Visual Verification Bridge KT

6
Vista CKB-304v2 Wiring Guide Visual Verification Bridge C H KT e C H KT e Powered by c

Transcript of Visual Verification Bridge KT

Page 1: Visual Verification Bridge KT

Vista

CKB-304v2 Wiring Guide

Visual Verification Bridge CH KTeCH KTePowered by c

Page 2: Visual Verification Bridge KT

Step 1 Power up the Bridge

Note: The Bridge draws 400mA peak. When powering the Bridge with the alarm, consider this when estimating your powered devices and back up battery.

In most cases*, an additional power supply is recommended. If a separate power supplyis used, the ground must remain common.

1

Vista

CKB-304v2Visual Verification Bridge

*The Vista provides 600mAmps of AUX power

Page 3: Visual Verification Bridge KT

Step 2 Run wire from OUTPUT 17 to the Arming Input

2

2

Vista

Note: This will allow you to arm/disarm the Bridge with the alarm panel.

CKB-304v2Visual Verification Bridge

Page 4: Visual Verification Bridge KT

CKB-304v2Visual Verification Bridge

EXAMPLE

This is a typical burg zone with the EOL at the device.

Vista

Page 5: Visual Verification Bridge KT

CKB-304v2Visual Verification Bridge

STEP 4

Run wire from the Bridge inputthe zone terminal of the panel.

3

This wiring method requires the Bridge to share a common ground with the alarm panel. Otherwise, the Zone Ground must be wired to the Bridge Input Ground.

Vista

Page 6: Visual Verification Bridge KT

Vista

ALARM PANEL PROGRAMMING: Bridge ProgrammingIn this scenario, program the following (assuming no output function previously used):

*80 [01]**2*31*2*17**[02]**2*22*0*17** (Change 01 and 02 to unused outputfunction if necessary.

**If using a 4204/4229 ensure proper programming is completed in *79 menuprior to assigning output functions in *80**

CHeKT DEALER PORTAL: Output 17 To Arm/DisarmWe recommend using “Voltage Arming” when possible. This defaults to the bridge being in an armed state if the wiring for the Arming Pin gets compromised or disconnected for any reason.