VINTON, TX Unified Development Code (UDC) Overview9571B011-F39E-4B6F-… · VINTON, TX Unified...

26
VINTON, TX Unified Development Code (UDC) Overview Luis Nunez Kendig Keast Collaborative August 1, 2017

Transcript of VINTON, TX Unified Development Code (UDC) Overview9571B011-F39E-4B6F-… · VINTON, TX Unified...

  • V I N T O N , T X

    Unified Development Code (UDC)

    Overview

    Luis NunezKendig Keast CollaborativeAugust 1, 2017

  • V I N T O N , T XUDC Priorities Implement the 2017 Comprehensive Plan Goals and Objectives

    Provide a code that is clear and understandable

    Modernize design standards

    Spell out and streamline all development processes

    Anticipate development issues before growth arrives

    Create right size regulations for staff administration

    Ensure that developers pay their fair share of development costs

    Every regulation must be based on Vinton’s Planning Vision

  • V I N T O N , T XUDC OrganizationThe UDC is organized to answer the following questions:

    1. What is my property zoned?

    2. What uses are permitted?

    3. What uses require Commission and Council action?

    4. What building design standards are required?

    5. How do I subdivide property?

    6. What are the site plan and sign requirements?

    7. What are the development processes?

    8. From whom do I receive approval?

    9. How are terms defined?

    Zoning

    Administration

    Subdivision/Site Development

  • V I N T O N , T X

    Zoning Maintained the existing district structure to avoid:

    - Creating nonconforming uses; and

    - The need for rezoning upon UDC adoption

    Created a Planned Development option to encourage design innovation.

    Created a Public Institutional district

    Renamed the EED district to Town Center (TC).

    Renamed the M-1 district as Business Park to distinguish it from the M-2 district.

  • V I N T O N , T X

    Zoning - DistrictsZoning District Names & Abbreviations Development

    Type District PurposeDistrict Name District AbbreviationResidential Uses

    Single-Family DetachedR-1 Standard Single family detached dwellings, with open space for recreation and drainage.

    RP-1 Planned Planned single-family detached residential and variable sized lots with more open space.

    Mixed Residential R-2 Standard Allows a mix of residential types and densities, with open space for drainage, recreation and buffering.

    Manufactured Home

    MH Subdivision Allow HUD code homes on lots with open space for recreation, drainage, and buffering.

    MH Portable Home ParkAllows pads for portable dwellings with open space for recreation, buffering, and drainage.

    MHP Planned Allow HUD code homes on smaller lots with a more open space and buffering.NonresidentialTown Center TC Mixed Use Allows a Suburban Village mix of uses.

    Retail Service C-1 Light Business Light intensity retail, office, and service uses.

    General Commercial C-2 Commercial Large scale uses that require highway and arterial street access and high visibility.

    Business Park M-1 Business Park A mixed use center of light industrial and business uses with enhanced design standards.

    General Industrial M-2 Industrial General/heavy industrial uses.

    Public Institutional PI Public Uses Public, institutional, and utility uses.

    RP-1 and MHP Zoning will only require Village

    approval of a site plan, rather than

    rezoning.

  • V I N T O N , T X

    Land Uses by Zoning DistrictEase of Use:

    Uses are separated into Residential and Nonresidential uses;

    The tables show where uses are permitted by zoning classification;

    The tables have cross-references and hyperlinks to Village webpage content;

    The tables have cross references and hyperlinks to external content;

    Temporary Uses are identified; and

    Uses the Village has already deemed to be nuisances are shown as prohibited.

  • V I N T O N , T X

    Zoning Districts / Land UsesResidential Uses by District:

    Land Use Standards Reference Zoning Districts

    Residential Nonresidential R-1 R-2 MH TC C-1 C-2 M-1 M-2 PI

    Legend: P = Permitted Use; PA = Permitted Accessory Use; TA = Temporary Accessory Use; S = Special Permit Use; TS = Temporary SUP; and - = Prohibited

    Accessory Dwelling Unit Sec. 4.03.03 PA - - - - - - - - Apartment, 7+ dwelling units Sec. 3.05.03 - P - - - - - - - Bed and Breakfast Home - S P - S - - - - - Child Day Care, In Home As regulated by DFPS1 PA PA PA - - - - - - Community Home, < 7 persons As regulated by DSHS2 P P P - - - - - - Dwelling, Single-Family Attached / Lot Line Home - S P - - - - - - -

    Dwelling, Single-Family Detached, including Modular - P P P - - - - - -

    Dwelling, Two-Family (Duplex) - - P - - - - - - - Dwelling, Multiplex, 3-5 dwelling units Sec. 3.05.03 - P - - - - - - - Farmstead/Homestead (Agricultural/Ranching) - P - - - - - - - -

    Use Legend

    Land Use

    State Agency Hyperlink

    UDC Hyperlink

    “Standards Reference” Refer to UDC Sections

    Indicates that the home remains as the Primary use

    Land Use

    Standards Reference

    Zoning Districts

    Residential

    Nonresidential

    R-1

    R-2

    MH

    TC

    C-1

    C-2

    M-1

    M-2

    PI

    Legend: P = Permitted Use; PA = Permitted Accessory Use; TA = Temporary Accessory Use; S = Special Permit Use; TS = Temporary SUP; and - = Prohibited

    Accessory Dwelling Unit

    Sec. 4.03.03

    PA

    -

    -

    -

    -

    -

    -

    -

    -

    Apartment, 7+ dwelling units

    Sec. 3.05.03

    -

    P

    -

    -

    -

    -

    -

    -

    -

    Bed and Breakfast Home

    -

    S

    P

    -

    S

    -

    -

    -

    -

    -

    Child Day Care, In Home

    As regulated by DFPS1

    PA

    PA

    PA

    -

    -

    -

    -

    -

    -

    Community Home, < 7 persons

    As regulated by DSHS2

    P

    P

    P

    -

    -

    -

    -

    -

    -

    Dwelling, Single-Family Attached / Lot Line Home

    -

    S

    P

    -

    -

    -

    -

    -

    -

    -

    Dwelling, Single-Family Detached, including Modular

    -

    P

    P

    P

    -

    -

    -

    -

    -

    -

    Dwelling, Two-Family (Duplex)

    -

    -

    P

    -

    -

    -

    -

    -

    -

    -

    Dwelling, Multiplex, 3-5 dwelling units

    Sec. 3.05.03

    -

    P

    -

    -

    -

    -

    -

    -

    -

    Farmstead/Homestead (Agricultural/Ranching)

    -

    P

    -

    -

    -

    -

    -

    -

    -

    -

  • V I N T O N , T X

    Zoning Districts / Land UsesNonresidential Uses by District:

    Land Use Standards Reference

    Zoning Districts Residential Nonresidential R-1

    R-2 MH TC

    C-1

    C-2

    M-1

    M-2 PI

    Legend: P = Permitted PA = Permitted Accessory TA = Temporary Accessory S = Special Use Permit - = Prohibited

    Alcohol Sales, On-Site Consumption1 TABC1 Permit and Subchapter

    3.05 - - - P P P - - -

    Alcohol Sales, Off-Site Consumption1 TABC1 Permit and Subchapter

    3.05 - - - - P P - - -

    Animal Veterinary, Small Animals Subchapter 3.05 - - - P P P P - - Art / Craft Studio, Gallery Subchapter 3.05 - - - P P P - - - Assisted, Congregate, Respite Care Subchapter 3.05 - P - - P P - - - Automobile, Major Service Subchapter 3.05 - - - - - P P P - Automobile, Minor Service Subchapter 3.05 - - - - P P - - - Automobile, Sales Subchapter 3.05 - - - - - P - P - Bank, Credit Union, Broker Subchapter 3.03 - - - P P P P - - Child Care Center Subchapter 3.03 - P - P P P P - P

    The format of the “Nonresidential Uses by Districts” is identical to

    the format described on the previous slide.

    Example: My property is zoned TC. I want to build a bank. I follow the “TC” and “Bank” arrows on the table to see that a bank is a permitted TC use.

    Land Use

    Standards Reference

    Zoning Districts

    Residential

    Nonresidential

    R-1

    R-2

    MH

    TC

    C-1

    C-2

    M-1

    M-2

    PI

    Legend: P = Permitted PA = Permitted Accessory TA = Temporary Accessory S = Special Use Permit - = Prohibited

    Alcohol Sales, On-Site Consumption1

    TABC1 Permit and Subchapter 3.05

    -

    -

    -

    P

    P

    P

    -

    -

    -

    Alcohol Sales, Off-Site Consumption1

    TABC1 Permit and Subchapter 3.05

    -

    -

    -

    -

    P

    P

    -

    -

    -

    Animal Veterinary, Small Animals

    Subchapter 3.05

    -

    -

    -

    P

    P

    P

    P

    -

    -

    Art / Craft Studio, Gallery

    Subchapter 3.05

    -

    -

    -

    P

    P

    P

    -

    -

    -

    Assisted, Congregate, Respite Care

    Subchapter 3.05

    -

    P

    -

    -

    P

    P

    -

    -

    -

    Automobile, Major Service

    Subchapter 3.05

    -

    -

    -

    -

    -

    P

    P

    P

    -

    Automobile, Minor Service

    Subchapter 3.05

    -

    -

    -

    -

    P

    P

    -

    -

    -

    Automobile, Sales

    Subchapter 3.05

    -

    -

    -

    -

    -

    P

    -

    P

    -

    Bank, Credit Union, Broker

    Subchapter 3.03

    -

    -

    -

    P

    P

    P

    P

    -

    -

    Child Care Center

    Subchapter 3.03

    -

    P

    -

    P

    P

    P

    P

    -

    P

  • V I N T O N , T X

    “Simplified” PD ProcessThe UDC includes a Planned Development process that only requires site planapproval, by ordinance, based on specific standards codified in the UDC. This will:

    Allow innovative development with a minimum amount of process;

    Allow flexibility for challenging sites (i.e., near arroyos);

    Create more predictability and reduce developer risk;

    Still require public hearings and public input;

    Allow staff approval of minor amendments, subject to tight criteria, and all other amendments by the Commission and Council; and

    Simplify developer adjustments to market changes (i.e., market flexibility).

  • V I N T O N , T X

    Potential Result . . . . . A developer could propose a cluster development that avoids a hazard, provides more usable common space, and maximizes the use of a difficult site (i.e., arroyo).

  • V I N T O N , T XPlanned Development Example:Example 1. Tree preservation depends on each owner. Only 6 lots have water access. The road will likely be a cut-through. Example 2. Similar to Example 1, with stream access for all owners and some common open space and tree preservation. Example 3. The hazard is avoided, tree and open space preservation are maximized, and the street is a less desirable short cut.

    The density of each of the three examples is the same, but each is unique, but only Example 3 requires a PD.Example 1 Example 2 Example3

  • V I N T O N , T X

    Development Standards - Residential

    Development Option

    District Allowed

    Development Standards Lot and Building Standards

    Minimum Lot Area

    Minimum Open Space Ratio (OSR)1

    Maximum Gross

    Density

    Lot Width

    Minimum Setbacks Maximum Building Height Front

    Interior Side

    Street Side Rear

    Standard Detached Residential Single-Family Detached Residential2

    R-1 7,000 sf. 10% 4.23 60' 20' 7.5' 15' 15' 35'

    Manufactured Home Subdivision4 MH 7,000 sf. 10% 4.23 60" 20' 7.5' 15' 15 35'

    Planned Single-Family Detached Residential Single-Family Detached Cluster3 RP-1 5,000 sf. 20% 5.05 50' 20' 5' 15' 15' 35'

    Twin / Lot Line Home, Garden Home

    RP-1 3,000 sf. 20% 7.35 30' 20' 0'/10' 15' 15' 35'

    Manufactured Home Subdivision4 MHP 5,000 sf. 20% 5.05 50' 20' 5' 15' 15' 35'

    Multi-Family Residential Twin Home, Lot Line Home, Garden Home6

    R-2 2,500 sf. 25% 8.50 35' 20' 0' 15 15' 35"

    Duplex6 R-2 3,750 sf.7 25% 5.15 75' 20' 0'/10' 15'7 20' 35' Multiplex6 R-2 3,000 sf.7 25% 8.50 25' 20' 0' 15'7 20' 40'8 Townhouse5,6 R-2 2,000 sf.7 25% 11.40 30' 20' 0' 15'7 20' 40'8 Apartment R-2 1,750 sf.7 25% 14.50 20' 15' 5' 10' 20' 45'

    Standard Development

    PD Minimum Standards

    More Density = More Open Space

    More Dwelling Units = More Open Space

    All proposed open space requirements exceed the existing park dedication

    requirements.

    Development Option

    District Allowed

    Development Standards

    Lot and Building Standards

    Minimum Lot Area

    Minimum Open Space Ratio (OSR)1

    Maximum Gross Density

    Lot Width

    Minimum Setbacks

    Maximum Building Height

    Front

    Interior Side

    Street Side

    Rear

    Standard Detached Residential

    Single-Family Detached Residential2

    R-1

    7,000 sf.

    10%

    4.23

    60'

    20'

    7.5'

    15'

    15'

    35'

    Manufactured Home Subdivision4

    MH

    7,000 sf.

    10%

    4.23

    60"

    20'

    7.5'

    15'

    15

    35'

    Planned Single-Family Detached Residential

    Single-Family Detached Cluster3

    RP-1

    5,000 sf.

    20%

    5.05

    50'

    20'

    5'

    15'

    15'

    35'

    Twin / Lot Line Home, Garden Home

    RP-1

    3,000 sf.

    20%

    7.35

    30'

    20'

    0'/10'

    15'

    15'

    35'

    Manufactured Home Subdivision4

    MHP

    5,000 sf.

    20%

    5.05

    50'

    20'

    5'

    15'

    15'

    35'

    Multi-Family Residential

    Twin Home, Lot Line Home, Garden Home6

    R-2

    2,500 sf.

    25%

    8.50

    35'

    20'

    0'

    15

    15'

    35"

    Duplex6

    R-2

    3,750 sf.7

    25%

    5.15

    75'

    20'

    0'/10'

    15'7

    20'

    35'

    Multiplex6

    R-2

    3,000 sf.7

    25%

    8.50

    25'

    20'

    0'

    15'7

    20'

    40'8

    Townhouse5,6

    R-2

    2,000 sf.7

    25%

    11.40

    30'

    20'

    0'

    15'7

    20'

    40'8

    Apartment

    R-2

    1,750 sf.7

    25%

    14.50

    20'

    15'

    5'

    10'

    20'

    45'

  • V I N T O N , T X

    Development Standards - Commercial

    Landscape Area

    Village may want to allow an SUP to permit a smaller lot area

    Build To” setback in TC

    Building Size Limited in TC

    Standard Stories

    Zoning Districts Public

    Institutional Commercial Industrial

    PI TC1,4 C-1 C-2 M-1 M-2 Minimum Landscape Area (Percentage of Site)

    Table Note2 10% 10% 10% 10% 10% 5%

    Minimum Lot Area Table Note2 NA 6,000 sf. 3,000 s.f. 2,500 sf. 10,000 s.f. 10,000 s.f.

    Minimum Street Frontage (Lot Width)

    Table Note2 NA 60' 100' 50' 50' 50'

    Maximum Building Height Table Note2 45' 35' 35' 50' 50' 70'

    Building Setbacks - Front2,3

    Table Note2

    35' 0 - 10'4 35' 0' 30' 30' - Interior Side2,3 15' 0' 15' 0' 20' 10' - Street Side2,3 25' 0-10'4 20' 20' 30' 20' - Rear2,3 50' 10' 15' 15' 30' 20' - Residential District Boundary 3 25' 10' 20' 30' 40' 50'

    Parking Lot Setbacks

    Front Table Note2 10' 5' 10' 5' 15' 10'

    Street Side Table Note2 10' 5' 10' 5' 15' 10'

    TABLE NOTES: NA = Not Applicable

    1. Buildings in the TC District shall have a maximum gross floor area of 15,000 square feet, unless a SUP is granted to allow a larger building.

    2. If the district or use requires a bufferyard wider than the setback required by this Section, the width of the setback shall be the width of the bufferyard, as set out in Sec. 7.02.05, Bufferyards.

    3. Residential district boundary setbacks apply to buildings and outdoor uses, except parking, on parcels that abut a property zoned or used for residential purposes.

    4. Figure Sec. 3.03.02.02, Permitted Setbacks in the TC District, illustrates the application of the "Build To" setback requirement.

    Standard

    Stories

    Zoning Districts

    Public Institutional

    Commercial

    Industrial

    PI

    TC1,4

    C-1

    C-2

    M-1

    M-2

    Minimum Landscape Area (Percentage of Site)

    Table Note2

    10%

    10%

    10%

    10%

    10%

    5%

    Minimum Lot Area

    Table Note2

    NA

    6,000 sf.

    3,000 s.f.

    2,500 sf.

    10,000 s.f.

    10,000 s.f.

    Minimum Street Frontage (Lot Width)

    Table Note2

    NA

    60'

    100'

    50'

    50'

    50'

    Maximum Building Height

    Table Note2

    45'

    35'

    35'

    50'

    50'

    70'

    Building Setbacks

    - Front2,3

    Table Note2

    35'

    0 - 10'4

    35'

    0'

    30'

    30'

    - Interior Side2,3

    15'

    0'

    15'

    0'

    20'

    10'

    - Street Side2,3

    25'

    0-10'4

    20'

    20'

    30'

    20'

    - Rear2,3

    50'

    10'

    15'

    15'

    30'

    20'

    - Residential District Boundary 3

    25'

    10'

    20'

    30'

    40'

    50'

    Parking Lot Setbacks

    Front

    Table Note2

    10'

    5'

    10'

    5'

    15'

    10'

    Street Side

    Table Note2

    10'

    5'

    10'

    5'

    15'

    10'

    TABLE NOTES:

    NA = Not Applicable

    1. Buildings in the TC District shall have a maximum gross floor area of 15,000 square feet, unless a SUP is granted to allow a larger building.

    2. If the district or use requires a bufferyard wider than the setback required by this Section, the width of the setback shall be the width of the bufferyard, as set out in Sec. 7.02.05, Bufferyards.

    3. Residential district boundary setbacks apply to buildings and outdoor uses, except parking, on parcels that abut a property zoned or used for residential purposes.

    4. Figure Sec. 3.03.02.02, Permitted Setbacks in the TC District, illustrates the application of the "Build To" setback requirement.

  • V I N T O N , T X

    Town Center District

    Streetscape Landscaping is an Option

    Building Area Limited to 15,000 SF. Larger buildings require an SUP

    “Build To” setback in the TC District

    Required Amenity Options

    Figure 3.03.02 Permitted Setbacks in the TC District

    Optional to allow up to a 10’ setback for landscaping, outdoor dining, or plaza

    The TC district continues to call out the Richardsonian Romanesque design, with a hyperlink showing

    design examples.

    Figure 3.03.02

    Permitted Setbacks in the TC District

  • V I N T O N , T X

    Retail Design

    Outdoor Sales/Display Area Limited to 15% of the Area of the Principal Building

    Requires 10% Lot Area Landscaping

    Seasonal Sales in Parking Lot is allowed subject to site plan approval

    Requires Decorative Fencing

    Outdoor Areas Must be Integrated into the Building Design (Under Roof and Outside)

    Figure 4.04.01 Attached Outdoor Display Area

    The proposed UDC regulates build design based on size, requires quality materials,

    articulation, and screening of roof and ground equipment and

    loading docks for new commercial development

    Figure 4.04.01

    Attached Outdoor Display Area

  • V I N T O N , T X

    Zoning - SummaryOverall Goal: Create / Maintain Community Character

    Allow the transition of Vinton from a Rural Village to a Suburban Village without diminishing the quality of life or discouraging economic investment.

    Balance Open Space / Density

    Provide Local and Regional Opportunities

    Allow a variety of residential types

    Direct Site and Building Design

    Maintain Village Culture / Flavor in the Town Center

    Facilitate Infill, Redevelopment, and Mixed Use

  • V I N T O N , T X

    Subdivision SummaryOverall Goal: Create / Maintain Community Character and Ensure Developer Accountability for Public Improvements

    Allow design flexibility based on land characteristics and limitationsRequire compliance with the Future Thoroughfare PlanClearly specify all developer responsibilitiesCodify the design standards and specifications of the Village

    for all public improvementsMaintained existing parkland requirementsFacilitate Infill, Redevelopment, and Mixed Use

  • V I N T O N , T X

    Site DevelopmentOverall Goal: Maintain public health and safety and ensure a reasonable site design that implements the 2035 Comprehensive Plan.

    Codified the Flood Damage Prevention regulations

    Created regulations to address noise, light, dust, and other environmental issues.

    Emphasizes landscaping and buffering to allow developer design flexibility, water conservation, and to require use compatibility buffers.

    Updated the Sign regulations to be appropriate for the Village in terms of sign design. A Master Sign Program was created for larger projects and projects with unique sign needs. All regulations are compliant with a recent U.S. Supreme Court decision pertaining to sign content.

  • V I N T O N , T X

    Administration / ProcessVillage-Friendly Understandable and streamlinedAppropriate for staffing levelClearly spells out all processes and procedures

    Empowers Planning and Zoning CommissionProvides better decision-making framework for Council

    Developer-FriendlyEasily understood by usersIntuitive and flows with the typical development processIncludes cross-references and hyperlinks to other Village codes

    Administratively, the UDC relies on:Tables and chartsGraphic Examples

  • V I N T O N , T X

    Administration Identifies the Players and Roles of Each

    Village Council

    Planning and Zoning Commission

    Development Review Committee (Staff and Referral Agencies)

    Floodplain Administrator

    Development Administrator (Primary UDC Administrator)

    Building Official

    Code Enforcement Officer

    Approvals grouped into Administrative and Public Meetings.

  • V I N T O N , T X

    Administrative ApprovalsTable 9.01.02

    Administrative Permits and Procedures Permit Required For Timing Exceptions Issued By Standards1

    Plats and Minor Planned Developments

    Administrative Plats Minor Plats

    Prior to sale or construction All other plats

    Zoning Administrator

    Sec. 9.03.01, Administrative Plats

    Minor PD Amendments

    Minor change to a Planned Development site plan

    Prior to construction or development

    Major amendments

    Zoning Administrator

    Sec. 9.03.07, Planned Development Plan, Minor Amendment

    Design Review

    Minor Modification Site Plans

    Minor change to a site plan approved by the Commission or Council and reasonable accommodations for persons with disabilities

    Prior to issuance of any permits

    Major amendments

    Zoning Administrator and Building Official

    Sec. 9.03.06, Minor Modification Site Plan

    Site Plan Non-residential development and expansion

    Prior to construction or development

    Single-family, duplex, and twin homes

    Zoning Administrator

    Sec. 9.03.02, Site Plan

    Other Administrative Permits and Approvals

    Interpretations

    UDC or Zoning Map interpretations, as set out in Sec. 9.05.01, Interpretations

    Within 14 days of receipt of a complete application

    Interpretation appeals are heard by the Village Council

    Zoning Administrator, unless appealed to the Village Council

    Sec. 9.05.01, Interpretations

    Floodplain Development Permit

    Development in a regulatory floodplain, as set out in Sec. 9.03.04, Floodplain Development Permit

    Prior to beginning improvements in a floodplain

    None Floodplain Administrator

    Sec. 9.03.04, Floodplain Development Permit

    Permits and Approvals are Listed by Type

    Timing of the approval is specified

    Exceptions are Identified

    Administrator Identified

    Hyperlinks to Pertinent UDC Standards are Provided

    Note: This title has been revised to Development

    Administrator

  • V I N T O N , T X

    Public MeetingsPermits and Approvals are

    Listed by Type

    Timing of the approval is specified

    Exceptions are Identified

    Approval Body Identified

    Hyperlinks to Pertinent UDC Standards are Provided

    Table 9.01.03 Public Meeting: Permits and Procedures

    Permit Required For Timing Exceptions Issued By Standards1 PUBLIC MEETINGS (NO PUBLIC HEARING REQUIRED)

    Appeals, Interpretations, Plats, Design, Dedication / Vacation of Rights-of-Way and Easements

    Public Improvement Acceptance

    Accepting public improvements

    Prior to public acceptance of public improvements

    None Council

    Sec. 9.04.03, Acceptance of Public Improvements

    Appeals Appeals from staff determinations

    Within 30 days of the action being appealed

    None Council Sec. 9.05.02, Appeals

    Interpretations Interpretation of the UDC or staff decisions

    Within 30 days of the decision being appealed

    None Commission after staff avenues are exhausted

    Sec. 9.05.01, Interpretations

    Major Plats All major plats and any related platting variances

    Prior to recordation and starting development

    Minor Plats and Stale Plats.

    Council, upon Commission recommendation

    Sec. 9.04.01, Preliminary Plat

    Master Sign Plan

    Approval of a sign design program

    Prior to installing special signage None Commission

    Sec. 9.04.12, Master Sign Program

    Planned Development Site Plan

    The creation of pallets of residential planned development options.

    Prior to the approval of a planned development (PD).

    Standard development

    Council, upon Commission recommendation

    Sec. 9.04.09, Planned Development Site Plans

    Vacation / Dedication of Easements

    Easement dedicated or vacated

    Prior to abandonment or conveyance of an easement

    None

    Council, upon Commission recommendation, if by plat, or by ordinance by Council

    Sec. 9.04.03, Vacations of Dedications of Easements

    Table 9.01.03

    Public Meeting: Permits and Procedures

    Permit

    Required For

    Timing

    Exceptions

    Issued By

    Standards1

    PUBLIC MEETINGS (NO PUBLIC HEARING REQUIRED)

    Appeals, Interpretations, Plats, Design, Dedication / Vacation of Rights-of-Way and Easements

    Public Improvement Acceptance

    Accepting public improvements

    Prior to public acceptance of public improvements

    None

    Council

    Sec. 9.04.03, Acceptance of Public Improvements

    Appeals

    Appeals from staff determinations

    Within 30 days of the action being appealed

    None

    Council

    Sec. 9.05.02, Appeals

    Interpretations

    Interpretation of the UDC or staff decisions

    Within 30 days of the decision being appealed

    None

    Commission after staff avenues are exhausted

    Sec. 9.05.01, Interpretations

    Major Plats

    All major plats and any related platting variances

    Prior to recordation and starting development

    Minor Plats and Stale Plats.

    Council, upon Commission recommendation

    Sec. 9.04.01, Preliminary Plat

    Master Sign Plan

    Approval of a sign design program

    Prior to installing special signage

    None

    Commission

    Sec. 9.04.12, Master Sign Program

    Planned Development Site Plan

    The creation of pallets of residential planned development options.

    Prior to the approval of a planned development (PD).

    Standard development

    Council, upon Commission recommendation

    Sec. 9.04.09, Planned Development Site Plans

    Vacation / Dedication of Easements

    Easement dedicated or vacated

    Prior to abandonment or conveyance of an easement

    None

    Council, upon Commission recommendation, if by plat, or by ordinance by Council

    Sec. 9.04.03, Vacations of Dedications of Easements

  • V I N T O N , T X

    Standardized Procedures

    UDC creates standardized procedures to:Eliminate procedural ambiguity;

    Specify what must be submitted to begin Village review;

    Itemize all details of the plan review process;

    Specify when public notice is required;

    Detail the public hearing process and the actions that may be taken; and

    Allow reimbursement for expenses incurred in the review of any UDC application, such as TIA review or legal fees.

  • V I N T O N , T X

    ApplicationsEach application is described in detail with the technical requirements for

    each.

    The review process for each is spelled out, as is action by the Commission, Council, and staff.

    Approval criteria where appropriate are included to guide Commission, Council, and staff action.

    New processes are included to administer the PD process, allow a Master Sign Plan, and amend the UDC and Comprehensive Plan.

    Itemized and detailed submittal lists for applications was moved to an Appendix to focus on each process and improve user navigation/ease of use.

  • V I N T O N , T X

    Other New Features

    All Key Terms are Defined

    Acronym List (Agencies, units of measure, etc., as referenced in the UDC)

    Appendix A includes:

    Application Submittal Requirements

    Standardized Village Certificates

    Standardized Village Legal Forms

  • V I N T O N , T X

    UDC Overview

    Next Steps

    Thank you.

    Unified Development Code (UDC) ��OverviewUDC PrioritiesUDC OrganizationZoning �Zoning - Districts�Land Uses by Zoning DistrictZoning Districts / Land UsesZoning Districts / Land Uses“Simplified” PD Process��Potential Result . . . . . �A developer could propose a cluster development that avoids a hazard, provides more usable common space, and maximizes the use of a difficult site (i.e., arroyo).�Planned Development Example:� �Example 1. Tree preservation depends on each owner. Only 6 lots have water access. The road will likely be a cut-through. �Example 2. Similar to Example 1, with stream access for all owners and some common open space and tree preservation. �Example 3. The hazard is avoided, tree and open space preservation are maximized, and the street is a less desirable short cut. ��The density of each of the three examples is the same, but each is unique, but only Example 3 requires a PD.Development Standards - ResidentialDevelopment Standards - CommercialTown Center DistrictRetail DesignZoning - SummarySubdivision SummarySite DevelopmentAdministration / ProcessAdministration Administrative ApprovalsPublic MeetingsStandardized ProceduresApplicationsOther New FeaturesUDC Overview