Vodafone Egypt 2G Cutover
BEP1.0
![Page 2: Vodafone Egypt 2G Cutover_2](https://reader036.fdocuments.in/reader036/viewer/2022083104/5880fac21a28abc3368b61bb/html5/thumbnails/2.jpg)
Top right corner for field-mark, customer or partner logotypes. See Best practice for example.
Slide title 40 pt
Slide subtitle 24 pt
Text 24 pt
Bullets level 2-520 pt
Ericsson Internal Vodafone Egypt 2G Cutover 2009-10-192
2G Cutover Scenario
Aims– Transport 2G traffic over 8600’s (El Haram - 3rd District) – Protect the traffic going over the redundant links
Agenda– Issues affecting the cutover– Proposed Solutions– Conclusion (Agree a new cutover date and ways forward)
![Page 3: Vodafone Egypt 2G Cutover_2](https://reader036.fdocuments.in/reader036/viewer/2022083104/5880fac21a28abc3368b61bb/html5/thumbnails/3.jpg)
Top right corner for field-mark, customer or partner logotypes. See Best practice for example.
Slide title 40 pt
Slide subtitle 24 pt
Text 24 pt
Bullets level 2-520 pt
Ericsson Internal Vodafone Egypt 2G Cutover 2009-10-193
2G Cutover Scenario
LSP 1+1 over two hops
Elharam1201
3rd District8102
3rd District8101
STM-1 over microwave #1
STM-1 over microwave #2
GE Link (ELP - worker)
GE Link (ELP - protection)
Working Tunnel over two hops strict hopSTM1#1 and GE
Protection Tunnel over two hops strict hopSTM1#2 and GE
8/0/0
7/0/0
13/0/0
2/0/0
8/1/1
7/1/1
8/1/1
7/1/1
BTS BSC
![Page 4: Vodafone Egypt 2G Cutover_2](https://reader036.fdocuments.in/reader036/viewer/2022083104/5880fac21a28abc3368b61bb/html5/thumbnails/4.jpg)
Top right corner for field-mark, customer or partner logotypes. See Best practice for example.
Slide title 40 pt
Slide subtitle 24 pt
Text 24 pt
Bullets level 2-520 pt
Ericsson Internal Vodafone Egypt 2G Cutover 2009-10-194
Cutover Issues
Deviation from HLD/LLD/Pilot Test Cases/Workorder– New Requirement for long term troubleshooting– Differences in Connectivity/Topology– Differences in Protection Scheme
Slow DCN to El Haram– Third party recommendations for the Management System
Flapping Third Party Microwave
![Page 5: Vodafone Egypt 2G Cutover_2](https://reader036.fdocuments.in/reader036/viewer/2022083104/5880fac21a28abc3368b61bb/html5/thumbnails/5.jpg)
Top right corner for field-mark, customer or partner logotypes. See Best practice for example.
Slide title 40 pt
Slide subtitle 24 pt
Text 24 pt
Bullets level 2-520 pt
Ericsson Internal Vodafone Egypt 2G Cutover 2009-10-195
Possible Solutions #1
LSP 1+1 over two hops without ELP
Elharam1201
3rd District8102
3rd District8101
STM-1 over microwave #1
STM-1 over microwave #2
GE Link #1
GE Link #2
Working Tunnel over two hops strict hopSTM1#1 and GE Link #1
Protection Tunnel over two hops strict hopSTM1#2 and GE Link #2
8/0/0
7/0/0
13/0/0
2/0/0
8/1/1
7/1/1
8/1/1
7/1/1
BTS BSC
![Page 6: Vodafone Egypt 2G Cutover_2](https://reader036.fdocuments.in/reader036/viewer/2022083104/5880fac21a28abc3368b61bb/html5/thumbnails/6.jpg)
Top right corner for field-mark, customer or partner logotypes. See Best practice for example.
Slide title 40 pt
Slide subtitle 24 pt
Text 24 pt
Bullets level 2-520 pt
Ericsson Internal Vodafone Egypt 2G Cutover 2009-10-196
Possible Solutions #1
2 Hop Tunnel without ELP– Explanation
2 Tunnels configured as LSP 1+1 over the two hops with working tunnel going over Microwave link #1 and GE link #1 and protection tunnel going over Microwave link #2 and GE link #2
– Advantages Can check which tunnel the PWE is taking in the
‘check operation status’ option in VPN provisioning Faster switching times
– Disadvantages ELP not configured on the GE links
![Page 7: Vodafone Egypt 2G Cutover_2](https://reader036.fdocuments.in/reader036/viewer/2022083104/5880fac21a28abc3368b61bb/html5/thumbnails/7.jpg)
Top right corner for field-mark, customer or partner logotypes. See Best practice for example.
Slide title 40 pt
Slide subtitle 24 pt
Text 24 pt
Bullets level 2-520 pt
Ericsson Internal Vodafone Egypt 2G Cutover 2009-10-197
Possible Solution #2
Elharam1201
3rd District8102
3rd District8101
STM-1 over microwave #1
STM-1 over microwave #2
GE (ELP – Worker0
GE (ELP – Protection)
Tunnel over two hops Primary path – STM-1 #1 and GE link - Worker
Secondary path - STM-1 #2 and GE link - Worker
8/0/0
7/0/0
13/0/0
2/0/0
8/1/1
7/1/1
8/1/1
7/1/1
BTS BSC
RSVP1:1 over two hops with ELP
![Page 8: Vodafone Egypt 2G Cutover_2](https://reader036.fdocuments.in/reader036/viewer/2022083104/5880fac21a28abc3368b61bb/html5/thumbnails/8.jpg)
Top right corner for field-mark, customer or partner logotypes. See Best practice for example.
Slide title 40 pt
Slide subtitle 24 pt
Text 24 pt
Bullets level 2-520 pt
Ericsson Internal Vodafone Egypt 2G Cutover 2009-10-198
Possible Solutions #2
RSVP 1:1 with ELP– Explanation
Tunnel configured over the two hops with primary path as the working path (i.e. Microwave link #1 and worker - GE link) and secondary path as the protection path (i.e. Microwave link #2 and worker GE link)
– Advantages ELP configuration on the GE link between 8101 and
8102 remains– Disadvantages
RSVP switching times slow compared to LSP1+1
![Page 9: Vodafone Egypt 2G Cutover_2](https://reader036.fdocuments.in/reader036/viewer/2022083104/5880fac21a28abc3368b61bb/html5/thumbnails/9.jpg)
Top right corner for field-mark, customer or partner logotypes. See Best practice for example.
Slide title 40 pt
Slide subtitle 24 pt
Text 24 pt
Bullets level 2-520 pt
Ericsson Internal Vodafone Egypt 2G Cutover 2009-10-199
Conclusion
Decide on the best possible solution for the cutover. Extensively test and verify the solution on site, using
Analyser/Test BTS (24hrs Stability Test) Execute the cutover Update the Design document with all the information
retrieved from the pilot testing and the first cutover. 3G Traffic scenario will be influenced by the proposed
solutions. Design will need to be updated and verified in pilot test.
![Page 10: Vodafone Egypt 2G Cutover_2](https://reader036.fdocuments.in/reader036/viewer/2022083104/5880fac21a28abc3368b61bb/html5/thumbnails/10.jpg)
Top right corner for field-mark, customer or partner logotypes. See Best practice for example.
Slide title 40 pt
Slide subtitle 24 pt
Text 24 pt
Bullets level 2-520 pt
Ericsson Internal Vodafone Egypt 2G Cutover 2009-10-1910