Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq,...
-
Upload
reynard-rogers -
Category
Documents
-
view
214 -
download
0
Transcript of Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq,...
![Page 1: Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq, Marseille FR Andreas Saniter, ITB, Uni HB GE.](https://reader036.fdocuments.in/reader036/viewer/2022082712/56649e9f5503460f94ba148e/html5/thumbnails/1.jpg)
Vienna-Meeting: ECVT-projects & GHK
AEROVET - Recognition & Validation
Annie Bouder, Cereq, Marseille FRAndreas Saniter, ITB, Uni HB GE
![Page 2: Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq, Marseille FR Andreas Saniter, ITB, Uni HB GE.](https://reader036.fdocuments.in/reader036/viewer/2022082712/56649e9f5503460f94ba148e/html5/thumbnails/2.jpg)
Vienna-Meeting: ECVT-projects & GHK
TPT 14:Passing bunched circuits in aircraft systems
Mobility unit
Assessment Plac
eDate
Signature
supported
under instruction
under surveilla
nce
indepen-dently
Mounting brackets and splitters (...)
Performing the MU above in context
reading & understanding work order
providing & preparing the material [...]
approving order
Reminder: The matrix
![Page 3: Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq, Marseille FR Andreas Saniter, ITB, Uni HB GE.](https://reader036.fdocuments.in/reader036/viewer/2022082712/56649e9f5503460f94ba148e/html5/thumbnails/3.jpg)
Vienna-Meeting: ECVT-projects & GHK
Reminder: Assessment
qualitative-performance-orientedThe person in charge estimates whether the apprentice has
the respective Mobility Unit (MU).
supported the work on
worked under instruction on
worked under surveillance on
worked
independently on
![Page 4: Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq, Marseille FR Andreas Saniter, ITB, Uni HB GE.](https://reader036.fdocuments.in/reader036/viewer/2022082712/56649e9f5503460f94ba148e/html5/thumbnails/4.jpg)
Vienna-Meeting: ECVT-projects & GHK
Recognition & Validation within the project(as training units)
• Each MU of a chosen unit is a necessary but not sufficient contribution on apprentices’ way to a competent worker – even more important than the parts is the ability to combine these parts contextualised.
• The sheet should not be used as a checklist.• Transcript of records of the LO related to the performed MU.• Validation by a kind of evaluation task:• TPT 14: The trainee is working on the whole process of passing
bunched circuits, with special respect to the interfaces. • The whole process should be under surveillance of the
trainer/teacher and/or an expert-worker.• Recognition: When successful, a certificate is delivered
(MaMo).
![Page 5: Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq, Marseille FR Andreas Saniter, ITB, Uni HB GE.](https://reader036.fdocuments.in/reader036/viewer/2022082712/56649e9f5503460f94ba148e/html5/thumbnails/5.jpg)
Vienna-Meeting: ECVT-projects & GHK
Recognition & Validation as part of the qualification(as occupational units)
• High overlapping not only in work but also in apprenticeship between Germany, France and UK
=> Good preconditions for recognising Learning Outcomes in the respective qualifications
• Poor overlapping with the Spanish EQF level 5 "HIGHER TECHNICIAN FOR AEROMECHANIC MAINTENANCE"
=> Learning Outcomes acquired in other countries should be certified separately, e. g. as in-house certificates
![Page 6: Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq, Marseille FR Andreas Saniter, ITB, Uni HB GE.](https://reader036.fdocuments.in/reader036/viewer/2022082712/56649e9f5503460f94ba148e/html5/thumbnails/6.jpg)
Vienna-Meeting: ECVT-projects & GHK
Recognition & Validation as part of the qualification(as occupational units)
France: very first steps towards designing the general conditions allowing for compatibility between present regulations and ECVET specifications (pilot project)
But: Main reticence is about considering that accumulated pieces of competences could lead to a qualification. Trying to find a compatible solution.- French units are terminal certification units and not progressive learning units (compensation system, acting and reacting capacity);-The main impact of ECVET would be at the level of the regulation for the delivery of diplomas;- A possible solution in a recent evaluation method introduced for the Bac Pros (the CCF – Control during Training)- In the aeronautic sector no attempt up to now, at system level. The Lycée’s initiative
![Page 7: Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq, Marseille FR Andreas Saniter, ITB, Uni HB GE.](https://reader036.fdocuments.in/reader036/viewer/2022082712/56649e9f5503460f94ba148e/html5/thumbnails/7.jpg)
Vienna-Meeting: ECVT-projects & GHK
Recognition & Validation as part of the qualification(as occupational units)
Spain: No realistic recognition within the higher
technician (Maintenance)
But: Potential of designing a qualification in aircraft production.
Actually: No qualification.
Airbus Spain is on the one side not really interested in designing a qualification (the way they hire their workforce is quite cheap)
But: On the other side there is an enormous lack of competence, they sent more than 900 workers to Airbus@Bremen within the last 2 years due to the A400M FAL in Seville.
The certificates these workers awarded are type-specific.
![Page 8: Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq, Marseille FR Andreas Saniter, ITB, Uni HB GE.](https://reader036.fdocuments.in/reader036/viewer/2022082712/56649e9f5503460f94ba148e/html5/thumbnails/8.jpg)
Vienna-Meeting: ECVT-projects & GHK
Recognition & Validation as part of the qualification(as occupational units)
UK: Realistic recognition as Aeronautical Engineering Suite 3Unit No 62: Installing Aircraft Cableforms/Looms
But: High preconditions in assessing, 8 requirements, e. g.:
4. Apply five of the following installation methods and techniques:● soldering● securing and locking● loom protection● earth bonding● crimping● wire locking● taking electrostatic discharge (ESD) precautions● correct loom/fibre-optic handling● correct amalgamated loom handling(source:http://www.ukstandards.co.uk/Admin/DB/0045/O45NAE3-062.pdf)
![Page 9: Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq, Marseille FR Andreas Saniter, ITB, Uni HB GE.](https://reader036.fdocuments.in/reader036/viewer/2022082712/56649e9f5503460f94ba148e/html5/thumbnails/9.jpg)
Vienna-Meeting: ECVT-projects & GHK
Recognition & Validation as part of the qualification(as occupational units)
Germany: Planned recognition as basis for the new profiles in the sector
But: Definitely not as occupational units in the understanding of the ECVET-recommendation.
Both social partners (BDLI, IG Metall) insist, that– a holistic exam is needed– the tradition of minimum standards (time frame) should be kept– the neo-liberal approach (the apprentice as the designer of his
vocational career by collecting his bricks) is misleading.
![Page 10: Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq, Marseille FR Andreas Saniter, ITB, Uni HB GE.](https://reader036.fdocuments.in/reader036/viewer/2022082712/56649e9f5503460f94ba148e/html5/thumbnails/10.jpg)
Vienna-Meeting: ECVT-projects & GHK
Draft: the new German occupational group:Aircraft technicians
![Page 11: Vienna-Meeting: ECVT-projects & GHK AEROVET - Recognition & Validation Annie Bouder, Cereq, Marseille FR Andreas Saniter, ITB, Uni HB GE.](https://reader036.fdocuments.in/reader036/viewer/2022082712/56649e9f5503460f94ba148e/html5/thumbnails/11.jpg)
Vienna-Meeting: ECVT-projects & GHK
The Network: