MAINTENANCE MANUAL VMC Series II Vertical Machining Centers Manual No. M-379C Litho in U.S.A. Part No. M C-0009500-0379 August, 2003 TP4163 TP3665

Transcript of VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully...

Page 1: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

MAINTENANCE MANUAL

VMC Series II

Vertical Machining Centers

Manual No. M-379C Litho in U.S.A.Part No. M C-0009500-0379 August, 2003

TP4163

TP3665

Page 2: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTICE -Damage resulting from misuse, negligence, or accident is not covered by theHardinge Machine Warranty.

Information in this manual is subject to change without notice.

This manual covers the maintenance of Hardinge Series II VerticalMachining Centers equipped with Fanuc or Siemens controls.Wherever possible, photographs of each control are displayed duringmaintenance procedures.

In no event will Hardinge Inc. be responsible for indirect orconsequential damage resulting from the use or application of theinformation in this manual.

Reproduction of this manual in whole or part, without writtenpermission of Hardinge Inc. is prohibited.

CONVENTIONS USED IN THIS MANUAL

- WARNINGS -Warnings must be followed carefully to avoid the possibility of personal injuryand damage to the machine, tooling, or workpiece.

- CAUTIONS -Cautions must be followed carefully to avoid the possibility of damage to the ma-chine, tooling, or workpiece.

- NOTES -Notes contain supplemental information.

Hardinge Inc.One Hardinge Drive

P.O.Box 1507Elmira, New York 14902-1507 USA

www.hardinge.com

© 2003, Hardinge Inc. M-379C

Page 3: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

READ THIS INFORMATION CAREFULLY BEFORE STARTINGOPERATION, MAINTENANCE, OR REPAIR ON HARDINGE

VMC SERIES II VERTICAL MACHINE CENTERS

The technicians who use this manual should have a general knowledge of machine mainte-nance and repair. This general knowledge coupled with the following manual will greatly reduceor eliminate machine downtime.

When machine maintenance is performed by persons not familiar with the operation of thisequipment, the machine operator’s manual for machines equipped with a Fanuc control (M-400)or the operator’s manual for machines equipped with Siemens control (M-406) must be con-sulted when instructions require that the machine be run.

- WARNING -Occupational Safety and Health Administration (OSHA) Hazard CommunicationStandard 1910.1200, effective September 23, 1987, and various state “employeeright-to-know laws” require that information regarding chemicals used with thismachine be supplied to you. The list of chemicals appears in manual SP-134, theMaterial Safety Data Sheets (MSDS’s). Refer to the applicable section of theMSDS’s supplied with your machine when handling, storing, or disposing ofchemicals. Store MSDS’s of other chemicals used with this Hardinge machine inthe same packet with manual SP-134.

HARDINGE SAFETY RECOMMENDATIONS

Your Hardinge machine is designed and built for maximum ease and safety of operation. Be-cause some previously accepted shop practices may not reflect current safety regulations andprocedures, they should be re-examined to insure compliance with the current safety and healthstandards.

Hardinge, Inc. recommends that all shop supervisors, maintenance personnel, and machinetool operators be advised of the importance of safe maintenance, setup, and operation of allequipment. Our recommendations are described below. READ THESE SAFETY RECOMMEN-DATIONS BEFORE PROCEEDING ANY FURTHER.

READ THE APPROPRIATE MANUAL OR INSTRUCTIONS before attempting operation,programming, or maintenance of the machine. Make certain that you understand all instruc-tions.

CONSULT YOUR SUPERVISOR when in doubt as to the correct way to do a job.

DON’T OPERATE EQUIPMENT unless proper maintenance has been regularly performedand the equipment is known to be in good working order.

WARNING and INSTRUCTION TAGS are mounted on the machine for your safety and in-formation. Do not remove them.

DON’T ALTER THE MACHINE to bypass any interlock, overload, disconnect switch, orother safety devices.

DON’T ALLOW the operation or repair of equipment by untrained personnel.

M-379C i

Page 4: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

DON’T OPERATE ANY MACHINE while wearing rings, watches, jewelry, loose clothing, orneckties. Long hair must be contained by a net or shop cap for safety.

WEAR SAFETY GLASSES AND PROPER FOOT PROTECTION at all times. Wear a res-pirator, helmet, gloves, and ear muffs or plugs when necessary.

DON’T OPERATE EQUIPMENT if unusual or excessive heat, noise, smoke, or vibrationoccurs. Report any excessive or unusual conditions as well as any damaged parts to yoursupervisor.

ALLOW ONLY AUTHORIZED PERSONNEL to have access to enclosures containing elec-trical equipment.

DISCONNECT MAIN ELECTRICAL POWER before attempting repair or maintenance.

DON’T REACH into any control or power case area unless electrical power is OFF.

MAKE CERTAIN that the equipment is properly grounded. Consult and comply with theNational Electric Code and all local codes.

DON’T TOUCH ELECTRICAL EQUIPMENT when hands are wet or when standing on awet surface.

REPLACE BLOWN FUSES with fuses of the same size and type as originally furnished.

ASCERTAIN AND CORRECT the cause of any shutdown before restarting the machine.

KEEP THE AREA AROUND THE MACHINE well lighted and dry.

KEEP CHEMICALS AND FLAMMABLE MATERIAL away from operating equipment.

HAVE THE CORRECT TYPE OF FIRE EXTINGUISHER handy when machining combusti-ble material and keep the chips clear of the work area.

DON’T USE a toxic or flammable substance as a solvent cleaner or coolant.

INSPECT ALL SAFETY DEVICES AND GUARDS to make certain that they are in goodcondition and are functioning properly.

MAKE CERTAIN THAT PROPER GUARDS are in place and that all doors and covers arein place and secured before starting a machining cycle.

DON’T OPEN GUARDS while any machine component is in motion. Make certain that allpeople in the area are clear of the machine when opening the guard door.

MAKE SURE that all spindle tools and any tool-holding devices are properly mounted.

MAKE SURE that fixture plates and all other table-mounted work-holding devices are prop-erly mounted.

ii M-379C

Page 5: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

MAKE CERTAIN that all tooling is secured either in the tool changer or spindle beforestarting the machine.

DON’T USE worn or defective hand tools. Use the proper size and type tool for the job be-ing performed.

USE CAUTION around exposed mechanisms and tooling especially when setting up. Becareful of sharp edges on tools.

USE ONLY a soft-faced hammer on table work-holding devices and fixtures.

MAKE CERTAIN that all tool mounting surfaces are clean before mounting tools.

DON’T USE worn or broken tooling on the machine.

INSPECT ALL WORK-HOLDING DEVICES daily to make certain that they are in good op-erating condition. Replace any defective devices before operating the machine.

ANY ATTACHMENT, TOOL, OR MACHINE MODIFICATION obtained from any sourceother than Hardinge, Inc., must be reviewed by a qualified safety engineer before installa-tion.

USE MAXIMUM ALLOWABLE gripping pressure on work-holding devices. Consider theweight, shape, and balance of the tooling.

DON’T EXCEED the rated capacity of the machine.

DON’T LEAVE tools, workpieces or other loose items where they can come in contact witha moving component of the machine.

REMOVE ANY LOOSE PARTS OR TOOLS from the work area. Always clear the machineand work area of tools and parts especially after work has been completed by maintenancepersonnel.

REMOVE SPINDLE WRENCHES before starting the machine.

CHECK THE SETUP, TOOLING, AND SECURE THE WORKPIECE if the machine hasbeen turned OFF for any length of time.

CHECK THE LUBRICATION AND COOLANT LEVELS and the status of control indicatorlights before operating the machine.

KNOW where all EMERGENCY STOP push buttons are located.

MAKE CERTAIN THAT PROPER FUNCTIONS are programmed and that all controls areset in the desired modes before pressing the CYCLE START push button.

DRY CYCLE a new setup to check for programming errors.

DON’T ADJUST tooling, workpiece, or coolant hoses while the machine is running.

M-379C iii

Page 6: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

KEEP CLEAR of any “pinch point” and any potentially hazardous situation.

DON’T LEAVE the machine unattended while it is operating.

DON’T REMOVE OR LOAD workpieces while any part of the machine is in motion.

BE CAREFUL of sharp edges when handling newly machined workpieces.

DON’T ATTEMPT to brake or slow the machine with hands or any makeshift device.

DON’T REMOVE CHIPS with hands. Make certain that all machine movement has stoppedand then use a hook or similar device to remove chips and shavings.

DON’T CLEAN the machine with an air hose.

KEEP TOTE PANS a safe distance from machine. Don’t overfill the tote pans.

Unless otherwise noted, all operating and maintenance procedures are to be performed byone person. To avoid injury to yourself and others, be sure that all personnel are clear ofthe machine when opening or closing the coolant guard door and any access covers.

FOR YOUR PROTECTION - WORK SAFELY

iv M-379C

Page 7: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

Table of Contents

CHAPTER 1 - POWER-UP PROCEDUREMachine Equipped with a Fanuc Control . . . . . . . . . . . . . . . . . . . . . . 1-1

Power-Up Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1Zero Return (Home) the Axes . . . . . . . . . . . . . . . . . . . . . . . . . 1-2power-Down Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3

Machine Equipped with a Siemens Control. . . . . . . . . . . . . . . . . . . . . 1-4Power-Up Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4Power-Down Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5

Spindle Warm-Up Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6Short Term Spindle Warm-Up . . . . . . . . . . . . . . . . . . . . . . . . . 1-6Long Term Spindle Warm-Up . . . . . . . . . . . . . . . . . . . . . . . . . 1-7

Machine with Oil-Air Spindle Lubrication . . . . . . . . . . . . . . . . . . . 1-7Machine with Grease Spindle Lubrication . . . . . . . . . . . . . . . . . . 1-7

CHAPTER 2 - AIR SYSTEMIntroduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1Air Control Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2Component Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3

Replace the Filter/Regulator Filter . . . . . . . . . . . . . . . . . . . . . . . 2-3Replace the Air Control Assembly Components . . . . . . . . . . . . . . . . . 2-4Replace the Pressure Switch . . . . . . . . . . . . . . . . . . . . . . . . . 2-5Replace a Solenoid Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6

Air System for Optional Optical Scales. . . . . . . . . . . . . . . . . . . . . . . 2-11Clean or Replace the Optical Scale Air Filters. . . . . . . . . . . . . . . . . . 2-11

CHAPTER 3 - COOLANT SYSTEMIntroduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1Water-Based Coolants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1Preparing the Coolant System . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2Care and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2

Concentration. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2pH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3Water Quality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3

Chip Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4Cleaning the Coolant Tank and Filters . . . . . . . . . . . . . . . . . . . . . . . 3-5Cleaning the Coolant In-Line Y Filter . . . . . . . . . . . . . . . . . . . . . . . 3-6Coolant Directional Balls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7Coolant/Chip Flush . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7Thru-Spindle Coolant [Option] . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8

Replacing the In-Line Spin-On Canister Filter . . . . . . . . . . . . . . . . . . 3-8

M-379C v

Page 8: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

CHAPTER 4 - LUBRICATIONImportance of Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1Axes Way Grease Lubrication. . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1Tool Knockout Piston Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . 4-2

Oil Specification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2Adding Oil to the Lubrication Cup . . . . . . . . . . . . . . . . . . . . . . . 4-2

Tool Carousel Rail Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3Adding Grease to the Tool Carousel Rail . . . . . . . . . . . . . . . . . . . . 4-3

Spindle Bearing Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3High-Speed Spindle Air-Oil Lubrication . . . . . . . . . . . . . . . . . . . . . . 4-4

Fill the Air-Oil Lubricator Tank . . . . . . . . . . . . . . . . . . . . . . . . . 4-4Verify Spindle Lubrication Status . . . . . . . . . . . . . . . . . . . . . . . . 4-5Set the Air-Oil Lubricator Air Regulator . . . . . . . . . . . . . . . . . . . . . 4-6Inspect the Air and Oil Lines and Set the Air Flow in the Mixing Block . . . . . . 4-6Spindle Labyrinth Air Seal . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8

High-Torque Gear Box Lubrication . . . . . . . . . . . . . . . . . . . . . . . . 4-9Adding Oil to the High-Torque Gear Box Tank . . . . . . . . . . . . . . . . . 4-9Changing the Oil in the High-Torque Gear Box Tank . . . . . . . . . . . . . . 4-11

CHAPTER 5 - MISCELLANEOUSChanging the Control Batteries (Fanuc Control Only) . . . . . . . . . . . . . . . . 5-1Cleaning the Power Case Heat Exchanger Air Filter . . . . . . . . . . . . . . . . 5-3Work Light Lamp Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4Spindle Belt Tension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5

Spindle Belt Tension Specification . . . . . . . . . . . . . . . . . . . . . . . 5-5Standard Spindle Drive. . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5High Speed Spindle Drive [Option] . . . . . . . . . . . . . . . . . . . . . 5-5

Adjustment Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6High-Torque Spindle Belt Tension . . . . . . . . . . . . . . . . . . . . . . . . . 5-7

Spindle Belt Tension Specification . . . . . . . . . . . . . . . . . . . . . . . 5-7Adjustment Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7Overtravel (Over-Limit) Fault Recovery Procedure. . . . . . . . . . . . . . . . 5-9

Resetting the Z Axis Home Position . . . . . . . . . . . . . . . . . . . . . . . . 5-10Machine Equipped with a Fanuc Control . . . . . . . . . . . . . . . . . . . . 5-10Machine Equipped with a Siemens Control . . . . . . . . . . . . . . . . . . . 5-14

APPENDIX ONE - PREVENTIVE MAINTENANCE SCHEDULEIntroduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A1-1Maintenance Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A1-1

8 Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A1-140 Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A1-1160 Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A1-2480 Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A1-2600 Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A1-21000 Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A1-22000 Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A1-24000 Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A1-2

Non-Metallic Materials Typically Found in Hardinge Machine Construction . . . . . . A1-3

APPENDIX TWO - PHOTOGRAPHS

vi M-379C

Page 9: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTES -

M-379C vii

Page 10: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTES -

viii M-379C

Page 11: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

CHAPTER 1 - POWER-UP PROCEDURE

- CAUTION -The recommended operating temperature range is 50° to 95° F [7° to 35° C]ambient.

MACHINE EQUIPPED WITH A FANUC CONTROL

- NOTE -Information relating to machines equipped with a Siemens control begins on page1-4.

POWER-UP PROCEDURE

- NOTE -It is important that the power-up proce-dure is followed as described to ensuresafe, accurate, and repeatable ma-chine operation.

1. Turn main disconnect switch “A”, Figure 1.1,ON.

2. At the rear of the machine, slide valve “B”,Figure 1.2, upward to turn the machine airON.

3. Check the air filter bowl; it drainsautomatically but may need to be cleaned.

4. Check the coolant level. Add coolant, ifnecessary.

- CAUTION -When pressing the Control ON pushbutton, DO NOT press any otherpush buttons or keys until theposition or alarm screen isdisplayed. Some push buttons andkeys are used for controlmaintenance or special operationcommands.

5. Press the Control ON push button and waituntil the control display screen is ON.

6. Pull the Emergency Stop push button OUT torelease the Emergency Stop condition.

M-379C 1-1

Figure 1.1 - Main Disconnect Switch

A

TP3672

Figure 1.2 - Filter/Regulator/LubricatorTP3664

B

Page 12: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

7. If necessary, release the Emergency Stop push button that is located next to the manualindex push buttons for the tool changer magazine(s).

8. Be sure that the coolant guard doors are closed.

9. The machine is now ready for the Zero Return (Reference Home) procedure.

- NOTE -High-performance high-speed machines require additional spindle and oil-air startup procedures. Refer to “Spindle Warm-Up Procedures”, on page 1-6.

ZERO RETURN (HOME) THE AXES

- CAUTION -When zeroing the axes with the Zero Return (Reference Home) procedure, be cer-tain that no interference exists between the machine table, workpiece on the ta-ble, and spindle tooling.

DO NOT attempt to Home the machine axes if the tool changer magazine(s) is(are) not at the Home position.

- NOTE -If necessary, switch to JOG mode to move the axes to a safe location for axesmotion; then, switch back to Zero Return mode to perform the Homing procedure.

1. Verify that the tool magazine is at the Home (retracted) position. If there is a second toolmagazine, verify that it is at Home also.

2. Select JOG mode.

3. If necessary, move the axes to a safe location for axes motion.

4. Set the Jog Feedrate switch to the desired feedrate.

- NOTE -Each axis must travel continuously at least one full inch [25.4 mm] before it returnsto Home.

The Zero Return (Home) position is not the same as the tool change position.

5. Use the -Z push button to jog the spindle at least 1 inch [25.4mm] toward (minus,downward) the table.

6. Use the +X push button to jog the table approximately 1 inch [25.4mm] in the plusdirection.

7. Use the -Y push button to jog the table approximately 1 inch [25.4mm] in the minusdirection.

1-2 M-379C

Page 13: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

8. Select Zero Return mode.

9. Press the +Z push button; the spindle will move to the spindle HOME position.

10. Press the -X push button; the table will move to the X HOME position.

11. Press the +Y push button; the table will move to the Y HOME position.

12. If the machine is equipped with an optional rotary table, press the +B push button to indexthe rotary table to the Home position.

POWER-DOWN PROCEDURE

- CAUTION -DO NOT power down the machine while Edit mode is active. Powering down themachine while Edit mode is active will result in the loss of all macro programs andmachine parameters.

If data is lost, all macro programs and parameters must be loaded into the controlmemory from the backup disc supplied with the machine.

1. Be certain that “Cycle Start” is not active. The Cycle Start push button light will be OFF.

2. Be sure the program has been completed and that the spindle and slides are stationary.

3. Press the Emergency Stop push button.

4. Press the Control OFF push button.

- CAUTION -If the machine is a high-performance high-speed machine, make certain that theLabyrinth air seal air pressure “C”, Figure 2.3, is left ON for 15 minutes after thespindle has stopped to allow the spindle interior to cool to room temperaturewithout drawing in coolant and contaminants.

5. At the rear of the machine, slide valve “B”, Figure 1.2, downward to turn the machine airOFF.

6. Turn main disconnect switch “A”, Figure 1.1, OFF.

M-379C 1-3

Page 14: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

MACHINE EQUIPPED WITH A SIEMENS CONTROL

- NOTE -Information relating to machines equipped with a Fanuc control begins on page1-1.

POWER-UP PROCEDURE

1. Verify the hard disk at the back of the operator’s control panel is set to the “Operating”position as follows:

A) Swing the control panel out to gain access to the back of the panel.

B) Unthread the screws to lift off the cover at the back of the panel.

C) Rotate the hard disk to the “Operating” position (counterclockwise to vertical).

D) Install the cover before trying to power up the machine.

- NOTE -The guard door must be closed when jogging an axis or Homing the machineaxes.

2. Close the main guard door.

- NOTE -The main disconnect switch is located on the power case on the right end of VMC600�� machines.

The main disconnect switch is located on the power case at the back of all otherVMC Series II machines.

3. Turn main disconnect switch “A”, Figure 1.1,ON.

4. At the rear of the machine, slide valve “B”,Figure 1.2, upward to turn the machine airON.

5. Check the air filter bowl; it drainsautomatically but may need to be cleaned.

6. Check the coolant level. Add coolant, ifnecessary.

- NOTE -The machine will power up in theShopMill mode.

Wait for alarm “3000 � EmergencyStop” to be displayed before proceed-ing to step 7.

7. Pull Emergency Stop push button “C”, Figure1.3, out and release it to allow the machineto power up.

1-4 M-379C

Figure 1.3 - Siemens OperatorControl Panel

C

TP4676

D

Page 15: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

8. On operator control panel “D”, press the Reset push button to clear the Emergency Stopcondition.

- NOTE -The Feed Stop indicator light will be on when Feed Stop is active.

9. Press the Feed Stop push button to deactivate the Feed Stop function.

10. Press the Axis Home push button to Zero Return all the axes at the same time. The AxisHome indicator light will start flashing and the X, Y and Z axes will automatically Home (goto the Home position for each axis).

11. Press the Manual push button to put the machine in ShopMill manual mode.

- NOTE -High-performance high-speed machines require additional spindle and oil-air startup procedures. Refer to “Spindle Warm-Up Procedures”, on page 1-6.

POWER-DOWN PROCEDURE

1. Press the Emergency Stop push button.

2. Turn main disconnect switch “D”, Figure 1.1, OFF.

3. Pull main air valve “B”, Figure 1.2, downward to turn the machine air supply OFF.

- CAUTION -If the machine is a high-performance high-speed machine, make certain that theLabyrinth air seal air pressure “F”, Figure 1.4, is left ON for 15 minutes after thespindle has stopped to allow the spindle interior to cool to room temperaturewithout drawing in coolant and contaminants.

M-379C 1-5

Page 16: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

SPINDLE WARM-UP PROCEDURES

- CAUTION -Failure to properly warm up the spindle can result in spindle failure.

Never run the spindle over 50 percent of the maximum rated speed without a toolholder installed in the spindle.

- NOTE -Spindle warm-up is only required on High Speed machining centers.

High Speed machining centers are equipped with an automatic timer that will inhibitspindle operation for 5 minutes after the machining center has been powered up.The purpose is to ensure proper lubrication of the spindle bearings. Perform theappropriate spindle warm-up after the 5 minute period has expired.

High Speed machining centers equipped with a 12,000 RPM spindle are available with eithergrease lubrication or oil-air lubricator “E”, Figure 1.4.

1. On machining centers equipped with oil/airspindle lubrication, make certain that oil-airlubricator “E”, Figure 1.4, is ON. Allow 5minutes BEFORE proceeding to step 2.

2. On machining centers equipped with oil/airspindle lubrication, turn spindle labyrinth airseal pressure valve “F” ON. Therecommended pressure setting is 7.4 psi [0.5bar].

3. Perform the appropriate spindle warm-up,depending on how long the machining centerhas been idle.

SHORT TERM SPINDLE WARM-UP

- CAUTION -Short term spindle warm-up shouldonly be used if the machining centerhas been idle LESS than 2 weeks.Refer to Long Term SpindleWarm-Up if the machine has beenidle 2 weeks or more.

Use Manual Data Input mode to run the spindleat 25 percent of the maximum spindle speed for15 minutes.

Once the spindle warm-up is completed, themachine is ready for operation.

1-6 M-379C

Figure 1.4 - High-Performance SpindleLubrication System - Air and Lubricator

TP4645

E

F

Page 17: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

LONG TERM SPINDLE WARM-UP

- NOTE -Use the appropriate procedure in this section if the machine has been idle 2 weeksor more.

Machine with Oil-Air Spindle Lubrication

Use Manual Data Input mode to run the spindle at 25 percent of the maximum spindle speedfor 30 minutes; then, 50 percent of the maximum spindle speed for 60 minutes.

Once the spindle warm-up is completed, the machine is ready for operation.

Machine with Grease Spindle Lubrication

Use Manual Data Input mode to run the spindle at 25 percent of the maximum spindle speedfor 20 minutes; then, 50 percent of the maximum spindle speed for 30 minutes.

Once the spindle warm-up is completed, the machine is ready for operation.

M-379C 1-7

Page 18: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTES -

1-8 M-379C

Page 19: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

CHAPTER 2 - AIR SYSTEM

- WARNING -When the air system’s components require maintenance, the machine must bepowered down. Refer to Chapter 1 for the appropriate power-down procedure.

INTRODUCTION

Factory air to the machine goes through a filter/regulator/lubricator system to set the air pres-sure, remove contaminants from, and add oil to the machine air supply. If the factory air has ex-cessive moisture, a heavy-duty air dryer must be added to the incoming air line. The high-perfor-mance spindle machines may have an air dryer.

The incoming air line must have a minimum inside diameter of 3/8 inch [9.5 mm]; however, ifthe air line is especially long, a larger diameter hose may have to be installed. The air volumerequirement for a standard machine is approximately 16 scfm [453 lm] at 70 psi [4.9 bars]. Ma-chines with other air operated options require a higher volume of air; the high-speed spindle re-quires 23 scfm [650 lm] at 75 psi [5.2 bars]. Maximum air flow and full scfm (service cubic feetper minute) is required for proper machine operation.

Connect the air source or add an air lock-out valve; turn the air ON and set the regulator at aconsistent pressure from 59 psi to 73 psi [4.1 to 5 bar] or high-performance spindle machinesnear 90 psi [6.2 bar]. The air pressure switch is preset at 58.8 psi [4 bar] or 87 psi [6 bar]. If thepressure falls below this, an alarm message appears and the machine is put in an EmergencyStop condition.

M-379C 2-1

Page 20: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

AIR CONTROL ASSEMBLY

The air control assembly, shown in Figures 2.1 and 2.2, is mounted at the rear of the machin-ing center, on the left side of the tower.

The assembly consists of a filter/regulator, lubricator, and pressure switch. It distributes air tothe tool changer (magazine) and spindle area. Additional switches and solenoid valves areadded to the manifold assembly as air options are added to the machine.

The air regulator knob must be set to a consistent air pressure between 59 psi and 73 psi[4.1 and 5 bars]. If the pressure falls below 58.8 psi [4 bars], an alarm message appears on thecontrol display and the program goes into Emergency Stop.

2-2 M-379C

Figure 2.1 - Air Filter/Regulatorand Lubricator

(VMC600 II Machining Center)

TP3669

Figure 2.2 - Air Filter/Regulatorand Lubricator

(All other Series II Machining Centers)

TP3664

Page 21: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

COMPONENT REPLACEMENT

REPLACE THE FILTER/REGULATOR FILTER

The filter/regulator filter bowl drains automati-cally and check the air system bowls once a weekfor contaminates.

1. Power down the machine.

2. Make certain that the air lock-out valve isOFF or factory air is disconnected. Lock thevalve in the OFF position.

3. Clean the air filter/regulator filter as follows:

A) Make certain that the machine is powereddown and that the air lock-out valve isOFF or disconnected.

B) Twist ring “A”, Figure 2.3, above the outershell on the filter/regulator counterclock-wise to release the shell and bowl fromthe head. Drain any water and contami-nants from the bottom of the bowl.

C) Wipe the bowl clean with a lint-free clothand check the O-ring for damage. Replacethe O-ring or bowl if necessary.

D) Clean or replace the filter as necessary.To release the filter, unscrew the nylon fix-ture. Thread the new filter on the nippleuntil it is tight.

4. Mount the bowl on the head as follows:

A) Put the plastic bowl into the shell.

B) Align the bowl in the head and press theshell up into place. Rotate the ring on theouter shell clockwise until it latches to seatthe O-ring.

C) Pull down on the bowl to confirm that thebowl is in place.

5. Unthread screw “B” and fill the lubricator withthe appropriate oil. Thread the screw on andtighten it.

M-379C 2-3

Machine component Filter/Regulator/Lubricator combination

Lubricantcharacteristic

1)Viscosity:ISO VG32

2)Viscosity index:above 95

3)Anti-rust,anti-oxidation

4)Good Stability

Lubrication method Oil feeder

Lubricationfrequency

As needed, 1/yr.

Tank capacity 0.3 Liters

Recommended gradeof lubricant

1)CPC CirculationOil R32

2)Mobil D.T.EHeavy Mediurn

3)Daphne SuperMulti Oil 68

4)Shell Turbo OilT685)Esso Auto A68

Figure 2.3 - Air Filter/Regulator/Lubricator

B

A

TP3668

C

Page 22: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

REPLACE THE AIR CONTROL ASSEMBLY COMPONENTS

Any of the air control assembly components can be replaced if they become damaged. Theair control assembly can also be replaced as a unit.

1. Power down the machine. If there is an air lock-out valve, make certain that it is OFF.

2. Disconnect the main air line from the air lock out valve.

3. If pressure switch “C”, Figure 2.3, has a junction box/switch box, disconnect the wiringcable as follows:

A) Unthread the screw and remove the junction box cover.

B) Make a diagram of the wire connections for re-assembly in the junction box.

C) Pull the wire connection from the terminals.

4. Disconnect the air line(s) from the air manifold.

5. Unthread the screws and remove the air assembly unit from the panel.

6. Unthread and remove the component being replaced.

7. If there are O-rings, make certain that the O-rings are in place and mount the newcomponent.

8. Mount the air assembly unit on the panel. Tighten the screws that fasten it in place.

- NOTE -Use just enough sealant to secure the fitting when fastening the air lines to themanifold((s). Do not apply sealant to the first few threads.

9. Fasten the air line(s) to the manifold.

10. Connect the wiring cable as follows:

A) Connect the wires to the terminals per the diagram from step#3.

B) Install the cover on the junction box and tighten the screws.

11. Connect the main air line and turn the air source on.

12. Power up the machine. Set the regulator to an operating pressure between 59 psi and 73psi [4.1 and 5 bars].

13. Zero Return (Home) the table and spindle.

14. Check the air system bowl for contamination, moisture, or air leaks and correct anyproblems as necessary.

2-4 M-379C

Page 23: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

REPLACE THE PRESSURE SWITCH

Pressure switch “C”, Figure 2.3, is designed to send a signal to the control and an alarm mes-sage appears on the control display when the air pressure falls below 58.8 psi [4 bars].

1. Power down the machine. Make certain that the air lock out valve is OFF or disconnect theair source.

2. If the pressure switch has a junction box, disconnect the wiring cable as follows:

A. Unthread the screw and remove the junction box cover.

B. Make a diagram of the wire connections for re-assembly in the junction box.

C. Pull the wire connection from the terminals.

3. Unthread the pressure switch from the manifold. The switch is tightened to the manifoldwith light torque pressure; however, a wrench may be necessary to unthread it.

- NOTE -Use just enough sealant to secure the fitting when fastening the pressure switch tothe manifold. Do not apply sealant to the first few threads.

4. Thread a new pressure switch on the manifold and tighten it to 50 lb-in [5.6 N•m].

5. Connect the wiring cable as follows:

A. Connect the wires to the terminals per the diagram from step 2.

B. Install the cover on the junction box and tighten the screws.

6. Power up the machine.

7. Set the regulator to an operating pressure between 59 psi and 73 psi [4.1 and 5 bars]except the high-speed spindle machines which must be set at 75 psi [5.2 bars].

8. Zero Return (Home) the table.

9. Check the air system bowl for contamination, moisture, or air leaks and correct anyproblems as necessary.

M-379C 2-5

Page 24: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

REPLACE A SOLENOID VALVE

1. Power down the machine. Make certain that the air lock out valve is OFF or disconnect theair source.

2. Refer to the schematic chart on the panel (tag) to identify which valve needs to bereplaced.

- NOTE -Two screws attach each individual valve to the manifold. The screws are offset andlocated near the middle of the valve. Refer to Figure 2.4.

3. Unthread the screws and remove the identified solenoid valve(s).

4. Check the valve and manifold for O-rings.

- NOTE -It is not necessary to remove the elec-trical connection or air line from valvesthat are not being replaced.

5. Unthread the screw that secures theelectrical connection to the solenoid valvebeing replaced. Pull the connection straightoff to release it from the valve.

6. Unthread the air line from the fitting on thevalve being replaced. If necessary, removethe pneumatic fitting from the valve.

7. Thread an air fitting to the new valve. Usesealant to secure the fitting but do not applyit to the first few threads.

8. Mount the new valve to the manifold. Checkvalve O-rings; replace any that are worn.

9. Support the new valve and fit the electricalconnection to it. Secure the connection withits screw.

10. Fasten the air line to the fitting on the bottomof the valve.

11. Power up the machine.

12. Set the regulator to an operating pressurebetween 65 psi and 73 psi [4.4 and 5 bars],except the high-speed spindle machineswhich must be set at 75 psi [5.2 bars].

2-6 M-379C

Valve List Function

Spindle Air Blow Air blast when unclamped

Chip Air Groove clean when oriented

Spindle Tool Unclamp/Clamp

Solenoid Valve Tags

Figure 2.4 - Air Solenoid ValvesTP3670

Page 25: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

13. Zero Return (Home) the table.

14. Check the air system bowl for contamination, moisture, or air leaks and correct anyproblems as necessary.

-NOTE -Solenoid valves that have adjustable force thumb screws act as flow valves. Theyhave a lock (jam) nut to secure the setting after the flow rate has been set.

14. Test the function of the option and adjust it as necessary.

- NOTE -Refer to the pneumatic schematic on the next page.

M-379C 2-7

Page 26: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

2-8 M-379C

Pneumatic Schematic

Tp4509.

Page 27: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

M-379C 2-9

Pneumatic Diagram

Tp4510.

Page 28: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

2-10 M-379C

High-Performance High-Speed Pneumatic Diagram

Page 29: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

AIR SYSTEM FOR OPTIONAL OPTICAL SCALES

Optical scales is an option that enhances the accuracy of the control to make more consistentparts. Although there is little maintenance to the optical scales as they are located under theaxes way covers, a constant flow of clean air purges dust and moisture from the scales. A smallfilter/regulator and coalescing filter module, mounted on the rear of the column, cleans and driesthe air before it is used to protect the scales. If the factory air has excessive moisture, an airdryer must be added to the incoming air line.

The air pressure switch is set at the factory and should not be adjusted. If the inlet air pres-sure is between 58 and 102 psi [4 and 7 bar], then, the outlet air pressure should be 14.5 psi [1bar]. When the outlet air pressure is lower than 10 psi [0.7 bar], the air filters must be cleaned orreplaced.

- CAUTION -Due to the exposed location at the rear of the machine, care must be taken not tobump or damage the filter/regulator and coalescing filter module.

CLEAN OR REPLACE THE OPTICAL SCALE AIR FILTERS

1. Power down the machine.

2. Make certain that the air lock-out valve is OFF or factory air is disconnected. Lock thevalve in the OFF position.

3. Clean the optical scale air filter/regulator filters as follows:

- NOTE -The filter in shell “D”, Figure 2.5, has acoarse 3 � m element (Hardinge partnumber NV 00116140110) while the fil-ter in shell “E”, has a fine 0.03 � m ele-ment (part number NV 00116140110).

A. Use the provided spanner (hook) wrenchto unthread the outer shell from the headto gain access to each filter.

B. Drain any water and contaminants fromthe bottom of the shell.

C. Wipe the shell clean with a lint-free clothand, if there is an O-ring, check it for dam-age. Replace the O-ring or shell if neces-sary.

D. Clean or replace the filter(s) as necessary. To release the filter, unscrew it.

E. After the filter is cleaned or replaced, thread it on the nipple until it is tight.

F. Thread the shells on and tighten them.

G. Pull down on each shell to confirm that each is in place.

4. Make certain that the factory air is connected or unlock the air lock-out valve as necessaryto have air.

5. Power up the machine and check the air pressure at the regulator. Make adjustments asnecessary.

M-379C 2-11

Figure 2.5 - Optical ScaleFilter/Regulator Air Module

D

TP4226

Inlet

E

Outlet

Page 30: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTES -

2-12 M-379C

Page 31: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

CHAPTER 3 - COOLANT SYSTEM

- WARNING -When the coolant system requires maintenance, the machine must be powereddown. Refer to Chapter 1 for the appropriate power-down procedure.

- CAUTION -Whenever cutting fluids are used, it is essential to follow the manufacturer’s rec-ommendations on the selection and maintenance for that particular fluid.

INTRODUCTION

Hardinge machining centers are designed using the latest technology and highest quality ma-terials available. However, due to the ever increasing number of cutting fluid (coolant) selectionsavailable, it is impossible to test material compatibility with each and every coolant. The twomost popular types of cutting fluids are cutting oils and water-based coolants. Be prepared to fillthe tank assembly with the approved coolant to the FULL line of the sight gauge after the cool-ant tank is in place.

Approximate coolant tank capacities are shown in the following chart:

Machine Models Coolant Tank Capacity

VMC600II, 800II, and 1000II Machines 40 gallons [150 liters]

VMC1250II and 1500II Machines 80 gallons [300 liters]

WATER-BASED COOLANTS

Water-based coolants are a cutting fluid which, when improperly specified or maintained, canaffect the life of a machine and the quality of the parts made on it. Water-based coolants are de-signed to suppress rusting, enhance cutting, increase tool life, promote heat dissipation, and beeconomical to use.

Some water-based coolants may cause machine corrosion problems and be incompatible withmachine components, especially if the fluid is not maintained correctly. Poorly maintained cool-ants may result in rancidity, poor tool life, staining, rusting, and foaming, which affect machineperformance and may cause health problems such as dermatitis. Water-based coolants must becorrectly specified according to the machined materials and ensure compatibility with the ma-chine’s components. Refer to the list of common materials used in the manufacture of Hardingemachines which is located at the end of Appendix One.

It is extremely critical to follow the coolant manufacturer’s recommendations when using a wa-ter-based coolant. Maintaining coolants per the manufacture’s recommendations will increasethe machine’s useful life and will minimize corrosion, rusting, staining, and health problems suchas dermatitis.

M-379C 3-1

Page 32: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

PREPARING THE COOLANT SYSTEM

- NOTE -The following procedure is used if the machining center has been moved after theinitial installation and the coolant tank has been emptied.

1. Roll the coolant tank into the opening under the front of the machining center.

2. Adjust the chip trays (screens) on each end or chip conveyor and check inside the workarea to see that coolant will drain back into the trays/conveyor and coolant tank.

3. Install the coolant hose and tighten the clamps.

4. Pour the coolant directly into the work area to drain into the coolant tank. Fill the tank withthe approved coolant to the FULL line of the sight gauge. Always check for cutting fluidleaks and correct them as necessary.

Make any adjustments before powering up the machine and turning the coolant ON.

CARE AND MAINTENANCE

- NOTE -A properly selected and maintained coolant will ensure the best performance fromthe coolant and machining center.

A daily check of the concentration and pH will help keep the coolant at its optimum perfor-mance level. Limit the growth of anaerobic bacteria which cause the rancid odors and feed onthe additives in the coolants.

Make-up coolant should be added when needed and according to the manufacturer’s recom-mendation. This make-up coolant is necessary to provide additional fresh coolant which containsthe essential additives required to keep the coolant performing properly.

Clean and replace the coolant per the coolant manufacturers recommendations. Propercleaning of the machine is very important before refilling the tank with fresh coolant. Dispose ofthe used coolant properly. Bacteria live and cling to all wetted surfaces in the machine. Specialcleaners, usually available from your coolant supplier, are recommended to flush the system be-fore refilling. These cleaners will kill the bacteria left after draining the machine. It also is recom-mended that a thorough cleaning, which includes scraping and removing any sludge found onthe bottom and hidden in the top panels of the coolant tank, be completed before circulatingcleaner through the system.

CONCENTRATION

Proper concentration control is essential for optimal tool life, corrosion control, and inhibitingbacterial growth. Water soluble coolants lose water by evaporation during normal operating con-ditions which tends to increase the coolant concentration over a normal work shift. The coolantconcentration must be checked each day.

The coolant concentration must be kept within the specified range determined by the coolantmanufacturer. Failure to maintain the coolant concentration within this range may result in poorperformance from that fluid. Lean concentrations can lead to rust, rancidity, short tool life, andother problems. Rich concentrations can result in foam, residues, health problems such as der-matitis, and increased coolant costs.

3-2 M-379C

Page 33: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

pH

pH is a measure of a solution’s alkalinity or acidity. There are two common methods used todetermine pH. One method is the use of special pH test paper and the other is a pH meter.

Water based coolants are designed to run within the pH range determined by the manufac-turer. The pH of water based coolants typically runs on the alkaline side of the pH scale. A dropin pH indicates a growth of bacteria. These anaerobic bacteria live on the additives found in thecoolants. When these bacteria feed on the oils they release an acidic by-product which eventu-ally drives the coolant towards a lower pH level. Typically, the pH range is between 8.5 and 9.2.

WATER QUALITY

The water quality is also an important factor toward achieving optimum coolant performance.Water that contains dissolved minerals, bacteria, and other impurities (hard water) can some-times adversely affect the coolant selected. An indication of water related problems is the forma-tion of a soap like scum which adheres to sumps and filters. It is best to consult with your cool-ant representative to determine your requirements.

M-379C 3-3

Page 34: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

CHIP REMOVAL

The coolant tank assembly is mounted on wheels and the coolant pumps are mounted onbrackets at the rear corners of the machine. The tank can be disconnected from the coolanthoses and rolled from under the machine for easy access. The tank assembly has chip traysthat screen the metal chips and allows the coolant to drain through and recycle.

- WARNING -Use a rake and suitable container to remove metal chips from the chip trays. In-jury may result from attempting to remove chips without a rake. Dispose of thechips in an environmentally safe manner.

1. Power down the machine.

2. Wait a minute to allow most of the coolant to drain back into the tank.

3. Open the coolant guard doors; sweep metal chips from the table and way covers into thecoolant tank. Rake out as many of the chips as possible.

4. If the machine does not have a chip conveyor, carefully slide chip tray “A”, Figure 3.1, and“B”, Figure 3.2, out the side from the corners of the coolant tank.

- NOTE -Chips can also be removed by disconnecting the coolant hoses from the tank,rolling the tank out from under the machine, and thoroughly cleaning the chip trays.When completed, return the tank under the machine and reconnect the coolanthoses.

5. Rake or dump the chips into a suitable container and dispose of them properly. Thoroughlyclean the chip trays before returning them to the corners of the coolant tank.

6. Check and maintain the coolant. Fill the coolant tank as necessary.

3-4 M-379C

Figure 3.1 - Left Side Chip TrayTP3656

A

Figure 3.2 - Right Side Chip Tray

B

TP3657

Page 35: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

CLEANING THE COOLANT TANK AND FILTERS

Clean the coolant tank at least once every six months or more frequently if the materials be-ing cut contaminate the coolant. Clean the coolant tank whenever changing the type or brand ofcoolant.

1. Power down the machine.

2. Wait a minute to allow the coolant to drain into the tank.

- WARNING -Use a rake and suitable container to remove metal chips from the chip trays. In-jury may result from attempting to remove chips without a rake. Dispose of thechips in an environmentally safe manner.

3. Open the coolant guard doors and sweep metal chips from the table and way covers intothe coolant tank.

4. If the machine does not have a chip conveyor, carefully slide chip tray “A”, Figure 3.1, and“B”, Figure 3.2, out the side from the corners of the coolant tank.

5. Disconnect the coolant hoses from the coolant tank, if necessary; move the tank into anarea that is convenient to remove the metal chips.

6. Rake or dump the chips into a suitable container and dispose of them properly

7. At both ends of the coolant tank, remove the pipe plug to drain the coolant or pump thecoolant from the tank. Completely empty the tank.

8. Lift the chip pans from the tank. Clean them thoroughly.

- WARNING -Wear protection and be careful when removing coolant and metal chips from thecoolant tank.

9. Remove any coolant still in the tanks and wipe the coolant tank clean.

10. Be aware of how the filter screens are mounted in the coolant tank. Lift the screens fromthe slots.

11. Shake out the metal chips and wipe the filter screens clean.

- NOTE -Dispose of the chips, coolant, and cleaner in an environmentally safe manner.

12. Wash the coolant tank and filter assembly with a cleaner recommended by the coolantmanufacturer to remove any bacterial contamination. Flush or pump the cleaner from thetank and screens. Remove any chips and wipe the tank and screens clean.

- NOTE -Do not force the filter assembly into the frame. There is only one way for it to fit.

13. Place the filter screens in their slots in the tank.

M-379C 3-5

Page 36: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

14. Return the tank to the opening under the machine. Adjust the chip trays on each end orchip conveyor and check inside the work area to see that coolant will drain back into thetrays/conveyor and coolant tank.

15. If necessary, connect the coolant hoses. Check the coolant hoses to the machine for kinksor distortion and straighten them as necessary.

16. Pour the coolant directly into the work area to drain into the coolant tank. Fill the tank withthe approved coolant to the FULL line of the sight gauge.

17. Always check for cutting fluid (coolant) leaks and correct them as necessary.

CLEANING THE COOLANT IN-LINE Y FILTER

Beginning in August, 2000 some machines have a coolant in-line Y filter and valve betweenthe back of the tank and coolant pump. The in-line Y filter must be checked for cleanliness everyday and cleaned as necessary. Whenever there appears to be a drop in coolant pressure, thein-line Y filter must be cleaned.

1. Power down the machine and allow the coolant to drain back into the tank and for thecoolant pressure to drop to zero.

- NOTE -Depending upon the valve configuration, ball valve “C”, may be in front of thein-line Y filter (as shown in Figure 3.3) or behind it.

2. Close ball valve “C”, Figure 3.3, (handle perpendicular to the coolant line) and wipe filtercap “D” clean with a lint free cloth.

3. Unthread the filter cap from the filter housing.

4. Note how the filter element is in the housing and pull it straight it out.

5. Clean the filter element or, if necessary,replace it. Make certain that all the particlesare out of the screen.

6. Put the filter element all the way down intothe filter housing and thread the cap in toseal the filter. Open the ball valve (handleparallel to the line as shown).

After the machine is powered up, check forcoolant leaks around the filter cap andtighten it as necessary.

3-6 M-379C

Figure 3.3 - In-Line Y Filter and ValvesTP4086

D

C

Page 37: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

COOLANT DIRECTIONAL BALLS

Five coolant directional balls are located on the spindle face, equally spaced around the tool.Refer to Figure 3.4.

The directional balls are mounted in Nylon cups; to adjust the directional position of the cool-ant balls, put a hex wrench or dowel up into the coolant ball orifice and move the ball. Move thedirection of the other balls as necessary.

COOLANT/CHIP FLUSH

The adjustable hoses shown in Figure 3.5 can be set at any length or angle to flush chips to-ward the chip recovery screens. After powering down the machine, separate any ball link, re-move or add links as necessary and re-attach the separated links by snapping them together.

The angle on the flexible hoses may be adjusted by forming the links until the desired positionis obtained to move the chips toward the front of the machine.

M-379C 3-7

Figure 3.4 - Spindle FaceTP3681

CoolantBalls

Figure 3.5 - Coolant/Chip FlushAdjustable Hoses

TP3682

Page 38: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

THRU-SPINDLE COOLANT [Option]

The thru-spindle coolant option must be factory installed. This unit is left in place at all times;the spindle can be run even though the coolant is not active.

The most important maintenance aspect of having thru-spindle coolant is having very cleancoolant. There are three coolant filters on machines equipped with the thru-spindle coolantoption: two in-coolant-line filters and the filter screens in the coolant tank.

The in-line filter is a Y filter mounted on the back of the coolant tank in the coolant returnline. The in-line Y filter must be cleaned whenever there appears to be a drop in thethru-spindle coolant pressure. Refer to page 3-6 for information on cleaning the in-line Y fil-ter.

Spin-on canister filter “E”, Figure 3.6, is mounted near the coolant pump on the right sideof the tower (facing the rear of the machine). The spin-on canister filter must be replacedwhenever there appears to be a drop in the thru-spindle coolant pressure.

The coolant tank screens must be checked for cleanliness every day and cleaned as nec-essary. Refer to “Cleaning the Coolant Tank and Filters”, page 3-5, to check and clean thecoolant tank screens.

REPLACING THE IN-LINE SPIN-ON CANISTER FILTER

1. Make certain that the machine is powered down and that the coolant pressure has droppedto zero.

2. Wrap the filter head with a rag to catchcoolant as filter canister “E”, Figure 3.6, isremoved. Unthread the filter from itsmounting nipple.

3. Wipe the mounting nipple with a lint freecloth and check to make certain that the filterseal is removed from the mounting surface.

4. Fill the replacement filter one-half full withfresh coolant and wipe a light coat of oilcompletely around the seal on top of thefilter.

5. Thread the replacement filter on themounting nipple until contact is made, then,thread it on one-quarter to one-half of a turnfurther.

6. After the machine is powered up, check forcoolant leaks around the filter head andtighten the canister as necessary.

3-8 M-379C

Figure 3.6 - Thru-SpindleSpin-On Canister Filter

TP3694

E

Page 39: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTES -

M-379C 3-9

Page 40: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTES -

3-10 M-379C

Page 41: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

CHAPTER 4 - LUBRICATION

IMPORTANCE OF LUBRICATION

Running conditions of this machine depend heavily upon the lubrication management. Makecertain that the lubrication system is checked frequently to keep the machine in proper workingcondition.

AXES WAY GREASE LUBRICATION

Grease is used to lubricate the guideways along the X, Y, and Z axes as well as the axesballscrew nuts. Kluber ISOFLEX® NBU 15 or NCA 15 grease, recommended by Hardinge, hasgood abrasion and adhesion properties.

- NOTE -Make certain all the sliding surfaces are lubricated well by jogging the axes severaltimes before resuming automatic operation.

Check the grease lubrication system monthly and add grease as necessary. The system can-not be over greased. Recommended lubrication is every 600 hours or approximately 4 months ofoperation.

1. Wait for the cycle to end and make certainthat the spindle is stopped.

- NOTE -From the front of the machine, the Zaxis cover is just above the coolantguard on the tower, Figure 4.1.

The X and Y axes cover is located onthe front of the way cover inside thecoolant guard doors, Figure 4.2.

2. Unthread the screws and remove the coversto uncover the axes grease fittings.

- NOTE -VMC1250II and 1500II machines areequipped with two sets of Y axisgrease fittings. The two sets of fittingsare positioned approximately 39 inches[990 millimeters] apart.

3. Jog the X axis until the Y axis grease fittings(lower set, Figure 4.2) are uncovered. The Xaxis grease fittings are attached and movewith the X axis jog.

M-379C 4-1

Figure 4.1 - Z Axis Grease Fittingsat Front of Tower

TP3688

Figure 4.2 - X and Y Axes GreaseFittings at Front of Way Cover

X Axis Fittings

Y Axis Fittings

TP3689

Page 42: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

4. Attach the grease gun (supplied with machine) to the grease nipple and pump in greaseuntil resistance is felt; then, one more pump of grease. Repeat the process for each greasenipple on all axes.

5. Wipe the nipples clean of excess grease.

6. Align the cover for each opening and secure them with their screws; continue with machineoperation or maintenance.

If grease was added because there was an alarm fault (”600 hour lube alarm”), clear thealarm after the control has been powered up.

Fanuc Control: Press the Reset and Feed Hold push buttons at the same time to clear thealarm.

Siemens Control: Press and hold the Reset push button for 5 seconds or until the alarm iscleared.

TOOL KNOCKOUT PISTON LUBRICATION

Add the specified oil to the air/oil tool-knockout piston oil cup “A”, Figure 4.3, located on theknockout piston near the top of the machine. The oil in this cup should be replenished at leastonce every six months; however it is recommended that the piston oil cup be checked everymonth.

OIL SPECIFICATION

CHARACTERISTICS

Viscosity :ISO VG68Viscosity index: above 95Anti-oxidation,Anti-corrosion,Anti-rust,Anti-emulsion

RECOMMENDED OILS

B.P.Energol NT 68Mobil Vactra Oil No.2Esso Febis K68Shell Tonna Oil T68Chevron Way Lubrica NT68

ADDING OIL TO THE LUBRICATION CUP

1. Wait for the cycle to end and make certain that the spindle is stopped.

2. Power down the machine.

3. Locate the oil cup at the top of the machine.

4. Inspect the cover to be sure the vent hole is not plugged.

5. Unfasten the cover of the oil cup and fill the cup. Install the cover.

6. Power up the machine.

4-2 M-379B

Figure 4.3 - Tool Knockout Lubricator Cup

A

TP3690

Page 43: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

TOOL CAROUSEL RAIL LUBRICATION

Tool carousel grease fitting “B”, Figure 4.4, is ina seam on top of the carousel. If there are twocarousels on the machine, there will be a fitting oneach carousel. The grease fitting can best beseen when the tool carousel is at the retract posi-tion (furthest from the spindle).

The grease fitting can be viewed from the leftend of the machine by looking up into the seamthat is nearly centered on that end. if there is asecond carousel, go to the other end of the ma-chine and the grease fitting will be centered in theseam on that end.

Add Kluber ISOFLEX® NCA 15 grease to thetool carousel rail each 600 hours of machine oper-ation.

ADDING GREASE TO THE TOOL CAROUSEL RAIL

1. Wait for the cycle to end and make certain that the spindle is stopped. Make certain thatthe carousel is in the retract position.

2. Power down the machine.

3. Locate the grease fitting at the top of the machine.

4. Wipe the fitting(s) clean of any dirt or contaminants.

5. Attach a grease gun (supplied) to the grease nipple and pump in grease until resistance isfelt; then, one more pump of grease. If there is a second carousel, repeat the process.

6. Wipe the nipple(s) clean of excess grease.

7. Continue with machine operation or maintenance.

SPINDLE BEARING LUBRICATION

The bearings in the spindle in the standard machine are designed to last the life of the ma-chine; therefore, no maintenance is required.

M-379B 4-3

Figure 4.4 - Carousel Grease FittingTP4193

B

Page 44: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

HIGH-SPEED SPINDLE AIR-OIL LUBRICATION

High-performance high-spindle machines are available with an air-oil spindle lubrication sys-tem. This configuration requires an air operating pressure of 75 psi [5.2 bar]. The air-oil lubrica-tion system is located at the rear of the machine between the power case and the column, asshown in Figure 4.5. The labyrinth air seal has a separate air regulator mounted with the air reg-ulator for the air-oil lubricator.

- NOTE -It is especially important to maintain the main air assembly filter/regulator andcoalescing filter as well as the additional air-oil lubrication system. Drain the bowlsdaily and correct any moisture problem.

The air-oil lubricator is active any time the air is ON and the CNC control is ON. It supplies oilto the spindle bearings whenever the spindle is running.

The tank contains approximately 0.85 liters of pre-filtered Mobil DTE-797 oil when filled, whichallows about 0.3 liters of the oil to be available for use. The run time for one full spindle lubrica-tor tank is approximately 5230 hours. The pump cycle time is preset at the factory to pump oilevery 48 minutes. The oil must be filtered through a 3 micro or better filter before being used.

When the machine is powered up and an “Oil Air ERR.” message is displayed with thecontrol forced into single block mode operation; first, check the oil level and, second, make cer-tain that there is air pressure to the system. Fill the lubricator tank when necessary to clear thismessage and re-enable the lubricator system.

FILL THE AIR-OIL LUBRICATOR TANK

1. Locate the lubricator tank and tank filler cap.

2. Wipe away any oil and contaminants fromthe tank cover and filler cap.

- CAUTIONS -Leave the filler tube screen in place.Do not tamper with the snap ring.

Use Mobil DTE-797 oil pre-filteredthrough a 3 micro or better filter.Oil obtained from Hardinge, partnumber MC-0010912-01, has alreadybeen filtered within specification.

3. Remove the filler cap and slowly fill the tankwith pre-filtered Mobil DTE-797 oil. Wait a full5 minutes to allow any air in the oil toescape.

4. Install the filler cap. Continue withmaintenance or operation.

4-4 M-379B

Figure 4.5 - High-Speed SpindleLubrication System - Air and Lubricator

TP4642

C

D

Page 45: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

VERIFY SPINDLE LUBRICATION STATUS

Check and correct the air-oil lubricator components as follows:

1. Open two latches and lift off front cover “D”, Figure 4.5.

– NOTES -The mixing block (metering unit) is mounted in the lower left corner with the air-oilfeeder lines and air line connected to the bottom.

The main air line is the larger diameter line. The smaller line supplies oil to themixing block.

2. Check the oil lines and oil pressure.

3. Check the air pressure from the main air panel to the controller and mixing block.

4. Check the air pressure from the mixing block to spindle.

The air-oil lubrication lines from the mixing block (metering unit) to the spindle must be atleast 16.5 feet [5m] long and the same length, within 1 inch [25mm], of each other. Loosely windthe excess line in 5 loops with a 2.38 inch [60mm] minimum loop diameter. Install loops at amid-way point between the spindle and lubricator, no closer than 3.3 feet [1 meter] to the spin-dle.

The spindle air-oil lubricator system consists of a Showa/MOA-5-1, 3X4 or a Vogel lubricatortank with oil pump and air metering, air regulator, oil and air lines with air valve and pressureswitch, a mixing block (metering unit), air-oil lines from the mixing block, and air-oil dischargeports. Any of the components can be replaced after powering down the machine, removing thecovers as necessary, and replacing just that component. When any of the needle valves in themixing block become damaged or clogged, replace the mixing block assembly.

Check the spindle air-oil lubricator system at the beginning of each shift for any unusual noiseor vibration. Check the lubricator oil lines and air lines for kinks or leaks. The pressure switchmounted on the air valve at the bottom of the lubricator tank is preset at the factory to 75 psi[5.3 kg/cm2]

The controller to the left of the air-oil lubricator tank indicates system conditions through threeLED’s “C”, Figure 4.5. The controller and tank are replaced as a unit. Each LED indicates thefollowing:

Top (MAIN) LED is the power supply and timer (CK). It indicates that power is supplied tothe IC controller and, when it is green, the timer is functioning normally.

Middle (LUBE) LED indicates low oil level (FS). It is lit when the float switch (FS) indicatesthat there is enough oil.

Bottom (FAILURE) LED indicates when the air pressure is too low, when there is notenough oil or any other part of the system fails. Fill the oil, check the system, and pressthe Reset push button.

M-379B 4-5

Page 46: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

SET THE AIR-OIL LUBRICATOR AIR REGULATOR

1. The machine must be powered up; main air filter/regulator turned ON and set to machineoperating pressure; from 77 to 87 psi [5.3 to 6.0 bar].

- NOTE -The gauge mounted in the controller on the air-oil lubricator tank is set at 0.5 MPa.Adjust this setting if the factory air pressure fluctuates during the day.

2. Pull up or out on the air-oil lubricator regulator knob, adjust the air pressure while watchingthe controller gauge along side the tank; then, press the knob back in place to lock it.

3. If the air fault light is or has been on, press the Reset push button.

The mixing block (metering unit) is mounted in the lower left corner, just inside front cover“D”, Figure 4.5, with the air-oil feeder lines and air line connected to the bottom of the block. Theblock receives a constant supply of oil while each of the five needle valves in the block set theair flow and mixes air with the oil.

INSPECT THE AIR AND OIL LINES AND SET THE AIR FLOW IN THE MIXING BLOCK

1. Power down the machine and lock out the power.

2. Remove the front and right side headstock covers.

3. Open two latches and lift off front cover “D”, Figure 4.5.

4. Inspect the air-oil lines for kinks, blockage, "dry line" or contaminants.

- NOTE -Hardinge cuts the length of the air-oil lubrication lines from the mixing block to thespindle at 16.5 feet [5 meters]. Any replacement lines must be cut at the samelength within 1 inch [25 mm] of the existing lines.

If it is necessary to replace a line, unwind it from the other loops. Do not shortenthe line to a length less than 16.4 feet [5 m] or use any short line. Keep all thelines within specified lengths.

5. Carefully inspect the air-oil lines and replace any lines as necessary.

6. Set the needle valves on the mixing block (metering unit) for air flow as follows:

A) Make certain that the main air filter/regulator lock-out valve is OFF. Lock out the airvalve.

B) Loosen the lock nut on the valve screw and unthread it to the top of the valve screw.

- NOTE -Unthread each valve screw when an air pressure gauge (next instruction) is goingto be installed and used in a line.

C) Use an air pressure gauge with a "Tee" fitting. Install the air pressure gauge “Tee” fittingin the lubrication line of lubrication fitting #1, no more than 4 inches [100 mm] from thefitting.

4-6 M-379B

Page 47: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

D) Adjust the lubricator air pressure needle valve for port #1 so that the air pressure gaugeat the spindle reads 55 to 58 psi [3.8 to 4.0 bar].

E) Repeat this procedure for each of the five lubrication lines. Each individual adjustmentwill affect each of the other lines, so re-check each line and adjust as necessary until alllines are at the specified pressure. Make sure to remove the pressure gauge from thelubrication line before operating the spindle.

F)

Secure each valve screw and thread the lock nut down. Tighten each lock nut againstthe mixing block.

G) Unlock the main filter/regulator lockout valve and turn it on.

- NOTE -If any needle valve is clogged or contaminated, replace the mixing block.

7. Power up the machine

8. Press the Reset push button.

9. Inspect the oil and air lines for leakage and inspect each line from the mixing block to thespindle for oil velocity. A very small stream of oil will move at approximately 5mm/sec.

10. Power down the machine, mount and latch the air-oil unit cover and mount the headstockcovers.

M-379C 4-7

Page 48: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

SPINDLE LABYRINTH AIR SEAL

- CAUTION -The air pressure must be left ON for 15 minutes after the spindle has stopped toallow the spindle interior to cool to room temperature without drawing in coolantand contaminants.

High-speed spindle machines equipped with an air-oil spindle lubricator are also equippedwith a labyrinth air seal system. This system provides positive air pressure at the spindle nose tohelp prevent contaminants from entering the spindle bearings.

Cleanliness of the air supply is critical for preventing damage to the bearings. 2-way solenoidvalve “E”, Figure 4.6, located on left side of air-oil solenoid valve, is provided in the air supply forON/OFF control of the labyrinth air seal.

The labyrinth air seal air pressure (7.4 psi [0.5 bar]) must be ON before cutting fluid is turnedON, during operation of the spindle and during spindle cleaning.

4-8 M-379B

Figure 4.6 - Labyrinth Air Seal AirRegulator

TP4188

E

Page 49: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

HIGH-TORQUE GEAR BOX LUBRICATION

The gear box on the high-torque spindle machines requires a closed-loop circulation of lubri-cation. This system consists of a tank, pump, heat exchanger (radiator and fan) and the gearbox. The heat exchanger helps stabilize and keep the gear box at a constant operating tempera-ture. The oil level must be checked each 2000 hours (approximately one year) of operation andthe oil must be changed every two years. Select the oil from the table on the next page.

ADDING OIL TO THE HIGH-TORQUE GEAR BOX TANK

1. Wait for the cycle to end and make certain that the spindle is stopped. Jog the spindledown to its lowest point (-Z position).

2. Power down the machine.

3. Unthread the screws and lift off the sheet metal cover above and around the spindlecolumn to expose the spindle drive and high-torque mechanisms.

4. Open the right side door and locate gear box tank “F”, Figure 4.7.

M-379B 4-9

Figure 4.7 - High-Torque Gear Box TankTp4215.

G

Gear Box

Spindle Drive Belt

F

Page 50: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTE -Select the oil from the table below.

Some tanks may have a filler cap; if there is a filler cap, clean the cap and areaaround the cap, open the cap and add oil until the tank is full.

5. Unthread tank vent “G”, and add oil until the tank is full.

6. Thread the vent on until it is snug.

7. Check the hoses for any kinks or leaks and correct any problems as necessary.

8. Mount the spindle sheet metal cover and tighten the screws.

9. Power up the machine and continue with machine operation or maintenance.

Machine Component High-Torque Gear Box tank

Lubricantcharacteristic

1)Viscosity: ISO VG322)Viscosity index: above 953)Anti-rust, anti-oxidation4)Good Stability

Lubrication method Oil circulation

Lubrication frequency As needed, 1/yr.

Tank capacity .95 qt. [1.0 Liter]

Recommended gradeof lubricant

1)CPC Circulation Oil R322)Mobil D.T.E Heavy Medium3)Daphne Super Multi Oil 684)Shell Turbo Oil T685)Esso Auto A68

4-10 M-379C

Page 51: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

CHANGING THE OIL IN THE HIGH-TORQUE GEAR BOX TANK

- NOTE -The oil in the high-torque gear box must be replaced every two years.

1. Wait for the cycle to end and make certain that the spindle is stopped. Jog the spindledown to its lowest point (-Z position).

2. Power down the machine.

3. Unthread the screws and lift off the sheet metal cover above and around the spindlecolumn to expose the spindle drive and high-torque mechanisms.

4. Open the right side door and locate gear box tank “F”, Figure 4.7.

5. Unthread the screws that fasten the tank top to the tank. The tank top has the lubricatorpump mounted on it.

6. Carefully pry the top from the tank and set it aside.

7. Pump or wipe the oil from the tank until it is empty.

Wipe the tank clean with a lint-free cloth.

8. Install the tank top and tighten the screws that fasten the top to the tank.

- NOTE -Select the oil from the table on the previous page.

Some tanks may have a filler cap; if there is a filler cap, clean the cap and areaaround the cap, open the cap and add oil until the tank is full.

9. Unthread tank vent “G”, and add oil until the tank is full. The tank will hold approximately 1liter of fluid.

10. Thread the vent on until it is snug.

11. Check the hoses for any kinks or leaks and correct any problems as necessary.

12. Mount the spindle sheet metal cover and tighten the screws.

13. Power up the machine and continue with machine operation or maintenance.

M-379C 4-11

Page 52: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTES -

4-12 M-379C

Page 53: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

CHAPTER 5 - MISCELLANEOUS

CHANGING THE CONTROL BATTERIES(Fanuc Control Only)

- CAUTION -A fresh battery pack must be installed at least once a year. Failure to perform thismaintenance will result in the loss of control information.

Battery SpecificationsManufacturer: SanyoBattery Number CR17450SE-RVoltage Rating: 3 voltBattery Type: Lithium

1. Power up the machine. Refer to the power-up procedure beginning on page 1-1.

- WARNING -High voltage AC will be present in the power case when the main disconnectswitch is ON.

2. Turn interlock bypass “A”, Figure 5.1, as indicated to allow the power case door to beopened with the power ON.

3. Open the power case door.

- WARNING -Hold the battery cover by the top and bottom and squeeze the cover while pullingit off.

4. Remove battery cover “B”, Figure 5.2.

M-379C 5-1

Figure 5.1 - Control Battery Unit Cover

A

TP5737

Figure 5.2 - CNC Control UnitTP5735

B

Page 54: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

5. Verify the replacement battery pack matches the battery pack being removed.

6. Disconnect the old battery pack from receptacle “C”, Figure 5.3.

7. Connect the new battery pack.

8. Install the battery pack and cover.

9. Close and secure the power case door.

10. Properly dispose of the old battery pack.

5-2 M-379C

Figure 5.3 - Control Battery ConnectionTP5736

C

Page 55: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

CLEANING THE POWER CASE HEAT EXCHANGER AIR FILTER

The power case is cooled by a heat exchange system. The heat exchanger provides the cool-ing and environmental protection necessary for proper operation of the printed circuit boards.This air unit employs a closed loop design which circulates air inside the power case while seal-ing out potentially contaminated, external air.

The heat exchanger is located either on the door exterior or near the top of the power case.Air is moved inside the power case while external air is drawn across the corrugated metal (heatexchange) plate. Clean air filter “D”, Figure 5.4, on the heat exchanger or above the power case.

1. Power down the machine.

2. Clean the power case heat exchanger air filter as follows:

A) Use the tab on the filter to lift the air filter up, slide the bottom out and pull it down to re-move the air filter from its frame.

B) Wash the air filter clean in detergent and water. Blow it out with compressed air and al-low it to air dry.

C) Make certain that the air filter is dry; put the filter, with tab down, up into the top of itsframe, press it in and drop it into the bottom of the frame.

3. Power up the machine.

M-379C 5-3

Figure 5.4 - Air Filter on Heat Exchanger

D

TP3672

Page 56: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

WORK LIGHT LAMP REPLACEMENT

The work light is mounted to an arm from the ceiling. It is a 24 volt, 70 watt, Series HGW -halogen lamp. A 60 or 50 watt, Series HGW halogen lamp may be used. The work light isturned ON when the machine is ON.

- WARNING -DO NOT perform any work on work light electrical components while the electri-cal power is ON.

The work light lens may be hot.

Never touch the glass portion of the halogen bulb with bare hands.

1. Open the main coolant guard doors and; then, power down the machine. Lock out the maindisconnect switch. If necessary, unlatch and open the right side access door.

2. Wipe the work light and work light arm clean.

3. At the rear of the lamp, unthread the six screws and lift the rear cover off.

4. Pinch together the wire retaining clip and unfasten it from the bracket; swing it back. Lifthalogen bulb “E”, Figure 5.5, from the socket. Disconnect the bulb wire.

5. Connect the new bulb wire and install the halogen bulb in the socket by fastening theretaining clip.

6. Make certain that the O-ring is in place; mount the cover and thread in the screws.

7. Close the main coolant guard doors.

8. Power up the machine. The light will come on when the machine is powered up.

5-4 M-379C

Figure 5.5 - Work Light(Rear Cover Removed)

E

TP3135.

Page 57: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

SPINDLE BELT TENSION

- NOTE -Refer to the page 5-7 for information on adjusting spindle belt tension on amachine equipped with the high-torque option.

Check the drive belt tension frequently across all belts approximately at the midpoint betweenpulleys, as shown in Figure 5.6.

SPINDLE BELT TENSION SPECIFICATION

Standard Spindle Drive

Belt Condition Force Deflection

New Belt 6.6 lb-f[3 Kg-f]

.108 in.[2.75 mm]

Belt Used in Excessof 1000 Hours

5.5 lb-f[2.5 Kg-f]

.108 in.[2.75 mm]

High Speed Spindle Drive [Option]

Belt Configuration Belt Condition Force Deflection

3 Strand BeltNew Belt 5.1 lb-f

[2.3 Kg-f].165 in.

[4.2 mm]

Belt Used in Excessof 1000 Hours

4.4 lb-f[2.0 Kg-f]

.165 in.[4.2 mm]

2 Strand BeltNew Belt 3.5 lb-f

[1.6 Kg-f].165 in.

[4.2 mm]

Belt Used in Excessof 1000 Hours

3.1 lb-f[1.4 Kg-f]

.165 in.[4.2 mm]

M-379C 5-5

Figure 5.6 - Spindle Belt Deflection

TI4523

Force

Deflection

Page 58: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

ADJUSTMENT PROCEDURE

1. Wait for the cycle to end and make certain that the spindle is stopped.

2. Power down the machine.

3. Loosen four mounting screws “G”, Figure 5.7, on the motor plate and two nuts of adjustingscrew “F”.

4. Adjust the belt tension by tightening or loosening adjusting screw “D”.

5. Lock the adjusting bolt by tightening the two nuts together.

6. Tighten the four mounting screws on the motor plate.

5-6 M-379A

Figure 5.7 - Spindle Belt Tension Adjustment(Machine Not Equipped with High Torque Option)

TI4524

F G

Page 59: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

HIGH-TORQUE SPINDLE BELT TENSION

- NOTE -Refer to the page 5-5 for information on adjusting spindle belt tension on amachine NOT equipped with the high-torque option.

The spindle drive belt connects high-torque gear box “I”, Figure 5.8, to the spindle pulley.Check the drive belt tension at least once a week during the first month of operation or more fre-quently if spindle performance is inconsistent. Check the belt tension approximately every 1000hours of operation after the first month of operation. Read the drive belt tension near the mid-point between pulleys, as shown in Figure 5.6.

SPINDLE BELT TENSION SPECIFICATION

Belt Condition Force Deflection

New Belt 20 lb-f[9 Kg-f]

.172 in.[4.37 mm]

Belt Used in Excessof 1000 Hours

15 lb-f[6.8 Kg-f]

.172 in.[4.37 mm]

ADJUSTMENT PROCEDURE

1. Wait for the cycle to end and make certainthat the spindle is stopped. Jog the spindledown to its lowest point (-Z position).

2. Power down the machine.

3. Remove the sheet metal cover above andaround the spindle column to expose thespindle drive and high-torque mechanisms.

4. Open the right side door and locate thespindle belt through access opening “K”,Figure 5.9. Apply the force and check thebelt deflection here.

5. When necessary to adjust the belt, loosenfour mounting screws “H”, Figure 5.8, on thegear box flange and locking nut on adjustingscrew “J”.

M-379C 5-7

Figure 5.8 - High-Torque Gear Boxand Adjustment Screws

(shown with Fanuc motor)

TP4211

I

H

J

Page 60: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

6. Adjust the belt tension by tightening or loosening adjusting screw “J”.

7. After the belt has been adjusted, lock the adjusting screw.

8. Torque four mounting screws “H” to 74 lb-ft [100 N•m].

9. Mount the spindle sheet metal cover.

5-8 M-379C

Figure 5.9 - High-Torque Belt AccessTP4209

K

Page 61: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

OVERTRAVEL (OVER-LIMIT) FAULT RECOVERY PROCEDURE

Whenever an axis travels past its software limit, the axis must be reset before the machiningcycle can continue.

1. Select Jog mode.

- NOTE -Yellow EM push button “L”, Figures 5.10 and 5.11 is an overtravel bypass switchthat allows the operator to jog an axis or axes out of an overtravel condition.

2. Press and hold yellow EM push button “L”, Figure 5.10 or 5.11.

3. Use the axis directional push button(s) to move the axis or axes out of the overtravelcondition.

4. Release the yellow EM push button.

5. Home (zero return) all axes.

6. Verify the machining cycle.

M-379C 5-9

Figure 5.10 - EM Push Button(Fanuc Control)

TP4164

L

Figure 5.11 - EM Push Button(Siemens Control)

TP5657

L

Page 62: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

RESETTING THE Z AXIS HOME POSITION

Occasionally it is necessary to reset the Z axis zero return (reference Home) position; the Zaxis is the elevation (up/down motion) of the spindle.

MACHINE EQUIPPED WITH A FANUC CONTROL

- NOTE -Refer to page 5-14 for the procedure used on machines equipped with a Siemenscontrol.

1. Power up the machine.

2. Remove any Z axis offset values in the control.

3. Verify that the tool magazine(s) is (are) at the Home (retracted) position.

4. In Emergency Stop or in Manual Data Input mode, set PWE (parameter write enable) to 1as follows:

MACHINES WITH A FANUC 0M-D CONTROLOR HARDINGE/FANUC CONTROL SYSTEM II

A) If necessary, press Emergency Stop.

B) Press the Parameter key.

C) Press the Parameter soft key.

D) Page down to Parameter Write Enable.

E) Key in: 1

F) Press the Input key.

MACHINES WITH A FANUC 0i-M OR 18-M CONTROL

A) If necessary, press Emergency Stop.

B) Press the Offset Setting key.

C) Press the Setting soft key.

D) Move the cursor to Parameter Write Enable.

E) Key in: 1

F) Press the Input key.

5. Turn Keyset ON:

A) Press Operator key.

B) Press the Operator soft key.

C) Cursor to the Keyset field.

D) Move the cursor to select ON.

5-10 M-379C

Page 63: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

6. Change the Z axis grid shift parameter to 0:

MACHINES WITH A FANUC 0M-D CONTROLOR HARDINGE/FANUC CONTROL SYSTEM II

A) Put the control into Manual Data Input mode.

B) Press the Parameter key.

C) Press the Parameter soft key.

D) Press the NO. key. (NO. will flash on the control display screen.)

E) Key in: 510

F) Press the Input key. The cursor will be positioned at parameter 510.

G) Key in: 0.

H) Press the Input key.

MACHINES WITH A FANUC 0i-M OR 18-M CONTROL

A) Put the control into Manual Data Input mode.

B) Press the System key.

C) Press the Parameter soft key.

D) Key in: 1850

E) Press the Number Search soft key.

F) Move the cursor to the Z data field.

G) Key in: 0.

H) Press the Input key.

7. Power down the control; wait a minute, then, power it up. While pressing the Cancel and Pkeys, turn the control ON.

8. After the control comes all the way ON, release the Cancel and P keys.

9. Home all axes.

10. Check the Relative position display as follows:

A) Press the Position key.

B) Press the Relative soft key.

At this time the Relative position should read:X 0.0000Y 0.0000Z 0.0000

11. Using Jog or Handle mode, position the Z axis so the arrows on the Z axis way cover andthe sheet metal are aligned.

12. Record the Z axis position from the Relative display.

M-379C 5-11

Page 64: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

13. Update the Z axis grid shift parameter as follows:

MACHINES WITH A FANUC 0M-D CONTROLOR HARDINGE/FANUC CONTROL SYSTEM II

A) Select Manual Data Input mode.

B) Press the Parameter key.

C) Press the Parameter soft key.

D) Press the NO. key. (NO. will flash on the control display screen.)

E) Key in 510

F) Press the Input key.

G) Enter the Z Position recorded in step 12.

H) Press the Input key.

MACHINES WITH A FANUC 0i-M OR 18-M CONTROL

A) Put the control into Manual Data Input mode.

B) Press the System key.

C) Press the Parameter soft key.

D) Key in: 1850

E) Press the Number Search soft key.

F) Move the cursor to the Z data field.

G) Enter the Z Position recorded in step 12.

H) Press the Input key.

- NOTE -The control display screen will display 000 P/S alarm.

14. Power down the control; wait a minute, then, power it up; press and hold the Cancel and Pkeys while turning the control ON.

15. After the control comes all the way ON, release the Cancel and P keys.

16. Do a normal axes Zero Return (Home) procedure.

5-12 M-379C

Page 65: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

17. In Emergency Stop or in Manual Data Input mode, set PWE (parameter write enable) to 0as follows:

MACHINES WITH A FANUC 0M-D CONTROLOR HARDINGE/FANUC CONTROL SYSTEM II

A) If necessary, press Emergency Stop.

B) Press the Parameter key.

C) Press the Parameter soft key.

D) Page down to Parameter Write Enable.

E) Key in: 0

F) Press the Input key.

MACHINES WITH A FANUC 0i-M OR 18-M CONTROL

A) If necessary, press Emergency Stop.

B) Press the Offset Setting key.

C) Press the Setting soft key.

D) Move the cursor to Parameter Write Enable.

E) Key in: 0

F) Press the Input key.

18. Press the Reset key.

19. Check the tool change height and adjust it as necessary.

M-379C 5-13

Page 66: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

MACHINE EQUIPPED WITH A SIEMENS CONTROL

- NOTE -Refer to page 5-10 for the procedure used on machines equipped with a Fanuccontrol.

1. Reference the axis.

2. Use the handwheel or jog the axis to the required reference point and record the value onthe display. Make sure that “MCS” or “Machine” co-ordinates are active.

- NOTE -The standard software limit for all linear axes is 2mm beyond the reference point;therefore, it will be necessary to temporarily increase the software limit to move thereference point beyond this position.

3. Press & the horizontal soft key to access the Startup area.

4. Press the vertical & soft keys to access axis specific machine data.

5. Select the Z axis from the vertical or soft keys.

6. Search for MD36110.

7. Record the current value.

8. Increase the value as required.

9. Press the vertical soft key to activate the modified value. (Refer to Figure 5.12)

5-14 M-379C

Figure 5.12 - Axis Software Limit Machine Data

TI5658

Page 67: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

10. Press & the horizontal soft key to access the Startup area.

11. Press the vertical & soft keys to access axis specific machine data and

12. Select the Z axis from the vertical or soft keys.

13. Search for MD34080.

14. If the motor encoder is the active position feedback device, adjust MD34080[0] by thevalue recorded in step 7.

If a linear scale is used, adjust MD34080[1] by the value recorded in step 7. (Refer to Fig-ure 5.13)

15. Press the MCP key to activate the modified value in MD34080 and reference the axis.

16. The new reference position is now set. If the Z axis software limit was changed, restore theoriginal value, which was recorded in step 7.

17. With the software limits restored, check that the axis travels to each software limit withouttripping the emergency stop hard limits. If an emergency stop limit is reached, adjust thesoftware limits as required.

M-379C 5-15

Figure 5.13 - Axis Reference Shift Machine Data

TI5659

Page 68: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTES -

5-16 M-379C

Page 69: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

APPENDIX ONE - PREVENTIVE MAINTENANCE SCHEDULE

INTRODUCTION

VMC Series II vertical machining centers are designed to provide minimal downtime and in-sure long machine life when the following schedule of preventive maintenance is applied. Modu-lar construction and easy access to components help to monitor each of the systems of the ma-chine. Pressure sensors and control alarms alert the operator through the control display whensystems malfunction. Circuit breakers and fuses with LED’s provide visual confirmation of theelectrical status of each circuit.

The access covers and doors, along with the sheet metal housings, have been designed tobe removed easily when service is required. Open access covers and doors or remove sheetmetal panels to gain access to system components. Any component can be removed from theframe when extensive service or replacement is necessary.

- CAUTION -Do not use caustic or abrasive cleaners on this machine.

Maintaining a clean machine is part of any good maintenance program. Machines should beperiodically wiped with lint-free cloths soaked with a petroleum-based solvent. If the machine isoperated in an atmosphere that causes surfaces to rust quickly, wipe these surfaces with alint-free cloth soaked in mineral oil.

NEVER USE COMPRESSED AIR TO CLEAN DIRT OR CHIPS FROM THE MACHINE. Airpressure could force dirt particles and other foreign material past seals and wipers.

MAINTENANCE SCHEDULE

The following maintenance times are approximate and components may need attention morefrequently if excessive environmental pollution is present. Preventive maintenance frequency isfor single shifts and should be increased proportionally when work is for two or three shifts perday.

8 Hours

Check air line filter bowls . . . . . . . . . . . . . . . . . . . . . . . . . Chapter 2

Check coolant level and thru-spindle coolant pressure . . . . . . . . . . . Chapter 3

Check cutting fluid (coolant) concentration and pH . . . . . . . . . . . . . Chapter 3

Clean thru-spindle coolant tank screens . . . . . . . . . . . . . . . . . . Chapter 3

Check coolant filters . . . . . . . . . . . . . . . . . . . . . . . . . . . Chapter 3

40 Hours

Remove chips from coolant tank (as necessary) . . . . . . . . . . . . . . Chapter 3

Check heat exchanger air filter, clean as necessary. . . . . . . . . . . . . Chapter 5

Wash machine and wipe clean

M-379C A1-1

Page 70: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

160 Hours

Check and clean air line filter . . . . . . . . . . . . . . . . . . . . . . . Chapter 2

Check tool knockout piston lubrication . . . . . . . . . . . . . . . . . . . Chapter 4

Check power case for contaminants

480 Hours

Adjust the spindle drive belt tension . . . . . . . . . . . . . . . . . . . . Chapter 5

600 Hours

Add X, Y, and Z axes way grease . . . . . . . . . . . . . . . . . . . . . Chapter 4

Add tool carousel rail grease . . . . . . . . . . . . . . . . . . . . . . . Chapter 4

Check tool knockout lubrication cup for oil . . . . . . . . . . . . . . . . . Chapter 4

Check spindle drive belt for wear and tension . . . . . . . . . . . . . . . Chapter 5

1000 Hours

Clean and flush coolant system and change coolant . . . . . . . . . . . . Chapter 3

Check coolant hoses for cracks, bad fittings, and kinks . . . . . . . . . . . Chapter 3

Check spindle drive belt for wear and tension . . . . . . . . . . . . . . . Chapter 5

Check and tighten all electrical plugs and connections

2000 Hours

Tool knockout piston oil . . . . . . . . . . . . . . . . . . . . . . . . . . Chapter 4

Check high-torque spindle gear box lubrication . . . . . . . . . . . . . . . Chapter 4

Check spindle oil-air lubricator oil . . . . . . . . . . . . . . . . . . . . . Chapter 4

Change control batteries . . . . . . . . . . . . . . . . . . . . . . . . . Chapter 5

Check spindle drive belt for wear and tension . . . . . . . . . . . . . . . Chapter 5

Check all push buttons and switches

4000 Hours

Change oil in high-torque gear box . . . . . . . . . . . . . . . . . . . . Chapter 4

A1-2 M-379C

Page 71: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

Non-Metallic Materials Typically Found in Hardinge Machine Construction

nitrile polycarbonatesneoprene nylonsfluorocarbon rubber phenolic plasticsurethane polyethylenesilicone rubbers PVCcork-nitrile composites PTFE (polytetrafluoroethylene)polyurethane enamelacetal plastics

M-379C A1-3

Page 72: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTES -

A1-4 M-379C

Page 73: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

APPENDIX TWO - PHOTOGRAPHS

M-379C A2-1

Figure A2.1 - Spindle and Tool Carousel

TP3692

Figure A2.2 - Tool Station (some numbers are on top,other numbers are on the edge or bottom)

TP3683

Page 74: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

A2-2 M-379C

Figure A2.3 - Spindle with ToolTP3691

Page 75: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

M-379C A2-3

Figure A2.4 - Tool-Knockout Cylinder,Lubrication Cup, and Spindle Drive Motor

TP3690

Page 76: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

A2-4 M-379C

Figure A2.5 - Z Axis Grease Nipple Block

TP3688

Figure A2.6 - X and Y Axis Grease Nipple Blocks,Jog the X Axis Until Both Sets of Grease Nipples are Uncovered

(VMC1250II and 1500II machines are equippedwith two sets of Y axis grease fittings)

TP3689

X Axis Nipples

Y Axis Nipples

Page 77: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

M-379C A2-5

Figure A2.7 - Z Axis Drive Motor (Fanuc),Coupling, and Counterweight Chains

TP3094

Page 78: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

A2-6 M-379C

Figure A2.8 - Z Axis Drive Motor (Siemens),Coupling, and Counterweight Chains

TP4703

Page 79: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

M-379C A2-7

Figure A2.9 - Outside Power Case Door and Heat Exchangeron Standard Machines

TP3672

Page 80: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

A2-8 M-379C

Figure A2.10 - Fanuc Power Case Interioron Standard Machines

TP3673

Page 81: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

M-379C A2-9

Figure A2.11 - Siemens Control Power Case InteriorTP4678

Page 82: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

A2-10 M-379C

Figure A2.12 - Coolant Tank, Chip Tray, and Coolant Pump

TP3678

Figure A2.13 - Coolant Pump Under Power Case

After August, 2000 some machines have an in-line “y” filterbetween the coolant tank and pump. Refer to the next page.

TP3680

Page 83: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

M-379C A2-11

Figure A2.14 - In-Line “Y” Filter and Valves

Depending upon the valve configuration, the ball valve may be switchedwith the check valve on either side of the “Y” filter. Also the hose on

VMC600 II machines may be longer than the hose shown in the photograph.

TP4086

Page 84: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

A2-12 M-379C

Figure A2.15 - Air Control Assembly Behind PowerCase and Mounted on the Side of the Tower

(VMC600II Machine)

TP3669

Figure A2.16 - Air Control Assembly MountedNear the Right Side of the Power Case

and on the Side of the Tower(VMC800II through VMC1500II Machines)

TP3664

Page 85: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

M-379C A2-13

Figure A2.17 - High-Speed Spindle Lubrication SystemSHOWA Air and Lubricator

TP4645

Page 86: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

A2-14 M-379C

Figure A2.18 - Early High-Speed SpindleVOGEL Lubrication System

TP4187

Page 87: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

M-379C A2-15

Figure A2.19 - High-Torque SpindleGear Box and Oil Coolant Reservoir

DriveMotor

Gear BoxOil CoolantReservoir

TP4215

High-TorqueGear Box

Page 88: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTES -

A2-16 M-379C

Page 89: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

- NOTES -

M-379C A2-17

Page 90: VMC Series II Vertical Machining Centers C-0009500-0379.pdf · read this information carefully before starting operation, maintenance, or repair on hardinge vmc series ii vertical

“Performance Has Established Leadership for Hardinge”®

Hardinge Inc.Elmira, New York 14902-1507 USA

Phone: 607-734-2281 Fax: 607-734-8819www.hardinge.com