fig. 40: Welder helmet components

Lens shade selectionThe selection of the appropriate lens shading depends on the welding process and arc energy level.Table 1 presents the shade grade for a variety of welding/cutting processes.

Auto-darkening lenses are available also, which can be set electronically in a range of shade grade andreaction time also. This type of lenses has no shade when the welding arc is off, providing clear vision tothe welder before welding, therefore a precise position of electrode or welding torch is possible aninstant before the welding arc starts. Consequently, the welder comfort is increased while weldingdefects associated with bad initial arc position are reduced.

Page 89: Vol 2 onshore pipelines the road to success 3rd edition

Table 1: Lens shading selector

9.8.6 Ventilation and fumes

In order to improve working conditions of welders, extensive research has performed. Welding fumesand gases have been particularly extensively studied due to their relationship with a number of illnessesand respiratory diseases. Much of the confusion driving the research is related to the difficulty ofassociating a particular illness with a specific constituent of the welding fume or gas.

Determining a direct relationship between an occupational illness and welding is difficult because of thecomplexity of fumes and gases, the synergistic effect of certain constituent and non-occupationalfactors (e.g. smoking), and because most of the illnesses are long-term, and take time to manifestthemselves. In any case, using correct ventilation considerably reduces any effect of welding fumes andgases on welders’ health.

In case welding is performed in an enclosed space such a welding shack, a minimum ventilation rate isrequired. Those values depend on the base metal, welding process, the consumable type, weldingconsumable diameter, etc. Indicative values are given in Table 2. In the case of welding shacks used incross-country pipeline construction, the ventilation system typically consist of an extractor fan forgeneral ventilation and a welding fume extraction system on top of the welding area (see Figure 43below). Each country has its own requirements on this matter. Contractors shall take into account theapplicable regulations when designing the ventilation system.

In case extra protection is needed, personal respirators provide a practical, portable solution. These typeof devices can be either powered, in which filtered clean air is blown into the welding helmet, or passive,in which a filtration mask is placed over the welder’s nose and mouth. The former provides also acooling effect that tends to reduce the welder’s heat stress and visor fogging.

Operation Electrode Size Arc Current Minimum Suggested1/32 in. (mm) (A) Protective Shade No.

Shade (Comfort)

Shielded metal arc Less than 3 (2.5) Less than 60 7 –welding 3–5 (2.5–4) 60–160 8 10

5–8 (4–6.4) 160–250 10 12More than 8 (6.4) 250–550 11 14

Gas metal arc welding Less than 60 7 –and flux cored arc 60–160 10 11welding 160–250 10 12

250–500 10 14

Gas tungsten arc Less than 50 8 10welding 50–150 8 12

150–500 10 14

Arc carbon (Light) Less than 500 10 12Arc cutting (Heavy) 500–1000 11 14

Plasma arc welding Less than 20 6 6 to 820–100 8 10100–400 10 12400–800 11 14

Plasma arc cutting (Light)** Less than 300 8 9(Medium)** 300–400 9 12(Heavy)** 400–800 10 14

Torch brazing – – 3 or 4

Torch soldering – – 2

Carbon arc welding – – 14

45

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Page 90: Vol 2 onshore pipelines the road to success 3rd edition

46

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Table 2: Suggested ventilation rates for SMAW [from The Welding Environment- AWS]

Fig. 41: Typical ventilation system used in welding shacks

Fig. 42: Personal respirator for welders.

Coated Electrodes Base Metal Rate, cfm

Steel, 5/32 in. diam. Steel 250Steel, 3/16 in. diam. Steel 400Steel, 1/4 in. diam. Steel 700Alloy (flouride coated), 5/32 in. diam. Alloy Steel 250Steel, 5/32 in. diam. Galvanised Steel 1000–1500

Generalventilation

Welding fumeextractionsystem

Page 91: Vol 2 onshore pipelines the road to success 3rd edition

47

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.8.7 Hard particle projectiles

IntroductionPortable grinders (including angle grinders) are intended for cutting, grinding, sanding or brushing metal,stone and timber materials, depending on the type of disc fitted to the machine. The main parts of a typical manual grinder are shown below:

Fig. 43: Main parts of a manual grinder

Usually, manual grinders are associated with a high spin speed. Typically, a point at the outer part of adisc can present a velocity of 80 m/sec which is equivalent to 288 km/hr. Therefore, a disc failure willspall out dangerous hard particles at high speed.

Types of discs The consumables of the manual angular grinders that usually are used in pipeline construction are madeof a reinforced glass fiber/resin composite disc on which the abrasive material is mounted or wire-brushtype. There are a number of different tools that may be fitted to a portable grinder design for a verity ofapplications. For example:

• bonded grinding and cutting discs

• bonded wheels

• diamond grinding and cutting discs

• flap discs

• flexible and semi-flexible discs

• pneumatic wheels

• rotary hacksaws

• ultra-thin cutting discs

• wire brushes

• woodcarving blades

Fig. 44: Different types of manual grinder tools

Page 92: Vol 2 onshore pipelines the road to success 3rd edition

48

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Hazards identificationThere are numerous hazards associated with operating a manual grinder, which include:

• Electric shocks

• Falls

• Impact

• Cuts

• Burns

• Fire

• Explosion

• Fume/dust

• Noise

• Vibration

Choosing the correct tool and controlling the risksEach tool used in manual grinders is designed for a specific type of application. Consequently, each toolis associated with certain variables such as material (carbon steel, stainless steel, high alloy steel, etc),use (cut, grinding, cleaning, etc.), dimensions, maximum rotary speed, etc. Usually the essentialparameters are clearly expressed in the tool’s operating manual.

Before using a certain tool, the job to be performed must be analyzed in order to select the correct tool.Using the tool incorrectly, in circumstances for which it was not designed, may cause its failure.

Follow the manufacturer’s informationBefore using a portable grinder for the first time, read the manual.

Ensure operators are trainedOperators must be trained in selecting, fitting and removing, caring for and inspecting discs; and thesafe use of portable grinders.

Ensure operators are supervisedEmployers, managers and/or supervisors must carry out checks to ensure grinding operations are beingdone in a safe manner, and that operators are observing the required safety precautions.

Use the correct discEnsure any disc to be fitted to the grinder is:

• the correct type for the material being worked with

• capable of being safely used at the maximum speed of the machine, stated asrevolutions per minute, meters per second or feet per second

• the correct size for the grinder

• free of any damage, flaws, dampness, warping or distortion that may result in the discshattering

• fitted in accordance with the manufacturer’s instructions (discs may be flat or havedepressed centers and require different methods of setting up. Refer to the machine’smanual)

Always unplug the grinder from the power supply, or remove the battery, before fitting or removing adisc.

Page 93: Vol 2 onshore pipelines the road to success 3rd edition

49

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Set the equipment correctly• When the disc is replaced, rotate the disk by hand in order to ensure it is centered and

it does not touch the guard. After that, adjust the locking nut

• Never adjust the disc by hand, use the adjusting tool

• Before starting working, always let the grinder runs for a minute to ensure it isfunctioning correctly

Use personal protective equipmentWhen using a grinder, always use personal protective equipment (PPE):

• eye protection

• hearing protection

Any additional safety equipment, including respiratory protection, gloves, sturdy shoes, apron andhardhat.

Beware of loose clothing that may be grabbed by the grinder.

Ensure guards are in placeNever use a portable grinder without the guard being in place and correctly adjusted. A properlyadjusted guard will minimize sparks hitting the operator and injury in the event of disc shatter.

Use all the safety featuresAlthough in most cases only premium products have especial feature such as soft anti-vibration handlesand dead man’s switch, in order to have full protection this type of feature should be taken into accountwhen selecting portable manual grinders. For safe operation, it important that all safety features are keptin good condition.

Angular grinder – safe techniques• Never use a portable grinder one-handed. Always have the auxiliary handle fitted; hold

the grinder with both hands and have a stable stance.

• If it’s not possible to use the grinder with both hands in place, then the grinder is thewrong tool for the job.

• Do not expose the discs to lateral force, torsion, or excessive pressure. Failure,overheating, efficiency lost, reacting forces and involuntary motion may result.

• For thin cutting discs, the tool shall be always positioned perpendicular to the materialbeing cut. Thin cutting discs should never be used in oblique positions. Forintermediate cutting discs (thicker than 4.8 mm) the maximum inclination angle shallnot exceed 60°.

• Grinding discs (thicker than 6.35 mm) shall be operated at a minimum inclination angleof 30°. This type of disc shall not be used for facing small diameter pipes because thelocalized over-wearing at the other part of the disc may cause its failure.

• Never use the grinder over the shoulder level because in case of an involuntary motionor reactive force the machine can hit the operator’s face, shoulder or arm.

• When working out of position, any involuntary motion or reactive force must move thegrinder away from the operator, otherwise it can hit the operator.

• Ensure the work piece is rigidly supported and firmly clamped. Movement in the workpiece during grinding may result in disc shatter or grinder kickback, with the potentialfor operator injury.

Page 94: Vol 2 onshore pipelines the road to success 3rd edition

50

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Other considerations when grinding• Select a grinder appropriate for the work to be done. Remember that grinders have

variable speed control, clutch systems and anti-kickback.

• Ensure the grinder is turned off before plugging in.

• Apply the grinder to the work piece only once the grinder has reached operatingspeed.

• Never put a grinder down while the disc is still turning.

• Be aware of others in the vicinity of the work area, as sparks and material may beejected over considerable distances.

• Check to make sure there are no flammable materials that may be hit by sparks andcheck the area for any smouldering material when the work is completed.

• Never clamp a portable grinder in a vice — a portable grinder is not a bench grindernor a substitute for one.

• Use a dust collection/control system whenever possible — some dusts may becarcinogenic, flammable or explosive.

9.8.8 Fire protection

The risk of fire is always present in welding operations. For a fire to survive there must be oxygen, fueland heat present. If any of these is removed the fire will be extinguished.

Fire precautions should include:• Inspect every location before cutting and welding commences to ensure the potential

for a fire to occur is eliminated

• Suitable fire-fighting facilities are available near the work area and operators knowwhere they are located. Are the fire-fighting facilities adequate for the potential hazard?

• Work areas being clear of all rubbish and flammable material such as rags, oil etc.These materials should be removed to a safe distance before cutting and welding

• Removal and/or protection of flammable material.

• Clear, or soak with water, dry grass and scrub in surrounding area

• Operators should check their clothing is not impregnated with oil or grease

• Conveyor belting or other combustible materials should be suitably protected fromcutting and welding and its sparks

• Inspecting the site after cutting and welding has been performed to ensure that thepotential for a fire to occur is eliminated

9.8.9 Explosion / gas containers

Cylinders gas containers should generally comply with the following:• Filled, inspected and maintained in accordance with applicable standard and

regulations

• Gas safety data sheets to be kept at all sites

• Cylinder valves should be tightly closed when not in use or where cutting activities arestopped for a period of time, e.g. lunch

• Never leave an empty cylinder connected to a process

• Never sling or lift a cylinder by the valve cap

• Do not subject cylinder to abnormal mechanical shocks

Page 95: Vol 2 onshore pipelines the road to success 3rd edition

51

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

• Cylinders shall be located so that sparks, slag and molten material cannot fall on hosesor on the cylinders or attachments

The following considerations for the storage should be taken into account:• All cylinders should be stored in accordance with the applicable standard and

regulations.

• All cylinders should be kept upright, away from any sources of heat, electrical circuitsand oil or grease during use.

• Cylinders should be stored at least 15m away from fuel bays, fuel outlets and mobileequipment under repair.

• All oxygen and acetylene cylinders should be placed on a stable footing and besecured to prevent falling.

• Storage areas should be fitted with lockable doors, level floors and should be raised atleast 150mm above the surrounding floor.

• Dry powder extinguisher should not be positioned less than 8m or more than 10mfrom the storage area.

• Cylinders should be returned to a safe storage area when operations are completedand kept isolated. Never leave them in the right of way in an unprotected area.

• Grease, oils or other combustible substances should not be in contact with the valvesof cylinders containing oxygen, nitrous oxides or other oxidants. Oils and any fuels inthe presence of oxygen may ignite spontaneously.

• Oxygen cylinders should be stored more than 3m away from fuel cylinders.

Transport:• Cylinders should be made secure when being transported and attached to a rigid

support.

• Acetylene and LP Gas cylinders should be transported in an upright position.

• Cylinders should not be rolled on the ground.

• Where possible use an appropriate trolley for transporting cylinders, even over shortdistances.

• All cylinders must be labelled, colour-coded and accounted for and removed from thework area after use.

• Cylinder valve guards should be used during transport.

• Cylinders should be lifted in a manner as recommended by the manufacturer.

Ignition:An ignition safety device (flint gun) for flame cutting and burning activities should be used at all times.Matches, cigarette lighters, wicks, smouldering material and other similar devices should not be used toignite a gas.

Hoses:• Hoses should comply with the applicable standard and regulations.

• Hoses should be protected from sparks, hot slag, hot objects, sharp edges and openflames.

• An automatic hose reeling system should be used when cutting and welding fromheights or in a trench.

• If hoses are burnt in a flashback or damaged they should be replaced.

• Do not use hoses which are longer than necessary.

• Hoses should be checked for leaks daily.

Page 96: Vol 2 onshore pipelines the road to success 3rd edition

52

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.8.10 Electric shock

Primary circuit:Primary circuit protection shall be in accordance with the applicable regulations and standards.Where mains-fed welding machines are to be used next to each other, the main connections shall bephased out to ensure that the open circuit voltage between adjacent electrodes does not exceed theextra-low voltage. If this is not possible fixed barriers should be installed so a person cannot gain accessto both electrode holders at the same time. Ensure multiple AC welding machines are installed in phase.

Output circuit:Electric shocks in welding occur when a person’s body is in simultaneous contact with any exposed partof the secondary circuit electrode conductor and any metal or conducting material connected to thework terminal.

All parts of the welding circuit including the return path is ‘live’, therefore the welding operator mustensure that no part of the body is placed in a position such that it completes a path through the body forthe passage of the electric current.

To prevent electric shock from the secondary circuit, it is important that:• Welding cable is in good condition and suitably rated, located, protected and

insulated, to contain all welding currents within the cable, and not allow any straycurrents to occur.

• The work return lead (cable) is fastened as close as practicable to the welding locationto avoid stray currentsNote:(i) Gears, bearings, brushings, pipes, etc should not be used to form part of the return circuit. This is toprevent damage to the equipment and arcing or sparking within the gear cases.(ii) Particular care should be taken when using two or more welding machines in close proximity.(iii) The lead (cable) connecting the welding machine to the work is called the “work return lead (cable)”.The work return lead (cable) is commonly (incorrectly) called the earth lead (cable). Deliberate oraccidental connection of the workreturn lead (cable) to earth creates hazardous situations and allows stray currents of significantmagnitude to be generated by welding circuits.

• The electrical connection between the work return lead (cable) clamp and cable issecure.

• Welding operators should ensure that no part of their body is placed in a position tocreate a return path for the circuit.

• Electrode holders are not defective.

• Welding machines must be switched off and isolated from supply before connectingand disconnecting leads.

• When welding has stopped for a period of time, power should be turned off and theelectrode removed from the holder in order to prevent inadvertent operation.

• Prevent bare skin contact with the work piece and always use dry insulating gloves.Gloves should always be used to handle electrodes.

• An output circuit safety switch, between the welding machine and the hand piece, isrecommended.

• Two electrode leads are not alongside each other

• For AC welding machines the electrode terminal is connected to the electrode leadand the work terminal is connected to the work return lead, and not vice versa

• Consideration should be given to the risk of electromagnetic induction with othercircuits

Page 97: Vol 2 onshore pipelines the road to success 3rd edition

53

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Welding cables:The welding cables should not be extended beyond 9m in length without consideration of voltage drops.The current-carrying capacity of the work return and electrode cable should be determined inaccordance with:

• Rated output of the welding machine

• Duty cycle of the welding machine

• The distance of the work from the welding machine

Voltage reduction devices (VRD):VRDs are a safety enhancement that greatly reduce the risk to welding personnel from exposure to thepotentially hazardous voltages produced by a welding power source. The VRD function is to reduce thevoltage from the electrode to a safe value when the welding machine is not being used.A system (VRD or alternative) shall be provided to reduce the no-load voltage or open circuit voltage(OCV), to a no load voltage of:a) 35V for AC, orb) 35V peak, 25V rms for AC circuits, orc) less when the resistance of the output circuit exceeds 200 Ohms.

Note:(i) Alternative systems may include triggers, switches and open circuit safety switch being operatedwhen changing electrodes.(ii) MIGs and TIG machines reduce the voltage to zero when the trigger is not operated.

Response time for VRD: the turn off time (reaction time) for the VRD to reduce the voltage to the lowvoltage state after the circuit resistance reaches or exceeds 200 Ohms shall be less than 300 ms.

9.8.11 Safety precautions for engine powered welders

• Always operate in an open well-ventilated area or vent the engine exhaust directlyoutdoors.

• Never fuel the engine while running or in the presence of an open flame.

• Wipe up spilled fuel immediately and wait for fumes to disperse before starting theengine.

• Never remove the radiator pressure cap from liquid cooled engines while they are hotto prevent scalding yourself.

• Stop the engine before performing any maintenance or troubleshooting. The ignitionsystem should be disabled to prevent accidental start of the engine.

• Keep all guards and shields in place

• Keep hands, hair, and clothing away from moving parts

9.8.12 Other risks

Other risks associated with any other industrial activity are also present in pipeline construction, even themore unexpected ones such as falls. Care must be taken in all the aspects and hazards in order tocontrol them and avoid accidents.

Page 98: Vol 2 onshore pipelines the road to success 3rd edition

54

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.9 Engineering stages for pipeline welding

This section describes the engineering stages that need to be accomplished and approved before fieldwelding activities can commence.

9.9.1 Review of project specifications

Based on the project design criteria, subsequent parent material selection and regulations governing theproject, the welding methods and processes are reviewed and evaluated to determine the bestapplication and production welding methodology. Criteria for acceptance of girth weld discontinuities areset at this stage and usually depend on the criticality of the in-service pipeline. Criteria may be based onachievable standards of good workmanship, general fitness for service criteria or an engineering criticalassessment.

9.9.2 Selection of welding and NDT methodology

For the selection of the welding method the quality (mechanical properties and NDT contingency) andquantity (production rate) are the two major criteria that have to be taken into account. Section 9.5.1shows a table with more detailed selection criteria.Criteria that are evaluated are;

• Pipe base material certificate

• Environmental conditions

• Welding consumable certificate

9.9.3 Welding procedures qualification (WPQ)

Welding qualifications are carried out to demonstrate the integrity of the weld system, weld parameters(such as heat input), and mechanical performance for both the parent material and the weld material.Weld qualifications are governed by industry specifications such as DNV, API, AS, BS or ISO withfrequent supplementation from the owning company’s specific requirements.

Normally several welds are made using the proposed welding technique. The weld parameters areoptimized to ensure quality and repeatability. The qualification welds are inspected by the required NDTmethod according to the applicable standard. When the quality is demonstrated (acceptable welding)the welds are sent to the destructive testing laboratory.

When mechanical testing is completed and the required mechanical properties are met, the procedurequalification record (PQR) is approved. This documentation is signed off on by both the contractor, andthe owning company and the qualified welding procedure specification (WPS) can be issued forconstruction. The design and preparation of a joint for production welding is also an importantengineering stage and should be carefully optimized during the welding procedure qualification. Mostpipeline welding documents require that the qualification tests closely resemble production conditions.

There are five basic steps in the qualification of a welding procedure:1. Preparation and welding of suitable samples 2. Testing of representative specimens3. Evaluation of overall preparation, welding, testing, and end results4. Possible changes in procedure 5. Approval

Page 99: Vol 2 onshore pipelines the road to success 3rd edition

55

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.9.4 Welder and welding operators approval and testing

After the WPS of the welding methods/processes has been approved for pipeline construction,welder/operator training will be started. After the training has been completed, the welder / operator hasto demonstrate the ability to produce acceptable weld(s) in compliance with the WPS. Welder, weldingoperator, and tack welder qualification tests are used to demonstrate the ability of those tested toproduce acceptably sound welds using a qualified welding procedure specification. These tests are notintended to be used as a guide for welding during actual construction, but rather to assess whether anindividual has a certain minimum skill level. The welder performance is documented in a welderperformance qualification record (WPQR).

9.10 Mainline construction stages

The next subsections describe the different stages of the preparation, welding and controlling activitiesduring field construction.

Fig. 45: Mainline construction stages

1- Surveying and clearing right of way2- Trenching and excavation3- Stringing pipe along the right-of-way4- Pipe bending equipment5- Pipe facing equipment6- Lining up the pipe ends7- Welding the pipe joints

8- Weld inspection9- Field joint coating10-Pipe protection11-Buoyancy control products12-Lowering in13-Padding and backfill14-Cleanup and restoration

Page 100: Vol 2 onshore pipelines the road to success 3rd edition

56

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.10.1 Pipe end inspection

Below is a summary of requirements and/or recommendations that control the quality of pipe ends andpipe end surfaces:

• Pipe and pipe-end surfaces must be smooth, uniform and free of laminations, tears,scale slag, grease and paint that might adversely affect the welding.

• Fusion faces on pipes and adjacent material must be free from fins, planar flaws, scale,rust, paint or grease prior to welding.

• After completion of circumferential weld, prior to UT testing, a compression wave testof the parent metal material must be performed, on both sides of the weld, minimumdistance 1.25x the longest surface skip distance.

• The parent metal, in the scanning zone surface, must be examined with straight beamprobes, prior to or after welding, unless it can be demonstrated (by the pipe mill) thatthe angle probe testing of the weld is not influenced by the presence of imperfectionsor high attenuation.

• Examination of the pipe ends for the presence of laminations should be performedafter a significant length of pipe has been removed

In modern pipe mills, the pipe ends already undergo various non-destructive tests to ensure soundparent material (see detailed descriptions of techniques used in section 10.5 “NDT at the materialsupplier and vendor inspection”). In most cases, the parent metal inspection is waived in lieu of thelamination checks that are performed at the pipe mill.

9.10.2 Pipe end preparation

The pipe end preparation area should be kept neat and clean. Waste material should be avoided byplacing a metal tray under the pipe being cut, following best practices and waste policy.

Pipe ends needs to be machined by a pipe facing machine (PFM) with the same bevel design performedduring the qualification of the welding procedure specification (WPS). Each bevel is checked fordimensional conformance at four to six locations evenly spaced around the pipe circumference. Correctand accurate bevel profile preparations are essential for the production of sound, defect-free welds. Theimportance of this step cannot be over-emphasized.

9.10.2.1 Standard bevel design (V-prep) for manual welding

Groove welds are the most used joint design for butt joints in pipe welding. There are various types ofgroove preparations for butt joints for SMAW. Groove welds should be designed so that completepenetration is possible with the least amount of welding. Welds must extend completely through thecross-section of the pipe being joined. Also, complete fusion without slag entrapment, excessiveporosity, or cracking must be obtained for a satisfactory weld. The most extensively-used bevel design issingle V-60°. When the pipe wall thickness is over 3/4 inches (19 mm), a compound bevel design isrecommended for reducing the amount of filler metal. However, for this range of thicknesses, semi-automatic, mechanized or automatic welding should be considered.

The root opening (R) is the separation between the members to be joined. A root opening is used forelectrode accessibility to the base or root of the joint. The smaller the angle of the bevel, the larger theroot opening must be obtain good fusion at the root.

If the root opening is too small, root fusion is more difficult to obtain and smaller electrodes must beused, thus slowing down the welding process. If the root opening is too large, weld quality does not

Page 101: Vol 2 onshore pipelines the road to success 3rd edition

57

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

suffer but metal is required; this increases welding cost and will tend to increase distortion. Backupstrips are used on large root openings.

Root opening and joint design will directly affect weld cost (kilograms of metal required), and a choiceshould be made with this in mind. Joint preparation involves the work required on pipe edges andincludes beveling and preparing the root face.

Using a compound bevel, in preference to a single-groove, cuts in half the amount of welding. Thisreduces distortion and makes it possible to alternate the weld passes on each side of the joint, againreducing distortion.

Fig. 46: Typical preparation for cellulosic SMAW

9.10.2.2 Narrow gap welding design

For pipes with thicker walls (above 19mm), generally semi-automatic, mechanized or automatic weldingis used and compound or J bevel reduces the amount of welding material as shown below:

Fig. 47: Typical bevels designs used for FCAW for heavy wall pipes

9.10.3 Pre-heat

Before the first weld pass is made, the weld joint is pre-heated. The minimum pre-heat temperature shallbe in compliance with the specified minimum temperature in the applicable welding procedurespecification (WPS). Additionally, the interpass temperature is generally controlled between a minimum(typically equal to the minimum preheat temperature) and a maximum level which is a function of themetallurgy and required mechanical properties. The interpass temperature is checked prior to startingeach weld pass.

Page 102: Vol 2 onshore pipelines the road to success 3rd edition

58

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.10.4 Lining up the pipe ends

The next pipe section is lifted by the front end side boom and transported to the mainline. Line up isperformed by the front end foreman, the side boom driver and some helpers. When the next pipe isaligned with the mainline, an internal line up clamp (ILUC diameter >6”) is used to maintain the alignmentof both pipe ends.

9.10.5 Manual welding

9.10.5.1 Root pass welding using SMAW

One of the most extensively-used welding processes in a cross-country pipeline, used to deposit theroot pass, is shielded metal arc welding (SMAW). Depending on the joint configuration and other weldingvariables, the welding consumables that typically are used are the following:

• Manual EXX10 (e.g., E6010) cellulose electrode, vertical-down progression. This is thetraditional and most popular method and offers the fastest welding speeds (rangingfrom 25-40 cm/minutes). Cellulosic electrodes may also be used vertical-up withslower travel speeds to handle greater variations in joint fit-up scenarios, such as a tie-in.

• Manual EXX16 or EXX18 (E7016 or E8018) basic low-hydrogen electrode, eithervertical-up or vertical down progression. While travel speeds in both case is slowerthan cellulosic electrode, this is the only option for welding a manual low-hydrogen rootpass.

Cellulosic electrodes can also be used in vertical-up progression in the case fit-up is very poor.However, there are two main drawbacks:

a) It leaves deep undercut grooves along the edges of the weld face, commonly referredto as wagon tracks

b) It is usually necessary to expose these wagon tracks so they can be consumed by thenext weld pass — the “hot” pass. This is done by removing the weld crown bygrinding.

Thus, using cellulosic electrodes requires extra time after welding the root pass to remove part of theweld and then replace with new weld metal. Also, cellulosic electrodes produce weld metal withrelatively high levels of weld diffusible hydrogen, rendering it crack sensitive when used on higherstrength pipe grades.

A low hydrogen manual root pass produces welds with a flat face (no wagon tracks) and less weldreinforcement on the inside of the pipe than with cellulosic electrodes. It produces a thick, crack-resistant low hydrogen root weld. However, with basic electrode in vertical- down progression the jointgeometry is different from that of cellulosic. Wider gap and smaller root shall be used in order tocompensate the less forceful arc. If the bevel geometry is not changed, then the production may slowdown.

When comparing SMAW welding consumables for root pass, high-cellulose electrodes offer superiorwelding speeds. This is the main reason for the predominant use of high-cellulose electrodes. However,the weld metal of high-cellulose electrodes contains higher amounts of diffusible hydrogen than that oflow-hydrogen electrodes.

Page 103: Vol 2 onshore pipelines the road to success 3rd edition

59

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.10.5.2 Welding techniques using SMAW

A number of factors will determine how many welders will be needed to weld the root pass. In any case,it is best to have welders either (1) weld opposite one another or (2) evenly spaced around the pipe.When the pipe diameter is larger than 46” three welders may be used, but one of the welders should beambidextrous. This will minimize the amount of distortion in the pipe and prevent the gap from openingor closing. If possible, it is also desirable not to finish a weld in exactly the bottom of the pipe becausethe tie-in can be more difficult. Similarly, it is best to avoid starting at exactly the top of the pipe (12o’clock position).

As a rule of thumb, for a 5/32” (4.0mm) cellulosic electrode, the welding time for one electrode shouldbe approximately one minute and the length of weld should be approximately the same as the length ofelectrode consumed. This would produce a travel speed of approximately 300 mm/min (12 in/ min), butthis is extremely sensitive to joint preparation and exact welding conditions.

The root pass is welded with a “drag” technique. The tip of the electrode is held in contact with bothpipes and dragged around the circumference of the pipe, progressing vertically down. The electrodeinitially should be held roughly perpendicular to the pipe. If there is a proper fit-up and the proper currentis used, a small “keyhole” will be seen following behind the electrode. If the keyhole is not seen, theelectrode is not penetrating through to the inside of the pipe. The remedies for this would be:

• Higher current.

• Apply more pressure on the electrode which lowers voltage and yields a colder puddle(depending on the type of welding machine).

• Use a push angle (although this is not always advisable).

• Slower travel speed.

If the keyhole becomes too large and difficult to control, the remedies would be:• Lower the current.

• Travel faster until the size of the keyhole decreases.

• Use more of a drag angle while using faster travel speed until the keyhole becomesmore manageable.

• Apply less pressure on the electrode which creates a bigger keyhole

If it is necessary to interrupt the arc before the run is ended, the tip of the electrode must be rapidlysnapped down. This prevents slag inclusion in the weld pool. Remove the slag from the crater and fromthe last 50 mm of the weld. The restart should be made starting on the weld metal approximately 12mm before the crater and moving towards it with an arc length slightly above normal. Then push theelectrode to the bottom of the joint to fill the crater and continue welding in the normal manner.

9.10.5.3 Hot pass using SMAW

On one hand the main purpose of the root pass is to bring a fast first metal backing, and when usinghigh cellulosic SMAW welding, the weld is usually very thin (1.5- 2 mm in thickness). On other hand, inorder to increase productivity fill passes are performed by using a high energy welding technique (highcurrent, high deposition rate). Therefore, if the metal backing deposited by the root pass is too thin, thenburn-through will occur. Consequently, the main objective of the hot pass is to bring a thicker metalbacking for the high energy stage of fill.

Another objective of the hot pass is that after the root pass is welded by using high cellulosic SMAWconsumable type, the root bead is generally very convex on the exterior of the pipe. The normalprocedure is to grind the root pass to eliminate the excessive convexity. Normally, the entire weld is notground out, rather only enough to expose “wagon tracks”. These are lines of slag that are on either side

Page 104: Vol 2 onshore pipelines the road to success 3rd edition

60

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

of the built up convex region. Then, another purpose of the hot pass is to burn out the “wagon tracks”.Ideally, this is achieved leaving the joint free of undercut and some filling of the joint is alsoaccomplished. To do this, a high current is normally used.

The hot pass should be started as soon as possible after completely finishing the root pass. Too long adelay may cause cracks in the root pass. The time between root pass and hot pass is a very importantvariable when using high cellulosic electrodes. For that reason, many pipeline constructions standardsand codes consider it an essential welding variable.

In the case that the root pass is deposited by GMAW-P(or other technique that assures a thick metalbacking without excessive convexity), then hot pass is not necessary and the fill stage can start over theroot pass.

Fig. 48: High cellulosic root pass in as weld condition.Notice the high convexity and the typical "wagon tracks"

The most extensive technique used for hot pass is high cellulosic SMAW (EXX10). In some cases, thehot pass may be performed using the same technique used for fill. In this case a highly-skilled welder isrequired because the probability of burn-through is high due to the high energy welding techniquetypically used for fill.

Usually 5/32” (4.0mm) cellulosic electrodes are normally used. Typically a current of 160 - 200 amps isused with electrodes, but note that if using higher current values, the electrode can overheat. Larger(3/16” diameter) electrodes can also be used, with currents around 180 amps. However, largerelectrodes have a tendency to fill rather than dig.

Maintain an arc length equal to the electrode diameter. Do not increase the arc length during movement.If the arc is interrupted before the bead is complete, remove the slag from the crater, restart the arcstarting on the bottom bead, approximately 12 mm in front of the second bead and move back up tothe crater.

Make sure that you have filled the crater, then restart welding as indicated previously. Carry out thesecond half of the run with the same procedure. It should be noted that the “pulling” technique withwhich the root bead is laid causes an incomplete fusion and slag inclusion “tramlines”) at the seamedges. Due to the higher current used, the second or “hot” pass does not transfer much metal to thejoint, but its greater heat frees the slag and completes the fusion between the weld edges and the basemetal.

Page 105: Vol 2 onshore pipelines the road to success 3rd edition

61

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Fig. 49: Starting the arc in hot pass

9.10.5.4 Fill and cap

The main objective of fill is to complete the type joint, until the weld metal thickness almost equals thepipe thickness, while the purpose of the cap passes is to reinforce the joint and create a smoothfinishing joint surface.

To carry out the filling passes, the starting position and trailing angles of the electrode are the same asindicated for the root and hot passes, but electrodes of 5.0 mm diameter with current set at 150-180Amust be used. Use a swinging movement, maintaining an arc length equal to the electrode diameter(Figure 50). Pause with the tip of the electrode on the edge of the previous bead. Move towards theopposite edge, descending by half the electrode diameter.

If it is necessary to restart the arc, use the same procedure as indicated for the hot pass. After havingwelded the second half of the joint, completely remove the slag.

To fill the joint up to 0.8 mm from the external pipe surface it may be necessary to deposit additionalpasses on the whole circumference (Figure 51). These beads should generally add a 1.6 mm thick layer.Use the same techniques indicated for the previous passes. Often, after having made all these layers,the joint is thicker in the upper and lower zone than in the side zones of the pipe, making it necessary tofill it evenly before making the cap (Figure 52). In this case stripper beads are laid with the sametechniques illustrated previously.

Fig. 50: Swinging technique used for fill passes

Page 106: Vol 2 onshore pipelines the road to success 3rd edition

62

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Fig. 51: Completion level for fill passes.

Fig. 52: Leveling beads

The technique used for the cap pass is the same as indicated for the penultimate bead, but theswinging movement must be wider. A “Z” or “half moon” weaving technique may be used (Figure 53).Dwell with the tip of the electrode on the edges of the previous bead. Advance at a speed that makes itpossible to obtain a 0.8 to 1.6 mm thick reinforcement and an overlap of approximately 1.6mm at theedges (Figure 54).

Fig. 53: "Half moon" weaving technique. Fig. 54: Cap pass. Typical dimensions

Page 107: Vol 2 onshore pipelines the road to success 3rd edition

63

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.10.6 Semi-automatic welding

This section presents a brief introduction of the use in cross country pipeline construction of semi-automatic welding processes, which include GMAW, GMAW-P and FCAW.

9.10.6.1 Root pass with semi-automatic welding

GMAW is used for root pass when using no backing. FCAW can be used in the root pass only whenusing copper backing. Since this pass needs low and very controlled energy, GMAW globular andspraymetal transfer mode are not used. Although regular short circuit transfer mode provides lowenergy, it is not used in semiautomatic welding, but is emulated by pulsing the current (GMAW-P).

With GMAW-P and the advance in power supply technology, there are two additional metal transfermodes available: pulsed short circuit and pulsed spray. In both cases, the current is not constant in timeand its variation can be represented by a wave with low and high levels (pulses). This wave signature willhave direct effect on the metal transfer phenomenon and its custom design can give precise controlover the weld deposition, heat transfer and other variables.

Pulsed short-circuit mode is used in pipeline construction for root pass deposition. It brings a faster andthicker root pass compared to SMAW. Pulsed spray transfer mode is associated with high depositionrates and good balance of the heat transfer which has a positive effect on mechanical and toughnessproperties. For that reason, it used in mechanized welding for fill and cap passes.

The joint design used in GMAW-P in root pass is similar to SMAW. The root opening can vary in therange of 1.5-4 mm, and the land can be 0-3 mm. This welding process has shown be very robust toovercome pipe fit-up problems. Even with important misalignment (hi-lo) or irregular gaps, this processcan perform a sound root pass.

Fig. 55: GMAW typical preparation for root pass

9.10.6.2 Fill and cap using semi-automatic welding

The welding processes that are typically used for fill and cap are FCAW-GS and FCAW-SS. Thesesemiautomatic welding processes lead to higher productivity than GMAW. Since FCAW and GMAW arevery similar in terms of equipment and logistics, FCAW is the choice of most contractors (particularlywhen welding heavy wall pipes).

FCAW-GS in particular tends to be the most productive of the semiautomatic welding processes. Whenit is combined with GMAW-P in the root pass, FCAW-GS can duplicate the productivity of manualwelding. However, this welding process is very sensitive to wind and requires the use of tents or shacks.It is very prone to create porosity if the wind protection is inadequate.

Page 108: Vol 2 onshore pipelines the road to success 3rd edition

64

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

The bevel design has an important influence on productivity for pipes thicker than 17mm. Compound orJ bevel can diminish the total volume to fill. Consequently, the total time to complete a joint can be quitelow with respect to that of single V 60°. Productivity can be improved even further when semi-automaticwelding is used. In that case the saving time can be up to 35 minutes when using GMAW-P/FCAW-GS.The saving is based not only on higher deposition rates but also on less dead time. SMAW is associatedwith low efficiency due to the need to stop and change electrode, grinding, etc. All those unproductivetimes are increased even further in the case of single V-60° bevel.

9.10.6.3 Welding technique using semi-automatic welding

GMAW and FCAW-GS are typically welded in up-hill progression, while FCAW-SS is used downhill. Theoscillation technique can vary in terms of pattern, but in any case it is important to limit oscillation.Particularly in the case of FCAW-SS excessive oscillation can increase the chances of having porosity.The maximum width of any weld bead shall not exceed 12 mm (1/2”). Beyond that oscillation, multiplebeads should be used. Torch oscillation also is important in terms of shielding and heat distribution. Themaximum tilt angle shall not exceed 60°.

All the concepts explained in the manual welding section regarding re-starting technique, levelling beadand capping technique are applicable for semiautomatic welding.

9.10.7 Automatic and mechanized welding

9.10.7.1 Introduction

The generic terms automatic and/or mechanized welding are used around the world with differentmeanings. Here, we propose definitions applicable for the purpose of this document to help readersidentify some key differences, enabling them to further develop their knowledge when speaking withspecialists.

Generally the welding head, or “bug”, will not complete a 360° circumference but 180° or less,depending on the total number of welding bugs used. The same scenario is replicated on either side onthe pipe at each welding station.

The basis of mechanized welding is setting a torch of a semi-automatic system on a carriage (bug);which will turn around the pipe along its guiding band. In this case the welding system will produceeffects including, but not limited to, translational motion, oscillation, metal feeding, arc distance setting,etc. During welding, the operator can adjust some of the welding parameters as needed. The typicalapplication is FCAW uphill.

Automatic welding is a term that refers to any welding system in which the operator has almost nocontrol on the weld operation, other than the start and stop. All the welding operational control isperformed by the system. They are basically a more controlled system than the mechanized ones. Theirtypical application is solid wire downhill.

As computing and welding technology have evolved over the past century, so has the level ofautomation. Mechanized and automatic welding for pipeline construction has been available for morethan 40 years. The first systems were tested onshore and naturally found their way into the offshoremarket in the early 1970s. The evolution of this technology has mirrored the computing revolution andtechnology advances in welding power supplies and electrodes.

Requirements in pipeline design and the micro-alloying of pipeline steels have increased the potential formechanized/automatic welding. Consistent heat inputs and superior mechanical performance aredrivers for the high performance welds required in today’s construction environment. Financial drivers

Page 109: Vol 2 onshore pipelines the road to success 3rd edition

65

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

such as increased production rates and the ability of operators to be trained to make high quality weldsin short time periods continue to make automation attractive. Worldwide resurgence in the pipelinemarket to fuel the energy needs of both developed and developing countries have led to a rapid growthof mechanized welding in recent years.

9.10.7.2 The systems and the main components

The main focus of a system is to assist the operator and make them more efficient. Mechanization alsodecreases the physical strain during welding and increases the productivity. Several welding variablesare mechanized and automated to ensure consistency of the welds produced. As technology improvesso do the capabilities of the systems.

Bug and band welding systems are typically engineered with the following components:• Guiding band or travel guide

• A chassis (also known as a carriage, or bug) to mount to the guiding band and holdthe required components

• Motor and wheels for travelling

• Motor(s) for manipulating the weld torch (oscillation and stick out control)

• Computer control board(s)

• Welding power supply with interface module

• Wire feed unit(s) with interface module

• Shielding gas (if required)

• Grounding

9.10.7.3 Control variables

The level of automation depends on the welding system that is selected for the specific application. Thecomponents are designed to work together to control travel speed, the electrode feed rate, torch angle,contact tip to work distance, oscillation rate, oscillation width and centering of the torch in the bevel. Thesensing and computing monitor make adjustments to the electrical characteristics through the weldingpower supply.

The variables described above are interlinked in the systems and they help ensure consistency of thewelds produced. Depending on the type of system used, operators will have some control of thevariables within the specified limits as allowed by the approved welding procedure specification (WPS).

9.10.7.4 Automation level

The decision on how to select whether mechanization or automation is right for each specific pipelineproject, and sections of it; depends on several variables. Typically these variables are driven by eithertechnical requirements or financial reasons. Below is a list of some of the variables to consider wheninvestigating whether the use of mechanized welding is justifiable.

• Length of the pipeline

• Pipe chemistry

• Condition of the terrain the pipeline will cross

• NDT techniques

• Service environment of the pipeline (H2S and CO2 content, operating temperature andpressure)

• Wall thickness of the pipeline

Page 110: Vol 2 onshore pipelines the road to success 3rd edition

66

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

• Skill set of the workforce

• Service condition of the pipeline (fatigue and critical zones)

Refer also to section 9.5.2

9.10.7.5 Welding processes

During the 1970s and 1980s, semi-mechanized gas metal arc welding (GMAW) proliferated with theadvances in power supply technology. The process became well-established and proved more reliable.The development of this reliable and stable weld process brought the mechanized and automaticwelding systems to a new technical level. With the evolution in computer technology it is now possible tocontrol the welding arc digitally in real time. Analogue welding controls are still in use today but the newsystems emphasise (thanks to reliable new digital electronics) high level QA/QC control and weldparameter monitoring. These developments make it possible to build machines that are much closer toachieving full automation.

The welding processes that are used for mechanized and automatic girth butt welding are:• Gas metal arc welding (GMAW) – typically in short arc mode or “dip transfer”

• Modified short arc GMAW – used to run root passes without either back up support orcross penetration

• Pulsed gas metal arc welding (GMAW-P)

• Flux cored arc welding (FCAW)

• Selfshielded flux cored arc welding (FCAW-S)

• Metal cored arc welding (MCAW)

• Gas tungsten arc welding (GTAW)

• Submerged arc welding (SAW) in the case of double jointing only

The most common used welding techniques are GMAW, P-GMAW and FCAW.

9.10.7.6 Orbital motion mechanism

There are a variety of mechanisms that provide the orbital motion of the system: chain, flat band, gearband, etc. Chain mechanism uses a chain around the pipe and the tension is used to fix the bug andmake it move. The advantage of this system is that the chain is part of the system itself and it does notneed any work prior to welding. In contrast, flat and gear bands need to be set in place before thewelding bag arrives at the joint. Usually, in a typical project using mechanized welding for fill and cap,several bands are needed. They are set in place in advance in the joints to be welded. After welding iscompleted, they are removed and move ahead of the welding crew to be set in place in new joints. Flatbands are usually also used for AUT systems. Then, the same band is used to weld and to inspect thejoint.

9.10.7 Mechanized welding

The basis of mechanized welding is setting a torch of a semi-automatic system on a welding bug andthe typical application is FCAW uphill. Typically this process is using a single torch per bug.The root pass is generally performed from the outside with no back support and a gap, just like on atypical stick rod or semi-automatic weld. This root pass can be “mechanized” but is quite often weldedusing a manual stick rod (SMAW) or semi-automatic (manual with a gun) modified short arc GMAWusing either solid or metal core wire or manual GTAW.

Page 111: Vol 2 onshore pipelines the road to success 3rd edition

67

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Quite often as well, a second pass, or even a third pass is performed using one of the above processesto create a strong enough support for the more powerful mechanized welding process to be applied ona sound and solid foundation.

For the remaining filling and capping, which are usually the “mechanized passes” the most used weldingprocesses are FCAW-GS; therefore consumables are the flux cored wires, typically with gas, but self-shielded wires are also used (FCAW-SS).

Typically these types of welding system are simple and robust. The automation level is low. Travellingand oscillation are usually automatic. The rest of welding parameters are manually controlled by theoperator.

9.10.7.7 Automatic welding

The basic idea is to further integrate together the welding and carriage systems to optimize the weldingarc properties, the quality and the productivity.

Single or multiple torches can be set on each single welding bug and single or multiple wires can be fedthrough each single torch.

One of the main reasons to use automatic welding is to achieve high production rates and high qualitywelds. To reach that goal narrow-groove bevel designs are used. The design of the bevel reduces theweld volume which reduces the arc time.

Therefore, with automatic welding, the bevel must be re-machined on site therefore a pipe facingmachine (PFM) will be required.

9.10.7.7.1 The root pass and the hot pass

The achievable production rate for pipeline welding is based on the speed of root pass welding (firststation). Production can only move forward when the root pass and the hot pass are completed andfocus on optimizing the cycle time in station 1 is critical. For root pass welding the following technologiescan be used:

• Mechanized root pass welding (external deposition)

• Copper back-up root pass welding (external deposition)

• Internal root pass welding (internal deposition)

A. Mechanized external root pass welding Recent technology based on hybrid short arc and pulsed waveforms have allowed for more control inthe way metal is transferred from the electrode into the molten weld pool. This technology was initiallyintended for manual welding of the root pass in an open gap scenario and has now been automated toprovide advantages.

The pipe is first lined-up with a standard internal line-up clamp (see Figure 56). The bevel types used forthis method are usually a standard V-bevel or a J-Bevel. When welding a standard V-bevel a root gap of2-4mm is usually to be applied. The opening depends on the selected weld technique. The J-bevel canbe welded with or without a gap. In an open gap scenario the arc must be initiated on the side wall ofthe bevel and brought into the gap area. For closed roots the arc is started in the weld joint at the fayinginterface.

An advantage of using a standard V-bevel is that it is not necessary to re-bevel the pipe ends.A disadvantage is a much lower weld speed compared to other root pass weld methods.

Page 112: Vol 2 onshore pipelines the road to success 3rd edition

68

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

B. Copper back-up root pass weldingThe copper backing shoes are mounted on an internal line-up clamp. The backing shoes are applied tosupport the weld puddle and allow it to quench without adherence to the surface. Several systems usethis method of root pass deposition. The backing ring allows high arc energy in order to achieve higherwelding speeds (up to 150 cm/min). The applied bevel type is normally a J-bevel with a closed root gap.

The advantage of using copper backing clamps is the increase of the weld speed over open rootprocedures. A disadvantage is that in case of excessive misalignment of the pipe-ends copper pick-upcan occur if the welding procedure is not followed.

Line-up clamps with copper backing are available for pipe diameters of 4” and greater.

Fig. 56: Internal lineup clamp with copper backing shoes

C. Internal Root Pass WeldingThe internal welding machine was first debuted in 1969. This machine has three functions:

• Line up

• Clamping and holding the weld joint together

• Depositing the root pass internally

The internal welder is a line-up clamp equipped with multiple welding heads to deposit the root pass.This automated innovation was a major step in increasing the weld speeds for root pass welding. Byusing multiple heads simultaneously, an effective joining speed approaching 2 m/min can be achieved.This industry benchmark explains why newer welding processes have found it so hard to gainacceptance. An advantage of the internal welder is the highest root weld speed in the industry. Adisadvantage is the size limitation as it is only for pipes with a diameter of 24” (609,4 mm) and greater.The weight may limit the maximum slope in which the system can move itself.

Fig. 57: Internal welder with multiple weld heads

9.10.7.7.2 Filling and capping passes with automatic welding

Most commonly the filling and capping passes are completed using either solid or metal core wire goingdownhill.

The welding processes used are either GMAW – pulsed or dip transfer (short arc). The capping can beperformed in 1 single wide pass or in 2 thinner passes deposited during the same run with a doubletorch bug.

Page 113: Vol 2 onshore pipelines the road to success 3rd edition

69

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Short circuit is typically used for the second pass (hot pass). This pass has to provide extra metalthickness to the root pass in order to form a metal backing strong enough to resist the high energy fillpasses. Then this pass is made typically using a fast low energy welding arc. The welding systems forthis application are typically simple and robust. The level of automation is low. Little (or no) oscillation isused and the operator controls the torch position only in order to keep it centred.

For fill and cap spray or globular transfer modes are used. Some welding systems use pulsed arcs,which provide a good balance among productivity, mechanical and impact properties. In order toincrease productivity some welding systems include multiple torches in the bug or multiple arcs in eachtorch (twin arc).

The automation level can be high. Some welding systems offer some features such as arc lengthcontrol, electrical and laser tracking. Welding parameters such as current or wire feed are automaticallycontrolled as a function of the welding position. Tilting sensors inside the bug provide a precisemeasuring of the actual position of the bug.

9.10.7.8 Advantages / disadvantages

Mechanized / automatic welding offers the following advantages as compared to manual / semi-automatic welding:

• The training time of the welders is quite short and in a few days they will be able toproduce high quality welds.

• The welding productivity is higher and fewer welders are required.

• Welding quality is higher. Mechanical and impact properties are generally better

• Mechanical properties of the produced joint can be very high, as flux cored wires canbe chemically tailored to suit the purpose.

• With the use of a narrow groove, the volume of filler material is lower.

The disadvantages are:• Equipment cost is higher.

• Mobilization is more expensive.

• More specialized maintenance personnel is required.

9.10.8 Weld finish

When the welding is finished, the weld needs to be cleaned, and spatter on the outer surface removed,as it may interfere with the NDT process.

9.10.9 NDT

The final stage of welding activities is the non-destructive testing (NDT) to identify whether the weldquality is in accordance with the acceptance criteria. The NDT inspection crew should remain as closeas possible behind the mainline welding crew.

Page 114: Vol 2 onshore pipelines the road to success 3rd edition

70

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.11 New welding technologies

9.11.1 Welding technologies of today

The different factors that are taken into consideration to select a particular welding technique to be usedin a cross-country pipeline construction project are described in section 9.5 “Welding methods andprocesses”.

Meanwhile, the latest trends and requirements, already implemented on offshore projects, are graduallybeing introduced to the landline market:

• High quality welds: the ability to ensure weld integrity in all types of weldingenvironments; improved quality leads to lower repair rates and higher productivity;

• High productivity: the ability to weld quickly, with minimal operational requirements, andthus, costs.

• Versatility: the ability to weld a large range of materials (carbon steels, corrosion-resistant alloys) with different pipeline dimensions, in different positions and on pipessubject to varying levels of criticality (steel catenary risers/fatigue-sensitive lines,offshore offloading lines).

• Reliability: the high complexity of off-shore pipe lay operations requires that all weldingequipment used should be as reliable as possible to prevent extra costs;

• Customized solutions: the ability to deliver operational support and expertise in theaccomplishment of seamless projects.

9.11.2 Technologies of tomorrow

Enhanced weld quality, improved spread efficiency of equipment and productivity, risk-mitigation basedon off-shore project processes are the different factors that have all contributed to successfulaccomplishment of projects at a global level. Hence, most research is centered on solid-state weldingprocesses:

• Off-shore-driven technology developments in pipeline welding are based onincreasingly stringent weld quality requirements for given operational constraints andpipeline design.

• Off-shore innovations or project service models made to suit the more unpredictableon-shore pipeline construction market, adapting highly technical and state-of-the-artwelding equipment, solutions and project management, while overcoming thechallenges created by onshore pipeline construction, such as:

- control of linear welding energy capabilities

- fracture mechanics

- pipe end measurements

- pipe sorting

- pipe counter boring

- pipe high grade

- out of roundness clamps

Page 115: Vol 2 onshore pipelines the road to success 3rd edition

71

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

Tomorrow’s welding process must be compatible and meet the following requirements• strain based design

• high strength material

• increased exposure to sour service conditions

• corrosion

• tight acceptance criteria

• stringent health, safety and environment (HSE) trends

9.11.2.1 Hybrid laser (HLAW)

Hybrid laser GMAW welding is an automated, high performance welding process which results in a verynarrow heat-affected zone (HAZ) with deep penetration and high travel speeds compared to moretraditional processes. This breakthrough approach combines the highly focussed intensity of a laser withthe joint filling capability of the traditional MIG process.

By combining the two processes, hybrid laser welding provides a unique opportunity for thicker weldswith less filler metal or higher travel speeds than typical welding, depending on the material thickness.An added benefit is that weld pool stability is greatly improved.

The hybrid laser presents a potential interest in terms of mechanical performance, and also productivityand quality. Heat input is close to the minimum required to fuse the weld metal. Heat induced distortionof the work piece and metallurgical effects in the heat-affected zone are minimized. Electrodes are notnormally required to conduct current to the work piece, thereby eliminating electrode contamination,indentation, or damage from high currents used in other welding processes. However, start and stopproblems are still an issue and must be resolved before this technology can be implemented in the fieldas well as finding ways of reducing the high expense of the equipment involved, that will hinder itsdevelopment. Furthermore, joints must be accurately positioned laterally under the laser beam and at acontrolled position with respect to the laser beam focal spot.

Once the technical hurdles are overcome, HLAW may find its first use on offshore lay barges or spoolbases. Eventually, it may be an option for an onshore pipeline construction. However, at this point, itremains in the R&D realm.

9.11.2.2 Friction welding

Friction welding is a solid -state process that produces a weld when two or more workpieces, rotating ormoving relative to one another, are brought into contact under pressure to produce heat and plasticallydisplace material from the weld interface. The two main variations of friction welding are direct drivefriction welding (FRW-DD) and inertia friction welding (FRW-I).

Although friction welding is a solid-state welding process, under certain circumstances a molten filmmay form at the weld interface during the heating stage. Filler metal, flux, and shielding gas are notrequired with this process.

Advantages include no filler metal being required for all similar and most dissimilar material joints;solidification defects and porosity normally are not a concern; and operators are not required to havemanual welding skills. Limitations include that the alignment of the workpieces may be critical todeveloping uniform frictional heat

Page 116: Vol 2 onshore pipelines the road to success 3rd edition

72

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 9

9.11.2.3 Friction Stir Welding

Friction stir welding (FSW) is a variant of friction welding that produces a weld between two (or more)work pieces by the heating and plastic material displacement caused by a rapidly rotating tool thattraverses the weld joint. Like conventional friction welding processes, the FSW process is solid-state innature. However, FSW differs from friction welding in one important aspect: in friction welding, therelative motion is between the work pieces that are held in compression, whereas the relative motion inFSW is between the work pieces and a rotating tool.

In friction stir welding, a cylindrical-shouldered tool, with a profiled threaded/unthreaded probe (nib orpin) is rotated at a constant speed and fed at a constant traverse rate into the joint line between twopieces of sheet or plate material, which are butted together. The parts have to be clamped rigidly onto abacking bar in a manner that prevents the abutting joint faces from being forced apart. The length of thenib is slightly less than the weld depth required and the tool shoulder should be in intimate contact withthe work surface. The nib is then moved against the work, or vice versa.

Frictional heat is generated between the wear-resistant welding tool shoulder and nib, and the materialof the work pieces. This heat, along with the heat generated by the mechanical mixing process and theadiabatic heat within the material, cause the stirred materials to soften without reaching the melting point(hence being known as a solid-state process), allowing the traversing of the tool along the weld line in aplasticized tubular shaft of metal. As the pin is moved in the direction of welding, the leading face of thepin, assisted by a special pin profile, forces plasticized material to the back of the pin while applying asubstantial forging force to consolidate the weld metal. The welding of the material is facilitated bysevere plastic deformation in the solid state, involving dynamic recrystallization of the base material.

Actually this process is in its preliminary stages on metallic materials. The main disadvantage is the tool’slimited lifetime, and the main concern is the joint’s performance with respect to fracture mechanics andcorrosion. Another limitation is that the joint is not self-supporting and must be properly restrained.Advantages include that FSW normally is done in a single pass with full penetration and with little or nojoint preparation. Further minimal distortion occurs during welding, provided proper clamping is used.

Page 117: Vol 2 onshore pipelines the road to success 3rd edition

1

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

10. Non-Destructive Tests

This chapter will describe the issues involved with non-destructive testing (NDT) of pipelines in thevarious stages of the project. The different stakeholders of the pipeline and their main concerns forcompleting the project are reviewed, followed by a discussion of the role of codes and standards in thedesign and building of pipelines. Finally, the chapter will cover the role of NDT in each stage:

• The role of NDT in the FEL/FEED stages.

• Vendor inspection and NDT at the material suppliers

• Girth weld inspection during the construction stage

• NDT during the use of the pipeline; considerations during the construction stage for futuremaintenance

10.1 The background of inspection – public safety

In its most general definition inspection and NDT are a formal examination of the pipeline. Performingthis examination is useful for a number of reasons. It may be useful to check on the work of contractors,or to check if a pipeline is still fit for purpose after a number of years. When viewed in the framework ofnational and international regulations, it is clear however that behind all this is the need for public safety.Although specific regulations are different in every country, the focus is often on the containment ofhazardous materials and the safety of pressure systems. This is motivated by the need for public safetyand is often the result of legislation that was implemented in response to tragic accidents. One exampleis the “Pipeline Inspection, Protection, Enforcement, and Safety Act of 2006” in the USA, which waswritten in response to two incidents; a 1999 gasoline pipeline explosion in Bellingham, Washington,causing three fatalities, and $45 million in damage and also the 2000 natural gas pipeline explosion nearCarlsbad, New Mexico, which killed 12 campers, including four children. Another example is the Sevesodirective in Europe (Council Directive 96/82/EC) the first version of which was developed as a responseto the release of a cloud of herbicides and pesticides from a chemical plant near the town of Seveso inItaly. As a result European legislation was passed in order to control major-accident hazards.

In general terms, the structure of these regulations is that they mandate that a number of managementsystems need to be in place. An example of this is that in many countries it is now mandatory to have apipeline integrity management system. These management systems are increasingly risk based; makingan inventory of the threats to the pipeline, and deriving measures for prevention and/or reduction of therisk, and mitigation of the consequences. For the technical details both regulations and integritymanagement systems refer to technical codes and standards. These standards provide guidance for theNDT and inspection to be performed.

10.1.1 Codes and standards for inspection and NDT

In the second half of the 18th century, industrialization had proceeded to the point that agreement wasneeded in industry to enable engineers to work together. Practices for making engineering drawings hadto be agreed on, and some parts had to be specified to be interchangeable. The resulting standardsenable that someone could buy a bolt on one side of the country, a nut on the other, and still have themfit together. Standards can be written by government departments, national and internationalstandardization organizations like DIN and ISO and engineering societies like ASME and IEC. Somecompanies also independently write standards. From the oil and gas industry, the design andengineering practice (DEP) specifications of Shell are an influential example.

Page 118: Vol 2 onshore pipelines the road to success 3rd edition

2

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

An important driver for standards was that many countries saw a sharp increase in the number of steamboiler explosions in the 1880s. Governments of industrialized countries demanded that industry improveits safety record. As a response standards for the manufacturing and testing of boilers and pressurevessels were developed. In the USA this task fell to the American Society of Mechanical Engineers(ASME) which developed the Boiler and Pressure Vessel Code, today still the largest engineeringstandard. In Germany, the industry founded industry associations for inspection of pressure vessel whichbecame the TüV association network. In the Netherlands, this task was given to a governmentdepartment (Dienst voor het Stoomwezen) which by now has been privatized.

The difference between a code and a standard is, that adherence to a standard is voluntary, while acode has been adopted by a government body and has the force of law. In the European contexthowever, another word used for standards is “norm”, which is the name for standards in many Europeanlanguages, and can refer to both legally-binding and voluntary standards.Currently another driver for standards development is that many insurance companies base theirpremiums on adherence to codes and standards.

10.1.2 The USA codes and standards system

United States standards are used in many countries beside the USA, and are typically the mostgenerally accepted standards.

In the USA most standards are written by engineering societies. For non-destructive testing importantengineering societies are the American Society of Mechanical Engineers (ASME) and AmericanPetroleum Institute (API) which write the standards for many of the products tested; the AmericanSociety for Testing and Materials (ASTM) which specifies many of the tests performed; and the AmericanSociety for Non-destructive Testing (ASNT) which also specifies tests, and regulates the personnelcertification in the USA.

All of these standards organizations are affiliated with the American National Standards Institute (ANSI)which specifies the procedures for development of standards. American standards are developed in aconsensus process. The committee meetings of a standards organization, which is comprised ofengineers with knowledge and expertise in the particular field, have to be open to the public and musthave representatives from all interested parties. Any comment on technical documentation must beconsidered in the approval process, and any individual may appeal to and demand actions from thecommittee.

In the context of pipelines, this means that every stakeholder, is permitted to participate in the standardswriting process, and can make sure that the standard is practical as well as meeting its purpose ofspecifying a practice that, if followed, results in a pipeline that is fit for purpose and safe for both thepeople working around it, and the general public

10.1.3 National standards systems

Almost every sovereign country has its own standards system, which is now in the process of beingharmonized. The organization of these systems is different in every country and for every industry. Togive some examples, the standards for pressure vessels were written by government institutes inGermany and England, while they were written by industry committees in the Netherlands. In the nuclearindustry, almost all standards are government controlled.

Page 119: Vol 2 onshore pipelines the road to success 3rd edition

3

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

The enforcement of standards is again something that is organized different in every country. Forpressure vessels, in Germany this is performed by industry associations (TüV), while in the Netherlandsand England it was performed by government agencies (Stoomwezen and HSE respectively). UnderEuropean harmonization, government inspection organizations have now been disbanded or privatized.

10.1.4 Harmonized standards

In 2001 the Vienna agreement came into effect, in which technical cooperation between ISO and CEN(the European Committee for Standardization) is agreed. This agreement offers a route for Europeanstandards to become worldwide standards, although this is not automatic. Combined with theharmonization of standards in the common European market, this means that in the future many morestandards will have a worldwide scope. For non-destructive testing, the ISO 9712 is an extension of EN473, which specifies the personnel qualification for NDT. Another example is ISO 13847 “Petroleum andnatural gas industries -- Pipeline transportation systems -- Welding of pipelines”, in which the NDT atpipeline construction is also specified.

10.2 Stakeholders in the pipeline project

From the point of view of inspection and NDT, the pipeline project has a number of stakeholders thathave different objectives. For the future pipeline owner, NDT is one of the ways to make sure therequired quality is achieved. For the construction contractor it is a method to obtain feedback on theprogress of various steps in the construction process. This section will review these stakeholders, thequality issues they face, and how inspection and NDT can help in addressing these issues.

10.2.1 The future pipeline owner

For the future pipeline owner, the main reason to perform NDT and inspection is to demonstrate to hisregulators that all the requirements that were specified for building the pipeline are met. At every stage ofthe production process checks are made to ensure the quality of the final pipeline, starting at the basematerial coming from the supplier, to the pipe forming process, and finally the welding in the field.

The inspection and NDT results are also an important item in the information that needs to be compiledto obtain a complete overview of the as-build condition of the pipeline. This information will be stored forfuture reference, and used as the starting point for the pipeline integrity management process

It is in the interest of the future pipeline owner to record and document each flaw in the pipeline.

10.2.2 The pipeline construction company

For the company performing the welding on the pipeline, inspection and NDT is used to demonstrateperformance and capabilities. NDT is used at various stages of the pipeline project. During the weldingprocedure qualification and the welder qualification, tests to verify the material properties are performed.These properties may have changed due to welding and need to be determined both in the base andweld material. The tests are typically tensile strength tests and nick break tests. NDT is performed toverify that no unacceptable weld flaws result from the welding process, and to verify the competence ofthe welders. These tests will typically be subcontracted to an NDT service provider.

Page 120: Vol 2 onshore pipelines the road to success 3rd edition

4

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

During the pipeline installation welds are tested as part of the quality control process. NDT can providevaluable feedback to the welders to make sure all of the parameters of the welding process are stillwithin acceptable limits.

For the pipeline contractor it is important to finish the project within time and budget. For this reason,unnecessary rejection of welds can put a strain on the project.

Consequently, an important step is to determine how production welds will be judged. This can be doneaccording to workmanship criteria, which are contained in pipeline codes, but it is often beneficial toperform a fitness for purpose analysis (often called an engineering critical assessment), as this mayresult in a more generous allowance for weld flaws, and consequentially fewer rejected welds.Nowadays, most pipeline welding standards allow for acceptance criteria based on engineering criticalassessments.

10.2.3 The regulator

In many pipeline projects there will be an independent third party which acts as the representative of thegovernment or certification agency, whichever is appropriate for the local regulatory situation.

This third party will primarily be checking if every part of the pipeline building process is performed incompliance with the specification and standards that were agreed upon and certify the pipelineaccordingly.

For the third party inspector, NDT and inspection are the eyes and ears that bring the information tomake this judgment.

10.2.4 Conflicts of interest

No contract is watertight, and every specification is to some extend open for interpretation. Theseinterpretations may lead to conflicts around the pipeline. As explained above, the future pipeline ownerwill want every part of the pipeline to be of the highest quality possible, and the pipeline contractorwants as little disruption of the pipeline building process as possible. This may lead to a conflict ofinterests when flaws are found. As inspection and NDT is often the messenger bringing the news ofwhether the pipeline is accepted or not, the NDT technician may likely find himself to be the centre ofsuch conflicts. Because of this is it important that NDT and inspection are performed transparently,inspection results are clear and that acceptance criteria are simple and recognized by all parties.Modern technology may be a big help in this.

On top of this it is important to realize that NDT is not perfect. In industry trials it was determined thateven the most advance NDT equipment finds only about 90% of the flaws present in pipeline welds, andtraditional NDT methods such as film radiography (especially with isotopes) and manual ultrasonictesting may find as few as 50% of the defects present in a weld. NDT and inspection can be of greatvalue in establishing a high quality pipeline, but at the current state of the art is no guarantee that noflaws are present.

Page 121: Vol 2 onshore pipelines the road to success 3rd edition

5

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

10.3 The NDT toolbox

In this section the four most important NDT methodologies for pipelines are discussed. The basicprinciple will be explained, and the applications, advantages and disadvantages of each technique willbe described. Where appropriate some future capabilities are also presented.

10.3.1 Radiography

Industrial radiography is a method of testing for hidden flaws and defects in various types of materialswith X-ray or gamma radiation. Industrial radiography is similar to medical X-ray technology in that a filmrecords an image of an item placed between it and a radiation source.

The basic principle of the process is fairly simple and common to all radiography applications. Theradiation from a controlled source is allowed to penetrate the test item and expose a speciallyformulated film. As the radiation passes through the item, a portion of it is absorbed by the molecularstructure of the material. The amount of radiation absorbed depends on the density and composition ofthe material. Simply put, the amount of radiation that passes through the item to expose the filmdepends on the density of the material. As cracks, fissures, and pockets in the material obviously havedifferent densities, they will be characterized by different exposure values as more or less radiationpenetrates at those points during exposure.

The radiation used with radiography can be generated from various sources. The most common ways togenerate the radiation are the use of an X-ray tube (see picture below), or the use of a radioactiveisotope such as Iridium (Ir-192) or Cobalt (Co-60) which generates gamma radiation. Other sources,such as a particle accelerator are also possible, but will rarely be encountered at a pipeline.

Before commencing a radiographic examination, it is always advisable to examine the component withone's own eyes, to eliminate any possible external defects. If the surface of a weld is too irregular, it maymake detecting internal defects difficult. Defects such as planar cracks are difficult to detect usingradiography, which is why some form of surface inspection (e.g. magnetic particle or dye penetrantinspection) is often used to enhance the contrast in the detection of such defects.

The most common way to capture the image is silver halide film. The film is processed in a processingmachine. The image will be a black and white photograph which needs to be viewed on a light box.Some image quality indicators will be attached to the film to have a reference for determining if thequality of the image is sufficient.

Recently several digital options for capturing the image have become available. Some of these replacethe film material with an image plate containing storage phosphor which can be read in a laser scanner,while other options use a direct digital detector.

Page 122: Vol 2 onshore pipelines the road to success 3rd edition

6

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

Top row from left to right; an x-ray tube, radiography film material, a film development machine and aradiography light box. Bottom; a practical example of a radiography film from manual welding. Thefuzziness of the picture is typical of film results in practical situations.

One of the big disadvantages of radiography is the fact that (fairly heavy) ionizing radiation is needed.Personnel performing radiography needs to be specifically trained for working with radiation and need toget a medical check-up regularly. Also, work areas need to be shielded or evacuated before radiographyis performed.

Industrial radiography is one of the last applications where silver-halide photographic materials are stillused. The other main application that used this material was medical radiography. For this applicationhowever, the transition to digital radiography is nearly complete. Suppliers of film material haveconfirmed that the production of film material will at some point be discontinued. At the same time theraw material for radiography film includes silver, which recently has risen in price considerably (doublingfrom 2010-2011)

10.3.2 Ultrasonic testing

Next to radiography, ultrasonic testing is one of the most well-known and applied NDT methodologies.Manual or automatic ultrasonic testing (MUT and AUT respectively) is used for different applications suchas wall thickness measurements and defect detection in steel components or welds. Ultrasonic testingmakes use of high frequency (ultrasonic) sound waves. Typically, the frequency range for mostapplications of these waves is 0.5 to 20 MHz. Under certain conditions, the ultrasonic waves canpropagate freely through the material. Usually, the ultrasonic waves are generated by piezo-electriccrystals or composites. When such a crystal is exposed to a mechanical vibration, an electric potential isgenerated. Vice versa, a mechanical vibration is generated when the crystals is subjected to an electricpotential. Crystals with these characteristics are called transducers. In practice, the crystal is exposed toa short potential pulse causing the crystal to vibrate with a frequency bandwidth and directivity patterncharacteristic for the crystal design.

Page 123: Vol 2 onshore pipelines the road to success 3rd edition

7

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

Typical cross country AUT inspection

When the ultrasonic waves travel through a material, they will reflect or diffract (scatter in all directions) atboundaries or inhomogeneities in the material. Like an echo, the waves reflected from boundaries orinhomogeneities can travel back to the transducer. The transducer will start to vibrate when the wavesare received and an electric signature can be recorded in a time-amplitude graph. The time of arrivalrelates to the distance between the point of reflection and the transducer. The amplitude of the signaturerelates the size of the inhomogeneity. The electric signature is called an A-scan. A-scans are thefundamental building blocks for data display and interpretation. Defects are mostly inhomogeneities inmaterial and can be detected using this principle, also referred to as the well-known pulse-echomethod.

The direction in which the waves travel after reflection depends on the geometry of the inhomogeneity orboundary. The directivity pattern of the ultrasonic waves can be compared with a small beam like a laserpointer (typically being 2-3 mm wide, depending on the transducer design). When the reflected wavetravels towards a different direction than the transducer, no signal will be received if the beam misses thetransducer. Therefore, it is vital to understand the type of defect so that the transducers can bedesigned based on the expected defect characteristics, such as location, size, orientation and shape(planar or volumetric). For newly constructed welds, an overview of the different types of defects ispresented in Figure 1.

Figure 1: An overview of different defects that may occur in newly constructed welds

Page 124: Vol 2 onshore pipelines the road to success 3rd edition

8

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

When ultrasonic responses are measured the results have to be evaluated. Responses caused by theirregular geometry of boundaries can usually be identified. Before the inspection starts, the geometry ofthe weld and the materials the weld and the pipe consist of, are known. Locations that cause responsesare, for example, the weld reinforcements (cap and root, see Figure 1), clad layers or buffer zones. Sincethe positions of those locations are known, the concomitant signals can be identified by their traveltimes. Sometimes the travel time from a defect to the receiver is almost the same as the travel time froma boundary to the receiver. In this case the defect’s responses are masked. By using a data presentationof colour-coded stacked A-scans, a pattern appears as a result of the geometry. This data displaymethod is called mapping, because the geometry responses are mapped as a pattern that can berecognized. Defects can be identified in the mapping display because they interrupt the pattern.

When a response is received from a defect, its size may be evaluated from the amplitude height of theresponse. Defect sizing based on amplitude height of the ultrasonic signal usually is done with the helpof a reference reflector with known characteristics and dimensions. Commonly used reflectors are boreholes, flat bottomed holes or notches. Relationships have been established to calculate a reflector’sdiameter from the measured amplitude, given the probe characteristics, the distance of the reflector andthe calibration amplitude. Diagrams are made from relationships, known as AVG curves (amplitudeverstarkung grösse), DAC curves (distance amplitude correction) or sizing curves. In practice, theamplitude caused by a defect will be compared to the amplitude of a reference defect. Then thedimensions of the reference defect with the corresponding amplitude obtained from the curve are usedas the defect size.

Amplitude based sizing has got some disadvantages. Firstly, by using the dimensions of acorresponding reference reflector, the assumption is made that the shape of the defect is identical to theshape of the reference defect. Furthermore, the amplitude of a reflected signal is highly dependent onthe orientation of the defect. The consequence can be that a large defect under a certain orientation isaccepted because the amount of received energy is much lower than the total reflected energy.

There are alternative methods for sizing that are not based on the amplitude height but rather are basedon the travel times from waves that are diffracted at defect tips. The most common method is the timeof flight diffraction method (ToFD). The transmitting and receiving transducers are placed in a so calledpitch-catch configuration. The travel time from source to defect tip to receiver contains the locationinformation of the defect. The ToFD technique is less dependent on defect orientation. When diffractionscaused by the upper tip and lower tip are measured, reasonably accurate sizing is possible, dependingon the frequency bandwidth of the signal. A disadvantage of the technique is the ‘dead zone’ caused bythe direct wave traveling just below the surface, also called the lateral wave. Cracks connected to thesurface are obscured by the lateral wave. The ToFD technique is widely accepted and special standardsare available. In most practical situations a combination of pulse-echo techniques and ToFD techniquesis used to increase the probability of detection of defects and to improve sizing by combining the results.Good results have been obtained with both the pulse-echo technique and ToFD techniques in controlledlaboratory and field circumstances. Still, those results involve interpretation by experienced operators.

Improvement of technologies can offer potential solutions for the limitations of defect detection, sizingand data interpretation. One such technology is based on ultrasonic phased arrays. Conventionaltransducers have fixed directivity properties for the ultrasonic beam. With a phased array transducer, thedirectivity properties such as beam angle and beam spread can be controlled with a computer. With thisflexibility, advanced ultrasonic techniques are possible. Such advanced ultrasonic techniques have beenstudied and applied to make an image of a defect illustrating the defects characteristics with so calledsectorial scans. Phased array sectorial scans are used successfully in medical imaging. With thedevelopment and miniaturization of ultrasonic array equipment, sectorial scans have become popular forindustrial applications. Although the interpretation possibilities of data have improved with sectorialscans, the same drawbacks regarding defect shape and orientation remain.

Page 125: Vol 2 onshore pipelines the road to success 3rd edition

9

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

One of the disadvantages of automated ultrasonic testing compared to radiography is, that a validationof the performance of the ultrasonic set-up on the specific welding process used in the pipeline projectis needed, and specific reference pieces (also called calibration blocks) made from the pipeline materialneed to be made. This is an additional cost, which is only offset by the higher productivity of ultrasonictesting on longer projects. An advantage of ultrasonic testing is, that it is more generally sensitive to allflaw types (i.e. planar flaws that are not detected readily with radiography) and that therefore engineeringcritical assessment methodologies for determination of acceptance criteria are possible (see above)

10.3.3 Magnetic flux leakage

Magnetic flux leakage (MFL) is a magnetic method of non-destructive testing that is used to detectcorrosion and pitting in steel structures, most commonly pipelines and storage tanks. The basic principleis that a powerful magnet is used to magnetize the steel. At areas where there is corrosion or missingmetal, the magnetic field "leaks" from the steel. In an MFL tool, a magnetic detector is placed betweenthe poles of the magnet to detect the leakage field. The leakage field is evaluated to determine damagedareas and to estimate the depth of metal loss

Figure 2a: Field lines of the magnetic field. Left: just the magnet, Middle: magnet with an undamagedplate, Right: magnet with a damaged plate

Figure 2b: Typical MFL in-line inspection tools.

Typically, an MFL tool (a “smart pig”) consists of two or more bodies. One body is the magnetizer withthe magnets and sensors and the other bodies contain the electronics and batteries. The magnetizerbody houses the sensors that are located between powerful magnets. The magnets are mountedbetween the brushes and tool body to create a magnetic circuit along with the pipe wall. As the tooltravels along the pipe, the sensors detect interruptions in the magnetic circuit. Interruptions are typicallycaused by metal loss, which in most cases is due to corrosion. Mechanical damage such as shovelgouges can also be detected. The metal loss in a magnetic circuit is analogous to a rock in a stream.Magnetism needs metal to flow and in the absence of it, the flow of magnetism will go around, over orunder to maintain its relative path from one magnet to another, similar to the flow of water around a rockin a stream. The sensors detect the changes in the magnetic field in the three directions (axial, radial, orcircumferential) to characterize the anomaly. An MFL tool can take sensor readings based on either thedistance the tool travels or on increments of time. The choice depends on many factors such as the

Page 126: Vol 2 onshore pipelines the road to success 3rd edition

10

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

length of the run, the speed that the tool intends to travel, and the number of stops or outages that thetool may experience.

The second body is called an electronics box. This section can be split into a number of bodiesdepending on the size of the tool. This box, as the name suggests, contains the electronics or "brains" ofthe smart pig. The electronics box also contains the batteries and in some cases an inertial MeasurementUnit (IMU) to tie location information to GPS coordinates. On the very rear of the tool are odometerwheels that travel along the inside of the pipeline to measure the distance and speed of the tool

As an MFL tool navigates the pipeline a magnetic circuit is created between the pipe wall and the tool.Brushes typically act as a transmitter of magnetic flux from the tool into the pipe wall, and as the magnetsare oriented in opposing directions, a flow of flux is created in an elliptical pattern. High field MFL toolssaturate the pipe wall with magnetic flux until the pipe wall can no longer hold any more flux. Theremaining flux leaks out of the pipe wall and strategically placed tri-axial Hall effect sensor heads canaccurately measure the three dimensional vector of the leakage field.

Given the fact that magnetic flux leakage is a vector quantity and that a Hall sensor can only measure inone direction, three sensors must be oriented within a sensor head to accurately measure the axial, radialand circumferential components of an MFL signal. The axial component of the vector signal is measuredby a sensor mounted orthogonal to the axis of the pipe, and the radial sensor is mounted to measure thestrength of the flux that leaks out of the pipe. The circumferential component of the vector signal can bemeasured by mounting a sensor perpendicular to this field. Earlier MFL tools recorded only the axialcomponent but high-resolution tools typically measure all three components. To determine if metal loss isoccurring on the internal or external surface of a pipe, a separate eddy current sensor is used to indicatethe wall surface location of the anomaly. The unit of measurement when sensing an MFL signal is theGauss or the Tesla. Generally speaking the larger the change in the detected magnetic field, the larger theanomaly

Because the MFL method responds to both far side (FS, external surface) and near side (NS, internalsurface) corrosion it is necessary to introduce a strong magnetic field into the component wall. The closerthis field becomes to saturation for the component, the more sensitive and repeatable the methodbecomes. For typical steels this value is large, generally between 1.6 and 2 Tesla. In this range anyresidual magnetism from previous scans or operations will be eliminated during subsequent scans so thatthe resulting flux leakage signals remain relatively constant and repeatable.

Working below the 1.6 Tesla level will still detect pitting on the first scan, but residual magnetism tends tocause a progressive deterioration of signal amplitude during subsequent re-scanning unless alternatescans are made from opposite directions. For a given magnet system the flux density achieved in thecomponent will depend on the thickness and permeability of the material. The factor controlling fluxdensity becomes one of plate thickness. There will be an upper thickness limit for each given magnetsystem above which the flux density will be too low to give adequate sensitivity to pitting.

Centred between the poles of the magnet bridge and stretching the full scanning width of the system isan array of Hall effect sensors. These are spaced between centres to give optimum resolution andcoverage. The sensing range of each sensor is sufficient to allow overlap with its neighbour. Hall effectsensors give a voltage signal proportional to the flux density of the field passing through the sensingelement. If the sensing elements were to be arranged perpendicular to the surface, then it would be thetangential (horizontal) vector component that would be measured. There are advantages anddisadvantages with these alternatives. The sensors are arranged to be close to but above the scanningsurface to avoid wear and other mechanical damage during scanning.

Page 127: Vol 2 onshore pipelines the road to success 3rd edition

11

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

Although primarily used to detect corrosion, MFL tools can also be used to detect features that they werenot originally designed to identify. When an MFL tool encounters a geometric deformity such as a dent,wrinkle or buckle, a very distinct signal is created due to the plastic deformation of the pipe wall

There are cases where large non-axial oriented cracks have been found in a pipeline that was inspectedby a magnetic flux leakage tool. To an experienced MFL data analyst, a dent is easily recognizable bytrademark "horseshoe" signal in the radial component of the vector field. What is not easily identifiable toan MFL tool is the signature that a crack leaves. An MFL tool is known as an "intelligent" or "smart"inspection pig because it contains electronics and collects data real-time while travelling through thepipeline. Sophisticated electronics on board allow this tool to accurately detect features as small as 1 cmby 1 cm. MFL technology has evolved to a state that now makes it an integral part of any cost effective pipelineintegrity program. Although high-resolution MFL tools are designed to successfully detect, locate andcharacterize corrosion, a pipeline operator should not dismiss the ability of an MFL tool to identify andcharacterize dents, wrinkles, corrosion growth, mechanical damage and even some cracks

10.3.4 Magnetic Particle Inspection

This method is suitable for the detection of surface and near surface discontinuities in magnetic material,mainly ferritic steel and iron.

The principle is to generate magnetic flux in the object to be examined, with the flux lines running alongthe surface at right angles to the suspected defect. Where the flux lines approach a discontinuity theywill stray out into the air at the mouth of the crack. The crack edge becomes magnetic attractive polesNorth and South. These have the power to attract finely divided particles of magnetic material such asiron filings. Usually these particles are of an oxide of iron in the size range 20 to 30 microns, and aresuspended in a liquid which provides mobility for the particles on the surface of the test piece, assistingtheir migration to the crack edges. However, in some instances they can be applied in a dry powderform.

The particles can be red or black oxide, or they can be coated with a substance which fluorescesbrilliantly under ultra-violet illumination (black light). The object is to present as great a contrast aspossible between the crack indication and the material background.

The technique not only detects those defects which are not normally visible to the unaided eye, but alsorenders easily visible those defects which would otherwise require close scrutiny of the surface.

There are many methods of generating magnetic flux in the test piece, the simplest one being theapplication of a permanent magnet to the surface, but this method cannot be controlled accuratelybecause of indifferent surface contact and deterioration in magnetic strength.

Modern equipment generates the magnetic field electrically either directly or indirectly.

In the direct method a high amperage current is passed through the subject and magnetic flux isgenerated at right angles to the current flow. Therefore the current flow should be in the same line as thesuspected defect

Page 128: Vol 2 onshore pipelines the road to success 3rd edition

12

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

If it is not possible to carry out this method because of the orientation of the defect, then the indirectmethod must be used. This can be one of two forms:

• Passing a high current through a coil which encircles the subject.

• Making the test piece form part of a yoke which is wound with a current carrying coil. The effectis to pass magnetic flux along the part to reveal transverse and circumferential defects.

If a bar with a length much greater than its diameter is considered, then longitudinal defects would bedetected by current flow and transverse and circumferential defects by the indirect method of anencircling coil or magnetic flux flow.

Subjects in which cracks radiating from a hole are suspected can be tested by means of the threadingbar technique, whereby a current carrying conductor is passed through the hole and the field induced iscut by any defects. Detection of longitudinal defects in hollow shafts is a typical application of thethreader bar technique.

The electricity used to generate the magnetic flux in any of these methods can be alternating current,half wave rectified direct current or full wave rectified direct current. A.C. generated magnetic flux,because of the skin effect, preferentially follows the contours of the surface and does not penetratedeeply into the material.

Normally, to ensure that a test piece has no cracks, it is necessary to magnetise it in at least twodirections and after each magnetising and ink application process visually examine the piece for crackindications

Magnetic crack detection equipment typically takes two forms. Firstly, for test pieces which are part of alarge structure, or pipes, heavy castings, etc. which cannot be moved easily, the equipment takes theform of just a power pack to generate a high current. This current is applied to the subject either bycontact prods on flexible cables or by an encircling coil of cable. These power packs can have variableamperages up to a maximum of 2000 Amps for portable units, and up to 10,000 Amps for mobileequipment. The indicating material is applied by means of a spray and generally the surplus runs towaste.

For factory applications on smaller more manageable test pieces the bench type of equipment isnormally preferred. This consists of a power pack, an indicating ink system which recirculates the fluid,and facilities to grip the work piece and apply the current flow or magnetic flux flow in a moremethodical, controlled manner. The work pieces are brought to the equipment and can be individuallytested in one operation. This type of universal equipment is ideally suited to either investigative work orroutine quality control testing.

These bench type equipments often incorporate a canopy to prevent direct light falling on the subject sothat ultra-violet fluorescent material can be used to the best effect. The indicating particles may besuspended in very thin oil (kerosene) or water. In some circumstances the indicating medium can beapplied dry

These equipments are suited to production work and in certain circumstances can be automated to theextent of loading, magnetizing, inking and unloading. The work pieces still have to be viewed by eye fordefect indications.

Specialized equipments are also frequently manufactured to test a particular size and type of test piece. Advantages of magnetic particle crack detection:

• Simplicity of operation and application.

• Quantitative.

• Can be automated, apart from viewing.

Page 129: Vol 2 onshore pipelines the road to success 3rd edition

13

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

Disadvantages of are:• Restricted to ferromagnetic materials.

• Restricted to surface or near-surface flaws.

• Not fail safe in that lack of indication could mean no defects or that the process was not carriedout properly.

10.3.5 Dye Penetrant Inspection

Dye penetrant inspection or liquid penetrant inspection (LPI) is used on non-porous metal and non-metalcomponents to find material discontinuities that are open to the surface and may not be evident tonormal visual inspection. The part must be clean before inspection. The basic purpose of dye penetrantinspection is to increase the visible contrast between a discontinuity and its background. This isaccomplished by applying a liquid of high penetrating power that enters the surface opening of adiscontinuity. Excess penetrant is removed and a developer material is then applied that draws the liquidfrom the suspected defect to reveal the discontinuity. The visual evidence of the suspected defect canthen be seen either by a colour contrast in normal visible white light or by fluorescence under blackultraviolet light.

The penetrant method does not depend upon ferromagnetism like magnetic particle inspection, and thearrangement of the discontinuities is not a factor. The penetrant method is effective for detecting surfacedefects in non-magnetic metals and in a variety of non-metallic materials. The method is also used toinspect items made from ferromagnetic steels and its sensitivity is generally greater than that ofmagnetic particle inspection. The method is superior to unaided visual inspection but not as sensitive asother advanced forms of tests for detection of in-service surface cracks.

The major limitation of dye penetrant inspection is that it can detect only those discontinuities that areopen to the surface; some other method must be used for detecting subsurface defects. Furthermoresurface roughness or porosity can limit the use of liquid penetrants. Such surfaces can produceexcessive background indications and interfere with the inspection. The method can be used on mostpipeline parts and assemblies accessible to its application

10.4 NDT during the FEL stage

10.4.1 Stress and strain based designs

This section covers how different terrain situations will lead to different type of pipeline designs withdifferent NDT acceptance criteria. Examples are flat country and hill country. It is generally recognizedthat pipelines are the safest and most economical mode to transport large quantities of liquid oil andgas. Most existing pipelines have been designed according to codes, which are based on limiting thestress in the construction and service phase of the lines. These stress-based design codes are widelyused and considered as safe and conservative. An alternative for the conservative stress-based designmethod is the less widely used strain-based design method. The strain-based design method takesadvantage of well-known steel properties.

10.4.1.1 Stress-based design

Steel pipelines design codes were originally developed in the USA. The first codes were ASME/ANSI

Page 130: Vol 2 onshore pipelines the road to success 3rd edition

14

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

B31.4 for Liquid Petroleum Transportation and B31.8 for Gas Transmission and Distribution PipelineSystems. As oil and gas was discovered around the world, countries and companies developed theirown standard, but used ASME as a good practical basis.

The pipeline codes used (maximum) design factors. Design factor is hoop stress/material yield strength.For oil pipelines no account was taken for population density in the location of the pipeline; a typicaldesign factor was 0.72. For gas lines account was taken of population density. This resulted in lowereddesign factors in populated areas down to 0.3 resulting in thicker pipe.

The advantages of stress-based design are:

• Simple and established;

• Accepted by regulatory authorities;

• Historical failure data shows safe pipelines.

The disadvantages of stress-based design are:

• Overly prescriptive design rules, leaving less freedom for design engineers;

• Prescribed unknown safety factors (e.g. conservative input SMYS)

• Many parts of codes are based on historical decisions and data (not recognizing new and safermaterials (e.g. higher steel grade, toughness, coatings)

• Cannot easily accommodate new technology (e.g. using distributions as inputs and not aminimum value like minimum wall thickness)

• Specific parts of codes differ from country to country (resulting in wall thickness changing atborder crossings)

10.4.1.2 Strain-based design

Strain-based design is a design method that places a limit on the strains at the design condition ratherthan the stresses. The methods using strain allow selected extensions to the stress-based designpossibilities to take advantage of steel’s well-known ability to deform plastically, but remain a stablestructure.

Strain-based design is used for many situations for pipelines where the loadings from forces, other thanthe internal pressure can be the largest generators of stress and strain in the pipe wall. Such loadingscan be generated by soil subsidence, frost heave, thermal expansion and contraction, landslides, pipereeling, pipe laying, and several other types of environmental loading. Designing based on strain forthese cases has an advantage over designing based on stress because these loadings tend to apply agiven displacement rather than a given force to the pipe.

10.4.1.2.1 Parent pipe requirements for strain based-design

When designing pipelines that may experience high axial strains during installation or in-service it isimportant to ensure that the parent pipe materials have adequate strength and ductility.

All pipe material standards specify minimum yield and tensile strength requirements for each pipe grade.However, while all pipe material standards specify minimum properties, many standards do not placelimits on maximum properties. As a result, pipe ordered to a specific pipe standard might exhibit tensileproperties well above the minimum requirements. This can give rise to a range of problems including:

• Reduced Y/T ratio (decreased work hardening)

• Reduced elongation to failure

• Weld material may unintentionally be of lower strength then the parent material

Page 131: Vol 2 onshore pipelines the road to success 3rd edition

15

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

10.4.1.2.2 Girth weld strength requirements for strain-based design

It is generally accepted that pipeline girth weld should overmatch the tensile properties of the pipematerial to avoid excessive strain accumulation in the girth weld during pipeline laying or normaloperation. This is generally achieved by selecting weld consumables that produce higher tensileproperties than the pipe material. In selecting welding consumables for pipeline applications it isimportant to consider the variability in both parent pipe and weld metal tensile properties. While mostwelding codes require overmatched welded joints, there are a number of reasons why excessiveovermatching should be avoided, particularly for high strength line pipe.

10.4.1.2.3 Girth weld toughness requirements for strain-based design

It is now common practice to specify minimum toughness requirements for pipeline girth welds toensure adequate resistance to brittle and ductile fracture. Minimum toughness requirements aregenerally determined by conducting fitness-for-service assessments assuming the worst case loadingcondition and the maximum permissible flaw size.

10.4.1.2.4 Engineering critical assessment methods for strain-based design (of girth welds)

Engineering critical assessment (ECA) is primarily used in strain-based design to assess the allowableflaw size for inspection or to check that the material toughness is sufficient for a given flaw size. Themethods are applied to both girth- and seam-welded areas based on the engineering understanding ofbrittle and ductile fracture and plastic collapse.

The design process for girth-welded pipelines that can experience high applied strains will usually needto include an ECA to demonstrate that the choices made regarding the girth weld area provide sufficientresistance to fracture under the peak strains. The methods that are used for the ECA must be applicableto the situation. Today’s situation in ECA methods is that routine methods are available for strains up tothe yield strain in tension and extensions of these methods have been used for higher strain, althoughthe methods have not become routine standard methods. As the strain in the pipe design is increasedup to 2% strain and beyond, very few methods are available and these methods may not cover all therequired behaviour.

10.4.1.2.5 Inspection by AUT of strain-based designed pipelines

The use of ECA for stress-based designs leads to safe weld defect acceptance criteria provided NDT iscapable of detecting and sizing critical defects. Automated ultrasonic testing (AUT) has come a long wayand is currently the most advanced inspection technique for inspection of girth welds. To ensure safestrain-based pipeline design and construction, the applied AUT needs a high probability of detection(POD) and defect sizing capabilities.

High POD precision and defect height and length sizing is a must for strain-based pipeline girth welddefect acceptance

Page 132: Vol 2 onshore pipelines the road to success 3rd edition

16

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

10.5 NDT at the material supplier and vendor inspection

Non-destructive testing (NDT) is a key technology in all modern pipe mills. The concept is one whereparticular techniques are specified according to the expected type of discontinuities inherent to theprocess route selected for pipe manufacture. The NDT regime is determined primarily by a combinationof line pipe standard and client purchaser specification, with due consideration given to the availabletechnologies at the pipe manufacturer’s mill and their associated limitations.

This section describes the various NDT regimes currently in use for different line pipe manufacturingroutes, and briefly highlights the key aspects of each technique

10.5.1 Submerged Arc Welded Pipe

10.5.1.1 Feed stock

The first area to address for submerged arc welded (SAW) pipe is the feedstock. The feedstock formsthe body of the line pipe and must be checked for internal soundness if it is intended to carry highpressure gas. The usual method for checking for internal soundness is via compression probe ultrasonictesting by either a manual ultrasonic testing (MUT) or automated (AUT) technique.

International standards such as API 5L/ISO 3183 and DNV OS-F101 are very specific regarding therequirements for feedstock checking; specifically designed standards for MUT/AUT checking such asISO 12094 or ASTM A578 are referenced, along with specific minimum area coverage requirements(e.g. 20%) and maximum acceptance criteria for both body and edges.

For helically welded pipe (SAWH), the norm is to apply the feedstock AUT at the pipe mill just after formingand welding due to the inherent difficulties involved with AUT testing in the coil plate mill. However forlongitudinally welded pipe (SAWL), most modern producers of line pipe steel will have the AUT applied atthe plate mill via a sophisticated automated system. This system uses specially designed calibration plateswith appropriate reflecting targets to set the sensitivity and coverage requirements of the standards. Asmentioned above, SAWH mills will conduct the feedstock AUT regime required by the standard/specificationto the agreed requirements but in pipe form. The same principles apply in that coverage and acceptancecriteria are guaranteed by prescribed scanning/oscillating patterns and appropriate calibration reflectors. It isimportant to note that most automated systems do not make a qualitative judgment; they merely identifyindications that have breached a sensitivity threshold. When this happens, MUT is usually applied to finally‘size’ the indication and evaluate acceptance or rejection, although there are some systems in place whichcombine detection with interpretation and acceptance/rejection.

10.5.1.2Weld Seam

Once in pipe form, the next NDT requirement is to confirm the quality of the SAW weld. Again, an AUTsystem is the norm in this case. As detailed at the start of 10.5, the aim is to generate a calibration blockwithin a section of pipe that recreates typical and expected discontinuities. This block is usually createdby removing a section of pipe weld and introducing a series of notches, holes or ceramic inserts whichrepresent typical defects. It is then reinserted into the donor pipe and forms a calibration pipe which isused to set up the AUT system (static calibration) and confirm the ongoing validity of the initial set up(dynamic calibration). The initial set up is the responsibility of qualified experts (Level 3 in UT) to definethe requisite probe configuration, angles and frequencies to best be able to detect the reflecting targetsin the calibration pipe.

Page 133: Vol 2 onshore pipelines the road to success 3rd edition

17

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

It is at this stage that the subtleties of weld seam AUT become important; factors such as the amount ofadditional sound energy applied to ensure safe calibration, and the sensitivity of couplant monitoringsystems can all directly influence the integrity of the AUT set up. If there is too great a level of sensitivity,the system will produce many spurious indications which will serve to undermine confidence andproductivity by requiring an inordinately high volume of MUT or radiographic testing (RT) to confirm. Onthe other hand, a lack of sensitivity may allow a reject able discontinuity to be passed and so affectconfidence from a different perspective.

The international standards mentioned above have addressed these issues and a standard approachhas been developed which most operators are happy to apply.

In addition to the AUT system, there are a number of other techniques also applied for the weld seam.As detailed before, the AUT system only detects indications; all such areas are recorded and sprayed foridentification. These areas of concern are then checked by RT or MUT or both. The selection of RT orMUT is usually controlled by a manufacturer defined decision tree and by reviewing which AUT probesystem detected the indication. It is here that a differentiation between RT and MUT should be made.RT is a non-volumetric check (unless stereoscopic RT is being considered) – it simply looks down inplane view, and a discontinuity with an acceptable cross section in plane view could have anunacceptable depth to it. Conversely, MUT does enable a definition of depth, but doesn’t provide areadily reviewable record of the inspection such as a radiographic image.

The AUT systems in place around the world all tend to have an area where coverage is limited; this isusually at the start and end of inspection where the probes have to drop down/lift up. Such areas areusually covered by mandatory MUT and/or RT.

Finally, there are a number of periodical, complementary tests which are performed on the weld metal.Specific tests for shallow surface breaking discontinuities which are undetectable by the AUT systemcan be specified. The appropriate techniques for this inspection are magnetic particle inspection (MPI) orother magnetic flux based system, and eddy current inspection (ECI). These techniques are specificallyfocused on detecting surface breaking discontinuities, but are not easily automated and are timeconsuming. If specified, these checks are normally performed on just the start and end areas of theweld, or on the full weld length of one or two pipes per production shift to maintain practicality. Carefulconsideration of whether this inspection applies to the internal and external surface must be made dueto access issues with performing the test inside the pipe. The other occasionally required inspection is tocheck for delayed hydrogen cracking. This feature can appear after the main AUT inspection has takenplace; industry practice recognizes that it can take up to 48hrs after welding for any cracks to appear. Inthis case, one or two pipes per shift are held back for 48hrs from welding and MUT is applied with aprobe specifically designed (45°) to detect the typical delayed hydrogen crack (the so-called chevroncrack). It is clear that these additional checks have practical limitations, and only in the event ofdiscovery of such features is the inspection frequency raised to try and encapsulate the issue.

10.5.1.3 Pipe Ends

The final area where NDT is applied for SAWH or SAWL pipe is at the pipe ends. The ends of the weldarea have already received various inspections as detailed in 10.5.1.2 above, so the focus is now on theparent material. Typical requirements that are codified within such standards as DNV OS-F101 requirethat the bevel face receives a full circumferential MPI check, and that the final 50mm of pipe material ateach end receives a compressive probe MUT or AUT check for laminations. This UT test can beconducted from the inside or outside, and can also be supplemented with a shear wave (45°) MUT/AUTcheck for cracks and other non-lamellar features.

Page 134: Vol 2 onshore pipelines the road to success 3rd edition

18

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

The importance of the pipe ends is obvious; this is where the critical girth welds will be performed, sothe acceptance criteria at the pipe ends is sometimes more stringent than would be the case for thepipe body.

10.5.2 Seamless Pipe

Due to the manufacturing processes involved with seamless pipe, feedstock inspection is unnecessary.The absence of a weld also makes for a conceptually simpler approach, and the basis of inspection isstill complex automated systems. For seamless material, it is better to consider each applicabletechnique rather than each part of the pipe.

10.5.2.1 AUT Systems

The AUT system is usually a rotary probe system; a standard pipe with machined targets (notches/holesetc.) is scanned by a system of probes that spin around the pipe (or the pipe spins around them). Thesesystems are usually quite complex and perform in a similar way to the AUT systems for the weld seam ofSAWH/SAWL material. The required targets are oriented, sized and positioned to represent typicaldiscontinuities (usually controlled by international standard and occasionally by purchaser specification),and specific probes are set up to target their detection. The targets are placed on the external andinternal surfaces, and oriented to represent transverse, longitudinal or lamellar flaws, and the targetsizes, probe settings and system sensitivity set the criticality of the regime. A complex interpretationsystem is commonly used to define acceptance or rejection; there still exists an option to determine finalacceptance via an MUT check of an AUT system detection as is the case with SAWH/SAWL material.During the AUT check, it is also quite common for seamless pipe to also be full-body checked for wallthickness by a compressive probe. This provides a large volume of data and therefore confidence in thethickness control of the seamless material.

The rotation of the probe assembly and the probe distribution are carefully designed to ensure that100% coverage of the pipe surface is achieved by each of the variously targeted probes for the giventhroughput speed.

10.5.2.2 Surface Testing Systems

The limitation of UT techniques to detect shallow surface breaking features is well known and has beendiscussed in the section on SAWH/SAWL material. As a result, seamless pipe producers havedeveloped systems that can perform a full body surface test on both the internal and external surfaces.The techniques commonly used are either magnetic flux leakage (MFL), eddy current (EDI) or MPI basedsystems, and the approach is the same as for AUT in that representative targets are located in acalibration pipe/block and the system must be able to detect each required target. As previously, thetargets have sizes, locations and orientations that are controlled by the international standards whichwork together with the system sensitivity settings to define how critically the inspection will beconducted. As with AUT systems, alarms and sprays can be used to identify indications andacceptability is either determined within the automatic nature of such systems, or is decided by manualprove up using an appropriate surface detection technique (e.g. MPI).

Page 135: Vol 2 onshore pipelines the road to success 3rd edition

19

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

In line with the welded products, there are often complementary inspections for surface testing whichcan see the full body (usually only the external surface) receiving 100% MPI for a small proportion ofpipes. This has practical limitations, and is usually seen as part of a procedure qualification process.

10.5.2.3 Pipe Ends

As stated previously, the pipe ends are critical to the integrity of the field girth weld, and extra inspectionand tighter acceptance criteria are usually applied. The pipe ends of seamless material often require thesame inspections as the ends of welded material. Indeed, most international standard define therequirements for pipe ends independent of the manufacturing process.

10.5.3 Electric Welded Pipe (e.g. ERW/HFW)

Electric resistance welded (ERW)/high frequency induction welded (HFW) material is primarily checkedby UT techniques; MPI or EDI is not normally specified. However, MFL techniques can be specified forthe detection of some longitudinally oriented discontinuities in the pipe body. The presence of a weldzone within the product means that there are separate systems for inspecting the body and weld areas.

10.5.3.1 Pipe Parent Material

As for SAWH material, the coil feedstock is usually checked in pipe form. The difference for ERW/HFWmaterial compared with SAWH material is the use of a full body rotary probe system. Again, targetreflectors are introduced to the calibration pipe and a combination of compression and shear probescan be used to search for lamellar or longitudinal discontinuities in the parent material. As for all theother AUT techniques, the size, location and orientations of these targets are often controlled byinternational standards and specifications so as to define system sensitivity/robustness. The scanningpattern and probe spacing etc. define the area coverage achieved, which is also usually specified withinstandards and specifications.

An additional specific check of the parent material adjacent to the weld is also usually made. While thisis usually performed in plate form for SAWL material, for ERW/HFW material an additional set of AUTprobes focus on a zone of parent material usually around 15mm wide either side of the weld. This areanormally has more stringent acceptance criteria, and so different reflective targets are required to ensuresufficient sensitivity. The probes used for this part of the inspection are not rotary; they are fixed.

10.5.3.2 ERW/HFW Weld Area

Typically, only longitudinal indications are found within the ERW/HFW weld; this is a function of the sizeof the weld zone in an ERW/HFW pipe. The width is to all extents and purposes infinitely small as theweld has no filler material and is in fact a fusion line; the available width for a transverse indication tomanifest itself over is therefore very small. Nevertheless, AUT systems are designed to scan the fulldepth of the weld and are calibrated in the regular manner via representative targets being detectedwhen passing the calibration pipe through. The systems in place around the world range from thoserequiring MUT prove up and those that rely on the AUT system to reject or accept.

Page 136: Vol 2 onshore pipelines the road to success 3rd edition

20

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

10.5.3.3 Pipe Ends

The pipe ends of ERW/HFW pipe are treated in the same manner as the pipe ends of seamless andSAWH/L pipe; please see the relevant sections.

10.5.4 Limitations of NDT Techniques

As discussed previously, some detection techniques have limitations; RT is non-volumetric, UT does notnecessarily produce a permanent record and struggles with shallow surface breaking defects, and MPIis slow and labour intensive. In short, there is no, one perfect system. A blend of techniques, withdeployment as appropriate is the best solution.

One must also address the question of detectability; what many engineers would consider implicit is anunobtainable ‘ideal’. No pipe will be free from discontinues; steel is not a fully homogenous material andwelding is not a perfect science. A particular NDT regime comprising different techniques, coverage andsensitivity can be described as having a high probability of detection (POD), but cannot be said to havea 100% POD. Certain discontinuities may only be discernable to techniques that are limited inapplication frequency due to practical concerns; it is considered to be more accurate to say that a pipehas no ‘detectable’ discontinuities after passing through a prescribed NDT regime. The pipe maycontain discontinuities that were not readily detectable by the techniques employed.

10.5.5 Other Vendor Inspections

Aside from the various NDT techniques described above, there are other inspections that are necessary;in the main, this means visual inspection. This is a sometimes overlooked area of inspection, as it is afundamentally subjective view, with human influence always being present. It is important to recognizesome key aspects of visual inspection:

• Fully trained inspection team, with direct experience and awareness of the appearance of eachtype of typical feature

• Sufficiently assured eyesight abilities (via regular testing)

• Sufficiently illuminated viewing areas

• Robust procedural control of where and when to look

Careful selection of various inspection points in the process is also critical; when the product ispotentially changed and new features are possibly introduced, re-inspection is necessary to reaffirm theproduct compliance.

10.6 NDT in the field – weld inspection

How to inspect pipeline girth welds and what to inspect for: choice between ultrasonic testing andradiography.

10.6.1 AUT inspection technique on pipelines

Application of automated ultrasonic testing on pipeline welds is advancing rapidly through newinnovations in AUT technology. AUT is replacing radiographic inspection techniques as the industry

Page 137: Vol 2 onshore pipelines the road to success 3rd edition

21

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

standard for inspection of pipeline welding and is recognized as the quickest, most reliable andbeneficial weld testing method available.

10.6.1.1 AUT Inspection Principle

Pipeline AUT uses fully automated ultrasonic equipment travelling circumferentially around the pipe girthweld on a welding (guide) band in a linear scan, with the array pulsing to cover all the weld zones. Anelectric motor drives the scanner and an encoder measures positions around the circumference.

The vertical cross-section of the weld is divided into approximately equal sections (zones,) with theheight of each zone roughly equal to the height of a single welding pass. Each zone is assessed by apair of ultrasonic search units (probes) on either side of the weld, the total of these ultrasonic searchunits called an array. The probe array is in a fixed position with respect to the weld centreline, resulting ina series of pulse-echo probes with their beams positioned to intersect the weld bevel centred on eachvertical zone. To ensure that the ultrasound energy and reflected signals are transferred from the probeto the pipe surface, water is used as a couplant or in freezing climates; a water methanol mix is used.

The ultrasonic information from the scanner / probe array is transferred to a computer through anumbilical cable. The computer is used for data presentation and analysis and is housed inside a 4WDvehicle. A trained ultrasonic technician / operator evaluates the returning data and assesses the results.The display consists of multiple strip charts where each strip represents a specific zone on either side ofthe weld. Each strip displays both signal amplitude and also the time-in-the-gate for defect location inthe weld. This allows more accurate interpretation as to the vertical height of a flaw or indication and itsposition within the weld, whether lack of fusion on the weld bevel or a volumetric type flaw within theweld body.

To establish a reference point as to the start of the weld bevel and be able to assess the vertical heightof an indication, the system is calibrated on a calibration block made out of identical pipe material usingsurface notches and/or side-drilled holes to represent weld imperfections on the weld fusion line, eachzone having a dedicated reflector. For each pipe diameter, wall thickness and weld bevel design aspecific project specific calibration block is used.

Step by step AUT inspection

• After weld bevel preparation and prior to fit-up/welding, a scribe line is put on the pipe end to beused as a reference line for the position of the guide band relative to the weld centreline.

• After welding, the OD surface on both sides of the weld is cleaned of weld splatter to allowproper coupling of the ultrasonic probes to the pipe surface.

• The weld is identified and marked with a unique number prior to inspection.

• The zero point, (usually top centre,) and the direction of the scan are clearly marked on the pipe.

• The guide band is placed around the pipe using the scribed line as a reference for exact positionin relation to the weld centreline.

• A calibration on the cal block is performed to establish the start of the weld bevel and therequired inspection sensitivity.

• The scanner is placed on the guide band, at the zero datum point described in point 4.

• A scan is performed over the entire weld circumference using the unique weld ID number for weldidentification and as part of the filename.

• Evaluation is performed in real time as the scanner moves around the circumference of the pipe.

• Data is stored immediately following final evaluation and determination as to weld acceptabilitydependant on client specification or code.

Page 138: Vol 2 onshore pipelines the road to success 3rd edition

22

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

• Rejectable welds are documented and can be reported immediately following the weld scan.Defects are identified in the data file and file is stored.

• During data analysis by the ultrasonic technician, the scanner technician will remove the scannerand guide band, and prepare for the next weld or calibration as required

10.6.1.2 Applications

10.6.1.2.1 Onshore Mainline

This is usually a 4 man crew able to scan up to 200 welds in a 12 hour working day; smaller crews maybe applied when production rates are lower. Welders are provided with immediate results due to theAUT crew being able to remain approximately 3 to 5 welds behind the capping crew. When automaticwelding is used process control is a key factor with this near instant feedback with results which assistsin keeping the repair rate as low as possible. Furthermore with the ability to size flaws vertically, relativeto height and depth, an ECA may be applied to further reduce unnecessary repairs. The inspection cycleinvolves mounting the scanner, scanning, analysing, removing the scanner and driving to the next weld.This can usually be performed in around four (4) minutes on large bore pipes up to 42" or largerdiameter pipe.

10.6.1.2.2 Onshore Tie-ins

This consists of a 2 man crew able to scan as many as 20 to 30 welds per day dependant onaccessibility of the welds, geographic location and diameter. Tie-ins are manual welds that are onlyaccessible on the outer diameter (OD) of the pipe and where results are desired immediately due toopen excavations that could need to be closed as soon as possible. The crew is generally able toprovide results immediately on final completion of the weld scan as opposed to the long exposures anddevelopment times needed for a radiographic tie-in crew.

10.6.1.3 Advantages of AUT as opposed to Radiographic inspection

• Engineered critical assessment (ECA) criteria vs. a good workmanship criteria can be appliedwhich can avoid unnecessary repairs, due to zonal discrimination and the ability to size flawheight and depth.

• Process control can be applied with far more accuracy as to the nature and cause of theimperfection and with quicker feedback to the welding crew.

• Higher probability of detection.

• Weld to weld inspections generally of 5 minutes or less.

• No radiation hazards – reduced HSE issues.

• Real-time and computer-aided analysis increases productivity and accuracy.

• All digital data archived electronically eliminating the need for huge filing and archiving rooms tostore film.

• Digital data archiving allow emailing of weld scans to allow next day assessment by clients orproject management and audit.

• The AUT systems are deployed on the OD of the pipe only as compared to a radiographiccrawler which must enter the ID of the pipe. This avoids possible delays due to crawlers beingstuck, as well as time spent with crawler battery changes each shift.

Page 139: Vol 2 onshore pipelines the road to success 3rd edition

23

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

10.6.2 Radiography inspection technique on pipelines

Application of radiographic approach to inspect pipelines was the preferred inspection method in thepast until the arrival of ultrasonic inspection technique. It is however doubtful that automated UT will eversupplant radiography due to the relative simple application and relative low cost.

10.6.2.1 Inspection Principle

A source of radiation is placed on one side of the pipe and a recording medium (film) is placed on theother side. It is based on the ability of X-rays and gamma rays to pass through metal to obtainphotographic records of the transmitted radiant energy. All materials will absorb known amounts of thisradiant energy and, therefore, X-rays and gamma rays can be used to show discontinuities andinclusions. As the X-ray absorption coefficient depends strongly on material density, radiography isparticularly effective at detecting volumetric defects, which have either extra mass or less mass (such asporosity or slag inclusions).Thus, the radiation that reaches the film in a potential flaw area is differentfrom the amount that impinges on the adjacent areas. This produces on the film a latent image of theflaw that, when the film is developed, can be seen as an “indication” of different photographic densityfrom that of the image of the surrounding material.

Digital Radiography is one of the newest forms of radiographic imaging. Since no film is required, digitalradiographic images are captured using special phosphor screens containing micro-electronic sensors.Captured images can be digitally enhanced for increased detail and are easily archived as they are digitalfiles. Real-Time Radiography (RTR): is the latest application for inspecting pipelines that allows electronicimages to be captured and viewed in real time allowing cycle times of 4 minutes or less like AUT.

Step by step radiographic inspection

• Weld will be identified by client with a unique number prior to inspection.

• Surface area will be cleaned to avoid masking of any imperfections.

• Zero point and direction of scan will be clearly marked on pipe.

• Location markers shall be placed around the pipe for circumferential reference

• Films shall be clearly identified by lead numbers, letters or flash cards, or any other method foridentification

• Film is placed in the desired location

• A source of radiation is put in place and activated for a set time

• Radiation is shut down and film is removed

• Film is developed in a dark room and evaluated for film quality and weld imperfections

• Film is stored immediately

• Rejectable welds are documented and can be reported immediately

10.6.2.2 Application

10.6.2.2.1 Onshore Mainline

This is usually a 4 man crew using an internal crawler; smaller crews may be applied when productionrates are lower. The X-Ray Crawler is similar to conventional radiography however an x-ray source tubeon a crawler device is run inside the pipe to each weld. Film is wrapped around the welds and thesource tube is excited. The film is then developed in a mobile dark-room on location. The technique is

Page 140: Vol 2 onshore pipelines the road to success 3rd edition

24

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

quick and can inspect on average 150 welds per day. The advantages of x-ray crawlers are their speedand the short exposure time. The quality of the image is far better due to the x-rays passing through lessmaterial compared to conventional radiography. The disadvantages are that the tool must be run into thepipe and the testing must be performed a significant distance from the welding crews for radiation safetyand the potential risk of risk of crawlers being stuck in the pipe.

10.6.2.2.2 Onshore Tie-ins

This consists of a 2 man crew able to inspect up to 15 welds per day depending on diameter, wallthickness and accessibility of the welds. Tie-ins are manual welds that are only accessible on the OD ofthe pipe. The x–ray film is placed on the external surface of the pipe section to be inspected and the x–ray source is placed against the pipe wall on the opposite side. This way, the section of the weld joint isradiographed through two walls. Multiple exposures are needed to cover the entire circumference of thepipe that may result in a relative long period of time before the weld quality can be evaluated.

10.6.2.3 Advantages opposed to AUT inspection

• More sensitive at detecting volumetric imperfections

• Less coating cut back required

• Able to inspect materials that are not suitable for ultrasonic inspection

• Able to deal with relatively large wall thickness variations

• Requires no dedicated calibration or reference blocks resulting in less preparation time

10.7 Future developments

10.7.1 Ultrasonic Imaging techniques

A new ultrasonic array technology for direct imaging of subsurface defects (2D & 3D visualization ofwelding defects) makes use of advanced algorithms that reconstruct the image of the defect fromsignals received from multiple detectors. Examples of these techniques are IWEX and sampling phasedarray.

Both in new construction and in service, detection, sizing and, characterization of defects are essentialfor integrity assessment of metal components and welds. Ultrasonic non-destructive testing using pulseecho technique or Time of Flight Diffraction (ToFD) has been proven to be reliable approaches to assessweld integrity. However, quantitative defect characterization with pulse-echo remains challengingbecause the signal caused by the reflection at the defect is very dependent on defect orientation. ToFDhas sizing capabilities, but only limited capabilities in flaw characterization. In phased arrays inspection,the image obtained from sectorial scans cannot be directly related to defect size and orientation. Datadisplay and interpretation are not straightforward and require operator skill and experience. A better andmore reliable ultrasonic inspection would be achieved if a methodology would be used that allows directimaging of defects.

These new imaging techniques have the potential to image welding defects in 3D, giving absolute valuesfor the orientation, length and height. This will enable the NDT result to be interfaced more directly withfracture mechanics calculation, potentially allowing more accurate determination of acceptance or non-

Page 141: Vol 2 onshore pipelines the road to success 3rd edition

25

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

acceptance of the weld. An example of what an image would look like is shown below, showing threeperspectives (a though c) of the same defect.

10.7.2 3D Radiographic inspection

10.7.2.1 Future of radiography

In normal photography almost all pictures and cameras are now digital. Similarly, radiography is becomemore and more digital. There are a number of ways in which digital radiography can be performed, eachwith their advantages and disadvantages. A distinction is made between computer radiography, wherethe film is replaced by an image plate, and digital radiography where the image is directly captured on adigital detector array. In the future it will also be possible to produce a 3D image of weld flaws, usingtopographic reconstruction.

10.7.2.2 Computed radiography

Computed radiography (CR) uses very similar equipment to conventional radiography except that inplace of a film to create the image, an imaging plate (IP) made of photo-stimulable phosphor is used.The imaging plate is housed in a special cassette and placed under the body part or object to beexamined and the x-ray exposure is made. Hence, instead of taking an exposed film into a darkroom fordeveloping in chemical tanks or an automatic film processor, the imaging plate is run through a speciallaser scanner, or CR reader, that reads and digitizes the image. The digital image can then be viewedand enhanced using software that has functions very similar to other conventional digital image-processing software, such as contrast, brightness, filtration and zoom.

Page 142: Vol 2 onshore pipelines the road to success 3rd edition

26

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 10

An advantage is that no processing chemical and silver based films are used, and that radiation levelsand exposure times are typically much lower than needed with film radiography. The replacement of filmby the image plate is very straightforward, and the process in the field will hardly change at all.

For weld radiography however, it is very hard to find an image plate and scanner than offers sufficientimage quality. Also at the high resolution needed for weld radiography the scanner time will become verylong. Additionally although image plates are reusable, they are sensitive to scratching, and combinedwith manual handling in this field this may lead to problems.

10.7.2.3 Digital Radiography

Digital radiography is a form of x-ray imaging, where digital X-ray sensors are used instead of traditionalphotographic film. Digital radiography (DR) is essentially filmless X-ray image capture. In place of X-rayfilm, a digital image capture device is used to record the X-ray image and make it available as a digitalfile that can be presented for interpretation, making real time interpretation of welds possible. DigitalRadiography can achieve the same image quality as film radiography.

The advantages of DR over film include immediate image preview and availability, a wider dynamic rangewhich makes it more forgiving for over- and under-exposure as well as the ability to apply special imageprocessing techniques that enhance overall image display. The largest motivator to adopt DR is itspotential to reduce costs associated with processing, managing and storing films. Crew sizes forradiography can be significantly reduced.

A disadvantage of digital radiography in the field is that a big and heavy manipulator is needed to movethe x-ray tube and detector around the pipe. In this sense the operation of digital radiography is verysimilar to automated ultrasonic testing.

10.7.2.4 3D radiography

An even more advanced development is the use of topographic reconstruction to make 3 dimensionalimages of weld flaws. The feasibility of this technology has been demonstrated in the detection andsizing of flaws in nuclear components. The detector needed is very similar to the one used in digitalradiography discussed above, but additionally to make a scan along the weld, and additional motionacross the weld is needed. Of cause this increases scan time considerable, but it gives anunprecedented image of weld flaws, and could be directly linked to fracture mechanics calculation,further simplifying the process of accepting welds.

10.8 Concluding remarks

In this chapter the use of NDT in pipeline construction was presented. NDT uses a number oftechniques to ensure the integrity of pipelines in every stage of a pipeline’s lifecycle. In the FEL stageNDT is used to check the assumptions of the pipeline design. At the pipe factory many tests are done tothe surface, weld seams and the pipe ends. In the field the girth welds are tested. All of this is to ensurethat the pipeline is fit for purpose, conforms to codes and standards and is safe for the general public. Inthe future, new imaging techniques will make an even better assessment. NDT ensures that everyoneinvolved in the pipeline project can rest assured that the pipeline is sound.

Page 143: Vol 2 onshore pipelines the road to success 3rd edition

1

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11. Pipeline Protection Systems

Pipeline integrity for durations well above the nominal 25-35 years of service is an important aspect inany pipeline’s design, construction and operation. Pipelines should not fail during their entire service lifebecause such failures could lead to human and economic costs. As the public’s perception of pipelinefailures is (generally) much worse than the actual human and economic failure costs, considerableresources have been dedicated to protect the pipes against any potential damage that could lead topipeline failure.

As the majority of installed and planned onshore transmission pipelines around the world are steelpipelines, this document will focus on the protection of steel pipes.

In order to ensuring a service life without failure, we need to apply a life-cycle approach to the steel pipeprotection, so that we avoid damage and failure during all the steel pipe’s life stages:

• Pipe transportation – from pipe mill or coating facility to temporary storage yards or tothe right-of-way

• Pipe handling – loading, unloading at different locations

• Pipeline installation – stringing, lowering in, backfilling

• Pipeline service life until decommissioning

The industry has been trying for decades to target the most common causes of onshore pipe damageand failure. In this context, the statistical data available for the onshore transmission pipeline systems –both gas and liquids – show that mechanical impact damage (including third-party damage andconstruction/repair damage) and external corrosion represent the cause for between half and two-thirdsof the reported onshore pipelines incidents and failures1.

Corrosion is an electrochemical phenomenon that leads to the degradation of the steel pipe material andcould ultimately cause pipeline failure. There are multiple ways of preventing corrosion or protecting thepipe against it, such as the use of corrosion-resistant alloys, steel pipe design corrosion allowance,external anti-corrosion coatings and cathodic protection (CP) systems. Some prevention and protectionsystems are called passive systems, such as external anti-corrosion coatings for line pipe (discussed inSection 11.1), the field joint area (Section 11.2) and for other pipeline components such as bends andfittings (Section 11.3), whereas others are considered active prevention and protection systems, such asthe cathodic protection systems (discussed in Section 11.8).

Mechanical damage can be sustained when the steel pipe suffers an external impact or penetration fromrocks, outcrops, construction equipment (excavators, backhoes, drills), other pipe joints etc. There aremultiple ways of preventing mechanical damage and protecting the pipe and its coatings, such aspipeline above-ground markers, call-before-you-dig numbers, sand bedding and padding, concretecoatings, mechanical padding with select backfill etc. The most common mechanical protectionsystems are reviewed in section 11.4.

Internal coatings are used to increase the flow efficiency for natural gas pipelines and to mitigatecorrosion damage to the steel pipe. The most common internal coating systems are reviewed in section11.5.

1 For onshore pipeline incident information, please see the reports and statistics published by government agenciessuch as the US Pipeline and Hazardous Materials Safety Administration (PHMSA), the US Department ofTransportation Research and Special Programs Administration, industry associations such as Association of Oil PipeLines (AOPL), Conservation of Clean Air and Water in Europe (CONCAWE), as well as other sources such as“Transmission Pipelines and Land Use: A Risk-Informed Approach”, Special Report 281, US TransportationResearch Bureau, 2004 or “Subsea Pipeline Engineering”, Palmer, A.C., King R.A., 2004.

Page 144: Vol 2 onshore pipelines the road to success 3rd edition

2

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

More recently, onshore insulation systems have been developed for the external anti-corrosionprotection and thermal insulation of pipelines operating at temperatures ranging from 85°C up to 650°C.These systems generally include a corrosion resistant coating, a thermal insulation layer and an outerjacket or protective topcoat and are discussed in Section 11.6.

In order to avoid the floatation phenomenon in onshore wet environments (such as lakes, river crossingsor swamps) the industry has developed solutions to mitigate the pipeline buoyancy phenomenon. Thesesolutions are based on the extensive experience in mitigating the pipeline buoyancy phenomenonoffshore and are discussed in Section 11.7.

Finally, as mentioned above, steel pipes and coatings can be damaged during each stage of the supplychain, including pipe handling (loading, unloading) and installation (stringing, lowering in), storage andtransportation. Section 11.9 discusses risks and available solutions during these logistic operations.

11.1 Review of Key Mainline External Anti-Corrosion Coatings

The purpose of the mainline external anti-corrosion coatings is to isolate the pipe steel from the externalenvironment (soil, air and water) and thus to protect the steel from corrosion damage that could lead tofailure. The mainline coatings protect the whole length of the steel pipe except for the variable-lengtharea where two pipes are joined – this area is usually protected by separate field joint coating solutions(assessed in the next section).

The mainline external anti-corrosion coatings can be categorized using several criteria:• Coating materials – powder systems (based on epoxy resins), polyolefin systems (polyethylene,

polypropylene), liquid systems, other materials (asphalt, coal tar)

Except for the single-layer coatings, all the others usually have a primer layer (closest to the steel),one or more topcoat layer and sometimes an adhesive between two coating layers

• Application method – electrostatic spraying, extrusion, liquid spraying, liquid painting, tape-wrapping, hybrid application (electrostatic spraying/extrusion)

Other categories are starting to be used, based on new criteria such as application temperature ranges,operating temperature ranges etc.

The most widely used coatings in the industry are reviewed in the following sections. The list of coatingsdescribed below is not exhaustive, as other mainline external anti-corrosion coatings are also used in theonshore pipeline projects, but on a more limited scale. Appendix 11.1 provides a table comparing thestrengths and weaknesses of the mainline coatings described below.

11.1.1 Fusion-Bonded Epoxy (FBE)

Fusion-bonded epoxy (FBE) coatings are thin film coatings based on epoxy-resin powder materials.Thickness and other coating configuration requirements can be found in the new EN ISO 21809-2standard, as well as CSA Z245.20. Most FBE coatings are rated for operating temperatures up to 85°Cin dry conditions and 65°C in wet conditions, but new products have been developed and are currentlydeveloped for higher operating temperatures.

FBE coatings were separately developed in Europe and North America and are usually applied inspecialised coating facilities in powdered form by electrostatic spraying. The pipes are pre-heated andthen blast-cleaned. The pipe surface is then inspected for any defects and the pipe is then washed andrinsed. Induction heating then brings the pipe to the temperature required for the spraying of the epoxypowder. The epoxy particles flow, melt and bond to the steel.

Page 145: Vol 2 onshore pipelines the road to success 3rd edition

3

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

The next step is to cool down the pipe through water quenching. Finally, the pipe is inspected forcoating defects (known as holidays) and then loaded out for storage.

Fig.1 – Fusion bonded epoxy (FBE) external coating

FBE coatings have undisputed benefits for the users. They offer excellent corrosion protection andexcellent adhesion properties. FBE coatings are very flexible, resistant to soil stresses and have goodhandling characteristics. They are usually used in pipeline projects that have standard requirements – i.e.do not have challenging terrain configurations, soil types, climatic conditions, exposure towater/moisture or harsh storage and handling conditions.

For the external anti-corrosion field joint coatings that are most commonly used with FBE mainlineexternal anti-corrosion coatings please see section 11.2.

11.1.2 Dual-Layer Fusion-Bonded Epoxy (2L FBE)

Dual-layer fusion-bonded epoxy (2LFBE) coatings are also based on epoxy-resin powders. Theirthickness and minimum technical performance requirements are standardized in CSA Z245.20. Like thesingle-layer FBE coatings, most dual-layer FBE coatings are rated for temperatures up to 85°C in dryconditions. Dual-layer FBE coatings are usually made of a fusion-bonded epoxy primer, similar to thecoatings in section 11.1.1 and, depending on the targeted application, a tougher FBE topcoat, usuallycalled abrasion-resistant overcoat (ARO), or a high operating temperature FBE topcoat.

The application process for dual-layer fusion-bonded epoxy coatings is very similar to the one for single-layer FBE coatings, with the two FBE layers being sprayed successively, and also takes place in aspecialised coating facility.

Page 146: Vol 2 onshore pipelines the road to success 3rd edition

4

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Fig. 2 – Dual-layer FBE (2LFBE) external coating

Dual-layer FBE coatings are usually used in specialty applications that require high abrasion resistance,such as horizontal directional drilling (HDD) projects and offer improved handling, as well as higherabrasion and impact resistance than single-layer FBE coatings. Other dual-layer FBE coatings are usedfor high operating temperature environments where increased flexibility is considered a benefit.

For the external anti-corrosion field joint coatings that are most commonly used with dual-layer FBEmainline external anti-corrosion coatings please see section 11.2.

11.1.3 Three-Layer Polyethylene (3LPE)

Three-layer polyethylene (3LPE) mainline coatings are multilayer anti-corrosion systems consisting of alayer of fusion-bonded epoxy primer, a polyethylene-based adhesive layer and an outer layer (topcoat) ofpolyethylene. Their thickness and minimum technical performance requirements are the subjects ofmultiple industry and international standards such as DIN30670, NFA49711, CSA Z254.21 and theupcoming EN ISO 21809-1 (draft). Most 3LPE mainline coatings are rated for operating temperatures ofup to 85°C.

3LPE coatings are applied in specialised coating facilities. The pipes are pre-heated and then blast-cleaned. The pipe surface is then inspected for any defects and the pipe is then washed and rinsed.Induction heating then brings the pipe to the temperature required for the spraying of the epoxy powderof the primer. The epoxy particles flow, melt and bond to the steel. The polyethylene-based adhesiveand then the polyethylene topcoat are then successively extruded on the rotating pipe. The next step isto cool down the pipe through water quenching. Finally, the pipe is inspected for coating defects(holidays) and then loaded out for storage.

Page 147: Vol 2 onshore pipelines the road to success 3rd edition

5

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Fig. 3 – Three-layer polyethylene (3LPE) external coating

Each of the three 3LPE coating layers adds specific technical performance characteristics to the finalcoating system: the FBE primer offers excellent adhesion to the steel substrate, as well as an excellentcorrosion resistance potential; the adhesive bonds the epoxy primer to the polyethylene outer layer; andthe polyethylene topcoat offers very good damage resistance, making the whole coating systemtougher, more durable and resistant to environment factors such as moisture penetration. 3LPE coatingsare used in projects that present technical challenges, such as rough storage or handling conditions,challenging backfill material or harsh climatic conditions.

For the external anti-corrosion field joint coatings that are most commonly used with 3LPE mainlineexternal anti-corrosion coatings please see section 11.2.

11.1.4 Three-Layer Polypropylene (3LPP)

Three-layer polypropylene (3LPP) mainline coatings are multilayer anti-corrosion systems consisting of alayer of fusion-bonded epoxy primer, an adhesive layer and an outer layer (topcoat) of polypropylene.Their thickness and minimum technical performance requirements are the subjects of multiple industryand international standards such as DIN30670, NFA49711, and the upcoming EN ISO 21809-1 (draft).Most 3LPP mainline coatings are rated for operating temperatures of up to 110° C.

The application process for three-layer polypropylene (3LPE) coatings takes place in a specialisedcoating facility and is very similar to the one for 3LPE coatings – described in section 11.3 – with theepoxy primer being applied by electrostatic spraying on the induction-heated rotating pipe, followed bythe application of the adhesive layer and the extrusion of the polypropylene top layer.

Page 148: Vol 2 onshore pipelines the road to success 3rd edition

6

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Fig. 4 – Three-layer polypropylene (3LPP) external coating

Each of the three 3LPP coating layers adds specific technical performance characteristics to the finalcoating system: the epoxy primer offers excellent adhesion to the steel substrate, as well as an excellentcorrosion resistance potential; the adhesive bonds the epoxy primer to the polypropylene outer layer;and the polypropylene topcoat offers very good damage resistance, creating the most durable anddamage-resistant plant-applied external anti-corrosion coating systems. 3LPP coatings are used inprojects that present technical challenges, such as rough storage or handling conditions, challengingbackfill material or harsh climatic conditions.

For the external anti-corrosion field joint coatings that are most commonly used with 3LPP mainlineexternal anti-corrosion coatings please see section 11.2.

11.1.5 Three-Layer Composite Coatings

Three-layer composite mainline coatings are multilayer anti-corrosion systems. As an example, a three-layer composite coating system currently supplied for onshore pipeline projects consists of a layer offusion-bonded epoxy primer, a specially formulated polyolefin adhesive layer that achieves a strongchemical bond with the FBE primer and a fused mechanical bond with the topcoat, and an outer layer(topcoat) of polyethylene. The thickness and minimum technical performance requirements of the three-layer composite external coatings are the subjects of multiple industry and international standards suchas CSA Z245.21, and the upcoming EN ISO 21809-1 (draft). Existing three-layer composite mainlinecoatings are rated for operating temperatures of up to 85° C.

Three-layer composite coatings are applied in specialised coating facilities. The pipes are pre-heatedand then blast-cleaned. The pipe surface is then inspected for any defects and the pipe is then washedand rinsed. Induction heating then brings the pipe to the temperature required for the spraying of theprimer epoxy powder. The epoxy particles flow, melt and bond to the steel. The polyolefin-basedadhesive and then the polyethylene topcoat are then successively sprayed on the rotating pipe. The nextstep is to cool down the pipe through water quenching. Finally, the pipe is inspected for coating defects(holidays) and then loaded out for storage.

Page 149: Vol 2 onshore pipelines the road to success 3rd edition

7

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Fig. 5 – Example of a 3-layer composite external coating

Each of the three layers of the three-layer composite coatings adds specific technical performancecharacteristics to the final coating system: the epoxy primer offers excellent adhesion to the steelsubstrate, as well as an excellent corrosion resistance potential; the adhesive bonds the epoxy primer tothe outer layer; and the topcoat offers very good damage resistance, creating a very durable coatingsystem. Like 3LPP and 3LPE coatings, three-layer composite coatings are used in projects that presenttechnical challenges, such as moisture penetration, rough storage or handling conditions, challengingbackfill material or harsh climatic conditions.

For the external anti-corrosion field joint coatings that are most commonly used with three-layercomposite mainline external anti-corrosion coatings please see section 11.2.

11.1.6 Tape Coatings

Tape mainline coatings are multilayer anti-corrosion systems. As an example, a tape coating systemconsists of a layer of liquid epoxy primer, an adhesive layer, and an outer layer (topcoat) of polyethylene.The thickness and minimum technical performance requirements of a tape coating system are describedin DIN30670. Existing tape mainline coatings are rated for operating temperatures of up to 60°C.

Tape coatings are applied in specialised coating facilities or in the field. The pipes are blast-cleaned, thenthe pipe surface is inspected for any defects. The pipe is then washed and rinsed. The epoxy primer isusually applied in liquid form (painting, brushing). The adhesive layer is then applied. The polyethylenetopcoat tape is finally wrapped on the pipe. Finally, the pipe is inspected for coating defects.

Tape coatings are used in certain markets in projects that need good damage resistance.

For the external anti-corrosion field joint coatings that are most commonly used with tape mainlineexternal anti-corrosion coatings please see section 11.2.

Page 150: Vol 2 onshore pipelines the road to success 3rd edition

8

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.2 Field Joint Anti-Corrosion Coating Selection Guide

High performance pipeline corrosion protection and insulation coatings have been developed to meetthe demanding requirements of current pipeline operating and field conditions. A variety of pipeline-coating technologies are available and selection has evolved along geographical lines.

These coating decisions are generally based on the owner-company or engineering companypreferences, but also on the pipeline construction and operating conditions. As an example, coatingdamage is a real concern in regions where limited transportation infrastructure, rough pipe handling,aggressive backfills and high populations are prevalent. This creates the need for robust, multi-layercoatings.

Once the coated pipe is delivered to the right-of-way and pipeline welding begins, then application ofthe field joint corrosion protection must commence.

There are several types of commercially available external anti-corrosion and insulation field jointcoatings. For the purposes of this document, the specific types of field joint coatings have beenidentified as being most suitable for use with the various mainline coatings.

Aside from the mainline coating compatibility the criteria for determining which field joint coating to useencompass a number of variables. Pipe diameter, operating temperature, construction conditions,backfill, soil conditions and contractor capabilities all affect coating choice. Appendix 11.2 outlines thevarious mainline anti-corrosion coatings along with the most suitable field joint coatings and relevantstandards.

While mainline coatings are applied in consistent factory environments, field joint coatings are applied ina variety of conditions which the photos below depict.

Fig. 6 – Application of field joint coating protection in desert conditions

In desert conditions, sand storms and huge day/night temperature fluctuations present specialproblems.

Fig.7 – Application of field joint coating protection in cold climates

Cold climates require additional equipment and expertise to deal with the low temperature constructionconditions.

Page 151: Vol 2 onshore pipelines the road to success 3rd edition

9

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

The paragraphs below provide a brief description of the most common onshore anti-corrosion andthermal insulation field joint coatings in use today.

11.2.1 Fusion Bonded Epoxy (FBE)

Fusion-bonded epoxy (FBE) coatings are thin film coatings based on epoxy-resin powder materials.They can vary in thickness depending on specification and be applied as single layer or dual layercoatings. For the purposes of field joints, FBE is only recommended for use with FBE mainline coatingsdue to the high pre-heat temperatures required by certain FBE materials, which could damage othertypes of mainline coatings. Prior to application, the field joint must be blast-cleaned to minimum Sa 2.5and inspected for soluble salt contamination.

Induction heating is then used to bring the field joint cutback to the temperature required for theapplication (typically 240ºC) of the epoxy powder which is flocked on using manually held or semi-automatic spray nozzles/application equipment. The field joint is allowed to cool naturally or throughwater quenching. Finally, the field joint is inspected for thickness and coating defects such as holidaysand then readied for burial.

Fig. 8 – Field-applied FBE joint coating

11.2.2 Two-Layer Polyethylene Heat-Shrinkable Sleeve (2LPE HSS)

These types of heat-shrinkable sleeves have been commercially available since pipeline coatings appliedin manufacturing plants became commonplace in the early 1960s. They consist of a cross-linked andstretched polyethylene sheet coated with a mastic or butyl-based adhesive resulting in the 2-layersystem. The application is direct to metal with surface preparation requirements varying from simplehand wire brushing to commercial blasting. No primers are required.

Application is done by preheating the field joint to a specified temperature (typical maximum of 80ºC),wrapping the sleeve around the field joint, securing a closure strip and heat-shrinking the sleeve usingsuitable propane or natural-gas-fuelled torches.

Fig. 9 – 2-layer sleeves ready for application

Page 152: Vol 2 onshore pipelines the road to success 3rd edition

10

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.2.3 Three-Layer Polyethylene Heat-Shrinkable Sleeve (3LPE HSS)

Three-layer polyethylene heat-shrinkable sleeve systems consist of an epoxy primer and a heat-shrinkable sleeve. In rare cases, the epoxy primer can be a fusion bonded epoxy but, more commonly, a2-component, liquid epoxy. The heat-shrinkable sleeve consists of a cross-linked and stretchedpolyethylene sheet coated with a hot-melt, hybrid or polyethylene-based adhesive layer depending onthe pipeline design service temperature.

The field joint must be blast-cleaned to minimum Sa 2.5 and inspected for soluble salt contamination. Ifthe soluble salt levels are deemed as being too high, then remedial measures to remove thecontamination and re-blast will be required.

Application is done by preheating the field joint to a specified temperature, applying the liquid epoxyprimer to the steel cutback, force-curing the epoxy primer (typically 90 - 120ºC) then wrapping thesleeve around the field joint, securing a closure strip and heat-shrinking the sleeve using suitablepropane or natural-gas-fuelled torches. Preheating and force-curing stages may be done with eitherinduction heating or gas-fuelled torches.

Fig. 10 – 3-layer heat-shrinkable sleeve graphic Fig. 11 – Completed and tested 3-layer HSS

11.2.4 Three-Layer Polypropylene Heat-Shrinkable Sleeve (3LPP HSS)

Three-layer polypropylene heat-shrinkable sleeve systems consist of an epoxy primer and a heat-shrinkable sleeve. The epoxy primer is a 2-component, liquid epoxy. The heat-shrinkable sleeve consistsof a cross-linked and stretched polypropylene sheet coated with a polypropylene-based adhesive layer.

The field joint must be blast-cleaned to minimum Sa 2.5 and inspected for soluble salt contamination. Ifthe soluble salt levels are deemed as being too high, then remedial measures to remove thecontamination and re-blast will be required.

Application is done by preheating the field joint to a specified temperature, applying the epoxy primer tothe steel cutback, force-curing the epoxy primer (typically heating to 175ºC), then wrapping the sleevearound the field joint, securing a closure strip and heat-shrinking the sleeve using suitable propane ornatural-gas-fuelled torches. The force-curing stage must be done with induction heating.

Page 153: Vol 2 onshore pipelines the road to success 3rd edition

11

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Fig.12 – 3-layer polypropylene sleeve application

11.2.5 Three-layer Polypropylene Field-Applied Systems (3LPP, IMPP, FSPP)

Systems consist of a polypropylene tape or sheet (3LPP Tape), flame-sprayed powder (FSPP) orinjection-moulded polypropylene (IMPP). Each of these systems consists of a fusion-bonded epoxyprimer, a powder applied polypropylene adhesive and an outer layer of polypropylene applied bywrapping, spraying or injection moulding. All of these systems are applied using specialised applicationequipment. The methods of application may be proprietary to the service company and generally requirespecialised equipment and highly-trained applicators.

11.2.6 Adhesive Tape Systems (CAT)

Tape coatings are multilayer anti-corrosion systems. As an example, a tape coating system consists of asolvent-based liquid primer, an adhesive layer, and an outer layer (topcoat) of polyethylene. Thesesystems often use two types of tapes such as a soft first layer for corrosion protection and a toughersecond layer for mechanical protection.

11.2.7 100% Solids, 2-Component Liquid Epoxy or Polyurethane (2CLE, 2CPU)

Commonly referred to as “liquids”, most liquid coatings in use for pipeline protection are either 100%solids, 2-component epoxies or polyurethanes. The 2 components are “base (or polyurethane: polyol)”and “cure (or polyurethane: isocyanate)” parts, sometimes referred to as Part A (base) and Part B (cure).The base and cure must be formulated to work together and mixing a base from one manufacturer andcure from another is not possible. The cure component is formulated to impart various cure timesdepending on type of application and application environmental conditions.

Liquid epoxies are formulated using a variety of epoxy raw materials. A few high performance epoxieshave operating service temperatures up to the 130ºC range. Liquid epoxies are applied to field joints ofFBE-coated pipelines and appear to be most companies’ choice for pipeline rehabilitation projects.Polyurethane coatings are generally used as pipeline coatings for ambient temperature water pipelinesor for lower operating service temperature conditions.

Liquid coatings are usually available in sprayable and brushable formats. The spray versions generallyhave a much faster set-up time and very limited “pot-life”. The extended pot-life of the brushable versionprovides adequate time for the applicator to mix and brush-apply the coating onto the pipeline section.

Page 154: Vol 2 onshore pipelines the road to success 3rd edition

12

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Fig. 13 – Liquid epoxy brush application

11.2.8 Pre-Insulated Pipe Onshore Field Joint Sealing and CorrosionProtection Selection Guide

The purpose of the field applied joint coating system is to maintain the continuity of the mainline coatingacross pipe connection points. In the case of pre-insulated pipes the field joint coating systems arerequired to provide not only anti-corrosion continuity but also thermal protection continuity. Moreover,similarly to the mainline pre-insulated coatings, the insulating materials used in the joints usually have tobe isolated from the environment and therefore most joint protection systems used with thermallyprotected pipes are designed to provide sealed, jacketed protection across the adjoining jacketedmainline coated pipes.

The most common insulating materials used on pre-insulated pipes are polyurethane (PU) foams,mineral wools and more recently aero gels. The insulation is either supplied to the field in the form ofhalf-shells or wrap-around blankets or, in the case of PU foams, it can be moulded on the pipe and filledor “foamed” at the job site. The insulation materials are rated through measurable methods such as thethermal conductivity coefficient, compressive strength, density, thermal life expectancy and operatingtemperature.

The selection of the pre-insulated field joints is governed by the operating environment of the pipeline(ex. above/below ground), geographical location, and operating temperature of the pipeline, pipediameter, construction conditions, backfill method, soil conditions, contractor’s capabilities and requiredin-process testing.

The paragraphs below provide a comprehensive summary of the most common pre-insulated pipe fieldjoint coating systems.

11.2.9 Heat-Shrinkable Casing System

The heat-shrinkable joint casing systems consist of an expanded high-density polyethylene (HDPE)casing which is attached to the mainline polyethylene jacket using either a hot melt adhesive or electro-fusion process. There are several variations of heat-shrinkable casing systems and they can becategorized using the following criteria:

• Material type: cross-linked vs non-cross-linked HDPE

• Application method: foam-in-place* vs pre-foaming

(*casing used as a mould for field-injected PU foams)

• Casing sealing method: adhesive vs electrofusion

• Secondary sealing requirement: collar sleeves

The method and complexity of field installation as well as functional performance of the product areunique to each variant of the heat-shrinkable casing system. Appendix 11.2 contains a comparativetable describing the strengths and weaknesses of the above described casing systems.

Page 155: Vol 2 onshore pipelines the road to success 3rd edition

13

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.2.9.1 Cross-linked Heat Shrinkable Casing Systems

Cross-linked heat shrinkable casing systems are the most technologically advanced joint protectionsystems used with PU foam based pre-insulated pipe systems. As the name suggests these types ofjoint systems consist of cross-linked high density polyethylene (HDPE). Cross-linking of HDPE enhancesthe functional performance of the material and enables fast and simple field application of the product.One of the most notable features of the cross-linked material is its stability in hot climates. Cross-linkedheat shrinkable casing systems do not pre-shrink due to the exposure to summer-like conditions as isthe case with non-cross-linked casing systems.

There are several variants of cross-linked heat shrinkable casing systems available on the market. Somesystem designs allow the casings to be used as a mould during field injection of PU foam in addition toperforming their primary function of sealing and mechanically protecting the joint. Other options includeinspection of the foam before sealing the joint off (see figure 14 below). There are also systems whichallow field testing to verify the seal performance. The seal between the adjoining polyethylene jacketpipes is primarily achieved through hot melt adhesives.

Figure 14. “Foam in place” vs “pre-foamed” pre-insulated cross-linked joint casing systems

“Foam in Place” “Pre-Foamed”

The sequence of the application steps for cross-linked joint casing system depends on the type ofsystem: foam in place vs pre-foaming. In the case of foam in place systems, the casing is secured overa joint before the foam is injected into the cavity. The first step of the application includes preparation ofthe PE surface on the adjoining PE jacket pipes. The second step consists of pre-heating the jacketpipe, using suitable propane of natural-gas-fuelled torches, and wrapping the adhesive around thejacket pipes. The next step consists of centrally locating the casing over the joint and shrinking theapplicable sections with suitable torches as described above. Upon verification of the proper installationof the casing, appropriated PU foam material is injected into the cavity formed by the casing.

In the case of the pre-foamed joint casing systems, the foaming of the cavity is completed as the firststep of the system application. Removable external moulds are used to form the foaming cavity. Thecasing is applied after the foam is inspected and the application of the casing follows the same generalsteps as the foam in place systems.

Page 156: Vol 2 onshore pipelines the road to success 3rd edition

14

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Figure 15: Typical pre-insulated pipeline joint coating operations

11.2.9.2 Non Cross-linked Heat Shrinkable Casing Systems

Non cross-linked heat shrinkable casing systems consist of expanded polyethylene tubes. Most projectsinvolving these casing systems use them as moulds during field injection of PU foam in addition to theirprimary function of sealing and mechanically protecting the joints. Application of this type of casing isrelatively slow, compared to cross-linked casing systems, and therefore shrinking of the entire casing (asis the situation with the pre-foamed casing systems) is impractical. Additionally, these casings have atendency to pre-shrinking on the pipes when exposed to summer temperatures. Pre-shrinking makesthe casings unusable as they cannot be moved over the joint. Another shortcoming of the non-cross-linked casing systems is their inability to maintain geometrical conformance to the shape of the pipe theyembrace. To counter the relaxation of non-cross-linked casing systems, heat-shrinkable cross-linkedcollar sleeves are used on both ends of such casings.

The application of a non-cross-linked casing starts with the preparation of the PE surface on theadjoining PE jacket pipes. The second step consists of pre-heating the jacket pipe, using suitablepropane or natural-gas-fuelled torches, and wrapping the hot melt adhesive around the jacket pipes.Alternatively, instead of preheating the adjoining PE jacket pipes and applying the adhesive strips,electro-fusion system components are wrapped around the adjoining jacket pipes. The next stepconsists of locating the casing over the joint and shrinking the applicable sections with suitable torchesas described above. In the case of electro-fusion systems, after the shrinking step, the sides of thecasing are then fused with the adjacent jacket pipes. Upon verification of the proper installation of thecasing, an appropriate amount of PU foam material is injected into the cavity formed by the casing.

Page 157: Vol 2 onshore pipelines the road to success 3rd edition

15

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Figure 16. Non-cross-linked joint casing systems with protective collars.

11.2.9.3 Heat-Shrinkable Sleeve Systems

Heat-shrinkable sleeve systems consist of cross-linked and stretched polyethylene sheets coated withadhesive layers. These systems are only applied on joints which have been pre-foamed using externalremovable moulds or where PUF half shells are used to provide the insulation at the joints.

The application consists of pre-heating the adjoining polyethylene jacket pipes, wrapping the sleevearound the pipe, securing a closure strip and heat-shrinking the sleeve with suitable propane or natural-gas-fuelled torches.

Compared to casing systems, heat-shrinkable sleeve systems provide inferior mechanical protectioncontinuity for pre-insulated pipe joints.

Figure 17. Cross-linked heat-shrinkable sleeve installed on a pre-foamed joint of a PUF pipeline

11.3 – Bends and Fittings

11.3.1 Application of Polyolefin Coatings

Bends and fittings are typically protected from external or internal corrosion by liquid coatings such aspolyurethane or epoxy, or by polyolefin coatings applied by two different processes. These componentsare coated individually and the process is usually referred to as ‘custom coating application’.

The two processes employed for the application of polyolefin coatings are fluidised bed or flock sprayingonto hot surfaces.

In the fluidised bed coating process, after pre-heating, the item is dipped into a bed of fluidising powder.This bed consists of two compartments, one on top of the other. The upper, larger compartmentcontains the coating powder. The lower compartment, or "plenum chamber", is a reservoir forpressurised air. A porous membrane, sometimes called a diffuser, separates the two compartments.Usually the membrane is made of canvas or a high quality filter paper. The porosity of the membrane iscritical to the quality of the fluidisation of the powder. Compressed air is forced into the lowercompartment. It diffuses through the membrane and moving upwards, still under pressure, passes

Page 158: Vol 2 onshore pipelines the road to success 3rd edition

16

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

between the fine powder particles that are contained in the upper compartment. As a result, the bulkdensity of the powder is reduced and this permits the preheated metal object to be lowered easily,without any resistance, into the now "fluidised" bed of powder. The powder behaves like a liquid andcontinues to do so, as long as the air is forced into the lower plenum chamber.

By careful agitation or controlled movement of the hot metal object underneath the surface of the "fluid"powder, the cold powder comes into contact with every point of the hot metal and fuses onto it. Athickness of between 300 and 750 microns is suggested in order to achieve the optimum potential ofthe coating material. Thicknesses outside the recommended range may be detrimental to the coating.Thicknesses above 1500 microns are to be avoided. The benefits of this process include: 100% coatingefficiency; faster cycle times than other application processes; thicker coating providing functionalprotection, longer life, impact resistance but with higher material usage and superior edge coverage.However, this application process requires capital to be invested in the fluidised bed unit.

Flock spraying is sometimes called "powder spray coating". This method consists of blowing powderthrough a suitable spray gun onto metal items that have been preheated to a predeterminedtemperature. The powder hits the hot metal and sticks to it, where it melts and gradually fuses to form ahomogenous coating. This method of powder application is particularly suited to coating large or odd-shape objects, which would otherwise be impractical to process by the fluidised bed process. Flockspraying has the added benefit that more than one coat of powder can be applied, if the metal object iscarefully re-heated before re-spraying. This process can be repeated several times, if necessary, in orderto build up and achieve the desired coating film thickness. This method is used for the application of 3layer polyolefin coatings where FBE, adhesive and top coat layers can be successively applied.Maximum thickness is limited by the application method to not more than 2mm. Other benefits of thisapplication process include: recycling of the coating material is possible; no major investment inequipment. However, this process has a lower coating efficiency than the fluidised bed process. Thesteps of a typical custom coating process are detailed in Appendix 11.3.

11.3.2 Internal Protection of Bends and Fittings

The use of internal coatings for corrosion protection, electrical isolation and deposit mitigation is acommon industry practice. A wide variety of pipeline components such as elbows, bends, valves, piglaunchers, and isolation spools are manually coated using spray and/or flocking guns.

A wide variety of liquid or powder coating materials are employed. Careful selection of the coatingmaterial based on the intended service environment is essential in order to ensure proper coatingadhesion and a long service life of the component. Some liquid coatings can cure at ambienttemperatures which makes them useful for large surface applications such as tanks and vessels.Powder coatings require factory-applied coating application because of the temperatures involved, butgenerally provide better chemical and temperature resistance versus typical liquid systems.

Fig 18 Internal Coating Materials for Immersion Service

Page 159: Vol 2 onshore pipelines the road to success 3rd edition

17

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

A variety of internal coatings are used for corrosion protection in continuous immersion service. Coatingswhich cure by chemical reaction (for example epoxy, polyester, polyurethane and coal tar epoxycoatings) have proven to be the most durable materials.

Over the last 20 years epoxy based coatings have proven themselves to be very successful inimmersion service. The success of fusion bonded epoxy (FBE) coatings is rooted in their excellentchemical resistance and long service life. FBE coatings are powder materials that are applied to aheated surface allowing the powder to melt and flow. Typically a liquid primer is first applied to allow forthe maximum level of adhesion of the overall coating system to the metal substrate. During the ‘curing’process, the primer and top coat react together and chemically cross-link, yielding a single system welladhered to the metal surface. In order to ensure proper application of FBE coatings the surfacepreparation is very important. The first step is to thermally clean the component to be coated attemperatures of up to 399°C. The part is then grit blasted with blast media, such steel grit or aluminiumoxide. The blasting is done to a NACE # 1 White Metal Finish (SSPC 5), the aim being to obtain asurface structure (anchor pattern) rough enough to allow excellent mechanical adhesion and a surfaceclean enough to allow excellent chemical adhesion by the primer system.

Chemistry Characteristics

Epoxy Temperature limit 225ºF (107ºC), the amount of flexibility and temperatureresistance are inversely related. Inherently have a fair amount of chemicalresistance.

Phenolic Temperature limit 400ºF (204ºC), high abrasion and temperature resistancealong with good chemical resistance. Can be brittle.

Epoxy Phenolic Temperature limit 250ºF (121ºC), produces a middle-of-the-road coating withgood flexibility, temperature resistance, and chemical resistance.

Epoxy Novolac Temperature limit 400ºF (204ºC), excellent chemical resistance (generallybetter than straight phenolic), temperature resistance and flexibility close to aphenolic coating.

Table 1 Main internal coating systems for bends and fittings

11.3.3 Substrate Suitability for Custom Coating – General Guidelines

Not all substrates are suitable for the application of internal coatings. An assessment of the metalsubstrates suitability for coating should be done using DIN 14879-1:2005. The material to be coatedshould be free of all sharp edges and corners that could interfere with the coating’s ability to provideadequate physical coverage, and the metal substrate must be easily accessible to hand tools in orderfor proper surface preparation. Any weld beads must be ground smooth, providing a surface where anadequate anchor profile can be generated for proper coating flow and adherence. In order to obtain thedesired anchor pattern (a surface roughness profile between 25-80 microns) the metal substraterequires blasting, usually with steel grit or aluminium oxide. Critical to the success of a coating systemwill be the ability to overcome the dimensional limitations and geometry of the material to be coated. Allsurfaces must be accessible not only for proper grit blasting but also for hand-held coating guns as wellas proper quality control measurements.

Some coating applications call for thermal cleaning for the purpose of eliminating organic deposits, atelevated temperatures in excess of 370°C. Care should be taken with corrosion resistant alloys (CRA),as they could possibly suffer from some level of embrittlement after thermal cleaning. Other specialtubulars i.e. nonmagnetic drill collars, cannot be thermally cleaned without changing the metallic surfacestructure. These special substrates are instead chemically cleaned prior to the coating application.

Page 160: Vol 2 onshore pipelines the road to success 3rd edition

18

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Fig 19. Metal Substrates Not Suitable for Custom Coating

Spiral &Weld Imperfections

Burrs & Longitudinal Chamfer

Weld Seam & Surface Imperfections

11.4 – Mechanical Protection Selection Guide

As mentioned earlier, mechanical impact damage is one of the most common causes of onshorepipeline incidents. Pipelines thus need mechanical protection in order to avoid or reduce the damagefrom impacts. The mechanical protection need for each onshore pipeline project has to be addressed,whenever possible, at an early stage in the design and/or construction of the pipeline in order to ensurethe integrity of the corrosion protection system(s) and thus the long-term pipeline integrity.

All the most common external anti-corrosion and insulation plant and field-applied coatings have anembedded basic mechanical protection potential coming from the intrinsic damage resistance of the rawcoating materials. Multi-layer external coatings have been developed to specifically improve the basicmechanical protection potential of the single-layer external coatings. However, the basic mechanical

Page 161: Vol 2 onshore pipelines the road to success 3rd edition

19

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

protection potential that can be obtained at a reasonable total installed cost, even by using multi-layerexternal anti-corrosion coatings such as those detailed in section 11.1, is rather limited, especially duringpotential high-impact activities such as backfilling. For example, field trials have shown that even withthe most impact-resistant coating systems, the maximum size of the backfill material that could be usedduring standard backfilling should be no more than 5-6 cm in diameter2.

Therefore, the onshore pipeline industry has focused on developing supplementary mechanicalprotection systems that increase the damage resistance of the pipe and pipe coating during thevarious stages of their life-cycle.

In this context, as mechanical impacts from different sources can happen at any time during the life of apipe joint, the supplementary mechanical protection systems can be categorized based on the timehorizon of their protection:

• Protection during transportation – separation pads etc

• Protection during handling (loading in and out) and storage – protection pads, sand berms,wood pads etc.

• Protection during installation (lowering in, backfilling) – sand padding, concrete coatings, non-woven geotextiles etc.

• Protection during pipeline’s service life – above-ground pipeline markers, coatings, concreteslabs etc

• Whole pipe life-cycle protection – including all stages above – selected plant-applied concretecoatings

The existing supplementary mechanical protection methods and systems can also be separated inseveral categories based on their location relative to the pipe:

• Above-ground systems – pipeline markers, ‘call-before-you-dig’ numbers, separation orprotection pads etc

• Buried trench protection systems – tunnels, concrete slabs, steel plates or wires that protector deny access to the pipeline trench etc

• Buried pipe protection systems – can be either protection systems that protect just part of thediameter or length of the pipe (such as foam pillows, sand bags etc) or systems that protect thewhole diameter and length of the pipe (such as plant and field-applied coatings, sand padding,select backfill [mechanical padding], non-woven geotextiles, rock shield materials etc)

Supplementary mechanical protection systems can also be categorized based on the location where theprotection is applied – in a specialised facility or in the field by a specialised contractor.

Based on these categories, for the purpose of this document, we are going to focus on the systems thatprotect the whole diameter and length of the pipe – the buried total pipe protection systems, both plant-applied and applied in the field.

The most widely used buried total mechanical protection systems in the industry are reviewed in thenext sub-sections. Note that the list of systems described below is not exhaustive, as other systems arealso used in onshore pipeline projects, but on a more limited scale.

2 For some examples of such field trials, please see Optimization of Pipeline Coating and Backfill Selection, EspinerR., Thompson I, Barnett J, NACE, 2003 and other similar sources listed in the section’s Bibliography

Page 162: Vol 2 onshore pipelines the road to success 3rd edition

20

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.4.1 Concrete Coatings

Concrete coatings were created to offer supplementary mechanical protection to the pipe and pipecoating. When applied in a specialised coating plant, concrete coatings are the only mechanicalprotection systems in the industry that protect the pipe during the whole pipeline construction process(transportation to ROW, temporary storage, handling, stringing, lowering in, backfilling) and the entirepipeline service life.

Concrete coatings can be plant-applied (through side-wrap, spraying or impingement processes) orapplied in the field – as form-and-pour or moulded concrete and are covered by the EN ISO 21809-5(draft) standard. All concrete coatings are reinforced by either wire mesh, rebar cages or different typesof fibres. While the reinforced concrete coating covers the pipe length, its field joint areas are protectedby either field-applied reinforced concrete, wire-reinforced polyethylene open-cell sheets or wood slats.Some concrete coatings are wrapped in a perforated polyethylene outer tape that prevents concretespalling and allows curing (the PE tape can then be removed at the customer’s demand). The minimumthickness of the concrete coatings is 6-7 mm (fibre-reinforced concrete), while the maximum that can beapplied is 150 mm for the side-wrap process and around 200 mm for the impingement and form andpour processes. Some of the fibre and wire mesh reinforced concrete coatings with a thickness of up to25 mm are bendable according to the industry specifications – 1.5° per pipe diameter. Some of thefibre-reinforced and higher thickness concrete coatings are not bendable, reducing their ability to followthe terrain configuration in the field.

Fig. 20 – Bendable plant-applied concrete coating

Concrete coatings offer some of the highest mechanical protection among the existing systems whilsttaking up little space. A 25 mm wire mesh reinforced concrete coating, for example, offers the equivalentimpact protection of a layer of 300 mm of sand padding. Some concrete coatings are capable ofresisting penetration from trench bottom outcrops, if specific point loading parameters supplied by theapplicators are satisfied.

If available in the project’s region, concrete coatings offer the highest flexibility to pipeline designers andcontractors, as they have no limitations of use in terms of terrain configuration (they work very well onsteep slopes), trench material type (large rocks) or climatic conditions (very cold climates), as all theother systems have. When applied in a plant, the concrete coatings do not delay the construction of thepipelines and do not require additional material, equipment or manpower on the right-of-way.

On the other hand, while reducing other pipeline construction costs, concrete coatings increase theweight to be transported and handled to and on the right-of-way. Non-bendable concrete coatings arealso less useful, as the coated pipe cannot follow the terrain configuration. Field-applied concrete

Page 163: Vol 2 onshore pipelines the road to success 3rd edition

21

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

coating is slow, can delay the pipeline construction and usually cannot offer the quality guarantee of aplant-applied coating.

11.4.2 Sand Padding

Sand bedding and padding is one of the most frequently used supplementary mechanical protectionsystem during the last decades. This system only protects the pipe against impacts during its loweringin, trench backfilling and during its service life after installation.

Sand padding is applied in the field. After the pipeline trench is opened, sand or fine gravel is brought inusing sand trucks, usually from a commercial sand pit in the region. The fine material is dumped next tothe trench. A first layer of sand, the sand bedding – usually 20-30 cm thick – is then placed on thetrench bottom for protection against rock or other hard outcrops. The pipe is then lowered in andanother layer of sand or other fine material is placed (padded) around and on top of the pipe – usuallyanother 20-30 cm on top of the pipe. The trench backfill is finished with some of the material excavatedfrom the trench and the topsoil. Finally, the surplus spoil – the original trench material displaced by theimported sand/fine gravel, such as shot rock, cobbles, boulders – is usually removed from the right-of-way and disposed of – at a cost – at a different location.

The sand padding provides adequate mechanical protection to the pipe and pipe coating and, bychanging the thickness of the top sand layer can withstand backfill impacts from virtually any size oftrench material. Sand also offers a certain degree of protection against penetration from trench bottomoutcrops, as long as there is sufficient sand to ensure outcrops are not in direct contact with the pipe.

Sand padding has some limitations in terms of climatic conditions – sand can freeze in large chunks incold weather, making padding more difficult or impossible. Its protection can also be impaired by sandwashouts on steep slopes or in other draining areas.

Sand padding needs additional material (sand), equipment (sand trucks, padding machines), additionalmanpower (truck drivers, one bedding team after the trenching team and one padding team after thelower-in team), space (sand truck access and sometimes temporary sand dump areas) on the right-of-way and adds surplus trench material disposal costs.

11.4.3 Select Backfill (Mechanical Padding)

The select backfill method (also called mechanical padding) was created to offer mechanical protectionto the pipeline by taking advantage of the local material that was excavated at the opening of the trench.This method protects the pipe only during its lowering in, trench backfilling and during its service life afterthe installation.

The select backfill (mechanical padding) is applied in the field. The local material excavated at theopening of the trench is fed into the mechanical padding machine, where it is screened based on size.The finer material is then placed under, around and on top of the pipe for protection against large backfillmaterials – the layer under and on top of the pipe are each usually 20-30 cm thick. The trench is thenclosed by adding the remaining larger size trench material and the topsoil.

Page 164: Vol 2 onshore pipelines the road to success 3rd edition

22

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Fig. 21 – Mechanical padding machine

The select backfill method provides adequate mechanical protection to the pipe and pipe coating and,by changing the thickness of the top padding layer can withstand backfill impacts from virtually any sizeof trench material. The biggest advantage of this system is that only the original trench material is used,and there is no requirement for imported fine materials (sand etc). Select backfill has the best resultswith dry granular trench materials.

The performance of this system is reduced in regions with wet, silty or clay trench materials. There aresome limitations in terms of climatic conditions – mechanical padding is more difficult when trenchmaterials are frozen. This system is also not very practical on steep slopes or areas with reduced or noright-of-way access for equipment.

Mechanical padding needs additional equipment (mechanical padding machines), additional manpower(padding machine operators) on the right-of-way, as well as additional time for setting up anddemobilizing the padding machines.

11.4.4 Rock Shield and Non-Woven Geotextile Systems

Rock shield materials are polyethylene or PVC-based solid sheets or open-cell extruded pads; non-woven geotextiles are needle-punched polypropylene fibre-based rolls. These materials are designed toprotect the pipe and pipe coating against damage during pipe lowering in, trench backfilling and duringthe pipeline’s service life after installation.

Rock shield and non-woven geotextile materials are installed on the pipe in the field outside the trench,in a spiral “cigarette” wrap application using tape or Velcro to secure the seam. Smaller diameter pipescan be longitudinally wrapped. Rock shield materials are available in rolls of various styles, sizes,thicknesses (usual range 6-11 mm per layer for rock shield and 4-14 mm per layer for non-wovengeotextiles) and technical performance properties.

Page 165: Vol 2 onshore pipelines the road to success 3rd edition

23

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Fig. 22 – Non-woven geotextiles installed on pipe

Rock shield and non-woven geotextile materials offer good mechanical protection to the pipe, especiallyin gravel/small cobble trench materials: according to the suppliers, the strongest multi-layer non-wovengeotextiles can withstand impacts from backfill material up to 10 cm in diameter without any damage(holidays) to the anti-corrosion coating or the pipe. They do not protect against penetration from trenchbottom outcrops and have to be combined with other systems (sand) in order to create some degree ofprotection.

Rock shield and non-woven geotextile systems will not provide adequate mechanical protection in rockytrenches and with largebackfill material. A rock shield could produce cathodic protection systemshielding if it is not an open-cell material, while, based on the information available from the industry, theimpact of the non-woven geotextiles on the cathodic protection system is unclear and needs furtherresearch.

Installation of rock shields or non-woven geotextile materials could slow down the pipeline constructionand needs additional material (rock shield, geotextile sheet), manpower (field installation crew) on theright-of-way, and sometimes other mechanical protection systems (sand, select backfill). Costly wastagecan also arise if the rock shield sheet width does not match the pipe diameter. The protection efficiencywill be dependent on the quality of the field installation crew’s work.

Page 166: Vol 2 onshore pipelines the road to success 3rd edition

24

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.4.5 Mechanical Protection Selection Guidelines

In order to make the most informed choice for the supplementary mechanical damage prevention andprotection of the onshore pipelines, the parties involved should use the following categories of selectioncriteria:

- Technical performance criteria – such as time horizon of the protection (e.g. is this whole lifecycleprotection or just protection during installation?); impact resistance during backfill (maximumallowable backfill size); resistance to penetration (from trench bottom etc); flexibility (impact onpipe cold bending); impact on the cathodic protection system etc.

- Pipeline design and constructability criteria – such as limitations in terms of trench material,terrain configuration, harsh climatic conditions; right-of-way allowance and access limitations;increased contractor risk (additional equipment and manpower needed, construction delays,potential future remediation cost risk etc); regulatory limitations (pipeline operator specifications,government/industry standards and regulations) etc.

- Environmental criteria – minimum impact on the right-of-way and surrounding environment duringpipe transportation, handling, installation and service life – impact can be measured by vegetationloss, increased erosion potential, volume of excavated and landfilled trench material, fauna andflora disturbance etc.

- Economic criteria – system availability in the region; total installed cost (including the materialsupply cost, but also all the direct and indirect mechanical protection installation costs)

Please find in Appendix 4 a table comparing the discussed supplementary mechanical protectionsystems based on the criteria listed above.

In terms of selection methodology, based on the criteria categories above, and if the basic mechanicalprotection provided by the external anti-corrosion coatings is not enough for the needs of a pipelineproject, the stakeholders can take a three-step approach in selecting the optimal supplementarymechanical protection system or combination of systems (as some of the systems discussed above canbe combined for increased mechanical protection):

1. Shortlist the preferred supplementary mechanical protection systems or combinations of systemsbased on the pipeline project specifics and on technical, design, constructability and environmentimpact criteria – see table in Appendix 1 for help

2. Once the most interesting systems or combinations of systems are selected, check theavailability of those systems in the project’s region or in a region with easy logistic access to theproject’s region

3. Choose among the available short-listed systems or combinations of systems the option with thelowest total installed cost or the best cost/benefit ratio

The selection of the supplementary mechanical protection solution should be done, as the selection ofthe mainline and field joint coatings, as early in the pipeline design and construction as possible, in orderto ensure consistent and cost-effective corrosion and mechanical protection for the pipeline.

Although the general technical performance of the different supplementary mechanical protectionsystems is well understood in the industry, we recommend that further research be done to clarify sometechnical performance aspects such as the comparative resistance of the different systems topenetration from outcrops in the trench bottom, re-validate the maximum backfill size that is allowed forthe different systems and the impact of increasing pipeline operating temperature on the performance ofthe different mechanical protection systems.

Page 167: Vol 2 onshore pipelines the road to success 3rd edition

25

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.5 – Internal Coatings

11.5.1 Internal Coatings’ Purpose

Internal coatings are used to increase the flow efficiency for natural gas pipelines and to mitigatecorrosion damage to the line pipe. Internal plastic coatings (IPC) have a very low surface roughness inrelation to the steel pipes they protect. This impacts pipe hydraulics and provides a surface change thatwill aid in the mitigation of organic and inorganic deposit formation, increasing the economicjustifications for using IPC.

The surface finish of an internally plastic-coated pipe has a fraction of the surface roughness of barepipe, reducing the friction generated at the surface during product flow. The usage of IPC in gaspipelines have shown a reduction in friction coefficient of up to 50% resulting in a transmission increaseof 15 to 25% (2) (4). The potential pipeline transmission increases are more pronounced in smaller sizedpipes, as well as systems with higher Reynolds numbers where flow is turbulent.

Fluid flow is characterized as laminar, or turbulent with most gas pipeline having turbulent flowconditions. Even for systems which are characterised by turbulent flow conditions, a minute laminar(sub) layer exists at the pipe wall, and the extent of the laminar sub layer is dependent upon the surfaceroughness of the pipe surface. Under laminar flow conditions, fluid and particle movements are morepredictable. The greater the laminar sub layer extends into the pipe ID the less friction is a factor onproduced flow. In uncoated pipe the surface will have a greater physical roughness which will increaseturbulence leading to greater friction being generated during flowing conditions. The overall effect of thisfriction will vary based on the type of product being transported and the rate of flow. Hydraulic modellingsoftware is now available to conduct simulations inputting varying surface roughnesses in an effort toidentify any possible increases in product throughput and also for research into the modelling ofmultiphase flow that is becoming ever more important as large offshore developments call for thepumping of gas, and oil/water emulsions in pipelines over extended distances.

Internal plastic coatings aid in maintaining fluid purity by mitigating product interaction with the bare steelsubstrate which can lead to harmful reaction products. They also aid in the prevention of organic andinorganic deposits adherence (3). Deposits of corrosion by-product, water born scales andmicrobiological ‘biofilms’ are usually encountered in low spots of the pipeline, i.e. road crossings, or atthe foot of a mountain and can result in premature pipeline failure due to corrosion (mostly localisedpitting corrosion).

Undesirable bacteria such as acid-producing bacteria (APB) and sulphate-reducing bacteria (SRB)associated with water transmission pipelines form dense ‘biofilms’ which can result in pitting corrosionof line pipe. The biofilm provides a habitat for the microorganisms, providing shelter from bulk fluidmovement and contact with most surfactant biocides able to effectively kill off the bacteria. Biofilm

Page 168: Vol 2 onshore pipelines the road to success 3rd edition

26

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

deposits can require extensive pipe pigging operations in addition to costly biocide treatments in orderto control corrosion. The material composition of the surface has little effect on the biofilm development(5) or adhesion to the substrate, bacteria will secrete polysaccharides and attach to metals as well as toplastics. The smooth surface (roughness) of coated pipe will however expose these microbiologicaldeposits (biofilms) to a much higher degree of sheer stress from the bulk fluid movement compared tobare pipe. The higher surface roughness of uncoated pipe helps shield the bacteria from the bulk fluidmovement, enhancing growth conditions for bacterial colonies. Coated pipe also provides an effectivebarrier (barrier coating) against the detrimental and corrosive effects of contact with the bacteriametabolic byproducts such as H2S and/or acids.

In water-injection systems where produced water from various formations and/or other sources such asriver water or seawater are mixed, the potential for the development of scale deposits in the pipeline lineis a possibility. Coatings can also provide benefits for production systems which are prone to have scaledeposits forming on the pipe surface. As in the case of bacteria, the low surface roughness of coatedpipes exposes the scale to higher sheer stress from the bulk fluid movement, additionally the coatedsurface provides reduced mechanical binding locations for the crystal lattice of the developing scale.Improved fluid purity will also increase the service life of pumps while reducing their power requirements(6) and resulting in cleaner filtration units.

Additional benefits of using internal flow coatings include: corrosion protection of the pipe during storageprior to installation; improved pigging conditions; faster drying times; and improved conditions for visualinspection of the internal surface of the pipe walls. Pipe storage periods prior to construction should bekept to a minimum as studies (1) have shown that the surface roughness of bare pipes will increaseduring storage due to surface corrosion. The high surface gloss of most internal plastic coatings are anexcellent aid in the visual inspection of the pipe interior prior to line commissioning, while the smoothcoating surface finish aids to extend the life of pipeline pigs during production/clean-up operations.

The application of internal plastic coatings involves several surface preparation steps. Initially there willbe a thermal cleaning step or chemical wash to remove any organic species that might be on the pipe’sinternal surface. The next step will include some level of grit blasting of the pipe’s internal surface to acleanliness level specified by the coating manufacturer/applicator. During the surface preparation of thepipe, all mill scale and metallic deposits are removed from the pipe ID; removal of this debris followingthe hydro testing of the pipeline would be extremely expensive. During hydro testing the water used isusually chemically treated so as not to cause corrosion or have water-borne bacteria becoming sessileand adhering to the new pipe.

Studies have shown that the typical payback for the internally coated pipe investment is between threeto five years, based purely on pipeline hydraulic improvements (8). Plastic coatings can reduce thepressure drop in pipelines, and have been shown to allow the operator to use a smaller ID line pipe whilestill maintaining the same throughput as with a larger diameter internally-bare pipe (9). One additionaleconomic benefit of using coated line pipe is the reduction in power consumption required to move the

Page 169: Vol 2 onshore pipelines the road to success 3rd edition

27

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

gas and/or liquids from one end of the line to the other. In countries such as Norway, over 30% of theproduced gas is used in offshore power generation that is required to fuel the compressors used for theexport gas pipeline.

11.5.2 Main Internal Coating Systems

Cement Lining

Cement mortar lining (CML) is a centrifugally-applied continuous lining of dense Portland cement mortarwith a smooth and uniform finish. These products were developed to provide an economical form ofinternal corrosion and abrasion protection for oilfield tubulars and line pipe. CML is used primarily inwater injection and disposal lines. These products are also suitable for potable water lines but shouldnot be specified for lines where hammer conditions or fluid pH below six (acidic condition) exist.

The lining provides economical and lasting protection against the corrosive effects of saline solutionsand other types of industrial liquids and wastes. It has excellent structural and spall-resistant properties.

This is a proven technology with over a century of use in municipal water mains and water service lines.The system is compatible with other external coatings. Extruded polyethylene external coating may beapplied over CML pipe provided the steel is not heated rapidly by more than 80°C during the coatingprocess. Cement is alkaline in contact with water which reduces the corrosion impact to the metalsubstrate under the cement mortar. Cement mortar however has restrictions with regards to water fluidspeeds and reduces the pipe ID to a larger extent than FBE coating systems would. Cement also has ahigher surface roughness compared to FBE and promotes microbiological growth to a larger extent,furthermore the degree of flexibility of cement mortar lined pipe and impact resistance is inferior to FBEtype of linings.

Fusion Bonded Epoxy

Typically when fusion bonded epoxy (FBE) is referenced, it is assumed to be for the external protectionof line pipe. There are a wide array of FBEs, primed and unprimed, that have proven to be successful inthe area of corrosion protection, hydraulic improvement and deposit mitigation for the internal of linepipe. FBE is a plant-applied thermoset lining for steel pipes where internal corrosion protection or asmooth surface is required. This lining reduces friction costs and compression costs, and provides aclean internal surface along with corrosion protection. As with internal plastic coatings, FBE has beenused since the early 1960s. FBE coatings are used extensively in the oil and gas industry for the coatingof line pipe, valves, fittings and for downhole materials such as tubing and casing. The fusion bondedepoxy coating systems are applied at what is called the “cladding temperature” of the powder. Thecladding temperature is the point at which the powder will melt and flow allowing it to adhere to the pre-prepared (grit-blasted and/or thermal-cleaned surfaces). Powder coating systems are applied in a onelayer process as opposed to liquid coating systems which can be applied in numerous, thin layers withan intermediate drying/baking cycle between each layer. As opposed to cement linings, FBEs are thickfilm coatings usually with a Dry Film Thickness (DFT) of less than 400 microns. Advantages of FBEcoatings are their adhesive properties, their chemical resistance, their high degree of flexibility and goodimpact resistance. Drawbacks of FBE coating systems are the high degree of surface preparationrequired for their application as well as a curing temperature in excess of 200°C, all of which requires‘shop applied’ coating application.

Page 170: Vol 2 onshore pipelines the road to success 3rd edition

28

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Polyamide Coatings

Internal coatings based on polyamide chemistry are defined as thermoplastics. Unlike thermosetmaterials, thermoplastics do not undergo a final curing step at elevated temperatures. Instead, thesematerials are applied at very high temperatures and are then led through a controlled cool down processthat will vary depending on the type of polyamide and the desired final properties. Due to this, heat-resistant polyamide powder coatings are primarily plant-applied coating systems. Polyamide coatingshave advantages over FBE coating materials due to a higher degree of flexibility and less damageexperienced from mechanical impact. Polyamide coatings generally require a liquid epoxy or phenolicprimer in order to ensure good adhesion.

Flow Efficiency Coating

Flow efficiency coatings (FEC) are thin film epoxy coatings applied in natural gas pipelines to smooth theinternal pipe surface for improved flow. Application of FEC replaces the internal rough surface of a steelpipe with a smooth surface finish which reduces friction and turbulence to increase flow efficiency. Thismay allow for use of a smaller diameter pipe or lower compression requirements resulting in reducedcapital and operating costs. After application of FEC, the clean internal surface of the pipe providescorrosion protection prior to installation and allows for easier visual inspection. The cleaner surfacereduces the cost and effort of drying the pipe after hydrostatic testing.

Anti-Corrosion for Potable Water – Epoxy LiningOne type of internal coating system for potable water applications is a 100% solids, two component,and solvent free, high build epoxy lining used to provide corrosion protection for the internals of steelpipes in potable water applications. BS6920 and ANSI/NSF 61 are local standards for potable water,and can also be used for other applications including raw water, process water, sewage, wastewater,crude oil, and white oils. These standards usually call for testing of the applied coating material withregards to taste, smell, microbiological growth and possible leaching out of heavy metals and/orsolvents. Coatings used for potable water handling must be solvent free in an applied form and are usedon valves, fittings, tanks and elbows as well.

These products are designed for high build, single coat applications by airless spray equipment.

Performance PropertiesThese products are allowed to cure to form a hard and glossy surface film with excellent resistance for awide range of aqueous chemicals including potable water, effluents, raw water, process water, sewage,crude oils, and white oils. These products exhibit excellent adhesion on correctly-prepared steelsurfaces. They are compatible with most readily-available field joint coating systems such as heat-shrinkable sleeves, liquid epoxy, FBE and polyurethane coatings.

Easy ApplicationThese products are suitable for application as a single coat system, using both standard and/or pluralcomponent airless spray equipment. They are capable of being applied by roller or brush for smallapplications and repairs.

Environmentally SafeWith a 100% by volume solids, zero volatile organic compound (VOC) formulation, these products aredesigned to meet strict health, safety and environmental standards. They eliminate solvent emissions,explosion risk and fire hazard and are designed to eliminate the risk of solvent retention which caninfluence water quality and coating defects.

Page 171: Vol 2 onshore pipelines the road to success 3rd edition

29

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Anti-Corrosion for Potable Water - FBE Powder CoatingsAnother type of internal coating is the FBE system. FBE powder coatings have been used in the pipelineindustry for more than 40 years. These powder coatings contain no solvents and are 100 % solidwithout any dangerous raw materials. FBE powder coatings meet a lot of standards around the world like DIN/ISO/EN, GSK, AWWA anddrinking water approvals such as - UBA-Guideline, Germany - ACS, France - WRAS, United Kingdom - KIWA, Netherlands - Belgaqua, Belgium - NSF 61, USA

The purity of the water for human consumption is the highest priority for the companies involved in thesupply chain of manufacture and management of the mains distribution systems. Therefor the control ofthe products used in the industry must also be of the utmost importance.

In Europe the control of materials used is normally determined through government departments orindependent test institutes or a combination of both. In certain cases only raw materials that are on a“positive” list can be used in a fusion bonded epoxy formulation. In this case the powder manufacturerwould also be audited on a regular basis and samples taken from production of FBE products to confirmthey continue to meet the approval documentation.

In the case of the KIWA or NSF drinking water approval the control of raw materials is very strict, withthe chemical composition of individual raw materials assessed to ensure the products conform to theirrequirements.In addition to these regulations further testing is performed on the growth of microorganisms onmaterials intended for use in drinking water. In particular the FBE technology has been tested inGermany by the Hygiene-Institut des Ruhrgebiets for examination and assessment following theregulations of the DVGW (German Association of Gas and Water) technical rules, method W 270. Thetest is targeted at determining any signs of bactericidal or fungicidal properties of the FBE-coatedsurface. The FBE technology has been tested to and meets the requirements of this specification withdocumentation available.

Anti-Corrosion for Potable Water – Polyurethane LiningPolyurethane-based products are 100% solids, either one or two component systems, 1:1 mixed byvolume, high performance, high build, fast set, aromatic and rigid polyurethane lining. They have beenspecifically designed as corrosion and abrasion resistant coating for long term protection of water pipeinternals. They should comply with the requirements of NSF/ANSI 61 standard for potable water andAWWA C222 standard. They can also be used for other applications including raw water, process water,sewage, and wastewater.

Excellent Performance PropertiesPolyurethane based systems cure to form a very hard and tough surface film with excellentresistance to abrasion, impact, chemical attack, and cathodic disbondment. They exhibitexcellent adhesion on correctly-prepared steel and ductile iron surfaces. The application of aprimer is not necessary. They are compatible with most readily available field joint coatingsystems such as heat-shrinkable sleeves, liquid epoxy, FBE, and polyurethane coatings.

All Temperature Cure and Unlimited Film BuildPU can be cured at almost any ambient temperature. These products have a very fast curingtime and are therefore applied using plural component spray equipment. The unlimited filmbuild can be achieved in a single coat multi-pass application. The end result is a thick,

Page 172: Vol 2 onshore pipelines the road to success 3rd edition

30

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

impervious, and holiday-free internal coating film within minutes of spray application. Inspectionand quality testing can be made within 30 minutes and pipes can be put into service withinhours.

Environmentally SafePU is a 100% solids system, being free of solvents and VOCs, and is designed to meet stricthealth, safety and environmental standards. The product contains only pure resins and thefinished coating is safe for drinking water and food contact.

11.5.3 Coating Qualification Testing

Regardless of the purpose of an internal plastic coating in a pipeline application, the coating must be ‘fitfor purpose’. For example, it must have sufficient resistance against delamination, swelling anddisbonding in its intended environment. Advances in coating chemistry and technology over the lastdecade have led to the usage of coated line pipe in environments where this was previously not feasible.Oil and gas fields with service temperatures in excess of 120°C, and extreme chloride concentrations inexcess of 160,000 ppm, coupled with substantial concentrations of sour gas are not uncommon anymore.

When choosing the qualification tests to be used for the testing of the most appropriate coating systemit needs to be kept in mind that the coating standards used for ID coatings originated from the externalcoating business. The confusion is amplified by the extensive number of ANSI, AWWA, API, NACE, DINand ASTM standards that are associated with coatings and paint. These may not be suitable for internalcoatings. Care has to be taken that these standards are not confused with one another and the testingduring fit for purpose trials is relevant to the system in question.

The coating material under consideration should be tested for its resistance in its intended environment.It has to be kept in mind that most test work relating to internal plastic coatings is derived from externalcoating test procedures. As such there are several tests which, while appropriate for external coatingsystems, provide little beneficial data regarding the performance of an internal coating in a particularenvironment. One such test is the salt spray resistance test (discussed in API RP 5L) for coatingsystems designed for immersion services. Another test that will not provide a realistic view of coatingperformance in a line pipe application is the 90° degree impact testing which was used in the past toexpose brittle coatings that were susceptible to disbonding. Given the nature and direction of flowthrough a pipeline, 90° impact angles are not representative of potential coating damage to the internalsurface.General environmental parameters such as temperature and pressure are important variables for thecoating selection, especially when it comes to immersion service in sour environments. As thetemperature increases resistance to H2S generally decreases, these effects and results are bestevaluated in an autoclave test series. For sour-service environments it is advisable to conduct autoclavetesting simulating the field conditions with regards to gas compositions, pressures, temperatures, and ifapplicable, reconstituted field/formation waters can be used. These tests are conducted according toNACE TMO185 “Evaluation of Internal Plastic Coatings for Corrosion Control of Tubular Goods byAutoclave Testing”. The test coupons from the autoclave testing can then be used to test for theadhesion of the coating material prior to and following exposure to the corrosive environments. Anappropriate test for adhesion is according to ASTM D4541-02 “Standard Test Method for Pull-offStrength of Coatings using Portable Adhesion Testers”. The possible formation of blisters, classifiedaccording to ASTM D-714 “Standard Test Method for Evaluating the Degree of Blistering of Paints”,following autoclave testing indicates loss of adhesion to the steel substrate. In the past internal coatingshave failed due to different rates of thermal expansion and contraction between coating and the metalsubstrate. This could be due to simple temperature gradients between day and night-time or largetemperature differences between pipe ID and OD.

Page 173: Vol 2 onshore pipelines the road to success 3rd edition

31

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Another important test indicating coating ‘flexibility’ is the Mandrel Bend Test (ANSI/AWWA P213-07),the coating requires sufficient flexibility to resist cracking and disbonding of the coating during pipelaying operations.

References

1. J. Nelson “Internal Tubular Coatings used to maximize hydraulic efficiency.” Corrosion 200 ,Paper 00173

2. Harald Strand “Economical and Technical Benefits of Internal Coatings of Oilfield tubulars andEquipment.” 10th International Symposium Celle

3. Crowe , R. H. “What Transco Learned about Internal Coating of gas Pipelines.” The Oil and GasJournal Vol 57, No. 15: pp 107-111

4. D.R. McLelland “Field Testing of Friction Losses in Plastic-coated Tubing.” API Division ofProduction

5. Pedersen 1990 “ Stainless Steel vs. PVC Surfaces”

6. A. Tamm, L. Eikmeier, B. Stoeffel “The influence of surface roughness on head, power input andefficiency of centrifugal pumps.” Hydraulic Machinery and Systems 21st JAHR Symposium,2002 Lausanne.

7. F.F. Farshad and H.H. Rieke “Flow Test validation of direct measurement methods used todetermining surface roughness in pipes (OCTG).” University of Louisiana

8. E. Sletjerding, J. Gudmundsson “Flow experiments with high pressure natural gas in coatedand plain pipes: Comparison of Transport Capacity.” Department of Petroleum Engineering andGeophysics, NUST Norway

9. M. Tobin, J. Labrujere “ High Pressure Pipelines – maximizing throughput per unit of pipelinediameter”, Shell Global Solutions, Moscow April 2005

Page 174: Vol 2 onshore pipelines the road to success 3rd edition

32

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.6 – Insulation

Onshore pipelines may require anti-corrosion coatings, insulation and internal coatings to maintainproduct flow, UV protection (for above-ground lines) or protective and weight coatings for rocky areas,river and lake crossings.

Onshore insulation systems available today have been developed for external protection and insulationof pipelines operating at temperatures ranging from 85°C up to 650°C. Systems generally include acorrosion-resistant coating, a thermal insulation layer and an outer jacket or protective topcoat.

11.6.1 Onshore Insulation Systems

Onshore insulation systems are moulded and/or spray-applied polyurethane foam coatings developedfor external protection of buried or above ground steel and plastic pipe. The polyurethane foam providesa cost-effective alternative for preventing hydrate formation in gas pipelines, maintaining viscosity of hotoil lines and providing freeze protection for water and sewage lines.Systems use a multi-layer coating consisting of an anti-corrosion layer, thick polyurethane foam and apolyethylene outer water barrier. The compressive strength is high to resist damage from handling andburial. The polyethylene jacket may also be formulated for cold weather installation.For systems up to a maximum operating temperature of 85°C, tape and primer may be applied as ananti-corrosion undercoat. For higher temperatures up to 110°C, fusion bond epoxy is used as the anti-corrosion layer.

11.6.2 Onshore Insulation to 150°C

High temperature systems use spray-applied polyurethane foam coating developed for externalprotection of buried or above ground steel pipe. The polyurethane foam provides a cost-effectivealternative for maintaining the viscosity of hot oil lines, diluent bitumen and hot bitumen lines to amaximum service temperature of 150°C. It consists of a high-temperature fusion bond epoxy anti-corrosion layer which has also been rated for up to a maximum service temperature of 150oC underinsulation. A sprayed-on low density polyurethane foam offers excellent insulation characteristics forextended service life at high temperatures. The thickness and compression strength can be tailored tomatch the pipeline project requirements. The foam is protected by an extruded high-densitypolyethylene jacket that provides excellent mechanical protection to prevent damage and moistureingress into the system. The system is designed to be installed in environments down to a temperatureof -40°C.

This high temperature system provides a watertight barrier. The polyurethane foam reduces heat loss toprevent hydrate formation in gas pipelines and helps to maintain viscosity in hot oil lines. An optionaldesign for further protection against temperature loss is the application of heat tracing channels.

1. Corrosion Resistant Coating

2. Thermal Insulation Layer

3. Outer Jacket - Protective Topcoat

Page 175: Vol 2 onshore pipelines the road to success 3rd edition

33

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.6.3 High Temperature Systems to 650°C

In addition to existing coating solutions, new products are being developed to address newrequirements for abrasion resistance, higher operating temperatures, and installation in extreme coldtemperatures to serve the oil sands and Arctic regions.

Pre-insulated pipelines are used to transport both high and low temperature mediums where maintainingpipeline temperature is important. Applications range from low temperature LNG pipelines to hightemperature bitumen pipelines. The pipelines consist of an inner carrier pipe covered in an insulatingmaterial and jacketed externally for protection and integrity.

Pre-insulated pipe systems for above-ground pipelines reduce project costs and improve schedules forconstruction of in-situ oil sands production installations. Pre-insulating pipes prior to shipping toconstruction sites should reduce field labour and is more time efficient than insulating pipes atcongested, space-constrained construction sites.

Very high temperature systems are required for above ground piping for thermal recovery operationswhere operating temperatures are 650°C such as: hot oil and bitumen, steam lines and hot processwater lines. These systems consist of wrapped aerogel insulation blanket and an aluminium cladding forweather proofing. Aerogel insulation offers very high thermal insulation efficiency resulting in reducedinsulation thickness compared with other alternatives such as rock wool or calcium silicate. Corrosionprotection is not required.

11.7 –Buoyancy Control Systems

Virtually all onshore pipelines have to cross aquatic environments – rivers, channels, lakes, fjords ornarrow sea gulfs, bays and channels – along their route. Sometimes, their route goes through semi-aquatic environments, such as swamps, marshes, or permafrost. In all these environments, if thepipeline is not buried in solid ground, it will tend to move from its design position and float towards thesurface. This phenomenon – identical to the one occurring in offshore environments – can affect anypipeline crossing an onshore wet environment. Moreover, it is more frequent in large diameter pipelinesand in pipelines transporting gas. As the pipeline moves from its design position, this creates buckling oreven rupture risks. Of course, an easy solution for the floatability/buoyancy issue would be to increasethe wall thickness of the steel pipe; however, this solution is very expensive, so that the industry hasresearched other cheaper but effective solutions for pipeline buoyancy mitigation. Therefore the industryhas developed similar solutions for the onshore wet environments, based on the extensive experience inmitigating the pipeline buoyancy phenomenon offshore, as well as other onshore pipeline constructiontechniques used for crossing or avoiding obstacles.

1. Aerogel Blanket

2. Metal Cladding

Page 176: Vol 2 onshore pipelines the road to success 3rd edition

34

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

In order to avoid the floatation phenomenon in onshore wet environments, the industry uses three maintypes of approaches:

- Wet environment aerial crossing – the pipeline is installed from the beginning at a safe distanceover the wet environment area. This is usually done by using existing road/railway bridges to carrythe pipeline or install a dedicated bridge for the pipeline over the river, lake or swampy area. Thisapproach has the advantage of minimizing the wet environment disturbance, but exposes thepipeline to potentially damaging weather-related factors – UV degradation, impacts, floods etc.

- Wet environment under-crossing – the pipeline is installed from the beginning at a safe distanceunder the wet environment area – under the river or lake bed. This is usually done by using horizontaldirectional drilling (HDD) techniques. This approach has the advantage of minimizing the wetenvironment disturbance, but will not solve the problem in certain types of onshore wetenvironments, such as marshes or permafrost, where the thickness of the wet layer is too highcreating technical challenges for installing the pipelines

- Buried pipeline – the pipeline is installed at the bottom of the wet environment – sometimes atrench is prepared to receive the pipeline – and then buried (by rock dumping etc). The advantage ofthis approach is that it reduces the risk of the pipeline floating to the surface. However, theeffectiveness of this method is dependent on the quality of the burial operation – strong rivercurrents, suboptimal trench cover material or incorrect burial could, for example, lead to the pipelinebeing uncovered and starting to float. Moreover, this approach is rather ineffective in marshes orpermafrost areas where the thickness of the wet layers is high.

- Buoyancy control systems - the main purpose of these systems is to avoid the above-mentionedrisks by creating negative buoyancy that will counter the floatation effect described above and willthus allow the pipeline to stay in the design position. The advantage of these systems is that most ofthem are effective in onshore wet environments where other approaches show limited results, suchas marshes, swamps or permafrost. Some of them also offer supplementary mechanical protectionagainst potential impacts from ship anchors, rocks, etc. Their main weakness is that the relativeinstability of some of them (such as aggregate-filled bags) means they cannot usually be used forenvironments such as rivers, lakes, sea channels etc.

The review in this section is going to focus on the buoyancy control systems. The first buoyancy controlsystems were developed in the early part of the last century, when two cast iron half shells were boltedtogether around the pipe. Cast iron weights were then replaced by the less expensive and easier tomanufacture cast concrete weights – set-on or bolt-on. The concrete weight coatings have beendeveloped during the second part of the century to become the main buoyancy control system in theindustry. Finally, during the 1990s, aggregate-filled envelopes were developed for use in regions wherethe other systems could not be used. The most widely used buoyancy control systems in the industrytoday are reviewed in the following sections. Note that the list of systems described below might not beexhaustive; other systems could be used in onshore pipeline projects, but on a more limited scale.

11.7.1 Concrete Weight Coatings

Concrete weight coatings have been developed and used for more than 40 years to provide negativebuoyancy to pipelines crossing onshore wet environments. Just like the concrete coatings formechanical protection, previously when applied in a specialized coating plant, the concrete weightcoatings are the only buoyancy control systems in the industry that also offer supplementary mechanicalprotection to the pipe and an anti-corrosion coating during the whole pipeline construction process(transportation to ROW, temporary storage, handling, stringing, lowering in, backfilling) and the entirepipeline service life.

Page 177: Vol 2 onshore pipelines the road to success 3rd edition

35

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Concrete coatings can be plant-applied (through side-wrap, spraying or impingement processes) orapplied in the field – sprayed or form-and-pour (moulded) concrete, and are covered by the new EN ISO21809-5:2010 international standard. All concrete coatings are reinforced by wire mesh, rebar cages ordifferent types of fibres and use a dry concrete mix (5-7% water) to allow for the pipe to be handled rightafter the application of the concrete. Their required 28-day compression strength is in the 40-50 MParange. Some concrete coatings are wrapped in a perforated polyethylene outer tape that avoidsconcrete spalling and allows curing (the PE tape can then be removed). Other concrete weight coatingsare cured allowing the concrete to cure naturally outdoors through accelerated curing using steam. Thefield joint area is usually protected by fast-setting reinforced concrete that is applied by specialisedcontractors in the field.

Compared to the mechanical protection concrete coatings, concrete weight coatings are thicker andheavier. Concrete weight coatings are usually 50-75 mm thick, although the maximum thickness thatcan be applied is 150 mm for the side-wrap process and around 200 mm for the impingement andform-and-pour processes. The negative buoyancy potential is given by the high density of the concreteweight coatings – between 1800 and 3700 kg/m3 – which is usually obtained by using heavy naturalaggregates (iron ore, barite) or industrial by-products (such as different types of heavy slags) in theconcrete mix. Concrete weight coatings are generally not bendable, reducing the capability of thepipeline to follow the terrain configuration.

Fig. 23 – Plant-applied concrete weight coating

If available in the region where the pipeline is built, concrete coatings offer the highest flexibility topipeline designers and contractors, as they have no limitations of use for negative buoyancy applicationsand can be used in any type of onshore wet environment from rivers to permafrost. Another advantageis that the concrete weight coatings offer not only negative buoyancy, but also mechanical protectionagainst potential impacts. Finally, the concrete weight coatings’ long-term stability is another strongpoint – the pipeline operators can be sure that the concrete weight coatings will remain in place (ifcorrectly applied) around the pipe for the entire service life of the pipeline, which is not always the casewith other onshore buoyancy control systems that can slip away from the pipe or move along it, causingpipeline stability issues. A factor that has to be taken into account is that the plant-applied concreteweight coatings increase the weight that has to be transported and handled to and on the right-of-way,thus slightly increasing the project costs. Field-applied concrete coating, although having a neutralimpact on the logistic costs, is a relatively slow process and can delay the pipeline construction process.Finally, using concrete weight coatings, applied in a plant or in the field, could be challenging in someremote ROW areas with difficult or restricted access.

Page 178: Vol 2 onshore pipelines the road to success 3rd edition

36

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.7.2 Cast Concrete Systems

Cast concrete systems were developed to replace the earlier cast iron bolt-on weights that were moreexpensive and more difficult to manufacture. Although there are many variations of cast concretebuoyancy control systems, one can divide them in two main categories based on their installationmethod:

- Set-on (saddle-type) cast concrete systems – these systems are built as a single-piece of castconcrete that is lowered on the pipeline at pre-determined distances. Because of their shape,they are sometimes called doghouse weights. The set-on systems sit on the top of the pipeline,with their sides straddling the pipe like a saddle. These systems tend to be used in semi aquaticenvironments, such as marsh or permafrost areas, as their relative instability on the pipe createschallenges for use in river or lake crossings

- Bolt-on (half-shell) cast concrete systems – these systems are made of two cast concrete half-shells that are installed on the pipeline at pre-determined distances. The two half-shells are boltedtogether, usually using steel bolts, or strapped on the pipe, and cover the whole circumference ofthe pipe. These systems are used more often for aquatic environments, such as river and lakecrossings, as their stability on the pipe is better than that of the set-on systems.

Fig. 24 – Set-on cast concrete weight

Cast concrete systems are usually manufactured in a specialized facility and based on the specificrequirements of the project – level of negative buoyancy needed, pipe diameter etc. They are alwayssteel rebar reinforced and the concrete mix usually includes special sulphate-resistant cements that aresuitable for construction applications in wet environments, as well as heavy aggregates for increasingthe buoyancy control potential. They do not have limitations in terms of pipe diameter and – especiallyfor the heavier ones – have handles provided for lifting and handling during transportation andinstallation. Because the contact between the pipe and the cast concrete can damage the anti-corrosion coating of the pipe, the pipe itself or both, all the cast concrete systems have a protectivelining installed at the interface between pipe and concrete. These linings are made of materials such asrubber, neoprene or non-woven geotextile fabrics.

Cast concrete systems are used in regions where concrete weight coatings are not available or areavailable at a much higher cost. Their main advantage is that they can be built by any cast concretemanufacturer, even having minimum previous experience in the pipeline construction industry. Thequality of their long-term buoyancy control is dependent on the quality of their installation on the pipelineby the field crews of specialized contractors. Moreover, the installation of some of these systems – doneon the right-of-way – can be slow, such as the bolting on of the concrete weights underwater by divercrews. Set-on cast concrete systems are inherently less stable and therefore cannot be used in mostaquatic environments. Even the bolt-on systems can become unstable or move due to strong watercurrents or other external impacts (ship anchors etc). Finally, cast concrete systems present a risk ofdamaging the pipe and its anti-corrosion coating during the installation – for example, the risk of a cast

Page 179: Vol 2 onshore pipelines the road to success 3rd edition

37

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

concrete weight falling on the pipe – and later, during the service life, especially if the concrete systemmoves from its designed place.

11.7.3 Aggregate Envelope Systems

Aggregate-filled envelope systems have been developed during the 1990s as a new method for solvingthe floatability issue in onshore wet environments. These systems have quickly carved a market niche forthemselves as solutions of choice in regions where the restricted access does not allow for the use ofconcrete-based buoyancy control systems or where these systems have a much higher cost.

The aggregate envelope systems, or saddle weight bags, are usually strong membranes made ofmaterials such as non-woven geotextile fabric, with one or more compartments that are filled with sandor local aggregates and then placed on the pipeline for buoyancy control. The industry has developeddifferent versions of these systems that can replace the two main categories of cast concrete systems;there are strap-on versions that are replacing the bolt-on cast concrete systems and set-on versionsthat are replacing the set-on cast concrete systems.

Fig. 25 – Aggregate-filled geotextile envelope system

Just like any of the competing systems, the aggregate envelope systems have some strong points andsome weaknesses. The aggregate-filled envelope systems are less expensive on a total installed coatbasis compared to the cast concrete or concrete weight coating systems. This cost advantage comesmainly from the fact that the transportation costs are lower – only empty saddle bags have to betransported to the ROW, where they are then filled with local material. The use of locally available fillermaterial (sand, natural aggregates) also reduces the costs, compared to concrete systems. Theirinstallation is also simpler and quicker than that of cast concrete systems. Aggregate envelope systemsalso conform better to the bottom of the pipeline trench and do not require a deeper trench like some ofthe cast concrete systems. They do not need a protective liner as the cast concrete systems do. Finally,they can easily be transported to restricted access areas where other systems cannot be transportedand extra bags left after the installation can be returned or easily stored and retained for the next project.Although the aggregate envelope systems can easily be used in semi-aquatic environments (marshes,permafrost), they are more challenging and slow to install than cast concrete systems in aquaticenvironments (such as rivers and lakes). Their stability in areas with strong water currents or otherpotential impacts is also questionable. Installation teams have to pay extra attention to the handling andinstallation of the saddle bags, in order to avoid rendering them useless through tearing or shredding.Finally, the efficiency of these systems will always be dependent on the quality of the installation processin the field, which cannot always be guaranteed.

Page 180: Vol 2 onshore pipelines the road to success 3rd edition

38

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.7.4 Steel Screw Anchors

An emerging technology used for pipeline buoyancy control is screw anchors. Screw anchors are steelshafts with helices welded to them that are literally ‘screwed’ into the soil beneath the pipeline. Oneanchor is installed on each side of the pipeline, and then connected over the top of the pipeline with asaddle which will allow the anchors to resist the uplift forces on the pipeline.

This technology was used extensively in North America in the late 1960s, but was phased out andtraditional concrete buoyancy control methods took over. It re-emerged in the 1990s in North Americaas pipeline owners and contractors performed value engineering analysis, and studied ways to reducethe ever-escalating costs of pipeline construction. Since that time, they have been used extensively inNorth American and Asia, as well as South America, Africa, and Europe. There are several stepsinvolved in the design of a proper screw anchor buoyancy control system:

• Identify pipe characteristics, and safety factor required

• Gather data on soil parameters (where feasible) or define assumptions for soil conditions (often inconjunction with contractor or screw anchor supplier)

• Calculate maximum allowable centre to centre spacing of anchors along the pipeline, taking intoaccount soil strength, anchor strength, allowable pipe stresses, and pipeline deflection

Fig. 26 – Pipeline with steel screw anchors

Generally cost effective on pipelines with an outside diameter of 300 mm and larger, a screw anchorbuoyancy control system can offer cost savings over concrete weight coatings or cast concretesystems. Cost savings are obtained through relatively large spacing between anchor sets along thepipeline length. This results in less material, transportation, and construction costs. The quality of screwanchors’ long-term buoyancy control is dependent on the quality of their installation on the pipeline bythe field crews. Moreover, the installation of some of these systems – done on the right-of-way – can beslow, especially if installation has to be done underwater. Screw anchors do not offer any mechanicalprotection for the pipe and its anti-corrosion coating against impact and penetration damage fromexternal sources (ship anchors etc). Finally, additional padding has to be inserted between the steelconnection on top of the pipe and the pipe itself to avoid any damage to the anti-corrosion coating andthe pipe. Screw anchor systems also present a risk of damaging the pipe and its anti-corrosion coatingduring the service life if the anchors move from their designed place.

Page 181: Vol 2 onshore pipelines the road to success 3rd edition

39

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.7.5 The Optimal Buoyancy Control System – Selection Guidelines

In order to minimize the risks for the stakeholders involved in an onshore pipeline project, the buoyancycontrol approach has to be discussed as early as possible during the early stages of the project. In orderto choose the optimal buoyancy control system(s), the parties involved have to use criteria that aresimilar to those used for the other pipeline protection systems.

- Technical performance criteria – in the case of buoyancy control systems, the most importanttechnical performance criteria will be the ability of the buoyancy control system to reach and maintainthe required level of negative buoyancy over the entire service life of the pipeline. The stakeholderswill have to assess if the selected systems have to fulfil other needs, such as the need for mechanicalprotection against various types of impacts.

- Design and constructability criteria – based on the specifics of the project, it is possible thatsome of the buoyancy control systems could not be used, due, for example to the limited access tothe right-of-way

- Environmental impact criteria – the stakeholders will be interested in selecting the buoyancycontrol system that will minimize the overall environmental impact of the project, such as habitat lossfor aquatic fauna and flora, disturbance of environmentally-sensitive areas (marshes and permafrost)etc.

- Economical criteria – the stakeholders will assess the availability of different buoyancy controlsystems in the project’s region and will compare the total installed cost of each system; thestakeholders will be interested in selecting the system that offers the optimal level of buoyancycontrol with the lowest total installed cost. The total installed cost will include not only the purchaseprice of the buoyancy control systems, but also the direct and indirect installation costs – such asadditional transportation and handling costs, additional manpower and equipment needed forinstallation, installation time etc.

Page 182: Vol 2 onshore pipelines the road to success 3rd edition

40

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.8 – Cathodic Protection

11.8.1 Background

Typically, an external pipeline corrosion protection system consists of two components – the coating andthe cathodic protection (CP) system. Corrosion takes place when electrons are removed from the metalat the anode area on the pipe surface and consumed by the reaction at the cathode with oxygen orhydrogen.

For corrosion to take place there must be:

• Anode (corroding area)

• Cathode (protected area)

• Electrically conductive metallic path connecting the anode and the cathode

• Ionically conductive electrolyte immersing the anode and cathode

There can be various causes of corrosion including:

• Differential Aeration Cells: A pipe installed under a paved road in compact soil reduces theamount of oxygen at the pipe whereas as pipe in nearby ditches may be in aerated soil.Corrosion takes place in the pipe beneath the road.

• Dissimilar Soils: In soils that are more conductive, corrosion takes place along those sections ofthe pipe.

• New / Old Pipe: New pipe used to replace a section of line becomes the anode and corrodes,protecting the old sections.

11.8.2 Purpose / Objective of the CP System

The anodic or corroding areas and the cathodic or protected areas on a pipeline are commonly on thesame surface but separated microscopically. The coating system is the primary barrier againstenvironmental corrosion while the CP system is a secondary defence to protect areas of the pipe thatbecome exposed due to scratched, missing or damaged coating. CP is typically used to preventcorrosion at any weak areas in the coating such as field joints or damaged spots.

CP is fundamental to preserving a pipeline's integrity by replacing the electrons generated by the normalcorrosion process. CP controls corrosion by supplying an external direct current that neutralizes thenatural corrosion current arising on the pipeline at coating defects. CP prevents corrosion by convertingall of the anodic or active sites on the metal surface to cathodic or passive sites by supplying electricalcurrent from an alternate source. The current required to protect a pipeline is dependent on theenvironment and the number and size of the coating defects. The greater the number and size ofcoating defects, the greater the amount of current required for protection.

Page 183: Vol 2 onshore pipelines the road to success 3rd edition

41

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.8.3 Available Cathodic Protection Systems

There are two main CP methods of providing protection against external corrosion – the impressedcurrent and the galvanic protection methods.

Impressed Current Cathodic Protection

Impressed current CP describes the case in which the electric current for protection is providedby an external power supply. This type of system uses a ground bed and an external powersource to impress current onto the pipeline. For a buried, onshore pipeline, a generator or alocal utility provides the electricity. Commercially supplied AC is converted to DC. The systemuses an anode bed and an external power source to impress current onto the pipeline.Impressed current protection involves connecting the metal to be protected to the negativepole of a direct current (DC) source, while the positive pole is coupled to an auxiliary anode.Electrons are introduced into the pipe and leak out at the bare areas where the cathodicreaction occurs. Impressed current CP is rarely used in subsea pipelines.

The ground bed is important for the effectiveness of the impressed current systems. It transferscurrent from the source through the ground to complete the circuit with the pipeline. One of themost common ground beds is the horizontal type with anodes installed with a backhoe at adepth below the frost level in the soil.

Galvanic-Anode Cathodic Protection

Subsea pipelines are commonly protected by galvanic anodes. This method employs the basicconditions needed to produce an active corrosion cell: an anode, cathode, electricallyconductive pathway and electrolyte; and a difference in energy level between anode andcathode. The flow of current through the electrolyte is always from the anode to the cathode.Wherever electrical current leaves the anode to enter the electrolyte, small particles of iron aredissolved into solution, causing pitting at the anode. Wherever the current enters the cathode,hydrogen gas is formed on the surface and the cathode is preserved and protected fromcorrosion. If one of the conditions above is removed, corrosion cannot continue. It is theremoval of one of the conditions, to reduce or interrupt the flow of current, which is the basisfor CP.

Negative Return Cable

(Structure Connection)

Protected

Structure

DC Power

Supply

Insulated

Anode Cable

Sea Water

Impressed

Current Anode

Page 184: Vol 2 onshore pipelines the road to success 3rd edition

42

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

For ground installations, the electrolyte is the moisture of the soil. The anode is a material having a moreelectronegative potential than steel. Typically, it is made from materials such as aluminium, zinc,magnesium or alloys of those metals. When the materials used as anodes are mechanically coupled tosteel with an attachment wire, the steel pipe becomes the cathode. Subsequently, a current flows, andthe anode corrodes to provide electrons that protect the pipeline.

CP trades corrosion on the pipe for corrosion on the sacrificial anode. The driving voltage (the differencein potential between the anode and cathode when coupled together in a corrosion cell) is limited withgalvanic anodes; the amount of current that can be delivered tends to be low. Galvanic anodes arenormally used in low resistivity soils to provide current to pipes having an excellent coating.

11.8.4 Anode Material Selection

Zinc has been in use as a sacrificial anode for longer than aluminium and is considered the traditionalanode material. However, aluminium has several advantages as a sacrificial anode material and is nowthe material of choice (magnesium can be used for onshore pipelines but is not efficient for subseapipelines because it corrodes rapidly in seawater and only provides about half the electric current forCP). Aluminium is capable of delivering more current in seawater and has higher a current capacity, so alower consumption rate. Thus a smaller mass of aluminium anode will protect the same surface for agiven period of time as compared to a zinc anode. This leads to greater economy and improvedperformance in using aluminium as opposed to zinc. Moreover, the effect of operating temperature onthe anode materials is very important. Zinc anodes alloy contains small quantities of iron which leads tointergranular corrosion. Aluminium is also usually preferred to zinc because it is less expensive.

The temperature will have an important impact on the electrochemical capacity – as seen below theanode current capacity decreases as the temperature increases, reducing the CP effectiveness.

Protected

Structure

(Steel)

Anode

Connection

Sea Water

Aluminium

Anode

Page 185: Vol 2 onshore pipelines the road to success 3rd edition

43

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

11.8.5 Cathodic Protection System Design

The goal of CP system design is to provide the minimum potential that provides CP. A potential abovethat level increases the cost and the electrical stress across the coating and may lead to cathodicdisbondment.

The galvanic anode system should be designed such that a sufficient current is provided to the pipelineto maintain the required potentials throughout the design life. There are two different kinds of galvaniccathodic protection available. Below is an overview of both, together with the benefits and limitations ofeach method.

Bracelet AnodesToday, almost all new pipelines installed are equipped with bracelet anodes. Two different kinds ofmaterials are normally used: aluminium and zinc. Bracelet anodes are cast as two halves that fit togetheraround the pipe. If there is no weight coating, the anodes are profiled with tapered ends, otherwise withshouldered ends when a weight coating is used.

Bracelet anodes may be fitted to the pipe as it is laid or retrofit anodes may be attached to the pipelineonce it is in place. Retrofit anodes have the benefit of being separated from the pipeline and so are notexposed to elevated temperatures.

The anodes are electrically connected to the pipeline by copper braided wire (pigtails), one endconnected to the steel insert and the other brazed or welded to the pipeline.

Square shouldered bracelet anodes are typically used on pipe that has a concreted weight coating.

Page 186: Vol 2 onshore pipelines the road to success 3rd edition

44

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Tapered anodes are designed to be installed on pipelines with only a corrosion or insulation coating. It isto protect the bracelet anodes during the pipe-laying process, and stopping them snagging on therollers used on the vessel firing line and stinger. Even with these tapered designs, non-weight coated pipelines can still suffer anode damage, which canin turn cause coating damage. Several methods are being used to combat this problem such aspolyurethane tapers or mounting both halves of the bracelet on top of the pipe thus avoiding contactwith the stinger during pipe laying.

Retrofit AnodesRetrofitting is normally used for the installation of additional anodes when a CP system is not adequate,or for extending the design life of the CP. It is also possible to use a retrofit system when it is notpossible to use anode bracelet, for example where the temperature of the pipeline would render braceletanodes ineffective. Finally, a retrofit CP survey is usually less expensive and easier to undertake.

11.8.6 Coating breakdown factor

The purpose of a protective coating on the pipeline is to restrict the access of oxygen to the pipeline andthus reduce the current demand. For CP design it is assumed that the protective coating is 100%effective except at areas of coating breakdown. The bulk of the protection current passes through thecoating because all organic coatings are permeable to oxygen to some extent. When the oxygen arrivesat the steel surface, it will remove electrons. This appears as a current flux through the coating. As thecoating ages, the resistance to permeation decreases and a higher oxygen flux occurs resulting in ahigher current flow through the coating. The final coating breakdown has a higher value than the meancoating breakdown. This means that the coating will protect the pipeline less, and will be more prone toexternal corrosion

11.8.7 Total net anode mass

The total net anode mass corresponds to the weight of anodes which must be used to provide sufficientpotential protection to the pipeline over its life. The total net anode mass is directly related to the anode

Page 187: Vol 2 onshore pipelines the road to success 3rd edition

45

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

utilization factor and the electrochemical capacity of the material used. For example, as zinc andaluminium do not have the same properties, the total net mass required may change considerably. Thetable below shows the difference between materials for a pipeline with no external coating.

11.8.8 Anode utilization factor

The anode utilization factor is required because it is not possible to obtain 100% utilization of the anodematerial. Anodes are made by casting the anode material in a steel former. During fabrication the anodecorrodes down to the inner ligature of the casting around the former, meaning the anode material loseselectrical connectivity with the former, thus rendering a percentage of the anode unusable.

11.8.9 Anode Numbers

The required number of anodes is calculated from the weight of each individual anode as a function ofthe total net mass demand. So if, we are using lighter anodes the number of anodes required willincrease.

Because it is necessary to respect a maximum distance between anodes (see section 11.8.5), it isimportant to find a compromise concerning the number of anodes. Using fewer anodes will reduce thecost of installation but may not provide sufficient current along the pipeline, whereas using a largenumber of anodes will provide sufficient current, but result in a higher installation cost.

The number of anodes is also dependent of the final individual anode current output and the demand forcathodic protection of a pipeline section. This will usually provide a lower anode numbers. But in orderto have sufficient protection, the required number should satisfy both criteria.

11.8.10 Cathodic Protection Surveys

Periodic inspection of the pipeline CP system is necessary to ensure that the system is functioningcorrectly. There is no corrosion allowance provided for external corrosion. A common approach is toinspect the pipeline shortly after installation, usually within the first year of service to ensure that theanodes are functioning and, then to resurvey about halfway through the design life of the CP system.The long delay from initial to second survey is acceptable because the coating on the pipeline shouldremain intact and the anodes are designed for protection of a significantly deteriorated coating.

11.8.11 Overprotection

Overprotection refers to the use of excessively high potentials to protect the pipeline. High potential canbecome a problem if the spacing between ground beds is too great or when poorly-coated lines areelectrically connected to well-coated pipelines. Calculations take into account factors such as piperesistance, soil resistivity, coating conductance and potential limitations to determine the spacing thatmeets the CP criteria without causing excessive potential near the ground bed. It may also be necessaryto insulate segments with poor coating quality from those with good coating quality. Proper CP designshould minimize overprotection.

Conclusion

The industry has come a long way in ensuring the integrity of pipeline projects. However, as the pipelinesector is growing further, challenges are born from the complexity of the new pipeline projects – more

Page 188: Vol 2 onshore pipelines the road to success 3rd edition

46

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

extreme climatic conditions, populated areas, longer pipelines, etc – and from the new pipelineoperation requirements – increasingly high or low operating temperatures, higher pressures, newproducts transported through pipelines etc. Innovation is thus needed to continue to ensure the integrityof new pipelines and to maximize their transportation potential.

Therefore nowadays the companies in the pipeline industry pay equal attention to all the aspects ofpipeline integrity during all the stages of the supply chain, as well as during the pipeline installation andservice life. The keyword for the future in this field is innovation - new coating materials, new coatingsystems, new application processes - and new holistic approaches to make the pipelines safer andmore efficient.

References

1 J. Alan Kehr, “Fusion-Bonded Epoxy (FBE) – A Foundation for Pipeline Corrosion Protection”,Houston, Tx, NACE International, 2003

2 D. Newman, “Pipeline Corrosion Protection for High Pressure High Temperature DeepwaterPipelines”, 2010

3 A. Palmer, R. King, “Subsea Pipeline Engineering”, Tulsa, Oklahoma, PennWell, 2004

Page 189: Vol 2 onshore pipelines the road to success 3rd edition

Appendix 11.1.1

Comparison of Mainline External Anti-Corrosion Coatings3

3 Adapted after New developments in high performance coatings, Worthingham R., Cettiner M., Singh P., HabererS., Gritis N., 2005

47

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

CoatingSystem

Single-layerFusion-BondedEpoxy (FBE)

National/InternationalStandard

Strengths Weaknesses

• CSA Z245.20 • EN ISO 21809-2

• Excellent corrosionresistance

• Does not shield CP system• High adhesion limits

damaged areas

Dual-LayerFusion-Bonded

Epoxy(2L FBE)

• CSA Z245.20 • Depending on the topcoatselection, very goodabrasion and damageresistance – ideal for specialapplications such as HDD –or very good performance inhigh operating temperatureenvironments

• Excellent corrosionprotection

• Low impact resistance resultsin considerable damage duringpipe handling, storage,transportation and installation

• High moisture absorption andpermeation especially at hightemperatures

• Affected by UV during storage

• Low flexibility• Sensitive to steel surface

preparation and condition• High moisture absorption and

permeation especially at hightemperatures

• Affected by UV during storage

3-LayerPolyethylene

(3LPE)

• DIN 30670• NFA 49 711• CSA Z245.21• EN ISO 21809-1

(draft)

• Excellent handling• Superior low temperature

flexibility and impactresistance

• Excellent corrosionresistance

• Excellent moistureresistance

• Prone to thinning across raisedweld seams

• Side extrusion prone todelaminations and voids

• Sensitive to steel surfacepreparation and condition

• Minimum thickness constraints

3-LayerPolypropylene

(3LPP)

• DIN 30670• NFA 49 711• EN ISO 21809-1

(draft)

• Excellent handling• Excellent impact resistance • Excellent corrosion

resistance• Excellent moisture

resistance

• Prone to thinning across raisedweld seams

• Side extrusion prone todelaminations and voids

• Sensitive to steel surfacepreparation and condition

• Minimum thickness constraints

3-LayerCompositeCoatings

• CSA Z245.21• EN ISO 21809-1

(draft

• Excellent handling• Excellent corrosion

resistance• Excellent low temperature

impact resistance andflexibility

• Excellent moistureresistance

• Excellent raised weldcoverage

• Thickness constraints• Sensitive to steel surface

preparation and condition

Tape Coatings • DIN 30670 • Good corrosion resistance• Good impact resistance

• Prone to delaminations andvoids

• Protection is dependent on thequality of the installation crew(if installed in the field)

Page 190: Vol 2 onshore pipelines the road to success 3rd edition

Appendix 11.1.2

Field Joint Coating Selection Table

* Standards and Specifications:1. ISO/FDIS 21809-3:2008(E) Petroleum and natural gas industries — External coatings for buried or submerged

pipelines used in pipeline transportation systems — Part 3: Field Joint Coatings2. CSA Z245.20, External fusion bond epoxy coating for steel pipe3. CSA Z245.21, External polyethylene coating for pipe4. EN 12068 Cathodic Protection - External Organic Coatings for the Corrosion Protection of Buried or Immersed

Steel Pipelines Used in Conjunction with Cathodic Protection - Tapes and Shrinkable Materials5. NFA 49-710, Steel tubes. External coating with three polyethylene based coating. Application through extrusion. 6. NFA 49-711, Steel tubes. External coating with three polypropylene layers coating. Application by extrusion.7. DNV-RP-F102 Pipeline Field Joint Coating and Field Repair of Linepipe Coating8. NACE RP0105-2005, Liquid-Epoxy Coatings for External Repair, Rehabilitation, and Weld Joints on Buried Steel

Pipelines 9. NACE RP0303-2003, Field-Applied Heat-Shrinkable Sleeves for Pipelines: Application, Performance, and Quality

Control 10. NACE RP0402-2002, Field-Applied Fusion-Bonded Epoxy (FBE) Pipe Coating Systems for Girth Weld Joints:

Application, Performance, and Quality Control 11. AWWA C209 Cold-Applied Tape Coatings for the Exterior of Special Sections, Connections, and Fittings for

Steel Water Pipelines12. AWWW C216, Standard for Heat-Shrinkable Cross-Linked Polyolefin Coatings for the Exterior of Special

Sections, Connections, and Fittings for Steel Water Pipelines

48

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

MainlineCoating

Fusion-bondedepoxy (FBE)

Most CommonField JointSystems

Alternate FieldJoint Systems

RelevantStandards andSpecifications*

- Fusion-bondedepoxy (FBE)- 2-Component liquidepoxy (2CLE)

3-Layer heat-shrinkable sleeve(3L HSS)

Dual-layer FBE(2L FBE)

- 2-Layer fusion-bonded epoxy(2L FBE)- 3-Layer heat-shrinkable-sleeve(3L HSS)

2-Component liquid epoxy(2CLE)

1, 2, 7, 8, 9, 10, 12

2, 4, 7, 8, 9, 12

3-Layerpolyethylene

(3LPE)

- <50ºC - 2-Layerheat-shrinkable-sleeve(2L HSS)- >50ºC - 3-Layerheat-shrinkable-sleeve(3L HSS)

Adhesive tape systems (CAT) 1, 3, 4, 5, 7, 9, 12

3-Layerpolypropylene

(3LPP)

- 3-Layerpolypropylene heat-shrinkable-sleeve(3LPP HSS)- 3-Layerpolypropylene tape(3LPP Tape)

- Injection-mouldedpolypropylene (IMPP)- Flame-sprayed powder (FSPP)

1, 4, 6, 7, 9, 12

3-Layer composite 3-Layer polyethyleneheat-shrinkable sleeve(3LPE HSS)

Flame-sprayed powder (FSPE) 1, 4, 7, 9, 12

Tape - <30” diameter -adhesive tape systems(CAT)>30” diameter - 2-layerpolyethylene heat-shrinkable sleeve(2LPE HSS)

- 2-Layer polyethylene heat-shrinkable sleeve (2LPE HSS)- 3-Layer polyethylene heat-shrinkable sleeve (3LPE HSS)

1, 4, 7, 9, 11, 12

Page 191: Vol 2 onshore pipelines the road to success 3rd edition

49

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Field Joint Coating Selection for Polyurethane Foam Coated Pipeline Systems

Page 192: Vol 2 onshore pipelines the road to success 3rd edition

50

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 11

Appendix 11.1.4

Supplementary Mechanical Protection Systems Selection Table

Page 193: Vol 2 onshore pipelines the road to success 3rd edition

1

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12 Pipelines and the Environment

12.1 Introduction

12.1.1 Environmental Assessment:

Environmental assessment emerged in the 1960’s and has been identified as a means to elevateenvironmental concerns to the decision making table that has been traditionally dominated by economicoutcomes. The aim of environmental assessment is to ensure that the environmental implications of adecision are taken into account prior to consent being given to the development. (EC, 2011). Currently two main types of environmental assessment exist; Strategic environmental assessment (SEA),and environmental impact assessment (EIA). SEA was developed to ensure environmental accountabilityin the context of policies, plans, and programmes, whilst EIA focuses on project level decision making.

12.1.1.1 Strategic Environmental Assessment:

SEA’s are carried out on behalf of governments or regional authorities. They ensure that governmentalpolicies minimize potential damage to the environment and adhere to the principles of sustainabledevelopment. In general, SEA’s focus on the broader impacts of a particular sector (energy, transport,education etc…) or a wider region, whilst EIA’s are highly detailed, and focus on the specific project areaand its direct surroundings. During the planning phase of a pipeline project, the developer shouldconsult national or regional governmental bodies to familiarise themselves with any SEA’s that areavailable and relevant to the development. Not only can this help to avoid delays, it can also be a usefulfirst point of source to establish potential environmental risks.

12.1.1.2 Environmental Impact Assessment:

EIA is a support tool that provides information on the likely significant impacts of a development, whichwill in turn help to determine whether a project will gain consent. At the core of EIA is the systematicidentification and evaluation of potential impacts arising from proposed developments and thesubsequent communication to decision makers and the public. Human development has caused habitatloss and fragmentation, resulting in significant biodiversity reduction. Ecological systems are complex intheir nature, making impact predictions a tough exercise. Due to the large scale, high potential risks, andthe complex task of predicting the impacts of a pipeline project on the environment an EIA must beundertaken. The EIA follows a standard procedure to ensure consistency across studies and maintain acommon ground for authorities to judge the impacts of a particular project in relation to other projects.The exact process required by legislation differs from country to country, especially in relation to theextent of public consultation, consideration of alternatives and consultation with local authorities.However, they all follow the same general format.

Policy

Plan

Programme

Project

SEA

EIA

Page 194: Vol 2 onshore pipelines the road to success 3rd edition

2

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

The standard EIA process:

Figure 1 Standard EIA process

Best practice principles from the International Association of Impact Assessment dictate that thefollowing characteristics should be common to all environmental impact assessments:

• Purposive • Efficient • Credible

• Rigorous • Focused • Integrated

• Practical • Adaptive • Transparent

• Relevant • Participative • Systematic

• Cost effective • Interdisciplinary

Project Proposal (incl. alternatives)

Screening

EIA Required No EIA Required

Project Consent Project Rejection

Scoping

Baseline Study

Impact Prediction & Analysis

Impact Mitigation

Preparation of the EIS (the report)

Review

Decision Making

Follow Up: Monitoring & Evaluation

Page 195: Vol 2 onshore pipelines the road to success 3rd edition

3

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.1.2 Social and environmental impact assessment process

Social and economic development is an essential element of meeting basic human needs, by improvingthe quality of life and securing better prospects for the community. It is essential, therefore, that thisdevelopment takes place on a sustainable basis. In the past, developments have taken place that havebeen destructive to the environment and thereby endangered the very basis on which sustainability ofdevelopment depends. As a result, there is an ever-increasing need to have a process in place that canenable the decision makers and stakeholders to properly understand the impacts of the proposeddevelopment.

Social and environmental impact assessment (SEIA) (Figure 1) of a proposed development is theprocess of:

• Gathering environmental and socio-economic information

• Describing the development and the alternatives studies in the process of engineering design

• Predicting and describing the environmental and socio-economic effects of the development

• Defining ways of avoiding, cancelling, reducing or compensating for the adverse effects(mitigation)

• Publicising the development and the environmental statement so that the community can play aneffective part in the decision making process

• Consulting specific bodies with social and environmental responsibilities

• Taking all of this information into account before deciding whether to allow the project to proceed

• Ensuring the measures prescribed to avoid, cancel, reduce or compensate for environmental andsocial effects are implemented and monitored

• Informing key stakeholders, including affected communities, about the development and anyassociated negative and beneficial impacts

Page 196: Vol 2 onshore pipelines the road to success 3rd edition

4

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

Figure 2: Typical SEIA process in a project

Page 197: Vol 2 onshore pipelines the road to success 3rd edition

5

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

The SEIA assessment focuses on obtaining primary information from key stakeholders, (includingaffected communities) and site surveys in order to

• Feed the results of consultation into the assessment process

• Assist with the decision-making process

• Identify the best measures to reduce and manage adverse impacts

In order to reap the maximum benefits and obtain objective information from the best available sources,the SEIA must place an emphasis on carrying out a bias-free, systematic and holistic process. The mostimportant benefit is the proper understanding which local authorities and communities gain of theproposed development’s potential impacts and how the developer proposes to minimise potentialeffects.

An SEIA involves prediction. Uncertainty therefore becomes an integral part and whilst it cannot beavoided in most cases, one must strive to minimise it. There are two types of uncertainty associated withsocial and environmental impact assessments: those associated with the process and those associatedwith the predictions. With the former, the uncertainty is whether the most important impacts have beenidentified and whether recommendations will be acted upon or ignored. For the latter the uncertainty isin the accuracy of the findings. According to de Jongh (1988), the main types of uncertainty and theways in which they can be minimised can be summarised as follows:

• Uncertainty of prediction: This is important at the data collection stage and the final certainty willonly be resolved once implementation commences. Targeted research can reduce the uncertaintytogether with the use of experienced professionals

• Uncertainty of values: This reflects the approach taken in the SEIA process. Final certainty will bedetermined at the time decisions are made. Improved communications and extensivenegotiations with agreed and documented outcomes should reduce this uncertainty

• Uncertainty of related decision: This affects the decision-making element of the SEIA process andfinal certainty will be determined by post evaluation, preconstruction permits and themanagement plans. Improved coordination between the developers, their engineers, theconsents team, contractors and operations teams reduces uncertainty to a large extent.

Page 198: Vol 2 onshore pipelines the road to success 3rd edition

6

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.2 ENVIRONMENTAL AND SOCIO-ECONOMICSCREENING AND SCOPING

12.2.1 Screening:

Screening is the first key decision of the SEIA process that determines whether the proposeddevelopment requires an SEIA. It involves making a preliminary determination of the expected impact ofthe development on the environment and the community, and the relative significance of each impact. Acertain level of basic information about the proposed development and its location is required for thispurpose. The time taken to complete the screening process depends upon the type of development, theenvironmental setting and the degree of experience of the assessors or understanding of its potentialimpacts.

Specific methods used in screening include:• A legal or policy definition of developments to which SEIA does or does not apply

• An inclusion list of projects (with or without thresholds) for which an SEIA is automatically required

• An exclusion list of activities that do not require SEIA because they are insignificant or are exemptby law (e.g. national security or emergency activities)

• Criteria for case-by-case screening of proposals to identify those requiring an SEIA because oftheir potentially significant environmental effects

This process establishes the basis for scoping, which identifies the key impacts to be studied andestablishes terms of reference for an SEIA.

If external funding is required the lenders requirements may, in some cases, be more stringent than thelocal regulatory regime.

12.2.2 Scoping

Scoping identifies the issues that are likely to be of most importance during the SEIA and differentiatethem from those that are of little concern. It is a critical step that represents an early, open andinteractive process of determining the major issues and impacts that will be important in decision-making on the proposed development and which needs to be specifically addressed in an SEIA.Typically, this process concludes with the establishment of terms of reference (TOR) for the preparationof an SEIA. Thus, it ensures that SEIA studies are focused on the significant effects and resources arenot wasted on unnecessary investigations.

The aim and objective of scoping is to:• Identify and engage key stakeholders early in the process

• Identify the important issues/impacts to be considered early in an SEIA

• Identify the appropriate time and space boundaries of the SEIA study

• Identify the information necessary for decision-making

• Review existing baseline data (if any) and identify the key gaps in these data in relation to theneeds of the SEIA study

• Outline a programme of additional data collection to address these gaps

• Outline the proposed methodology for impact assessment

• Discuss the next steps in the SEIA process

Page 199: Vol 2 onshore pipelines the road to success 3rd edition

7

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.2.3 Terms of reference

TOR specifies what the SEIA is to cover, the type of information to be submitted and the depth ofanalysis that is required. It provides guidance to the developers on how the study should be conductedand managed. It is a flexible document that is revised as further information becomes available (i.e. inresponse to newly emerging issues or as existing impacts are reprioritised).

The TOR generally requires the following points to be covered:• Whether a range of alternatives should be considered, and if so whether they would be less

environmentally damaging than the current proposal

• The main environmental effects of the proposed development, both within the project area andsurrounding environment, and the expected timescale of the impacts

• The size and extent of the impacts based as much as possible on quantitative rather thanqualitative assessment

• The present policy, institutional and legislative situation and future needs

• Groups that will benefit from and those disadvantaged by the project

• The impact on any rare/keystone species of plant or animal in the area

• The impact on human health

• The control and management aspects of the project, to determine if they will be effective

• The need for further baseline data collection or other specialist studies

• The mitigating measures needed and how they should be incorporated into the project design

• The monitoring and evaluation activities that are required to ensure that mitigating measures areimplemented and future problems are avoided

12.2.4 Social impact assessment (SIA)

In the past, environmental impact assessments (EIA) focused on direct and indirect biophysical impactsof proposed developments (i.e. impacts of development activities on water, air, land, flora and fauna). Inrecent years, the impacts of industrial development on society, culture and different forms of economicactivity have gained equal importance, thus traditional EIA has developed into SEIA. Social impactassessment (SIA) is the systematic analysis used during SEIA to identify and evaluate the potentialsocio-economic and cultural impacts of a proposed development on livelihood and circumstances ofpeople, their families and their communities. If such potential impacts are significant and adverse, SIAcan assist the developer, and other parties to the SEIA process to find ways to reduce, remove orprevent these impacts from occurring. The SIA will:

• Describe the current social and economic conditions of the area concerned

• Predict the positive and negative effects of a project on people and communities

• Identify ways to reduce negative effects and improve positive effects

• Dhow changes caused by the project will be managed and monitored

It also provides a forum for planning how to maximise the beneficial impacts of a proposeddevelopment. These can include a better standard of living owing to increased access to employment,business opportunities, training and education; greater access to and from a community; and increasedfunding to improve social infrastructure and cultural maintenance programmes.

Page 200: Vol 2 onshore pipelines the road to success 3rd edition

8

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

SEIAs can address issues such as, but not limited to demographics, socio-economic matters, socialinfrastructure, resources, psychological and community aspects, cultural property and social equity,which are discussed briefly below.

12.2.4.1 Demographics

Demographics include changes in the size and make-up of a population due to migration of people insearch of work, emigration from an area because of safety or security issues or any other reasons.

12.2.4.2 Socio-economic

Socio-economic issues can include:• Taxes and royalties: expected payments to different levels of government (national, regional,

local); time profile of payments

• Supply chain impacts: local sourcing opportunities; potential inflationary impacts on local marketsfor goods and services; impact on non-oil-and-gas-sector industries (e.g.dutch disease )

• Employment: labour practices; changes in existing industries as workers shift from traditionalindustries to oil and gas activities; movement of other necessary workers (e.g. teachers andpolice) into the oil and gas industry as translators or security personnel; return of constructionworkers to lower end jobs

• Time profile of projects: construction boom; operation phase; decommissioning; potential oil andgas dependencies.

12.2.4.3 Social infrastructure

Social infrastructure issues comprise the adequacy of health care and education facilities, transport androads, power supply and fresh water supply to support project activities and personnel as well as for thecommunity.

12.2.4.4 Resources

Resource issues are land-take for facilities and resettlement, new or increased access to rural or remoteareas, and the use of natural resources.

12.2.4.5 Psychological and community aspects

Changes from traditional lifestyles, community cohesion, attitudes and behaviour, and perception of riskare considered in an SIA.

12.2.4.6 Cultural property

Cultural property is defined as sites and structures with archaeological, historical, religious, cultural oraesthetic values that may be changed or have their access limited by a proposed development.

12.2.4.7 Social equity

Social equity identifies those who benefit and those at a disadvantage as a result of the project oroperation.

Page 201: Vol 2 onshore pipelines the road to success 3rd edition

9

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.2.5 Health impact assessment

The development of natural resources, urban development, the expansion of transport systems andother infrastructure all precipitate changes to environmental and social determinants of health such as:

• Income and social status

• Education

• Physical environment

• Social support networks

• Genetics

• Health services

• Gender

The resulting health outcomes can be negative or positive.

Health impact assessment (HIA) provides an important decision-making tool through which health issuescan be addressed early in development planning and design. Like other impact assessment processes itproposes a systematic process for screening, scoping, assessing, appraising and formulatingmanagement plans to address key issues in development project implementation.HIA is a fast-growing field that helps policymakers take advantage of these opportunities by bringingtogether scientific data, health expertise and public input to identify the potential and often overlookedhealth effects of proposed developments. It offers practical recommendations for ways to minimise risksand capitalise on opportunities to improve health. HIA gives federal, tribal, state and local legislators,public agencies and other decision makers the information they need to advance smarter policies todayto help build safe, thriving communities tomorrow.

The HIA:• Looks at health from a broad perspective that considers social, economic and environmental

influences

• Brings community members, business interests and other stakeholders together, which can helpbuild consensus

• Acknowledges the trade-offs of choices under consideration and offers decision makerscomprehensive information and practical recommendations to maximise health gains andminimise adverse effects

• Puts health concerns in the context of other important factors when making a decision

• Considers whether certain impacts may affect vulnerable groups of people in a number ofdifferent ways

Health impact assessment focuses on community health and is generally integrated with the socio-economic survey, with questions on health included in the household surveys undertaken in project-affected communities. Information from a desktop literature reviewis used to inform the questionnaireformulation. The heath issues that have the potential to be impacted by the project include:

• Organisation of the health care system

• Overall health status

• Infectious diseases

• Non-communicable diseases.

Page 202: Vol 2 onshore pipelines the road to success 3rd edition

10

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

Overlap with the social and environmental aspects that include health issues are often dealt with in otherparts of the SEIA, for example air, water, food, and soil and demography, economics and education.

The typical effects that a pipeline project and associated development can have on the health of localcommunities include:

• Introduction of non-local workers, mostly males, to certain localities including constructioncamps.These workers are sometimes subject to operating rules that allow for, or restrictinteraction between workers and local people.

• Potential for an increase in communicable diseases arising from interaction between workers andlocal people

• Storage and handling of food and drinks in accommodation/camps and increase in disease fromvectors such as rodents if food and drink is not stored properly

• Increased risk of respiratory illnesses from changes in air quality (such as dust)

• Road traffic accidents and disturbance to sleep from increase noise levels

• Increased hazards from solid and liquid waste disposal and potential for water-borne diseases ifwaste management is not implemented effectively

• Open excavations and potential for accidents and injuries

• Conflicts between community members and security personnel

• Increase in drug and alcohol abuse

• Spread of new diseases to indigenous communities

• Impacts on health of operations personnel

• Impact of local diseases on workers and the spread of pandemics such as HIV and sexuallytransmitted diseases.

Baseline data informs operator and contractor surveillance and control programmes for infectiousdiseases, security and logistical issues such as supply of drinking water, waste management and accessto medical facilities.

12.2.6 Ecosystem services

A relatively recent addition to SEIA is the inclusion of ecosystem services, but it is too early to say howthese may have an effect on the SEIA process. However, it is intended that these services will assistdecision makers in the determination of projects and the interaction on complex natural ecosystems andtheir dependent human populations.

Assessment of ecosystem services is likely to focus on the interaction of development on resourcessuch as food and minerals, waste generation, climate change, disease, nutrient cycles, crop pollinationand cultural and recreational benefits.

Page 203: Vol 2 onshore pipelines the road to success 3rd edition

11

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.3 Description Of The Project

An integral part of the scoping and SEIA process is the description of the project that includes:• Route selection, including alterative options considered, routeing corridors and eventual route

selection by the client, engineers, and environmental and social practitioners. This is done withdue considerations to above ground installations (AGIs) such as block valves, pigging,compressors, cathodic protection, storage and import/refining facilities

• The nature and scale of specific activities involved during construction, operation anddecommissioning, including quantification of emissions and construction/operation activity

• Quantifying the project description (emissions, traffic, noise, logistics, waste generation, use ofhazardous materials, camp/lay-down)

• The geographical location and environmental setting for the project, and baseline environmental,social and cultural information

• The use of materials, including their life-cycle and carbon footprint assessment

In most cases the design engineers and client take responsibility for providing the written projectdescription. The section should clearly demonstrate the evolution of the proposed route andengineering design to demonstrate that social and environmental considerations have influenced thedesign, including design changes as a direct result of stakeholder consultation. The project descriptionmay include examples of specialist techniques or innovative solutions which may include early input frompipeline contractors.

12.3.1 Routing

Web-based tools to assist with the development of route options are useful but no substitute for awalkover survey or drive through of the route with a team of experienced pipeline practitioners,engineers, contractors,field geologists, archaeologists and ecologists to look at pinch points,topography, access routes, geomorphology, crossings, construction methodology and unavoidableprotected areas.

12.3.2 Timing

SEIA typically occurs before and during front-end engineering design (FEED) when pipeline routeing isbeing defined. SEIA practitioners are used to working with the engineers in the definition of constraintswithin ever-decreasing pipeline route corridors. A close working relationship between the SEIA team andthe engineers is important, as exchange of information early in the process on environmental issuessuch as potential pinch points, ground conditions and other constraints may influence engineeringdesign and the eventual construction methods employed.

The timing of route selection is critical if a rigorous ESIA is to be undertaken which and the consentobtained.. Insufficient engineering design and a poorly considered SEIA can lead to rejection by theauthorities and extend the time for consent. Without consent a pipeline project cannot be built. In the event that options still exist for the routing or engineering design (for example details of the exactnature of the methodology for river crossings) when the consent has to be submitted, the worst casescenario should be assessed together with an outline of other potential construction options. It will thenbe down to the regulator to determine whether this is acceptable. If there are too many optionspresented, this may cause delays or even refusal of the consent for the project.

Page 204: Vol 2 onshore pipelines the road to success 3rd edition

12

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.3.3 Project description

The project description should be as accurate as possible, but one needs to also bear in mind thatdetailed engineering is still progressing and hence changes could still occur.

This section of the SEIA also presents a description of the proposed works required to complete theproject and a` description of the equipment that will be operated during the project lifetime. It should alsocover the extent that the activities envisaged for planned routine maintenance of the equipment and forcorrective maintenance of faulty equipment at this stage. Furthermore this section addresses theengineering aspects of the project that are the focus of the assessment during its life cycle, which willinclude the proposals that have been developed to facilitate eventual decommissioning of the facilities.

It is easier to undertake the impact assessment using as much quantification in the project design aspossible. Quantities and type of waste, amount of water use, number of vehicles to move materials, sizeof loads/vehicles, lengths of pipe, location and numbers of camps, location of access routes andnumbers of construction personnel are all the types of data that can be extracted from typical pipelineprojects and should be used. In the event that these subsequently change it is relatively easy to justifyand explain the significance of the change.

12.4 Applicable Laws And Regulations

As part of an SEIA, it is very important that the relevant laws as well as environmental protectionlegislation is stated, understood and analysed within the document. Legislation may include a statutoryrequirement for an SEIA to be carried out in a prescribed manner for specific development activities.When carrying out an SEIA it is essential to be fully aware of the statutory requirements and the legalresponsibilities of the concerned institutions.

Additionally, a list of all the applicable laws and by-laws, regulations and statutory requirements shouldbe developed and included. In addition, an SEIA should be able to assess the acceptability or severity ofimpacts in relation to legal limits and standards.

Lenders’ requirements should be stated where necessary. Lenders should be signed up to the EquatorPrinciples, which are a voluntary set of standards for the management of social and environmental risksin project financing. Additionally, operators’ internal best practice guidelines should be taken intoaccount.

The SEIA should specify the measurements (generally the most stringent of the regulatory requirements)that will be applied to the project design.

Regulatory consent for a project typically includes reference to the SEIA or ESMMP as consentconditions which require formal reporting, audits and licences to be issued prior to construction workscommencing.

Legal review is typically undertaken by the developer/partners and their funding partners.

Page 205: Vol 2 onshore pipelines the road to success 3rd edition

13

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.5 Description Of Alternatives

Descriptions of the alternatives studied during engineering feasibility and early route options are includedin the SEIA report.

The descriptions generally include a high-level review of alternative options to a pipeline and justificationfor the selected project, as well as a description of the route options and constraints within the area ofsearch.

For some aspects of the project, it is necessary to consider alternative design solutions. For each one,this part of the SEIA presents the options that were assessed and the reasons why the solution adoptedin the final design is preferred. These include cost considerations, construction or operational difficulties,as well as environmental and social considerations. A ‘no development’ option is also researched anddetailed.

12.6 Description Of Baseline

Potential route options are further developed in a series of pipeline route corridors, early in the SEIAprocess. In some cases this requires baseline surveys, landowner investigation and desk-basedresearch to be progressed in parallel for a range of route options.

As the route selection process is refined, detailed surveys can be designed to address gaps ininformation identified in the desk-based assessment. The nature, extent and seasonality should beagreed with the regulators (generally as part of the scoping assessment).

Baseline surveys and reports will form the basis of the environmental baseline description of the SEIAand will typically include:

• Ecology (botany and zoology)

• Agriculture and land use

• Topography and soils

• Geology, geomorphology and geohazards (seismic risks)

• Meteorology and climate

• Landscape and visual

• Hydrology and flood risk

• Hydrogeology and aquifers

• Background noise

• Air quality and climate change

• Archaeology and cultural heritage

• Socio-economics and demographics

• Land ownership and land use

• Employment skills and livelihoods

• Infrastructure and services

• Traffic and transport

• Community health

• Unexploded ordnance

• Contaminated land

Page 206: Vol 2 onshore pipelines the road to success 3rd edition

14

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

Constraints maps using geographic information systems (GIS), aerial photography and satellite imageryare built up from the baseline data and used to further refine the route with the engineers. Data is likelyto be collected from and inputted by a variety of sources. It is therefore important that the GIS systemuses agreed projections, feature classes and individual attributes so that the global positioning systems(GPS) used in the acquisition of field survey data are compatible with the structure of GIS system. Theexchange of constraints data on its own to the engineers is important, however it is vital that adescription of the type and extent of any constraints are also provided so the engineers can assist in theformulation of practical mitigation measures. Agreement on terminology (kilometre points/chainage/GPScoordinates) reduces the potential for misunderstandings. Agreed mitigations are documented in theSEIA report, associated constraints maps and management plans.

As surveys are completed it is useful to consult with the regulatory authorities and allow them to reviewthe baseline reports ahead of completion of the impact assessment. In some cases regulators may haveadditional information or insight into the local conditions, which may be useful in the impact assessmentprocess. This is typically done in the form of a preliminary environmental information or social andenvironmental baseline report. The baseline report is subsequently amended in line with comments andincluded in the SEIA.

12.6.1 Seasonality

Seasonal restrictions may prolong the SEIA timescale, and sufficient time should be left to collectrepresentative samples of environmental and social baseline.

The scoping report should provide an indication of any restrictions to survey effort as a result ofseasonality in agreement with the regulators. In some cases data from two seasons is required to obtaina representative sample.

Licences or restrictions may need to be obtained to undertake surveys at specific times of year, forexample nesting, breeding and spawning periods. At other times of year it is easier (or more difficult) toidentify species due to hibernation or moulting periods. Typical UK survey timings are shown in Figure 3.

Page 207: Vol 2 onshore pipelines the road to success 3rd edition

15

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

Figure 3: An Example of UK Environmental Survey Timings

Page 208: Vol 2 onshore pipelines the road to success 3rd edition

16

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.7 Consultation

Stakeholders are persons or groups who are directly or indirectly affected by a project, as well as thosewho may have interests in a project and/or the ability to influence its outcome, either positively ornegatively. Stakeholders may include locally affected communities or individuals and their formal andinformal representatives, national or local government authorities, politicians, religious leaders, civilsociety organisations and groups with special interests, the academic community or other businesses(International Finance Corporation (IFC), 2007).

Large projects may also consist of a consortium of companies and lenders who will also act asstakeholders and will need their own reporting requirements one of whom may be the ultimate operator.Stakeholders share information and knowledge, and may contribute to the development so as toenhance its success. It is therefore very important to identify and list these groups early in the SEIAprocess. The range of stakeholders involved in an SEIA typically includes:

• Individuals, groups and communities who are affected by the proposed development

• The proponent and other project beneficiaries

• Government agencies

• Non-governmental organisations (NGOs) and interest groups

• Others such as donors, the private sector, academics, etc.

Public involvement is specifically a valuable source of information when identifying key impacts, potentialmitigation measures, landowners and the selection of alternatives. It also ensures the SEIA process isopen, transparent and robust, and is characterised by defensible analysis.

Consultees can also provide information on the future projects or planned constraints that may affectrouteing or the location of specific AGIs and temporary construction and accommodation camps.

The stakeholder consultation process should be documented in the public consultation and informationdisclosure plan (PCDP) and SEIA, and any changes to the project design attributed to stakeholderconsultation should be described.

12.7.1 Public consultation and information disclosure plan (PCDP)

Many financial institutions and governing bodies now have policies and requirements regarding publicconsultations and disclosures within their SEIA system to ensure that projects in which they invest areimplemented in an environmental, timely and socially responsible manner. These requirements varywidely depending on the particular SEIA system: most, if not all, nowadays require some publicinvolvement as part of the SEIA process, while others require extensive consultation and reporting. Thereis growing recognition that the public has the right to meaningfully participate in the SEIA process. Someregulatory authorities have even specified that the public must be properly consulted, even when there isno law specifically governing the process.

The PCDP is a public document that sets out the company’s commitments relating to stakeholderengagement, consultation and disclosure, and is to be updated for each phase of the project.

A PCDP, prepared early in the scoping phase, provides the following benefits: • Ensures transparency and involvement of stakeholders in assessing and managing the potential

environmental, socio-economic and health impacts of the project

• Identifies and involves all potentially affected groups and individuals

Page 209: Vol 2 onshore pipelines the road to success 3rd edition

17

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

• Improves decision-making and builds understanding by actively involving key project-affectedstakeholders in two-way communication. Through this process, the proposed developmentbetter understands the concerns and expectations of stakeholders, and the opportunities toincrease project value to the local community

• Identifies issues early in the project cycle that may pose a risk to the project or its stakeholders

• Ensures that mitigation measures are appropriate (implementable, effective, and efficient)

• Establishes a system for long-term communication between the project and communities that isof benefit to all parties

During the SEIA process consultations start at an early stage and project information is provided inadvance. The proposed development sponsor usually consults stakeholders at least twice; once duringscoping before the TOR for the SEIA are finalised, and again once the draft SEIA is ready for circulationto the relevant consultees. In addition, the owner/operator consults with such groups throughout projectimplementation to address SEIA-related issues that affect them.

Despite a number of guidance documents on principles and methods surrounding public involvementprograms, there are no set rules about how to involve the public and it is important that the processremains innovative and flexible. It is therefore important to understand how decisions are made locallyand what the methods of communication, including available government extension services.Stakeholder consultations can be conducted in different forms (both formal and informal), but not limitedto:

• public meetings

• semi-structured interviews

• focus groups

• face-face meetings

The range of groups outside the formal structure with relevant information is likely to include; technicaland scientific societies, NGOs, experts on local culture, and religious groups. However, it is important tofind out which groups are under-represented and which ones are responsible for, or have a highinfluence over access to natural resources (i.e. grazing, water, fishing and forest products).

12.7.2 Consultation disclosure

The SEIA process needs to demonstrate that stakeholder concerns have been identified and taken intoaccount. Examples of mitigation commitments designed to deal specifically with stakeholder concernsmay comprise:

• Land acquisition and livelihoods, including clear guidance on land acquisition and compensation(setting out the principles and key mechanisms by which livelihoods would be maintained) forthose individuals likely to be affected by land acquisition. Access for livestock to grazing lands,watering holes and public rights of way will be maintained or, if restricted, to the minimum extentreasonably practical

• Infrastructure damage, including a commitment relating to avoiding damage and to repair whereany damage occurs

• Employment opportunities, including commitments setting out the policies for employing localpeople if the required skills are available. Targets for local recruitment can be set and monitoredto assure that this commitment is met

• Pollution: Commitments may be applied to suppressing dust and lowering noise to acceptablelevels. Monitoring to assure that the commitments are being applied and achieving theirobjectives is likely to be needed.

Page 210: Vol 2 onshore pipelines the road to success 3rd edition

18

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.8 CHARACTERISTICS OF POTENTIAL IMPACTSAND THEIR EXTENT

Several factors influence the characteristics of potential impacts and are taken into account whenpredicting impacts and making decisions. They include:

• The nature of the impact (positive, negative, direct, indirect, cumulative)

• The magnitude and complexity of the impact (severe, moderate, low)

• The extent/location (geographical area and size of the affected population)

• Timing (during construction, operation, decommissioning, immediate, delayed, rate of change)

• The duration of the impact (short term, long term, intermittent, continuous)

• The reversibility/irreversibility of the impact

• Probability (likelihood, uncertainty or confidence in the prediction)

• The significance of the impact (local, regional, global).

12.8.1 Impact assessment

The most common impacts are those that are directly related to the proposed development and have adirect correlation with the actions that caused them. Typical examples of direct impacts are destructionof habitat caused by forest clearance; relocation of households caused by reservoir impoundment; andincreased air particulate emissions caused by operation of a new power station or, as in the case of apipeline, the use of gas compressor trains or water bath heaters. Indirect or secondary impacts arechanges that are usually less obvious, occurring later in time or further away from the impact source.Examples of these types of impacts are the spread of malaria as a result of drainage schemes thatincrease standing water and thereby create new vector habitats; bio-accumulation and bio-magnificationof contaminants in the food chain through take up of agricultural pesticides; and anxiety, stress andcommunity disruption associated with increased traffic volumes, or construction camp locations andnoise/vibration caused by road development.

While defining the characteristics of the impact, estimating the magnitude of the impact is also a primarytask. Typically, it is expressed in terms of severity, such as major, moderate or low. It also takes accountother aspects such as whether an impact is reversible and, if so, the likely rate of recovery. Attemptsshould be made as much as possible to quantify the impact.

The extent or zone of impact influence can be predicted for both site-specific and regional occurrences.Depending on the type of impact, the variation in magnitude needs to be estimated, for example,alterations to range or pattern of species or dispersion of air and water pollution plumes. This is mucheasier for direct impacts but is not as straightforward for other types of impacts e.g. indirect andcumulative impacts.

Impacts arising from all of the stages of the life cycle or phases of the project, such as construction,operation and decommissioning, should be considered. Some impacts occur immediately, while othersare delayed, sometimes by many years. These impact characteristics are noted in the SEIA report.

Some impacts may be short-term, such as the noise arising from the operation of equipment duringconstruction while others may be long-term, such as the operation of process plant. Certain impactssuch as blasting may be intermittent, whereas others, such as electromagnetic fields caused by powerlines, may be continuous. Impact magnitude and duration classifications can be cross-referenced, forexample, major but short term (less than one year), low but persistent (more than 20 years).

Page 211: Vol 2 onshore pipelines the road to success 3rd edition

19

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

Cumulative effects can accumulate with time either incrementally (or additively) or interactively(synergistically) so that the overall effect is larger than the sum of the parts. These impacts may beindividually minor but collectively significant because of their spatial concentration or frequency in time.

The evaluation of significance at SEIA stage depends on the characteristics of the predicted impact andits potential importance for decision-making. Significance is evaluated in terms of environmental loss anddeterioration, social impacts resulting directly or indirectly from environmental change, and/or non-conformity with environmental standards, objectives and guidelines.

12.8.2 Impact assessment and commitments register

Impact assessment is the systematic assessment of the potential effects of a development on the social,cultural and environmental baseline. There is no prescribed method of impact assessment, and differentprojects will adopt different approaches. However, all seek to identify the potential impacts arising fromthe project and will apply either standard, recognised, industry-practice mitigation measures or impact-specific, feasible and cost-effective mitigation measures to minimise the potential effects.

The impact assessment methodology takes account of potential impacts on a wide range of receptorsincluding:

• The physical and chemical environment (e.g. climate, air quality, soil and groundwater quality)

• The biological environment (e.g. plants, terrestrial animals, birds and their food chains)

• Communities, social groups and individuals (e.g. employment generation, changes in per capitaincomes, threats to vulnerable groups and exposure to health and safety risks).

The principles of SEIA are now widely established. All major projects will cause some changes to theenvironment. In the past the SEIA process mainly identified what these changes would be and, afterproposing mitigation, reported them to the decision maker.

As SEIA has evolved the emphasis has moved on to the reduction of potential adverse impacts andmaximising potential benefits through appropriate design measures. Designing out the significant effectsof a project is the central tenet of the approach.

Impact assessment is an iterative process, the aim of which is to design out or minimise potentialimpacts and to do so in a way that prioritises those that are potentially most significant. The assessmentprocess constitutes a systematic approach to the evaluation of the proposed project in the context ofthe natural, regulatory and socio-economic environments in which development is proposed.

Potential impacts arising from the project are identified, and mitigation measures agreed. These can beeither recognised industry best practice mitigation measures they should however be feasible and cost-effective. Any potential impacts that remain after the application of mitigation measures are referred to asresidual impacts. All residual environmental and social impacts are assigned a level of impact of low,medium, high or beneficial. Impacts may be assessed without mitigation then again after mitigation isapplied.

Residual environmental and social impacts are then described. The objective being to identify mitigationmeasures which reduce the potential effect before mitigation to a reasonable and acceptable level.Where appropriate, other mitigation options considered in the assessment and the reasons for theirrejection can be presented.

Page 212: Vol 2 onshore pipelines the road to success 3rd edition

20

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

The mitigation measures are typically compiled into a commitments register which sets out all themeasures that the project proposes to adopt in relation to potential impacts identified in the SEIA.Mitigation measures include those incorporated into the engineering design process, as well as thoseproposed for construction, operation and decommissioning. The commitments register should be readin conjunction with the full text of the SEIA document, which provides important context andbackground, as well as describing the impacts that the listed measures aim to mitigate or manage andthe residual impacts that may remain.

The SEIA should clearly set out the methodology and legal standards that are being applied to theassessment process. Seeking early agreement with the regulatory authorities early in the project, as partof the scoping/consultation exercise, may also reduce the timescale for consent.

12.8.2.1 Example methodology

The residual environmental and social impacts are assigned a level of significance based on theimportance/sensitivity of the receptor and the magnitude of that impact.

For each impact an importance/sensitivity ranking between A and E, and an impact magnitude rankingof between 1 and 5 is applied using categories of importance/sensitivity of the receptor and magnitude,which are described independently for each topic based on legal guidelines, codes of practice etc. Thesignificance level of the residual impact can then be determined using a matrix such as that in Figure 4.

Figure 4: Typical significance matrix

All residual impacts identified from the impact assessment are given a significance ranking with theterms low, medium and high representing a comparative scale. Where an impact is of medium or highsignificance, it is addressed in greater detail in the text.

The SEIA may chose to detail any beneficial impacts (such as employment and local investment as wellas impacts of low significance that are deemed to warrant further explanation.

Documented commitments form the basis of the environmental and social mitigation and managementplans (ESMMP) for construction and operation. They will include generic and site-specific commitments.

Page 213: Vol 2 onshore pipelines the road to success 3rd edition

21

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.8.3 Cumulative and secondary impacts

Secondary impacts are a complex element of impact assessment and subject to diverse guidance andapplication2. They are an integral part of the impact assessment. Direct impacts are relatively easy toassess, whereas those that have an indirect, cumulative, in-combination effect are, by their own nature,more complex.

Impact-assessment evaluation techniques include the use of matrices, expert opinion, modelling andcarrying capacity analysis, and combinations of these techniques can be applied. However, it is best tokeep this process as simple as possible with a clear explanation of the methodology adopted.

Cumulative impact assessment generally covers those other development projects which are in thepublic domain. However prediction of potential effects is often limited by the difficulty in obtaining datain sufficient to undertake a rigorous impact assessment

2 EC DGX11 Guidelines for the assessment of indirect and cumulative impacts as well as impact interactionshttp://ec.europa.eu/environment/eia/eia-studies-and-reports/guidel.pdf

12.8.4 Unplanned events

The majority of the impact assessment process considers the potential effects of the construction andoperation of the pipeline and operating facilities under normal operating conditions. However there is arequirement to look at the potential for unplanned events. This section in the SEIA will include asummary of the engineering risk assessment and major accident hazard assessments undertakenduring detailed engineering design. Emergency response measures and operational controls will also beexplained in this section. The impact assessment criteria in this section generally includes anexplanation of likelihood of an event occurring.

12.8.5 Mitigation of impacts

Mitigation is a critical component of the SEIA process that aims to prevent adverse impacts fromhappening or reduce the severity of impacts to occur within an acceptable level. The objectives of mitigation are to:

• Find better alternatives and ways of performing tasks

• Enhance the environmental and social benefits of the proposed development

• Avoid, minimise or improve adverse impacts

• Ensure that residual adverse impacts (i.e. those impacts remaining after mitigation) are kept withinacceptable levels

Early links are established between the SEIA and project design teams to identify mitigationopportunities and incorporate them into consideration of alternatives and design options. In practice,mitigation is emphasised in the SEIA process once the extent of the potential impact of a proposal isreasonably understood. This typically takes place following impact identification and prediction. Onceidentified, these mitigation measures are implemented during the impact management stage of the SEIAprocess.

The objectives of impact management are to:• Ensure that mitigation measures are implemented

• Establish systems and procedures for the implementation of these measures

• Monitor the effectiveness of mitigation measures

• Take any necessary action when unforeseen impacts occur

Page 214: Vol 2 onshore pipelines the road to success 3rd edition

22

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.9 ENVIRONMENTAL AND SOCIAL MANAGEMENTAND MONITORING PLANS

Critical to the successful implementation of the commitments and mitigation measures within this SEIAis the development of a commitments register.

The construction-phase commitments are tracked through from the commitments register in the SEIA toenvironmental and social management and monitoring plans (ESMMP), which will form theenvironmental and social management system (ESMS) in the construction phase.

The ESMMP should also be included in the invitation to tender (ITT) for the construction contractor(s),and implementation of the management plans it contains should become contractually binding. Wherethe measures to be implemented can be clearly identified/quantified then they should be priced andexecuted at the contractor’s risk. Where the measures cannot be clearly identified then budgetaryallowances (in terms of costs and programme) should be made by either the contractor or the client.The contract should clearly allocate responsibility for unquantifiable measures to either contractor orclient.

Monitoring during the construction and operational phases of the project, through the audit of impactpredictions and mitigation measures, will assure:

• Mitigation measures are implemented effectively

• Mitigation measures are appropriate and, if not, that they are amended or additional measuresare designed and implemented

• Compliance with project standards, guidelines and best practice as applicable

• Assessment of cumulative and residual impacts, so that appropriate measures can be designed ifnecessary

• The continuation of the SEIA as an iterative process, through the construction and operationalenvironmental and social management systems, will be based on continual improvement

Operations-phase commitments are incorporated into an integrated ESMS.

The objectives of the ESMMP are to:• Help the developer to achieve its intended environmental and social management outcomes and

mitigate the project’s identified environmental and social impacts to the levels predicted in theSEIA

• Describe the requirements that the contractor should meet to ensure that the commitmentsmade in the SEIA for the project are fully implemented

• Provide a mechanism to achieve compliance with consent conditions and legal obligations anddemonstrate conformance with developers environmental and social policies

• Provide a framework for the contractor to develop environmental and social implementation plansto address the commitments and requirements in the ESMMP, including method statementstaking account of local conditions. The environmental and social implementation plans aredeveloped by the contractors to allow some flexibility in approach and constructiontechniques/machinery. The method statement may require regulatory approval

The client may undertake some of the commitments. A clear description of the responsible party,location and timescale should be included in the ESMMP.

The ESMMP may also describe the environmental and social performance criteria (key performanceindicators(KPIs)) for the project and also the auditing, reporting and monitoring requirements.

Page 215: Vol 2 onshore pipelines the road to success 3rd edition

23

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

The project’s ESMMP is the primary mechanism for implementing the measures listed in thecommitments register. The ESMMP forms the basis of contractual agreements between the project andthe main contractors involved in project construction. The ESMMP is likely to include topic-specificmanagement plans such as those listed below:

• Reinstatement/biorestoration plans (translocation/nursery/contract growing)

• Emergency response plans

• Health and safety plan

• Security plan

• Ecological management plan

• Waste management plan

• Pollution prevention plan

• Resources management plan

• Construction camp management plan

• Infrastructure and services management plan

• Community health, safety and security plan

• Community liaison plan

• Local recruitment and training plan

• Procurement and supply plan

• Cultural heritage management plan

• Land management plan

• Traffic management plan

The ESMMP is provided to the contractor as part of the tender for construction so that commitmentsare included in the construction costs and contractor implementation plans. These may be integratedwith the contractors documented and operational ESMS (such as the international standard ISO 14001environmental management system).

Some elements of the commitments are implemented by the developer using specialist contractors priorto appointment of the contractor, which typically includes preconstruction commitments such asarchaeological investigations, translocation of ecology and land acquisition. The roles and responsibilitiesof the developer and contractor(s) should be clearly defined.

Operational management and monitoring plans will be developed to implement operationalcommitments before the project moves to the operations phase.

12.9.1 Construction phase ESMMP

The ESMMP is not a legally binding document, however it may form part of the consent conditionsgranted by the regulatory authority. While it draws on and replicates commitments made in the mainbody of the SEIA, it does not make (and should not be read as making) any new, amended or additionalcommitments by the project. The definitive source for all commitments made in this SEIA is thecommitments register. The ESMMP is a tool designed to help implement those commitments and isconsidered a ‘live’ document that is likely to evolve during the lifetime of the project to encompass theconstruction and commissioning phase. The plans will be updated to include regulator and stakeholderfeedback. The ESMMP provides details of how the project proposes to implement and monitor thecommitments made in the SEIA.

Page 216: Vol 2 onshore pipelines the road to success 3rd edition

24

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

The construction-phase ESMSs will include the ESMMP, which describes:• The legislative framework for the project

• Guidance for international industry good practice

• Roles and responsibilities of the client/developer and the contractor

• The actions required to avoid and mitigate environmental and social impacts and to put thecommitments in the SEIA into effect

• The monitoring and reporting requirements for environmental and social performance

• The requirement to carry out inspections and audits, and to implement corrective actions usingan action tracking system

The ESMMP typically contains several management plans depending on the client’s requirements andthe nature of the project. A sample is listed below:

• Reinstatement plan:o Topsoil and sub-soil managemento Erosion control during (e.g. at crossings, steep slopes, trench breakers) and after

construction o Engineered reinstatement of right of way (ROW) and watercourse crossingso Seeding and matting

• Landscape management plan:o Existing land useo Landscape planso Landscape protection before and during constructiono Seeding and re-vegetation objectives/erosion controlo Maintenance works of both existing and new vegetationo Monitoring and reporting

• Ecological management plan:o Ecological trainingo Location of protected species and sensitive areaso Preconstruction ecological surveyso Habitat and species protection before and during construction (e.g. working width restriction,

translocation, avoiding seasonal sensitivities, traffic restrictions, code of conduct, aquaticenvironment protection)

o Biorestoration (e.g. re-vegetation, selection and procurement of seeds, seeding methods,seed collection, replanting)

o Monitoring and reporting• Waste management plan:

o Waste management trainingo Identification and classification of wasteo Waste hierarchy and waste minimisation strategy (i.e. reduction at source, reuse, recycling,

energy recovery, responsible disposal)o Waste handling (i.e. collection, segregation and containers, storage and treatment, transport

and documentation, disposal)o Monitoring and reporting

• Pollution prevention plan:o Pollution prevention trainingo Energy efficiency (vehicle and equipment selection and maintenance)o Emissions and dust management (i.e. vehicle, equipment and generator emissions, dust

management)o Wastewater management (e.g. run-off, trench dewatering, hydrotest water disposal and use

of chemicals in hydrotest water, vehicle and equipment washing)o Sewage treatment and disposal

Page 217: Vol 2 onshore pipelines the road to success 3rd edition

25

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

o Noise and vibration managemento Oil and chemical management (i.e. storage, handling and spill prevention) o Treatment of contaminated soilo Management of hazardous liquid wasteo Monitoring and reporting

• Resource management plan:o Training (incl. energy efficiency and water use minimisation)o Aggregates management (estimation of requirement, identification of quarries and borrow

pits, transportation, control of third parties) o Water management (water supply, hydrotest water abstractiono Construction camp management plano Consultation with local communities before construction camp is developedo Restriction of access to camp and use of its facilitieso Training (including induction briefing on camp rules and awareness of local issues and

sensitivities)o Camp rules (e.g. discipline and restrictions on alcohol, drugs, noisy activities and illegal

activities, community liaison, ethnic tensions, market distortion and communicable diseases)• Infrastructure and services management plan:

o Disruption to infrastructure (transport, electricity, irrigation)o Prevention and repair of community infrastructure damaged by project activities o Management of disruption to communities and individualso Community health, safety and security plano Worker–community interaction (e.g. spread of communicable diseases)o Management of construction sites (e.g. access to ROW and open-trench philosophy) o Traffic safety (e.g. control of traffic flows through villages)

• Community liaison plan:o Community liaison officer (CLO) requirementso Maintaining good relations with communities, landowners and land users (e.g. meetings,

complaints management procedure) o Community access

• Local recruitment and training plan:o Local recruitment for construction-phase workforceo Skills and HSE training (for all personnel) including induction trainingo Retrenchment

• Procurement and supply plan:o Maximising local procurement of goods and services o Transparency of procurement process

• Cultural heritage management plan:o Ensure avoidance of heritage site impactso Mitigation measure to reduce impact to heritage sites where avoidance is not possibleo Protection of heritage sites during constructiono Monitoring and reporting of results

• Land management plan:o Assessment of additional lando Spoil disposal sites and borrow pitso Land acquisition and compensation requirementso Monitoring and reporting

• Emergency response plano Location of response equipment and response timeso Local government arrangements o Joint industry arrangementso Training

Page 218: Vol 2 onshore pipelines the road to success 3rd edition

26

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

The ESMMP should include in the introduction the allocation of responsibilities for development ofimplementation plans relating to each management plan. The construction contractors will be requiredto develop an ESMS, including implementation plans that are in line with the management plans in theESMMP and give details of how commitments will be implemented and monitored. The constructioncontractors will submit implementation plans for approval before construction begins. The contractors’implementation plans and associated procedures and method statements will be checked by the client,and/or regulators to ensure they incorporate the relevant environmental, social and cultural heritagerequirements stated in the ESMMP. The implementation plans and method statements may beincorporated into consents and agreements with the regulators. Once the plans are approved, anychanges will need to be revisited and approved.

The public consultation and disclosure plan (PCDP) for the project provides the structure for effectivemanagement of consultations with third parties during the design and construction stages of the project.The PCDP and associated stakeholder consultation database are live documents and will be updated asnecessary during the project to reflect the status of planned activities.

Page 219: Vol 2 onshore pipelines the road to success 3rd edition

27

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.10 Transboundary Effects

Transboundary impacts are impacts that cross the border into neighbouring countries which may be asa result of planned or unplanned events.

The 1991 Espoo Convention on Environmental Impact Assessment in a Transboundary Context sets outa process by which countries that are party to the convention inform each other of projects that canhave transboundary impacts.

The cumulative impact assessment identifies those environmental and/or socio-economic aspects thatmay not constitute a significant impact on their own, but when combined with impacts from past,present or reasonably foreseeable future activities associated with a proposed development and/or otherprojects may result in a larger and more significant impact(s). Examples of such impacts include:

• The recurring loss of habitat in areas that are disturbed and re-disturbed over an extended period

• Additional emissions as a number of projects are developed at the same time or a processingplant or pump station is expanded over a period of time

• The on-going development of employment opportunities and enhancement of a local labour skillsbase as successive projects (related or unrelated) come on stream

12.10.1 Carbon measurement and assessment

In the EU, the Environmental Impact Assessment Directive (as amended) requires the consideration ofdirect and indirect effects of development projects on ‘climate’ (Article 3) and ‘climatic factors’ (AnnexIV). Despite these requirements, calculating the greenhouse gas (GHG) emissions (or “carbon footprint”)of a project is a relatively recent approach to impact assessment, and is a separate consideration tothose emissions that affect air quality given the very different nature and scale of the impacts.

For pipeline projects, sources of GHG emissions may include:

• Manufacture of pipe work and associated materials and infrastructure

• Transportation of the above materials to the site

• Impacts to, or losses of, natural carbon sinks such as peatland or forestry during routepreparation

• Energy consumption (i.e. fuel or electricity) from site activities

• Transport and accommodation of site workers

• Waste arisings (depending on their treatment)

• Construction equipment for pipeline construction

• Fugitive pipeline emissions

Where a project entails pumps and compressors, the driving of these is likely to be the most significantsource of emissions. It is therefore important that the selection process includes analysis or comparisonof the energy efficiency ratings.

The UK Institute of Environmental Management & Assessment (IEMA) published guidance on preparingClimate Change chapters for Environmental Statements [IEMA Principles Series: Climate ChangeMitigation & EIA; Version 1.1; 1st June 2010]so that climate change impacts of developments, bothpositive and negative, are better addressed as part of SEIAs.

Page 220: Vol 2 onshore pipelines the road to success 3rd edition

28

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

The overarching principles of the IEMA guidance are as follows:

• GHG emissions from all projects will contribute to climate change; the largest inter-relatedcumulative environmental effect

• The consequences of a changing climate have the potential to lead to significant environmentaleffects on topics in the EIA Directive including population, fauna, soil etc.

• When GHG emissions have a combined environmental effect that is approaching a scientificallydefined environmental limit, as such, any GHG emissions or reductions from a project might beconsidered significant

• The EIA process should, at an early stage, influence the location and design of projects tooptimise GHG performance

For pipeline projects, opportunities to minimise GHG emissions may include:

• Routing to avoid natural carbon sinks such as peatland or forestry

• Appropriate management arrangements for any impacted natural carbon sinks (e.g. peatmanagement)

• The specification of construction materials with low embodied carbon e.g. recycled aggregates,low carbon concrete, local materials (use of padding machines)

• The use of local labour and suppliers

• Replacement planting for any tree felling

• Consideration of fuel efficiency, driver training and carbon emissions when specifying constructionplant and vehicles

• The use of zero / low carbon energy technologies to contribute to any energy demands

Quantifying GHG emissions associated with different pipeline options at the early stages of a project(e.g. different pipeline routes, materials, construction techniques etc), as recommended by the IEMAguidance, enables the relative carbon performance of each option, and hence climate change effect, tobe established and feed into the option evaluation process.

GHG emissions resulting from the future use of the fossil-fuels transported in a pipeline is typicallyexcluded from the overall assessment.

12.10.2 Carbon offsets

The opportunity may also exist to offset GHG emissions associated with a pipeline project, for exampleits manufacture, construction and/or operation. A carbon offset is a reduction in emissions of GHGsmade in order to compensate for an emission made elsewhere.

There are two markets for carbon offsets. Firstly in the larger compliance market, companies,governments, or other entities buy carbon offsets in order to comply with caps on the total amount ofcarbon dioxide they are allowed to emit. This market exists to achieve compliance with obligations ofAnnex 1 parties under the Kyoto Protocol, and of liable entities under the EU Emission Trading Scheme.Secondly in the voluntary market, individuals, companies, or governments purchase carbon offsets tomitigate their own greenhouse gas emissions from transportation, electricity use, and other sources.

Offsets may be cheaper or more convenient alternatives to reducing one's own fossil-fuel consumption.However, some critics object to carbon offsets, and question the benefits of certain types of offsets. Duediligence is recommended to help businesses in the assessment and identification of "good quality"offsets to ensure offsetting provides the desired additional environmental benefits, and to avoidreputational risk associated with poor quality offsets.

Page 221: Vol 2 onshore pipelines the road to success 3rd edition

29

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.11 LAND EASEMENTS AND WAY LEAVES

Land access issues and related planning processes are typically addressed in documents that may beprepared and submitted separately from the overall SEIA, but are at least summarised in the SEIA if notappended and disclosed with it. These stand-alone documents require, as stipulated by internationalnorms such as the IFC’s Performance Standard 5 (2012):

• A resettlement action plan (RAP), if there is physical displacement (loss of shelter) or ifcompulsory acquisition processes, will be used which typically has to be submitted and disclosedas part of the SEIA package or concurrently as a separate document

• A livelihood restoration plan or framework if there is no physical displacement and no recourse tocompulsory acquisition, which in short is a simplified version of the RAP.

The RAP is linked to the Environmental and Social Management and Monitoring Plans (ESMMP) whichare discussed in Section 9.

The planning process is based on baseline studies that typically include:

• An inventory of affected assets and an associated census of affected households, which isrequired to address 100% of affected assets and people

• A detailed socio-economic survey of the baseline circumstances of affected households, whichmay address only a valid sample in situations where there is no physical displacement; focusshould be put on the dependency of livelihoods on the affected land such that a properunderstanding of the actual impacts can be developed

• Land market and valuation studies

• Reviews of the local legislation in light of international requirements and of any establishmentagreement (“host government agreement” or similar) that may establish exceptional legal regimesto the benefit of project sponsors

In addition to these studies, it is critical that the planning process should be based on intensiveconsultation with affected people and/or their representatives, particularly in situations where there isphysical displacement.

Pipelines have two particularities compared with other types of infrastructure:

• Discrete impacts on one given household are typically fairly benign:

o Physical displacement can usually be avoided by re-routeing o Impacts are experienced for a short period during construction, while impacts at operation

stage involve restrictions that typically do not impede the resumption of normal agriculturalactivities

• These relatively benign impacts are often experienced by very large numbers of households:numbers of affected plots in the thousands or even in the tens of thousands are not uncommonfor pipelines of several hundred kilometres

The following aspects are therefore critical to proper planning and implementation of land access onlarge pipeline projects:

• Start early: Land acquisition and resettlement specialists should be associated as of the initialnegotiations of the host government agreements, such that key issues can be identified early andsolutions reflected in legal documents

• Valuation: Land compensation needs to be based upon fair replacement value (market value plusany transaction costs).Under-compensation is unfair to affected people and would adversely

Page 222: Vol 2 onshore pipelines the road to success 3rd edition

30

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

impact their livelihoods but over-compensation triggers opportunistic or speculative behavioursand must be avoided too. Hence the importance of robust valuation studies, based on a soundassessment of the actual impacts of construction and of further reuse restrictions, using differentand proven assessment methodologies, and based on a proper analysis of agricultural landmarkets, particularly where such markets are in a formative state, as is the case in manydeveloping or emerging economies

• Livelihood restoration: Where pipelines affect predominantly agricultural land, livelihoodrestoration requires both adequate compensation and proper reinstatement of the agriculturalpotential of affected land; the involvement of experienced reinstatement specialists, andintegration of adequate reinstatement provisions in construction contracts are essential tominimising impacts and associated claims

• Resourcing: Where there are thousands of compensation agreements to reach, negotiations withlarge numbers of affected people for compensation payment and grievance management is ahugely demanding task. Associated resourcing, and the costs thereof, should not be under-estimated. An order of magnitude of 10% of the total cost of land access should be used as a“rule-of-thumb” estimate of the cost of planning and administering the process.

The construction tender documents should clearly identify responsibility between client and contractoras to who is responsible for:

• Obtaining planning or other local regulatory consent in respect of the proposed pipeline route andany other necessary accesses, compounds, camps, offices, pipe dumps; workshops etc.

• Who is to negotiate and pay compensation to affected landowners

Finally, it is important to note that the cost of land access is not a marginal factor of the overall cost of apipeline project, even in developing countries (ratios of 3–6% can typically be expected). Properlyplanning land access is therefore not only a matter of ensuring compliance with internationalrequirements or good practice, but also part of sound economic optimisation of the overall project cost.

Long-term easement agreements will confer the rights of access in the long term for maintenanceoperations and security patrols. The operator will implement such agreements to protect the pipeline inthe long term from development, erosion or interference.

Page 223: Vol 2 onshore pipelines the road to success 3rd edition

31

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.12 Hazard And Risk Assessment

Environmental hazard and risk assessment (EHRA) and social risk assessment (SRA) are processeswhereby the SEIA team can:

• Confirm its understanding of the project with the design engineers

• Identify to the design engineers areas of potential environmental concern

• Jointly develop alternatives so that potential impacts can be avoided where possible orproactively mitigated

EHRA/SRA issues are discussed with key project engineers and HSE advisers. These discussions arefacilitated by members of the SEIA team and the pipeline and facilities engineering team during thedesign process. These discussions allow input from all participants in the identification of potentialenvironmental and social hazards associated with project activities. In addition, possible alternatives andoptions could be evaluated. The process considers each activity that will, or may, occur during theproject including:

• Planned routine activities

• Planned but non-routine activities

• Unplanned or accidental activities

Existing mitigation measures designed into the project are also considered during these discussions.

Hazard analysis and risk assessment studies are included in the SEIA; describing and assessingunplanned events that could potentially cause risks to public safety and harm to the environment.In addition proposed mitigation measures and the strategy proposed that aims to manage the riskspotentially associated with a project are also outlined.

Risk assessment is both a design tool and a valuable tool for ranking potential risks during the lifetime ofa gas or oil pipeline or facility, prioritising operational efforts to reduce the likelihood of leakage and toguide emergency planning. It can be used to assist safety-based decision-making on future land use inthe vicinity of the pipelines and facility.

The main steps in the risk assessment process are:

• Identifying potential failure causes

• Estimating failure frequencies

• Identifying potential release modes

• Estimating release frequencies

• Assessing release consequences

• Calculating risk to the public

• Assessing the significance of the risk

• Identifying and evaluating additional risk prevention or risk mitigation measures as appropriate,and recalculating risks.

Page 224: Vol 2 onshore pipelines the road to success 3rd edition

32

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

Wherever practicable the pipeline route will have avoided populated areas, crossings or geologicallycomplex areas (landslip, wadis, and flood plains). Further mitigation measures can take the form ofengineering design, construction techniques or operating techniques and technology such as:

• Increased wall thickness

• An increased depth of cover

• Anti corrosion protection/improved welding practices

• Concrete slabs and marker tape installed over the pipeline

• Motion sensors and CCTV monitoring

• Pipeline foot patrols and aerial surveillance

• One-call systems and landowner communication

The impact significance and probability of occurrence typically considers the potential impact andprobability of an unplanned event. It subsequently takes account of the design measures that aim tominimise the probability and consequences of the event and, the proposed operational controlmeasures. This gives an overall assessment of the residual risk of unplanned events.

Page 225: Vol 2 onshore pipelines the road to success 3rd edition

33

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.13 Consent Process

12.13.1 SEIA documentation

SEIA documents are provided in support of the development application to the regulatory authorities.Typically they include a non-technical summary, the SEIA report and technical appendices. A separateenvironmental baseline report may have been issued to regulators and made available by selectedstakeholders for comment early in the SEIA process.

12.13.2 Stakeholder engagement and education

It is normal practice for the SEIA process to include a disclosure period followed by consultations withstakeholders, who may be individuals, groups or organisations whose interests could be affected by theproposed pipeline route or the associated construction activities. The SEIA process has to demonstratethat stakeholders have been consulted and document any changes to the design that have occurred asa result of the consultation. Consultation continues into construction and during operation of thepipeline.

Copies of draft SEIA documents are made available at locally agreed locations. Communities are notified(by means of a number of communication channels, including adverts in local and national papers) ofthe whereabouts of the documents and the timescales for comments to be returned. In many cases,local meetings are held to support the disclosure process.

The disclosure process has the advantage of identifying major omissions and providing an opportunityfor stakeholders to comment on the proposals before the formal submission for approval.

12.13.3 Condition negotiation

The time taken to consent a project will depend on the statutory regulations in the region and can takeweeks, months or even years. However all applications undergo some form of regulatory review,consultation and negotiation of consent conditions.

The discussions will focus on the assessment of significant effects, mitigation measures andcommitments. Conditions are generally presented in draft by the regulator and discussed and agreedupon with the developer.

Reporting and management of the consent conditions by the developer is important, as the regulatorshave the authority to stop work in the event that conditions are not met to their satisfaction.

12.13.4 Community fund/commitments

Discussions on community outreach and social and environmental offset projects are often also includedas part of the consent conditions negotiation process if they have not already been discussed andagreed during community consultation.

The main goal of community funds and commitments is to build and maintain positive relationships withthe pipeline communities by socio-economic development in the communities.

Page 226: Vol 2 onshore pipelines the road to success 3rd edition

34

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

Many clients and their project partners have developed community outreach and corporate responsibilitypolicies to support enhancement of the quality of life of the affected communities, and elements of thepolicies are included by agreement in documents such as the SEIA or stakeholder developmentstrategy.

The extent or numbers of communities, benefiting from the programme, are generally restricted to theproject-affected communities and people (namely landowners and tenants) defined in the SEIA.

The areas selected for investment vary, however, for pipeline projects they generally relate to agricultureand civil society capacity building. In such cases country specific information will be considered whenidentifying the most suitable areas for further intervention. It is important to understand cumulative issuesrelating to other similar projects that may have affected the communities in the past. It is important thatrecognised national and international industry guidelines and practices are adopted, as there may wellbe precedents set by other developers who may have adopted other means to construct adevelopment. Needs assessment and discussion with community leaders and regulators may assist inthe identification of projects or programmes to ensure consistency of approach.

12.13.5 Formal Consent

Formal consent for a pipeline project can take varying periods of time depending on the number andcomplexity of the regulatory authorities involved. Generally it is a matter of months, however it may takeyears to get particularly complex multinational agreements for transboundary pipelines.

Pipeline projects typically traverse a number of local, national and international boundaries with differentregulatory requirements. SEIA documents may be required in a variety of languages and formats tomeet local requirements and the documents should accommodate this requirement or have reachedprior agreement with the regulatory authorities or governments on the agreed minimum statutoryrequirements. These may take the form of host government agreements (HGA’s) and potentially aremore stringent than local regulatory requirements.

Page 227: Vol 2 onshore pipelines the road to success 3rd edition

35

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.14 Preconstruction

The SEIA process is undertaken in parallel to the engineering design it provides a documented snapshotof the engineering design at the end of the FEED process. Engineering design continues to evolve wellbeyond the submission of the SEIA.

Given that the consent process can often take months to gain approval there are inevitable changes tothe submitted design that have to be incorporated into the construction contract and approved by theregulatory authorities before construction activities commence. A site visit, aerial photography or Googleearth imagery are often used by the client to provide the contractor with a ‘walk through’ of the selectedpipeline route.

The SEIA team often provides input to the construction tender specification and the tender review andinterview of contractors to ensure that the commitments made in the SEIA and presented in the ESMMPare understood and have been included in the costs.

Discussions at contract negotiations may be needed to clarify and justify some of the routing andconstruction methodologies. Where alternatives are proposed they will be more favourably accepted ifthey reduce the environmental or social impacts and reduce costs.

12.14.1 Client supply

12.14.1.1 Preconstruction consents

Preconstruction consents may need to be obtained for items that were not included in the SEIA or havesubsequently been changed. It is important that the responsibilities for preconstruction consents areclearly identified in the tender documents. These may include:

• Drainage consents

• Water use and abstraction consents

• Water discharge consent

• Temporary planning consent for pipe lay-down and camps

• Highways improvement agreements

• Tree-felling licences

• Translocation of species licences and agreements

• Rights of way or footpath diversion consents

• Archaeological excavation and rescue

• Seed import and plant material import licences

• Fuel and hazardous materials storage consent

• Licensed waste disposal (incineration/landfill) consents

• Borrow pit aggregate extraction licences

• Special crossings consent

• Additional off-easement land requirements for special crossings

The preconstruction consent and the responsible party should be clearly identified in the constructioncontract documents. Timely management of the consents avoids costly construction delays.

Page 228: Vol 2 onshore pipelines the road to success 3rd edition

36

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.14.1.2 Site visit (flyover)

The tender package may contain, in addition to the alignment sheets, constraints maps on GIS systems,together with video footage or aerial photographs as part of the tender package. Field visits or flyoversduring the tender preparation phase are important and time should be allowed for contractors to assessthe route in the field.

Considerable cost savings can be made by removing contingencies as a result of site visits.

12.14.1.3 Geotechnical investigations

Geohazards should be assessed as part of the SEIA and geotechnical investigations should beundertaken early and the subsequent results provided as part of the tender package.

The Road to Success Earthworks section (see Section 6) contains further details on constructiontechniques for different rock types.

12.14.1.4 Pre-clearance archaeological investigation

Known archaeological sites should be either avoided by amending the route alignment or kept in situ byrestricting the working width. Where this is not possible, data and artefacts should be recovered fromsites prior to construction activities.

The construction contract should clearly specify responsibilities between client and contractor fordealing with archaeological finds.

Post-construction scientific reports recording the excavation and any artefacts will be prepared for therespective museum curators and, where required, the artefacts rendered to the care of the museum forsafe keeping and display if desired.

12.14.1.5 Seed collection and contract growing of plants

In some special areas, local seed may need to be collected, stored and germinated in preparation forreseeding or contract growing. This is a specialist exercise and local nurseries and subcontractorsshould be employed to undertake the work.

12.14.1.6 Client supply of long-lead items

Long-lead items are often supplied free of charge to the contractor. It is important that transport andstorage arrangements are clearly understood and are included in the chain of custody documents sothat contractors can take possession of long-lead items that are of a quality and standard specified andin a timely manner.

Page 229: Vol 2 onshore pipelines the road to success 3rd edition

37

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.15 Construction

12.15.1 Contractor mobilisation

Contractor mobilisation and early works include;

• The ROW survey and marking;

• Identification and establishment of camps, lay-down areas, ports, transport systems (rail head,bridge reinforcement, road improvement and alternative construction traffic access routesmarked where there are “lock out” sections such as at railways and large river crossings) as wellas vegetation clearance;

• Identification of services, borrow pits, waste disposal routes and facilities, fencing and signage.

It is likely that some of these activities and locations have been identified within the SEIA and consentconditions. However, for those items that were not included in the SEIA or have subsequently beenchanged it is important that the responsibilities for preconstruction consents and mobilisation activitiesare clearly identified in the contract documents.

The contractor will also need to see any additional preconstruction survey work (not included in theSEIA) that has been undertaken, such as:

• Special crossing surveys

• Geotechnical surveys

• Meteorological data

• Landowner record of condition surveys and agreements

• Highways access/improvements/construction and road/footpath closure agreements

• Agreed water abstraction locations

• Landowner agreements on stock fencing and watering facilities

• Pre-clearance works for archaeology

• Waste disposal routes

• Borrow pits

• Locations sensitive to noise or vibration (protected buildings, schools, hospitals etc.)

The Road to Success Logistics section (see section 8) contains more details on contractor mobilisationand logistics.

12.15.2 Consultation

On-going stakeholder engagement and public consultation is undertaken with the project-affectedpeople and communities to educate and inform them of the construction activities, timings and safetyconsiderations.

12.15.3 Landowner liaison

Constant communication is required to keep landowners informed of progress and how the constructionactivity affects their land. Entry requirements need to be met to allow the contractor onto each individuallandowner’s property. During the course of construction proper heed should be paid to dealing withdrainage, and water management; livestock and crops to ensure that the land is not damaged byconstruction equipment or soils contaminated. On completion of construction, reinstatement needs tobe signed off by each landowner.

Responsibility for liaising with landowners should be defined as either client or contractor.

Page 230: Vol 2 onshore pipelines the road to success 3rd edition

38

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.15.4 ROW preparation

Once all agreements are in place the ROW preparation can start in earnest, including:

• Survey and peg route

• Agreed alien species and communicable diseases mitigation measures

• Ecological mitigations (translocation, fencing, seed collection, turfing)

• Vegetation clearance, dewatering, etc.

• Fencing

• Topsoil stripping

• Drainage (dewatering, header drains, etc.)

• Signage

12.15.5 Construction/labour

For pipeline projects, the majority of social impacts tend to occur during construction stage.Construction camps usually are the source of both negative and positive social impacts. The potentialbenefits associated with camps are mainly associated with local employment opportunities.Construction camps attract migrant workers from different regions as camps are perceived by many asa key source of employment/income. During construction, employment will reach to its peak level, asthere is a demand for direct employment as well as indirect employment. Services such as logistics andcatering are required to serve construction workers. Increase in expenditure as a result of workers’spending could also boost the local economy, and could potentially lead to development of smallbusinesses. However, despite the positive impacts related to employment, there are also a number ofpotential negative impacts.

The negative social impacts associated with construction camps are:

• Unplanned immigration of labour towards construction camp locations

• Impact on housing market and increase in rents

• Increase in traffic and road accidents

• Increase in crime as a result of any potential conflict between the locals and the newcomers

• Increase in cost of products as a result of localised inflation, which will affect locals’ purchasingpower

• Local concerns associated with recruiting local contractors/workers from different regions wherethe construction camps are not located

• Increase in incidences of communicable diseases from interaction between workforce inconstruction camps and local people

• Tensions resulting from cultural differences, anti-social behaviour of construction workforce,potential prostitution and attraction of 'hangers on' at camp sites

• Frustration and resentment if local workers perceive that foreign workers are receiving better payor conditions for exactly the same job

Overall, construction camps could pose a risk to community health, safety and security if the negativeimpacts listed above are not mitigated and managed properly. Operation teams and developers need toapply certain mitigation measures to reduce adverse social impacts, and to ensure that localcommunities’ livelihood is not harmed. A key aspect to reduce adverse impacts is to regularlycommunicate with local communities to inform them of development stages and risks associated withdevelopment and operations. Typical key management plans to cover aspects associated withemployment, community health, safety and security, community liaison and camps are:

Page 231: Vol 2 onshore pipelines the road to success 3rd edition

39

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

• Local recruitment and training plan

• Construction camp management plan

• Community health, safety and security plan

• Community liaison plan

12.15.6 Construction monitoring/reporting

Environmental and social management typically apply the ‘plan, do, check, act’ principles ofenvironmental and social protection to activities (Figure 5).

These principles include:

• Plan – prior assessment of environmental and social impact

• Do – implementing design and mitigation measures that reduce or minimise potential impact

• Check – monitoring performance and the efficacy of the mitigation measures that areimplemented

• Act – auditing and tracking the implementation of corrective actions

Environmental auditing results are analysed and any necessary amendments to practices are identifiedand implemented in a timely manner.

Figure 5: Typical environmental and social planning principles

12.15.6.1 Plan

The ‘plan’ stage of the cycle identifies hazards and risks to the project(e.g. through the SEIA process),resulting in a commitments register for the project. Planning also involves the identification of legal andother requirements (e.g. developing the legal and permit registers) and sets goals and targets such asKPIs.

The commitments register for the project will list the commitments that will have been generated throughthe project’s comprehensive SEIA process. The register assigns each commitment that will beimplemented in the ‘do’ stage of the management cycle to an appropriate plan in the ESMMP and

Page 232: Vol 2 onshore pipelines the road to success 3rd edition

40

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

clarifies whose responsibility it is for producing a plan to implement the commitment. The commitmentsregister is updated periodically to take account of engineering design, consent conditions andcontractor implementation plans.

12.15.6.2 Do

A management-of-change procedure typically ensures that any changes during the final design andconstruction stages are subject to scrutiny and that any implications for environmental, social or culturalheritage issues are identified, approved, and addressed.

12.15.6.3 Check

The ESMMP specifies key indicators for environmental and social performance. The contractors’implementation plans will ensure that monitoring data on these indicators is gathered and reported.

Some of the management plans in the ESMMP may require the contractors to carry out regular (e.g.weekly) documented inspections of certain day-to-day items such as pollution control, waste storage,and traffic movements. The contractors’ implementation plans will typically develop pro forma for theinspections and ensure the process for reporting the findings of these inspections. In addition, certainrequirements (e.g. adherence to ROW speed limit) are best monitored through informal dailyobservations, which are made while staff are travelling around the works.

The amount of reporting required by the ESMS will be commensurate with the scale and length of theproject. The construction contractor may be required to submit combined environmental and socialreport at periodic intervals. The report may include items such as:

• KPI data (e.g. waste volumes, types and disposal; complaints received and resolved)

• Activities carried out (e.g. surveys, translocation, meetings with communities, site inspections andfindings)

• Status of non-conformances identified during inspections

• Environmental, social and cultural heritage issues arising in the course of the works (e.g.contaminated land discovered, archaeological finds, ecological issues)

It is considered best practice for contractors to prepare and submit individual reports after anyenvironmental or social ‘incident’ and ‘near-miss’ (e.g. spills, pollution incidents, environmental damage,accidents, complaints from communities and neighbours).

Other than the regular daily checks along the pipeline spread, it is also best practice to carry out regularweekly audits to track the progress and performance in implementing the commitments in the ESMMPand the effectiveness of the mitigation measures implemented in avoiding environmental and socialimpacts. Generally, the aim will be to audit all elements of the contractors’ ESMP during the constructionphase. The frequency of auditing for individual commitments will be reviewed regularly and adjusted asnecessary taking account of audit findings.

Spot check audits of any issues that are of particular concern may also be undertaken.

Page 233: Vol 2 onshore pipelines the road to success 3rd edition

41

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.15.6.4 ActThe documented inspection and audit processes together with non-conformance reports (NCR’s) andcorrective action requests (CAR’s) will entail action-tracking systems to monitor the effectiveness ofactions taken in response to NCRs and CARs.

Typically, the client’s environmental adviser and cultural heritage monitor will track the implementation ofcorrective actions and will update the construction manager and the environmental and social managerdaily on non-conformances that require follow-up actions.

12.15.7 Training

At the ‘do’ stage of the ESMS cycle, training is fundamental to the successful delivery of the SEIAcommitments.

Pipeline construction activity at any one location will be of relatively short duration, so establishing keyenvironmental and social requirements at the outset is important to the provision of effective training.The main training elements required are:

• Management briefings

• Induction training for client, construction contractor and subcontractor staff

• Toolbox talks

12.15.7.1 Management briefings

An environmental and social training session by the project environmental representative on site willprovide the project management team with overview of the ESMMP and a common understanding ofroles, responsibilities and project standards.

Following the award of contract, a second environmental and social training session will ensure that theproject management team and the construction contractor’s senior personnel adopt a coordinatedapproach to implementing the requirements stated in the ESMMP. The session will also affirm thecommitment to good environmental performance and to establishing good community relations.

12.15.7.2 Induction training

Included in the ESMMP are the following training plans:

• The local recruitment and training plan prescribes the delivery of induction training (in theappropriate language(s)) to the construction workforce; it also specifies the delivery of ES trainingand skills training (including toolbox talks) to the construction workforce

• The construction camp management plan requires a camp induction that will address campsecurity, health and safety, code of conduct, local cultural sensitivities and camp emergencyevacuation

• All project construction staff will receive an environmental and social induction that will explain thekey requirements common to everyone on the site. The induction will have a strong focus onvisual presentation (graphics, illustrations, diagrams, photographs, etc.) and will contain simple,clear messages

Page 234: Vol 2 onshore pipelines the road to success 3rd edition

42

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.15.7.3 Toolbox talks

In addition to toolbox talks delivered by the construction contractor as part of skills training, it is typicalfor the client’s environmental and social advisers, CLOs and cultural heritage officers to deliver talks tocontractor and subcontractor personnel to make them aware of SEIA commitments to avoid or mitigatespecific environmental and social impacts that relate to their tasks.Particularly where the impacts aresignificant or where the requirements are not covered in the general induction. This could apply topersonnel involved in:

• Clearing of fly-tipped waste and contaminated soil before construction

• Right-of-way and facility site preparation (covering such matters as the archaeological watchingbrief; fencing for public protection; avoiding encroachment into areas off the ROW and workingareas and accidental damage to sensitive receptors; correct storage of topsoil; and relocation ofsensitive fauna)

• Pipeline lowering and laying (covering such matters as procedures for correct compaction,grading and topsoil replacement)

• Construction of rail, road and river crossings (covering such matters as the particular proceduresfor construction and reinstatement in these areas and expanding and reinforcing pollution controlawareness and training, in particular for the watercourse crossings)

• Hydrostatic testing (covering such matters as pollution prevention and erosion control)

• Driving (covering such matters as vehicle routes, safe driving and vehicle maintenance)

12.15.8 Grievance mechanism

A formal grievance (complaint) procedure needs to be established during the early stages of the projectto obtain an affected community’s concerns and views. The complaint procedure can be used as a toolto monitor the livelihood and well-being of an affected community with regard to different phases of theproject. It is important that the mechanism be impartial, transparent and fair. The mechanism shouldinclude the following:

• Objectives: a statement of the intended aims and benefits of the grievance procedure

• Scope: a clear statement of the types of grievances covered by the procedure

• Responsibilities: who is responsible for the various components of the system

• A description of the step-by-step process for registering and addressing grievances and providespecific details regarding a cost-free process for registering complaints

• A description of the mechanism for appeal, and the provisions for approaching civil courts if otheroptions fail

• Procedures for recording and acknowledgement of grievances, comments or complaints

• A transparent methodology for investigation of grievances, comments or complaints

• Acceptable, publicly stated, timescale targets for responding

• Procedures for further review of unresolved issues

• Monitoring and feedback, with targets for satisfactory complaint resolution

• A brief on how the procedure will be communicated to third parties

• Disclosure: how information about grievances/comments/complaints that have been lodgedand/or resolved will be made publicly available

Page 235: Vol 2 onshore pipelines the road to success 3rd edition

43

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.15.9 Record of condition

Before the contractor takes control of the pipeline route, it is important to survey the areas over whichconstruction works will take place and produce a record of condition report of the land, access roadsand lay-down areas. This record will contain photographs of the condition of the pipeline spread, accesspoints and areas where there is planned vegetation removal. The record of condition will enable theproject to determine what damage is attributable to the construction activities should there be anydispute over the pre- and post- construction conditions. It is also a useful aid in determining what isrequired to return the land to its former condition during the reinstatement of the entire area occupied bythe construction activities.

12.15.10 Archaeological, preservation and storage write up of finds

During the preparation of the SEIA discussions will have taken place with the statutory consultees,including the representative archaeological authorities. Part of these discussions is to determine how toidentify and treat archaeological features along the pipeline route. Following the discussions a writtenscheme of investigation will be produced, in which the developer and the archaeologist will agree howthe works will progress, taking account of any previously identified archaeological features and whatmeasures are to be implemented to deal with any undiscovered features or artefacts.

To minimise the possibility of encountering any unidentified features an archaeologist should ideally bepresent during the topsoil strip to act as a watching brief. In certain circumstances the areas where awatching brief is required can be reduced by agreement during the consultation process; provided thedesk-based assessment and previous ground survey can prove the watching brief is unnecessary.

Statutory regulations and standards govern the handling of any archaeological features or artefactsdiscovered during the pipeline construction activities. All such finds must be recorded on site by a teamof specialist archaeologists and any removable objects bagged, recorded and stored pending transportto the local archaeology department or museum. In the case of any human remains being unearthed it ismandatory to report it to the police and coroner and to involve them in the identification of the remainsand in determining the length of time the remains have been buried. All construction-related activities inand around such a discovery will cease until the area is cleared by the respective investigatingauthorities.

Following the completion of the construction works on site a full post-construction report is prepared bythe contractor’s archaeologist that details all activities, features and artefacts found during theconstruction phase of the pipeline works.

Page 236: Vol 2 onshore pipelines the road to success 3rd edition

44

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.16 Hydro Testing And Reinstatement

12.16.1 Hydro testing

The pipeline is backfilled with the sub-soil (or in certain circumstances a selected backfill if the removedmaterial is unsuitable for screening, such as hard rock) that has been stored adjacent to the pipelinetrench.

The new pipeline will be subjected to hydrostatic pressure testing to prove the strength and integrity ofthe section in accordance with the relevant standards and any additional company requirements. Thenumber of test sections will depend on the topography over which the new pipeline is routed. Thelocation of the test station(s) shall be positioned as close to the lowest point of the pipeline section aspossible. The test sections must maintain a pressure above the required minimum for a period of 24hours, and a correlation must be made between the pressures, temperatures, water added and waterremoved, thus clearly demonstrating that the section of pipeline is leak free. Any malfunction of thepressure recorder during the hydrostatic test may require a repeat test.

Hydrostatic testing activities will be carried out in sequence and will include:

• Welding certified test ends onto each end of the pipeline test section

• Internal cleaning of pipeline sections using cleaning pigs to remove construction debris

• Running a gauging pig to confirm the internal geometry is within specified limits

• Controlled filling of pipeline sections with water from a suitable agreed source (well, mains, river,lake, sea etc.)

• A temperature stabilisation period to allow the water and line pipe steel temperature to stabilise

• Temperature stabilisation

• Pressurisation of the pipeline test section to its design operating pressure

• A test pressure hold period (i.e. commencement of up to 24-hour strength and leak test)

• Depressurisation of the pipeline test section

• Controlled dewatering of the pipeline test section

• Swabbing of the pipeline test section to remove as much water as practicable

• Removal of the test ends

The displaced hydrostatic test water may be transferred to another section of pipe or discharged at asuitable location. Filters and break tanks will be used to remove any solids and control the rate ofdischarge. Discharge locations and rates will be agreed in advance with the relevant authorities. Ifchemical additives have been used, the water will be tested and treated, as required, before dischargeto ensure all discharges are in compliance with applicable environmental requirements. Duringdischarging operations, samples for water quality analysis will be taken and stored for reference.Following successful hydrostatic testing and dewatering, tie-in golden welds will be carried out to linkeach new section.

Water for testing will be sourced from nearby approved water sources. It will be either transferred directto the test sections by a temporary surface-laid pipe or taken by road tanker and stored in temporaryponds until sufficient volume is available for the hydrotest.

The abstraction and disposal of water for the hydrostatic testing will require statutory approval from therelevant authority. In normal circumstances the authorities like to have the water returned to the sourcelocation once the test is completed. However, because of the potential transport of vast quantities of

Page 237: Vol 2 onshore pipelines the road to success 3rd edition

45

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

water involved, which can be transferred from section to section along the pipeline route, it is usual toapply for a dispensation on this matter and make arrangements for an alternative discharge locationpending the outcome of a formal application to carry this out.

Water for hydrostatic testing will be clean, contain the minimum achievable concentrations ofcontaminants (e.g. sediment, bacteria) and be non-corrosive. Water abstraction sources will be selectedto suit the geographical location of the pipeline and be of sufficient quantity and quality to facilitate fillingof the pipeline test sections without any detrimental effect to the surrounding ecology and downstreamconsumers.

Potential hydrotest-water abstraction points identified by the construction contractor(s) will be subject toan environmental review by the project team before their adoption. All necessary permits required forwater abstraction and disposal will be obtained from the owner/occupier/local authorities and will be inaccordance with project environmental requirements. The test water will be analysed to check qualitybefore and after use; the use of chemicals will be minimised but it may be necessary to add corrosioninhibitors, oxygen scavengers or biocides.

The water used for the hydrotest will need to be discharged in accordance with the terms andconditions of the abstraction and disposal licence received from the relevant authority; in the UK this isthe Environment Agency (EA). Authorities sometimes insist that the test water be returned to the sourceif taken from a watercourse. However, this may not be a practical or financial option in which case, byagreement with the EA, alternative disposal methods or locations can be agreed during the consentingprocess.

Once the pipeline is successfully tested, and the temporary test ends removed, the open ends of thevarious test sections need to be closed. This involves welding the individual pipe sections to theneighbouring test section until the pipeline forms one continuous section along the entire length of thenew pipeline.

12.16.2 Reinstatement

The pipeline running track and trench is reinstated to grade level using the topsoil that has been storedto one side of the running track during the first of the ROW preparation works. The intention during thereinstatement works is return the whole of the construction occupied areas to their former condition.

The key areas that require full reinstatement are the ROW, the construction camps and storage areas,the block valve sites and the new temporary access roads. The project reinstatement specification isgenerally based on the following principles:

• Disturbed areas will be reinstated to pre-construction conditions to the greatest practicablestandards. This to include for bio-restoration, species translocation, reseeding and replanting andmaintenance with the correct measures implemented to include for pest control, weeding andavoidance of introducing or the spreading of foreign/invasive species and notifiable diseases.

• There may be a continuing requirement for access along the ROW by patrols and formaintenance.

• Levelled working areas on side slopes and ridges may be retained to allow future access forinspection and maintenance.

• Disturbed areas will be stabilised to protect the integrity of the pipeline and minimise potentialimpacts associated with erosion, transportation and sedimentation of material from disturbedareas.

Page 238: Vol 2 onshore pipelines the road to success 3rd edition

46

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

• Disturbed areas will be re-vegetated to achieve conditions similar to those that exist immediatelyadjacent to the ROW.

• Regular monitoring and maintenance of all reinstated areas will be undertaken until environmentalrequirements and goals are achieved. The commitment to monitor the success or otherwise ofthe reinstatement plan can vary and can be anything up to a period of ten years, The developerthen remains the responsible body for any further reinstatement or erosion control work for the lifeof the development

As well as reinstating the pipeline ROW any temporary areas previously occupied by the constructionactivities must also be reinstated to their preconstruction condition As mentioned earlier (see Section15.9) a record of condition report will have been undertaken before works begin and this will prove to bea useful tool in assessing what (if any) damage to land, property, access roads, etc., is attributable to thepipeline build and what is needed to reinstate the matter to its former condition should any repair bedeemed necessary.

Corrosion protection is installed during pipeline construction and employs an impressed-currentcathodic protection system. This may require the installation of additional anode ground beds,transformer rectifiers and associated utility supplies to support the facility.

Page 239: Vol 2 onshore pipelines the road to success 3rd edition

47

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.17 Pipeline Operation

Once completed the new pipeline is expected to have a 25–30-year lifespan. This may be less forpipelines transporting CO2 or sour gas. The pipeline lifespan will be achieved by a combination oftechnology and management techniques including pipeline coatings, protection from external damage(slabs and tape over the pipeline, increased depth of cover), mass concrete and increased wallthickness, effective backfilling/padding and reinstatement to prevent washout or erosion exposing thepipeline and cathodic protection systems (to reduce the potential for induced current corrosion andbiological and chemical attack on the pipeline). Sophisticated movement detection systems using fibreoptic cable laid alongside the pipeline have been deployed on recent pipelines to detect seismic eventsor where the risk of illegal hot tapping is considered likely to detect excavation or movement over thepipeline.

Internally applied linings and additives to the product can be used to enhance the hydraulic properties ofthe pipeline. Regular monitoring and maintenance of the pipeline will be required to ensure the safe andcontinued operation of the pipeline with particular emphasis on any geohazards encountered or third-party interference. Techniques for monitoring the pipeline include aerial surveillance, walkover patrols,vantage points surveys and landowner liaison. Registration of the pipeline with ‘one-call’ services andthe government agency responsible for development control is also useful, where they exist. Low-levelmarker posts with identification plates containing contact details may be installed along the pipelineroute. Aerial marker posts may also be installed to aid the identification of the pipeline route whenviewed from the air. The spacing of block valves (BV) or AGI’s to isolate discreet sections of the pipelinefor maintenance, accident, damage or repair of the asset will have been considered during engineering.The BVs are generally located at regular intervals along the pipeline route (they may be buried or aboveground) the distance depending, among other things, on the operating philosophy of the pipeline, profileand environmental hazards. For example, on an oil pipeline block valves are often located either side ofriver crossings to enable the river crossing to be isolated. The BV is a very small installation and, apartfrom the operating valve stem, all of the pipe work within the security fence is below ground. Where theBVs are not automatic it is important to ensure that the operator has emergency response plans that areregularly exercised, including alternative access routes to the location and whether pollution control/spillequipment/containment measures can be deployed in sensitive areas/watercourses etc. Pipelineoperators work closely with the emergency services or develop their own or pooled emergencyresponse teams including containment and mop up kit.

Pigging stations allow the pipeline to be inspected, cleaned and gauged. The pigging launch andreceiving facility is usually an integral part of a larger AGI, such as distribution off take stations,compressor stations or reception terminals.

Operating permits for compressor stations and processing plant will be obtained and maintained by theclient in accordance with the consent conditions and the local regulatory requirements.

12.17.1 Operations Phase ESMS

Operations ESMS are often certified to national or international standards such as ISO 14001 and followthe ‘plan-do-check-act’ cycle similar to the construction ESMMP shown in Figure 5: Typicalenvironmental and social planning principles.

The operations ESMS should be developed before operations begin and are based on the operationscommitments in the SEIA and the client’s own operating standards. Transition plans may need to bedeveloped to assist with the movement from the construction-phase to the operations-phase ESMS.The delivery of as-built plans, environmental databases, cadastre of landowners, and stakeholderengagement databases are vital to the operators to ensure continuity at project handover, as are the

Page 240: Vol 2 onshore pipelines the road to success 3rd edition

48

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

records and more particularly dates for consent conditions, reinstatement monitoring reporting, anddefects liability periods for landscape planting works. This body of data will all form an important part ofthe operational phase ESMS .

Similar to the construction management system, the primary functions of the operationsESMS will be to:

• Ensure that the pipeline and associated facilities are operated in accordance with relevant legaland regulatory standards and client operating policies

• Ensure that the commitments made in the SEIA relating to operations are implemented

The management system should regularly assess the environmental and social aspects and impacts ofits activities, develop objectives and targets to address any significant aspects, appropriately resourceand train staff, and monitor and audit the success of its actions in addressing the significant impacts.This system will be implemented to ensure continual improvement in performance.

Key components of an operations ESMS, consistent with ISO 14001 requirements,are shown in Table 1.

ISO 14001 EMS Components

1. EMS general requirements 10. EMS documentation

2. Environmental policy 11. Document control

3. Environmental aspects 12. Operational control

4. Legal and other requirements 13. Emergency preparedness and response

5. Objectives and targets 14. Monitoring and measurement

6. Environmental management programmes 15. Non-conformance and corrective action

7. Structure and responsibility 16. Records

8. Training and awareness 17. Environmental management system audit

9. Communication 18. Management review

Table 1: ISO 14001 EMS commitments

The operations commitments included within the SEIA, consent conditions and operating consents willbe implemented through the management system.Typical operations include:

• Emissions management (water, air, noise)

• Community liaison, safety infrastructure and services

• Employment and training

• Waste management

• Ecological management and monitoring

• Cultural heritage management

• Local procurement and supply management.

• Emergency response plan (ERP)

The as built plans and cadastre of landowners, and stakeholder engagement databases will be updatedand maintained throughout the life of the development.

Page 241: Vol 2 onshore pipelines the road to success 3rd edition

49

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

12.18 Decommissioning

At the end of the operational and economic life of the pipeline and the associated AGIs adecommissioning programme will be implemented.

There are four main options for an onshore buried pipeline:• Abandoned in place and filled with either an inert gas (such as nitrogen) or grouted with a solid

material such as concrete or bentonite

• Totally removed and the materials recycled or disposed of to the relevant licensed waste stream(scrap metal)

• Re-use the facilities in situ provided they meet the set criteria for the new purpose

• Extend the operational life of the pipeline which may require risk assessment and engineeringimprovements and additional facilities

The facility will have been condition monitored throughout its operational life. By using this historical datait is possible to formulate a programme of post-decommissioning monitoring to ensure no harm iscaused to the environment or other land users provided decontamination procedures and mitigationmeasures are strictly adhered to during the process.

In all cases it is likely that there will be a requirement to discuss the decommissioning with the localregulatory authorities and there may be the requirement for consents or an SEIA to be undertaken forthe decommissioning process. Decommissioning any large project focuses on the re-use, recycling orreduction of the waste from the project and the trend is increasingly towards design and engineeringprojects which consider the deconstruction of the project as part of the carbon footprint or lifecycleanalysis process during the design of the project.

Page 242: Vol 2 onshore pipelines the road to success 3rd edition

50

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

References

deJongh, P. (1988), ‘Uncertainty in EIA’, in Paul Wathern (ed.), Environmental Impact Assessment:Theory and Practice (London: Routledge).

International Finance Corporation (2007), ‘Stakeholder Engagement: A Good Practice Handbook forCompanies Doing Business in Emerging Markets’.

International Finance Corporation (2012), ‘Performance Standard 5: Land Acquisition and InvoluntaryResettlement’.

World Federation of Pipeline Industry Association (Ed 1, Nov 2003), Environmental Guidelines forInternational Onshore Pipeline Construction

The Institute of Environmental Management & Assessment (IEMA) published guidance on preparingClimate Change chapters for Environmental Statements [IEMA Principles Series: Climate ChangeMitigation & EIA; Version 1.1; 1st June 2010]

International Finance Corporation (2006), Performance Standards on Social & EnvironmentalSustainability: Performance Standard 1: Social and Environmental Assessment and ManagementSystems (Washington, DC: International Finance Corporation)

World Bank Group (2007), Environmental, Health, and Safety General Guidelines and Environmental,Health, and Safety Guidelines for Onshore Oil and Gas Development (Washington, DC: World BankGroup).

The Equator Principles (EP II) (2006); A financial industry benchmark for determining, assessing andmanaging social and environmental risk in project financing http://www.equator-principles.com

Council Directive of 27 June 1985 85/337/EEC (as amended); on the assessment of the effects ofcertain public and private projects on the environment

EC DGX11 Guidelines for the assessment of indirect and cumulative impacts as well as impactinteractions http://ec.europa.eu/environment/eia/eia-studies-and-reports/guidel.pdf

United Nations Economic Commission for Europe (UNECE) ESPOO Convention on EnvironmentalImpact Assessment on a Transboundary Context (ESPOO, 1991)

Austrialian Pipeline Industry Association (APIA) Code of Environmental Practice Onshore Pipelines,March 2009

Page 243: Vol 2 onshore pipelines the road to success 3rd edition

51

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

Case Studies: Construction Mitigation Measures

The following case studies have been provided by IPLOCA members to illustrate a range of social andenvironmental mitigation measures implemented on pipeline projects. It is proposed that further bestpractice case studies are added to these, if you have experience which you would like to share pleaseforward them in a similar format (1 page) to IPLOCA secretariat (or upload to Wiki)

Plant Nappies as an Alternative to Conventional Drip TraysAn above ground installation (AGI) conditioning works project has chosen to replace conventional driptrays with ‘Plant Nappies’ on all 13 sites. The decision was taken as a result of the continual emptyingand disposal of contaminated water and the generation of absorbent pads which are used to soak upcontaminants with conventional drip trays.

Conventional Drip TraysDrip trays are usually made of pressed mild steel and placed under plant and machinery to capture oilleaks and spills. Although these drip trays are suitable for the intended purpose, they are prone todamage and corrosion and require regular emptying which can often be cumbersome and producehazardous waste (used absorbent pads and contaminated water).

Plant NappiesThe ‘Plant Nappy’ or ‘mat’ is an alternative to using conventional drip trays and is designed to replaceexisting forms of drip trays with a light, user-friendly method of containing oil drips and spills. The mat isrugged enough to withstand plant on it in all weather. Drips or spills of oil will be captured by the matwhile water is allowed to pass through, thus eliminating costly emptying of contaminated trays after use.The mat can be stood on uneven ground or slight inclines with no loss of performance ensuringprotection at all times.

DesignThe design allows drips of oil or fuel to be caught in the base and rainfall to escape through the sidewalls as pure clean water. The base of the mat is non-permeable fabric laminated with an oil soak filter,to absorb the oil, and protected by a permeable top fabric to allow free passage of contaminants. Theside wall is permeable with a filter fabric that allows free passage of water but not oil. It only dischargesclean water.

Blue cones highlighting drainsThe project demarcate watercourses using blue netlon fencing which acts as a prompt to remind sitepersonnel of these sensitive areas. However, often the permanent drainage on a site is forgotten about.It is important to protect drainage systems from spills and silt pollution as often a drain can lead directlyto a watercourse.

Page 244: Vol 2 onshore pipelines the road to success 3rd edition

52

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

To address this problem and ensure all personnel on site are aware of the site drainage system, thecompany have placed blue cones over all drainage manholes. If a spill were to occur on site, the bluecones clearly identify the manholes where monitoring can take place to check if the spill has entered thedrainage system.

The cones could also be used to demark open drains. If a spill to ground were to occur in the vicinity ofan open drain, or a pumping activity were to take place close by, site personnel would be quickly awareof the location of drains and put procedures in place to protect them.

Spill Kit ChecksSpill kits are located at prominent locations on a site to ensure they are quickly available to clean up aspill if they were to occur. Sometimes the whole spill kit is used to clean up a spill, and other times onlypart of the kit is required. It is important to ensure that the spill kits are replenished after use andcontinue to be located in these specific areas.

In order to ensure complete spill kits are available, this particular project introduced fortnightly spill kitchecks. This ensures all spill kits in high risk locations are logged and checked regularly forcompleteness.

Spill kit located by the mobile fuel bowser Check sheet attached to spill kit

Page 245: Vol 2 onshore pipelines the road to success 3rd edition

53

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

The spill kits are given a unique reference number and have a checklist attached to the back whichdetails what must be in it (this is dependent on its location). Typically, this consists of:

• Absorbent pads

• Absorbent booms

• Disposal bag

• Gloves (suitable for use with hydrocarbons)

• Emergency response procedure

• Hazard/near miss reporting cards & pen

Once the spill kit has been checked and confirmed as complete, the check sheet is signed. Records arealso kept electronically in order to keep a tight control on the number and locations of spill kits on site.

Page 246: Vol 2 onshore pipelines the road to success 3rd edition

54

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 12

Page 247: Vol 2 onshore pipelines the road to success 3rd edition

1

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13 New Trends and Innovation

13.1 Functional Specifications for a Near-Real-TimeConstruction Monitoring Tool

Introduction

The concept of developing a responsive and prompt project controls tool, aiming to enhance theefficiency, quality, safety and environment of onshore pipeline construction operations, emerged as aprospective route towards establishing an integrated GIS-based pipeline construction managementsystem.

The purpose of this section is to recommend the basic functional specifications for developing a "near-real-time (near-live) monitoring tool”, a comprehensive project controls tool with a GIS-based interface,which can be used during the life-cycle of the pipeline construction project. Technical specifications andsubsequent development of a system that meets these specifications would follow this preliminaryphase.

Scope of Innovation

The tool aims at presenting an accurate outlook on the major aspects of the construction cycle as wellas significant related events, as soon as they occur or can be recorded, and in a visual geographicalenvironment. Updated feedback would include:

• Construction progress reporting

• Project information and documentation

• Assets and resources management

• Material control and traceability information

• Quality control data

The ensuing visual controls platform shall comprise data-rich feeds and dynamic reporting which wouldenhance the proactive involvement of project staff for better anticipation of construction conditions andimprovement of the critical decision making process.

Description

Building on the collaborative experience of pipeline contractors, major data groups were identified askey elements of the pipeline construction phase. While these groups are not necessarily conclusive, theyprovide the guideline for the way forward. Appendix 13.1.1 provides a more comprehensive profiling ofthe groups, information sources, attributes, data workflows, and potential operations enhancements.The following is a list of these data groups with their associated classes:

• Material management

• Pipe shipments• Pipe yards• Stores information

• Manpower

• Accommodation information• Manpower data

• Equipment

• Machinery and vehicle stores• Emergency equipment• Equipment tracking information• Vehicles tracking information

Page 248: Vol 2 onshore pipelines the road to success 3rd edition

2

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

• Progress

• Construction progress of activities• Planning/scheduling of activities

• HSE and social

• Points of interest (hospitals, medical centers, police stations etc.)• Accidents and incidents• Grievances and complaints• Areas of special status

• Engineering data

• Pipeline routes• Crossings• Access roads• AGIs and tie-in points• Marker points• Fiber-optic cables• Geotechnical and cathodic protection data

The diagram below indicates the information associated with the data groups identified in this section,and how they and the technical specifications serve to provide the high-level users with an integratedcontrols platform.Features

Page 249: Vol 2 onshore pipelines the road to success 3rd edition

3

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

With this scope in mind and to facilitate user interaction, the development of this platform mustencapsulate state-of-the-art features and workflows built on the concepts of a GIS interface, webaccessibility and shared data repositories. The tool would be empowered by:

• Links to the existing project controls and logistics systems

• Business features such as electronic data interchange (EDI), flags, notifications, flexiblereporting tools, and improved procedures

• Modern technologies and practices in systems development

• State-of-the-art market tools

• R&D on new concepts with innovation potentials

For each of the data groups, an EDI needs to be developed with the related systems to which the toolwill link. An EDI is generally defined as a standardized or structured method of transmission of databetween two media, and in this context the EDI will govern what information will be collected for eachdata group, its format, in addition to how, when and by whom it shall be acquired. Properlycharacterized and implemented EDIs are integral to the successful design and operation of the tool.

Flags and notifications are also essential features. The idea is to have intelligent reminders or promptsthat are automatically generated to highlight anomalies, points of concern arising, or cues for furtherconsiderations, and that require action (flags) or raised awareness (notifications). The trigger for flags andnotifications would be based on the data processed from various data groups and, crucially, their designand scope needs to be based on a well-founded knowledge of the construction workflows and on thedifferent roles of the project players who would need to interpret them and take consequent actions.

Page 250: Vol 2 onshore pipelines the road to success 3rd edition

4

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Flags and notifications would take on different formats, including RSS feeds, SMS, multimediamessages, emails, or even image and video feeds, with access through the interface. The accessibilityto these flags would be linked to different roles on the project, for example equipment notificationswould be directed mainly to plant managers and engineers whereas material shortages would bedisplayed for material personnel and control managers. The format for these notifications should allowfor an adequate level of flexibility to meet different needs and work practices by different players, forinstance the ability to subscribe to specific RSS feeds upon demand, and secure limited access tosensitive feeds. The figure abovr is a conceptual example of a GIS-based dashboard that collectsinformation about site construction equipment and associated systems, and acts as a monitoring toolfor these assets. It incorporates the EDI concept, GPS locating technology, and an RSS-type strip forflags and notifications.

Another feature of vital benefit to the management is the ability to extract various formats of progress,statistical, analytical and listing reports. While formal reports can be obtained by links to the EDMS, thetool must accommodate more interactive reporting techniques including pivot tables, dashboardqueries, data-mining techniques and visual charts. The concept of near-real-time inherently implies the employment of the latest available technologies. Assuch, development of this tool would typically involve innovations in:

• IT and communication such as satellite connectivity, WiMAX and WiFi technologies,GPRS, and GSM

• Automated data acquisition techniques such as the use of handhelds, PDAs, RFIDsetc.

• Modern construction approaches and technologies such as computerized NDT, AUT,automatic welding, and GPS surveying

• Business process management and project control workflows and solutions

Expected Advantages

In line with the IPLOCA Novel Construction objectives, the development of this tool will stimulateinnovation in the processes of controlling the pipeline construction. It will also invoke improvedtechnology techniques, market software and R&D on new concepts to achieve this step forward.Potential benefits include:

• Efficiency: The tool would instigate an overall improvement in the efficiency of projectconstruction tasks by allowing decision makers to monitor site activities, retrieve up-to-date progress reports, foresee possible hiccups and take immediate action

• Quality: By serving as near-live information storage and sharing container, the toolwould improve the quality of work done at supervisory level, drilling down to the directmanpower level. The data would be available at a secure role-based portal for all keyplayers including project management, engineers, construction crew leaders andproject partners

• Safety would be enhanced by adopting this tool through:

• Providing immediate alerts on safety and security threats and concerns that wouldotherwise escalate without prompt action

• Assisting management in better planning for safer manpower activities (includingaccommodation, transportation and emergency plans) by providing a multilevelgeographical view of the project’s different locations and facilities

• Cutting down site visits by supervisory personnel by providing remote access tomost of the information required

• Environmental awareness is promoted through the use of the tool by:

• Better control and maintenance of project equipment with early notifications ofbreakdowns and spills, leading to a better control of emissions

Page 251: Vol 2 onshore pipelines the road to success 3rd edition

5

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

• Identification of environmentally sensitive issues and zones and propagating thisknowledge to the different levels of project staff

• Decreasing the carbon footprint created by the project supervisory personnel byreducing the necessity for direct site visits, hence promoting “Green ConstructionCulture”

The conceptual specifications in Appendix 13.1.1 are the first step towards building this tool. The latterwould in turn provide a cornerstone for the pipeline simulation tool discussed in the following section, byproviding the prerequisite information needed for more accurate simulations of construction activitiesand related what-if scenarios.

Page 252: Vol 2 onshore pipelines the road to success 3rd edition

6

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Page 253: Vol 2 onshore pipelines the road to success 3rd edition

7

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.2 Conceptual Specifications for Building a Pipeline ConstructionSimulation Tool

Computer Simulation

“A simulation is the imitation of the operation of a real-world process or system over time.” Computersimulation involves the creation of an artificial history of a system and the observation of that history tomake analogies and conclusions about the operation of the real system. A simulation model, in the formof assumptions, is required to describe the behaviour of the system over time and the relationshipbetween its constituents usually expressed mathematically, logically and/or symbolically. A simulationmodel can be used to investigate a wide variety of what-if questions about the real-world system. It canbe used as an analysis tool to assess the impact of potential changes on the system and study theperformance of a system in the design stage. Computer simulation and modelling is especially effectivefor real-world systems which are too complex to be solved manually using mathematics.

Computer simulation can run at virtual speeds, much faster than real life, so results can be obtained in afraction of the time required in real life. It offers insights into resource interaction and their effect on thesystem. Bottleneck analysis and elimination can be performed on the computer without any real liferesource costs and time requirements. What-if analysis and scenarios can be run quickly and at muchreduced costs.

Simulation has gained a lot of momentum in recent history. Universities now dedicate courses andprogrammes to the study of computer modelling and simulation. Corporations are adopting it as ameans for predicting outcomes, adapting to change during execution, and for retrospective analysis.

The knowledge gained through simulation reduces the risk associated with important decision making inreal life.

Computer Simulation In Construction

Computer modelling and simulation is an important management tool well suited to the study ofresource-driven tasks and processes. This makes construction activities prime candidates for theapplication of computer simulation as it helps analyse resource requirements, process interaction andfactors that affect construction processes (random internal and external factors).

Case Studies (from an IPLOCA member)

At this IPLOCA member company, we have successfully applied computer modelling and simulation ofconstruction activities over the past few years. Such applications included using different modelling andsimulation techniques for the different situations encountered. We have been able to effectively apply ourdifferent simulators during the tendering phase, during execution and retrospectively for lessons learntand quantification and justification of a claim. The following are two of our more recent case studies ofapplying computer simulation in construction.

Case Study 1: Using the earthworks simulator during the tendering phase

Scope: A large excavation and removal of material operation (55 million m3) needed to be performedwithin a specific period of time. The process also involved screening the removed material for possibleuse as fill material. The estimators wanted to test different methodologies and equipment mixalternatives to assess time and equipment requirements, find the optimal solution, and use it as basis toestimate the cost of the operation.

Achievements: The Earthworks simulator presented itself as an advanced tool capable of quickly andaccurately mimicking real world earthworks operations enabling engineers to quickly and efficiently buildand run scenarios to examine all the proposed alternatives. Each of the possible alternatives was fedinto the simulator and the results compared to the proposed mix. The simulator helped in quickly

Page 254: Vol 2 onshore pipelines the road to success 3rd edition

8

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

reaching an optimal equipment mix for use as the basis for estimating the operation. The results of thesimulator were soon after validated against site findings during execution.

Case Study 2: Use of simulation in quantification and justification of a claim for extensionof time

Scope: a major early site works project had as its two major operations the excavation andtransportation of existing material away from site, and the import of fill material from a distant quarry.After project award, many additional constraints were placed on the project, and which had not existedduring the estimation of the project. Such additional constraints included allowable truck sizes andweights, transportation routes, onsite speed and routing, weight bridges for both in and out traffic, andadditional security gates. The simulation team was called upon to assist in quantifying the impact ofthose additional constraints on traffic congestion (truck trips per hour along the different routes) and thetotal duration of the project.

Achievements: Traditional critical path method (CPM) planning tools were not able to incorporate all thevariables and constraints to estimate the new time and equipment requirements. Computer simulationpresented itself as a viable option to handle all the new variables and constraints and incorporate theminto a new time and equipment requirements estimate. In order to assess all those constraints, twosimulators were used in sequence. The first simulator summarized and combined all the variablesrelated to the route sections into a single average route speed variable. The average route speedvariable was then fed into the earthworks simulator along with the remaining constraints to assess totaltruck requirements and total duration for each of the operations. Total truck requirements over theprescribed duration allowed the calculation of truck traffic per hour. The use of the simulators wasinvaluable in quantifying the effects of the additional constraints mixed with the number of variablesinvolved in the earthworks operations, and running numerous alternative scenarios quickly and efficiently,a task that proved very difficult to manually handle. The quantified results produced by the simulatorhelped determine the total duration of the operations and the calculation of truck traffic per hour; thoseresults were then exclusively presented to the client as justification for the request for additional time.

Pipeline Construction Simulator

Pipeline construction projects are by nature complex linear projects with dynamic properties that varyalong the length and duration of the project. Although it is possible to use analytic techniques to planand manage the performance of such projects, using simulation can provide us with an advantage inaddressing the complexity and dynamicity involved in pipeline projects.

A computer simulation of pipeline construction projects is a valuable predictive tool where we can varyinputs, collect and analyse outputs, and determine bottlenecks and sources of waste and delay. We canalso determine the best preemptive measures to take to minimize risks of delays and cost overruns.

The basic objective of the simulator is to be able to simulate construction of pipelines at any point of theproject life, before or during construction. It will allow us to perform scenario-based planning andforecasting during execution. The target users of this simulator include project managers, planners,estimators, procurement, engineering, construction engineers.

Major Operational Components of the Simulator

1. Pipeline Construction WBS: The basic subdivision of a pipeline project in terms of construction isthrough the construction work breakdown structure (WBS). For the simulator, this will follow ageneric WBS suitable for all projects. It is broken down into seven levels as follows:

a. Project: the top level definition of the pipeline construction project.

b. Areas: these are the major sections of the pipeline.

c. Subareas: these are the subsections of the pipeline.

Page 255: Vol 2 onshore pipelines the road to success 3rd edition

9

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

d. Fragnets: these are the sequence of activities to build the subarea. In the case of a pipelineproject these can be represented by the March charts (sequence of work of crews) for therelevant subarea.

e. Schedule Activities: standard activities for the subarea as per the construction schedule.

f. Objects: these are usually distinct construction objects which in the case of a pipelineconstruction project would be the kilometers within the subarea.

g. Operations: if needed, further elaboration or subdivision of work for an activity

2. Resources: The main resources to be managed within the simulator will be equipment, crews,and camp capacity. The simulator can run in either of two modes with respect to resources. Inunlimited resources mode, the simulator will attempt to finish the project within the shortestpossible time and deduce the corresponding required resources. In constrained resources mode,the simulator will run with the assigned resources and indicate the total time required to finish theproject.

3. Material Management: Required piping material as extracted from alignment sheets will beassigned and handled by the simulator at the kilometer level. Hauling routes of material betweenstores and site and in-between sections will be optimized by the simulator. Material in differentphases (already on-site, being shipped, ordered, requisitioned) can be selectively used in thesimulator to examine the effect of material availability on the project.

4. Camp Management: Camp capacities dictate the available number of crews per constructionarea and sub area. The simulator will aid in planning camp logistics over the duration of theproject in relation to progress and managing transfer of camp units from camp to camp based onthe manning chart produced by the simulator.

5. Pipeline Construction Activities: Every sub area and kilometer combination is usually representedby one or more March charts. Each line of the March chart is the work of one crew whose scopecan be deduced from data extracted from engineering (alignment documents?). The slopes of thelines of the March charts represent the productivities of the crews and it is assumed that theselines should stay parallel at all times with no interruption in work. The simulator will examine andvalidate the aforementioned assumptions based on activity parameters and resource, materialand camp constraints, and indicate any convergence or divergence in the March charts. Thesimulator can also help manage multiple crew assignments to same task/location, work prioritiesand sequencing.

6. Other Construction Activities: These activities are usually considered as independent subareaswith no pipeline work such as pump stations, river crossings etc. Each will have its own fragnetand will be simulated in terms of activity parameters and resource, material and campconstraints.

7. Spatial Integration: GIS systems can help both visually and with spatial data and information forthe simulator. Two-way integration with a GIS system would allow the simulator to read spatialinformation for optimizing camp locations and sizing, borrow pit locations, and truck routing andsend back progress and output information for visualization.

8. Optimizer: One of the objectives of the simulator is to address chronic issues with standardplanning tools which offer only one perspective on construction execution by examining complexdynamic relationships between activities. Such dynamicity might allow for minimization of totaltime of execution through changing the sequencing of the activities when possible. Areas wheresuch re-sequencing/optimization maybe examined and potentially applied include activities such

Page 256: Vol 2 onshore pipelines the road to success 3rd edition

10

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

as environmental protection related activities, tie-ins, cathodic protection, crossings, hydro-testing etc...

9. C3D - Simulation Integration: This simulator is meant to integrate with a core constructionmanagement platform, C3D, used by this IPLOCA member to manage pipeline projects, enablingC3D users to run comprehensive simulation models on construction WBS objects and theircorresponding activities in C3D. This will allow users to call a simulation model, pass parametersto it, and receive simulation results, all from within the C3D environment. The three componentsof the integration between the simulation model and C3D can be summarized as follows:A. Model: A simulation model that describes the processes to be simulated and the interaction

between them. This model is usually made up of:a. Objects that are the subject of the simulationb. Activities applied to those objectsc. Process flow and logicd. Resources required for application of the activities on objects

B. Parameters: Parameters are required to inform the simulator of the number of availableresources for the current scenario. Users may also wish to experiment with the productivitiesof specific resources. As such, these can also be passed within the scenario. a. Resource Quantitiesb. Resource Productivities

C. Inputs: For our purposes, C3D will pass to the simulator a list of objects that will act as inputsfor the simulation model. The objects will each have a set of properties.a. List of objectsb. Properties of each object: these properties in conjunction with the business logic built into

the simulation model will dictate: i. The amount of resources needed ii. Time required for each of the activities to be applied to each object iii. Logical flow within the simulation model

Running the simulator model with the objects and resources from within C3D will return a resultset consisting of a list of time-stamped object statuses (activities completed) and resourcerequirements over time. This will allow the user to perform output analysis on the artificial historyproduced by the simulator and examine idle times for each of the resources. From within C3D,the user will also be able to run more than one model back to back, using the results from therunning of one model as parameters for the subsequent model.

Basic System Requirements

The pipeline simulator should run on a typical desktop or laptop computer. It should adhere to computersimulation industry standards such as discrete event simulation and high level architecture. It should bebuilt on an industry standard development platform.

Proposed Methodology

Ontology

In building this simulator, we propose to use an ontology of the pipeline construction simulation with thefollowing classes:

Product: The product is a class which defines the pipeline to be constructed along with all associatedpermanent and temporary structures associated with the final product or the building process includingthe pipeline, segments, sections, routes, impediments, and structures.

Page 257: Vol 2 onshore pipelines the road to success 3rd edition

11

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Process: The process is a class which defines all process-related activities, project schedule, resourcesand constraints.

Environment: The environment is a class which defines all geotechnical information and constraints,weather, calendar, camp locations etc.

Simulator Architecture

Simulations can be based in any of many modelling paradigms. For our purposes, we propose to usediscrete event simulation (DES), where the states in the system change when activities take place, andhigh level architecture (HLA; IEEE Standard 1516). The architecture of the simulator will be a two-tiermapping of the ontology defined above to the DES and HLA. The first tier will consist of processsimulation models of the different pipeline project logistical and construction activities using DES. Eachof the process simulation models will represent in detail either a main construction activity (ROW,stringing, welding, trenching etc.) or a logistical process (supply chain, camp operations etc.). Thesecond tier will furnish a distributed simulation infrastructure allowing the different process models of thefirst tier to assimilate into a fully integrated pipeline construction simulation model where the processescan run from different locations and communicate and interact seamlessly. The different data sourcesrequired for the simulator will have to be defined throughout the simulator development process andmapped to the different process models.

Simulator Outputs: A preliminary definition of the outputs to be delivered by the simulator to meet theabove mentioned objectives along with an output analysis methodology are to be defined initially andcontinuously updated throughout the model development process.

Figure 1: HLA/DES Simulator Architecture

Page 258: Vol 2 onshore pipelines the road to success 3rd edition

12

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Data Collection and Aggregation

Historical data from previous pipeline projects is required for producing initial data trends to be used forpopulating simulator parameters. This will involve a comprehensive analysis of the proposed simulatorparameters and definition of the sources of existing data required for input data modelling, analysis anddistribution fitting. Fitted distributions will be used as stochastic parameters for productivities andprocess durations.

Simulator Development

Simulator development will structurally follow simulator architecture to deliver a high level architecturesimulator composed of discrete event simulation models.

Discrete event simulation models will be used to simulate the process models of the different pipelineconstruction and logistical activities. Each process model will have its own user interface that allowsinput of parameters and monitoring of simulation progress and outputs during simulation running. Thesimulation engine allows for the collection of various statistical data for each of the process models foranalysis at the end of the simulation run.

The distributed simulation infrastructure will be developed using an implementation of the high levelarchitecture (IEEE Standard 1516) consisting of a runtime infrastructure, an object model template and adevelopment framework for building and running distributed simulations

Verification and Initial Validation

Verification of a computer simulation model is performed to ensure that the programming andimplementation of the model is conceptually correct. For this simulation model, a purposefully builtsimulation language will be used in conjunction with Visual Basic for both the DES and the HLA tiers.This inherently decreases the possibility of errors when programming simulation models compared tousing a regular high level programming language such as Visual Basic, Java or C++ alone. It is essentialthat the model be verified continuously by the development team while it is being developed.

Validation of the model is also a critical process as it involves ensuring that the model built does in factmimic real life processes using the computer. Validation can be performed either by the developmentteam or by an independent expert third party. The third party either performs a full independentverification and validation process, or an independent validation process in conjunction with a review ofthe verification process performed by the development team.

Pilot Application

We propose that a specific project be selected as an example application for the simulation model. Thisexample application can be used for both developing the model and then running the simulator afterinitial verification and validation have been performed.

Development Requirements

It is estimated that a team of at least one leader and three specialized engineers will be required to workfull time on this project for at least one year. The phases listed above will require a large amount ofsoftware development, travel, hardware, software, consultant work etc.

Page 259: Vol 2 onshore pipelines the road to success 3rd edition

13

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.3 Equipment Tracking System

Overview

The objective of this project is to satisfy the needs of companies owning a diversified fleet of equipmentacquired from many major manufacturers in the market. For them, the option of using eachmanufacturer’s monitoring and tracking system on their respective equipment will render the monitoringtask complicated.

Efforts and initiatives to create a homogeneous architecture and technical platform as a unified base toenable data collection from the diversified fleet (via unified or similar systems adopting readily availableinterfaces or using the same normalized protocols) will have to be backed-up by partnerships,participation and dedication, which are requested from all the IPLOCA members.

This chapter provides an overview of and vision for the near-real-time prototype equipment trackingsystem (ETS) recently developed by an IPLOCA member. It also presents the challenges, details andcapabilities of the system. The aim is to share this prototype openly with the IPLOCA community,expecting other members to further contribute to its development. ETS is an equipment tracking system designed to monitor and administer the different aspects of anenvironment where equipment and machinery are used. These aspects include:

ProjectsEquipmentEmployeesGeographical fences (Geofences)Equipment commands and actions

The remainder of this chapter serves to introduce this system, its features, its current implementation, aswell as ideas for future development.

Vision

The purpose of ETS is to provide management and staff with the ability to monitor and controlequipment locations and operations. This will not only serve as a security measure, to keep track of thewhereabouts of every piece of equipment at near-real-time, but can also assist in improving the projectoperations, availability, productivity rates, and resource management.

One of the major benefits of such a system is lowering operating costs, thereby indirectly lowering theowning cost, by inducing better management of idle time, timely attendance to preventive maintenance,repairs and equipment fuel usage, and updating of enterprise asset management computerizedsystems. By enabling monitoring and management of these aspects, we expect to keep the assets inbetter technical conditions and eventually increase their useful lifespan which will provide the option toextend the periods over which the landed cost is depreciated, hence maintaining a lower owning costand higher resale value.

The system can also lead to increased productivity, by identifying over- and under-used assets based onobserved modes of operation, and to improved logistics for fuel, transportation and service dispatch.

The system also improves safety and risk management, through the monitoring of unauthorised areasand geographical fencing.

Challenges

The goal of ETS is to provide a generic open solution, applicable across organisations, for any type ofequipment or machinery. To support that, a universal standard must be agreed on for describingequipment GPS and CANBUS data and constructing a dictionary to support the CANBUS protocol(CANBUS, or controlled-area network bus, is a data bus standard which allows vehicle electronics to

Page 260: Vol 2 onshore pipelines the road to success 3rd edition

14

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

communicate with each other). By unifying this standard across equipment manufacturers, the processof outfitting new equipment with the hardware module and integrating them within the organisation’stracking system can be a simple “plug-and-play” operation. Thus, regardless of the type of equipment,manufacturer, and CANBUS data (CANDATA) available, the overall procedure to capture and processdata would be the same. However, reaching such a standard is no easy task and requires thecollaboration of all parties involved in the field.

Work is underway with major equipment manufacturers to find solutions for unifying the CANBUSprotocols or to develop interfaces, so that specific equipment data that can be read, such as:

Vehicle speed (wheel speed)Cruise control statusClutch statusPower take-off (PTO) statusAccelerator pedal positionOverall fuel consumptionFuel tank levelEngine speedAxle load of individual axlesTotal engine operating hoursVehicle ID numberSoftware ID numberTotal vehicle mileageNext regular serviceTachograph informationEngine coolant temperatureFleet management system (FMS) standard informationSeat belt on/offHarsh brakingExcessive idlingOver-speedingOver-revving

Depending on the type of equipment, such data shall be modified and attributes added or deletedaccordingly.

Similarly such tracking systems can collect performance, diagnostic, tracking and safety data from othermanufacturers of pipeline equipment producing pipe-facing machines, line-up clamps, automaticwelding rigs, bending machines and others.

Besides equipment malfunction errors, diagnosis and standard information, a variety of performancedata can assist the production teams in their performance on site. For the following machines, examplesof such data are:

- Pipe-facing machines: bevel angle setting, rotational speed, cutting bit travel, idle rotations, etc.- Line-up clamps: hydraulic or pneumatic pressure, idle time, copper shoes thicknesses, etc.- Automatic welding machines: Bug speed, welding current, wire feed speed, Hiab crane usage,

generator output, welding gas level, etc.- Bending machines: pipe sizes, counts, bend measurements, etc.

With the help and assistance of major contractors, IPLOCA members and equipment manufacturers,the aim is to reach, as a first phase, the following goals:

1. Unification of the CANBUS standards2. Free submission of the dictionary or Process IDs behind the CANBUS protocol3. Alternatively, provide a low-cost interface unit to secure the CANBUS from client access and

manipulation and have it restricted to be read-only; although the tool currently cannot feed to theCANBUS, it is “read-only”, designed to provide reports for data analysis.

4. IPLOCA members to push their equipment suppliers to follow the IPLOCA standard for dataconnectivity

Page 261: Vol 2 onshore pipelines the road to success 3rd edition

15

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Components & Features

The general purpose of the system is to provide monitoring capabilities of the equipment and theiroperations to the end-user. This is facilitated via two components:

Hardware Module: a device deployed on every piece of equipment to be monitored andresponsible for detecting, gathering and transmitting all location and CANBUS data.Monitoring Interface: a component integrated within the VBC Dashboard[1] software anddesigned for displaying equipment location and monitoring their motion in real-time.

Via these components, the equipment tracking system can provide a fully-integrated solution having thefollowing features:

Posts GPS and CANBUS data from the device module deployed on each piece of equipmentto a recipient endpoint which processes this data and inserts it into the ETS database

Figure 1. ETS monitoring interface

[1] VBC Dashboard is a highly-usable interface using the latest rich internet applications (RIA) technologies. It allowsthe customizable consolidation of personal, team, departmental, project, corporate, and other external informationinto a single portal. It thereby provides the end user with a consolidated view of an organisation’s knowledgesources, and immediate access to key business information.

Visualizes ETS data via the monitoring interface by querying a web service created on top ofthe ETS database, exposing the functions required to get equipment information and latestlocationsAllows authorised users to force the application of specific actions on selected projectequipment, to stop the engine or change a configuration for example, or to dispatchcommands or messages to the equipment and its operatorRestricts the presence of selected equipment to certain geographical locations and uponviolation allows the transmission of alerts and/or execution of actions directly on the equipment

Before exploring the components in detail, we stop to highlight two of the major features in the ETSsystem: geofencing and equipment actions.

Page 262: Vol 2 onshore pipelines the road to success 3rd edition

16

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Geofencing

The “geofencing” feature allows administrators to restrict the operation of equipment to selectedgeographical areas. Any violation to the bounds of these geofences is logged, indicating the violatingequipment, in addition to the time and location of the breach. Accordingly, certain actions can be taken,from alerting an assigned employee to the violation as soon as it occurs, to the forcible shut-down of theequipment itself.

Geofences can be associated with zero or more projects and/or zero or more equipment. Since a pieceof equipment is contained within a single project, that equipment either inherits its project geofences (ifany) or can be associated independently with its own separate geofences.

Equipment Actions

Equipment actions allow administrators or authorised users to issue commands to control equipment ormachinery operation or to configure the deployed device’s functionality. Such commands include but arenot limited to:

Turning the equipment engine on/offTurning the wireless on the device on/offChanging the interval of data transmissionUpgrading the device module firmware or configuration

A user can apply an action by scheduling it for execution on selected equipment at a certain date andtime. The database keeps track of all actions scheduled, in progress, and completed. Upon request, thescheduled actions, whose time has passed, are dispatched to the device for execution.

In addition to manually scheduling actions, equipment commands can be automatically triggered bycertain events, e.g. a geofence violation or an infringement of predefined rules of operation. At suchinstances, an action can either be scheduled for immediate execution on the equipment itself orexecuted server-side, to send out an alert for example.

Monitoring Interface

The monitoring interface is a web component within VBC Dashboard that communicates with a webservice built on top of the ETS database. The service exposes all the required functionality for queryingthe data accumulated in the database. By invoking the service operations, this component can receive alist of all available equipment, their current positions and all associated data. In general, it is designed to:1. Provide a graphical representation of the available equipment and associated data

Equipment can be located by filtering on certain search criteria, either by the equipment fleethierarchy or by project (or both). The equipment fitting the selected criteria are listed in a grid, andcan be chosen to be displayed on the map. The latest posted geographical position of theequipment is shown on the map, indicating the equipment which is identified by its unique code.Selecting a certain vehicle shows the collected information relevant to that particular position,including the GPS latitude/longitude coordinates, the CANBUS data, all sensor-detected data, andthe vehicle operator (if any).

2. Enable real-time tracking of equipment and vehicle movementThe monitoring web component refreshes its view on a regular interval, each time requestingupdated data from the web service. Since each deployed device is constantly posting its currentgeographical location to be stored in the ETS database, the service has access to the latest positionreceived from the device, thereby enabling near-real-time tracking of the monitored vehicles’ motion.

3. Enable viewing of equipment location historyAll data transmitted from each device is stored and maintained in the database. Via the monitoringinterface, a user may choose to view the history of locations for a particular piece of equipment on aparticular date. The positions are shown in ascending order of time, allowing the user to track thetrajectory followed by the vehicle on that date.

Page 263: Vol 2 onshore pipelines the road to success 3rd edition

17

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

4. Enable viewing of equipment geofences and their violationsOne of the options available on any equipment’s context menu is “Show GeoFences”. It displays allthe geofences associated with the selected equipment, either directly or through its containingproject. In addition, if, at any point, the current equipment position was recorded as a geofenceviolation, it is indicated as such on the interface.

Figure 2. ETS monitoring interface - menu options

5. Enable viewing and scheduling of equipment actionsOther context menu options are related to the actions available for execution on the equipment(discussed in a prior section). A list of all “Allowed Actions” designated as applicable on theequipment can be displayed on the monitoring component. From these, an action can be chosen forexecution at a specific date and time and with the required parameters (if any). Also available is a listof all “Queued Actions” waiting for execution by the equipment; they are the actions that have beenscheduled for execution at any time prior to the current time at the equipment’s location and whichhave not yet been requested by the equipment. Once the request for actions is transmitted by thedeployed device and the queued actions are received, they are removed from this list and transferredto the “Actions History” list where all actions, either in progress or completed, can be viewed.

Figure 3. ETS monitoring interface - associated data

Page 264: Vol 2 onshore pipelines the road to success 3rd edition

18

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Administration Tool

Authorised users are given the ability to manage equipment information, their categorisation anddistribution, as well as the organisation of projects and employees, and the definition of geofencesthrough an administration tool, a Windows application exposing all the CRUD(create/retrieve/update/delete) operations required for the entities related to the equipment trackingsystem as a whole.

Project Hierarchy

Projects in ETS are defined under a geographical location hierarchy, namely a Zone containing Areascontaining Countries which in turn include Projects. The entire hierarchy may be manipulated via thistool, and project information can be created, edited or removed accordingly.

Equipment Hierarchy

The equipment organisation hierarchy is structured as Groups composed of Types composed of Fleets.Each piece of equipment or machinery belongs to a single fleet, and the entire hierarchy, as well asequipment information, may be manipulated as required. Any piece of equipment must also belong to aparticular project, and can be associated with the collection of employees who are allowed to operate it.

Employees (operators)

The tool exposes a list of registered equipment operators, with their full personal information, whichadministrators may create, edit or delete as needed. Through the employee section of the tool,employees can also be associated with projects and equipment.

Figure 4. ETS administration tool

Equipment Actions

Equipment actions can be viewed and queued for execution via the monitoring interface, but their actualdefinition is done through this administration tool. An action is identified by a unique code, a description,an action type, and a domain. An action domain is the set of equipment hierarchy entities on which theaction can be applied, i.e. the Group, Type, Fleet, or Equipment instances for which this action isallowed. Naturally, an entity at a certain level of the hierarchy inherits the actions allowed at the higher-level entity containing it, i.e. the actions allowed for a Type are also allowed for its child fleets and their

Page 265: Vol 2 onshore pipelines the road to success 3rd edition

19

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

contained equipment. Consequently, the actions created and associated with a certain entity in this toolare the ones shown under the “Allowed Actions” list for any particular equipment in the monitoringcomponent.

Geofences

Geofences are created, allocated or deleted via a Windows administration tool. An authorised user candraw the geofence, by assigning its boundary points on the given map, give it a unique code anddescription, and then add it to the ETS database. At this point, geofences may also be linked to entireprojects and/or separate equipment to indicate association and allow for monitoring of boundarybreaches. For all related equipment, any number of allowed actions may be selected to be used incases of violation of the geofence in question.

Figure 5. ETS administration tool - geofences

Excel Import and Export

All of the above-mentioned features are managed through the administration tool’s visual interface.However, the tool also provides the option for importing and exporting to and from Excel sheets. TheExcel sheets are designed in a specific format to support these features, and all ETS entities may beadded, edited, or removed directly via these Excel sheets. This would facilitate the process of managingbulk operations.

Device

The final component of the ETS system is the hardware module, which is to be installed on themonitored equipment and is designed to collect CANBUS information from the available ports on theequipment, as well as its GPS location. The CANBUS information can include but is not limited tospeed, mileage, engine temperature, RPM, fuel level and fuel consumption. Also, by installing RFIDreaders on man-operated equipment, the device can also post identifying information on the occupantsof the vehicle, i.e. the operator and all employees onboard.

Page 266: Vol 2 onshore pipelines the road to success 3rd edition

20

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Composition

The device itself is composed of several modules to handle each of its operations (see pictures below):GPS: tracks the equipment position in latitude/longitude coordinatesCANBUS: collects equipment data, such as speed, mileage, RPM, fuel consumption, etc. Itallows only data extraction, and cannot be used for accessing or manipulating equipmentparameters.

• GSM/GPRS: transmits and/or collects information from a certain endpoint• WIFI: downloads data over wireless networks• RFID: identifies authorised personnel, either as equipment operators or as passengers on the

transportation vehicle. In addition, it allows for keyless-go, where equipment can be started andoperated via RFID only, which would also enable restricting equipment operation to onlyselected authorised operators.

• 8 Digital Inputs / 8 Digital Outputs: collect equipment data via installed two-state sensors, e.g. adoor sensor (door opened - door closed)

• 8 Analogue Inputs: collect equipment data via installed analogue sensors, which normallymeasure data as analogue voltage, e.g. a temperature sensor

• Serial Port: allows device configuration and data download to an attached computer

Operation

The device is installed on each piece of equipment or vehicle to be monitored. It is configured toconduct all required readings and to communicate with a configurable endpoint on which a webpage isdeployed, ready to reply to the device requests. The device tracks its current position, records allcollected information, and transmits a message containing this data on regular intervals, determinedduring device installation and dependent on the device operation and supporting infrastructure in itshosting environment.

Figure 6. Device package Figure 7. Unit & package Figure 8. Unit & modules

Figure 9. Tracking unit Figure 10. CANBUS

Page 267: Vol 2 onshore pipelines the road to success 3rd edition

21

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Figure 11. RFID Figure 12. WIFI

The message is in XML format,, and has been adopted in the absence of a universal standard fordescribing CANBUS data, and which enables easy information posting on the part of the device as wellas easy processing on the server receiving end. The webpage deployed on the server, upon receivingany transmission from the device, processes the XML message and records it in the ETS database, foruse by the other system components. As new data is posted from the device, the geofences associatedwith the transmitting equipment are checked. If the equipment is detected to be outside the bounds ofall its geofences, then the violation is logged and the configured handling mechanism, if pre-set, isexecuted.

Note that the interval of transmission by the device can differ from the interval of data collection. Forexample, in environments where obtaining a server uplink is an expensive operation, the transmissioninterval may be made larger, while the recording interval can be kept at a smaller regular interval, andeach transmission can contain multiple data recordings. Also note that the transmission interval can beconfigured dynamically, even after the device is deployed on the equipment, and the interval while theequipment is operational can be different from that while the equipment is stationary or shut down.Below is a sample of the XML format to be exchanged between the device and the webpage:

<Root ID="…"><method v="PostData"/><operator v="…" /><Employees>

<Employee v="…" /><Employee v="…" />

</Employees><Post>

<GPS LN="03530.54000" LT="3353.22000" Time="15:02:53" Date="2011.05.11"Heading="0" Sat="2" SP="55"/>

<CANBus v="xx;xx;xx;xx;xx;xx"/><INPUT D="xx" A1="xx" A2="xx" A3="xx" A4="xx" A5="xx" A6="xx" A7="xx"/>

</Post><Post>

<GPS LN="03530.51000" LT="3353.31000" Time="15:03:23" Date="2011.05.11"Heading="0" Sat="2" SP="55"/>

<CANBus v=" xx;xx;xx;xx;xx;xx "/><INPUT D="xx" A1="xx" A2="xx" A3="xx" A4="xx" A5="xx" A6="xx" A7="xx"/>

</Post></Root>

In addition to the submission of location and sensor data, the device is also programmed to periodicallycheck for actions scheduled for execution (introduced in a previous section). The device sends a request

Page 268: Vol 2 onshore pipelines the road to success 3rd edition

22

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

to the webpage for actions queued for execution at this time. It receives a list of all actions stillscheduled on its equipment up until the time of the request; these actions are then marked in thedatabase as being “In Progress”. The actions are supposed to be executed by the device by modifying aconfiguration or changing the status of one of the equipment’s ports for instance. After execution, thestatus of the action is returned in a reply to the webpage, which marks the action as “Completed” or“Failed” accordingly.

Future Development

The ETS system is a growing project, with room for improvement in its multiple components, and thefeatures to be considered for development in the near future can be categorised as follows:1. New system features

a) Modifications and improvements on the viewing capabilities of the monitoring componentb) Support for scheduling of repeated actions, i.e. equipment actions set to run on a periodic

schedule and not just at a single specific date and time

2. Business intelligence opportunitiesThis system is data-intensive, with the possibility of thousands of records of data being collected ona daily basis. This fact opens up vast opportunities for integrating the system with businessintelligence (BI) solutions, which will assist administrators and moderators in not only having a betterglobal view of the data and its implications, but also in understanding current trends and buildingprojections into the future. The BI solution transforms the data collected from the system intomeaningful information to be analysed from various angles using slicing and dicing techniques, whichin turn enables decision makers to reach the right assessments within the necessary timeframe forthe improvement of the project.

3. Integration with other systemsa) Integration with GIS-based systemsb) Integration with enterprise resource planning (ERP) or asset management solutions, e.g. IBM’s

MAXIMO asset management systemc) Integration with fuel management system controls and handheld devicesd) Integration of a built-in battery in the device for stand-alone cases and emission of distress

signals4. Compatibility with other mapping technologies

Figure 13. ETS monitoring interface - integration features

Page 269: Vol 2 onshore pipelines the road to success 3rd edition

23

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.4 Google Earth in Construction Monitoring

Introduction

Google Earth is a virtual globe, map and geographical information program. It maps the Earth by thesuperimposition of images obtained from satellite imagery, aerial photography and GIS 3D globe.

Google Earth is client-based software that is installed on individual PCs and also can be viewed usingweb browsers through a Google Earth plug-in. It is available in two versions:

1) Free license that uses public satellite photos and maps from Google servers2) Licensed Google Earth Professional that can be used by advanced users and also can be

connected to local licensed Google Earth servers with private satellite images and maps.

Google Earth is widely used by different industries to design, monitor and maintain earthwork andconstruction projects. Municipalities and governments, for example, use Google Earth to design andtrack the installation of water pipelines, cities and urban design, roads construction, earthworks etc.

The use of Google Earth to design and monitor the construction of pipelines reduces the time and effortspent in studying the landscape and elevation changes along pipelines. Google Earth can be also usedto monitoring the actual construction of the pipeline, especially if high-quality satellite imagery is alignedto the Google Earth system.

This section will focus on the implementation of Google Earth in a near-real-time monitoring system tosimulate the construction of a pipeline project. It can also be used at the design stage, for thepreliminary definition of pipeline routing – see Appendix 5.1.2.

Requirements

The implementation of Google Earth in a near-real-time monitoring system to simulate the constructionof a pipeline project is a very useful tool to monitor and track the progress during construction. Itrequires the implementation of the functional specifications specified in section 7.1 of the 1st edition of“The Road to Success” and section 13.6.1 (volume 2) of the 2nd edition.

The installation of Google Earth client or Google Earth Web browser Plugin is also required to be able toview KML files containing the geometric data to be illustrated.

Engineering Details Required

Engineering details of pipelines can be illustrated on Google Earth pipeline simulations. Details availablemay include the following, based on the availability of project data:

• Pipe information• Diameter• Wall thickness• Material grade (X60 , X65, X70 etc…)• Coating• Depth of cover• Cut pieces• Chainage• Bends, elbows• Crossings (road, river, rail)• Terrain type• Property name and limits• Joints• QC Data• Valve information (valve tag number, type, manufacturer, XY location)• Cathodic protection information (location, type)• Testing information• Pipeline markers (type and location)

Page 270: Vol 2 onshore pipelines the road to success 3rd edition

24

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

• XYZ coordinates from surveyors’ GPS readings

These engineering elements are normally stored in the material management system/ERP (seeimplementation section).

Photos from the site during installation and construction process will be displayed on Google Earth ifthose photos exist in the material management system.

The system will be designed to use Google Earth elevation data in case the elevation data does not existin the Material Management System. The use of elevation data of Google Earth may create dummynodes that monitor and record elevation changes along pipelines.

The pipeline route geometric points are collected from each joint by surveyors and the distance betweenjoints indicates the pipeline size.

Keyhole markup language (KML) will be used to represent the pipeline route in Google Earth. KML is anXML notation, developed for use with Google Earth, for expressing geographic annotation andvisualization within Internet-based, two-dimensional maps and three-dimensional Earth browsers. Anexample KML file is shown in the KML module section. KML data are often distributed as zipped(compressed) KMZ files. The contents of a KMZ file are a single root KML document (notionally"doc.kml") and optionally any overlays, images, icons, and COLLADA 3D models referenced in the KML,including network-linked KML files.

Figure 1. The near-real-time pipeline simulation in Google Earth

In Figure 1, which shows the design of the near-real-time pipeline simulation in Google Earth, Talisman isthe material management system. This is the center of data acquisition, which is connected to the GISand the centralised electronic database management system (EDMS). The KML module creates theKML file, which then becomes ready for viewing on Google Earth.

Page 271: Vol 2 onshore pipelines the road to success 3rd edition

25

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

ImplementationMaterial Management System:The material management system is used for data acquisition. The system is administered by theoperating network group located in the pipeline site or facility. The material management system,integrated with the plant management and vehicles (PMV) system, monitors all pipeline, machinery andPMV elements at all locations along the pipeline and consolidates the data and then transfers it to thecentral EDMS via a VPN internet connection (microwave, 3G or public communication carrier). GoogleEarth will connect and use this data for visual representation.

Coordinates:All data referring to locations must comply with the project coordinate reference system (sometimesreferred to as projection parameters). This includes all spatial and non-spatial data either for linking tospatial data or for transformation to spatial data format. Where information is to be tied to a specificgeographic location, GPS coordinates in the project projection parameters must be collected for everyfeature. The below table shows an example of a coordinate reference system:

Standard for Azerbaijan and Georgia

Horizontal coordinate reference system:

Geodetic datum Pulkovo 1942

Ellipsoid Krassowski 1940

Semi-major axis (a) 6378245.0 meters

Inverse flattening (1/f) 298.3

Prime meridian Greenwich

Map projection CS42, zone 8

Projection method Gauss-Kruger (a form of transverse Mercator)

Projection parameters

Latitude of origin 0 degrees North

Longitude of origin 45 degrees

Scale factor at origin 1.0

False Easting 8,500,000metres

False Northing 0 meters

Grid units International meters

Vertical coordinate reference system

Vertical datum Baltic Datum (sometimes referredto as Krongstad Datum)

Height units International meters

Note: The Caspian Sea level is 28 meters below Baltic Datum, therefore elevations in some parts ofthe pipeline route will have a negative value in respect to Baltic Datum.

KML Module:The KML module reads the GPS XYZ coordinates, which are then converted to latitude, longitude andaltitude points using universal transverse Mercator (UTM) based on the coordinate reference system (seeprevious section). Those points represent the pipeline joints. The points after being stored in the EDMSare annotated automatically to the project KML file (also stored in the EDMS) which can be viewed inGoogle Earth to show the progress of the pipeline.

In addition to the pipeline route, the KML file may present any other places, photos, roads etc. availablein the KML file. For example, the KML file may be annotated with the latest welds (joints between pipes)

Page 272: Vol 2 onshore pipelines the road to success 3rd edition

26

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

during the construction of the pipeline. Depending on the site update status and project monitoringrequirements, this could be every 30 minutes, one hour or more.The simple KML file below demonstrates how the pipeline route is presented:

<?xml version="1.0" encoding="UTF-8"?><kml xmlns="http://www.opengis.net/kml/2.2"><Document><name>Pipeline Route Example</name><description>www.ccc.gr</description><Style id="rangecolour"><LineStyle><color>660000FF</color><width>0.1</width></LineStyle><PolyStyle><color>660000FF</color></PolyStyle></Style><Style id="linecolour1"><LineStyle><color>660000FF</color><width>3</width></LineStyle></Style><Placemark>

<name>Mechata pipeline CL</name><description></description><styleUrl>#linecolour1</styleUrl><LineString id="Line 1">

<tessellate>1</tessellate><altitudeMode>clampToGround</altitudeMode><coordinates>

6.027586622,35.91654266,932.5223066</coordinates>

</LineString></Placemark></Document></kml>

Construction Monitoring ResultsThis section proves the ability monitor the progress of the construction of the pipeline on a daily basis.The image below illustrates the pipeline route:

Page 273: Vol 2 onshore pipelines the road to success 3rd edition

27

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

The image below presents a closer look at the pipeline:

The above images use default Google Earth satellite images; for more landscape details at higherresolution images can be acquired from satellite images providers.

During the construction, Google Earth may also illustrate the progress of the pipeline construction. Theimage below shows the progress of the pipeline construction, using colour to by reflect the status of apipeline section. For example, green shows the finished section, yellow shows the hydrotesting processand red shows the material missing/non-received section

Page 274: Vol 2 onshore pipelines the road to success 3rd edition

28

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Benefits:

Google Earth provides a reliable and user-friendly tool for near-real-time monitoring of the pipelineconstruction, which can handle day-to-day operations of work on site. Installation delays, equipmentusage, material shortage and many other elements can be visually tracked by the continuous linkprovided between Google Earth and the pipeline control system (ERP).

The work done in this section used the free Google Earth client and Google Earth Web browser plugin.For advanced usage with proprietary satellite photos the Google Earth Enterprise server (which requireslicensing) can be used.

Page 275: Vol 2 onshore pipelines the road to success 3rd edition

29

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.5 Skidless methodology

Introduction

The Facing, Lining-up and Welding (FLUW) group’s mission is to stimulate innovation in the area ofbending, stringing, facing, lining-up up and welding activities and deliver appropriate technologies andworking practices to facilitate the overall goals of the Novel Construction Initiative.

The key goal of the group is to provide processes and equipment recommendation that can consistentlyreduce the repair rate in the full range of anticipated environmental and safety conditions with reducedhuman intervention and supervision.

The intention was also to create favourable conditions for proven welding techniques and new weldingtechniques to be used.

The boundaries of the project included pipe between 30 and 56” diameter, cross-country hydrocarbonpipelines and existing international design codes and material standards.

Our activities include: • An analysis of existing processes and technologies for pipe handling, stringing, facing, bending

and welding • Identify technology gaps and areas for innovation • Develop and demonstrate appropriate new technologies and working practice

The development of the process below and the related equipment would in many cases also offer thepossibility to eliminate the use of skids, or at least considerably reduce it.

This study is presented in 2 steps:13.5.1 Activities to perform at the pipeyard

13.5.2 Activities to perform on the ROW

13.5.1 Activities to perform at the pipeyardThe pipeyard is the pipe receiving and storing area.

This proposed new process favours work done at the pipeyard for as many operations as feasible, thusdrastically reducing work done along the line. Work at the pipeyard is done in a single location allowingbetter and easier control resulting in better quality and reduced risks to safety and the environment.Surveying and data collection was not part of FLUW’s charter but it will be needed to implement the newprocess.

• The first task to be performed is measuring and inspecting pipes for quality and dimensions • From the ROW surveying data, which needs to be available from the system, final positioning

and bending requirements of each pipe is established and the bending is done at the pipeyard • Then bevelling is performed with pipe ends protection • Whenever site conditions allow it, pipes will be double jointed, UT controlled, and possibly field

joint coated, then stored again, according to their respective positions on the line

13.5.2 Activities to perform on the ROW and “skidless methodology”

Activities to perform on the ROW are presented in 3 steps13.5.2.1 Transportation

13.5.2.2 Stringing

13.5.2.3 Skidless methodology

Page 276: Vol 2 onshore pipelines the road to success 3rd edition

30

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.5.2.1 Transportation On site transportation, can be a very challenging and costly operation, depending on topography andground conditions. The study of new means of transportation which could include longer and pre-bentpipes would certainly be very useful. Our current new process is based on traditional on site trucktransportation.

13.5.2.2 StringingPipe stringing will be done in accordance with the work programme and each pipe will be delivered insequence to its pre-established position. Pipe unloading is done by a pipe layer or excavator equippedwith vacuum-lift attachment to avoid any damages to the pipe and the coating. They will be supportedby a few basic types of skids, such as sand bags, to avoid contact with the ground.

13.5.2.3 Skidless methodology

This new process will be presented in 5 steps

13.5.2.3.1. Overall description of the new process

13.5.2.3.2. Description of the process on the ROW with illustrations

13.5.2.3.3. Description of the new equipment needed

13.5.2.3.4. Equipment preliminary technical specifications

13.5.2.3.5. Analysis of potential savings in terms of cycle time, productivity and manpower

13.5.2.3.1 Overall Description of the new Process

In the new process equipment is moved underneath the pipe, rather than being alongside the pipe, thusavoiding the use of wooden skids.

The first crew is the front end gang composed of:

• 1 excavator equipped with a grabbing tong able to rotate the new pipe for seam alignment andbend orientation just before setting the pipe on the line-up station.

Page 277: Vol 2 onshore pipelines the road to success 3rd edition

31

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

The front-end line-up station is composed of 2 stations: • 1 back-end line-up and welding station (called “S1” for first station) guided by GPS • 1 front-end line-up carrier (called “FEC”) guided by GPS and controlled by welding station S1

The next crew is the back end welding crew with stations for Fill and Cap (number of stations is dictatedby welding system, pipe wall thickness and number of passes required).

• Each back end station is identical and guided by the pipe (called S2-1 for the first fill, S2-2 forthe next one and so on...)

• All stations (S1 and S2) have the capacity to be pulled out from the line should a stationencounter a problem that cannot be quickly solved.

When moving to next weld, each S2 type station is not in contact with the pipe in order to avoidvibrations while other stations are working. In addition, each station has the capacity to support 4 pipes.An automatic system will prevent a station from moving should the pipe not be secured correctly by asufficient number of stations. All stations will have a cab offering the workers an enclosed workingenvironment where heat, cold and dust will be fully controlled.

After the last welding station come the NDT station, repair station and joint coating station.

The last coating station pulls a lay-down stinger unit in order to bring the pipe from the welding level(about 1.7m or 6 feet) down to the sand bags level as shown on the sketch Phase V.

The welding supervisor can remotely monitor actual welding production and parameters from thestations. All parameters will be downloaded using wireless connections.

Page 278: Vol 2 onshore pipelines the road to success 3rd edition

32

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.5.2.3.2 Description of the process on the ROW with illustrating Sketches

Phase I.To initiate a section, an excavator picks up the pipe and sets it on stations S1 and S2-1. S1 is alignedusing a precise geo-positioning system (GPS). S1 and all S2 stations have a gripping capability toprevent the pipes from moving during the line-up operation and on lateral or longitudinal slopes.

Phase IIThe front end line-up carrier (FEC), also using a precise GPS system, is set ahead of S1, ready tosupport the next pipe to be welded. The excavator is equipped with a pipe rotator for proper seamalignment and for bend orientation.

Phase IIIThe second pipe is now set on line-up rollers, and the line-up operation starts. The line-up rollers on S1and FEC are controlled by an operator located in S1. Once the line-up operation is done, S1 starts thewelding cycle.

Phase IVWhen root and hot welding passes are completed, the internal clamp is moved ahead. S1 movesforward while still, supporting the pipe. When S1 reaches the middle of the second pipe, the FEC ismoved ahead to the front end of the third pipe, which is to come next. S1 then moves to its final positionand holds the line, allowing S2-1 to move ahead, and S2-2 to enter the line. The internal clamp is set onthe pipe end, the clamp operator being located within the S1 cab.

Phase VA new pipe is positioned on FEC and S1 and so on.Once all welding stations have completed their work, the following stations will operate in sequence: S2-UT is to perform UT, S2-RP repair, S2-SB sand blasting, S2-JH joint heating and S2-JC joint coatingThe last station (S2-JC) pulls a lay down stinger unit to smoothly position the line on sand bags.

Phase VIWhen a bend is integrated in the line, the FEC is equipped with a rotating table that allows the bendedpipe to be backed up in position against the last welded pipe.

The last station S2-JC pulls a lay down stinger unit that will allow a smooth positioning of pipe on sandbags.

The six sketches in the following pages illustrate the above, together with the four images at the end ofthe section which are extracted from the animation included in the attached CD.

Page 279: Vol 2 onshore pipelines the road to success 3rd edition

33

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Page 280: Vol 2 onshore pipelines the road to success 3rd edition

34

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Page 281: Vol 2 onshore pipelines the road to success 3rd edition

35

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Page 282: Vol 2 onshore pipelines the road to success 3rd edition

36

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Page 283: Vol 2 onshore pipelines the road to success 3rd edition

37

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Page 284: Vol 2 onshore pipelines the road to success 3rd edition

38

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Page 285: Vol 2 onshore pipelines the road to success 3rd edition

39

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.5.2.3.3 Description of the new equipment needed

Grabbing tongA grabbing tong prototype has already been built and tested on the 56’’ OPAL pipeline in Germany.

Basic station design Stations include one track-mounted self-propelled platform, the tracks being on each side of the pipe.The platform itself includes two sets of pipe support devices (probably rollers front and back). Thesedevices will have to be adjustable in height (when unit moves up to the next weld, the pipe should notbe supported in order to avoid vibrations/movements of the line while other stations are welding). Allplatforms will be equipped with a cab, which will be easily removable. Welders and helpers will stay inthe cab while the station moves to the next joint.

Each platform will be equipped with a power unit to provide either power for travel or for welding andany other related equipment. With this system, there are no parts exposed to damage such as umbilicalcables or hoses.

All S2 type stations are of modular design and each module can be removed from the string for a quickexchange of faulty components, or replaced easily in case of major problems.

The carrying capacity of one station, when double jointed pipe are installed, should be approximately 2pipes 24 m long each (56” diameter) allowing for some potential delay in one cabin operation. However,generally all stations should be a maximum of 48 m apart.

Each station is controlled by one onboard operator, however, each cab should allow up to 5 personsinside. These cabs will be air-conditioned and heated.

A safety device will automatically stop the machine in case a person or an obstacle is on the travellingroute or too close to the machine.

Each station behind the front end will be guided by the pipeline.

Each station has holding pads to prevent the pipe or line from moving during the line-up operation orwhen working on lateral or longitudinal slopes. An automatic safety device prevents a station frommoving if the line is not secured by other stations. Each station also has its own operating mode forloading/unloading into transport units.

Station S1 Station S1 has the same design as the basic stations, except that its front rollers (which support theback end of the new pipe) can move up/down and left/right for line-up purposes. Rollers have a 30Tholding capacity and are positioned outside the cab in order for the excavator to easily set the pipe. Station S1 is positioned by a precise geo-positioning system.Rollers are positioned outside the cab in order for excavator to easily set the pipe.

Front end carrier (FEC) The FEC is a self-propelled track carrier remotely controlled by an operator located in S1 and preciselypositioned by GPS. It is designed to carry one pipe. The FEC is fitted with holding pads and rollers thatmove up/down/right or left. The unit has also a rotating bearing between the undercarriage and supportrollers in order to accommodate a bent pipe and back it up in line with the preceding one.

A safety device automatically stops stations in case of obstacles or hazards.

Lay down stinger unitThe last station will pull a lay-down stinger unit in order to bring the line down to the sand bags. Thecapacity of this unit will be 4 pipes.

Page 286: Vol 2 onshore pipelines the road to success 3rd edition

40

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.5.2.3.4 Equipment preliminary technical specifications

The main technical specifications should include the following.

Stations

Platform Maximum width in transport mode: less than 3.00 m

Maximum height from the ground up: 1.70 m

Necessary power: 200 KVA. The power unit must be able to withstand temperatures from -50°C to + 50°C, in lateral slopes of +/-10% and longitudinal slopes of max. +/- 30%

Pipe bottom above ground: 1.7 m

Weight to be supported by the roller: 30 tonnes

Holding and lining-up devices (S1)

GPS system for station S1

Possibility of lowering a roller for guiding rings

Adjustable cab support

Anti-collision system and other safety devices

Cabin Dimensions: L 3.50 m, width and height to meet main specs.

Adjustment “curtains” to enclose the pipe

Areas to accommodate generator, gas bottles, air distribution

Heater and/AC units

Cab floor for operators and helpers

Floor to cope with slopes up to 30%

Quick connection/disconnection devices

The unit must be able to be removed from the pipe sideways

Front end carrier

Transport width: maximum 3 m

Necessary power as required

Weight to be supported by rollers: 15 tons

Control system and GPS positioning

Safety devices

Lay down stinger

The last station on the line pulls a non-propelled stingerto lay pipes on sand bags or equivalent devices.

Page 287: Vol 2 onshore pipelines the road to success 3rd edition

41

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.5.2.3.5 Potential savings in terms of cycle time and productivity

Preliminary studies indicate that significant reductions of cycle time as well as savings in terms ofmanpower and equipment in the order of 10 to 30% can be expected. Furthermore, this new methodology will have a positive impact on:

Safety• Elimination or at least strong reduction of skidding operations. This will decrease the number of

workers on the ROW • Less manpower on the ROW means fewer transportation requirements, consequently fewer

risks of hazards and accidents • Welders will no longer be on the ground but will work in an enclosed and clean environment,

even when moving to the next pipe• Cabs are seated on a solid base and are no longer hanging on a boom • Cabs are dust-controlled and air-conditioned or heated for better working conditions

Quality: • Line-up and fit-up processes are improved with consequences for productivity and quality • As cabins no longer hang on booms, they can be adapted to sophisticated welding processes

for better quality and productivity • Fixed computerized cabins allow for the latest technologies and improved pipe positioning

Environment: • Decrease in air pollution due to a reduce number of operations on the ROW • The new equipment will be of the latest technology and meet all new air pollution requirements • As all operations will be conducted from an enclosed environment, collection of debris will be

facilitated and more efficient

Page 288: Vol 2 onshore pipelines the road to success 3rd edition

42

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Page 289: Vol 2 onshore pipelines the road to success 3rd edition

43

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.6 Machine Development

13.6.1 Lowering & Laying: Functional Specifications of the Ideal Machine

13.6.1.1 Objectives

13.6.1.1.1 Initial objectivesThe initial objectives of the Lowering & Laying working group as defined in February 2007 were:

Key Objective

• Develop processes and equipment that match pipeline string design and conditions toensure minimum installation stresses, minimum handling and zero pipe and coating damagewhen integrating with other innovations developed by other working groups of the NovelConstruction Initiative for improved construction production rates

Primary Objectives

• To stimulate innovation in the area of pipe lower-and-lay processes in order to deliverappropriate technologies and working practices

• In particular the key goal was to develop lower and lay processes and equipment whichwould integrate with the other Novel Construction processes and which would beengineered to match the pipeline string design and environmental/terrain conditions toprovide:

• Minimum installation stresses • Minimum handling of the completed pipe string • Zero damage to pipe and external corrosion protection systems

These objectives covered both the “process” and the “product” aspects of the lowering-and-layingoperation in pipeline construction.

13.6.1.1.2 Revised objectivesAfter analyzing the lowering-and-laying operation, the group concluded that the process aspect of thisoperation was directly connected with many other factors in pipeline construction, such as:

• Constructability and general layout of the pipeline• Processes and machinery used in the alignment, welding and coating phases of pipeline

construction

We could not therefore improve existing processes or develop new ones in the lowering-and-layingoperation, with the certainty that these new processes would be totally consistent with all otheroperations on the pipeline construction project.

The working group then decided to focus on the product aspect of the lowering-and-laying operation,rather than on the process.

Within the product perspective, the group identified and developed a workplan to address two targetedprojects:

1. Develop functional specifications for the “ideal” sideboom.2. Develop functional specifications for the “ideal” attachment.

Page 290: Vol 2 onshore pipelines the road to success 3rd edition

44

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

It was then decided to conduct a survey amongst IPLOCA members, who are the contractors actuallyusing those machines. A questionnaire was developed and addressed as a survey to the contractorsthrough the IPLOCA website, with the support of the IPLOCA Secretariat and their web-site coordinator.

The survey’s objective was to identify:• Current applications of sidebooms• Design weaknesses of current sidebooms• The features of the ideal sideboom to perform lowering operations• The features which contractors would like to see on the ideal attachment

The specific questions were:• which features are “most liked”and which are “most disliked”• which features the ideal sideboom and attachment “must have”, or would be

“nice to have”

Responses were received from over 20% of the contractors. The respondents included some of themajor on-shore pipeline contractors, which gave a high degree of credibility and reliability to the surveyresults.

The next phase of the project consisted in analysing the responses and comments, and in translatingthose into functional specifications for the ideal lowering-and-laying machine and attachment. This workwas performed during summer 2008 and concluded at the working group’s meeting in Italy in July 2008.

One consideration which also came out of the survey is that often some contractors asked for featureswhich already exist on machines available on the market, and yet are not used, such as:

• Factory-installed & certified cabs, roll-over protective structures (ROPS), seat belts etc.• GPS positioning systems (Product Link)• Electronic jobsite management (Accugrade)• Operator simulation training tool

This prompted the question:Why is so much effort spent in developing new products and state-of-the-art features to improve theindustry practices in terms of productivity, health and safety and environmental impact when – in the realworld – machines which are 40 year old, have Tier Zero emissions engines, non-original ROPS or non-certified modifications are still accepted on jobsites?

Section 13.6.1.1.3 below propose certain recommendations to progressively correct this situation.

13.6.1.1.3 The ideal machineOnce they had developed the functional specifications of the ideal side boom, the group realized thatmost of the features identified could be extended to all types of machinery used on pipeline jobsites.

This actually represented the second shift in the Lowering & Laying Group objectives and deliverables.From nalyzing the process and the product aspects of the lowering-and-laying operation in pipelineconstruction the scope was restricted to analyzing the product aspects of this operation. With thesurvey results, it was broadened again and extended to the functional specifications which we haddeveloped to all products, i.e. all machines used on the pipeline construction jobsite, instead of limitingits application to just sidebooms.

The newly-developed functional specifications are presented in the next section.

As for the ideal attachment functional specifications, the group has developed the concept of a toolwhich can be installed either on a sideboom or on an excavator, and which can hold the pipe sections in

Page 291: Vol 2 onshore pipelines the road to success 3rd edition

45

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

any desired position, including rotation of the pipe section around its axis. This is under development byone of the manufacturers participating in the grooup.

13.6.1.2 “Ideal Machine” Functional Specifications.

13.6.1.2.1 TransportabilityTransportation of the machine is the prime end-user selection consideration, due to the transient natureof pipeline construction and to the frequent need to move machinery around.

Machine transportability can be further broken down into:

Ease of Disassembly and Re-AssemblyMachine dimensions

Ease of Disassembly and Re-AssemblyThe ideal machine will have NO disassembly and reassembly operation.Should this target not be met, then the goal for the machine design should permit easy disassembly andloading within one hour and without special tools or lifting devices.

Machine DimensionsIt is highly desirable that the basic shipping dimensions of the machine be achieved orimproved upon. The overall machine size, weight criteria and transportation restrictions must be carefully considered.

HeightThe machine, loaded on a low bed trailer, should not exceed non-permit limitations inheight with minimal disassembly, as follows:

Location Minimum Height Requirement (m)

North America 4.12

Europe 4.20

South America 4.40

WidthThe machine, loaded on a low bed trailer, should not exceed non-permit limitations inwidth with minimal disassembly, as follows:

Location Maximum Width Requirement (m)

North America 3.05

Europe Category 1 – below 3.00

Category 2 – below 4.00

Category 3 – above 4.00

South America 3.00

Page 292: Vol 2 onshore pipelines the road to success 3rd edition

46

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

WeightThe machine, loaded on a low bed trailer, should not exceed non-permit limitations inweight with minimal disassembly, as follows:

Location Maximum Weight Requirement (kg)

North America 54,500

Europe 42,000

South America 45,000

13.6.1.2.2 SafetyThe implementation of safety measures is a prime end-user selection consideration. How a machineperforms in this area is of utmost importance.

Roll Over Protection System (ROPS)A roll-over protection system (ROPS) should be implemented as standard on all machinescapable of carrying a load. The ROPS device shall support the whole load (weight) of themachine in working configuration, in a rollover event, including to some extent the dynamic loadassociated to such event.

Safety belts should be compulsory.

Load MonitoringA load-monitoring device should be implemented as standard on all machines capable ofcarrying a load.

In addition, the machine shall be equipped with a printed table with safe limits of operation in allsituations as well as a table of the recommended steel cables to be used.

Slope indicatorA slope indicator device should be implemented as standard on all machines capable ofcarrying a load. This should be useable both when the machine is under load and when it is notunder load. The slope indicator should be lateral and longitudinal.

VisibilityFunctional visibility in all directions from the operator station is a requirement in critical areas asfollows:

1. Forward and side view of the left-hand track and ditch area2. Forward view over the front of each track3. Rearward for towing device and a towed load4. Drawworks5. Upwards to the tip of the boom

Reduction of visibility with an enclosed cab should be minimal over a non-enclosed ROPS. A separate alarm signal is desirable for areas in “dead angles”.

13.6.1.2.3 Accessories and ComfortThe implementation of operator comfort features should be taken into great consideration whendesigning a machine.

Page 293: Vol 2 onshore pipelines the road to success 3rd edition

47

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

The following are some of the features which should be considered.

Enclosed Operator Cab

This will allow installation of air conditioning and/or heating. Extreme ambient temperatures should beconsidered, with attachments that would allow the machine to operate in ambient temperatures varyingbetween +42 to –45ºC. The cab should be pressurized to prevent dust from penetrating the operatorenvironment.

ControlsMachine controls should require minimum operator effort and should consist of effort-assisted levers orjoysticks which will allow operation with the maximum possible precision.Controls shall have also an "anti-jolting" system and a blocking system to prevent sudden drops of theboom/load.

Noise LevelThe reduction in noise exposure during machine operation should match or fall under the applicablerequirements as required by law in the location.

13.6.1.2.4 Environmental FeaturesThe machine should be designed to meet the most advanced environmental requirements in areas suchas:

Low Engine EmissionsEngine emissions should meet or fall under Tier IV requirements.

Fuel EfficiencyThe machine should have a proven fuel efficiency (gallons of fuel consumed per quantity of workproduced).

Bio FuelsThe engine should be able to run with biodegradable fuels.

Bio OilsThe machine should be able to run with biodegradable oils. In addition, the machine should be equipped with leaking protection devices to prevent contamination ofsoil in the event of normal maintenance (oil changes) or of oil leakage.

Manufacturing processThe machine should be manufactured in the most environmentally respectful manner. Use ofremanufactured components would be a plus. Also, manufacturing processes and facilities should havea proven track record of environmental friendliness (low CO and GHG emissions, process for waterrecuperation and recycling etc.).

Machine RecyclabilityThe machine should be recyclable as much as possible.

Page 294: Vol 2 onshore pipelines the road to success 3rd edition

48

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.6.1.3 Recommendations to improve the existing quality of equipmentused on existing pipeline projects

The “Ideal Machine” functional specifications were then submitted to manufacturers of all type ofmachines used on on-shore pipeline projects (e.g. welding tractors, padding machines, dozers,excavators, loaders, dump-trucks etc.) The manufacturers were asked to indicate which features of theircurrent models already comply today with those ideal specifications, which features do not comply andwhich plans are in place for making the machine comply with the required ideal specifications.

The results of this survey are that construction and pipeline machinery of major manufacturers alreadymeets most of the ideal functional specifications.

However, it has to be noted that this result applies to machines which are new, ex-factory today, and notto old equipment which may still be used on pipeline jobsites. Manufacturers also highlight the fact that,although their appearance may be similar, current machinery is very different from old machinery, andthat it is virtually impossible to upgrade old machines to the specifications of new ones.

To bring this work to a positive and concrete conclusion, the working group proposes that clientsconsider including contractual means in order to require and certify that a certain percentage of themachines used by contractors on the future jobsites actually comply with the ideal functionalspecifications (or with a minimum requirements to be established by themselves, based on the idealfunctional specifications).

As an example clients may want to require 10% (or any percentage to be determined by them at theirdiscretion, as long as it drives increases in safety, productivity and environmental features) of themachines in the first year (2010), with a plan to increase by such percentage in each subsequent year.

We trust by having the client drive such best practices, will result in improved efficiency, productivity,safety and environmental respect on the projects and jobsites.

Page 295: Vol 2 onshore pipelines the road to success 3rd edition

49

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.6.2 Use of Computer-based Technologies

13.6.2.1 GPS in Machine Control and Operation

1. GPSGlobal positioning system (GPS) satellites provide precise location information for elevation andalignment control with potentially centimeter-level accuracy.The GPS system considered here uses GPS satellites to determine precise blade / bucket positioning.The system features fully-automated blade adjustments for elevation control, and vertical and horizontalguidance light bars for manual control.Such a system complements the Equipment Tracking System described in section 13.3.

1.1 OperationMachine control systems use advanced GPS technology to deliver precise blade positioning informationto the cab. The information necessary for the system to accurately determine blade / bucket positioningwith centimeter-level accuracy is determined using machine-mounted components, an off-board GPSbase station, and real time kinematic (RTK) positioning. The system computes the GPS positioninginformation on the machine relative to the base station, compares the position of the blade relative to thedesign plan, and delivers that information to the operator via an in-cab display. Information providedincludes blade elevation; how much cut/fill is necessary to achieve the required grade; a visual indicationof the blade’s position on the design surface; and a graphical view of the design plan with the machinelocation.

Machine control systems put all the information the operator needs to complete the job in the cab,resulting in a greater level of control. Vertical and horizontal guidance tools visually guide the operator tothe desired grade. Automated features allow the hydraulic system to automatically control bladeadjustments to move the blade to grade. The operator simply uses the light bars to steer the machinefor consistent, accurate grades and slopes resulting in higher productivity with less fatigue.

1.2 Single GPS systemWhen combined with cross/slope, the single GPS system provides automated blade adjustments to oneside of the blade for cross slope and elevation control.

1.3 Dual GPS systemWhen two GPS receivers are used, the system provides automatic elevation control to both sides of theblade or bucket.

1.4 GPS receiverA GPS receiver is mounted on top of a mast above the cutting edge or on counterweight. GPS satellitesignals received by the GPS receiver help define the horizontal and vertical position of the blade orbucket. This allows the system to precisely measure the machine’s blade/ bucket tip location in real-timewith centimeter-level accuracy.

1.5 MastA rugged steel mast is used for mounting the GPS receiver above the blade cutting edge orcounterweight for optimum GPS satellite reception.

1.6 RadioThe communications radio is mounted on the machine cab to ensure maximum signal reception. Theradio receives real-time compact measurement record (CMR) data from the GPS base station radio forcalculating high-accuracy GPS positions. Radio broadcast frequencies work in all weather conditions,penetrating clouds, rain and snow. This allows the machine control system to accurately control bladeoperation in fog, dust and at night.

Page 296: Vol 2 onshore pipelines the road to success 3rd edition

50

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

1.7 In-cab 3D displayThe in-cab graphical 3D display/control box with keypad allows the operator to interface with the systemusing push buttons and a colour monitor. As the machine works the operator can view information inreal-time, including machine location, blade / bucket position and elevation relative to the design plan.The system uses design files that are stored on a compact flash data card and inserted into a slot belowthe keypad.

1.8 Light barsThree light bars are mounted in the machine cab and provide vertical and horizontal guidance to theoperator.

• Two “vertical guidance” light bars visually indicate where the blade/bucket tips are relative tothe grade.

• The “horizontal guidance” light bar indicates blade/bucket location relative to the selectedhorizontal alignment.

1.9 ControlsThe controls are located on the levers in the cab. They are used to activate the automatic/manualoperating modes and increment/decrement switches.

1.9.1 • Automatic/manual buttonAllows the operator to toggle between automatic and manual mode. In automatic mode, the systemautomatically controls blade adjustments. In manual mode, the operator manually controls theblade/bucket, while using cut/fill information on the display and light bars to guide blade movements.

1.9.2 • Increment/decrement switchAllows the operator to set elevation offsets at a preset distance from the design plan to optimize cuttingdepth in various soil conditions or accommodate sub base fill requirements.

2. Features and BenefitsMachine control systems are easy to use and deliver a wide range of benefits. In order to evaluate thepotential benefits of the systems mounted on the machines, comparison tests were carried out on twoshort road works running in parallel on the same terrain. One roadwork was carried out using thetraditional method, the other used exactly the same equipment but with the machine control systemsinstalled. Larger scale tests should be carried out to obtain a meaningful quantification of the results butthe initial results show the definite benefits listed below.

2.1 Increased productivity and efficiency• Increased productivity• Accurate operations lead to reduced guesswork and costly rework• Reduced survey costs • Reduced material useuse• Reduced operating costs• Extended work days• Increased operator efficiency• Improved accuracy

2.2 Assistance with labour shortages• Reduced labour requirements and costs• Allows customers to get the job done more quickly and efficiently• Reduced need for staking, string lines and grade checkers• Improved operator confidence, empowering them by delivering grading information to the cab

2.3 Worksite Safety• Grade stakers and checkers are removed from the worksite and away from the heavy

equipment• Safety interlock features can ensure blade security when the system is inactive• Improved road safety by maintaining consistent crowns

Page 297: Vol 2 onshore pipelines the road to success 3rd edition

51

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

2.4 Improved employee satisfaction and retention• Elevation control brought to the cab by in-cab display• Operators empowered with real-time results• Real-time feedback on progress increases job satisfaction, eliminates guesswork and reduces

operator stress• Improved operator skills, taking performance to the next level• Investing in the latest technology leads to a sense of value and trust by the operator

3. Current industries using this technology• Road building and excavation have used machine control systems successfully in the past.• They have achieved the benefits in processes from ranging from bulk use of materials for site

development to paving.• Compaction companies also use this to determine pass counts and compaction values.

4. Future benefits to the Pipeline Industry• Site line work to show ROW, environmental areas, center of ditch line.• Ability to record GPS locations with machine blade / bucket.• Machine guidance at all times for the operator.

Page 298: Vol 2 onshore pipelines the road to success 3rd edition

52

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.6.2.2 Data Transfer

What is a Data Transfer System?Data transfer systems are data transmission and positioning systems for construction machines, basedon state-of-the-art data transmission technology.

Most data transfer systems provided by construction equipment manufacturers can provide data sets attwo levels.

• The basic level is in general less sophisticated, requires no integration with the machineelectronics, and can be installed on many types of machine, irrespective of their brand.

• Advanced parameters are linked to data coming out of the electronic machine controller.Advanced parameters include fault codes, fuel consumption and idle time.

Data transfer systems are designed to provide information which can help contractors, optimizeproductivity and increase machine use.The Association of Equipment Management Professionals (AEMP) protocol calls for data transfersystems to use a common XLM-based dataset, providing 4 parameters that are common to most OEMs

How does it work?Construction machines are equipped with an integrated GPS receiver, modem and antenna. Using thistechnology, machine data is then transferred to a central database via GPRS/GSM mobile network orsatellite. GPS is also used to detect the exact machine location.

All that is needed to access information about a specific construction machine is an internet-connectedcomputer and a personalized and secure user log-in.

What information does a data transfer system provide?The generic data available from a basic system is as follows:

• Location• Geofencing data (see below)• Timefencing data• Hours

More advanced systems can include the following data:• Engine start / stop• Fuel level• Operator / machine ID• Fuel consumption• Idle time• Fuel spent in idle mode• Digital switches• Maintenance scheduling• Events and diagnostics.

Below are some examples of functions above, and the screens that construction equipmentmanufacturers make available with their systems.

The screens below show the location of a fleet of machines. This also allows the tracking of machinemovement over any specified time period.

Page 299: Vol 2 onshore pipelines the road to success 3rd edition

53

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Data transfer systems have the capability to establish “geofencing”, i.e. boundaries beyond which themachines are not supposed to be. Street maps and satellite views simplify setting up of site boundaries,providing valuable asset-tracking and security-monitoring tools. Additional features can include settingtimes for alerts, such as security alerts on nights or weekends only.

Position of the machine on the map can also be combined with other machine data (fuel level, alerts, idlevs working time), to provide a user-friendly dashboard, as in the examples below.

Daily hour reports keep track of how many hours per day machines have worked over a selected timeperiod, for better planning of machine usage and fleet size. Alternatively, the system can instantly relateand compare the use of all assets on a job site. This will allow the rapid identification of assets workingunder capacity.

Page 300: Vol 2 onshore pipelines the road to success 3rd edition

54

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Another key function that can be performed by the data transfer system is service planning and fastparts ordering.The system can indicate impending service requirements (how many machine hours are left until thatservice, and approximately what date the service will be needed on, based on past machine usage), or“to do” checklists for common preventive maintenance and service procedures. In some cases, the datatransfer system can even lead the user directly to ordering the parts needed for a specific maintenanceoperation.

Benefits and AdvantagesIn general, the benefits of data transfer systems can be summarized in two major areas:

1. Lower Owning and Operating Costs• Monitor and manage idle time and fuel usage• Avoid costly machine failures• Extend machine life through proactive maintenance and identification of harsh operation

Data transfer systems provide operation reports providing detailed fuel consumption information. It canbe analyzed on its own or compared to other machines or between operators using workshiftfunctionality, enabling the customer to take a proactive approach towards operator training orapplication in order to achieve best practice and drive down fuel costs. Likewise, simple features likedaily hours take the hassle out of administration and invoicing. Information is provided directly in the webportal, means operators don’t waste time looking for a specific gauge on the machine just to get thehour meter reading for example.

2. Increased Productivity• Know where the fleet is • Identify over and under-used assets• Improve logistics for fuel, transportation and service dispatch• Maximize asset up-time• Thanks to the above, help to keep jobs on schedule

Data transfer systems capture detailed machine use data where critical performance information likework and idle time, work mode, distance travelled and fuel consumption are displayed. Analysis of thedata enables the customer to look for areas of opportunity to enhance machine performance andproductivity. The data can also help in making machine acquisition decisions, for example is anothermachine required or can increased workloads be managed with the existing fleet?

Data Transfer Systems capture machine-specific alarms and error codes. Depending on the severity,immediate action can be taken by the customer or OEM dealer to avoid costly repairs and unscheduleddowntime. Smaller issues can be planned and taken care of at the next scheduled maintenance,reducing cost and increasing convenience.

Page 301: Vol 2 onshore pipelines the road to success 3rd edition

55

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

It should never be necessary to stand a machine down during a shift for routine maintenance. Ensuringthis however, and servicing machines efficiently requires planning. When will machines be due forservice? How many mechanics are required? What parts and tools are needed? Is the workshop bigenough? Data transfer systems typically incorporate service reminders, giving advance warning when amachine is due for service and enabling all service requirements to be fully planned well in advance, toreduce inconvenience and avoid downtime. And for machines in remote areas, the OEM dealer can usethe mapping functions to fully plan the route for the field service van and be sure they find the machinequickly, reducing travel costs.

There are also some additional benefits, including:• Monitoring unauthorized areas through geo-fencing• Identifying opportunities for operator training• Maintaining peak operating conditions to reduce emissions

Page 302: Vol 2 onshore pipelines the road to success 3rd edition

56

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Page 303: Vol 2 onshore pipelines the road to success 3rd edition

57

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Appendix 13.1.1

Conceptual Functional Specifications for a GIS-basedNear-Real-Time Construction Monitoring Tool

Table Of Contents

Foreword 59Purpose 59Scope 59

Potential Benefits 60Efficiency 60Quality 60Safety 60Environment 60

Features 61Electronic Data Interface/Interchange 61Flags And Notifications 61Reporting 61Techniques And Technologies 62

Data Groups 63Material Management 64Manpower 64Equipment 64Planning And Progress 64HSE And Social 64Engineering Data 64

Material Management 65Pipe Shipments 65Pipeyards 67Stores Information 69

Manpower 71The Accommodation Information 71Manpower Data 73

Equipment And Vehicles 76PMV Stores Locations 76Emergency Equipment 78Equipment Tracking Information 80Vehicles Tracking Information 82

Planning And Progress 85Daily Pipeline Progress Activities 85Pipeline Planning/Scheduling Activities 87

HSE And Social 89Points Of Interest (Hospitals, Medical Centers, Police Stations, Etc.) 89Accidents And Incidents 90Grievances And Complaints 92Areas Of Special Status 94

Engineering Data 96Crossings 96Access Roads 98

Page 304: Vol 2 onshore pipelines the road to success 3rd edition

58

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Marker Points 100Pipeline Routes 101Above Ground Installations (AGIs) 102Tie-In Points 104Fiber-optic Cables 105Additional Features, Geotechnical And Cathodic Protection Data 107

Recommended Technical Specifications 109Gis Software 109Connectivity To Data Sources 109Web Mapping Of Pipeline Data 109

Glossary

Page 305: Vol 2 onshore pipelines the road to success 3rd edition

59

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Foreword

Purpose

The purpose of this document is to recommend the basic functional specifications for developing a"near-real-time (near-live) monitoring tool” (NRT), a comprehensive project controls tool with a GIS-basedinterface, which can be used during the life-cycle of the pipeline construction project. This preliminaryphase would be succeeded by detailed technical specifications and subsequently actual development ofthe NRT.

Scope

The NRT aims to present an accurate outlook on the major aspects of the construction cycle as well asother significant events, as soon as they occur or can be recorded, and in a visual geographicalinterface. Updated feedback would include:

• Construction progress reporting

• Project information and documentation

• Assets and resources management

• Material control and traceability information

• Quality control data

These recordings set the foundation for an integrated GIS-based pipeline construction managementsystem that comprises data-rich feeds of information and dynamic reporting, and enhances theproactive involvement of senior project staff for an improved decision making process.To this extent, this document profiles the major relevant data groups, with specifics on what and how toacquire the details for each group. It also presents some recommendations for technical tools selection.

Page 306: Vol 2 onshore pipelines the road to success 3rd edition

60

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Potential Benefits

In line with the primary IPLOCA NC objectives, the development of this tool stimulates innovation in theprocesses of controlling the pipeline construction, and invokes improved technology techniques, marketsoftware, and R&D on new concepts to achieve this step forward. The results would have positiverepercussions on the construction phase of the project, specifically in the aspects of efficiency, quality,safety, and environment.

Efficiency

A successfully operational monitoring tool would instigate an overall improvement in efficiency of projectcontrol tasks, and in effect all related construction activities. An elaborate and well-rounded NRT wouldbe a useful project management tool to:

• Monitor site activities

• Retrieve up-to-date progress reports

• Foresee possible hiccups

• Take immediate action

Quality

The NRT would serve as near-live information storage and sharing container, with an interface to beused at different levels of project management, engineers, construction crew leaders, and projectpartners. Such a medium would have a positive effect on the quality of work done at supervisory level,and drill down to the direct manpower level.

Safety

Adopting this tool would potentially enhance safety by:

• Providing immediate alerts on safety and security threats and concerns that would otherwiseescalate without prompt action.

• Assisting management in better planning for safer activities related to manpower, includingaccommodation, transportation, and emergency plans by providing a multilevel view of theproject’s different locations and facilities.

• Cutting down site visits by supervisory personnel by providing remote access to most of theinformation required for improved decision making.

Environment

Environmental awareness is promoted through the use of this tool by:

• Better control and maintenance of project equipment with early notifications of breakdowns andspills, and better control of emissions.

• Identification of environmentally sensitive issues and zones, and propagating this knowledge to thedifferent project staff levels.

• Decreasing the carbon footprint created by the project supervisory personnel by reducing theneed for direct site visits, hence promoting “green construction culture”.

Page 307: Vol 2 onshore pipelines the road to success 3rd edition

61

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Features

The development of this platform must encapsulate state-of-the-art features and workflows built on theconcepts of a GIS interface, web accessibility, and shared data repositories. The tool would beempowered by:

• Links to existing project controls and logistics systems.

• Business features such as EDI development, flags, notifications, flexible reporting tools, andimproved procedures.

• Modern technologies and practices in systems development.

• State-of-the-art market tools.

• R&D on new concepts with innovation potentials.

Additionally, it is envisioned – for improved performance – that a central database would serve as themain information container for collection of extracted data, in addition to direct links to the existingsystems.

Electronic Data Interface/Interchange

For each of the data groups defined hereafter, an electronic data interface (EDI) will need to be puttogether with the related systems to which the NRT will link or extract information from. An EDI isgenerally defined as a standardised or structured method of transmission of data between two media,and in this context the EDI will govern what information will be collected for each data group, its format,in addition to how, when, and by whom it shall be acquired. Properly characterized and implementedEDIs are integral to the successful design and operation of the NRT.

Flags and Notifications

Flags and notification are essential features of the NRT. The idea is to have intelligent reminders orprompts that are automatically generated to highlight anomalies, arising points of concern, or cues forfurther considerations, and that require action (flags) or raise awareness (notifications). The trigger forthese flags and notifications would be based on the data processed from various data groups, whiletheir design and scope needs to be based on a well-founded knowledge of the construction workflows,and the different roles of the project players who would need to interpret these flags and takeconsequent actions. A flag section is referenced as a guideline within each data group where applicable.Flags and notifications would take on different formats, including RSS feeds, SMS, multimediamessages, emails, or even image and video feeds, with access through the NRT interface. Theaccessibility to these flags would be linked to different roles on the project, for example equipmentnotifications would be directed mainly to plant managers and engineers whereas material shortageswould be displayed for material personnel and control managers. The format for these notificationsshould allow for an adequate level of flexibility to meet different needs and work practices by differentplayers, for instance the ability to subscribe to specific RSS feeds upon demand and secure limitedaccess to sensitive feeds.

Reporting

The ability to extract various formats of progress, statistical, analytical, and listing reports from the NRTinterface is one feature of substantial benefit to managers. While formal reports can be accessedthrough links to the electronic document management system (EDMS), the NRT must accommodatemore interactive reporting techniques including pivot tables, dashboard queries, data mining, and visualcharts.

Page 308: Vol 2 onshore pipelines the road to success 3rd edition

62

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Techniques and Technologies

The concept of NRT inherently implies the incorporation of the latest innovations to achieve the near-real-time handling of information. Whereas current and future solutions would be welcome additions forincorporation into the development of the tool, the following are some suggestive samples that can beeffectively employed for data production, capturing, or processing, and that have been used within onesetting in pipeline construction.

Modern Communication technologiesThe field of IT and communication is always on the move, and designing the NRT entails making use ofthe availability of innovations in this field. Connectivity examples include satellite connectivity, WiMAX andWiFi technologies, GPRS, and GSM.

Improved Business ProceduresConstruction workflows are continually nourishing on advancement in electronics and communications,and in turn the digital aspects of many procedures have improved significantly. Although the decision onthe construction procedures is not within the scope of the NRT, the use of techniques that allow forcapturing digital data in the field would be a major advantage. Examples of such technologies includecomputerized NDT, AUT, automatic welding, and GPS surveying.

Engineering and Construction Control SoftwareImprovement in business procedures has been accompanied by development of data control softwarethat tackles the related workflows. The more the NRT makes use of such systems, the better the qualityof available data. These control software comprise such categories as:

• Pipeline design software

• Document management systems: e.g. VBC™, Documentum™, etc.

• Material management systems: e.g. Talisman™, Marian™, etc.

• Quality control systems

• GIS systems (refer to technical specifications section)

• Vehicle tracking systems

Hand-Held MachinesHandheld machines or PDAs are significant tools to speed the control aspects of construction activities.Handheld forms can be used to replace traditional hardcopy documentation to record/register theprogress of construction activities like stringing, bending, pipe cutting, welding, and others. The benefitsof such advanced solutions would be apparent in the time saved on multiple processing of the data, theminimization of handling errors, and the speed with which the data can be provided. Alternativehandheld machines would have a GPS capability for taking location, direction, and digital images ofrelevance.

Page 309: Vol 2 onshore pipelines the road to success 3rd edition

63

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Data Groups

Thorough functional specifications for the NRT defined above would address the different domains ofthe construction phase of the pipeline project. Fig. 1 below is an indicative schematic of the informationassociated with the data groups identified in this document.

Fig. 1 Functional Specs - Data Groups Relations

The data groups will be illustrated in the following sections by identifying the detailed informationrequired in each group, the source and methods of obtaining them, the format, the frequency of update,and who is responsible for collecting them. The following data groups will form the basic functionalspecifications for the NRT tool inputs.

Page 310: Vol 2 onshore pipelines the road to success 3rd edition

64

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Material Management

• Pipe shipments

• Pipeyards

• Stores information

Manpower

• Accommodation information

• Manpower data

Equipment

• Plant machinery and vehicle stores

• Emergency equipment

• Equipment tracking information

• Vehicle tracking information

Planning and Progress

• Construction progress of activities

• Planning/scheduling of activities

HSE and Social

• Points of interest (hospitals, medical centers, police stations etc.)

• Accidents and incidents

• Grievances and complaints

• Areas of special status

Engineering Data

• Crossings

• Access roads

• Marker points

• Pipeline routes

• AGIs

• Tie-in points

• Fiber-optic Cables

• Geotechnical and cathodic protection data

Page 311: Vol 2 onshore pipelines the road to success 3rd edition

65

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Material ManagementThis main group comprises the following data group classes:

• Pipe shipments

• Pipeyards

• Stores information

Pipe Shipments

DescriptionThis data group covers pipe shipment data and related features such as port/harbour locations. Themain purpose of this section is to provide all information related to the delivery of line pipe to sites forexpediting purposes.

Data Delivery to the NRT ToolThe EDMS and expediting/shipment tracking (ExTr) systems are the main sources of information for thisdata group. The NRT must be dynamically linked and/or integrated with the relevant systems to ensurelive GIS-based update of the line pipe shipments information.

General Information

Data SpecificsSpatial (Geographical) DataHarbour location: The harbour location refers to the area(s) of the main entry of line pipes to thecountry. This would be a representation of the geographical data, in this case the location features andboundaries.

Non-Spatial DataNon-spatial data for this group are:

Contact Information: This includes the main contact details of the person who is responsible forlogistics related to the pipe shipments at the harbour. The EDMS contact module (CMod) will be used tostore this information and EDIs will be used to extract required information to the NRT data containers.

Expediting/Tracking Information: This includes shipment details such as the reference number,expected arrival date, status, actual arrival date, total number of pipes, and the total number of pipesexpected to be received at that harbour per type. These data will be extracted from the ExTr system viaa live link and EDI. The shipment reference number(s) will act as the key link(s) between the two media.

Expediting Documents: These include shipment expediting and logistics documents, which arenormally stored in the EDMS. The link between the NRT and the EDMS will be the shipment referencenumber. Once the link is activated, a query is sent to the EDMS to display documents/drawings relatedto the shipment in question, on the NRT interface.

Digital Photos: Digital photos will be taken periodically and geo-referenced for the harbour(s), and willbe stored in the EDMS; a link between the NRT and the EDMS will be established. The linking querybased on the harbour in question will extract all related photos for display.

Page 312: Vol 2 onshore pipelines the road to success 3rd edition

66

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Data Details/GIS Attributes

Flags/NotificationsWithin this data group, flags/notifications are related to shipment statuses and pipe delivery times. Theirpurpose is to provide early alerts about events that would potentially affect pipe shipments and delaysubsequent construction activities or cause resources to be idle. Sample alerts include:

1 Connection type refers to the way the data is accessed from the original source.2 Extract refers to the process of importing the data from the original source at the defined frequency update interval to the central storage database of the NRT.3 Link refers to the process of directly accessing the data from the original source and displaying them on the NRT GIS-based interface on demand.

Page 313: Vol 2 onshore pipelines the road to success 3rd edition

67

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Pipe Shipment Data - Workflow & EDIs

Pipeyards

DescriptionThis data group covers pipeyard locations in addition to line pipe management and control data. It isintended to assist material and logistics teams in handling line pipes efficiently.

Data Delivery to the NRT ToolEDMS and MMS are the main sources of information for this data group. The NRT tool must bedynamically linked or integrated with the relevant systems to ensure live GIS-based update of thepipeyard’s information.

General Information

Data SpecificsSpatial (Geographical) DataPipeyard location is the geographic information for this data group. Spatial data are mainly the externalboundaries of the pipeyard, or just a simple point presentation in case there are no engineering drawingsavailable for the pipeyards. An EDI is to be deployed to capture the graphical information from the CADsystem to the GIS interface automatically. To achieve this task, all pipeyard drawings must be properlycreated and geographically projected.

Non-Spatial DataNon-spatial data for the GIS are divided into three sets:

Contact Information: This includes the main contact details for the person who is responsible for alllogistics related to the pipeyard, the pipeyard superintendent. The EDMS contact module will be used tostore this information and EDIs will be used to extract this information to the GIS.

Page 314: Vol 2 onshore pipelines the road to success 3rd edition

68

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Pipe Material Management Information: This includes the number of pipes available, the total numberof pipes expected to be stored at the pipeyard, the date the last update was done to the pipeyardmaterial management information, and the kilometers of the project that will be covered by this pipeyardcapacity. All this information will be extracted from the material management system via live link and/orEDI to the NRT. The pipeyard name will act as the main link between the two systems. This link will beused as well to retrieve detailed reports from the material management system about each and everypipe in the yard.

Digital Photos: Digital photos will be taken frequently for the pipeyards where pipes are stored. Thesephotos will be kept in the EDMS where a link, the pipeyard name, between the NRT and the EDMSwould be established. Once the link is activated, a query will be sent to the EDMS to extract all photosrelated to the pipeyard in question.

Data Details/GIS Attributes

Flags/Notifications

Page 315: Vol 2 onshore pipelines the road to success 3rd edition

69

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Pipeyards Data - Workflow & EDIs

Stores Information

DescriptionThis data group handles store locations in addition to the data related to material management (otherthan line pipe material). Its main purpose is to help material personnel maintain a better control of thelocal material required for project execution by providing updated inventories.

Data Delivery to the NRT ToolEDMS and MMS are the main sources of information for this data group. The NRT must be dynamicallylinked or integrated with the relevant systems to ensure live GIS-based update of the stores information.

General Information

Data Specifics

Spatial (Geographical) DataThe store location is the geographic information for this data group. Spatial data are mainly the externalboundaries of the storage area, or just a simple point presentation in case there are no engineeringdrawings available for the stores. An EDI is to be deployed to capture the graphical information from theCAD system to the NRT directly. To achieve this, all stores drawings must be properly created andgeographically projected.

Non-Spatial DataNon-spatial data for the GIS is mainly divided in three sets:Contact Information: This includes the main contact details for the store material superintendent, theperson who is charge for the store and for all logistic issues related to the store. EDMS contact modulewill be used to store this information and EDIs will be used to extract this information to the NRT.

Page 316: Vol 2 onshore pipelines the road to success 3rd edition

70

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Stores Material Management Information: This includes a link to some queries and dynamic reportsextracted from the material management system to reflect the material status, material balances,material shortages, and material take-off reports in addition to the kilometers of the project that will becovered by this store. All this information will be extracted from the material management system via alive link/EDI to the NRT. The store name will act as the main link between the two systems.Digital Photos: Digital photos will be taken frequently for the stores. These photos will be kept in theEDMS where a link, the store name, between the NRT and the EDMS is established. Once the link isactivated, a query will be sent to the EDMS to extract all photos related to the store in question.

Data Details/GIS Attributes

Flags/NotificationsAlerts related to stores would include:

Page 317: Vol 2 onshore pipelines the road to success 3rd edition

71

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Stores Data - Workflow & EDIs

Manpower

• Accommodation information

• Manpower data

The Accommodation Information

DescriptionThis data group refers to camps locations, layouts, accommodation details such as capacity andvacancies, and any other related information. Its main purpose is to assist in controllingmobilization/demobilization activities, and make sure logistics arrangements are in place to handlemanpower needs.

Data Delivery to the NRT ToolEDMS, Camps Control System (CCS) and the project schedules are the main sources of information forthis data group. The NRT must be dynamically linked or integrated with them to ensure live update ofthe camp’s information.

General Information

Page 318: Vol 2 onshore pipelines the road to success 3rd edition

72

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Data SpecificsSpatial (Geographical) DataSpatial camp information mainly refers to the external boundaries of the camp. To eliminate theredundant work of retracing the camp layout in the NRT, EDIs need to be developed to capture thegraphical information from the CAD system directly. To achieve this, all camp drawings must be properlycreated and geographically projected.Non-Spatial DataNon-spatial camp data is mainly divided into the following sets:Contact information: The EDMS contacts module will be used to store contact information for thecamp key contact. The camp name will be the reference to extract the contacts data from the EDMSCMod to the NRT.Planning/Progress Information: This includes the camp construction date, the progress ofconstruction, and camp demobilization date. All this information would be extracted from the schedulingsystem via a live link or EDI to the NRT. This link between the construction schedule and the camp datais typically established using four fields to identify different schedule activities related to the camp. Whileone field might be sufficient, additional fields provide a more accurate depiction of progress.Camp Accommodation Information: This will include the number of camp residents, their statuses,the vacancies per type of room, camp facilities, and related details. This information will be extractedfrom the camp control system via a live link or EDI to the NRT. The camp name is the linking property.Engineering/Logistics Information: Logistics documents include approvals, permissions, andagreements among others, whereas engineering documents include camp design and constructionlayouts/drawings. The link between the NRT and the EDMS will be the camp name. Once the link isactivated, a query will be sent to the EDMS to extract all documents and drawings related to the campin question.Digital Photos: The construction team would be required to submit for each camp two sets of photos,one set for the camp sites status before construction and the other set after construction. Those photoswill be stored in EDMS where a link with the NRT is established. Once the link is activated, a query willbe sent to the EDMS (web client) to extract all photos related to the camp in question.

Data Details/GIS Attributes

Page 319: Vol 2 onshore pipelines the road to success 3rd edition

73

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Flags/NotificationsAlerts related to accommodation/camps are primarily targeted at providing early feedback of issuesrelated to manpower accommodation, assisting decision makers in the administration of manpowerlogistics activities, and addressing any related safety or security concerns. These would include:

Accommodation/Camps Data - Workflow & EDIs

Manpower Data

DescriptionThis data group refers to construction site locations with available human resources in each by skill type.Its main aim is to provide management with a quantitative tool to audit and control manpowerdistribution, and assess the need for any changes that would improve productivity.

Data Delivery to the NRT ToolEDMS, daily progress reports, organisation charts, and daily time sheets are the main sources ofinformation for this data group. The NRT must be dynamically linked or integrated with the relevantsystems to ensure live update of the manpower information.

Page 320: Vol 2 onshore pipelines the road to success 3rd edition

74

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

General Information

Data Specifics

Spatial (Geographical) DataThe actual locations of the construction sites or the actual spread where the construction team isoperating, act as the geographic information for this data group. This information will be updated dailyand dynamically using an EDI from the daily progress reports. This EDI will translate the actual sitelocation (surveying coordinates) or spread (from/to km) into linear objects reflecting the actualgeographic location of the construction.

Non-Spatial DataNon-spatial manpower data is mainly divided into three sets:

Contact information: The EDMS contacts module will be used to store contact information for eachsite construction team supervisor. The team reference code will be used as the unique identifier for thecontacts and the link between the EDMS and the NRT.Manpower: This includes the number of staff available at the construction site per category. Thisinformation will be extracted from the daily progress report, the organisation chart, and the daily timesheets. The link between these systems and the NRT will be the construction team reference code.Typical categories are:

• Management

• Senior engineers

• Junior engineers

• Pipeline Welders

• Surveyors

• Skilled labourers (other than welders)

• Non-skilled labourers

• Crane operators

• Machine operators (other than cranes)

• Drivers

Manning Schedules: These include the detailed schedules of manpower resources for eachconstruction spread. This report is generated from the timesheet system and is linked to the NRT usingthe construction team reference code. Once the link is activated, a query will be sent to the timesheetsystem to extract all related information for the period in question.

Page 321: Vol 2 onshore pipelines the road to success 3rd edition

75

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Data Details/GIS Attributes

Flags/Notifications

Page 322: Vol 2 onshore pipelines the road to success 3rd edition

76

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Manpower Data - Workflow & EDIs

Equipment and Vehicles

• Plant machinery and vehicles (PMV) stores• Emergency equipment• Equipment tracking information• Vehicle tracking information

PMV Stores Locations

DescriptionThis data group covers project local stores for equipment and vehicles (plant machinery and vehiclesstores) and all relevant information. The main purpose of this group is to provide and control sparesrequired for the operation and maintenance of project equipment, and to ensure there are noconstruction delays due to shortage.

Data Delivery to the NRT ToolAll data related to the location and details of the equipment stores will be collected directly from the PMVcontrol system. A unique identifier for each equipment store will be given as per the project standards.This identifier will be used to link the NRT with the PMV system and EDMS.

General Information

Page 323: Vol 2 onshore pipelines the road to success 3rd edition

77

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Data Specifics

Spatial (Geographical) DataPMV stores’ geographical locations are the spatial information for this data group. This would be theexternal boundaries of the storage area, or just a simple point presentation in case there are nodrawings available for the PMV stores. An EDI is to be deployed to capture the geographical informationfrom the CAD system to the NRT directly. To achieve this, all drawings developed for stores must beproperly created and geographically projected.

Non-Spatial DataNon-spatial data is mainly divided into these sets:

Contact Information: This includes the main contact details for the PMV store superintendent, theperson who is charge for the store and related logistical issues. The EDMS contact module will be usedto store this information and EDIs would be deployed to extract this information to the NRT.PMV Stores Spare Parts List: An inventory report for the spare parts that are available in the PMV storeper each equipment/vehicle category will be retrieved from the PMV system to the NRT interface, via alive link or EDI where the store name and the equipment/vehicle category will act as the link.Digital Photos: Digital photos will be taken frequently for the PMV stores. These photos will be saved inthe EDMS where a link - the PMV store name - between the NRT and the EDMS is established. Oncethe link is activated, a query will be sent to the EDMS to extract all photos related to the PMV store inquestion.

Data Details/GIS Attributes

Flags/Notifications

Page 324: Vol 2 onshore pipelines the road to success 3rd edition

78

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Equipment Stores - Workflow & EDIs

Emergency Equipment

DescriptionThis data group refers to locations of emergency equipment and facilities. Its purpose is to providedetailedinformation regarding emergency equipment so it can be located easily in case of an emergency.

Data Delivery to the NRT ToolThe EDMS, the emergency equipment HSE report, HSE system, or PMV system would serve as themain sources of information for this data group. The HSE department must maintain the databaserelated to emergency equipment up to date reflecting the latest status, details and availability.

General InformationData Specifics

Spatial (Geographical) DataThe locations of the emergency facilities – the X and Y coordinates – serve as the geographicalpresentation of the emergency equipment data group in the NRT interface.Non-Spatial DataNon-spatial emergency equipment data are mainly divided into two sets:Contact information: The EDMS contacts module will be used to store the contact details concerningeach person responsible for any emergency facility in each site or location along the pipeline route. Eachemergency facility will be given a unique identifier which will be used as a link to the EDMS contactsmodule.

Page 325: Vol 2 onshore pipelines the road to success 3rd edition

79

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Emergency Equipment Details: This includes the emergency depot type and its details. Thisinformation can be available in the HSE system or as an HSE report loaded in the EDMS or in anequipment inventory system (PMV system). In all cases, the emergency facility reference number will beused to link to the relevant system and extract the required details for that facility.

Data Details/GIS Attributes

Flags/Notifications

Emergency Equipment - Workflow & EDIs

Page 326: Vol 2 onshore pipelines the road to success 3rd edition

80

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Equipment Tracking Information

DescriptionThis data group covers the locations and status of operational equipment along the pipeline route andrelated vital information. The concept behind equipment traceability is the capability of acquiring theactual location of any equipment at any given time. This will provide the management with powerful andeffective tools for controlling, reporting and studying the equipment operations closely, so that propermeasures are taken to improve the construction operations, productivity rates, risk management, andrescue requests responses. The equipment traceability system consists of four major components:

• A GPS-based tracking device installed on the equipment; this device will record and send, atminimum, the location and operation status of the equipment.

• A server with the proper hardware to receive the data transmitted periodically from each trackingdevice.

• Software to process the tracking information and save it within the database.

• Communications infrastructure (GPRS or GSM), which will serve as the media for datatransmission.

Data Delivery to the NRT ToolThe EDMS, the equipment tracking system, and the PMV system are the main sources of information.These systems will collect reference and active (live) information about the equipment in question.

General Information

Data Specifics

Spatial (Geographical) DataThe location of the equipment – the X and Y coordinates – is the geographical presentation for theequipment tracking data group. These data will be extracted from the equipment tracking systemperiodically and automatically, typically through an embedded device that transmits relevant locationstatus information for processing. Each equipment will be given a unique reference number, which willact as the link between the NRT and relevant systems.

A sample basic format for this number is: TTT-NNNN where:

• TTT is a three letter identifying the equipment type (e.g. EXC for excavator, CRN for crane)• NNNN is a sequential number per equipment

Non-Spatial DataNon-spatial equipment tracking data is mainly divided into four sets:Contact Information: The EDMS contacts module will be used to store the contact details for eachperson responsible for operational equipment in each location along the pipeline route. The equipmentreference number will be used as a link to EDMS contacts module.Equipment List: This includes a list of the available major equipment per category and their locations.The list includes categories involved in the pipeline construction operations such as:

• Earth-moving including excavators, trenchers, bulldozers, loaders, scrapers, graders, and rollers.

• Pipe handling (lifting and loading) including cranes, side booms, fork lifts.

• Pipe-bending machines.

• Pipe-welding machines.

• Trailers and pipe carriers

Page 327: Vol 2 onshore pipelines the road to success 3rd edition

81

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Equipment Details: For each of the above types, a detailed list of reports will be available showingadditional information, such as manufacturer, capacity, part suppliers, fuel type, power, and maintenanceschedule for every equipment within the selected category. This information will be extracted from thePMV system via a live link or EDI with the NRT. These data will be shown on the NRT interface once thelink to the PMV system is activated, using the equipment reference number.Active Information: The main data to be shown is the equipment type and operation status (idle oroperating, static or moving). This inforamtion will be extracted from the equipment tracking systemperiodically and automatically via a live link or EDI. The reference number will be used to link the NRTwith the equipment tracking system.Digital Photos: Digital photos will be taken frequently for equipment to show the equipment visually,and will be saved in the EDMS. A link, the equipment reference number, is established between the NRTand EDMS. Once the link is activated, a query will be sent to the EDMS to extract photos related to theequipment in question.

Data Details/GIS Attributes

Flags/Notifications

Page 328: Vol 2 onshore pipelines the road to success 3rd edition

82

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Equipment Tracking - Workflow & EDIs

Vehicle Tracking Information

DescriptionThis data group refers to the locations of project operational vehicles along the pipeline route withrelated vital information. This is almost similar to the previous group, the equipment tracking data group,except that it covers moving passenger vehicles, such as cars and buses, and any operation thatincludes distance movement like material transport. This will provide the management with severalpowerful and effective tools for controlling and reporting the use of vehicles in the project, so that propermeasures are taken to improve the use of these vehicles, manage risks, and respond to rescuerequests.The vehicle traceability system consists of four major components:

• A GPS-based tracking device to be installed on each equipment; this device will record and send,at minimum, the location and status of the equipment.

• A server with the proper hardware to receive the data being transmitted periodically from eachtracking device.

• Software to get the tracking information and save it in a database.• Communications infrastructure (GPRS or GSM), which will serve as the media for data

transmission.

Data Delivery to the NRT ToolThe EDMS, the vehicle tracking system, the journey management system (JMS), and the PMV systemare the main sources of information for this data group.

General Information

Page 329: Vol 2 onshore pipelines the road to success 3rd edition

83

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Data Specifics

Spatial (Geographical) DataThe location of the equipment – the X and Y coordinates – is the geographical presentation for thevehicle tracking data group. These data will be extracted from the embedded unit of the vehicle trackingsystem periodically and automatically. Each vehicle will be given a unique reference number, which willact as the link between the NRT tool and the relevant systems.A simple format for this number is: TTT-NNNN where:

• TTT is a three letter identifying the vehicle type (e.g. BUS for buses, 4WD for four-wheel drive cars)

• NNNN is a sequential number per vehicle

Non-Spatial DataNon-spatial vehicle tracking data is mainly divided into four sets:Contact Information: The EDMS contacts module will be used to store the contact details for eachperson responsible for operational vehicles in each location along the pipeline route. The vehiclereference number will be used as a link to the EDMS contacts module.Vehicle List: This includes a list of the available vehicles per category such as:

• Trucks

• Buses

• Four-wheel cars

• Saloon cars

Vehicle Details: For each of the above types, a detailed list of reports will be available showingadditional information, such as brand, manufacturer, capacity, part supplier, fuel type, power, andmaintenance schedule about each vehicle within the selected category. This information will beextracted from the PMV system via a live link or EDI with the NRT. The vehicle reference number will actas the link between the two systems.Active Information: The vehicle type and operational status (static or moving) are the major data to beshown on the NRT interface. These data will be extracted from the vehicle tracking system and journeymanagement system periodically and automatically via a live link or EDI. The operational vehiclereference number will be used to link the NRT with these systems.Digital Photos: Digital photos will be taken frequently for each vehicle to show the vehicle visually, andwill be saved in the EDMS. A link, the vehicle reference number, between the NRT and the EDMS isestablished. Once the link is activated, a query will be sent to the EDMS to extract all photos related tothe vehicle in question.

Data Details/GIS Attributes

Page 330: Vol 2 onshore pipelines the road to success 3rd edition

84

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Flags/Notifications

Vehicle Tracking - Workflow & EDIs

Page 331: Vol 2 onshore pipelines the road to success 3rd edition

85

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Planning And Progress

This data group comprises the following two classes:

• Construction progress of activities

• Planning/scheduling of activities

The contents of each section represent different stages of the construction, namely on-site activitiesversus planned schedule. The flags and notifications will be considered within the context of the twoclasses.

Daily Pipeline Progress Activities

DescriptionThe daily progress of the pipeline main construction activities in kilometer ranges are shown andprojected in the NRT interface on a near-real-time basis (a maximum delay of one day). The mainactivities of pipeline construction operations are:

• Route clearance (clearance, de-bushing, demining, etc.)• Route survey• ROW preparation (top soil removal, grading, etc.)• Stringing• Bending• Welding (end face preparation, joint welding, NDT, field joint coating)• Trenching (excavation, bedding, padding, etc.)• Lowering and laying• Backfilling• Hydrotesting• Cleaning and gauging• ROW reinstatement• Any other project specific activity

Each one of these activities will be treated as a separate data group for ease of viewing andmanipulation of data by the end user.

Data Delivery to the NRT ToolDaily progress reports, progress measuring and monitoring systems, and EDMS are the main sources ofinformation for these data groups. To ensure daily updates of the progress data groups, the NRT mustbe dynamically linked and integrated with the relevant information sources via EDIs. This will reduceredundant data entry efforts needed for updating the progress statuses.

General Information

Data Specifics

Spatial (Geographical) DataThe geographic information for this data group is the progress achievement of each activity per day inkilometers, from the start km to the end km. An EDI is to be deployed to capture the geographicalinformation from the daily progress report and project it directly to the NRT interface.

Page 332: Vol 2 onshore pipelines the road to success 3rd edition

86

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Non-Spatial DataNon-spatial data are mainly divided into two sets:

Daily Progress Information: This includes the progress report reference number, the report date, andthe progress achievement (distance in km). This information will be extracted from the daily progressreport or the progress measurement system via a live link or EDI. Additionally, this daily progress reportwill be kept in the EDMS, where it can be retrieved via a dynamic link using the report number as areference.

Digital Photos: Digital photos are to be taken for the daily progress activities. These photos are to bekept in the EDMS where a link, the report reference number, is established between the NRT and theEDMS. Once the link is activated, a query will be sent to the EDMS to extract all progress photos relatedto the specific pipeline construction activity for any specific period.

Data Details/GIS Attributes (For Each Pipeline Construction Activity)A similar data group is to be developed for each construction activity in the above list. This wouldinclude the information required for building the pipebook handover document, specifically related towelding, NDT, line pipe, and as-built survey data.

Progress Activities - Workflow & EDIs

Page 333: Vol 2 onshore pipelines the road to success 3rd edition

87

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Pipeline Planning/Scheduling Activities

DescriptionThis data group class refers to the construction schedule of the major activities on the pipeline. The NRTwill reflect the planned dates for the main construction works in kilometers. These activities include:

• Route clearance (clearance, de-bushing, demining, etc.)• Route survey• ROW preparation (top soil removal, grading, etc.)• Stringing• Bending• Welding (end face preparation, joint welding, NDT, field joint coating)• Trenching (excavation, bedding, padding, etc.)• Lowering and laying• Backfilling• Hydrotesting• Cleaning and gauging• ROW reinstatement• Any other project specific activity

Those activities must be identical to the way progress is measured, such that at any point of time acomparison can be made of planned versus achieved. Similarly, each one of these activities will betreated as a separate data group for ease of viewing by the end user.

Data Delivery to the NRT ToolThe planning/scheduling system is the main source of information for these data groups. The NRT toolmust be dynamically linked or integrated with the planning/scheduling system via EDIs to ensureautomatic update of modifications in the plan.

General Information

Data SpecificsSpatial (Geographical) DataThe planned route coverage of any activity in kilometers, from the start km to the end km, is thegeographic spatial information for this data group. An EDI is to be deployed to capture the graphicalinformation from the scheduling system and project it directly in the NRT tool interface.

Non-Spatial DataNon-spatial data are:

Planning and Scheduling Information: This includes the activity code, activity description, expectedearly start and finish dates, expected late start and finish dates, total float and the portion of the pipelinethat is planned under this activity. All this information will be extracted from the planning/schedulingsystem via a live link or EDI to the NRT. The activity code would act as the reference link between thesystems.Data Details/GIS Attributes (For Each Pipeline Construction Activity)A similar data group is to be developed for each construction activity in the above list.

Page 334: Vol 2 onshore pipelines the road to success 3rd edition

88

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Flags/Notifications

Planning/Scheduling Activities - Workflow & EDIs

Page 335: Vol 2 onshore pipelines the road to success 3rd edition

89

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

HSE and Social

• Points of interest (hospitals, medical centers, police stations, etc.)• Accidents and incidents• Grievances and complaints• Areas of special status

Points of Interest (Hospitals, Medical Centers, Police Stations, etc.)

DescriptionThis data group covers the location of hospitals, medical facilities, police stations, and any other pointsof interest with their contact details. Its main purpose is to provide fast access to key information forproject stakeholders.

Data Delivery to the NRT ToolAll data related to the location and details of point of interest will be collected directly by the HSE teamand stored in the HSE system or database if available. EDMS will be used to capture this information. Aunique identifier for each facility or point of interest will be given, based on a defined naming conventionsuch as TTT_NNNN where:

• TTT is a three-character code describing the type of facility(e.g. HOS for hospital, POL for police station)

• NNNN is a four-digit sequential number for each point of interest.

General Information

Data SpecificsSpatial (Geographical) DataThe location of the point of interest – the GPS X and Y – is the main geographical information in this datagroup.

Non-Spatial DataNon-spatial point of interest data are mainly divided into three sets:

Contact information: The EDMS contacts module will be used to store contact information for eachpoint of interest captured into the NRT. The reference code for each facility will be the unique identifierand the link to the EDMS contacts module.

Other Information: This includes the name, type, and the location description of the facility. Thisinformation can be entered directly into the NRT or extracted from the HSE system or database via alink, being the unique identifier of the facility.

Digital Photos: Digital photos taken for the points of interest will be saved in the EDMS where a link, thereference number, between the NRT and the EDMS is established. Once the link is activated, a querywill be sent to the EDMS to extract photos related to the point of interest in question.

Data Details/GIS Attributes

Page 336: Vol 2 onshore pipelines the road to success 3rd edition

90

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Points of Interest - Workflow & EDIs

Accidents and Incidents

DescriptionPipeline construction accidents/incidents, their locations, details, categories, and related reports are allcovered and presented under this data group. Any incident (or accident) whether fatal, minor, or a nearmiss is to be recorded and presented on the NRT. The availability of such crucial information will exposethe safety status of the construction operations on a daily basis for decision makers, giving them anearly indication of the potential areas for improving the construction operations and staff behaviour,tohelp them become more safety-alert and conscious, and eventually achieve the target of zero fatalities.

Data Delivery to the NRT ToolThe EDMS incident recording module acts as the main source of information for this data group.To ensure daily update of the incident data group, the NRT must be dynamically linked or integrated withthe incidents recording module via an EDI. The incident reports are kept in EDMS, whereas the incidentsrecording module will provide all the attributes required to register the occurrence of this incident and itsvital information. A better approach would be the automation of the incident reporting process, forinstance using handheld devices equipped with GPS and a camera and carried by safety officers.The officer will record all related information on the handheld so that an incident report can be generatedautomatically and fed into EDMS and the incident recording module. The information recorded on thehandheld will constitute the attributes for that incident report and digital photos will be linked as well.An EDI will transfer all this information automatically to the NRT.

Page 337: Vol 2 onshore pipelines the road to success 3rd edition

91

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

General Information

Data Specifics

Spatial (Geographical) DataThe incident location - X and Y coordinates that are recorded as part of the incident report – is thegeographic information for this data group. An EDI is to be deployed to capture the graphical informationfrom EDMS incident recording module, and project it directly to the NRT.

Non-Spatial DataNon-spatial data include:Incident Report Details: These include the incident report number, the report date, the incident type,the incident category, and the incident description. This information will be extracted from the EDMSsystem on a daily basis via an EDI. The incident report reference number will act as the main linkbetween the NRT and the EDMS. Additionally, the actual incident report will be kept in the EDMS whereit can be retrieved through the NRT interface via a dynamic link using the report reference number.Digital Photos: Digital photos taken for the incident are to be kept in the EDMS where a link, theincident report reference number, is established between the NRT and the EDMS. Once the link isactivated, a query will be sent to the EDMS to extract photos related to the incident in question.

Data Details/GIS Attributes

Page 338: Vol 2 onshore pipelines the road to success 3rd edition

92

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Accidents/Incidents Information - Workflow & EDIs

Flags/Notifications

Grievances And Complaints

DescriptionWith the increased significance of social interaction especially in pipelines passing through populatedareas, grievances and complaints that are recorded against the project should be available for referencewithin the NRT, to assist management in taking corrective actions and plan activities with increasedsocial awareness.

Data Delivery to the NRT ToolGrievance reports are the main source of information for this data group. Therefore, the interfacemanagement department, logistics department, or equivalent entity would record any grievance orcomplaint that arises during construction. Among others, GIS team must be duly informed for properregistration within the NRT. This is achieved by adding the GIS team to the project distribution matrix forsuch issues.

General Information

Page 339: Vol 2 onshore pipelines the road to success 3rd edition

93

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Data Specifics

Spatial (Geographical) DataThe location where the complaint occurs - the GPS X and Y coordinates – will be registered as attributesfor the report in the EDMS. An EDI is to be used to upload the graphical location into the NRT fromEDMS attributes.

Non-Spatial DataThe main non-spatial data include:

Grievance Report Details: This includes the type and description of the grievance or complaint.These values will be saved as EDMS attributes for the reports, and the interface managementdepartment’s EDMS user will be responsible for inputting these data. An EDI is to be used to extractthese data into the NRT. The Grievances report reference number will act as the main link between thesystems. Additionally, the actual report will be kept in the EDMS where it can be retrieved through theNRT interface via a dynamic link (report reference number).

Digital Photos: Digital photos taken related to the grievance or complaint are kept in the EDMS where alink, the report reference number, is established between the NRT and the EDMS. Once the link isactivated, a query will be sent to the EDMS to extract all photos related to the grievance report inquestion.

Data Details/GIS Attributes

Grievances and Complaints - Workflow & EDIs

Page 340: Vol 2 onshore pipelines the road to success 3rd edition

94

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Areas of Special Status

DescriptionThis data group includes all areas of specific environmental, safety, or security concerns which mightaffect the pipeline operations. The system should spot these areas and display any significantinformation on the NRT interface to be reviewed as needed by key personnel for decisive action whenconstruction operations are near or within such areas. Contaminated sites, water sources, naturalreserves, waste emission sites, historical zones, and archeological sites are examples of environmentallysensitive areas covered by this data group. Access-restricted areas and military zones are examples ofspecial security areas whereas mine fields, unstable explosives zones, and socially unsafe areas areexamples of special safety areas.

Data Delivery to the NRT ToolHSE reports and surveys provide the main source of data for this group. The HSE team will ensure thatall related findings are properly distributed to concerned project teams, including the GIS team who canthus have access to any report or survey related to any area classified as of special status.

General Information

Data Specifics

Spatial (Geographical) DataThe outmost boundaries of the special area represent the geographic information for this data group. Ifavailable, an EDI should be developed to upload the geographical location into the NRT from electronicHSE reports/surveys. Alternatively, standard GIS functions would be used to create these features forthe NRT system, based on surveying reports.

Non-spatial dataThe non-spatial data for this group are mainly divided into three sets:

Contact information: The EDMS contacts module will be used to store contact information for personsresponsible for these areas. A unique reference number will be given for each site, and this will link theEDMS with the NRT.

Other Information: This includes the category of the site (e.g. environmental, safety, security), the typeof the special area (water source, contaminated site, restricted area, nuclear area, military area etc.), inaddition to details and description for this site. These values will be stored in the EDMS as properties forthe HSE/surveying report. An EDI will be used to extract these values from EDMS to the NRT. Thespecial site reference number will be used as the link between the systems.

Photos, documents and reports: Digital photos and reports related to the special area will be kept inthe EDMS, where a link (the special area reference number) between the NRT and the EDMS isestablished. Once the link is activated, a query will be sent to the EDMS to extract all documents andphotos related to the special area in question.

Page 341: Vol 2 onshore pipelines the road to success 3rd edition

95

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Data Details/GIS Attributes

Areas of Special Status - Workflow & EDIs

Flags/Notifications

Page 342: Vol 2 onshore pipelines the road to success 3rd edition

96

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Engineering Data

The NRT should also capture information about essential activities other than those directly linked to theconstruction of the line pipe itself. The key purpose of these data groups is to provide relevantinformation for the project stakeholders to consider in planning on-site activities for pipeline and observethe progress of additional supporting activities. The main source of information would be the engineeringand design documents, and they would fall under one of the following categories:

• Accessibility• Crossings• Access roads• Marker points

• Design• Pipeline routes• AGIs• Tie-in points• Fiber-optic cables

• Non-pipeline Features: geotechnical data and cathodic protection data• These include boreholes, soil resistivity information, cathodic test points, rectifiers, ground

beds, galvanic anodes, bond leads, etc.

• Any additional project-specific data groups

Crossings

DescriptionThis data group refers to all crossing types along the pipeline route such as gas pipes, oil pipes, fences,electric lines, telephone lines, water pipes, roads, railways, rivers, canals and ditches. Prompt access toaccurate information about crossings would assist construction personnel to prepare better forconstruction activities by highlighting what permits need to be prepared and what special constructionmethods need to be considered.

Data Delivery to the NRT ToolAlignment sheets, crossing drawings and the crossing register are the main sources of information forthis group. These documents are maintained within the EDMS, and EDIs are to be developed to capturetheir data from the relevant engineering documents directly to the NRT. Each crossing will be given aunique identifier as per the project standards. This unique reference will act as the link between the NRTand the EDMS or any other data container that might carry valuable information related to the crossings.

General Information

Data SpecificsSpatial (Geographical Data)Spatial crossing information is mainly the centerline of each crossings and the width of the crossing at itsbeginning and end. To eliminate the redundant work of retracing the crossings layout in the NRT, EDIsshould be developed to capture the geographical information directly. To achieve this task, all alignmentsheets and crossing drawings must be properly created and geographically projected. Moreover,crossing features that are required should be created on separate layers and according to proper CADstandards.

Page 343: Vol 2 onshore pipelines the road to success 3rd edition

97

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Non-Spatial Data

Non-spatial crossing data for NRT are mainly divided into the following sets:

Contact information: The EDMS contacts module will be used to store contact information for eachcrossing. The crossing’s unique name will be used as the unique identifier for the contacts. An EDI willbe adopted to capture contact data from EDMS to the NRT.

Others: This includes the crossing identifier, crossing type, crossing category, and reference to sitesurveys. An EDI is used to capture these data from the crossing register or EDMS to the NRT. Alldocuments related to a specific crossing whether drawings or site surveys, would be stored in EDMSwith properties holding the crossing identifier that would act as a link between the EDMS and NRT. Oncethe link is activated, a query will be sent to the EDMS to extract all drawings or documents related to thecrossing in question.

Digital Photos: The construction team is to submit for each crossing two sets of photos, one set takenbefore construction and the other set showing the status after construction. Those photos are kept inthe EDMS where a link, the crossing reference number, between the NRT and the EDMS is established.Once the link is activated, a query will be sent to the EDMS to extract all photos related to the crossingin question.

Data Details/GIS Attributes

4 Crossing Type per Crossing Category

5 Additional Properties

Page 344: Vol 2 onshore pipelines the road to success 3rd edition

98

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Crossings - Workflow & EDIs

Access Roads

DescriptionThis data group refers to the project existing and to-be-constructed access roads along the pipelineroute, with all relevant information. It is intended to assist management in logistics and constructionsupport functions by displaying accessibility options at different project locations.

Data Delivery to the NRT ToolAccess road drawings are the main source of information. The GIS team must be updated on anychanges on the access road drawings issued to have updated information within the NRT.

General Information

Data Specifics

Spatial (Geographical Data)Spatial access road information is mainly the centerline of the access road. To eliminate the redundantwork of retracing the access roads layout in the GIS interface, EDIs need to be developed to capture thegeographical information to the NRT directly. To achieve this task, all access road drawings must beproperly created and geographically projected. Moreover, access road features that are required shouldbe created on separate layers and according to proper CAD standards.

Non-Spatial DataNon-spatial access road data for GIS are divided into the following sets:Contact information: The EDMS contacts module will be used to store contact information for eachaccess road. The access road name will be used as the unique identifier to extract the contacts details.

Page 345: Vol 2 onshore pipelines the road to success 3rd edition

99

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Others: This includes the access road identifier, the name of the facility serviced, road type, anddescription. This information is typically available on the access road drawings. The EDMS operator willbe responsible for inputting the drawings with attributes into the EDMS, and the unique access roadidentifier would link the EDMS and NRT, to extract the drawings and data on demand.

Digital Photos: The construction team is to submit for each access road two sets of photos, one set isfor the access road status before construction and the other set is for the status after construction.Those photos would be kept in the EDMS and linked by the unique access road reference number tothe NRT for extraction on call.

Data Details/GIS Attributes

Access Road Data - Workflow & EDIs

Page 346: Vol 2 onshore pipelines the road to success 3rd edition

100

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Marker Points

DescriptionThis data group refers to the different types of markers for the constructed pipeline, such as aerial andground markers; this information would assist in tracing the pipeline design and as-built routes.

Data Delivery to the NRT ToolAlignment sheets and as-built data are the main sources of information for this data group.

General Information

Data SpecificsSpatial (Geographical Data)Spatial information for this shape file is mainly marker locations along the pipeline route. To eliminate theredundant work of retracing the marker points in the NRT, EDIs will be developed to capture the pointlocations of the pipeline marker directly. To achieve this task, all alignment sheets must be properlycreated and geographically projected, and marker points created on separate layers and according toproper CAD standards.

Non-Spatial DataNon-spatial data for the marker shape files is mainly the name and type of markers, which are typicallyavailable in the alignment sheets as block attributes. EDIs will be developed to extract the requiredvalues for use in the NRT.

Data Details/GIS Attributes

Page 347: Vol 2 onshore pipelines the road to success 3rd edition

101

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Marker Points - Workflow & EDIs

Pipeline Routes

DescriptionThis specific data group refers the pipeline routes considered at the different stages of the project,including at the design and as-built stages. Its purpose is to provide a geographical display of thepipeline centerlines in comparison with the other features shown on the NRT interface in order to assistin better visual planning.

Data Delivery to the NRT ToolAlignment sheets, route surveys, and other reference drawings maintained within the EDMS are the mainsources of information for this data group. The GIS team should be informed of any relevant updates tomaintain the latest accurate display of the route centerline within the NRT.

General Information

Data Specifics

Spatial (Geographical Data)Spatial pipeline route information refers mainly to the properly-projected pipeline centerline atengineering (and later as-built) stage. To eliminate the redundant work of retracing this information forthe NRT, EDIs need to be developed to capture the geographical information to the NRT directly fromalignment sheets and survey data. To achieve this task, all relevant drawings must be properly createdand geographically projected.

Page 348: Vol 2 onshore pipelines the road to success 3rd edition

102

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Non-Spatial DataThese include a route unique identifier with descriptive details of the route. Survey reports and referencedrawings will be maintained in the EDMS with proper attributes referencing the pipeline route. An EDMSquery/EDI will use the route identifier value to extract all documents or drawings related to a specificroute.

Data Details/GIS Attributes

Pipeline Routes Data - Workflow & EDIs

Above Ground Installations (AGIs)

DescriptionThis data group refers to AGI information along with the basic outline of the AGIs. These include facilitiessuch as block valves, check valves, pigging stations, pump stations, pressure boosting stations, andmetering stations. The information within this group helps present a visual clarified scope of the AGI fromwithin the NRT interface.

Data Delivery to the NRT ToolAGI drawings are the main source of information for this shape file. The GIS team should be informed ofany AGI drawings issued to update the NRT promptly.

Page 349: Vol 2 onshore pipelines the road to success 3rd edition

103

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

General Information

Data Specifics

Spatial (Geographical Data)Spatial AGI information is mainly the outline fence of the facility, the track leading to the facility and themain AGI point location. To eliminate the redundant work of retracing this information for the NRT, EDIsneed to be developed to capture the geographical information directly. All AGI drawings must beproperly created and geographically projected, and related AGI features created on separate layersaccording to proper CAD standards.

Non-Spatial DataThis includes the AGI unique identifier, AGI type and references to all AGI reports. The first two aretypically available on the AGI design drawing title block. The EDMS will be used to capture these valuesas attributes for the AGI drawing. The EDMS operator will be responsible to input these data in theEDMS. All AGI reports will be given an attribute that will hold the unique name of the AGI, and an EDMSquery/EDI will use this value to extract all documents assigned for a specific AGI with all relevantattributes.

Data Details/GIS Attributes

Page 350: Vol 2 onshore pipelines the road to success 3rd edition

104

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

AGI's Data - Workflow & EDIs

Tie-In Points

DescriptionThis data group refers to points where the pipeline ties in to external facilities outside the main scope ofwork such as gas lines, electric lines, water pipes, and other utilities. It is intended to provide a visualscope of the expected interaction with external players for management and other key players to assistin the coordination efforts.

Data Delivery to the NRT ToolAlignment sheets and any tie-in schedules available as a part of the tender or engineeringdocumentation are the main sources of information. The EDMS operator shall ensure that thesedocuments are readily available and up-to-date within the EDMS, and that any changes are highlightedto the GIS Team, to be incorporated within the NRT.

General Information

Data Specifics

Spatial (Geographical Data)Spatial information for this shape file is mainly the location of the tie-in points. To eliminate redundantdata-entry work, EDIs should be developed to capture the location of the tie-in points to the NRTdirectly. To achieve this task, all alignment sheets must be properly created and geographicallyprojected. Tie-in points should be created on separate layers and according to proper CAD standards.

Page 351: Vol 2 onshore pipelines the road to success 3rd edition

105

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Non-Spatial DataNon-spatial data for the tie-in points include the type of the facility that the project ties in, and anyspecial reports or construction references (e.g. before/after photos) that need to be considered in thetying-in process. It also includes contact information of personnel involved with this facility. A unique tie-in reference will be used to identify each tie-in point, and EDIs should be developed to extract the tie-ininformation to the NRT.

Data Details/GIS Attributes

Tie-in Points - Workflow & EDIs

Fiber-optic Cables

DescriptionThis data group refers to the routes of the fiber-optic cables, the cable pulpits, and the terminationpoints. Its purpose is to provide the FOC scope in visual display on the NRT to assist in planning relatedactivities.

Data Delivery to the NRT ToolFiber-optic design drawings and related cable schedules are the main sources of information for thisdata group. This information should be readily updated within the EDMS, and provided to the GIS teamwho will be responsible for displaying these data on the NRT interface.

Page 352: Vol 2 onshore pipelines the road to success 3rd edition

106

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

General Information

Data Specifics

Spatial (Geographical Data)Spatial information for this shape file is mainly the cable route, and locations of the pulpit and terminationpoints. To eliminate the redundant data-entry work, EDIs should be developed to capture thisinformation to the NRT directly. All fiber-optic cable general arrangement drawings must be properlycreated and geographically projected, and related features should be created on separate layers andaccording to proper CAD standards.

Non-Spatial DataNon-spatial fiber-optic cable data are mainly divided in two sets:Progress Data: The construction progress for the fibre-optic cable will be measured per KP (kilometerpoint). This information would be available in the progress monitoring system or the daily constructionreports. An EDI should be developed to capture this information to the NRT directly.Other Information: This includes the tag numbers for the optic cables, the pulpits and terminationpoints in addition to references for the faults reports and the test results. The tag numbers are typicallyavailable on the design drawings as block attributes. EDIs should be developed to extract the requiredtags and assign them to the relevant feature in the NRT. These references to fault reports and testresults are static values for the same section of the optical cable, and should be available in the EDMSfor extraction into the NRT.

Data Details/GIS Attributes

Page 353: Vol 2 onshore pipelines the road to success 3rd edition

107

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Fiber-optic Cables - Workflow & EDIs

Additional Features, Geotechnical And Cathodic Protection Data

DescriptionThis data group comprises information related to additional features of the pipeline not included underany of the previous sections, and of significant value to key personnel during the construction phase.This includes activities and reports such as boreholes, soil resistivity information, cathodic test points’data, rectifiers, ground beds, galvanic anodes, and bond leads. Data related to the design andinstallation locations, and the attributes of each feature are the main constituents of this group.

Data Delivery to the NRT ToolDesign documents/drawings, alignment sheets, test reports such as cathodic protection and resistivitytests, and construction progress reports are the main sources of information for this data group. TheEDMS team is responsible for ensuring that the EDMS is populated with the latest updates of these datain a timely fashion, so that the GIS team has access to the related information for displaying in the NRT.

General Information

Data Specifics

Spatial (Geographical Data)The main spatial information for this data group is the feature location. Wherever possible, EDIs shouldbe developed to capture the location points to the NRT directly. All alignment sheets and referencedrawings must be properly created and geographically projected, and related features created inseparate layers as per proper CAD standards.

Page 354: Vol 2 onshore pipelines the road to success 3rd edition

108

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Non-Spatial DataNon-spatial data for these features are mainly the reference ID and attributes. The reference IDs can beobtained from the design documents. EDIs should be developed to extract the required attribute valuesand assign them to the relevant feature in the NRT. Reference reports and static values would beavailable in EDMS and would be retrieved to the NRT by linking the unique reference ID.

Data Details/GIS Attributes

Additional Features – Workflow & EDIsWorkflows are dependent on the specific feature to be displayed on the NRT, and what type ofinformation is extracted, rather than linked from the EDMS. Whereas spatial and any contact data wouldbe extracted to the NRT database, reference documents, photos, and other non-spatial data would belinked via a query/EDI connecting on the unique identifier of the feature in question.

Page 355: Vol 2 onshore pipelines the road to success 3rd edition

109

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

Recommended Technical Specifications

This section presents general recommendations for the selection of technical tools to be used in thedevelopment of the NRT. It is intended as a guideline during the detailed system design phase,specifically for areas of technical significance related to building the GIS-based interface, acquiring datafrom system repositories, and the display of this information.These recommendations are derived from market studies of available open source and commercialsoftware, historical information, programming tools, common practices, modern technologies,standardized formats, and other relevant research items. The results recorded herewith are intended tohighlight key technical features to be considered to meet the conceptual functional specificationrequirements.

GIS Software

The GIS-based interface is one of the core concepts of the NRT. Careful selection of the GIS software tobe used is hence of vital importance. The selected software should:

• Have the capability to work with vector and raster data, so that combinations betweensatellite images and pipeline objects are possible.

• Run under different platforms and operating systems, such as MS Windows, Linux,and UNIX.

• Have interoperability with other GIS software, as GIS data from different sources and withdifferent formats might have to be readable.

• Be able to manage topology and 3D representations. This allows the user to have 3Doutlooks on the pipeline project for improved analyses.

• Produce good quality cartographic representations. The additional advantage of preparingdetailed project layouts is a very useful tool for construction teams.

• Allow for developments with common languages like VB and C++, so that users can add andmanipulate scripts for more efficient use.

• Work with large data structures, as the pipeline project would entail a huge amount of data.• Allow advanced spatial analysis of vector data and raster data, simultaneously if possible.• Allow for multilingual interfaces.

Connectivity To Data Sources

With a wide scope of information to handle, the NRT would have to not only extract but also link toexisting databases, to make use of data in existing control systems. Finding the right connectivity toolsis a critical factor in ensuring the data is not only provided promptly, but also accurately.Based on our review of common connectivity techniques, including Microsoft ActiveX data objects(ADO), object linking and embedding database (OLE DB), and open database connectivity (ODBC), thebetter choice for our NRT is the one that can:

• Work with different operating systems.• Handle both relational and non-relational databases.• Connect to multiple databases simultaneously.

Web Mapping Of Pipeline Data

There are two main ways to publish GIS information on the web. Creating a specific website is one, andexporting the data and maps to existing websites is the other. The recommended technicalspecifications for web mapping of pipeline projects depend on the selection made. In the case ofcreating a new website, it is useful to have a website that can:

• Be dynamic.• Visualize maps with advanced functionalities.

Page 356: Vol 2 onshore pipelines the road to success 3rd edition

110

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Appendix 13.1.1

• Use vector and raster data.• Have good compatibility with different navigators, programming languages, and database

formats.In the case of exporting data to existing web sites, the selection should be a web site that is:

• A known geographic website with a simple data format.• Compatible with different programming software formats.

Page 357: Vol 2 onshore pipelines the road to success 3rd edition

111

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.7 Near real time automatic data acquisition

Introduction

One of the main challenges of a pipeline project is due to the differing locations of construction facilities,from the pipe mill and coating, intermediate ports and stations to the stockpiles and construction sites.

Predictive modelling over vast physical areas is complex due to latency in communication andmanagement control. The geographical nature of pipeline projects further complicates the constructionworks and raises the requirement to have timeless and accurate update of daily activities.

With the recent innovations and enhancements of mobile technology, handheld devices have eliminatedthe paper-based process, reducing the physical piles of papers on construction sites by having therequired data in hand electronically. Examples include specifications and quality standards, constructiondrawings, inspection check lists and forms. This also works in the other direction too, with dailyconstruction reports now being created electronically directly, eliminating the paper-to-electronic dataentry process.

A good near real-time reporting tool should integrate: a backend control system for reference data,mobile units for quick data acquisition, and a GIS-based system for geospatial dynamic reporting.

The purpose of this document is to highlight the basic specifications of mobile control solutions forautomating and reporting daily construction site activities to a backend GIS user-interface system usinghandheld devices in near real-time

This document will cover

• Pipeline project controls system for non-spatial reference data• Construction progress reporting using handhelds (data loggers)• Integration with a GIS-based system

Scope

Description

In pipeline projects, pipes are distributed along thousands of miles of alignment, following a standardizedprocedure pre-defined by the project’s requirements, dependent on environment, property and safety.Such projects function remotely. With several parties operating autonomously, which require a well-understood manageable infrastructure to be established to overcome adverse impacts of loss incommunication and dependency that might return as high costs on schedule.

The backend project controls system is used to track and control construction activities on daily basis.Integrated with content management and GIS systems, the project controls system stores documents,investigation reports and construction activities data. This system allows the project team and managersto access spatially based information and near real-time construction monitoring data through oneportal. Figure 1 illustrates the main integration between these different systems.

Page 358: Vol 2 onshore pipelines the road to success 3rd edition

112

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Fig. 1: Pipeline and project data flow

Components of a pipeline near real-time construction management solution

Project controls system

In construction projects, information is collected from different sources and in different formats. Thebackend controls system hosts the initial data groups collected from pipeline owner, client and design atthe FEED stage, to validate construction processes whereas the electronic data management system(EDMS) archives textual documents (procedures, RFIs, schedules, checklists, specifications, etc), andany graphical documents (drawings, alignment sheets, photographs, etc).

Modules, integrations and electronic data interchange (EDI)

The pipeline tracking system starts with some basic information needed to initiate the control systemsand to enforce validations of collected data against procedure and requirements. For example, for thepipeline tracking system, the tally sheet and pipe shipments details are required from the vendor.

An electronic data interchange (EDI) is used to define the electronic data to exchange between multiplesoftware systems and its format.

Tally sheetPipe tally sheets list the pipe tags and their main properties and specifications including:

• Pipe tag number, the unique number to track each pipe allowing full traceability from mill tillwelding on site

• Heat number: identifies the batch (cast) of the pipe. The materials certificate will beapplicable for this batch of pipes

• Material specification• Diameter and wall thickness• Length, weight and surface area

Page 359: Vol 2 onshore pipelines the road to success 3rd edition

113

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

• Coating• Certificates• Etc…

Pipe shipmentsPipeline shipment information is transferred frequently prior to the arrival of each shipment (please referto Appendix 7.1.1 in “The Road to Success”, 1st Edition Vol. 2 for more details about data group andattributes).

Non-destructive testsNon-destructive tests (NDT) are test methods used to examine an object, material or a system to verifyits quality and compliance to the quality standards. The requirements are loaded into the project controlsystem and used by the quality department to guide them during their quality control checks of thepipeline welding.

Alignment sheetAlignment sheets or “as-built” drawings are blueprints of the pipeline route with all the related details ofthe surrounding areas. Normally in landscape format, it includes a map view of a few kilometres’ sectionof the pipeline with important topographical features such as soil, wetland, etc. Other information mightinclude the landowner, listing of rivers, crossing, and elevation profile showing the altitude and slope ofeach segment of the pipeline. At the bottom of the sheet there is usually the list of pipes laid in thissection with their properties: material description, grade, thickness, coating, etc.

Project scheduleA project work breakdown structure (WBS) can be defined by dividing the pipeline route into sectionseach formed of multiple kilometres. Construction activities are referenced and updated per kilometre. Aprogress monitoring system measures the progress completed against planned and reports the earnedvalue versus actual progress calculations per construction activity.

Pipeline construction projects are considered linear and planned in sequence along the pipeline route.A march chart is a good planning tool for scheduling construction activities. Also known as time-distance chart, it provides a comprehensive representation of the project plan, indicating the activitiesrequired, their location along the pipeline, and their time frame. Addition information such as route profile(elevation), soil content, crossings locations, landmarks, environmental interest areas etc can beindicated at the correct linear location. Figure 2 shows an example of a pipeline project WBS hierarchy.

Fig. 2: Example WBS for a pipeline project

Page 360: Vol 2 onshore pipelines the road to success 3rd edition

114

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Other reference tables include:• Welding procedure specifications (WPS) per diameter and thickness• Welders qualifications

The detailed integration and data exchange is illustrated in Figure 3.

Fig. 3: Integration and data exchange system

Mobile pipeline management system (MPMS)

Handheld devicesMobile handheld devices are portable computers that come in different sizes, and features. Handheldsinclude PDAs, tablet PCs, notebooks and lately smart phones. Usually, ruggedized handhelds are usedin construction fields for durability. Features differences include size which ranges from palm-size tolarge display tablet PCs, input methods whether using keypads or touch screens. Handhelds mightfeature additional integrated components such as GPS receivers, camera, barcode readers and RFIDreaders.

Fig. 4: Handheld devices

Page 361: Vol 2 onshore pipelines the road to success 3rd edition

115

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Mobile data acquisitionWith a mobile pipeline management system (MPMS), pipeline engineers, storekeepers and/or inspectorscan perform inspections and complete tasks at the point-of-work, with more efficiency, enhanced dataintegrity and reduced workloads.

A MPMS covers all procedural aspects needed for monitoring pipeline progress from delivery, transfer,activity updates to welding reports and quality control (QC) inspections/tests.

With advances in technology, an automated data collection (ADC) based system is able to operate inmobility using various communication media such as GPRS, EDGE, etc, leveraging for flexible real-timeimplementations under a diversity of environments.

Fig. 5: Why mobile

A MPMS can automate site work, minimizing paper work and manual data entry while providing datareliability and efficiency. This is done through usage of smart selections and drop-down lists and forwardcompatibility with barcode technology which is also optionally extendable to radio frequencyidentification (RFID).

A MPMS can be enriched with warehouse logistics, handling the tracking of pipe movements andequipped with specialized modules for recording welding of joints, along with optional GPSinteroperability. Depending on the accuracy requirement, this can either use a built-in hardware or third-party global navigation satellite system (GNSS) system to fetch the x, y and z coordinates of joints. Thiscan then be integrated with a GIS system. Figure 6 lists the data workflow using the handhelds.

Page 362: Vol 2 onshore pipelines the road to success 3rd edition

116

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Fig. 6: Handhelds data collection and reporting

Benefits and features

Fig. 7: Benefits and features

Page 363: Vol 2 onshore pipelines the road to success 3rd edition

117

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Logistics activities (material tracking)A pipeline project includes material of various specifications, where pipes are usually sourced frommultiple pipe manufacturers. Thus, each party would be required to prepare an electronic tally sheetreferred as the packing list, to be sent before shipping their pipes to site. These are usually grouped intolots, depending on which mill they were produced in. The tally sheet is an essential requirement fortraceability. In case of any defective pipes, other pipes from the same batch can be identified forquarantine via the heat number. MPMS makes it portable and allows validation at the point of inspection.

Tracking of pipes starts from the mill or coating yard. The shipments data is created while loading thepipes to be able to validate the quantities and pipe tags received against the shipment lists. For easiertracking, the pipeline route is divided into logical stores designated by the kilometres representation.Each kilometre is considered a store and the pipes are received during the stringing activity are markedwith the kilometre number and the location within. A sample logistics distribution is illustrated in figure 8.

Fig. 8: A sample logistics distribution and reporting of pipelines

Material receipt with visual inspection and damage reportingThe tally sheet is loaded into a MPMS by the crew handling the delivery at site. The pipe numbers areentered on the system (scanned if barcodes are available, otherwise manually input) to update the stock.The MPMS checks these pipe numbers against the tally sheet retrieving the corresponding info (length,heat number).

Minor corrections can be done on the spot (actual length), whereas major errors (heat number,thickness) are to be reported and the pipe quarantined.

Missing barcode labels can be created instantly, printed and applied straight away to the pipe, followinga standard labelling procedure.

Page 364: Vol 2 onshore pipelines the road to success 3rd edition

118

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Aside from mismatch, the crew visually inspects each pipe for any damages. Coated pipes can be givena holiday test to ensure that pipe metal is shielded properly.

Accepted pipes can be transported to site or store with the crew feeding MPMS with the pipe issuingdata. Rejected pipes would be transferred to a quarantine store and the crew would raise a QC flag viaMPMS. This toggled flag would notify an inspector to visually investigate the rejected pipes. Damagesare registered using MPMS in an OSD report with details of the damage, along with photos.

Figure 9 explains the pipe receipts workflow with snapshots from MPMS handheld forms

Fig. 9: MPMS pipe receipts workflow

Page 365: Vol 2 onshore pipelines the road to success 3rd edition

119

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Material issuance (waybills)At any requisition or transition from one store to another, the MPMS automatically writes out theavailable stock quantity of the requested pipes via simply scanning the corresponding barcode that inreturn would retrieve live information of their physical location either in terms of grid numbering or GPScoordinates. This assists the storekeeper to swiftly fetch out where to load out, without the hassles ofconflicts and rush hour. Plus, for advanced traceability and budget control, the MPMS allows to thestorekeeper to make optional record of the recipient at pick-up for those pipes fetching the truck’sidentity via barcode otherwise manually or selectively entered along with extra information such asdepartment name and that optionally, print out waybills for approvals and tracking purposes.

Figure 10 explains the pipe issuance (waybill) workflow with snapshots from MPMS handheld forms.

Fig. 10: MPMS waybill workflow

Construction progress activitiesMPMS integrated with ERP has allowed progress update on multiple WBS levels of the project such askilometre section, pipe tag or even a joint. The list of activities is flexible, and is predefined in templatetables.

Figure 11 lists an example of these construction activities within a template.

Page 366: Vol 2 onshore pipelines the road to success 3rd edition

120

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Fig. 11: Construction activities within a template

The main pipeline construction activities are shown in Figure 12.

Fig. 12: Main pipeline construction activities

All MPMS users’ activities are tracked and reported immediately if any failure or unusual validationoccurs, allowing for swift action to be taken by designated parties on departmental level or systemsupporters. At any time, the MPMS can automatically write out the current activity of any requested pipewith live information of its physical location either in terms of coordinates (pipe, joint), section or kilometrenumbering. The diagram in Figure 13 illustrates the different construction activities.

Page 367: Vol 2 onshore pipelines the road to success 3rd edition

121

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Fig. 13: Construction activities of pipelines

StringingAs soon as the pipes arrive to site, they will be aligned one after the other parallel to the flow line of thepipeline either by using an alignment sheet or markings set by surveyor illustrating the kilometre andsub-meters within it. With a MPMS, those inspectors would scan each pipe loaded off the truck,retrieving its information to empower their decision on where it should be placed. After the pipes havebeen settled down in the desired location, the MPMS would provide flexibility to fetch the pipes'coordinates using integrated GPS or selectively by feeding in the surveyor’s markings. Consequently,MPMS would guide the inspectors visually via a map instantly revealing all the pipes and their location.

Figure 14 illustrates the stringing process with snapshots from MPMS handheld forms

Fig. 14: MPMS stringing process and handhelds forms

Page 368: Vol 2 onshore pipelines the road to success 3rd edition

122

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Cut pipeIn case of a defect or damage, pipes often get cut down into pieces. Depending on the location of thedamage, this might result in a pipe splitting into two or multiple sub-pieces. In such an activity, a MPMSwould assist the QC inspector to scan the defective pipe to retrieve its original length and when the cutoccurs, new measurements would be made and the new length would be fed into MPMS. In the casethat the cut has resulted in two pipes, then one of them would be named as the original numbered XXXXwith a new length, whereas the other would be named in the same syntax of the original followed by thesequential number or character i.e. XXXX_A also with a new length with the original pipe lengthmaintained and stores for reconciliation and tracking. Naming convention is auto-generated by theMPMS.

BendingA similar process takes place for any other activity such as bending, where at some areas of the flowline, pipes need to be bent to satisfy the alignment sheet as pre-designed by the engineers. The MPMSwould encapsulate those data according to the assigned position set by the inspectors, or automaticallyby GPS. This will fetch all the needed bends for the pipes and that would be cross-matched after it hasbeen applied locally or was originally received bent from the manufacturer. In case of local application,inspectors would feed into the MPMS all relevant information such as the bending angle, operator,machines used etc.

Figure 15 explains the pipe bending workflow with snapshots from MPMS handheld forms.

Fig. 15: MPMS pipe bending workflow

Page 369: Vol 2 onshore pipelines the road to success 3rd edition

123

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

WeldingThe MPMS is equipped with functionalities to assist QC inspectors or engineers with live references orprocedures, such as WPS and welder’s qualification, etc, for empowering their field control over weldersas to assure welding efficiency and, by increasing the quality of data reported, in return improving itsassurance.

Figure 16 illustrates the welding process with snapshots from MPMS handheld forms.

Fig. 16: MPMS welding process

MPMS provides QC inspectors with various parameters to customize their reporting and control over thewelding procedure, giving them information at every weld to know which WPS is appropriate, revealingrelevant specification i.e. welding types, required preheat for a successful process and which electrodesshould be assigned.

The MPMS can assist the QC inspector by determining which alignment sheet has been used atkilometre and sub-meter scales, helping maintain the uniqueness of the current weld number by listingall weld created under that selected criteria. However, the MPMS still provides auto-generation of theweld numbers according to preset rules.

At the initial stage of any weld, a fit-up occurs between the two pipes, creating a report by the MPMS forthe inspector to visually evaluate against standards if it is acceptable or not. If accepted, inspectorwould feed the MPMS with the fitted pipes by scanning them in the order of the project flow, the firstand second pipes being assigned as the start and end tag respectively.

At every scan, the MPMS would provide the inspector with the history each pipe has undergone i.e.damages and all its relevant information i.e. length, heat number etc. As soon as that has been verified,welding would go through a sequence of pass types: root, hot, cap, and fill. No matter what order theseare done in, the MPMS would force the inspector to ensure all stages are performed.

Page 370: Vol 2 onshore pipelines the road to success 3rd edition

124

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

At this stage, welders should start welding, but not before their certification is assured to be compliantwith selected WPS and pass type, plus that those certifications are within their expiration dates.Normally, this incurs an intensive activity by the inspector to validate the welder’s suitability for the task.In contrast, the MPMS has taken over that obligation by capturing all welders information i.e. certificationand expiry, providing it to the inspector as sensible and reliable reference material, after scanning thewelder’s badge ID. Having that provided, the inspector can easily record in the MPMS every passoccurred specifying the legitimate welder and optionally the side applied (either ROW or trench or any,the latter usually being used when a single pass is embraced by multiple welders).

After the weld is finalized with all the passes, the inspector can optionally use the MPMS’ interoperabilitywith GPS to record the exact location of the pipe in reference to the project. For high accuracy, MPMScan integrate with Trimble’s GNSS system used by the surveyor and improve location drastically tomillimetres. As soon as the QC inspector has closed this weld and progressed to the next one, theMPMS would automatically update itself, if it was connected via 3G/EDGE/Wi-Fi, allowing the rest of theQC inspectors to collaborate live, resulting into a real-time presentation, via GIS, of progress on site forthe management.

As the welds are updated into the backend database, they are all subjected to non-destructive test(NDT) as the automated ultrasonic testing (AUT) to ensure no defects occurred and if there were any,those welds are objected to be cut and re-welded again until no defects are found.

TrenchingMPMS does not only maintain track of pipes’ activities, but also has added features to reportconstruction activities. Although lowering (see next section) is an activity for the pipes, it is stilldependent on the trench’s availability, which in fact is part of construction, and if not maintained wouldcarelessly compromise the various parties’ ability to collaborate. The MPMS overcomes this byincorporating trenching, to ensure the proper forward planning of activities on site.

LoweringAfter welding, pipes are not independent anymore. Instead they are distinguished as joints, and progresson various activities is measured with reference to that. An example of such an activity would belowering, where jointed pipes are lowered on after the other into the trench. It would be difficult todistinguish the pipes, but the MPMS eases this by recording all the related welds, allowing theinspectors to selectively specify pipe sections by start and end joints. The system would accordinglyupdate all the interconnected pipes. Optionally, the MPMS also provides the capability for augmentingthe inspectors’ input with GPS, displaying a map hosting all nearby joints.

Basically, at every stage, when pipes change from one activity to another, the related information getsmanually fed into the MPMS by dedicated operators or inspectors in charge of a single or multipleactivities. This provides the project with a history tracked by time stamp, which can be used as a goodsource for planning and measuring progress.

Other progress activities

SafetyUsually in any pipeline construction, safety is the most significant concern among all activities, requiringan awareness of any incidents occurring, whether fatal, minor or near-miss. As these could potentiallylead to huge losses, affecting the project’s success, it is necessary to be conscious of suchvulnerabilities. The MPMS helps this, as it allows the on-site safety team to create a report easily,attaching photos of any incident, with the associated location and direction recorded using the built-inGPS and compass. It can also be supplemented with extra information, such as victims’ identity (bybadge scan), or type of incident.

When consolidated on a daily basis, such information would help decision makers plan ahead toindicate required improvements at potentially unsafe areas, or changes in staff behaviour required, ifpossible, to reduce injuries and fatalities.

Page 371: Vol 2 onshore pipelines the road to success 3rd edition

125

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Land acquisitionFor pipeline construction to take place, a passageway along the pipe’s route is required, for pipes, toolsand machinery to freely move and perform all necessary functions such as trenching, stringing, etc.Depending on the agreement with the land owner, this passageway (the ROW) would be acquiredtemporarily, and returned upon completion. The MPMS would help reinstate the land to its originalcondition, via photos and location details capturing the state of the land before usage, along withadditional information such as type of sand, measurements, terraces, etc. After gathering all thosedetails, MPMS would upload them into ERP, EDMS and GIS systems, so the project management canvisually envisage how much impact the construction would have, thereby improving their forwardplanning, and ensuring the best safety and rights for properties.

Handover deliverables

PipeBookThe PipeBook report is a full-tracking handover document combining all the construction details to besubmitted to the pipeline owner/operator.

The main information listed in PipeBook is:• Joint number• Starting pipe tag and ending pipe tag numbers• Welding passes completed per joint and the welder used per weld sector (ROW, trench)• The daily welding report number• NDT (RT, MPI, UT) and testing reports• Field coating reports• Alignment sheet• Pipes specifications: material, Dia heat number, certificate number, mill length, actual length,

visual check, etc.• Actual progress tracking for activities such as stringing, coating, lowering, cathodic

protection and backfilling

A sample PipeBook is shown in Figure 17.

Page 372: Vol 2 onshore pipelines the road to success 3rd edition

126

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Fig. 17: Sample PipeBook

Page 373: Vol 2 onshore pipelines the road to success 3rd edition

127

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Supporting documentsDocuments such as drawings, site forms, certificates and other scanned documents are handed over inelectronic format.

GIS databaseThis is a database of spatial and non-spatial data that includes links to EDMS documents.

GIS-based systemA GIS-based project control solution provides the integration between the collected data,documentation and procedures in EDMS, and a dynamic reporting engine.

The EDMS and project controls system are the main sources of information for this GIS data group.Therefore, the GIS system must be dynamically linked and integrated with the relevant systems toensure live update of the GIS based pipes tracking information.

The project controls system feeds the GIS system with the full traceability data of the pipes andshipments, in addition to receipt and issuance activities on ports and lay down yards. The GIS systemalso gets the work schedules and actual progress completed in construction activities, tagged bylocation (XYZ coordinates).

The EDMS provides the link to all drawings and alignment sheets, aerial photos, land parcel informationand documentation, certificates and site reports that were used to feed the project controls system withthe required pipe tracking data (please refer to Appendix 7.1.1 in “The Road to Success”, 1st EditionVol2 for more details about data group and attributes).

Figure 18 displays sample integration between the GIS-based system and data stored in the EDMS andproject controls systems.

Page 374: Vol 2 onshore pipelines the road to success 3rd edition

128

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Fig. 18: GIS-based system and data stored in EDMS (integration sample)

Page 375: Vol 2 onshore pipelines the road to success 3rd edition

129

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Conclusions

This section highlighted the basic specifications of mobile controls solutions used to automate andreport daily pipeline construction site activities using handheld devices in near real-time and load it backinto a backend GIS user-interface system. It has elaborated on how the electronic documentmanagement system (EDMS) can be used as a tool for pipeline project controls.

The EDMS provides the link to all drawings and alignment sheets, aerial photos, land parcel informationand documentation, certificates and site reports that were used to feed the project controls system withthe required pipe tracking data.

The EDMS and project controls system are the main sources of information for the GIS-based projectcontrol solution. To ensure live update of the GIS based pipes tracking information, the GIS system mustbe dynamically linked and integrated with the relevant systems.

The project controls system feeds the GIS system with the full traceability data of the pipes, shipments,in addition to receipt and issuance activities on ports and lay down yards. The GIS-based system anddata stored in EDMS and project controls systems can be easily integrated.

Page 376: Vol 2 onshore pipelines the road to success 3rd edition

130

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Page 377: Vol 2 onshore pipelines the road to success 3rd edition

131

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.8 Innovations in CO2 Pipeline Construction

13.8.1 Abstract

Carbon dioxide (CO2) is captured to prevent it being discharged to the atmosphere, as it is widelyrecognized around the world as one of the main causes of climate change. The level of CO2 in theatmosphere is rising as a result of human activities. One of the options that can be used to combatclimate change is to capture CO2 produced by power generation and industrial processes and store itdeep underground, a process known as carbon capture, transport, and storage (CCTS). The processinvolves capturing the CO2 produced by the burning of hydrocarbons (e.g. coal and natural gas) beforeit enters the atmosphere, and storing it deep underground.

The main components of CCTS are:1) capture (separation from the gas stream) at a power plant or an industrial source2) compression3) transport via pipeline4) injection into an underground storage formation through a well

Oil and gas industries have for many decades been injecting fluids and gases (including CO2) into deepunderground storage formations to assist oil and gas production in depleting oil and gas fields, this is atechnique known as enhanced oil (or gas) recovery (EOR/EGR).

This chapter primarily reviews the pipeline transportation of CO2. This cannot be discussed on its ownand techniques of capturing, other modes of transport, and storing CO2 will also be briefly touched on.The challenges, opportunities, equipment, sustainability, facilities, and cost models of CCTS are amongthe other subjects covered

Keywords: Carbon capture transport and storage (CCTS), carbon sequestration, pipelinetransportation, carbon dioxide, climate change.

13.8.2 Introduction

Carbon dioxide gas (CO2) is found in small proportions in the atmosphere. It is produced by manyprocesses, including respiration in plants and animals. It is widely used commercially, to control nuclearreactor temperatures, in the food and beverage industries, in the medical field, and is also used as a fireextinguisher. It is the historically recent burning of fossil fuels that has started to release large quantitiesof CO2 into the atmosphere.

CO2 is a major greenhouse gas that contributes to the Earth’s global warming. Over the past twocenturies, its concentration in the atmosphere has greatly increased, mainly because of human activitiessuch as fossil fuel burning.

One possible option for reducing CO2 emissions is to capture CO2 at its point of production, andtransport it to be stored underground. This technique is called carbon capture, transport, and storage(CCTS). There are other solutions being researched, such as extraction of CO2 from the atmosphere.These other solutions are not as well-developed as carbon capture technology, which in itself is currentlyin demonstration phases around the world. This chapter reviews the techniques of capturing andtransporting CO2, talking about the challenges, opportunities, equipment, sustainability, facilities, costmodels, etc.

To capture CO2 it is first separated from the other gases resulting from combustion or industrialprocesses. However, CO2 storage gas will have combustion impurities, such as SOX (sulphur oxides)and NOX (nitrogen oxides), and hence is not as clean as the CO2 gas currently being used for EOR.

Page 378: Vol 2 onshore pipelines the road to success 3rd edition

132

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

When the emission source is not located directly over the storage site, the CO2 needs to betransported. Small quantities of CO2 could be transported offshore by ship, but transport of largervolumes would require pipeline. Pipelines have been used for this purpose in the USA since the 1970s[10]. CO2 is generally transported in a super-critical phase; it is pumped at high pressure, with boosterstations to maintain the pressure.

Storage in geological formations is the cheapest and most environmentally-acceptable storage optionfor CO2. The three main types of geological storage are oil and gas reservoirs, deep saline formations,and un-minable coal beds.

13.8.3 The need for CCTS

The future of gas within the European energy mix is coming under increasing scrutiny, in the context ofambitious climate stabilization objectives. To date much of the debate around CCTS has focused oncoal. However, the December 2011 European Commission Energy Road map and other studies identifyscenarios with a significant ramp-up of gas power with CCTS in decarbonizing the power sector from2030 [10]. There are multiple practical hurdles to CCTS deployment, creating risks of “carbon lock-in” or“stranded assets”. Chief among these is the absence of a clear ‘business case’ for investment in CCTSgiven uncertainties around technology, carbon prices, potential load factors and the absence of robusteconomic incentives to support the additional high capital and operating costs associated with CCTS.

Nowadays CCTS is developing and further information and data are being made available. TheCO2PIPETRANS joint industry project (JIP) is making experimental data freely available, which will furthersupport global CCTS implementation. The data released by the CO2PIPETRANS JIP complementspreviously-released data and will greatly assist dense phase CO2 computer model development andvalidation [6].

Over recent years media attention has focused on the rapid expansion of coal use in China, butpolitically important countries as diverse as the US, India, South Africa, Australia, Poland, and the UK areconcerned by the implications of an end to coal use for their domestic energy security [3]. Addressingclimate change means addressing emissions from coal, both technically and politically, starting in thisdecade; although coal has been the main focus, the same issues are beginning to arise for CO2 gas.

Some governments plan to use renewable, nuclear and CCTS as three legs of the low carbon strategy.If CCTS is not available, this removes one of the options and means the other two must be relied onmore heavily. Without CCTS, the 30-50GW of coal and gas plant remaining in the UK by 2030 will haveto be scrapped or run at low load factor [10].

In Europe the regulations around pipelines are well established, as are the design codes. Theseregulations do not consider CO2 as a specific named substance in the prescriptive manner of the USfederal regulations. This may require changes to the regulations; however in the UK it has been statedthat from 2008 until the existing regulations are changed, carbon dioxide is to be considered as if a'dangerous fluid' for the purposes of the Pipeline Safety Regulations 1996 and as if a 'dangeroussubstance' for the purposes of control of major accident hazards [3].

Other current legislation in the UK also applies to CCTS for pipelines. Specifically, compliance with thefollowing regulations and requirements must be achieved including any regulations enacted under them;Construction (Design and Management) Regulations 2008; Control of Major Accident Hazards(Amendment) 2005; Deregulation (Pipe-lines) Order 1999; Electricity and Pipe-lines Works (Assessmentof Environmental Effects) Regulations 1990 and amendments; Environmental Protection Act 1990;Health and Safety at Work etc.; Act 1974; Health and Safety at Work (Northern Ireland) Order 1978;Pipe-lines Act 1962; Pressure Equipment Regulations 1999; Pressure Systems Safety Regulations2000, Town and Country Planning Act 1990 [11].

Page 379: Vol 2 onshore pipelines the road to success 3rd edition

133

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Property Unit ValueMolecular g/mol 44.01Critical Pressure bar 73.8Critical Temperature oC -56.6Aqueous Solubility at 25oC, 1 bar g/l 1.45Standard (gas) density Kg/m3 1.98Density at critical point Kg/m3 467Liquid density at 0oC, 70 bar Kg/m3 995Sublimation temp. 1 bar oC -79Solid density at freezing point Kg/m3 1562Colour - None

Table 1: Specific properties of CO2

Table 1 provides various properties of CO2, and Figure 1 illustrates the CO2 phases for a range ofpressures and temperatures. Transportation for storage will generally occur above the critical pressure(86 – 172) atmosphere, and temperature (4 - 38 °C). At standard temperature and pressure, the densityof CO2 is around 1.98 kg/m3, about 1.5 times that of air.

Fig. 1: Carbon dioxide: temperature – pressure diagram (state diagram)

At atmospheric pressure (1 bar) and a temperature of −78.51 °C (−109.32 °F), CO2 changes directlyfrom a solid phase to a gaseous phase through sublimation, or from gaseous to solid throughdeposition.

Liquid CO2 forms only at pressures above 5.1 atmosphere (bar); the triple point of CO2 is about 518kPa at −56.6 °C. The critical point is 7.38 MPa at 31.1 °C. Another form of solid CO2 observed at highpressure is an-amorphous glass-like solid. This form of glass, called carbonia, is produced bysupercooling heated CO2 at extreme pressure (40–48 GPa) in a diamond anvil. This confirms the theorythat CO2 could exist in a glass (solid) state similar to other elements of its family, like silicon (silica glass)and germanium dioxide. Unlike silica and germania glasses, however, carbonia glass is not stable atnormal pressures and reverts to gas when pressure is released [5].

Page 380: Vol 2 onshore pipelines the road to success 3rd edition

134

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

The physical properties of a CO2 stream defined by its individual chemical compounds may vary fromthe physical properties of pure CO2 in terms of but not limited to: toxicity, critical pressure andtemperature, triple point, phase diagram, density, viscosity, and water solubility [15].

Before CCTS, CO2 is first separated from the other gases resulting from combustion or industrialprocesses. CO2 storage gas will have combustion impurities, such as SOX (sulphur oxides) and NOX(nitrogen oxides).

Fig. 2: CO2 phase envelope (pure case and with impurities present)

Figure 2 shows the effect of impurities in the CO2 gas mixture. Impurities affect both the phase envelopeand the physical properties, which in turn will affect the operability of the pipeline. Equations of state areneeded to accurately predict the mixture’s behaviour.

A typical CCTS transportation mixture will comprise >95% CO2, with water content <500 ppm, toprevent occurrence of carbonic acid in the pipeline, which would lead to internal corrosion on the pipewall if free water in the pipeline was to occur.

13.8.4 CO2 equation of state models

Equation of state models are available for 100% pure CO2, but these models become inaccurate assoon as any impurity is added to the CO2 composition stream. Flow assurance and software developersare in the process of updating and benchmarking their equation of state software packages, but untilthen safety margins should be considered.

Specifically, currently available versions of the equations of state are not reliable enough to be used inprecise pipeline and compression system designs, to predict the properties of supercritical CO2 which iscontaminated with other compounds (i.e. A, N2, O2, CO, NH3, H2S,) at conditions near the criticalpoint. Furthermore, pure CO2 ’sequation of state is not good enough when we have water condensingout. Small amounts of impurities in CO2 change the location of the supercritical line.

Page 381: Vol 2 onshore pipelines the road to success 3rd edition

135

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Since the equation of state models for CO2 -based mixtures have not to date been fully developed orvalidated, large differences (15% variation) exist in gas properties predicted by standard equation ofstate models and pure CO2 correlation models. This will affect equipment sizing and its rupture point.

As a result of the deficiencies in the available data, designers and manufacturers use larger margins ofsafety than may be necessary in their products, by up to 15%. An illustration of the differences in Figure3 shows the variation in predicted density of CO2 obtained with various prediction models. This confirmsthat the variation of density between different models could be as high as 15%.

Fig. 3: Variation in predicted gas density for CO2 mixtures

13.8.5 Pipeline transport of CO2

Efficient transport of CO2 via pipeline requires that CO2 be compressed and cooled to the liquid state.Transport of CO2 at lower densities (i.e. gaseous CO2) is inefficient because of the low density of CO2and relatively high pressure drop per unit length. Moreover, by operating the pipeline at pressures greaterthan the CO2 critical pressure of 7.38 MPa, temperature fluctuations along the pipeline will not result inthe formation of gaseous CO2 and the difficulties encountered with two-phase flow [14].

The properties of CO2 are considerably different from other fluids commonly transported by pipeline,such as natural gas. Thus, it is necessary to use accurate representations of the phase behaviour,density, and viscosity of CO2 and CO2 -containing mixtures in the design of the pipeline. Figure 4 showsthe compressibility of CO2 based on the Peng–Robinson equation of state. It shows the nonlinearity inthe typical pipeline transport region and the sensitivity to impurities (by mole fraction). Thecompressibility of CO2 is non-linear in the range of pressures common for pipeline transport and ishighly sensitive to any impurities, such as hydrogen sulfide (H2S). Figure 4 also shows the significantdifference between the compressibility of pure CO2 and CO2 with 10% by volume H2S. To reducedifficulties in design and operation, it is generally recommended that a CO2 pipeline operate atpressures greater than 8.6 MPa where the sharp changes in compressibility of CO2 can be avoidedacross the typical range of temperatures that may be encountered in the pipeline system [15].

Page 382: Vol 2 onshore pipelines the road to success 3rd edition

136

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Line-pipe with ASME-ANSI class 900 flanges has a maximum allowable operating pressure of 15.3 MPaat 38 °C. Operating the pipeline at higher pressures would require flanges with a higher rating [14]. Overthe range of typical conditions shown in Figure 4, the density of CO2 varies between approximately 800and 1000 kg/m3.Operating temperatures of CO2 pipelines are generally dictated by the temperature ofthe surrounding soil. In northern latitudes, the soil temperature varies from a few degrees below zero inthe winter to 6–8 °C in summer, while in tropical locations; the soil temperature may reach up to 20 °C[14]. However, at the discharge of compression stations, after-cooling of compressed CO2 may berequired to maintain phase regime and to ensure that the temperature of CO2 does not exceed theallowable limits for either the pipeline coating or the flange temperature.

Fig. 4: The compressibility of CO2 and the typical pipeline transport region [15]

13.8.6 CO2 collection/capture

CO2 could be captured from power plants or industrial facilities which produce large amounts of carbondioxide. Three systems are available for power plants: post-combustion, pre-combustion and oxyfuelcombustion systems. The captured CO2 must then be purified and compressed for transport andstorage. Problematically, the technology to capture CO2 from small or mobile emission sources, such ashome heating systems or cars, is not yet sufficiently developed. Consequently small or mobile emissionsources in homes, businesses or transportation are not suitable for CCTS.

Page 383: Vol 2 onshore pipelines the road to success 3rd edition

137

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Table 2 shows typical CO2 stream compositions from various capture technologies vs. the current EORcomposition (labelled under Weyburn).

Component Post Combustion IGCC Oxyfuel WeburnCO2 >95% >95% >95% >95%N2/Ar 0.01 0.03-0.06% 4.1% <4%O2Hydrocarbons 0 0.01% <5%H2 0 0.8-2% 0H2o >95% >95% >95% <100 ppmH2s 0 0.01-0.06% 0 <1450 ppmvCO 0 0.03-0.4% 0Hg 0Sox <0.01%, <100 ppm <0.01%, <100 ppm 0.5%Nox <0.01%, <100 ppm <0.01%, <100 ppm 0.01%

Table 2: typical CO2 stream compositions from various capture technologies vs. current EORcomposition

Several factors determine whether CO2 capture is a viable option for a particular CO2 emission source[18]:

• The size of the emission source

• Whether it is stationary or mobile

• How near it is to potential storage sites

• How concentrated its CO2 emissions are

In 2000, close to 60% of the CO2 emissions due to the use of fuels were produced by large stationaryemission sources, such as power plants and oil and gas extraction or processing industries. Table 3shows the profile by process or industrial activity of worldwide large stationary CO2 sources, withemissions in millions of tons of CO2 /year [10].

The distance between an emission location and a storage site can have a significant bearing on whetheror not CCST can play a significant role in reducing CO2 emissions. In broad terms, these figures indicatethat there is potentially good correlation between major sources and prospective sedimentary basins,with many sources lying either directly above, or within reasonable distances (less than 300 km) fromareas with potential for geological storage.

Process Number of sources Emissions (MtCO2 yr-1) % CO2 EmissionsFossil fuelsPower 4,942 10,539 78.26Cement production 1,175 932 6.92Refineries 638 798 5.93Iron and steel industry 269 646 4.80Petrochemical industry 470 379 2.81Oil and gas processing N/A 50 0.37Other sources 90 33 0.24BiomassBioethanol and bioenergy 303 91 0.67Total 7,887 13,466 100

Table 3: CO2 emissions due to the use of fuels [9]

Page 384: Vol 2 onshore pipelines the road to success 3rd edition

138

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Principles of CO2 capture

Three systems are available for power plants: post-combustion, pre-combustion, and oxyfuelcombustion systems. To capture carbon dioxide ( CO2) it is first separated from the other gasesresulting from combustion or industrial processes. The captured CO2 must then be purified andcompressed for transport and storage [10].

• In a post-combustion system, the gas produced by combustion of the fuel with air onlycontains a small fraction of CO2. It is captured by injecting the flue gases in a liquidthat selectively absorbs the CO2 (such as a cooled or compressed organic solvent).Nearly pure CO2 can then be released from the liquid, typically by heating it orreleasing the pressure. Similar separation processes are already used on a large scaleto remove CO2 from natural gas.

• In a pre-combustion system, the primary fuel is first converted into gas by heating itwith steam and air or oxygen. This conversion produces a gas containing mainlyhydrogen and CO2, which can be quite easily separated out. The hydrogen can thenbe used for energy or heat production.

• Oxyfuel combustion uses pure oxygen to burn the fuel instead of using air which onlycontains 20% of oxygen and a lot of nitrogen. It results in a gas mixture containingmainly water vapour and CO2. The water vapour is then easily removed from the CO2by cooling and compressing the gas stream. However, for this process one must firstseparate oxygen from the air, which is a fairly complex process.

Similar capture systems are already used in several industrial processes, such as hydrogen or ureaproduction, and coal gasification. Many institutes aim to develop new capture technologies and makeimprovements to existing capture technologies in order to provide significant cost reductions in CO2capture compared to the current estimates.

• Solvent systemsSolvents systems remain the industry benchmark. They use carbonate and amine-based systems at pre and post-combustion stages, with the aim of reducing energyusage. However, solvent-based capture systems also have applications to all fuelsources and the investigations should be expanded to other fields, including naturalgas and industrial applications. They should include developing cheaper constructionmaterials, developing promoters to improve capture characteristics and usingmembranes in conjunction with solvents.

• Membrane systemsRelative to absorption or adsorption technologies, membrane technology can beconsidered a new technology that is undergoing major growth and has the potential toprovide significant capture cost reductions.

• Adsorbent systemsThe development and application of new materials for adsorbent processes arepresently in the development phase. Current research areas include improved zeoliticadsorbents, next generation adsorbents, adsorbents that are optimized for vacuumswing adsorption (VSA) processing, high temperature CO2 capture using metal oxides,improved VSA processes, pre-combustion CO2 capture and the capture of CO2 fromnatural gas using pressure-swing adsorption (PSA) technology.

Page 385: Vol 2 onshore pipelines the road to success 3rd edition

139

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

• Cryogenics/hydrates systemsSeveral projects and research efforts are aiming at developing and applying newcryogenic and hydrate removal processes in order to reduce the cost of CO2separation from a range of industrial applications, particularly pre-combustion captureand oxyfuels in the first instance, and potentially also in other industries such as thecement and steel industry. They also aim to demonstrate the applicability of thesetechnologies. Initial laboratory trials have been completed. Further laboratory anddesign work is progressing with a view to take these to pilot scale.

Capture systems reduce the CO2 emissions from combustion plants by about 80 to 90%. These figurestake into account the fact that capture systems require additional energy.

For new fossil fuel power plants, CO2 capture can increase the cost of electricity production by 35 to85% depending on different assumptions in plant design, operation and financing. This represents 0.01to 0.03 US$ per kWh of electricity produced; Table 4 compare these costs [10].

Cost in US$/kWhNew fossil fuel plants without capture 0.03 – 0.06New fossil fuel plants with capture 0.04 – 0.09Capture alone 0.01 – 0.03

Table 4: Costs is US$/kWh of power in fossil fuel plants [10]

Capture costs can also be expressed in US$ per net ton of CO2 captured. This unit cost varies greatlyfor different types of combustion plants and for industrial processes. The unit cost of capture is generallylower where a relatively pure CO2 stream is produced, such as in natural gas processing, hydrogenproduction, and ammonia production [10].

13.8.7 CO2 storage

Capture and geological storage of CO2 provides a way to avoid emitting CO2 into the atmosphere, bycapturing CO2 from major stationary sources, transporting it (usually by pipeline), and injecting it intosuitable deep rock formations.

The subsurface is the Earth’s largest carbon reservoir, where the vast majority of the world’s carbon isheld in coal, oil, and gas organic-rich shales and carbonate rocks. Geological storage of CO2 has beena natural process in the Earth’s upper crust for hundreds of millions of years. CO2 derived frombiological activity, igneous activity and chemical reactions between rocks and fluids accumulates in thenatural subsurface environment as carbonate minerals, in solution or in a gaseous or supercritical form,either as a gas mixture or as pure CO2. The engineered injection of CO2 into subsurface geologicalformations was first undertaken in Texas, USA, in the early 1970s, as part of EOR projects and has beenongoing there and at many other locations ever since [10].

In a little over a decade, geological storage of CO2 has grown from a concept of limited interest to onethat is quite widely regarded as a potentially important mitigation option [20]. There are several reasonsfor this. Firstly, as research has progressed and as demonstration and commercial projects have beensuccessfully undertaken, the level of confidence in the technology has increased. Secondly, there isconsensus that a broad portfolio of mitigation options is needed. Thirdly, geological storage (inconjunction with CO2 capture) could help to make deep cuts to atmospheric CO2 emissions. However,if that potential is to be realised, the technique must be safe, environmentally sustainable, cost-effectiveand capable of being broadly applied. To geologically store CO2, it must first be compressed, usually toa dense fluid state known as ‘supercritical’. Depending on the rate that temperature increases with

Page 386: Vol 2 onshore pipelines the road to success 3rd edition

140

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

depth (the geothermal gradient), the density of CO2 will increase with depth, until at about 800 m orgreater, the injected CO2 will be in a dense supercritical state (Figure 5) [10].

Fig. 5: Variation of CO2 density with underground depth [9]

Geological storage of CO2 can be undertaken in a variety of geological settings in sedimentary basins.Within these basins, oil fields, depleted gas fields, deep coal seams and saline formations are allpossible storage formations (Figure 6).

The cost of CO2 geological storage is site-specific, which leads to a high degree of variability. Costdepends on the type of storage option (e.g., oil or gas reservoir, saline formation), location, depth andcharacteristics of the storage reservoir formation and the benefits and prices of any saleable products.

Onshore storage costs depend on the location, terrain and other geographic factors. The unit costs areusually higher offshore, reflecting the need for platforms or sub-sea facilities and higher operating costs.

Fig. 6: Options for storing CO2 in deep underground geological formations [10]

Page 387: Vol 2 onshore pipelines the road to success 3rd edition

141

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

The major capital costs for CO2 geological storage are drilling wells, infrastructure and projectmanagement. For some storage sites, there may be in-field pipelines to distribute and deliver CO2 fromcentralized facilities to wells within the site. Where required, these are included in storage cost estimates.For enhanced oil, gas and coal bed methane options, additional facilities may be required to handle theoil and gas produced. Reuse of infrastructure and wells may reduce costs at some sites. There may beadditional costs for remediation work for well abandonment that are not included in existing estimates.Operating costs include manpower, maintenance and fuel. The costs for licensing, geological,geophysical and engineering feasibility studies required for site selection, reservoir characterization andevaluation before storage starts are included in the cost estimates.

Storage may require more or less public supervision than transport. The composition of the storagemarket will depend on the geological availability of storage sites, economies of scale and politicalchoices. In a scenario where the number of independent stores connected to a network is small andowned by just a limited number of firms, public supervision would be required to prevent adversemonopoly behaviour. Alternatively, storage could be integrated with transport or publicly-ownedcompanies. In a scenario with multiple independently-owned stores, competition may flourish, andintervention beyond establishing environmental and safety regimes and providing for liabilities might notbe necessary.

13.8.8 Transporting CO2

Except when plants are located directly above a geological storage site, captured CO2 must betransported from the point of capture to a storage site. This section reviews the principal methods ofCO2 transport and assesses the health, safety and environment aspects, and costs.

Pipelines for CO2 transportPipelines have been in use for decades, and large volumes of gases, oil and water flow through pipelinesevery day. Pipelines today operate as a mature market technology and are the most common methodfor transporting CO2. Gaseous CO2 is typically compressed to a pressure above 8 MPa in order toavoid two-phase flow regimes and increase the density of the CO2, thereby making it easier and lesscostly to transport [15].

A CO2 pipeline usually begins at the source of capture and travels directly to the storage site; although,in some cases, it might travel as far as it can in the pipe, then transition to a tanker or ship to finish off itsjourney. It all depends on where the source, pipeline and storage site are located. Both the public andprivate sector can own pipelines. You can put a pipeline just about anywhere; underground or underwater, with depths ranging from a few meters to a kilometer.

The first long-distance CO2 pipeline came into operation in the early 1970s. In the United States, over2,500 km of pipeline transports more than 40 Million ton CO2 per year from natural and anthropogenicsources, mainly to sites in Texas, where the CO2 is used for oil recovery [15]. These pipelines operate inthe dense phase mode (in which there is a continuous progression from gas to liquid, without a distinctphase change), and at ambient temperature and high pressure. In most of these pipelines, the flow isdriven by compressors at the upstream end, although some pipelines have intermediate (booster)compressor stations.

Pipelines can transport CO2 in three states: gaseous, liquid and solid. Solid CO2 is commonly known asdry ice, and it is not cost-effective to transport CO2 as a solid. Pipelines commonly transport CO2 in itsgaseous state. A compressor "pushes" the gas through the pipeline. Sometimes a pipeline will haveintermittent compressors to keep the gas moving. The CO2 must be clean (free of hydrogen sulfide) anddry. Otherwise, it can corrode a typical pipeline, which is made of carbon manganese steel. As of yet,there are no standards in place for "pipeline quality" carbon dioxide, but experts say that pipelines built

Page 388: Vol 2 onshore pipelines the road to success 3rd edition

142

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

from stainless steel would have a lowered risk of corrosion. This, however, may not be economical, sincewe would have to build brand new pipelines just for CO2.

Environment, safety and risk aspects

It should be recognised that CO2 pipelines at the scale that will be associated with CCTS projects arenovel to many countries and this should be reflected in the risk management strategy adopted. The risksto people in the vicinity of the pipeline must be robustly assessed and effectively managed down to anacceptable level. To achieve this, CO2 hazard management processes, techniques and tools requirecritical examination and validation [6]. The safety risk related to transport of CO2 should include but notbe limited to controlled and uncontrolled release of CO2.

Just as there are standards for natural gas admitted to pipelines, CO2 should emerge as the CO2pipeline infrastructure develops further. Current standards, developed largely in the context of oilrecovery applications, are not necessarily identical to what would be required for CCTS. Low-nitrogencontent is important for oil recovery, but would not be so significant for CCTS [8]. However, a CO2pipeline through populated areas might need a lower specified maximum H2S content.

CO2 could leak to the atmosphere during transport, although leakage losses from pipelines are verysmall. Dry (moisture-free) CO2 is not corrosive to the carbon-manganese steels customarily used forpipelines, even if the CO2 contains contaminants such as oxygen, hydrogen sulphide, and sulphur ornitrogen oxides. Moisture-laden CO2, on the other hand, is highly corrosive, so a CO2 pipeline in thiscase would have to be made from a corrosion-resistant alloy, or be internally clad with an alloy or acontinuous polymer coating [8].

Gaps in current codes

There are significant gaps in the current code, which current studies are looking to fill. These gapsinclude:

• Dense phase CO2 release modelling validation data

• Full scale crack arrest testing

• Corrosion

• Material compatibility (elastomers/polymers)

• Examine effects of contaminants on the phase diagram

• Hydrate formation/ waste solubility

• Public communication and interaction

• Update of recommended practice

13.8.9 Current CCTS studies

A number of studies are currently ongoing covering CCTS and testing CO2 pipeline transport. Suchstudies are very important to fill the gaps in CCTS and to understand the problems and risks of pipelinetransport of CO2. These studies and testing areas include:

• CO2 PVT modelling/impact of impurities on CO2 behaviour

• CO2 behaviour during pipeline failure

• Pipeline depressurisation

• Fracture arrest (full scale crack arrest)

• Investigation of corrosion rates at high partial pressure CO2• Material compatibility (polymers and elastomers)

Page 389: Vol 2 onshore pipelines the road to success 3rd edition

143

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

• Effects of impurities

• Hydrate formation

• CO2 release and dispersion studies

• Risk management guidance

• CO2 PIPETRANS II

• Dense phase CO2 release model validation data• Full scale crack arrest testing• Corrosion: determine the corrosion mechanism and the corrosion rate• Material compatibility (elastomers/polymers)• Examine effects of contaminants on the phase diagram• Hydrate formation and water solubility• Update of Recommended Practice (DNV RP J202)

Some of these are discussed below.

Technology

The hazard and risk profile for CCTS projects will clearly depend on the technology adopted. Forexample, if intermediate storage of CO2 proves necessary in order to mitigate pipeline operationalissues, then the quantities involved could be substantial and the process would be less inherently safe.

Source term modelling

It is necessary to be able to model the consequences of a major release of CO2 in order to inform layoutand other safeguards and to demonstrate safety. CO2 is likely to be piped as a dense phase liquid(above the thermodynamic critical pressure but below the critical temperature).

Safety evaluations

For CCTS, with few companies or people with hands-on experience and few relevant hazardidentification studies, great care should be taken during hazard identification exercises since hazardsmay be missed, or hazards that are identified may be deemed non-credible due to lack of relevantknowledge. Until experience and knowledge is built up and communicated within the CCTS industry,greater focus should be applied to hazard identification (and risk assessment) to compensate for thelack of experience. Major accident hazard (MAH) risk assessment should be performed to provideestimates of the extent (i.e. hazard ranges and widths) and severity (i.e. how many people are affected,including the potential numbers of fatalities) and likelihood of the consequences of each identified majoraccident hazard. MAH risk assessment could be used as input to design requirements, operationalrequirements and planning of emergency preparedness.

Risk basis for design

The pipeline shall be designed with acceptable risk. The risk considers the likelihood of failure and theconsequence of failure. The consequence of failure is directly linked to the content of the pipeline andthe level of human activity around the pipeline. Hence, both the content (CO2) of the pipeline and thehuman activity around the pipeline need to be categorized, and will provide the basis for safety levelimplied in the pipeline design criteria. CO2 pipelines have MAH potential due primarily to a combinationof vast pipeline inventories and the consequences if CO2 is inhaled at concentrations above thresholdlevel. A precautionary approach to risk management is therefore recommended, and it is recommendedthat, until sufficient knowledge and experience is gained with CCTS pipeline design and operation, amore stringent fluid categorization should be applied in populated areas, than one would normally applyfor CO2, for example more stringently than according to ISO 13623.

Page 390: Vol 2 onshore pipelines the road to success 3rd edition

144

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.8.10 Preliminary route selection

Modern people’s lives are based on an environment in which energyplays a predominant role. Oil and gas are the major participants inthe supply of energy, and pipelines are the primary means by whichthey are transported (Figure 7). It is no coincidence that an extensivepipeline network goes hand in hand with a high standard of livingand technological progress.

Routing is extremely important for CO2 pipelines, as any gas leakage will be difficult to detect.Population densities should be avoided, with recommended buffer zones of up to 300 – 500 m frompopulated areas. Valleys and low points are also to be avoided as CO2 is denser than air and canaccumulate to dangerous concentrations.

Fig. 7: Nation's existing pipeline infrastructure used to move oil and natural gas

The general recommendation with respect to CO2 pipeline routing is that a standard approach shouldbe applied, as for route selection for hydrocarbon pipelines. The standards referred to, in combinationwith the specific CO2 safety aspects and the pipeline design considerations, provided elsewhere in theDNV RP, give the necessary guidance on CO2 pipeline routing issues.

Route selection is a process of identifying constraints; avoiding undesirable areas; and maintaining theeconomic feasibility of the pipeline. Having to divert the pipeline around obstacles can be very costly.For example, an NPS 42 (nominal pipe size 42 inches diameter) pipeline costs more than $1,000 permeter to build [17].

The ideal route, of course, would be a straight line from the origin to the terminal point. However,geography, environmental, design, and construction constraints usually alter the route. The followingfactors must be considered prior to selecting the optimal route for the pipeline: cost efficiency, pipelineintegrity, environmental impacts, public safety, land-use constraints, and restricted proximity to existingfacilities.

Page 391: Vol 2 onshore pipelines the road to success 3rd edition

145

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

The initially selected routes should address the intrinsic and extrinsic constraints inherent to pipelineconstruction and operation by avoiding or minimizing the various geographic and regulatory restrictions.The following elements headline restrictions, construction challenges, factors that affect routes andfactors that can actually help routing and are considered during the selection process. Considering all ofthese factors, possible routes are first selected.

Related to rivers, creeks, lakes, and swamps

• Unnecessary crossings

• Braided channels

• Areas of erosion potential

• Bedrock

• Natural meander progression

Related to physiography

• Excessively steep slopes

• Side slopes

• Rocky slopes

• Erosive soils

Pipeline route selection, survey, and geotechnical guidelines

• Rocky soils

• Sandy soils

• Earthquake intensities/locations

• Fault locations/types/movements

Related to the environment

• Fish spawning areas

• Endangered species’ habitats

• Historical and archaeological sites

• Merchantable timberlands

Other factors

• Existing corridors

• Road and railway crossings

• Areas of population concentration

• Restricted areas such as national parks

• Native reservations

• Forest regeneration sites

• Temporary and permanent access

• Camp locations (if applicable)

• Construction schedules

Page 392: Vol 2 onshore pipelines the road to success 3rd edition

146

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.8.11 Materials of CO2 pipelines

The selection of materials should be compatible with all states of the CO2 stream [17]. Oxygen and freewater is usually removed from the CO2 stream to avoid corrosion. Dry CO2 does not cause corrosion inthe carbon-manganese steel generally used in pipelines under ordinary circumstances. If the CO2cannot be dried it can still be transported through corrosion-resistant (stainless) steel pipes, but this willsignificantly increase the cost of the pipeline.

Line pipe materials

Candidate materials need to be qualified for the potential low temperature conditions that may occurduring pipeline depressurization situation. Carbon-manganese steel is considered feasible for pipelineswhere the water content of the CO2 stream is controlled to avoid formation of free water in the pipeline.Application of homogenous corrosion resistant alloy (CRA) or CRA clad/lined line pipe may be an option,but normally only for shorter pipelines.

Non-line pipe materials

Dense phase CO2 behaves as an efficient solvent to certain materials, such as non-metallic seals. Withrespect to elastomers (a polymer with visco-elasticity, generally having low Young's modulus and highyield strain), both swelling and explosive decompression damage must be considered.

Internal coating

Internal coating for either flow improvement or corrosion protection is generally not recommended dueto the risk of detachment from the base pipe material in a potential low temperature conditionassociated with a too rapid pipeline depressurization.

Running ductile fracture control

The pipeline shall have adequate resistance to propagating fracture. The fracture arrest properties of apipeline intended for transportation of a CO2 composition at a given pressure and temperature dependson the wall thickness of the pipe, material properties, in particular the fracture toughness, and thephysical properties of the CO2 composition in terms of saturation pressure and decompression speed.The pipeline should be designed such that the rupture is arrested within a small number of pipe joints.The fracture control design philosophy may be based on ensuring sufficient arrest properties of thepipeline base material to avoid ductile running fractures or installation of fracture arrestors at appropriateintervals.

To prevent ductile running fractures, the decompression speed of the fluid needs to be higher than thefracture propagation speed of the pipe wall, i.e. if the decompression speed outruns the fracturepropagation speed, the fracture will arrest. The particular issue related to CO2 is the step change inrapid decompression speed as the pressure drops down to the liquid-vapour line (saturation pressure).Compared to natural gas, the decompression speed of liquid CO2 may be significantly higher. However,as vapour starts to form, the decompression speed of the CO2 stream drops significantly. To that extentrunning ductile fractures is a higher concern for CO2 pipeline compared to, for example, natural gaspipelines, this needs to be related to the design pressure of the pipeline.

For low design pressure (typically less than 150 bar) [17], CO2 pipelines may come out worse comparedto natural gas pipelines. This may, however, not be the case for higher design pressure. A fracturecontrol plan should be established. A coarse assessment of fracture arrest may be performed throughthe following steps, [17]:

Page 393: Vol 2 onshore pipelines the road to success 3rd edition

147

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Step 1: Determine fracture arrest pressure (PA) based on proposed pipeline design in terms of pipelinediameter (D), wall thickness (t) and material specifications.

Step 2: Determine the critical (saturation) pressure (PC) based on CO2 stream composition

Step 3: If PA > PC, fracture arrest

It should be noted that for a CO2 stream containing a significant fraction of non-condensable gases,such as H2, the above approach may be non-conservative.

As a consequence of the above approach, low (design) pressure pipeline (thin-walled) will have a lowermargin between arrest pressure (PA) and saturation pressure (PC), hence be more susceptible torunning ductile fractures. In case neither fracture initiation control nor fracture propagation control isensured by other means, fracture arrestors should be installed. The feasibility and type of fracturearrestors should be documented. Spacing of fracture arrestors should be determined based on safetyevaluations and cost of pipeline repair.

Internal corrosion

The primary strategy for corrosion control should be sufficient dewatering of the CO2 at the inlet of thepipeline. For a carbon steel pipeline, internal corrosion is a significant risk to the pipeline integrity in caseof insufficient dewatering of the CO2 composition. Free water combined with the high CO2 partialpressure may give rise to extreme corrosion rates, primarily due to the formation of carbonic acid. Themost likely cause of off-spec water content is considered to be carry-over of water/glycol from theintermediate compressor stages during compression of the CO2 to the export pressure.

There are currently no reliable models available for prediction of corrosion rates with sufficient precisionfor the high partial pressure of CO2 combined with free water. The presence of other chemicalcomponents such as H2S, NOx or SOx will also form acids which in combination with free water willhave a significant effect on the corrosion rate.

13.8.12 Design considerations of CO2 pipelines

Dry CO2 is inert to commonly used industrial materials. However, CO2 is an acid gas and will react withwater to form carbonic acid. Carbonic acid corrosion is a formidable challenge and consideration forfacilities that process CO2.

Material selection in these environments is governed by the corrosion rate, which can be established bya number of predictive tools. For example, the De Waard/milliams nomogram is used to estimatecorrosion rates of carbon steel under various operating temperatures and CO2 partial pressures [17].

The use of CO2 for enhanced oil recovery projects typically requires CO2 transmission by pipeline. Theproperties of CO2, corrosion rates, and gas mixture make-up, are important considerations towardestablishing the material specification for a CO2 pipeline. The gas mixture may include a mix of CO2 andhydrocarbons, which could include liquid components, impacting overall pipeline pressures and creatingdesign issues as the pipeline may need to be designed to operate with either gas, or liquid-phase,content.

To be transported in a pipeline, CO2 should be compressed to ensure that single-phase flow isachieved. The most widely used operating pressure is between 7.4 and about 21 MPa [17]. Above 7.4MPa CO2 exists as a single dense phase over a wide range of temperatures (see Figure 1). Clearly atransmission pipeline can experience a wide range of ambient temperatures, so maintaining stability ofthis single phase is important in order to avoid considerations of two-phase flow that could result in

Page 394: Vol 2 onshore pipelines the road to success 3rd edition

148

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

pressure surges. The DNV RP contains a separate section related to design issues that are specific toCO2 and that are normally considered as part of the pipeline concept phase. Some of these issues arebriefly presented below [13].

Pipeline routing

The general recommendation with respect to CO2 pipeline routing is that a standard approach shouldbe applied, as for route selection for hydrocarbon pipelines. The standards referred to, in combinationwith the specific CO2 safety aspects and the pipeline design considerations provided elsewhere in theRP, should give the necessary guidance on CO2 pipeline routing issues.

For onshore pipelines the population density should be determined according to ISO 13623 [2]. Thedistances used to determine the population densities should, until CO2 specific distances are definedand stakeholder accepted, be determined using dispersion modelling. Due care should be takenregarding the heavier-than-air characteristic of CO2 and ground topography when determining the zonewidth along the pipeline.

CO2 stream composition evaluations

It is recommended that the CO2 stream composition specification shall be determined based upontechnological and economical evaluations, and compliance with appropriate regulations governing thecapture, transport and storage elements of a CCTS project.

CO2 composition in integrated pipeline networks

In case of mixing of different CO2 streams in a pipeline network, it must be ensured that the mixture ofthe individual compounds from the different CO2 streams do not cause:

• Risk of water dropout due to reduced solubility of one of the streams

• Undesired cross chemical reactions/effects

Water content

Maximum water content in the CO2 stream at the upstream shall be controlled to ensure that no freewater may occur at any location in the pipeline within the operational and potential upset envelopes andmodes, unless corrosion damage is avoided through material selection. For normal operation a minimumsafety factor of 2 should be specified between the specified maximum allowable water content and thecalculated minimum water content that may cause water drop within the operational envelope.

Typical pipeline-engineering considerations for CO2 include [2]:

• Operating pressure

• Operating temperature

• Gas mixture composition

• Corrosivity

• Ambient temperatures

• Pipeline control (SCADA)

Page 395: Vol 2 onshore pipelines the road to success 3rd edition

149

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Examples of additional specific design considerations inplace for CO2 pipelines are:

• Effect of cooling from pressure changes

• Requirement for dehydration of CO2• Routing topography

• Dispersion pattern

• Valve materials

• Compressor, seal, and auxiliary materials

• Requirement to minimise flow transients

• Risk assessment focused on impact of rupture on human health

13.8.13 Pipeline protection/external protection

Buried pipelines are subject to external corrosion caused by the action and composition of the soilssurrounding them. During the design stage, the types of external coatingmaterial and cathodic systemsrequired to protect the pipeline from external corrosion must be defined [17]:

Pipeline design and construction: a practical approach

Pipeline coating and cathodic protection are chosen according to economics and ability to protect thepipeline. External coating is usually a plastic material that is wrapped or extruded onto the pipe orfusion-bonded to the surface. External coatings have to be designed to serve as a corrosion barrier andto resist damage during transportation, handling, and backfilling. Therefore, in some cases corrosionprotection coatings are combined with other external coatings, such as insulation, rock-shield, orconcrete.

Internal protection

Fluids containing corrosive components such as salt water, hydrogen sulphide (H2S), or carbondioxide/monoxide can cause internal corrosion. Many of the internal corrosion problems can hecorrected in the design stage. This is done by proper design and selection of materials appropriate forthe fluid to be transported. Sour gas is natural gas or any other gas containing significant amounts ofhydrogen sulphide (H2S). Although the terms acid gas and sour gas are sometimes usedinterchangeably; a sour gas is any gas that specifically contains hydrogen sulphide in significantamounts, whereas an acid gas is any gas that contains significant amounts of acidic gases such as CO2or hydrogen sulphide. Thus, carbon dioxide (CO2) by itself is an acid gas, not a sour gas.

Corrosions in CO2 pipelines

Pitting corrosionA specification for the line pipe material developed at the design stage ensures that the pipe produced issuitable for the operating temperatures that will be encountered. Pitting corrosion results from chemicalattack at low points where fluids settle and accumulate in the piping system.

General corrosionGeneral corrosion results from chemical attack and usually occurs on the upper half of the pipe walladjacent to low areas where the pipe wall is alternately wet and dry. The use of corrosion inhibitors hasproven to be the only effective method to mitigate internal corrosion. On-stream pigging facilities aregenerally incorporated into the design of the system to permit the removal of liquid accumulation on aschedule. On-stream pigging also improves the distribution of the corrosion inhibitors and is a valuableaid in the mitigation of internal corrosion.

Page 396: Vol 2 onshore pipelines the road to success 3rd edition

150

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Erosion corrosionErosion corrosion results from impingement of fluids/chlorides on the pipe surface at high flowingvelocities. Piping is generally sized to limit flowing velocities below the critical velocity at which corrosionerosion will begin to occur. Critical velocity is defined as the point at which velocity is a significant factorin the removal of inhibitor films or corrosion products [17].

In-line inspection

In-line inspection of pipelines for internal and external corrosion, metallurgy, and weld condition isextensively used for integrity management. A main challenge for in-line inspection is the medium throughwhich the inspection tool must travel. One of the most challenging media is CO2. Although CO2 is notvery aggressive chemically, under certain conditions it is a very strong solvent. The size and shape of themolecules allow it to diffuse into nearly every type of rubber or plastic, hence its critical effect onnumerous parts of inspection tools, e.g. cables and sensors. Another issue is the dryness of thetransported CO2, which can lead to high frictional wear on the cups and discs, and can also prevent theequalization of potential electrical conductivity. The wear of the cups and discs can limit the length of linethat can be pigged. The electrical charge that can build up due to the movement of the cups and discsalong the pipe wall can damage the electrics of the tool.

In-line inspection tool providers are aware of the issues, and solutions are available. For instance,different materials have been developed for the cups and disc. Although parts may still wear, or getdamaged, during the in-line inspection, they should not impact the performance and data gathering ofthe in-line inspection. Therefore, the main consequences for inspecting CO2 pipelines is the additionalcost for replacing worn and damaged parts subsequent to an inspection. To overcome this, a number ofin-line inspection companies have conducted tests in order to establish appropriate levels of CO2resistance for in-line inspection materials.

In summary, internal inspection of CO2 pipelines in both gaseous and dense phase is deemed to beproven, and commercially available from a number of inspection companies, who are confident in theirability to inspect CO2 pipelines. With ongoing experience and technology updates, inspection of CO2pipelines will be no different to inspecting oil and gas pipelines.

13.8.14 CO2 dispersion studies

Pipeline failure can lead to CO2 escaping from the pipeline, and potentially damaging the pipelinematerial and also endangering life (Figure 8). It is possible for dangerous levels of CO2 to form outdoorsin trenches, depressions or valleys, This is particularly likely when the gas is colder than the surroundingair, which may occur following pressurized release, or due to undetected leaks. Dispersion modellinginvolves analysing and evaluating risks of how far CO2 will travel following a pipeline failure, or leak, andat what concentrations.

Fig. 8: Dispersion of CO2

Page 397: Vol 2 onshore pipelines the road to success 3rd edition

151

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Although dispersion modelling of gases and liquids emitted from vessels and pipelines has beenundertaken routinely by industry for several decades as part of a safety risk assessment, carbon dioxide,CO2, presents a number of new challenges to dispersion models due to its particular thermodynamicproperties. Due to this, there are a number of industry research exercises ongoing on how to best modelCO2 dispersion, and also the validation of the analysis methodology and models.

There is currently very little publicly-accessible experimental data on CO2 releases of the magnitude andphysical characteristics expected from a dense phase CO2 pipeline. A number of collaborative projectsare being planned, and one or two have recently commenced e.g. CO2PIPETRANS II, COOLTRANS.This means that validation of CO2 dispersion models, particularly with regard to prediction of leakagerates and thermodynamic properties of plumes is not as well-developed as would ideally be the case.

The COOLTRANS research programme involves collaboration between a number of universities andrecognized industry experts to conduct experimental and theoretical studies to address knowledge gapsin the theoretical models used for predicting the behaviour of CO2 under release conditions in which itdecompresses, flows out of the pipeline, and disperses, and the pipeline material properties which arerequired to control failure and the behaviour of any defects in the pipeline. The aim is to enhance existingengineering models and methods applied in dispersion analysis.

A primary safety issue is the possibility of solid or “dry ice” discharge during an accidental release. This isrelevant given the near-adiabatic decompression process and the unusually high Joule Thomsoncoefficient expansion of CO2. Solids discharge will affect many aspects of the ensuing hazard spanningthe erosion of surrounding equipment, atmospheric dispersion, and potentially the pipe propensity tofracture propagation.

The main commercially available software used for dispersion modelling is the PHAST dispersion model(version 6.54 and the new revision 6.6) which can be used to make predictions of CO2 concentrationsat sensitive receptors intercepted by the plume from a leaking CO2 source (Figure 9). PHAST can beused to assess the extent of adverse CO2 concentrations, for appropriate leakage scenarios frompipeline under most circumstances, but may not be suitable for dispersion analysis in heavily built-upareas of plant or areas of varying topography.

Fig. 9: Modelling of a plume from a leaking CO2 source

Page 398: Vol 2 onshore pipelines the road to success 3rd edition

152

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Computational fluid dynamics (CFD) software, such as ANSYS, is sometimes used to supplement theuse of the PHAST model. This is for assessing CO2 flows around buildings as part of a safety riskassessment, and situations of potential CO2 accumulation such as certain topographical features. CFDmodelling can also be used to test various assumptions implicit in the PHAST dispersion model, in orderto increase the confidence of the PHAST predictions. In particular, the sensitivity of assumptions maderegarding rate of sublimation of solid CO2 formed in the initial jet of a CO2 leak to the subsequentdispersion can be examined.

13.8.15 Leak detection

Pipelines are built to defined codes and standards that are subject to regulatory approval to assure ahigh level of safety, particularly in populated areas. Pipelines in operation are monitored internally andexternally by corrosion monitoring and leak detection systems. In the event of a leak, transport of gas isshutdown automatically, assuming the leak is detected.

CO2 leaking from a pipeline is potentially a physiological hazard to humans and animals. As CO2 has ahigher density than air, it may accumulate locally to dangerous levels under calm conditions. Particularcare must therefore be taken when CO2 pipelines go through populated areas. This is similar to thechallenges involved in pipeline transport of hydro-carbon gases.

Should CO2 be transported through populated areas, specified maximums of toxic impurities would beset much lower. If the CO2 contains significant levels of hydrogen sulphide (H2S), this could significantlyincrease the impact of a leak or rupture.

Leak detection systems are continually evolving over the years and can be of different types. Acomputational pipeline monitoring (CPM) system measures the fluid volume entering the pipeline andcompares it to the fluid volume exiting the line, and this system can detect leaks to very low levels. Leakdetections systems can sometimes take time to confirm the leak, and hence to initiate closure of anyisolation or sectional valves, whilst allowing the leaking gas to accumulate at the land contours andcollect in low points on the terrain. Since CO2 is dangerous in low concentrations, the time lag forclosing may not be acceptable. The current systems may not be suitable since it is necessary to detectsmall leaks before these become catastrophic. Considering that embrittlement can occur at the leakagearea, a small leak can lead to a large leak of CO2 quite rapidly.

To support safe pipeline operation, it may be prudent to use odorants to allow detection of low levelleaks that give early warning for impending failures or “weak links” in the pipeline.

Other alternatives include using pipe-in-pipe technology in high risk locations whereby the pipe carryingCO2 is contained within a carbon steel carrier pipe. The annulus could contain sensors and annuluspressure monitors to provide early warning for system leaks (Figure 10) [19].

Fig. 10: Pipe-in-pipe technology with gas detection and annulus pressure monitors [19]

Page 399: Vol 2 onshore pipelines the road to success 3rd edition

153

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Other options include event detection methods that sense local ground movement around the pipeline.This would include burying a fibre-optic cable in the same trench as the pipeline. The fibre-optic cablewould detect any noise (e.g. hissing noise from a leak), or any ground movement, and alert theoperators, who can either go the event location for a visual inspection, or shut the pipeline down (Figure11) [19].

Fig. 11: Example of event detection method [19]

13.8.16 Pipeline cost model

Detailed construction cost data for actual CO2 pipelines are not readily available. Therefore, the data setused to develop the pipeline capital cost model is based on natural gas pipelines. However, there aremany similarities between transport of natural gas and CO2. Both are transported at similar pressures,approximately 10 MPa and greater [15]. Assuming the CO2 is dry, which is a common requirement forCCTS, both pipelines will require similar materials. Thus, a model based on natural gas pipelines offers areasonable approximation for a preliminary design model used in the absence of more detailed projectspecific costs.

The costs of pipelines can be categorised into three items:

• Construction costs

• Material/equipment costs (pipe, pipe coating, cathodic protection, telecommunicationequipment; possible booster stations)

• Installation costs (labour)

• Operation and maintenance costs

• Monitoring costs

• Maintenance costs

• (Possible) energy costs

• Other costs (design, project management, regulatory filing fees, insurances costs,right-of-way costs, and contingencies allowances)

The pipeline material costs depend on the length of the pipeline, the diameter, the amount of CO2 to betransported and the quality of the carbon dioxide.

The CO2 pipeline capital cost model, published in the literature, is based on regression analyses ofnatural gas pipeline project costs published between 1995 and 2005 [16]. These project costs arebased on Federal Energy Regulatory Commission (FERC) filings from interstate gas transmissioncompanies. The entire data set contains the ‘‘as built’’ costs for 263 on-shore pipeline projects in thecontiguous 48-states and excludes costs for pipelines with river or stream crossings as well as lateralpipeline projects (i.e., a pipeline of secondary significance to the mainline system, such as a tie-in

Page 400: Vol 2 onshore pipelines the road to success 3rd edition

154

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

between the mainline and a power plant) [15]. Costs from each year’s projects have been adjusted to2004 US dollars using the Marshall and Swift equipment cost index. The pipeline data set containsinformation on the year and location of the project and the length and diameter of the pipeline. Locationsare listed by state in the data set; however, to develop the regression models, the states have beengrouped into six geographical regions.

The total construction cost for each project is broken down into four categories: materials, labour, right-of-way (ROW), and miscellaneous charges. The materials category includes the cost of line pipe, pipecoatings, and cathodic protection. Labour is the cost of pipeline construction labour. ROW covers thecost of obtaining right-of-way for the pipeline and allowance for damages to landowners’ propertyduring construction. The miscellaneous includes the costs of surveying, engineering, supervision,contingencies, telecommunications equipment, freight, taxes, allowances for funds used duringconstruction, administration and overheads, and regulatory filing fees [22].

Figure 12 shows results from the model as a function of pipeline distance for a project in the MidwestUSA for four different design mass flow rates. In this example the pipeline capacity factor is assumed tobe 100%, so the annual mass transported equals the design capacity of the pipeline. Figure 12 showsthat the levelised transport cost increases with distance and decreases with increasing design capacityfor a fixed distance. For a typical 500 MW power plant (emissions of approximately 2–3 million tons peryear), the transport cost could range from US$ 0.15 per ton for a 10 km pipeline to US$ 4.06 per ton fora 200 km pipeline based on a 100% capacity factor [15].

Fig. 12: Illustrative results from a transport model showing the total transport cost over a range ofpipeline design capacities and pipeline lengths. (All costs in 2004 US dollars) [15]

For an annual capacity factor of 75% (typical for existing coal-fired power plants), the levelised cost perton would increase to between US$ 0.20 per ton for the 10 km pipeline to US$ 5.41 per ton for 200 kmpipeline. Figure 12 also illustrates the differences in levelised cost between the same pipelineconstructed in the Northeast and Central regions. For all pipeline distances and all pipeline designcapacities, the transport cost is lowest in the Central region and highest in the Northeast region [15].

Page 401: Vol 2 onshore pipelines the road to success 3rd edition

155

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Illustrative results from the pipeline model were developed using parameters representative of a typicalcoal-fired power plant in the Midwest region of the United States (Table 5). Several parameter values(e.g. capital recovery factor) are default values from the IECM software [15]. Table 5 includes a nominalCO2 mass flow rate and pipeline length, but these two parameters are varied parametrically in the casestudy results presented here.

Model parameter Deterministic value Uncertainty distributionPipeline parametersDesign mass flow (Mt/year) 5 Variables 5 VariablePipeline length (km) 100 Variables 100 VariablePipeline capacity factor (%) 100 Uniform(50, 100) 100 Uniform (50, 100)Ground temperature (8C) 12 12Inlet pressure (MPa) 13.79 Uniform (12, 15) 13.79 Uniform (12, 15)Minimum outlet pressure (MPa) 10.3 10.3Pipe roughness (mm) 0.0457 0.0457Economic and financial parametersProject region Midwest MidwestCapital recovery factor (%) 15b Uniform(10, 20) 15b Uniform (10, 20)Annual O&M cost (US$/km/year)3250 Uniform (2150, 4350) 3250 Uniform (2150, 4350)Escalation factor for materials cost1 Uniform (0.75, 1.25) 1 Uniform (0.75, 1.25)Escalation factor for labour cost1 Uniform (0.75, 1.25) 1 Uniform (0.75, 1.25)Escalation factor for ROW cost1 Uniform (0.75, 1.25) 1 Uniform (0.75, 1.25)Escalation factor for miscellaneouscost 1 Uniform (0.75, 1.25) 1 Uniform (0.75, 1.25)

a This parameter is modelled as a series of discrete values.b Corresponds to a 30-year plant lifetime with a 14.8% real interest rate (or, a 20-year lifewith 13.9% interest rate).

Table 5: Illustrative case study values for the model parameters [15]

For the case study CO2 pipeline, the total levelised cost is estimated to be US$ 1.16 per ton of CO2transported. The cost category that accounts for the largest regional difference is the labour cost, whichis lowest in the Southwest and highest in the Northeast. In this example the pipeline capacity factor isassumed to be 100%, so the annual mass transported equals the design capacity of the pipeline.CCTS is a high cost abatement option and will remain so in the short-term. It is technically immature (atleast in terms of integrating capture, transport and storage in full-scale projects) and, unlike renewableenergy and energy efficiency, it does not generate revenues if there is no carbon price or a commercialmarket for the captured CO2 for enhanced oil recovery. Current carbon prices are well below CCTScosts (Figure 13) [12]. This is because current short-term emissions targets can be met without the useof CCTS. Research and development, and experience gained from demonstration projects will lowercosts, while rising carbon prices will boost revenues.

Page 402: Vol 2 onshore pipelines the road to success 3rd edition

156

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Fig. 13: Current carbon prices from the EU Emissions Trading Scheme or the Clean DevelopmentMechanism [12]

13.8.17 Future challenges

The future role of gas-fired power generation in Europe is coming under increasing scrutiny, in thecontext of ambitious climate stabilization objectives. Scenarios developed by civil society, industry andthe European Commission consistently point to an increasingly important role for gas power to provideflexible generating capacity that can respond to intermittent generation from renewable. But, despite gaspossessing lower carbon content than coal, these studies also indicate that gas plants may need to fitCCTS technology in the future.

The European Commission’s Energy Roadmap 2050 sets out the scale of the challenge: “For all fossilfuels, carbon capture and storage will have to be applied from around 2030 onwards in the powersector in order to reach the decarbonisation targets […]. Without CCTS, the long term role of gas maybe limited to back-up and balancing renewable energy supplies.” These statements present a freshperspective for consideration in CCTS policy debates, where the overwhelming focus over recent yearshas been on how CCTS could enable the continued use of coal and lignite. Gas CCTS has not receivedthe same level of priority, for example in respect to funding CCTS demonstration projects.But despite this lower level of attention, the Energy Roadmap 2050 and other studies identify asignificant ramp up of gas power with CCTS in decarbonising the power sector through to 2050. Europeis likely to experience a “dash for gas” in its power sector in the next two decades, with currently-planned gas plants expected to double EU gas power capacity. This is both an opportunity and achallenge for Europe’s decarbonisation mission. The European Commission’s Energy Roadmap 2050,published in December 2011, identified the need for a significant ramp-up of gas power with CCTS andindicated that gas CCTS will be of greater importance than coal CCTS within two decades. But practicalchallenges could yet limit the deployment of gas CCTS. In particular, it must be practical to capture CO2at individual gas plants, and transport it to storage sites with sufficient capacity for storage.It has been reported that by 2030 over 60% of gas power plants will either not have been assessed forcapture readiness or will face difficulties in accessing CO2 storage. This highlights the risk of freshinvestments locking in generating plant to locations unsuitable for CCTS and increasing the future costsof decarbonisation.

Page 403: Vol 2 onshore pipelines the road to success 3rd edition

157

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

More positively, our analysis indicates that the practical potential for gas CCTS could reach 50 to 100GW by 2030 under different policy scenarios. However, this will only be delivered with strong supportfrom governments and the European Commission to require meaningful capture readiness actions fromplants constructed during the coming “dash for gas”. Such actions would help provide wider impetus forthe application of CCTS for the power sector and industry worldwide.

Governments can begin to address the challenges of the capture, transport and storage of CO2 for gaspower plants through their implementation of the CCTS directive. The European Commission canactively increase industry expectations and create positive momentum in support of gas CCTSdeployment. This will require fresh proposals for financial and regulatory incentives that support thebusiness case for gas CCTS, as well as attention to the practical barriers to deployment.

Encouragingly, the five biggest economies of the EU have the greatest potential for CCTS by 2030. It is,therefore, the actions of a few key countries in Western Europe which will largely determine the uptakeof gas CCTS in the next 20 years and, by implication, the future of gas-fired power generation in the EU.CO2 capture and storage is technologically feasible and could play a significant role in reducinggreenhouse gas emissions over the course of this century. Although parts of the technology are triedand tested, increased knowledge, experience, and reduced uncertainty about specific aspects of CO2capture and storage would be important to enable its large-scale deployment.

First, the technology needs to mature further. While the individual components of CO2 capture andstorage are well-developed, they still need to be integrated into full-scale projects in the electricity sector.Such projects would demonstrate whether the technology works when fully scaled up, thus increasingknowledge and experience. More studies are needed to analyse and reduce the costs and estimate thepotential capacity of suitable geological storage sites. Regarding other forms of storage, pilot scaleexperiments on mineral carbonation are needed to reduce costs and net energy requirements. Inaddition, studies concerning the ecological impact of CO2 in the deep ocean are required.

The adequate legal and regulatory environment also needs to be further developed. This must includeagreed methods for estimating and reporting the amount of CO2 avoided by CO2 capture and storageas well as the amounts that may leak over the longer term. Long-term liabilities regarding geologicalstorage and potential legal constraints on storage in the marine environment need to be taken intoaccount.

Other issues to be resolved include the potential for transfer and diffusion of CO2 capture and storagetechnologies, opportunities for developing countries to exploit them, application of these technologies tobiomass sources of CO2, and the potential interaction between investment in CO2 capture and storageand other mitigation options.

There are a number of CO2 storage pipelines already operating. Ongoing CO2 pipeline transportationtechnology research includes:

• Quantitative hazard assessment, addressing accurate predictions of fluid phase,discharge rate, and atmospheric dispersion; quantifying hazardous consequences;basis for emergency response and land use planning

• Materials for CO2 pipeline transport systems

• Steady state and transient modelling

• Anthropogenic CO2 corrosion with focus on the effect of impurities.

Page 404: Vol 2 onshore pipelines the road to success 3rd edition

158

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

13.8.18 Conclusions and recommendation

One possible option for reducing CO2 emissions is to capture CO2 and transport it to be storedunderground. This technique is called carbon capture, transport, and storage (CCTS). This chapterreviews the techniques of capturing and transporting CO2, talking about the challenges, opportunities,equipment, sustainability, facilities, and costs.

CCTS is still a high-cost option and will remain so in the short term. It is technically immature (at least interms of integrating capture, transport and storage in full-scale projects) and, unlike renewable energyand energy efficiency, it does not generate revenues if there is no carbon price or a commercial marketfor the captured CO2 for enhanced oil recovery. This is because current short-term emissions targetscan be met without the use of CCTS. Research and development, and experience gained fromdemonstration projects will lower costs, while rising carbon prices will boost revenues.

CCTS will require support for both capital deployment and the operation of capture units, networks andstorage. Faced with a combination of technology risk, immature regulatory and policy frameworks andlow or absent market revenues, capital providers will be reluctant to commit substantial sums.Investment support will be necessary, in the form of grants and/or provision of debt or equity capital, aswill operating support for CCTS (i.e. incentive mechanisms to provide additional revenue for each unit ofoutput where a CCTS unit is operational). Plants fitted with CCTS will have higher operating costs, butoften no additional revenue.

Among other conclusions and recommendations are:1. There are risks associated with CO2 transport; were the gas to leak, it can collect in

low ground with a risk of asphyxia at high concentrations, since it is denser than air.This can be mitigated with appropriate design and monitoring and careful siting.

2. It is during the injection of CO2 that the fluid pressures are greatest and the CO2 ismost mobile and hence potentially able to escape. Over time, the CO2 will dissolve,precipitate or become trapped and the pressure dissipates. This implies that propermonitoring and injection design is needed for the duration of the project, but notnecessarily long afterwards.

3. It is cheaper to collect CO2 from several sources into a single pipeline than totransport smaller amounts separately. Early and smaller projects will face relatively hightransport costs, and therefore be sensitive to transport distance, whereas an evolutiontowards higher capacities (large and wide-spread application) may result in a decreasein transport costs.

4. There is a huge amount of field experience from the oil industry of injection of CO2deep underground. CO2 storage is quite well understood with over one hundred sitesworldwide where CO2 has been injected.

Over time, CCTS technology will mature and investors will become more familiar with it. As emissionreduction targets become more demanding, firms will come to understand where the best opportunitieslie. Policy makers may either direct emissions savings where they believe them to be most cost-effectiveor simply let the market decide where to invest. Without further policy support for operations, the assetwill not be used.

The policy choices fall under four broad themes and the policy approach is likely to shift over time:

• Funding: incentives for capital deployment or for operations

• Costs and risks: borne by the public sector or the private sector

• Subsidies/penalties: subsidising abatement or penalizing emissions

• Technology support: targeting CCTS-specific incentives or technology-neutralincentives.

Page 405: Vol 2 onshore pipelines the road to success 3rd edition

159

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Over time, risks surrounding the technology will diminish and the regulatory and policy framework willbecome better established and understood. As returns over the lifetime of the asset are substantiated,investors will be more willing to commit funds without capital support. If expectations are realised,capital support can decline and make way for a greater emphasis on operating support.

References

1. Aarnesa J. and Selmer-Olsena S. and Carpentera M. Flacha T. (2009): Towards guidelines forselection, characterization and qualification of sites and projects for geological storage of CO2.Elsevier Ltd. Norway.

2. Barrie J. and Brown K. and Hatcher P. (2004): Carbon Dioxide Pipelines: A Preliminary Reviewof Design and Risks. Canada.

3. Blunt M. (2010). Carbon Dioxide Storage: Grantham Institute for Climate Change, BriefingPaper No 4. Imperial College, London.

4. Carbon Capture and Storage (2012). From Wikipedia, the free encyclopedia:http://en.wikipedia.org/wiki/Carbon_capture_and_storage.

5. Carbon dioxide (2012). From Wikipedia, the free encyclopedia:http://en.wikipedia.org/wiki/Carbon_dioxide#Physical_properties.

6. Det Norske Veritas (DNV) (2010). Project Specific Guideline for Safe, Reliable, and Cost-Effective transmission of CO2 in Pipelines, Energy Report. Joint Industrial Project (JIP),

7. Eldevik F. and Graver B. and Torbergsen L. and Sau O. (2009): Development of a Guideline forSafe, Reliable and Cost Efficient Transmission of CO2 in Pipelines. Elsevier Ltd. Norway.

8. Energy Institute (2010). Good Plant Design and Operation for Onshore Carbon CaptureInstallations and Onshore Pipelines. London, www.energyinst.org

9. Enviance (2006). Meeting the GHG Challenge, Developing the Right Reporting Solution, WhitePaper. USA, www.enviance.com.

10. IPCC Special Report on Carbon dioxide Capture and Storage (2005). Carbon Dioxide Captureand Storage. UK, www.ipcc.ch.

11. Green Alliance Policy In sight (2012). The CCS Challenge, Securing a second chance for UKCarbon Capture and Storage. London, www.green-allinace.org.uk.

12. International Energy Agency (IEA) (2012). A Policy Strategy for Carbon Capture and Storage.Information paper. France, www.iea.org.

13. Johnsen K., Helle K., Roneid S. and Holt H. (2011). DNV Recommended Practice: Design andOperation of CO2 Pipelines. Elsevier Ltd.

14. Johnsen K., Helle K. and Myhrvold T. (2009); Scale-up of CO2 capture processes: The role ofTechnology Qualification. Elsevier Ltd.

Page 406: Vol 2 onshore pipelines the road to success 3rd edition

160

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Section 13

Page 407: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Glossary

Glossary

The following definitions and abbreviations apply in the context of this Appendix unless otherwisementioned:

AGI Above ground installationsAUT Automatic ultrasonic testingCAD Computer-aided designCANBUS Controller–area network bus standardCANDATA CANBUS dataCCS Camp control systemCMod EDMS contacts moduleCP Cathodic protectionCPM Critical path methodCSE Confined space entryDES Discrete event simulationECI Eddy current inspectionEDI Electronic data interface/interchangeEDMS Electronic document management systemERP Emergency response plansERW Electric resistance weldExTr Expediting and shipment tracking systemFBE Fusion bonded epoxyFLUW Facing, lining up and welding (IPLOCA working group)FMS Fleet management systemFOC Fiber-optic cablesGIS Geographic information systemGPRS General packet radio serviceGPS Global positioning systemGSM Global system for mobileHAZID Hazard identificationHAZOP Hazard and operability studyHFW High frequency induction weldHLA High level architectureHSE Health, safety and environmentHSEIA/HSEIS Health, safety and environment impact assessment/studyHSES Health, safety, environment and socioeconomicIP Injured personIPLOCA International Pipe Line and Offshore Contractors AssociationJMS Journey management systemKP Kilometer pointLLI Long lead itemsLNG Liquified natural gasMAOP Maximum allowable operating pressureMFL Magnetic flux leakageMMS Material management systemMPI Magnetic particle inspectionMTO Made to orderMUT Manual ultrasonic testingNC/NCI IPLOCA Novel Construction InitiativeNDT Non-destructive testingNRT Near-real-time toolOD Outside diameterOEM Original equipment manufacturerPDA Personal digital assistantPDC Planning, design and control (IPLOCA workgroup)PFD Probability to fail on demandPK Point kilometre (see KP)PMV Plant machinery and vehiclesPOD Probability of detection

Page 408: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Glossary

PPE Personal protective equipmentPTO Power take-off QA/QC Quality assurance/controlQRA Quantitative risk assessmentR&D Research and developmentRFID Radio-frequency identificationRFQ Request for quotationROW Right of wayRPE Respiratory protective equipmentRSS Really simple syndication (web feed format for publishing frequently updated works)RT Radiographic testingSAWH Submerged arc-welded pipe, helical seamsSAWL Submerged arc-welded pipe, longitudinal seamsSCADA Supervisory control and data acquisitionSIL Safety integrity levelSIMOPS Simultaneous operationsSIS Safety instrumented systemSMS Short message service (texts)SMYS Specified minimum yield strengthUPI Unique purchase itemsUT Ultrasonic testingVOC Volatile organic compoundVPN Virtual private networkWBS Work breakdown structureWiFi Wireless networking technologyWiMax Worldwide interoperability for microwave access (protocol)WPS Welding procedure specificationsWT Wall thicknessXML Extensible markup language

Page 409: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Bibliography

Bibliography

Section 11 Pipeline Protection Systems

• Various company coating manuals, construction specifications, engineering manuals andmaterial specifications, material, equipment manufacturer and coating applicator websites

• Selected national, industry, and international standards, specifications and recommendedpractices:

• CSA Z245.20-02/Z245.21 - External Fusion Bond Epoxy Coating for Steel Pipe- External Polyethylene Coating for Pipe

• DVGW GW 15: 2007-01 - Protection from corrosion; coating of pipes, fittingsand moulded parts

• DVGW GW 340:1999-04 – FZM-Ummantelung zum mechanischem Schutzvon Stahlrohren und –formstücken mit Polyolefinumhüllung – Anforderungenund Prüfung, Nachumhüllung und Reparatur, Hinweise zur Verlegung und zumKorrosionschutz

• EN ISO 21809-1 (draft) - Petroleum and natural gas industries – Externalcoatings for buried or submerged pipelines used in pipeline transportationsystems - Part 1: Polyolefin coatings (3- layer PE and 3- layer PP)

• EN ISO 21809-2 - Petroleum and natural gas industries - External coatings forburied or submerged pipelines used in pipeline transportation systems - Part 2:Fusion-bonded epoxy coatings (2007)

• EN ISO 21809-3 - Petroleum and natural gas industries -- External coatings forburied or submerged pipelines used in pipeline transportation systems -- Part3: Field joint coatings (2008)

• EN ISO 21809-5 (draft) - Petroleum and natural gas industries -- Externalcoatings for buried or submerged pipelines used in pipeline transportationsystems -- Part 5: External concrete coatings

• Selected technical papers, books and reports:• Comparison Methodology of Pipe Protection Methods, CIMARRON

Engineering Ltd, 2005• Design and Coating Selection Considerations for Successful Completion of a

Horizontal Directionally Drilled (HDD) Crossing, Williamson A.I., Jameson J.R.• Development of a Cost Effective Powder Coated Multi-Component Coating for

Underground Pipelines, Singh P., Cox J.• Field joint developments and compatibility considerations, Tailor D., Hodgins

W., Gritis N., BHR 15th International Conference on Pipeline Protection• High temperature pipeline coatings - field joint challenges in remote

construction, Buchanan R., Hodgins W., BHR 16th International Conference onPipeline Protection

• The importance of hot water immersion testing for evaluating the long termperformance of buried pipeline coatings, John R., Alaerts E., BHR 16thInternational Conference on Pipeline Protection

• Long term performance - critical parameters in materials evaluation andprocess controls of FBE and 3LPO pipeline coatings – Guan S.W., Wong D.T.,World Pipelines, 2008

• Mechanical Protection of Fusion-Bonded Epoxy Coatings by Use of FibreReinforced Mortar, Schemberger D., BHRA, Nov 1985

• New developments in high performance coatings, Worthingham R., CettinerM., Singh P., Haberer S., Gritis N., 2005

• Optimization of Pipeline Coating and Backfill Selection, Espiner R, Thompson I,Barnett J, NACE, 2003

Page 410: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Bibliography

• The Performance Capabilities of Advanced Pipeline Coatings, Singh P.,Williamson A.I., Hancock J.R., Wilmott M.J.

• Pipeline Coatings & Joint Protection: A Brief History, Conventional Thinking &New Technologies, Buchanan R., Rio Pipeline 2003

• Pipeline Girth-Weld Joint Corrosion Protection: Remote Project Field InstallationChallenges, Buchanan R., Dunn R., Gritis N., International Conference onTerrain and Geohazard Challenges Facing Onshore Oil and Gas Pipelines

• The Resistance of Advanced Pipeline Coatings to Penetration and Abrasion byHard Rock, Williamson A.I., Singh P., Hancock J.R., October 2000

• Rock Jacket – A Superior Pipe Protection System for Rocky Terrain,Bragagnolo P., NACE, Nov 1991

• Simulation of Coating Behaviour in Buried Service, Andrenacci A, Wong D.T.,NACE, 2007

• Subsea Pipeline Engineering, Palmer, A.C., King R.A., 2004• Transmission Pipelines and Land Use: A Risk-Informed Approach – Special

Report 281, US Transportation Research Board (TRB), 2004• Trends in Pipeline Field Joint Coatings, Buchanan R., Pipeline Coating

Conference 2009, Vienna, Austria• Vancouver Island Pipeline Project – Material Selection, Engineering Design and

Construction Plan, Yamauchi H., NACE, Nov 1991• Various company coating manuals, construction specifications, engineering

manuals and material specifications, material, equipment manufacturer andcoating applicator websites

• Selected national, industry, and international standards, specifications andrecommended practices:

o DNV-OS-F101 – Submarine Pipeline Systems

o EN ISO 21809-5:2010 - Petroleum and natural gas industries --External coatings for buried or submerged pipelines used in pipelinetransportation systems -- Part 5: External concrete coatings

o NAPCA Bulletin 18-99 - Application Procedures for Concrete WeightCoating Applied by the Compression Method to Steel Pipe

• Selected technical papers, books and articles:o Lepech, M., Popovici, V., Fischer, G., Li, V. and Du, R., Improving

Concrete for Enhanced Pipeline Protection, in Pipeline and GasJournal, March 2010

o McGill, J.C., Novel Approach to Pipeline Weighting ReducesBuoyancy, Cost and Materials, in Water Engineering & Management,April 2002, Volume 149, Number 4

o Palmer, A.C., King R.A. Subsea Pipeline Engineering, 2004

o Popovici, V., A Concrete Legacy, in World Pipelines, September2008

o Popovici, V., Getting the Best from a Byproduct, in World Cement,May 2010

Page 411: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Bibliography

• Various company coating manuals, construction specifications, engineering manuals and materialspecifications, material, equipment manufacturer and coating applicator websites

• Selected national, industry, and international standards, specifications and recommendedpractices:

o CSA Z245.20-02/Z245.21 - External Fusion Bond Epoxy Coating for Steel Pipe - ExternalPolyethylene Coating for Pipe

o DVGW GW 15: 2007-01 - Protection from corrosion; coating of pipes, fittings and mouldedparts

o DVGW GW 340:1999-04 – FZM-Ummantelung zum mechanischem Schutz von Stahlrohrenund –formstücken mit Polyolefinumhüllung – Anforderungen und Prüfung, Nachumhüllung undReparatur, Hinweise zur Verlegung und zum Korrosionschutz

o EN ISO 21809-1 (draft) - Petroleum and natural gas industries – External coatings for buried orsubmerged pipelines used in pipeline transportation systems - Part 1: Polyolefin coatings(3- layer PE and 3- layer PP)

o EN ISO 21809-2 - Petroleum and natural gas industries - External coatings for buried orsubmerged pipelines used in pipeline transportation systems - Part 2: Fusion-bonded epoxycoatings (2007)

o EN ISO 21809-3 - Petroleum and natural gas industries -- External coatings for buried orsubmerged pipelines used in pipeline transportation systems -- Part 3: Field joint coatings(2008)

o EN ISO 21809-5 (draft) - Petroleum and natural gas industries -- External coatings for buried orsubmerged pipelines used in pipeline transportation systems -- Part 5: External concretecoatings

• Selected technical papers, books and reports:

o Comparison Methodology of Pipe Protection Methods, CIMARRON Engineering Ltd, 2005

o Design and Coating Selection Considerations for Successful Completion of a HorizontalDirectionally Drilled (HDD) Crossing, Williamson A.I., Jameson J.R.

o Development of a Cost Effective Powder Coated Multi-Component Coating for UndergroundPipelines, Singh P., Cox J.

o Field joint developments and compatibility considerations, Tailor D., Hodgins W., Gritis N., BHR15th International Conference on Pipeline Protection

o High temperature pipeline coatings - field joint challenges in remote construction, Buchanan R.,Hodgins W., BHR 16th International Conference on Pipeline Protection

o The importance of hot water immersion testing for evaluating the long term performance ofburied pipeline coatings, John R., Alaerts E., BHR 16th International Conference on PipelineProtection

o Long term performance - critical parameters in materials evaluation and process controls ofFBE and 3LPO pipeline coatings – Guan S.W., Wong D.T., World Pipelines, 2008

o Mechanical Protection of Fusion-Bonded Epoxy Coatings by Use of Fibre Reinforced Mortar,Schemberger D., BHRA, Nov 1985

o New developments in high performance coatings, Worthingham R., Cettiner M., Singh P.,Haberer S., Gritis N., 2005

o Optimization of Pipeline Coating and Backfill Selection, Espiner R, Thompson I, Barnett J,NACE, 2003

o The Performance Capabilities of Advanced Pipeline Coatings, Singh P., Williamson A.I.,Hancock J.R., Wilmott M.J.

o Pipeline Coatings & Joint Protection: A Brief History, Conventional Thinking & NewTechnologies, Buchanan R., Rio Pipeline 2003

o Pipeline Girth-Weld Joint Corrosion Protection: Remote Project Field Installation Challenges,Buchanan R., Dunn R., Gritis N., International Conference on Terrain and GeohazardChallenges Facing Onshore Oil and Gas Pipelines

Page 412: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Acknowledgements

o The Resistance of Advanced Pipeline Coatings to Penetration and Abrasion by Hard Rock,Williamson A.I., Singh P., Hancock J.R., October 2000

o Rock Jacket – A Superior Pipe Protection System for Rocky Terrain, Bragagnolo P., NACE, Nov1991

o Simulation of Coating Behaviour in Buried Service, Andrenacci A, Wong D.T., NACE, 2007

o Subsea Pipeline Engineering, Palmer, A.C., King R.A., 2004

o Transmission Pipelines and Land Use: A Risk-Informed Approach – Special Report 281, USTransportation Research Board (TRB), 2004

o Trends in Pipeline Field Joint Coatings, Buchanan R., Pipeline Coating Conference 2009,Vienna, Austria

o Vancouver Island Pipeline Project – Material Selection, Engineering Design and ConstructionPlan, Yamauchi H., NACE, Nov 1991

Page 413: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Acknowledgements

First Edition Acknowledgements

More than 100 persons and 45 companies participated in the preparation of this publication.

Each person’s name is mentioned in the main area of her/his participation as follows:

• as a member of one, or more than one, of the six Working Groups or

• in the coordination and support functionsor

• as having given editorial support to members of the Working Groups or

• as having attended one or more Plenary Sessions of the Novel Construction Initiative

• This work is the outcome of six Working Groups:

1. Planning, Design & Control (PDC)Co-Chairmen: Mike King *(BP) & Zuhair Haddad (CCC)Participants: Yasser Hijazi* (CCC), John Truhe (Chevron), Paul Andrews* (Fluor),Cris Shipman (GIE), Paulo Montes (Petrobras), Tales Matos (Petrobras)

2. Contract Negotiating & Risk Sharing (CRS)Co-Chairmen: Barry Kaiser* (Chevron) & Bruno de La Roussière* (Entrepose)Participants: Sarah Boyle (Heerema), Barbara de Roo (Heerema), Paul Andrews* (Fluor),Frank Todd (Land & Marine), Jean Claude Van de Wiele (Spiecapag), Daniel Picard (Total)Consultant to IPLOCA and principal writer: Daniel Gasquet*

3. Pipeline Earthworks (EW)Co-Chairmen: Paul Andrews* (Fluor) & Bruno Pomaré (Spiecapag) Participants: Mike Sweeney (BP), Ray Wood (Fugro), Helen Dornan* (Serimax), Sue Sljivic*(RSK Group plc), Flavio Villa (Tesmec), Francesco Mastroianni (Tesmec),

4. Facing, Lining-Up & Welding (FLUW)Co-Chairmen: Frederic Burgy (Serimax) and Bernard Quereillahc* (Volvo)Participants: Zahi Ghantous (CCC), Jim Jackson (CRC-Evans), Marco Laurini (Laurini),Claudio Bresci (Petrobras), Derek Storey (Rosen)

5. External Corrosion Protection System (ECPS)Chairman: Sean Haberer* (Bredero Shaw) Participants: Dieter Schemberger (Akzo Nobel), Vlad Popovici* (Bredero Shaw),Nigel Goward (Canusa-CPS), Micheal Schad (Denso), Graham Duncan (Fluor),Damian Daykin (PIH)

6. Lowering & Laying (L&L)Chairman: Marco Jannuzzi* (Caterpillar) Participants: Zahi Ghantous (CCC), Kees Van Zandwijk (Heerema), Peter Salome (Heerema),Marco Laurini (Laurini), Claudio Bresci (Petrobras), Marcus Ruehlmann (Vietz), Lars-IngeLarsson (Volvo)

Page 414: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Acknowledgements

• Overall Coordination and Support to the six Working Groups

Coordination was carried out by Luc Henriod* (IPLOCA), Ian Neilson (BP) and François Pesme (BP),supported by the IPLOCA staff in Geneva who organised the plenary sessions, conference calls etc:Juan Arzuaga*, Caroline Green, Alain Hersent (IPLOCA Consultant), Sarah Junod and Liz Spalding.Roberto Castelli (Bonatti) was in charge of coordinating with the Board of Directors of IPLOCA.

*Names of the writing and editing team of the final document are designated in thisAcknowledgement by an asterisk (*).

The following persons have given editorial support to members of the Working Groups or haveshowed their interest and support by attending some of the Plenary Sessions of our IPLOCA NovelConstruction Initiative (in alphabetical order by company):

Antonio Galetti (Bonatti), Andrea Piovesan (Bonatti), Barry Turner (Borealis), Bill Blosser (BP),Patrick Calvert (BP), Shaimaa Fawzy (BP) , Roger Howard (BP), Hikmet Islamov (BP), John McAlexander (BP), Colin Murdoch (BP), Geoff Vine (BP), Jean-Luc Bouliez (BS Coatings),Ray Paterson (BrederoShaw), Adrian Van Dalen (BS Coatings), Cortez Perotte (Caterpillar), Kurt Wrage (Caterpillar), Issam El-Absi (CCC), Joseph Farah (CCC), Hisham Kawash (CCC),Ramzi Labban (CCC), Fernando Granda (Chevron), Keith Griffiths (Chevron), Karlton Purdie(Chevron), Brad Stump (Chevron), C.S. Sood (CIT), Bo Wasilewski (Conoco-Phillips), Martin Kepplinger (deceased) - (CRC-Evans), Brian Laing (CRC-Evans), Gus Meijer (CRC-Evans),Bernhard Russheim (CRC-Evans), Oliver Zipffel (Denso), Peter Schwengler (E.ON Ruhrgas),Claudia Mense (Elmed), Carlo Spinelli (ENI), Paul Leyland (Entrepose), Jean-Pierre Jansen(Europipe), Daniel Delhaye (Fluor), Sub Parkash (Fluor), Conrado Serodio (GDK), Karl Trauner(HABAU), Marc Peters (Herrenknecht), Frank Muffels (Industrie Polieco MPB), Lorne Duncan(Integrated Project Services), Ed Merrow (IPA Global), Hudson Bell (ITI Energy), Nigel Wright(ITI Energy), Adam Wynne Hughes (Land and Marine), Tom Lassu (Ledcor), Boris Boehm (Maats),Jorge Baltazar (Petrobras), Sergio Borges (Petrobras), Paulo Correia (Petrobras), Ney Passos (Petrobras), Jimmie Powers (PRCI), Max Toch (PRCI), Jie-Wei Chen (Rosen), Mike Mason (RSK Group plc), David Williams (Serimax), Massimiliano Boscolo (Socotherm),Danillo Burin (Socotherm), Lotfi Housni (Somico), Remy Seuillot (Spiecapag), Luis Chad(Tenaris-Confab), Livia Giongo (Tesi), M. Lazzati (Tesmec) Francesco Mastroianni (Tesmec), John Welch (Tesmec), Andrea Zamboni (Tesmec), Paul Wiet (Total), Bart Decroos (Volvo), Jack Spurlock (Volvo).

Page 415: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Acknowledgements

Second Edition Acknowledgements

More than 100 persons and 46 companies participated in the preparation of this Second Edition.

• The work was divided among six working groups:

1. Planning and DesignCo-Chairmen: Criss Shipman (GIE) & Mike King (BP)Participants: Mustafa Abusalah, Firas Hijazi, Ramzi Labban (CCC);Sub Parkash (Fluor)

2. Monitoring & ControlCo-Chairmen: Zuhair Haddad (CCC) and Mike Gloven (Petro IT Americas)Participants: Jan Van der Ent (Applus RTD); Aref Boualwan, Firas Hijazi, Antoine Jurdak,Hazem Rady, Khaled Al-Shami (CCC); Abhay Chand (Petro IT); Paul Wiet (Total)

3. Pipeline EarthworksCo-Chairmen: Paul Andrews (Fluor) & Bruno Pomaré (Spiecapag) Participants: Ray Wood (Fugro); Marc Peters (Herrenknecht); Marco Laurini (Laurini);Flavio Villa (Tesmec); Lars-Inge Larsson (Volvo)

4. External Corrosion Protection System (ECPS)Co-Chairmen: Sean Haberer (ShawCor), Vlad Popovici (Bredero Shaw FJS)Participants: Volker Boerschel, Dieter Schemberger (Akzo Nobel); Norbert Jansen, BarryTurner (Borealis); Raphael Moscarello (Bredero Shaw); Adrian Van Dalen (BS Coatings); PaulBoczkowski (Canusa-CPS); Cindy Verhoeven (Dhatec); Bill Partington (Ledcor); Fred Williams(Shell); Dan King, Steve Shock, Dave Taylor (TransCanada); Axel Kueter (Tuboscope)

5. Facing, Lining-Up & Welding (FLUW)Co-Chairmen: Frédéric Lepla (Serimax) and Bernard Quereillahc (Volvo CE)Participants: Subhi Khoury, Ramzi Labban (CCC); Matthew Holt (CRC-Evans);Christian Hädrich (Max Streicher); Mladen Kokot (Nacap)

6. Lowering & LayingChairman: Marco Jannuzzi (Caterpillar) & Bernard Quereillahc (Volvo CE)Participants: Andreas Clauss, Scott J. Hagemann, Cortez Perotte (Caterpillar); Jim Jackson(CRC-Evans); Marco Laurini (Laurini); Hannes Lichtmannegger, Johannes Mayr (Liebherr); Scott Haylock, Lars-Inge Larsson (Volvo CE)

Page 416: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Acknowledgements

• Overall Coordination and Support to the Working Groups

Coordination was carried out by Juan Arzuaga (IPLOCA) and Daniel Gasquet (IPLOCA Consultant),supported by the IPLOCA staff in Geneva: Caroline Green, Guy Henley, Sarah Junod and ElizabethSpalding. Osman Birgili (Tekfen) was in charge of coordinating with the Board of Directors ofIPLOCA.

Additionally, we thank the following companies and individuals for their valued participation in theSecond Edition of the Road to Success (in alphabetical order by company):

Paul Harbers, Dirk Huizinga, Niels Portzgen, Casper Wassink (Applus RTD); Maurizio Truscello(Bonatti S.p.A.); SC Sood (CIT); Rita Salloum Abi Aad (CCC); Russell Dearden (Corus);Ryan Fokens, Dennis Haspineall (CRC-Evans); Ivan Gallio, Nicola Novembre, Luca Prandi,Carlo Spinelli (ENI); Andreas Meissner (EPRG); Shiva Vencat (Euro Airship); Graham Duncan,Jason Fincham, Sub Parkash (Fluor); Henk De Haan (Gasunie); John Balch (GIE); Claudio Dolza(Goriziane); Gerhard Wohlmuth (HABAU); Geert Dieperink, Gerben Wansink (Maats); Mark Roerink(Nacap); Greg Rollheiser (PipeLine Machinery); Reiner Lohmann, Ralf Prior (PPS Pipeline SystemsGmbH); Peter Döhmer (Techint); Hasan Gürtay, Dinc Senlier, Alpaslan Sumer (Tekfen).

Page 417: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Acknowledgements

Third Edition Acknowledgements

The persons and Companies who participated in the preparation of this Third Edition are presentedbelow.

• The work was divided among five working groups:

1. EarthworksCo-Chairmen: Paul Andrews (Fluor) & Bruno Pomaré (Spiecapag)Participants: Adam Thomas, Jon Baston-Pitt & Raphael Denis (Fugro); Mike Sweeney &David Waring (BP); Marco Albanesi & Vincenzo Calabria (Sicim); Diana Pfeff & Marc Peters(Herrenknecht); Marcelo Texeira & Tales Mattos (Petrobras); Marco Laurini & Livia Giongo(Laurini); Flavio Villa (Tesmec); Johannes Mayr (Liebherr); Lars-Inge Larsson (Volvo);David Shilston (Atkins); George Tuckwell (RSK); Neil Smith (Mears); Rene Albert (Wermeer),Daniel Gasquet (IPLOCA)

2. Pipelines and the EnvironmentCo-Chairpersons: Sue Sljivic (RSK) & Adul Waasay Kan (SNC Lavalin)Participants: Alejandro Sarrubi (Techint); Loek Vreenegoor & Fred Williams (Shell);Goeff Tabor (RSK); Ricardo Marcus (TGP); Barbara Lax (Caterpillar); Martin Coleman(Spiecapag)

3. Future Trends and InnovationChairman: Zuhair Haddad (CCC) Participants: Mustafa Abusalah, Firas Hijazi, Antoine Jurdak & Ramzi Labban (CCC);Luca Prandi (ENI); Abbay Chand & Mike Gloven (Petro IT); Maurizio Truscello (Bonatti);Paul Andrews & Sub Parkash (Fluor); Bruno Pomaré (Spiecapag); Andrea Trevisanello &Massimo Passarella (Goriziane); Geert Dieperink (Maats); Marco Jannuzzi (Caterpillar);Jan van der Ent (Applus RTD); Idsart van Assema (Dhatec)

4. LogisticsCo-Chairmen: Bruno Pomaré (Spiecapag) and Bernard Quereillahc (Volvo CE)Participants: Cindy Verhoeven (Dahtec); Christophe Kapron (Renault Trucks);Jean-Michel Gallois (Vopak); Frédéric Teitgen (TOTAL); Oscar Scarpari (Techint);Firas Hijazi (CCC)

5. WeldingCo-Chairmen: Jan van der Ent (Applus RTD) & Gustavo Guaytima (Techint)Participants: Benedict de Graaff, Scott Funderburk & Paul Spielbauer (CRC-Evans);Frédéric Lepla (Serimax); Fabio Rinaldi & François Pesme (PWT); Matt Boring (Applus RTD);Kevin Beardsley (Lincoln Electric); Atilla Madazilioglu (TEKFEN); Ramesh Singh (GIE);Derick Railling & Mike MacGillivray (ITW); Daniel Matarrese (Techint); Anthony Van DerHeijden (Lastechniek Europa); photos courtesy of ESAB.

Page 418: Vol 2 onshore pipelines the road to success 3rd edition

Onshore Pipelines - THE ROAD TO SUCCESS Vol. 2 Acknowledgements

• Overall Coordination and Support to the Working Groups

Coordination was carried out by Juan Arzuaga (IPLOCA) and Daniel Gasquet (IPLOCA Consultant),supported by the IPLOCA staff in Geneva: Caroline Green, Sarah Junod and Elizabeth Spalding.Editing and English review were performed by Guy Henley and Edmund Henley (Consultants).Doug Evans (GIE) was in charge of coordinating with the Board of Directors of IPLOCA.

Additionally, we thank the following companies and individuals for their valued participation in theThird Edition of the Road to Success (in alphabetical order by company):

Volker Boerschel (Akzo Nobel); Frits Doddema (Seal-for-Life); Norbert Jansen (Borealis);Barry Turner & Pascal Collet (Axon Coatings); Pascal Lafferierre & Nigel Goward (Canusa CPS);(GE Measurement & Control); Frank Muffels (Industrie Polieco (MPB)); Axel Kueter(NOV Tuboscope); Sean Haberer, Vlad Popovici & Alex Durkovics (ShawCor); Rainer Kuprion(TIB Chemicals).