System Process DocumentViewing an Indented Bill of Material
Department
Responsibility/Role
File Name 27762989.docRevision
Document Generation Date 18/01/2010 09:37:00
Date Modified 1/18/2010 09:37:00 AM
Last Changed by
Status
Viewing an Indented Bill of Material
Trigger:
Concept
An indented (multilevel, exploded) manufacturing or engineering bill of material displays the
structure of a manufacturing or engineering item.
If you enter an alternate, the explosion process will search for all components with the same
alternate label. If, at any level, an alternate with the same label is not found, the primary is used.
The explosion process then continues searching for the original alternate label.
The Indented Bills of Material page has the Components region with the following tabbed
regions, some of which may be disabled according to the display options you selected: Item
Details, Bill Details, Quantities, Effectivity, Material Control, Lead Time, Order Entry, Costing,and Shipping.
In this topic, you will view an indented bill of material.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/18/2010 09:37:00 AM Page 1
-
8/14/2019 Viewing an Indented Bill of Material_SPD
2/24
System Process DocumentViewing an Indented Bill of Material
Procedure
Step Action
1. Begin by navigating to the Find Indented Bills page.
Click the vertical scrollbar.
Page 2 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Viewing an Indented Bill of Material_SPD
3/24
-
8/14/2019 Viewing an Indented Bill of Material_SPD
4/24
System Process DocumentViewing an Indented Bill of Material
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Indented Bills link.
Page 4 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Viewing an Indented Bill of Material_SPD
5/24
System Process DocumentViewing an Indented Bill of Material
Step Action
5. Use the Organizations page to select your organization.
Last changed on: 1/18/2010 09:37:00 AM Page 5
-
8/14/2019 Viewing an Indented Bill of Material_SPD
6/24
System Process DocumentViewing an Indented Bill of Material
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OKbutton.
orPress [Alt+O].
Page 6 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Viewing an Indented Bill of Material_SPD
7/24
System Process DocumentViewing an Indented Bill of Material
Step Action
8. Use the Find Indented Bills page to enter the item and/or the alternate for the bill.
If you enter an alternate, the explosion process will search for all components with
the same alternate label. If, at any level, an alternate with the same label is not
found, the primary is used. The explosion process then continues searching for the
original alternate label.
Last changed on: 1/18/2010 09:37:00 AM Page 7
-
8/14/2019 Viewing an Indented Bill of Material_SPD
8/24
System Process DocumentViewing an Indented Bill of Material
Step Action
9. Click in the Item field.
Page 8 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Viewing an Indented Bill of Material_SPD
9/24
System Process DocumentViewing an Indented Bill of Material
Step Action
10. Enter the desired information into the Item field. Enter "RT1000".
Step Action
11. Click in the Levels field.
Last changed on: 1/18/2010 09:37:00 AM Page 9
-
8/14/2019 Viewing an Indented Bill of Material_SPD
10/24
System Process DocumentViewing an Indented Bill of Material
Step Action
12. You can enter the number of levels to explode for this bill in the Levels field.
Enter the desired information into the Levels field. Enter "8".
Page 10 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Viewing an Indented Bill of Material_SPD
11/24
System Process DocumentViewing an Indented Bill of Material
Step Action
13. Use the Display option to select All, Current, or Future and Current components
effective as of the revision date you specify.
Click the Display Option list.
Step Action
14. Click the All list item.
Last changed on: 1/18/2010 09:37:00 AM Page 11
-
8/14/2019 Viewing an Indented Bill of Material_SPD
12/24
System Process DocumentViewing an Indented Bill of Material
Step Action
15. Click the Order By list.
Page 12 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Viewing an Indented Bill of Material_SPD
13/24
System Process DocumentViewing an Indented Bill of Material
Step Action
16. Select a sort option for each level of the bill, by operation sequence then item
sequence, or item sequence then operation sequence.
Click the Item Seq, Operation Seq list item.
Step Action
17. You can simulate product costs for budgeting and planning analysis purposes. To
do so, the Privilege to View Cost security function must be enabled for the
responsibility.
Click the Costs option.
Last changed on: 1/18/2010 09:37:00 AM Page 13
-
8/14/2019 Viewing an Indented Bill of Material_SPD
14/24
System Process DocumentViewing an Indented Bill of Material
Step Action
18. Click in the Cost Type field.
Page 14 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Viewing an Indented Bill of Material_SPD
15/24
System Process DocumentViewing an Indented Bill of Material
Step Action
19. Enter the desired information into the Cost Type field. Enter "Frozen".
Step Action
20. Indicate whether to view lead time and/or material control information, and
whether to use planning percents when calculating component quantities.
Click the Lead Time option.
Last changed on: 1/18/2010 09:37:00 AM Page 15
-
8/14/2019 Viewing an Indented Bill of Material_SPD
16/24
System Process DocumentViewing an Indented Bill of Material
Step Action
21. Click the Material Control option.
Page 16 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Viewing an Indented Bill of Material_SPD
17/24
System Process DocumentViewing an Indented Bill of Material
Step Action
22. Click the Use Planning % option.
Step Action
23. Any field that is checked here causes a corresponding tabbed region to appear on
the Indented Bills of Material page.
Last changed on: 1/18/2010 09:37:00 AM Page 17
-
8/14/2019 Viewing an Indented Bill of Material_SPD
18/24
System Process DocumentViewing an Indented Bill of Material
Step Action
24. Click the Find button.
Page 18 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Viewing an Indented Bill of Material_SPD
19/24
System Process DocumentViewing an Indented Bill of Material
Step Action
25. The Indented Bills of Material page displays the structure of a manufacturing or
engineering item. It displays the first level of the bill.
Step Action
26. Use the Item Details tab to view the item details.
Click the Item Details tab.
Last changed on: 1/18/2010 09:37:00 AM Page 19
-
8/14/2019 Viewing an Indented Bill of Material_SPD
20/24
System Process DocumentViewing an Indented Bill of Material
Step Action
27. Use the Control buttons to expand or collapse portions of the indented bill. You
can only expand up to the explosion level indicated in the Find page.
Page 20 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Viewing an Indented Bill of Material_SPD
21/24
System Process DocumentViewing an Indented Bill of Material
Step Action
28. Use the Bill Details tab to view the details of the bills of material.
Click the Bills Details tab.
Step Action29. Use the Material Control tab to view the material control information.
Click the Material Control tab.
Last changed on: 1/18/2010 09:37:00 AM Page 21
-
8/14/2019 Viewing an Indented Bill of Material_SPD
22/24
System Process DocumentViewing an Indented Bill of Material
Step Action
30. Click the Costing tab.
Page 22 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Viewing an Indented Bill of Material_SPD
23/24
System Process DocumentViewing an Indented Bill of Material
Step Action
31. Click the Leadtime tab.
Step Action
32. Click the Order Entry tab.
Last changed on: 1/18/2010 09:37:00 AM Page 23
-
8/14/2019 Viewing an Indented Bill of Material_SPD
24/24
System Process DocumentViewing an Indented Bill of Material
Step Action
33. You have completed the Viewing an Indented Bill of Material procedure.