FY2013 BudgetJanuary, 2012FY2013 Budget

Agency of Transportation 1Legislative Initiatives2012 SessionJanuary, 2012FY2013 Budget

Agency of Transportation 2012 Session Major Initiatives Streamline ROW necessity processAmend Town Highway Emergency ProgramTo include state match for FHWA Emergency Relief projectsWill now be 80/10/10: 10% local/10% state on town highways.Entire non-FHWA 20% share was previously localDMV Fee bill proposed to add $6.3M in FY2013TIB BondingFY2013 Budget proposes $10M in transportation infrastructure (TIB) bondsAccelerated Bridge Program TH Bridge IncentiveCIRC alternativesPrivate rail crossings January, 2012FY2013 Budget

Agency of Transportation FY2013 Budget Overview

January, 2012FY2013 Budget

Agency of Transportation 2013 Budget Areas of EmphasisBuilding Bridges to the Future - Accelerated Bridge Program12% are structurally deficient and/or functionally obsolete (ranked 23rd)Preserving our HighwaysIn 2011, 25% listed in very poor condition (Down from 34% in 2009)Rail prioritiesFurther upgrade of bridges to standard weight capacityPlanning to extend Amtrak service to MontrealPlanning for western corridor passenger service to BurlingtonMobility, Sustainability & LivabilityPlanning transportation investments for a changing futureResiliency and AdaptationPlanning for post-Irene standards in construction and business practices

January, 2012FY2013 Budget

Agency of Transportation FY2013 Budget Overview FY 2012 FY 2013 Increase PercentFund Source As Passed GOV REC (Decrease) ChangeSTATE (TFund) 191,665,076 201,357,773 9,692,442 5%FEDERAL 276,191,518 390,536,639 114,345,121 41%ARRA FEDERAL 40,582,716 6,301,953 (34,280,763)-85%LOCAL/OTHER 3,465,052 6,419,356 2,954,304 85%TIB FUND 19,009,937 20,806,637 1,796,700 9%TIB BOND PROCEEDS-10,000,000 10,000,000100%INTER-UNIT TRANSFERS 5,434,076 4,317,197 (1,116,879)-11%CENTRAL GARAGE FUND 17,286,915 18,653,244 1,366,3298%TOTAL 553,635,290 658,392,544 104,757,25419%January, 2012FY2013 Budget

Agency of Transportation Six Year Budget HistoryFY2013 is a record high!January, 2012FY2013 Budget

Agency of Transportation Paving$28 million increase (36%)70 miles on interstate220 miles on state highways

January, 2012FY2013 Budget

Agency of Transportation Bridge Programs$18.0 million increase (17%)Town Highway Bridges$3.1m increase (17.7%)First ABP project - ThetfordState Highway Bridges$3.2m decrease (6%)Reflects completion of Lake Champlain BridgeInterstate Bridges$18.0m increase (50%)Three design-build projectsBrattleboroMiltonWindsor

January, 2012FY2013 Budget

Agency of Transportation Roadway Program$7.8m increase (13.3%)Major projects include:Barre CityPittsford Brandon US 7Morristown Truck RouteCabot Danville US 2 Danville US 2$10.75m for Irene-relatedJanuary, 2012FY2013 Budget

Agency of Transportation Highway Safety & Traffic Operations$1.4m increase (12.3%)Reflects stable funding for this important programMajor projectsCambridge VT15/VT108 roundaboutManchester roundaboutEssex Town VT117/TH4 intersection Waterbury roundaboutRichmond intersection improvementsJanuary, 2012FY2013 Budget

Agency of Transportation Park & Ride Facilities$806,000 increase (27%)Constructs or improves 8 facilitiesCreates over 500 new spaces4 facilities under development200 new or improved spacesAll projects - construction and development - will nearly double # of spaces from 2008 by 2018$250k for Municipal park-and-ridesExtremely popular programJanuary, 2012FY2013 Budget

Agency of Transportation Bicycle & Pedestrian Facilities$197,000 decrease (2.2%)Funds 12.5 miles of improvements19 bicycle/pedestrian projects9 Safe Routes to School projects80 miles constructed over last 15 yearsJanuary, 2012FY2013 Budget

Agency of Transportation Enhancement Grants$1m increase (33%)Funds all projects ready to proceedNearly 80 projects fundedConstruction on 39 projectsProjects include:Sidewalks and pedestrian improvementsScenic easementsMitigation of stormwater runoffHistoric preservationJanuary, 2012FY2013 Budget

Agency of Transportation Rest Areas$1.3 million decrease (17.5%)Major construction projects Bennington Welcome CenterFair Haven parking improvementsJanuary, 2012FY2013 Budget

Agency of Transportation Maintenance$2.1m increase (3.2%)

January, 2012FY2013 Budget

Agency of Transportation Public Transit$232,000 increase (0.9%)Utilizes $4.4m of state of good repair grant awardsSoftware and capitalSplit over FY12 - FY14 Public Transit funding has doubled since FY2003From $12.7m to $25.6m

January, 2012FY2013 Budget

Agency of Transportation Aviation$1.6 million decrease (20.2%)FY2012 included $1.3m earmarkRunways and safety areas improvementsHazard beacon improvementsHangar developmentSolar initiativesSnow removal equipment/buildings

January, 2012FY2013 Budget

Agency of Transportation Rail$27.3m decrease (50%)Decrease is attributable to near completion of $52.7m FRA grant to upgrade Amtrak Vermonter service Continues upgrade to the 286,000 pound standard$4.5m for continuation of AmtrakIncludes $50k for marketingJanuary, 2012FY2013 Budget

Agency of Transportation Central Garage$1.4m increase (7.9%)Largely due to estimated fuel cost increasesIncludes $5.9m for equipmentJanuary, 2012FY2013 Budget

Agency of Transportation Transportation Buildings$850,000 increase (40%)Constructs or improves facilities in:Central Garage heating systemColchester (Fort renovations)MendonMiddleburyRoyaltonWestfieldWilmington

January, 2012FY2013 Budget

Agency of Transportation Town Highway Bridge$3.1 million increase (17.7%)Accelerated Bridge ProgramFirst project ThetfordRehab Bridge 8 TH1

January, 2012FY2013 Budget

Agency of Transportation Town Highway Programs$8.7 million increase (15%)$5.8m for TH Structures grants Maintains $2m FY2011 increase (52%)$7.3m for TH Class 2 grantsMaintains $1.5m FY2011 increase (26%)Town highway emergency programIncrease of $4mNow will fund local match for FHWA emergency relief on town highways$26.5m for Town Highway AidIncrease by $1.5mFirst increase since FY2005

January, 2012FY2013 Budget

Agency of Transportation Accelerated Bridge Program

January, 2012FY2013 Budget

Agency of Transportation Accelerated Bridge ProgramNow is the Time!

January, 2012FY2013 Budget

Agency of Transportation Presentation Outline

Case for Change Accelerated Bridge ProgramRecent HistoryDefining the Accelerated Bridge ProgramStructures Re-organizationGoals and ObjectivesDraft Performance MeasuresShared Challenges Ahead

January, 2012FY2013 Budget

Agency of Transportation Case for ChangeVermonts Functional Obsolescence (FO) and Structural Deficiency (SD) Population(as of or reported to FHWA in April 2011)FO% FOSD% SDInterstate Long Structures9530.4%134.2%State Highway Long Structures10013.0%7810.2%Town Highway Long Structures35522.0%16110.0%On-System Short StructuresN/AN/A12710.0%System Total550379Current Condition of Vermonts Bridge InventoryJanuary, 2012FY2013 Budget

Agency of Transportation Case for Change

January, 2012FY2013 Budget

Agency of Transportation Case for Change

January, 2012FY2013 Budget

Agency of Transportation Case for Change

Budget Projections as of TodayTH Bridge Program $20 MillionJanuary, 2012FY2013 Budget

Agency of Transportation Case for Change

Budget Projections as of Today

State Bridge Program $45 MillionJanuary, 2012FY2013 Budget

Agency of Transportation Case for Change

Budget Projections as of Today

Interstate Bridge Program $50 MillionJanuary, 2012FY2013 Budget

Agency of Transportation Case for Change

Budget Projections as of Today

Total Programs about $120 Million /YrJanuary, 2012FY2013 Budget

Agency of Transportation Case for Change

January, 2012FY2013 Budget

Agency of Transportation Case for Change Public Expectations Post TS IreneDesign fastBuild fastABC Program approach to Innovation and AccelerationStandardized Approach

January, 2012FY2013 Budget

Agency of Transportation Recent History of Innovation

ARRA Sense of urgency for project developmentMany examples of innovative project developmentAlternative ContractingDesign/BuildSEP14 Use of MRA with simple biddingA+B bidding to support short duration closuresModified LTF Model for ARRA bridge decksAccelerated Bridge ConstructionIndividual LeadersWith short duration road closures6 successful projects last year including Chester x2

January, 2012FY2013 Budget

Agency of Transportation Defining the Accelerated Bridge ProgramFixing Bridges and Doing Business DifferentlyThe accelerated Bridge Program will rely on the use of innovative and accelerated project development and construction techniques.Reduce/streamline self imposed controls that add time to projectTake advantage of all flexibility in rules and law.Empower project managers to build agile and aggressive project schedulesIncrease use of innovative contracting one size fits all no longer worksAccelerated Bridge Construction is the future of bridge construction in Vermont

January, 2012FY2013 Budget

Agency of Transportation Good Bridge Management StrategiesBetter Project InitiationTimely programmingScoping, Estimate and ScheduleProjects selected appropriately for ABPInitially 25-30% of the projectsProjects drawn from existing programs and fundingCreate a Scalable organization

Defining the Accelerated Bridge ProgramJanuary, 2012FY2013 Budget

Agency of Transportation First Step Structures Re- OrgJanuary, 2012FY2013 Budget

Agency of Transportation Accelerated Bridge Program (ABP) Goals and Objectives Improve the Condition of Vermonts Bridges Reduce the number of Structurally Deficient Bridges.Create and implement strategies to improve the long-term condition of all bridges.Improve the ability to deliver the Interstate, State and TH bridge programs at current funding levels.

January, 2012FY2013 Budget

Agency of Transportation ABP Goals and Objectives Save Money By Completing Projects Sooner Deliver timely bridge maintenance and repair to reduce future costly deterioration Hedge against construction cost inflation. Complete projects on-time and on-budget.

January, 2012FY2013 Budget

Agency of Transportation ABP Goals and Objectives Complete Projects Efficiently and Innovatively Create and implement strategies to shorten project delivery durations Maximize the use of available technology (electronic plans, data sharing, websites, etc.)Standardize design and plan preparationUse Design-Build and other innovative contracting techniques.Minimize environmental, ROW and utility impacts and design duration by avoiding temporary bridge construction

January, 2012FY2013 Budget

Agency of Transportation ABP Goals and Objectives Implement Accelerated Bridge Construction(ABC)Partner with contractors to mainstream accelerated bridge constructionCreate Decision Making tools to determine when to use ABC and road closuresCreate and implement strategies to shorten construction durationsReduce Construction Engineering costs by short duration projectsComplete projects with minimum disruption to people and commerce.Improve safety in the work zone

January, 2012FY2013 Budget

Agency of Transportation ABP Goals and Objectives Build on Success and Innovations from Irene and from other States/FHWADevelop working relationships with leaders from other states and FHWAProvide training and employee development based on what has been successfulLeverage FHWAs Every Day Counts Initiative to maximize flexibilityUse sense accomplishment and urgency from Irene to create an urgency and spirit of innovation around ABP projects in all Sections of VTrans

January, 2012FY2013 Budget

Agency of Transportation ABP Goals and Objectives Project Transparency and Accountability Provide frequent and detailed reports to the public on the progress of the ABP.Develop overall project controls to ensure adherence to project schedules and budgets within VTrans.Measure agency performance in streamlining design and construction schedules.

January, 2012FY2013 Budget

Agency of Transportation Draft Performance MeasuresAdvertise all bridge projects currently programmed by 2016The time from completion of project initiation to Contract Plans for ABP project will not exceed 24 months.The time from completion of project initiation to Contract Plans for conventional project will not exceed 60 months.30% ABC by 2014

January, 2012FY2013 Budget

Agency of Transportation Shared Challenges AheadSupport from Executive StaffShare the Mission We do not have all of the good ideas yet innovation and creativity is valuedBe Bold with Us!Innovation TeamsJanuary, 2012FY2013 Budget

Agency of Transportation Q and ANow is the Time!January, 2012FY2013 Budget