Southern Nuclear Operating Company
ND-12-0356
Enclosure 1c.
Vogtle Electric Generating Plant (VEGP) Unit 3&4
Transmittal of
February 1, 2012 SNC Presentation to the NRC on
AP1000 Overview of First-Plant-Only and First-Three-Plants-Only Test Program(Non-Proprietary)
Page 1 of 16
Westinghouse Non-Proprietary Class 3 © 2011 Westinghouse Electric Company LLC. All Rights Reserved.
Test Preparation, Performance, and SVP 1
Documentation Schedule
r a, c
I PREUMINARY DOCUMEN,_Ti I M
Ill I liii
.t-i-.t--1.-.,- I
' _, i i I , j l lIllill! ll 11 111111111111I ; ~iii
I II|IIlIIIII II ! lIi I|I! I!! I I I I I II!!I
S~~ . I I I!I III
L.
jowwrongouse y2
Westinghouse Non-Proprietary Class 3 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5SVPSVO_001173
Response to NRC Letter - January 13, 2012
e Protocol for sharing test data and results" Bullet 1
" Bullet 2
" Bullet 3" Bullet 4
" Bullet 5" Bullet 6
- Program Documentation
- Comparison of QAPrograms- Design Fidelity- Initial Test Program Validation- Critical Test Parameters- Translation Controls
* NRC Access for China tests
Mill," M
Owmwouse3
Westinghouse Non-Proprietary Class 3 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5SVPSV0_001173
Sharing Test Data and Results
" Documents to be submitted- Reports- Letter Responses
* Documents for Audit- Cranberry Headquarters- Rockville Office
SWestinghouse4
Westinghouse Non-Proprietary Class 3 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5
SVPSVO_001173Program Procedures and Documentation
Bullet 1 - Provide to the NRC staff copies of the quality assurance program, test
control program, test specifications, and test procedures for staff review.
* Information will be made for available for audit
* The information includes:- Quality Management System (QMS) description- AP1000 Commissioning Program administrative procedures- Test Specifications and Procedures (see next page)
" Actively working to gain permission to provide the construction QAprogram for review
* Schedule - Information available for audit: throughout 2012
Owinglom"5
Westinghouse Non-Proprietary Class 3 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5SVPSV0_001173
Test Specification and Procedure Information
a, c
First Plant Only Test DCD Section Tet_________n pe De at Test Procdur ProcdurDueDat
IRWST Heatup 14.2.9.1.3(h)
Pressurizer Surge Line Stratification 14.2.9.1.7 (d)
RV Internals Vibration/CVAP 14.2.9.1.9
Natural Circulation -SteamGeneator14.2.10.3.6GeneratorNatural Circulation -Passive RHR
Heat Exchanger 14.2.10.3.7
RCCA Out of Bank Measurements 14.2.10.4.6
Three Plant Tests _______ Section__ Test______ ______SpcDeaeTetPrcdrePoedr _ueDt
Core Makeup Tank Heated 14.2.9.1.3(K) & (w)Recirculation I I Iw)
ADS Blowdown 14.2.9.1.3(s)
* Specifications and procedures will be available for audit
ownghoum6
Westinghouse Non-Proprietary Class 3 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5SVPSVO_001173
Comparison and Validation of QA Programs
Bullet 2 - Validate the adequacy of the quality assurance program for construction andperformance of the initial test program by providing a comparison of the qualityassurance program implemented for the construction and initial test program at SanmenUnits 1 & 2 and Haiyang Units 1 & 2 to the quality assurance program as described inSection 17 of the FSAR for VEGP Units 3 and 4. This includes validating the adequacyof the quality assurance program for instrument calibration.
* Information in response to this bullet will be provided in a report
" The response will address three main topics:
1. Project quality plan outlining the QA aspects of the FOAK testing toassure compliance to 1OCFR50 Appendix B and [ ]a~c- Developed in accordance with WEC Quality Management System- Schedule:[ axc
O Woillouse
Westinghouse Non-Proprietary Class 3 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.Attachment 5
SVPSV0_001173
Comparison and Validation of QA Programs (cont)
2. Comparison or description to identify compliance of the QAprogram(s) applied to construction of the SSCs critical to each test to10CFR50 Appendix B and [ ]a~c
- General requirement is plant construction is [Iaxc
- Schedule: [ ]ac
3. To address the issues surrounding instrument calibration andcalibration laboratory certification, two options are being considered toaddress differences in requirements between US and Chinesecalibration supplier qualification:
- [ ] ac-_ [ ] a,C
* Schedule:Status u d f calibration option [ ]axc
*9Werghouse 8
Westinghouse Non-Proprietary Class 3 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5
Design Fidelity of Tested System CriticalParameters
SVPSVO_001173
Bullet 3 - Demonstrate the fidelity of the design, construction, and as-builtcondition of Sanmen Units 1 & 2 and Haiyang Units 1 & 2 to VEGP Units 3 and 4 inrelation to the applicability of the FPO T/F3POT tests. This includes identifying anyphysical verification(s) that have been or will be performed.
* Information in response to this bullet will be provided in a TechnicalReport
" The physical parameters for each system that are critical to theperformance of that system for the specified test will be listed.
* Justification for the selection of the parameters will be provided." A comparison will be made between the as-built critical physical
parameters of Sanmen Unit 1 and Vogtle Unit 3 and Summer Unit 2(when available) and critical design values.
" Schedule: Initial report (w/o as-built info) [ lax
*Westinghouse9
Westinghouse Non-Proprietary Class 3 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5SVPSVO_001173
Initial Test Program (ITP) Validation
Bullet 4 - Validate the adequacy of the initial test program. This includes adescription of the administrative controls governing the initial test program atSanmen Units 1 & 2 and Haiyang Units 1 & 2, including a comparison to theadministrative controls governing the initial test program as described in Section14.2 of the FSAR for VEGP Units 3 and 4.
* Information in response to this bullet will be provided in a report
* A comparison will be made between the ITP administrative controls forthe China units and those of VEGP Units 3 and 4.
* A tabular summary format will accompany a detailed write-up* Translation Controls (Bullet 6) will be addressed in the same report
* Schedule: [ax
Welinghouse " 10
Westinghouse Non-Proprietary Class 3 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5SVPSVO_001173
Critical Test Parameters
Bullet 5 - Identify all the test critical parameters, calculations, and verificationmethods used during the initial test program. For calculated values this includesthe validation methodology, software verification and validation (when applicable),and the actual data inputs and outputs from the initial test results to supportcalculated values.* Information in response to this bullet will be provided in a Technical Report,
except for the WCAPs to be revised as part of the RVI CVAP program" Critical test parameters are defined as those that describe the calculated or
predicted performance of a system for a specified test
" Justification for the selection of the parameters will be provided
* Schedule: Initial report [ I a,c
O*Wstinghouse11
Westinghouse Non-Proprietary Class 3 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5
SVPSVO_001173Translation Controls
Bullet 6 - Document the controls that WEC will have in place during the initial testprogram to ensure that work performed to non-English procedures or instructionsare correctly translated from English.
* The information to be provided in response to this bullet will be providedas part of the report in response to Bullet 4 (ITP Validation)
* English is the official language of the conduct of the tests; controldisplays are in English
" Actions taken to assure the veracity of translations will include:- Use of bi-lingual work group leaders- Repeated instructions- Group meetings to fully understand the translation of written
procedures- Training and conversations about those procedures.
OWesoomse12
Westinghouse Non-Proprietary Class 3 0 2012 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5SVPSVO_001173
N RC Access for China Tests
" Executive visits in February to China plant owners and NNSA" Westinghouse is facilitating communication between NRC & NNSA" Direct contact between NRC and NNSA is desired by NNSA
" Contacts: -i a, c
* Note: the NNSA office is 13 hours ahead of EST (14 hours ahead of
Westinghouse13
Westinghouse Non-Proprietary Class 3 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5SVPSV0_001 173
RVI Vibration Test (CVAP) - Early Review
" Reg. Guide 1.20 Pre-Hot Functional Test Report- Predictive Analysis Plan- Measurement, Test, and Inspection (MTI) plan- Predictive Analysis Results (expected and allowable
responses)* Schedule for submittal to NRC
- Coordination meeting desired to establish detailedreview plan
-- a, c
LL---WON OAODý
OWmos
14
Westinghouse Non-Proprietary Class 3 © 2011 Westinghouse Electric Company LLC. All Rights Reserved.
Attachment 5
Availability of Sanmen 1 Test DocumentationVt _VVu UIUIIa
1
First Plant Only Test DCD Section ocalized Test Procedures Preliminary Data Report Final Data Report
IRWST Heatup 14.2.9.1.3(h)
Pressurizer Surge Line
Stratification (HFT) 14.2.9.1.7(d)
RV Internals Vibration 14.2.9.1.9
Natural Circulation - Steam 14.2.10.3.6Generator
Natural Circulation - 14.2.10.3.7Passive RHR Heat Exchanger
RCCA Out of Bank14.2.10.4.6
Measurements
Three PlantTests DCDSection Localized Test Procedures Preliminary Data Report Final Data Report
Core Makeup Tank Heated 14.2.9.1.3(K) & (w)
Recirculation
ADS Blowdown 14.2.9.1.3(s)
a, c
S Wenghouse15