7/28/2019 _Vetasi Work Management v1 http://slidepdf.com/reader/full/vetasi-work-management-v1 1/27  MAXIMO V6 TRAINING HANDBOOK 1/20/2009 Work Management using Maximo v6 This training module covers work-order process from preventive maintenance both for time based maintenance and meter based maintenance. It also covers conditions monitoring as well as the basic of work request for corrective maintenance  

Transcript of _Vetasi Work Management v1

Page 1: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 1/27

 

MAXIMO V6 TRAINING

HANDBOOK 

1/20/2009 Work Management using Maximo v6

This training module covers work-order process from preventive

maintenance both for time based maintenance and meter based

maintenance. It also covers conditions monitoring as well as the

basic of work request for corrective maintenance 

Page 2: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 2/27

MAXIMO v6 Training Handbook 

Table of Contents

CHAPTER 1: WORK ORDER OVERVIEW ............................................................................................................... 1 Maximo Work Order Cycle ............................................................................................................................................................... 1 

CHAPTER 3: PREVENTIVE MAINTENANCE WORK-ORDER ............................................................................ 6 Generating PM Work Orders........................................................................................................................................................... 8 Generate Work Orders Select Action .......................................................................................................................................... 8 Generate Time Based PM Work-order .................................................................................................................................... 10 Generating a Work Order from an Asset Meter Reading .............................................................................................. 14 

Enter Meter Reading Details ..................................................................................................................................................... 16 CHAPTER 4: CONDITION MONITORING ............................................................................................................ 19

 CHAPTER 5: ROUTE .................................................................................................................................................. 22 

Preventive Maintenance Work-order ..................................................................................................................................... 22 Applying Route directly to a Work-order ............................................................................................................................. 23 

Page 3: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 3/27

MAXIMO v6 Training Handbook 

Page 1 

CHAPTER 1: WORK ORDER OVERVIEW

For assets or location, you can create and generate work orders, sometimes with associated job plans,

safety plans, and contracts, in the following ways:

  A PM becomes due and is automatically generated by the system cron-task 1 or using the PM

application itself.

  A condition measurement falls outside the limits and is automatically generated by the system cron

task or using the CM application itself.

  A problem is reported and can be manually (user) entered in the Work Order Tracking, Service

Requests, or Quick Reporting applications.

  If necessary, a follow up work order is generated from an originating work order

Maximo Work Order Cycle

1 System cron-task is an application program that run at Maximo Server automatically. This program can be used to

automate certain periodic activitities such as PM Work Order generation (in version 4.x known as WOGEN)

Page 4: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 4/27

MAXIMO v6 Training Handbook 

Page 2 

CHAPTER 2: WORK REQUEST

Raising Work Request 

In this section we will raise the work a work request for a corrective maintenance. Follow the procedure

below:

Step Action

1  Login to Maximo as genuser xx 

Note: this genuserxx users are set up for training purpose only. In the real Maximo environment,

you shall login using your own user-name and password.

2  After you login, you will be presented a start-center like this:

Page 5: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 5/27

MAXIMO v6 Training Handbook 

Page 3 

3  Go to the Work Order Request application (listed in Requisition Application or Goto-menu)

Press new-record

This action will give you an empty screen of Work-request with an auto-number for its Work-

order number, like this:

4  Enter an informative description on the description. You optionally can put more descriptive yet 

long explanation of the work-request in the long description field.

Page 6: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 6/27

MAXIMO v6 Training Handbook 

Page 4 

5  Fill in the required (mandatory) fields in the work request screen:

-  Location

-  Target Finish

-  Responsibility

6  Save the work-request 

Record you work-order number here : _____________________________________

 Approvin g Work Request from Work-Tr ackin g Application  Step Action

1  You need to logout and change the credential before you can approve a work-request. The

genuser xx  from previous exercise don’t have the right to approve a work -request (or work-order)

You can use user : wilson as the approver of the work-order

2  Navigate to Work-Order Tracking Application. The application opens and displays the List tab.

Page 7: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 7/27

MAXIMO v6 Training Handbook 

Page 5 

3  Search your work-order

Note : If you can not find your work-order, please check the site filter. The work-request created

in previous exercise is created in INA site. Alternatively you can change your default profile in

profile link near Sign Out short-cut 

You can change the default site as well as the default storeroom.

4  If you can find the work-order, the screen will look like this:

Page 8: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 8/27

MAXIMO v6 Training Handbook 

Page 6 

5  You can change the status of the work-order by selecting Change Status action from Select 

 Action menu, or by pressing Change Status button

It gives you a Change Status dialog

6  Change the status to APPR

7  Click OK

Alternatively, you can approve multiple work-orders at one time

Step Action

1  Navigate to List View of Work-order Tracking application

2  Filter the list with status = WAPPR

Page 9: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 9/27

MAXIMO v6 Training Handbook 

Page 7 

3  Click “Select Record” check box located below of the list  

Now, left to the list there are empty boxes

4  Select several work-order by checking the empty check-boxes

5  Go to Select Action menu, and select Change Status

6  Press OK button

Maximo begin to process the request 

7  The selected work-orders have been approved

Page 10: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 10/27

MAXIMO v6 Training Handbook 

Page 8 

Chapter 3: PREVENTIVE MAINTENANCE WORK-ORDER

Generating PM Work Orders

In this section, based on frequency information that we entered using the Preventive Maintenance 

application, we will focus on PM work orders that are automatically generated by the system and manually

initiated by a user.

You can generate work orders in four different ways:

  Manually by selecting the Generate Work Orders action (in Preventive Maintenance and

Conditions Monitoring Applications). 

   Automatically 

o  The PM cron task (PMWoGenCronTask) triggers a work order because the frequencies have

been reached.

o  The system generates a work order because an entered asset meter reading has reached the

meter frequency.

o  The Condition Monitoring cron task (MeasurePointWoGenCronTask) triggers a work 

order because the Measurement Actions frequencies or Characteristic Values have beenreached, thereby triggering a PM

Generate Work Orders Select Action

Page 11: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 11/27

MAXIMO v6 Training Handbook 

Page 9 

Field  Description 

Generate WOs Due Today Plus… The number of days the work orders should be generated.

Use Frequency Criteria?  Specifies whether frequency criteria should be used while

generating the work orders. If this box is selected (the default),

Maximo evaluates the frequency criteria for the selected set of 

records to determine which PMs are due to generate work 

orders. If a PM is part of a hierarchy, it may trigger work order

generation from the entire PM hierarchy. Clear this check box to

generate work orders for the selected set’s top-level PMs

regardless of their due dates. If a top-level PM is part of a

hierarchy, it might trigger work order generation from the

entire hierarchy.

Run Work Order Generation…?  Specifies whether to display the work order creation dialog box.

If selected, no message will display. If left blank, a work ordergeneration dialog box will display a listing of the work orders

generated.

Counter field on PM

The Counter field is read-only. This field counts the number of work orders generated from the PM since

the First Start Date. The counter is set to zero when you insert a new PM record, and increases each time

Page 12: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 12/27

MAXIMO v6 Training Handbook 

Page 10 

you generate a top-level work order from the PM. If you are using a job plan sequence, the job plan is

selected after the counter increments.

Generate Time Based PM Work-order

Below is a procedure for generating a time based work-order for a PM

Step Action

1  Go to the Preventive Maintenance application. The application opens and displays the List tab.

2  Locate PM-PUMP x : Condensate Return Pump Quarterly Service

Hints: Search using PM-PUMP_ (with underscore at the end)

Note: Your instructor may have create some of PM records for you. Replace  x  with a number

between 1 and 9. But, if you can’t find them just create a duplicate PM from record PM-PUMP 

3  Take a look on the Job-plan field in Work-Order section.

Click Go-to Job Plan or Go-to Job Plan (Oil) on the detail menu.

Notify that you have a grey title bar with return link  on upper right hand

Page 13: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 13/27

MAXIMO v6 Training Handbook 

Page 11 

4  Explore the detail information of the Job-plan :

-  Details

-  Job Plan Tasks

-  Labor

-  Materials

Hint : You can press Alt-F1 in each field to get the information about what field it is.

5  Press return shortcut to return to Preventive Maintenance application

Page 14: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 14/27

MAXIMO v6 Training Handbook 

Page 12 

6  Navigate to Frequency tab to explore the parameters and options of this time-based PM.

The “Use Last WO’s Start Information to Calculate Next Due Frequency” check box indicates

that the reference date for determining next due-date for this PM is whether the  ACTUAL START-

DATE or ACTUAL FINISH-DATE.

The others two check-boxes are irrelevant to this PM.

Discussion :

1.  What is Alert Lead (Days) parameter?

2.  Why the Estimated Next Due Date is empty (null) ?

3.  Why the Extended Date and Adjust Next Due Date are both read-only ?

7  First, check the status of the PM. Make sure the status is ACTIVE before you can generate work-

order for it.

8  From the Select Action menu, select Generate Work Orders.

Result: The Generate Work Orders dialog box opens.

Page 15: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 15/27

MAXIMO v6 Training Handbook 

Page 13 

9  Clear the Use Frequency Criteria? check-box and click OK to generate a work order for this PM.

Result: Maximo begins processing your request 

When finished, Maximo displays a message box

Record your work order number: .

Discussion :

1.  How can we get the work-order number(s) if we fail to record the generated work-

order(s) number from this dialog?

2.  What is the different “technical” process between Maximo v6 PM work-order creation

process and WOGEN in version 4? Hint : Maximo v6 is web-based application

3.  Check on Frequency tab. Can you find any different ?

Page 16: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 16/27

MAXIMO v6 Training Handbook 

Page 14 

10  To verify that the last work order is using the Monthly Inspection job plan, click the detail menu

from either location or asset details button and select View Work Orders and PMs. In our case,

since it is a location based PM, you can only see the menu on the Location field

Hint: You can refine your search by entering N in the Is Task? field, and status = WSCH then press

Enter.

11  Click the Work Order Details button and select Go To Work Order Tracking.

Result: You are brought to the Work Order Tracking application.

Note: Notice that the job plan for this work order is JP11430A.

Discussion:

1.  Where did the “Safety Field” field value came from? 

2.  Where did the “Responsibility” field value came from? 

Generating a Work Order fr om an Asset Meter Reading

In this section, Maximo will automatically generate a meter-based PM work order record based on an asset 

meter reading.

A PM record must be set up with the Generate WO When Meter Frequency Is Reached? Option

Page 17: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 17/27

MAXIMO v6 Training Handbook 

Page 15 

There are three different types of meters that can be associated to an asset record:

  Continuous meters are used where the readings increase continuously; for example, odometers.These meters might be used to track miles, hours, engine starts, pieces produced, fuel consumed,

and other continuous readings. This type of meter can be used only when setting up meter-based

PM frequencies.

  Gauge meters are used where the readings may fluctuate; for example, thermometers or pressure

gauges. These meters might be used to track temperature, pressure, noise levels, oil levels, and

other readings that fluctuate. This type of meter can be used only when setting up condition

monitoring measurement points.

  Characteristic meters are used where an observed state is being tracked; for example, a color

change. These meters might be used to track brick/refractory color (yellow, orange, white) or oilcolor (clear, turbid, dark). This type of meter can be used only when setting up condition

monitoring measurement points.

On the Asset Select Action menu, you have three choices to manage the asset’s meter(s):

  Use the Enter Meter Readings action to record meter readings for an asset. This

action is also available in the Work Order Tracking and Quick Reporting

applications.

  Use the Manage Meter Reading History action to view or update historical meter

readings.

  Use the Reset/Replace Meters action to reset a meter’s readings (for example,

when you replace a continuous meter)

Page 18: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 18/27

MAXIMO v6 Training Handbook 

Page 16 

Enter Meter Reading Details

With the meter reading details action, you can view the meter reading details on an asset’s meter(s).

The following table describes the meter reading fields

Field Description 

Since Last Overhaul Difference between the current meter reading and the meter

reading when the last work order of type OVERHAUL was

opened or closed as determined by application setup.

Since last inspection Difference between the current meter reading and the meter

reading when the last work order of type INSPECTION was

opened or closed as determined by application setup.

Since Last repair Difference between current meter reading and the meter

reading when the last work order was opened or closed as

determined by the PM setup

Since install Difference between the current meter reading and the meterreading when this asset meter’s asset was moved into its

current configuration.

Life to Date for Asset Total of all meter readings since the meter was manufactured.

Reset only on replacement of physical meter.

The procedure below illustrate the use of meter-based PM

Step Action

1  Go to the Preventive Maintenance application. The application opens and displays the List tab.

Page 19: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 19/27

MAXIMO v6 Training Handbook 

Page 17 

2  Navigate to FLEET site, and find PM-MTR00 : FLD112 STRAIGHT TRUCK Lubrication change

Check the frequency tab, and notify that this is a meter-based PM with job-plan sequence apply on

it.

Record your exploration:

Frequency : _______________________________________

Next Meter Reading : _______________________________________

 Asset Number : _______________________________________

3  Navigate to Meters application to check what others assets/equipments that use the same meter

4  Open the Assets application and retrieve asset record, which is located at the FLEET site

Cross check the meter entries in the Meter tab

5  From the Select Action menu, select Enter Meter Readings.

Result: The Enter Meter Reading dialog box opens

Page 20: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 20/27

MAXIMO v6 Training Handbook 

Page 18 

6  Before entering the meter reading, let’s look at the meter details of the asset. On the Meter

column, click the View Details button.

7  Enter “Next Meter Reading” plus some positive offset you recorded in the step 2

in the New Reading field.

Click OK  

8  Check the work-orders created from Select Action menu

Remember, in Maximo you can save your search lists to an Excel spreadsheet by clicking

Download

Page 21: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 21/27

MAXIMO v6 Training Handbook 

Page 19 

CHAPTER 4: CONDITION MONITORING

In this section we will generate a work order action based on condition monitoring measure point readings

that fall outside of the Warning or Action limits for the asset.

Many organizations will have control systems that feed real-time measurement data into Maximo and

automatically trigger work order generation based on upper- and lower-limit readings. Your system

administrator would set up the condition monitoring cron-task, MeasurePointWoGenCronTask , to allow

for this automatic generation.

For classroom and demonstration purposes we will be entering measurements and generating work orders

manually there are only two types of meters that can be associated to an asset’s measurement point: 

  Gauge

  Characteristic

These are the only types of meter readings that can trigger work order generation.

In Maximo there are three ways to capture condition monitoring measurement point or characteristicvalue readings:

  On the asset using the Enter Meter Readings select action

  In the Measurements table window in the Condition Monitoring application 

  In a Job Task row on the actuals tab in the Work Order Tracking application 

For this exercise we will enter measurement readings using the Condition Monitoring application, and thenmanually generate a work order.

Page 22: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 22/27

MAXIMO v6 Training Handbook 

Page 20 

Step Action

1  Open the Condition Monitoring application, then search for and retrieve the Condition : Outlet 

Pressure Monitor record for 11430.

Hint: Remember, your default site might not be the site at which a record is located. You might 

have to clear the Site field or specify the correct site. (In this case, the record is in the Bedford

site.)

2  In the Measurements frame, click New Row.

Result: A detail input form opens, ready to accept your new measurement information

Page 23: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 23/27

MAXIMO v6 Training Handbook 

Page 21 

3  Enter the following information in the designated fields of the input form, and then Tab out of the

Measurement field.

Field  Value 

Date [Today’s Date] (Note: Use the Select Date button.)

Measurement 5,700 (or any value higher than the Upper Action Limit)

Result: The new measurement appears on a line in the Measurements frame. 

4  Save the record, then select Generate Work Order from the Select Action menu.

Result: The Generate Work Order dialog box opens.

5  Accept the defaults in the Generate Work Order dialog box and click OK.

Result: The work order is generated.Maximo automatically generates a work order number, which is displayed in the Historyframe window

Write your work order number here: ___________________________________

Page 24: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 24/27

MAXIMO v6 Training Handbook 

Page 22 

CHAPTER 5: ROUTE

A route is a list of related work assets, which are considered " stops" along the route. These route stops

represent assets or locations. Routes simplify building hierarchies of work orders for inspections. You can

use a route in the following ways:

  Apply the route to a preventive maintenance record to generate work orders for all work assets

listed as stops on the route.

  Apply the route to a work order and generate child work orders for each work asset listed as a stop

on the route.

Preventive Maintenance Work-order

Step Action

1  Go to the Routes application in the planning module. The application opens and displays the List 

tab. Press enter to see the list of routes available.

For our exercise, we will user 1002 – Inspect Fire Extinguishers 

2  Select Route 1002

You can modify the members of route (can be location OR asset) on that table

Page 25: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 25/27

MAXIMO v6 Training Handbook 

Page 23 

3  Go to the Preventive Maintenance application, and search for PMs that use route 1002

Hint : Use advanced search

4  From Select Action menu, force generate this PM

5  Check your new work-orders

 Applying Route dire ctly to a Work -orde r

Step Action

1  Go to the Work Order application. Insert a New Work Order.

Record your work order number: ________________________________________

2  In the Description field, enter:

 xx (to identify your record) Manufacturer Bulletin: Fire Extinguisher Gauge. Inspect for corrosion.

3  From the Select Action menu, select Apply Route.

Result: The Apply Route window opens.

Page 26: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 26/27

MAXIMO v6 Training Handbook 

Page 24 

4  Select Route 1002 – Inspect Fire Extinguishers.

Result: Maximo displays a message similar to this example:

Record your work order numbers: Work Order #:

Work Order #: ______________________________________

Work Order #: ______________________________________

Work Order #: ______________________________________

Work Order #: ______________________________________

Work Order #: ______________________________________

Work Order #: ______________________________________

5  Click Close.

Result: You are brought back to the top-level (parent) work order

Page 27: _Vetasi Work Management v1

7/28/2019 _Vetasi Work Management v1

http://slidepdf.com/reader/full/vetasi-work-management-v1 27/27

MAXIMO v6 Training Handbook 

6  Click on the Plans tab.

Result: Children work orders have been created

To display the work order’s children, click the Show Table button on this table’s bar. 

Result: Your screen should look similar to the one below

7  When we created this route, we had associated a job plan to each asset. To view the work plan for

one of the assets, click on the first (Sequence 10) work order’s Detail menu.  

Result: Your Work Order field should look like similar to the one below.

8  Select Move To.

Result: Your work order is moved to the Work Order key field and the parent work order

populates the Parent WO field. Notice that the job plan was carried over to the work plan.