View from Birds Nest - Redcliffe State High School › Supportandresources › ... · placed...

3
Redcliffe State High School View from Birds Nest

Transcript of View from Birds Nest - Redcliffe State High School › Supportandresources › ... · placed...

Page 1: View from Birds Nest - Redcliffe State High School › Supportandresources › ... · placed parallel to Red Studio with view over the oval. A walkway will be provided between ...

Redcliffe State High School

View from Birds Nest

Page 2: View from Birds Nest - Redcliffe State High School › Supportandresources › ... · placed parallel to Red Studio with view over the oval. A walkway will be provided between ...

K L I N G N E R R O A D

1:250

fall

1:250

fall

5

1

2

3

4

6

7

8

9

10

11

1215

1413

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

DESIGN DEVELOPMENT

Overall planning

The new administration building and assembly hall is located on Klingner Road and gives the school a new formal entry for students, staff and visitors. The project includes a new administration centre and assembly hall, the replacement of the basketball courts and two sheds, and the relocation of P Block and Q Block.

To allow the new administration building to places in the best location, the basketball courts that are being demolished will be relocated with the other sports courts and adjacent to the oval. P Block and Q Block will therefore need to be relocated and will be placed parallel to Red Studio with view over the oval. A walkway will be provided between the two buildings.

The new bus shed will be located on the eastern campus adjacent to the library and allow easy access to the workshop on the same campus. The new PE shed which replaces two sheds that need to be removed, will be located next to the oval behind the security fence to ensure equipment is secure after hours.

Safety and security

Redcliffe State High School has a medium security level and the visitors’ entry to the administration building is clearly visible from the street along the main pathway into the school. Legibility for visitors is important to ensure they can easily find the administration services before entering the school grounds. The student entry into the administration building is separate to public entry. Further detail has been provided around appropriate duress and locking systems, fencing and gates as well as general security considerations to protect the school and the safety of students and staff.

Construction

The large volume of the hall has a steel portal frame structure while the administration building, with more modest volumes, has a steel column and framed roof. Metal sheeting is used as the lightweight infill material for the hall and prefinished fibre cement for the administration building. Metal roof sheeting is used for the entire building. A mixture of commercial and industrial glazing systems are used throughout. All materials have been chosen to reduce ongoing maintenance and address the coastal location.

Interior design

The overall composition that the administration areas aim to provide is a clear and organised interior for the staff working in the space while providing a welcoming, sophisticated and professional area for visitors and students. Colour is applied in bold strokes and forms to bring attention to key zones assisting wayfinding and reinforcing clear routes.

The colour palette in both the administration areas and the hall combines shades of blue with warm tones and the texture of natural timber, offset with sharp whites to reinforce a strong school identity. The school colour of Deep Ocean Blue is a soothing colour stimulating clear thought, and the lighter softer blues calm the mind and aid concentration. The interior composition aims to simultaneously recall the school’s colours, and its nautical location. Simple interior elements and forms including accent paint, carpeting, bulkheads are used to encourage a directional flow towards gathering spots and to stimulate interaction creating a dynamic active space.

The interior and external colours of the new building reflect the school colours and the boldness, independence and decisiveness of the school’s emblem – the eagle.

Site Plan for Western Campus

Redcliffe State High School

Birds Nest

Gymnasium

Red Studio

Relocatables

New basketball courts

M Block

New PE shed

HallAdmin

Page 3: View from Birds Nest - Redcliffe State High School › Supportandresources › ... · placed parallel to Red Studio with view over the oval. A walkway will be provided between ...

RW-3

SETOUT

SETOUT

rt

RW-2

RW-1

RW-1

RW-2

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

col

dpdp

dp

dp

dp

dp

dp

dp

dpdp

dp

dp

dp

dp

dp

dp

dp

BRIDGE TOSTAGE DOOR

STAGE CURTAIN

FHR

hwu

1:14

RAM

P

1:14

RAM

P

1:250

fall

1:250

fall

hwu

FHR

FHR

BOLLARD

RENDEREDFINISH TOEXPOSEDFOOTING

REPLACE DOORWITH WINDOW

CJCJ

compactus

FIP

FOYER02.01

02.03

STAGE02.04

KITCHEN02.07

COLD ROOM02.09

BULK STORE02.08

AV02.05

CHAIR STORE02.06

WC MALE02.11

WC FEMALE02.10

WC PWD02.12

CLEANERS'02.13

PRINCIPAL01.12

DEPUTY01.13

DEPUTY01.14

CONFERENCE01.07

K'TTE01.08

B.S.M.01.16

DEPUTY01.15

STAFF ROOM01.21

K'TTE01.22

COMMS/DATA01.18

STAFF TCE.01.23

PLANT01.24

RESOURCE01.09

HEAD OF DEP.01.17 WC+SHW.

01.20

RESOURCE STORE01.10

SUPPORT/RECEPTION01.05

WAIT - VISITOR01.03

WAIT - STUDENT01.04

INTERVIEW01.06

C'DOR02.02

CORRIDOR01.02

CORRIDOR01.01

F

vp

vp

vp

vp

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

VNL-1

CPT-1

CPT-1

WL-1

CPT-1

VNL-1

VNL-1

VNL-1

WL-1

CPT-1

CPT-1

VNL-1

VNL-1

VNL-1

VNL-1

VNL-1

VNL-1

VNL-1

VNL-1

VNL-1 VNL-1

WL-1 WL-1

APL-3

VNL-1

VNL-1

MSB

CNC-1

VNL-1

APL-

2

APL-

2

APL-2

VNL-1

SECURE STORE01.11

WC PWD01.19

SETOUT

Floor Plan for Administration and Hall

Redcliffe State High School

CURRENT STATUS

The Schematic Design Project Proposal has been completed, forwarded to DET and approved.

The Department, school and the consultants have been working on the design and documentation of the new Administration and Hall building which includes the relocation of the school basketball courts. This has progressed well and documentation has reached 90% completion. Both the school and DET are enthusiastic about the layout and design of the new facilities.

The project will change the main entry to the school’s administration building and consideration has been given to the affect this may have on the day-to-day running of the school. The project’s consultants have taken care to incorporate the new main entry into the grounds so that the arrival and departure of personnel and visitors to the school can be monitored.

The design of the project incorporates a fire services upgrade.

Target Dates

• Department financial approval March 2017

• Tender documentation to be completed February 2017

• Community Infrastructure Designation March 2017

• Construction tender award May 2017

• Completion of the project to be ready for commencement of school year 2018.

KLINGNER ROAD

Hall

Fire booster Entry

Plaza

Public entry

Student entry

Fig tree

Tiered seating