Vertical Test Area RF qualification of C100 cavities for 12 GeV project Mircea Stirbet Open...

download Vertical Test Area RF qualification of C100 cavities for 12 GeV project Mircea Stirbet Open Collaboration Meeting on Superconducting Linacs for High Power.

If you can't read please download the document

Transcript of Vertical Test Area RF qualification of C100 cavities for 12 GeV project Mircea Stirbet Open...

  • Slide 1
  • Vertical Test Area RF qualification of C100 cavities for 12 GeV project Mircea Stirbet Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 2
  • CHL-2 New cryomodules get new rf zones CEBAF 12 GeV Upgrade New cryomodules: 10 Voltage per cryomodule: 108 MV avg. Cavities per cryomodule 8 Heat budget: @ 2.07 K 300 W / CM 29 W / cavity, avg. Cavity: 1.497 GHz 0.7 m Low loss cell shape Higher order mode damping: - Transverse (R/Q)Q k < 2.4 x 10 10 /m - Longitudinal (R/Q)Q < 6.5 x 10 11 /m Key Project Parameters
  • Slide 3
  • Principles Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland - All cavities (R100 and C100) for 12 GeV project should be qualified in Vertical Test Area (VTA) before being string assemble. - VTA tests will be done on cavities with or without He vessels.
  • Slide 4
  • Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland State-of-the-art production SRF cavity
  • Slide 5
  • Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland Inventory Receipt Visual Inspection Dimensional Receipt Inspection via CMM RF Receipt Inspection Ultrasonic Clean 1 hour at 120F DI+Liquinox Heat Treatment 10 hours at 600C Ultrasonic Clean 1 hour at 120F DI+Liquinox Electropolish 30 microns at 20C Ultrasonic Clean 1 hour at 120F DI+Liquinox RF Tune Dimensional Check and Correction Helium Vessel Welding Measure RF Properties Lap Vacuum Seal Surfaces Final Dimensional CMM Ultrasonic Clean 1 hour 120F DI+Liquinox First HPR 2 hours, 2.4 gpm at 1250 psig First Assembly Class 10 Final HPR 2 hours, 2.4 gpm at 1250 psig Final Assembly Class 10 Test Stand and Leak Check Bake 24 hours at 120C RF Test 2K Dewar Qualified? Store in Clean Room for String Assembly 12 GeV C100 Cavity Process Flow
  • Slide 6
  • Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland Vertical test Area (VTA): Qualification tests - HOM survey - RF power qualification: a)Cavity performances: Lock frequency, Emax, FE onset, Radiation, test limits, cavity vacuum. b)Qo vs Eacc c)Rad vs Eacc d)HOM A and HOM B vs Eacc e)Delta Freq vs Eacc2 f)Qo vs T Data mining and analysis for eventual corrective actions for the process flow.
  • Slide 7
  • Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland Vertical test Area (VTA): Landing area and control room
  • Slide 8
  • Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland Vertical test Area (VTA): Dewars and control room Vertical test Area (VTA): Dewars area
  • Slide 9
  • Vertical test Area (VTA): HOM survey - Specifications - Measurement methods : manual and enhanced Polfit package based on Carstens and Hans Walter method to extract loaded Q from measured scattering parameters. Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 10
  • Vertical test Area (VTA): HOM survey cont.
  • Slide 11
  • Operator interface low loss cavity LL002 at 44 MV/m Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 12
  • Operator interface LabView program Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 13
  • Data acquisition, traveler, Excel macro Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 14
  • Qo and Rad vs Eacc Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 15
  • HOM A and HOM B power vs Eacc Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 16
  • Lorentz coefficient Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 17
  • 1/Qo vs temp Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 18
  • E max of VTA Qualified Cavities for 12 GeV Upgrade
  • Slide 19
  • Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland E max of VTA Qualified Cavities for 12 GeV Upgrade
  • Slide 20
  • Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland Qualified Cavities for 12 GeV Upgrade Cryomodule C100-3
  • Slide 21
  • Data mining Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 22
  • Data mining Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 23
  • Data mining Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 24
  • -Cables (some trivial cables not connected, broken connectors supposed to operate at low temperature). -Lambda vacuum leaks. -Occasional high radiation levels > all cavities are now radiation monitored after VTA tests. -Clean room over crowed (sometimes). -Glycol spill. -Vibration due to demolition, fumes and dust from construction area, power outages. Issues during VTA qualification tests Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 25
  • 12 GeV Upgrade Cavities Production Tracking System
  • Slide 26
  • Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland C100 string assembly All remaining cavity strings should be clean room assembled by the middle for Feb 2012
  • Slide 27
  • Cryomodule assembly Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland - All 80 cavities will be VTA qualified by mid Dec 2011 important effort to qualify at least 3 cavities each week! - 3 Cryomodules installed and commissioned in CEBAF machine (R100 and 2 C100). - C100-3 advanced qualification tests in CMTF - 7 cavity strings in different phases of assemble - All reaming cavity strings should be clean room assembled by the middle of February 2012.
  • Slide 28
  • VTA operator team for 12 GeV project Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland Kirk Davis Christiana Grenoble Mircea Stirbet Tiffany Bass Pete Kushnick Grigory Emereev Ari Palczewski Gianluigi Ciovati Rongi Geng John Mammosser Andrew Burrill Tom Goodman J. C. Westby-Gibson Cryogenie support Pete Kushnick Tiffany Bass Danny Forehand Pansophy support Valery Bookwalter Bonnie Madre Melody Jones Crane operators Chris Dreyfus Steve Castagnola Tom Goodman Danny Forehand Roland Overton
  • Slide 29
  • TUPO061 SRF 2011 Chicago, July 25-29, 2011 Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland
  • Slide 30
  • Conclusions Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN Geneva Switzerland Almost all cavities for 12 GeV project are qualified. Thank you !!!