VIRTUALIZATION ACTUALIZATION
Balacom Services
Daniel R. Bennett, Kyle Campbell, Jimmy Schmalzl
Virtual Server Farm
INTRODUCTION• Group Background• Project Overview
• ITCS• Servers
• Networking• Backups • Storage
• UPS• ESX
• Stress Testing• ISP’s
• Lessons Learned• Conclusion• Questions
VirtualizationActualization
GROUP BACKGROUND
• Group Formed in 2010• Worked Together on a Perl project• Studied Together Weekly• Shared Common Interests
VirtualizationActualization
Project Overview
• Our Client is Balacom Services• Designed a Virtual Server Farm• Proof of concept• Capable of hosting 50 VMs• Smallest possible footprint
VirtualizationActualization
Interested in ITCS?
• This project coincides with the ITCS curriculum
• ESX, server stress testing and configuration, OS setup, networking
VirtualizationActualization
Servers• Test server was configured in the
ITCS project lab• Server implemented was an HP
DL385G7• Other server manufacturers
considered include Dell and Gateway
VirtualizationActualization
Servers• Server required for VMware Virtual
Center• Allows for administration of virtual
servers• Suggested system is the Dell
PowerEdge T310• Windows computer is also required
for vSphere
VirtualizationActualization
Networking• Selected switch was a Cisco ESW-
540-24• Network design keeps production
and management traffic separate• Cat5e chosen over Cat6 for gigabit
Ethernet
VirtualizationActualization
Backups• Backups are done for loss prevention
not file retrieval• Backup scheme involves a weekly
copy of the virtual machine virtual disk file using tar and cron
• Chosen media is the hard drive as opposed to other traditional methods
VirtualizationActualization
Expanded Storage• The NAS box is a Buffalo TeraStation III• Data is transferred using iSCSI• TeraStation III is capable of storing 8TB
of data• Other researched alternative is the
Dell PowerEdge NX3000 running Windows Server 2008 R2
VirtualizationActualization
UPS• Optional UPS’ Considered:• SMT3000• SMT1500RM2U
• The UPS Selected: SMT2200• Why it was selected• Cost and Performance
VirtualizationActualization
VMware ESX vs ESXi• ESX• Red Hat Linux console
• ESXi• Free of charge
• Why we selected ESX over ESXi
VirtualizationActualization
STRESS TESTING• Web Load Tester• Graphical user interface(GUI)• Very versatile
• Siege• Run from the command line
VirtualizationActualization
ISP’s• Internet Service Providers
VirtualizationActualization
Shaw TELUS Rogers Bell
Cost/Month $301.95 $345.00 $169.95 $160.00
Upload Speed 5 Mbps 1.5+ Mbps 2 Mbps 800 Kbps
Download Speed 15 Mbps 1.5+ Mbps 10 Mbps 6 Mbps
Bandwidth 200 GB/Month Unlimited Unlimited 300 GB/Month
Support Weekdays, 24hours 24/7 24/7 24/7
Provision of Domain
No Yes Yes Yes
No. Of Static IP's 1 Static IP 5 Static IP's 5 Static IP's 1 Static IP
LESSONS LEARNED AND CHALLENGES
• Pre-Planning• Communication• Time Management• Read The Manual• Don’t Rush
VirtualizationActualization
CONCLUSION
VirtualizationActualization
• We are the Virtualization Actualization workgroup
• Our project involved designing a virtual server farm for Balacom Services
• This project was a proof of concept• We researched and planned for the
networking, physical hardware and software for the server farm