Vincent Matthews and Lauren Heerschap Colorado Geological Survey Photographs from FEMA Photo...
-
date post
20-Dec-2015 -
Category
Documents
-
view
216 -
download
0
Transcript of Vincent Matthews and Lauren Heerschap Colorado Geological Survey Photographs from FEMA Photo...
Vincent Matthews and Lauren HeerschapColorado Geological Survey
Photographs from FEMA Photo Library
A Repeat of Colorado’s Largest Historical Earthquake
If a repeat of the 1882 M6.6 were to occur near Estes Park, we would have…
• $2.8 billion in economic losses statewide
• 35,000 buildings with moderate or higher damage
• 190 casualties requiring hospitalization
• 2,650 displaced households
If a M6.25 were to occur near the Rocky Mountain Arsenal today…
• $14.9 billion in economic losses statewide
• 152,000 buildings with moderate or higher damage
• 2,500 casualties requiring hospitalization
• 28,500 displaced households
• $5.6 billion loss in Denver County alone
Deterministic Scenarios for Known Faults
Known faults that displace Miocene or younger strata and
deposits
Known faults that displace Quaternary
deposits
Faults and epicenters evaluated for this
study
1882 Earthquake
Rocky Mountain Arsenal
Rampart RangeRampart RangeFaultFault
goldenSelected Hazus
Scenario Results
Golden Fault
M 6.5 $ 21.9 billion
Ute passSelected Hazus
Scenario Results
Ute Pass Fault
M 7.0 $ 16.8 billion
rampartSelected Hazus
Scenario Results
Rampart Range Fault
M 7.0 $ 23.1 billion
cherawSelected Hazus
Scenario Results
Cheraw Fault
M 7.0 $ 1.3 billion
N sangreSelected Hazus
Scenario Results
N Sangre de Cristo Fault
M 7.5 $ 8.0 billion
cannibalSelected Hazus
Scenario Results
Cannibal Fault
M 7.0 $ 675 million
Busted boilerSelected Hazus
Scenario Results
Busted Boiler Fault
M 6.5 $ 694 million
RoubideauSelected Hazus
Scenario Results
Roubideau Creek Fault
M 5.5 $ 94 million
cimarronSelected Hazus
Scenario Results
Cimarron Fault
M 6.75 $ 808 million
S SawatchSelected Hazus
Scenario Results
South Sawatch Fault
M 7.25 $ 4.7 billion
mosquitoSelected Hazus
Scenario Results
Mosquito Fault
M 7.0 $ 6.2 billion
frontalSelected Hazus
Scenario Results
Frontal Fault
M 7.0 $ 6.7 billion
Williams forkSelected Hazus
Scenario ResultsWilliams Fork Fault
M 6.75 $ 3.5 billion
The City that Waits