Visio-System SLD - July 26, 2010 · Heisler 6L02 To Stettler 769S 6L03 To Sullivan Lake 775S 10...
Transcript of Visio-System SLD - July 26, 2010 · Heisler 6L02 To Stettler 769S 6L03 To Sullivan Lake 775S 10...
Legend
Circuit Breaker LTC transformer
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Anderson 801SGanged Air Switch
240 kV
9L70
9L59
ToOakland 946S
240 kV
901T250/144 kV
75/100/125 MVA
To Cordel 755S
9L93
3(r
e-te
min
ated
to
the
new
bay
)
Motor Operated Disconnect Switch
9L95
0
To Ware Junction 132S
Proposed Additions / changes
ToOakland 946S
ToWare Junction 132S
9L97
9L93
49L
100
ToSheerness 807S
9L99
To Sheerness 807S
ToW. Brooks 28S
812-SLD-801S
144 kV
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
Notes:
Hanna Region Transmission Development in 2012
Battle River 757S
72 k
V
6L08 To Bigfoot 756S
701T 144/72 kV
45/60/75 MVA
144
kV
605T 72/2.4 kV
6L05 To Bigknife Creek/
Heisler
6L02 To Stettler 769S
6L03 To Sullivan Lake
775S
10 MVAR Capacitor
Bank
812-SLD-757S
Legend
Circuit Breaker LTC transformer
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Ganged Air SwitchRelocated Equipment
Salvaged Equipment
Proposed Additions / changes
Notes:
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
Hanna Region Transmission Development in 2012
Coyote Lake 963S
To ATCO Oakland
946S
9L29
240 kV
T1240/144 kV
180/240/300 MVA
144 kV
To Michichi Creek 802S (Reserve Space for
240/320/400 MVA Transformer)
812-SLD-963S
Hanna Region Transmission Development in 2012
Legend
Circuit Breaker LTC transformer
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Ganged Air SwitchRelocated Equipment
Salvaged Equipment
Proposed Additions / changes
Notes:
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
7L12
8
Excel 910S
144 kV
701T144/4.16 kV
15/20/25 MVA
4.16 kV7L116
Lanfine
(Previously 7LA98 to 7L98 T-Tap)
Hanna Region Transmission Development in 2012
812-SLD-910S
Legend
Circuit Breaker LTC transformer
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Ganged Air SwitchRelocated Equipment
Salvaged Equipment
Proposed Additions / changes
Notes:
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
Heatburg 948S(Near Delbourne 760S)
T1144/25 kV
15/20/25 MVA
144
kV
7L159 To Three Hills 770S
7L16 To Nevis 766S
New D/C 144 kV to 7L16 Open Point
812-SLD-948S
Hanna Region Transmission Development in 2012
Legend
Circuit Breaker LTC transformer
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Ganged Air SwitchRelocated Equipment
Salvaged Equipment
Proposed Additions / changes
Notes:
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
25 kV
144 kV
To ATCO Oakland 946S
9L24
240 kV
240 kV
144 kV
9L46
To ATCO Pemukan 932S
T1240/144 kV
180/240/300 MVAY-Y
(Space for Upgrade to 400 MVA Xformer)
Lanfine 959S
812-SLD-959S
Hanna Region Transmission Development in 2012
Legend
Circuit Breaker LTC transformer
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Ganged Air SwitchRelocated Equipment
Salvaged Equipment Scope covered in this Appendix
Proposed Additions / changes
Notes:
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
To ATCO Excel 910S
7L1167L132
To ATCO Oyen 767S
30 MVAr Capacitor
Bank
30 MVAr Capacitor
Bank
-100/+200 MVAr SVC
Michichi Creek 802S
10 MVAR Cap Bank
144
kV
7L85 To Anderson 801S
702T144/25 kV
30/40/50 MVA
25 kV
703T144/25 kV
30/40/50 MVA
25 kV
Salvage 6L22 To
Rowley 768S
72 kV 6L56 ToHanna 763S
34.5 kV 72 k
V
144
kV
7L128 To Coyote Lake
963S
812-SLD-802S
701T144/72 kV
Hanna Region Transmission Development in 2012
Legend
Circuit Breaker LTC transformer
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Ganged Air SwitchRelocated Equipment
Salvaged Equipment
Proposed Additions / changes
Notes:
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
7L25 To Rowley 768S
(re-terminated to new bay)
Monitor 774S
6L12 To Sullivan Lake
775S
701T144/72/25 kV12/16/20 MVA
25 kV
72 kV
702T144/25 kV
12/16/20 MVA
25 kV
144
kV7L224 To Hansman Lake 650S
7L110 To Loyalist 903S
20 MVAr Cap Bank
7L127Pemukan 932S (1)
1) 7L79 to Veteran 771S re-terminated at Pemukan 932S to breaker bay to terminate 7L127 at Monitor 774S
2) 7L98 to Oyen 767S salvaged; 144 kV breaker bay available for future development.
812-SLD-774S
30 MVAr Cap Bank
7L98Oyen 767S (2)
Hanna Region Transmission Development in 2012
Legend
Circuit Breaker LTC transformer
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Ganged Air SwitchRelocated Equipment
Salvaged Equipment
Proposed Additions / changes
Notes:
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
Nevis 766S
144
kV
901T240/144/14.4 kV60/80/100 MVA
240
kV
9L912 ToRed Deer 63S
9L20 To Cordel 755S
7L143 To Stettler 769S
7L16 To Heatburg 948S
(Delburne 760S)
701T144/72/25 kV
20/26.6/33.3 MVA
Salvage 6L31 To Stettler
769S
25 kV
14.4 kV (not used)
812-SLD-766S
Hanna Region Transmission Development
In 2012
Legend
Circuit Breaker LTC transformer
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Ganged Air SwitchRelocated Equipment
Salvaged Equipment
Proposed Additions / changes
Notes:
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
Legend
Circuit Breaker
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Potential TransformerOakland 946S
Ganged Air Switch
240 kV
240 kVTo
Lanfine 959S
To Anderson 801S
9L70
9L97 9L24
ToCoyote Lake 963S
Motor Operated Disconnect Switch 812-SLD-946S
ToAnderson 801S
Proposed Additions / changes
9L29
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
Notes:
Hanna Region Transmission Development in 2012
Oyen 767S
701T144/72/25 kV12/16/20 MVA
25 kV
72 k
V
602T72/25 kV6/8 MVA
25 kV14
4 kV
7L760 To AltaLink
Amoco Empress 163S
7L132 To Lanfine 959S
Note: 7L98 to Monitor 774S Disconnected to Provide
144 kV Bay for New 7L132 Line
6L09 To Hanna 763S
812-SLD-767S
Hanna Region Transmission Development in 2012
Legend
Circuit Breaker LTC transformer
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Ganged Air SwitchRelocated Equipment
Salvaged Equipment
Proposed Additions / changes
Notes:
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
Stettler 769S
25 kV
Salvage 601T72/25 kV6/8 MVA 6L02 To
Battle River 757S
Salvage 602T72/25 kV6/8 MVA
25 kV
6L44 To Rowley
768S72 k
V
7L143 To Nevis 766S
New 144/72/25 kV 40/50/66 MVA
15 MVAr Cap Bank
Salvage 6L31 To Nevis 766S /
Delburne 760S
144/25 kV15/20/25 MVA14
4 kV
812-SLD-769S
Legend
Circuit Breaker LTC transformer
(Manual Operation)
HookstickOperated 1ph.Disconnect Switch (Solid)
Ganged Air SwitchRelocated Equipment
Salvaged Equipment Scope covered in this Appendix
Proposed Additions / changes
Notes:
1. This single line diagram provides an illustration of a functional arrangement that would meet the need identified in the needs identification document no. 1605359. The exact routing and configuration of the project proposed by the Transmission Facility Owner (TFO) in its facility application may vary slightly from this configuration based on the more detailed engineering, routing and siting information obtained by the TFO in the preparation of its Facility Application.
To 25 kV Bus
Hanna Region Transmission Development in 2012