- ' CLAIM REPORT 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037, Client # 393261
Prospecting Report of the Brady Lake Property
February 2 and 3, 2009 and on March 16, 17, 18, 19 and 20,2009
Claim # 1230992, Lot 3, 4, 5, 6 and 7 Concession 2
Hindon Township, Haliburton County,
Southern Mining Region
Submitted By
Yvonne C. Fulton Bell, License # C39037, Client Number 393261 -March 29, 2009
Report Written by
Chief Zane Bell, License # C390038, Client Number 393262
\RECE\VED ~?R 0710Q9
GEOSCIENCE ASSESSMENT 1 L OFFICE -
This report covers the prospecting activities on the identified claim #1230992 on
February 2 and 3, 2009 and on March 16, 17, 18, 19 and 20, 2009
On February the 2nd and 3rd the claim was accessed via access from Highway # 118
at the east edge of Concession 2 Lot via snow shoes to mark and locate an access rout to be developed the next spring as there is still and access problem along the north edge of the claim units due to private property ownership and highway access
criteria Distance from bend in highway for entrance approvals). In the spring a new claim unit will be claimed to gain access to Concession 2 and the claim units within this Claim 1230992. Three prospectors attended the site for an overnight stay over within the claim unit,
the claim holder Chief Yvonne Fulton-Bell, Chief Wabiska Mukwa (Zane Bell) and Eric Poole.
On March 16, 17, 18, 19 and 20, 2009
Two days of prospecting (trail blazing) are included in this assessment report. This activity on February 2 and 3th
This claim is accessed by travelling east from Bracebridge on Highway 118 to the
Muscoda I Haliburton boundary and travelling east approximately 16 km east to the
1
CLAIM REPORT 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037, Client # 393261
Brady Lake Road Trail at the big bend. Access to the south side of the Highway to the claim is on a road entrance to the south just east of the big bend as shown on
the plan.
On February 2 mobilization from Minden at 9:00 AM and arrived at location 1, as identified on site plan attached appendix. Off loaded supplies at side of highway and the three prospectors' accessed site to begin identification of best route to begin trail blazing. Access began at the south east end of Lot 1 Concession 3 Hindon
Township.
Using flagging tap a trail was blazed in a south west direction to Lot 3 Concession 2
Hindon Township arriving at the claim unit at an approximate distance of 600 meters. Trail blazing continued along the south east branch of Anson Creek on the
Claim unit till arriving at the south west corner of Lot 4 Con. 2 to skirt the small drainage gully that drains north to heart swamp.
Access to the north was just west of the gully and 2:45 PM the group crossed over Anson Creek at the beaver dam at the west end of Heart Swamp. Travel from the highway was impeded extensively due to the wind fall blow down along the south side of Anson Creek. Travel was difficult on snow shoes.
Lunch was taken at 2:00 PM on the north side of the beaver dam. After lunch the group travelled west along the north side of Anson Creek approximately parallel to the south lot line at the north 410 meter mark, to the center of Lot 6, Concession 2. This is the area that will be subject to extensive investigation spring 2009 after the
snow melts. CAGii Aboriginal Global Initiatives Inc., will be contracted to begin work on this claim. Tent was Pitched 4:30 PM and a fire was made for evening warmth.
February 3 at 9:30 AM camp was struck and the group began to retrace trip and continued to mark trails and get familiar with potential for investigation for the spring in 2009. The group took a loop to the north swinging east through the middle
of lot 5. Saw three moose bedded down. 10:08 AM.
Travelling south when they came to the water discharge system of Skull Lake. 10:45
Travelling south to the trail of the day before. Lunch at 11 :30. 12:00 Noon travelled south to cross over at the beaver dam on Anson Creek.
The group arrived to the highway for the 4:00 PM pickup at 3:45 PM and travelled back to Minden for 5:00 PM. Total travelled 2.8 KM to camp and 3.4 KM return.
Appendix 3 is the site plan for this prospecting trail blazing. Appendix 4 shows the air photo of the site and travel difficulty to access the site.
2
CLAIM REPORT 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037, Client # 393261
On March 16, 2009 the above three prospectors attended claim 1230992 to continue the previous grid layout for future sampling regime slated for the spring of 2009 by CAGii, Canadian Aboriginal Global Initiative inc. The previous work done on the claim which has expired in Lots 3 and Concession 4 will be redone when reclaimed
in the spring.
This claim is accessed by travelling east from Bracebridge on Highway 118 to the Muscoka I Haliburton boundary and travelling east approximately 16 km east to the Brady Lake Road Trail at the big bend. Access to the south side of the Highway to the claim was via the big bend ridge - the old Brady Lake trail as seen on Appendix •
The prospectors (3) left Minden on March 16 at 8:30 AM and arrived at the parking spot north side of the highway Lot 5 Concession and proceeded to walk to the Big Hill at the bend, and travelled south to the north lot line of Lot 4 Concession 2.
Photo 1 shows the lay of the land at the north boundary of Lot 2, Concession 2. Photos 2 and 3 show a large white pine on Claim Unit.
Photos 3 & 4 shows a large ghost quartz seam across pluton of Diorite. Visual inspection showed no visible metals.
On accessing claim unit old trail was again reflagged to identify trail before spring flush obscures trail in the heavy bush.
10:30 AM Arrived at site of the south end of grid system previously established, Photo 8 taken of exposed diorite surface rock, dimensional stone prospect at beginning of layout of new grid system.
10:37 AM Photo 9 Taken of the south east view from the top of the diorite pluton.
AT 10:45 AM the group began to establish a new grid line along the top ridge of the
diorite ridge in a south west direction to allow for sampling and drilling the coming
spring summer. Photo 10 Grid Point 0, was taken to identify main gridline shooting
north to last established east west grid
Photo 11 taken at 10:55 AM, Grid point 0, new 100 meter grid line shooting west. No
line established as outside claim unit. This will be established after re-staking
previous claim which expired last year.
Photo 12, taken at 11 :00 AM from Grid Point 0, grid line shooting east and the grid
line was established to 100 metres east and broken down in 50 meter sections, east
west and 40 meter sections south.
.............. ---------------3
- ' CLAIM REPORT 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037, Client # 393261
On March 20, 2009 return trip Chief Yvonne and Chief Zane (2) only to explore the
south end of the diorite pluton looking for further exposures of bornite.
The prospectors left Minden on March 19 at 8:4 AM and arrived at the parking spot
north side of the highway Lot 5 Concession and proceeded to walk to the Big Hill at the bend, and travelled south to the north lot line of Lot 4 Concession 2 to arrive at the south end of the pluton at Grid Point 20.
22 photos were taken see Prospecting log appendix 2 and see Appendix 1 for photo
descriptions of work done.
See Appendix 5 Site Plan for this report.
Report by Chief Wabiska Mukwa (Zane Bell), License # C390038, Client Number 393262
March 29, 2009
For Claim Holder Chief Yvonne Fulton-Bell, License # C39037, Client Number 393261
March 29, 2009
5
APPENDIX 1 CLAIM REPORT 1230992 MARCH 292009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Appendix 1
Claim 1230992 March 162009
Photo 1 Access to claim 1230992 North Boundary
Photo 2 & 3 Grandmother Pine
1
APPENDIX 1 CLAIM REPORT 1230992 MARCH 292009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 4 Ghost Quartz seam running across diorite pluton. Photo 5 Chief Yvonne at seam exposure
using hand glass for metallic evidence
Photo 6 Re-establish trail with flagging tape
Photo 7 Evidence of moose yarding
2
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 8 exposed diorite surface rock, dimensional stone prospect
Photo 9 within claim 1230992 at location of continuance of grid system established last report photo to
south east off top of Diorite pluton showing topography of general area. I
Photo 10 Grid Point 0, main gridline shooting north to last established east west grid
Photo 11, Grid point 0, new 100 meter grid line shooting west. No line established as outsi I e claim unit.
Will be established after re-staking previous claim expired.
3
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 12, Grid Point 0, grid line shooting east Photo 13, Grid Point 0, Chief Yvonne chai ing grid line
south
Photo 14, Grid Point 1, grid line shooting east Photo 15, Grid Point 1, grid line shooti
Photo 16 & 17, Grid Point 2, exposure of Diorite dimensional stone
4
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 22 Grid Point 3, shooting west Photo 23, Grid Point 3 shooting east
Photo 24, Grid Point 4, shooting west Photo 25, Grid Point 4 shooting southwest
Photo 26, Grid Point 5, at rock exposure down-slope to west. Photo 27, Grid Point 5 shooting west over
ridge exposure diorite.
6
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 28, Grid Point 5, shooting east. Photo 29, Grid Point 5 shooting north along edge of exposed
west face of ridge
Photo 30, Grid Point 5 rock exposure metal staining is pegmatite seam. Photo 31, Grid Point 5 shooting
south along west face ridge.
7
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 32, Grid Point 6 exposure of diorite weathered by glaciations. Photo 33, Grid Point 6 shooting
south.
Photo 34, Grid Point 6 shooting east Photo 35, Grid Point 6 shooting west
8
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 36 & 37, Grid Point 7 shows exposed diorite with some staining on rock surface Moose had just
left the area.
Photo 38, Grid Point 7 shooting south along ridge. Photo 39, Grid Point 7 east along grid line.
Photo 40, Grid Point 7 shooting west along grid line. Photo 41, Grid Point 8 exposed! diorite
9
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 42, Grid Point 8 shooting south. Photo 43, Grid Point B shooting eats along grid line.
Photo 44, Grid Point B shooting west along grid line. Photo 45, Grid Point 9 exposure of diorite
Photo 46, Grid Point 9 shooting east no shoot south. Photo 47, Grid Point 9, shooting west
10
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 48, Grid Point 10, shooting east,. Photo 49, Grid Point 10 shooting west.
Photo 50, Grid Point 10 shooting south Photo 51 Grid Point 10 showing moose hair
Photo 52, Grid Point 11 shooting south. Photo 53, Grid Point 11 shooting east
11
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 54, Grid Point 11 shooting west. Photo 55, Grid Point 12 shooting south.
Photo 56, Grid Point 12 shooting east. Photo 57, Grid Point 12 shooting west.
Photo 58, Grid Point 13. Exposure of diorite. Photo 59, Grid Point 13 shooting south.
12
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 60, Grid Point 13 shooting east. Photo 61 Grid Point 13 shooting west.
photo 62 Grid Point 14 shooting south. Photo 63 Grid Point 14 shooting east.
Photo 64 Grid Point 14 shooting west. Photo 65 Grid Point 15. Diorite exposure ..
13
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell
License #C39037, Client # 393261
Photo 66 Grid Point 15 shooting south. Photo 67 Grid Point 15 shooting east.
Photo 68 Grid Point 15 shooting west. Photo 69 Grid Point 16 shooting south.
Photo 70 Grid Point 16 shooting east. Photo 71 Grid Point 16 shooting west.
14
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 72 and 73 Grid Point 17 exposure of diorite with quartz intrusions.
Photo 74 Grid Point 17 pegmatite intrusion. Photo 75 Grid Point 17 shooting east.
Photo 76 Grid Point 17 shooting south. Photo 77 Grid Point 17 shooting west.
15
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 78 Grid Point 18, diorite exposure. Photo 79 Grid Point 18 pegmatite exposure.
Photo 80 Grid Point 18 pegmatite exposure. Photo 81 Grid Point 18 light grained diorite.
Photo 82 Grid Point 18 shooting south. Photo 83 Grid Point 18 shooting east.
16
APPENDIX 1 CLAIM REPORT 1230992 MARCH 292009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 84 Grid Point 18 shooting west. Photo 85 Grid Point 19 shooting west.
Photo 86 Grid Point 19 shooting east. Photo 87 Grid Point 19 shooting south west over ridge to Anson
Creek.
Photo 88 Grid Point 20 shooting west. Photo 88b Grid Point 20 showing diorite.
17
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell
License #C39037, Client # 393261
Photo 94, March 19, 2009 exploring the end of the ridge overlooking Anson Creek. Large exposed rock
face of diorite. Good sunny day but cold.
Photo 95 of exposure end of ridge diorite. Photo 96 shooting south to south of Anson Creek to
the extension of the diorite ridge. Anson Creek still ice bound.
Photo 97 shooting down south face of ridge to Anson Creek. Photo 98 shooting east.
19
APPENDIX 1 CLAIM REPORT 1230992 MARCH 292009 PHOTOS -Chief Yvonne Fulton-Bell
License #C39037, Client # 393261
Photo 99 showing staining of highly weathered pegmatite exposure east along grid line 20.
Photo 100 shows fine grained diorite with some bornite. Photo 101 shows broken rock face of diorite
with bornite.
20
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell i
License #C39037, Client # 393261
Photo 104 more bornite exposure. Photo 105 bornite with staining
Photo 105 bornite.
21
APPENDIX 1 CLAIM REPORT 1230992 MARCH 292009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 106 bornite.
March 20, 2009 return trip Chief Yvonne and Chief Zane. Along exposure of diorite.
Photo 109 shooting south over Anson Creek. Photo 110 shooting north east up the slope of the end of I
the diorite ridge good grained diorite.
22
APPENDIX 1 CLAIM REPORT 1230992 MARCH 292009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 111 quartz exposure seam in diorite / pegmatite
no visible metal.
Photos 111 & 112 south over Anson Creek, moose tracks of moose leaving before us.
Photo 113 up slope of beaver dam. Photo 114 beaver dam holding back Heart Swamp where group
crossed over February 2 and 3, 2009 from the south.
23
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 115 and 116 exposure west of grid line south face of main grid line of massive quartz. No visible
metal was seen in hand lens.
Photo 117 and 118 of a massive exposure of pegmatite just west of main grid line over the broken rock
face.
24
APPENDIX 1 CLAIM REPORT 1230992 MARCH 29 2009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 119 another exposure of pegmatite, no sample were taken.
Photo 120 shooting south Photo 121 shooting north along west side of main pluton glacial erosion.
Photo 122 of eroded diorite west face travelling north on trip out. Photo 123 secondary ridge west of
main ridge.
25
APPENDIX 1 CLAIM REPORT 1230992 MARCH 292009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Photo 124 exposure north along west secondary ridge of pegmatite. Photo 125 more pegmatite.
Photo 126 more pegmatite. Photo 127 west ridge slopes up to main ridge on way out to the north.
Photo 1.28 large spin rock from glaciations. Photo 129 more pegmatite.
26
APPENDIX 1 CLAIM REPORT 1230992 MARCH 292009 PHOTOS -Chief Yvonne Fulton-Bell License #C39037, Client # 393261
Report by Chief Wabiska Mukwa (Zane Bell), License # C390038, Client Number 393262
March 29, 2009
For Claim Holder Chief Yvonne Fulton-Bell, License # C39037, Client Number 393261
March 29, 2009
2i'
APPENDIX 2 - CLAIM REPORT Log 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037,
Client # 393261
Prospecting Log of the Brady Lake Property
February 2 and 3, 2009 and on March 16, 17, 18, 19 and 20, 2009
Claim # 1230992, Lot 3, 4, 5, 6 and 7 Concession 2
Hindon Township, Haliburton County,
Southern Mining Region
Submitted By
Yvonne C. Fulton Bell, License # C39037, Client Number 393261
March 29, 2009
Report Written by
Chief Zane Bell, License # C390038, Client Number 393262
This report covers the prospecting activities on the identified claim #1230992 on
February 2 and 3, 2009 and on March 16, 17, 18, 19 and 20, 2009
February 2 mobilization from Minden at 9:00 AM
Arrived at location 1- 9:30 AM. Off loaded supplies at side of highway and the three
prospectors' accessed site. No camera. Weather -10 C Clear sky.
9:30 AM travelled south west as identified on site plan.
2:45 PM the group crossed over Anson Creek at the beaver dam at the west end of
Heart Swamp.
Lunch was taken at 2:00 PM
2:38 PM travelled m west along the north side of Anson Creek approximately parallel
to the south lot line at the north 410 meter mark, to the center of Lot 6, Concession
2.
Tent was Pitched 4:30 PM and a fire was made for evening warmth. Bannock, moose burgers and mukaday waboo was for supper.
1
APPENDIX 2 - CLAIM REPORT Log 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037,
Client # 393261
Night was comfortable and wolves howling.
February 3 at 9:30 AM camp was struck and the group began to retrace trip and
continued to mark trails.
The group took a loop to the north swinging east through the middle of lot 5.
Saw three moose bedded down at 10:08 AM.
Travelling south they came to the water discharge system of Skull Lake at 10:45.
Then travelling south to the trail of the day before. Lunch at 11 :30. 12:00 Noon travelled south to cross over at the beaver dam on Anson Creek.
The group arrived to the highway for the 4:00 PM pickup at 3:45 PM and travelled back to Minden for 5:00 PM. Total travelled 2.8 KM to camp and 3.4 KM return.
March 16, 17, 18, 19 and 20, 2009
The prospectors left Minden on March 16 at 8:30 AM and arrived at the parking spot north side of the highway Lot 5 Concession and proceeded to walk to the Big Hill at the bend, and travelled south to the north lot line of Lot 4 Concession 2.
Arrived at Lot 4, Concession 2 at 9:30 AM. March 16, 2009, Photo 1 taken.
9:40 AM, Photos 2 and 3 taken of large white pine on Claim Unit.
9:50 AM, Photos 3 & 4 taken, shows a large ghost quartz seam across pluton of Diorite. Visuals inspect showed no visible metals.
10:00 AM Photo 5 taken on trail and beginning flagging.
10:15 AM Photo 6 was taken of evidence of moose yarding.
Photo 6 Re-establish trail with flagging tape
Photo 7 Evidence of moose yarding
10:30 AM Photo 8 taken of exposed diorite surface rock, dimensional stone prospect
at beginning of layout of new grid system
10:37 AM Photo 9 Taken of the south east view from the top of the diorite pluton.
') <-
APPENDIX 2 - CLAIM REPORT Log 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037,
Client # 393261
10:45 AM Photo 10 was taken at Grid Point 0, main grid line shooting north to last
established east west grid.
Photo 11 taken at 10:55 AM, Grid point 0, new 100 meter grid line shooting west.
Photo 12, taken at 11 :00 AM from Grid Point 0, grid line shooting east and the grid
line was established to 100 metres east and broken down in 50 meter sections, east
west and 40 meter sections south. East Line established.
Grid Point 0, Photo 13, taken at 11 :20 shooting along the main grid line southwest
shows Chief Yvonne chaining grid line south 40 meters.
Grid Point 1 Photo 14, grid line shooting east taken at 11 :35. East Line established
at 11:48,
Grid Point 1 Photo 15, , grid line shooting west taken at 11 :48 and west line
established at 12:14 PM.
Line to Grid point 2 established at 12:25 Pm.
Photo 16 & 17, Grid Point 2, taken at 12:25 PM of exposure of Diorite dimensional
stone.
East line established at 12:49 PM and west Line established at 1:12 PM. No photos
taken east west at this grid point.
Photo 18, Grid Point 2 Shooting south to Photo 19 was taken at 1:20 PM showing
good grained diorite exposure.
South grid to Grid Point 3 established at 1 :30 PM Lunch break on rock at Grid Point ~,
Photo 20 taken at 1:55 PM shooting south. Photo 21 shows fresh moose tracks. They
just left the area when we stopped for lunch.
Photo 22 Grid Point 3, taken at 2:00 PM. shooting west along grid line. Line
established at 2:18 PM.
Photo 23, Grid Point 3 shooting east was taken at 2:19 PM and grid line was
established at 2: 37 PM.
Line south to Grid Point 4 was established at 2:49 PM.
Photo 24, Grid Point 4, shooting west was taken at 2:40 PM and Photo 25, Grid Point
4 shooting southwest to Grid Point 5 was taken at 2:45 PM.
3
APPENDIX 2 - CLAIM REPORT Log 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037,
Client # 393261
Photo 26, Grid Point 5, at rock exposure down-slope to west was taken at 2:50 Pm
and Photo 27, Grid Point 5 shooting west over ridge exposure diorite was taken at
2:55 PM.
Photo 28, Grid Point 5, shooting east was taken at 3:00 PM. Photo 29, Grid Point 5
shooting north along edge of exposed west face of ridge was taken at 3:10 PM and
Photo 30, Grid Point 5 rock exposure metal staining is pegmatite seam taken at 3:15
PM •• Photo 31, Grid Point 5 shooting south along west face ridge was taken at 3:20
PM.
East Grid line was established at 3:15 PM and the west grid line was established at
3:48PM.
South grid line was established at 4:12 PM.
Photo 32, taken at 4:15 PM Grid Point 6 shows exposure of diorite weathered by
glaciations. Photo 33, taken at 4:18 PM Grid Point 6 shooting south. At this point
the group of prospectors proceeded to leave the site for the day. Arrived at truck at
5:10PM and arrived in Minden at 5:45 PM.
March 17, 2009
The prospectors left Minden on March 17 at 8:40 AM and arrived at the parking spot north side of the highway Lot 5 Concession and proceeded to walk to the Big Hill at the bend, and travelled south to the north lot line of Lot 4 Concession 2 to arrive at Grid Point 6.
Arrived at Grid Point 6 at 9:30 AM and proceeded to establish east grid line at 9:48 Am. West Grid Line established at 10:05 am.
Photo 34, Grid Point 6 shooting east taken at 9:35 AM. Photo 35, Grid Point 6
shooting west taken at 9:40 AM. Grid line to Grid Point 7 established at 10:20 AM.
Photo 36 & 37, taken at 10:25 AM. Grid Point 7 shows exposed diorite with some
staining on rock surface Moose had just left the area.
Photo 38, Grid Point 7 shooting south along ridge to south was taken at 10:30 AM.
Photo 39, taken at 10: 30 AM at Grid Point 7 shooting east along east grid line. East
Grid line established at 10:45 AM.
Photo 40, Grid Point 7 shooting west along grid line was taken at 10:45 AM. West
grid line was established at 11 :00 AM.
Grid line to Grid Point 8 was established at 11:12 AM.
4
APPENDIX 2 - CLAIM REPORT Log 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037,
Client # 393261
Photo 41, Grid Point 8 exposed diorite was taken at 11 :15 am
Photo 42, Grid Point 8 shooting south was taken at 11:18 AM. Photo 43, Grid Point 8
shooting east along grid line was taken at 11:50 AM. East grid line was established
at 11 :20 AM and the west grid line was established at 11 :38 AM. Photo 44, Grid Point
8 shooting west along grid line was taken at 11 :53 AM.
Grid line south to Grid Point 9 was established at 12:13 PM. Photo 45, taken at 12:15
PM at Grid Point 9 shows exposure of diorite was taken at 12:15 PM.
Photo 46, Grid Point 9 shooting east was taken at 12:16 PM. Photo 47, Grid Point 9,
and shooting west was taken at 12:18 PM. East grid line was established at 12:15 Pm
and west gridline was established at 12:37 PM.
10.
No photo shot south to Grid Point
South Grid line to Grid Point 10 was established at 12:50 PM. Lunch taken
Photo 48, Grid Point 10, shooting east was taken at 1: 12 PM. East grid line was
established at 1 :33 PM and west gridline was established at 1 :48 PM.
Photo 49, Grid Point 10 shooting west was taken at 1:14 PM.
Photo 50, Grid Point 10 shooting south to Grid Point 11 was taken at 1:16 PM.
Photo 51 Grid Point 10 taken at 1:18 PM showing moose hair on ground.
Grid line south to Grid Point 11 was established at 2:10 PM.
Photo 52, Grid Point 11 shooting south was taken at 2:12 PM.
Photo 53, Grid Point 11 shooting east was taken at 2:14 PM.
Photo 54, Grid Point 11 shooting west was taken at 2:15 PM.
East Grid Line was established at 2:28 Pm and the west grid Line was established at
2: 47 PM.
South Grid line to Grid Point 12 was established at 3:10 PM.
Photo 55, Grid Point 12 shooting south was taken at 3:15 PM.
Photo 56, Grid Point 12 shooting east was taken at 3:16 PM.
Photo 57, Grid Point 12 shooting west was taken at 3:18 PM.
5
APPENDIX 2 - CLAIM REPORT Log 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037,
Client # 393261
The east grid Line was established at 3:26 PM. The west grid line was established alt
3:44 PM.
South Grid line to Grid Point 13 was established at 4:08 PM.
Photo 58, Grid Point 13 was taken at 4:09 PM of an exposure of diorite.
Photo 59, Grid Point 13 shooting south was taken at 4:10PM.
Photo 60, Grid Point 13 shooting east was taken 4:13 PM. Photo 61 Grid Point 13
shooting west was taken at 4:15PM
At this point the Group left the claim unit for the day arriving at the truck at 4:55 Pm
and arriving in Minden at 5:30PM.
March 18, 2009
The prospectors left Minden on March 18 at 8:30 AM and arrived at the parking spot north side of the highway Lot 5 Concession and proceeded to walk to the Big Hill at
the bend, and travelled south to the north lot line of Lot 4 Concession 2 to arrive at
Grid Point 13
Arrived at Grid Point 13 at 9:40 AM and proceeded to establish east grid line at 9:58 Am. West Grid Line established at 10:15 am.
Grid Line to Grid Point 14 was established at 10:32 AM
Photo 62 Grid Point 14 shooting south was taken at 10:34 AM.
Photo 63 Grid Point 14 shooting east was taken at 10:36 AM.
Photo 64 Grid Point 14 shooting west was taken at 10:38 AM.
East Grid line was established at 10:48 AM. West Grid line was established at 11:10
AM.
Grid line to Grid Point 15 was established at 11 :25 AM.
Photo 65 Grid Point 15 was taken at 11 :30 AM of a diorite exposure.
Photo 66 Grid Point 15 shooting south was taken at 11 :35 AM.
Photo 67 Grid Point 15 shooting east was taken at 11 :38 AM.
Photo 68 Grid Point 15 shooting west was taken at 11 :43 AM.
6
APPENDIX 2 - CLAIM REPORT Log 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037,.
Client # 393261
East Grid Line was established at 11:55 AM. West Grid Line was established at 12:18
PM.
Grid Line south to Grid Point 16 was established at 12:35 PM.
Photo 69 Grid Point 16 shooting south to Grid Point 17 was taken at 12:37 PM
Photo 70 Grid Point 16 shooting east was taken at 12: 40 PM.
Photo 71 Grid Point 16 shooting west was taken at 12:42PM.
East Grid line was established at 1 :15 PM after lunch and the west grid line was
established at 1 :37 PM.
The south grid line was established at 1 :55 PM.
Photo 72 and 73 Grid Point 17 exposure of diorite with quartz intrusions were taken
at 2:00 PM
Photo 74 Grid Point 17 pegmatite intrusion was taken at 2:05 PM.
Photo 75 Grid Point 17 shooting east was taken at 2:10 PM.
Photo 76 Grid Point 17 shooting south was taken at 2:12 PM.
Photo 77 Grid Point 17 shooting west was taken at 2:14 PM.
The east grid line was established at 2:18 PM. The west grid line was established at
2:45 PM.
·rhe south grid line was established at 3:10 PM.
The south grid line to Grid Point 18 was established at 3:22 PM ..
Photo 78 Grid Point 18 was taken at 3:25 PM showing a diorite exposure.
Photo 79 Grid Point 18 was taken at 3:30 PM showing a pegmatite exposure
Photo 80 Grid Point 18 taken at 3:32 PM showing pegmatite exposure.
Photo 81 was taken at 3:34 PM at Grid Point 18 light grained diorite.
Photo 82 Grid Point 18 was taken at 3:36 PM shooting south.
Photo 83 Grid Point 18 was taken at 3:38 PM shooting east.
Photo 84 Grid Point 18 was taken at 3:40 shooting west.
7
APPENDIX 2 - CLAIM REPORT Log 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037,.
Client # 393261
The east grid line was established at 3:38 PM and the west Grid line was established
at 4:01 PM.
The south grid line to grid pOint 19 was established at 4:15 PM.
Photo 85 Grid Point 19 shooting west was taken at 4:05 PM.
Photo 86 Grid Point 19 shooting east was taken at 4:08 PM.
Photo 87 Grid Point 19 shooting south west over ridge to Anson Creek was taken at
4:10 PM.
At this point the group left the claim lands and arrived at the truck at 5:10 Pm and
arrived in Minden at 5:45 PM.
March 19, 2009
The prospectors left Minden on March 19 at 8:15AM and arrived at the parking spot north side of the highway Lot 5 Concession and proceeded to walk to the Big Hill at the bend, and travelled south to the north lot line of Lot 4 Concession 2 to arrive at Grid Point 19.
Arrived at Grid Point 19 at 9:40 AM and proceeded to establish east grid line at 9:56 AM. West Grid Line established at 10:14 am.
Photo 88 Grid Point 20 shooting west was taken at 10:20 AM.
Photo 88b Grid Point 20 showing diorite was taken at 10:25 AM.
Grid line to Grid Point 20 was established at 10:20 AM.
East grid line established at 10:40 AM.
West grid line was established at 11 :00 AM
Photo 89 Grid Point 20 shooting south over ridge of Anson Creek was taken at 10:23
AM.
Photo 90 Grid Point 20 shooting east was taken at 10:25 AM.
Photo 91 Grid Point 20 end of ridge shot west was taken at 10:27 AM.
Photo 92 Grid Point 20 of pegmatite and quartz intrusions was taken at 10:31 AM.
8
APPENDIX 2 - CLAIM REPORT Log 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037,
Client # 393261
Photo 93 Grid Point 20, was taken at 10: 36 AM rounded diorite end of ridge at top of
bluff of Anson Creek.
Photo 94, 2009 taken at 11:15 AM exploring the end of the ridge overlooking Anson
Creek. Large exposed rock face of diorite. Good sunny day but cold. Chief Yvonne ill1
photo.
Photo 95 was taken at 11 :20 AM of an exposure end of ridge diorite.
Photo 96 was taken at 11 :28 AM shooting south to south of Anson Creek to the
extension of the diorite ridge. Anson Creek still ice bound.
Photo 97 was taken at 11 :39 AM shooting down south face of ridge to Anson Creek.
Photo 98 was taken at 11 :45 shooting east.
Photo 99 was taken 11 :55 AM showing staining of highly weathered pegmatite
exposure east along grid line 20.
Photo 100 taken at 12:10 PM shows fine grained diorite with some bornite.
Photo 101 taken at 12:15 shows broken rock face of diorite with bornite.
Photo 102 taken at 12:27 PM shows more bornite exposure.
Photo 103 taken at 12:30 shows again more bornite exposure.
Photo 104 taken at 12: 45 PM shows more bornite exposure.
Photo 105 taken at 1 :00 PM which shows bornite with staining.
Photo 105 taken at 1 :05 PM which show more bornite.
Photo 106 taken at 1:10 Pm shows more bornite.
Lunch taken at 1:15 PM till 1:38 PM After Lunch all prospectors began to leave the
site and began to flag previous two days grid line work as the day before flagging tap
had already begun to be pulled by the moose on the ridge. Arrived at the truck at
3:45 PM and arrived in Minden 4:45 PM
On March 20, 2009 return trip Chief Yvonne and Chief Zane only to explore the south
end of the diorite pluton looking for further exposures of bornite.
The prospectors left Minden on March 19 at 8:4AM and arrived at the parking spot north side of the highway Lot 5 Concession and proceeded to walk to the Big Hill at the bend, and travelled south to the north lot line of Lot 4 Concession 2 to arrive at
9
APPENDIX 2 - CLAIM REPORT Log 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037,.
Client # 393261
the south end of the pluton at Grid Point 20.
Arrived at Grid Point 209 at 10:10 AM and proceeded to travel east along the east
line exploring for bornite exposures in the exposed rock faces.
Photo 107 was taken at 10:30 AM of a pegmatite intrusion.
Photo 108 was taken at 10:45 AM of uplift exposure towards beaver dam.
Photo 109 was taken at 11 :00 AM shooting south over Anson Creek.
Photo 110 was taken at 11:15 shooting north east up the slope of the end of the
diorite ridge good grained diorite.
Photo 111 was taken at 11 :30 back at south east line just west of the line on the
south face of the diorite pluton of a quartz exposure seam in diorite I pegmatite no
visible metal.
Photos 111 & 112 were taken at 11 :45 am south over Anson Creek, moose tracks of'
moose leaving before us.
Photo 113 was taken at 11 :50 AM up slope of beaver dam.
Photo 114 was taken at 12:00 noon at the direction of the beaver dam holding back
Heart Swamp where group crossed over February 2 and 3, 2009 from the south.
Lunch was taken at this time.
Photo 115 and 116 was taken at 12:25 PM of exposure west of grid line south face I)f
main grid line of massive quartz. Just to the west of the grid line. No visible metal
was seen in hand lens.
Photo 117 and 118 was taken at 12:38 PM of a massive exposure of pegmatite just
west of main grid line over the broken rock face.
Photo 119 was taken at 12:45 PM of another exposure of pegmatite, no sample were
taken.
Photo 120 was taken at 12:55 PM shooting south of pluton exposure of diorite
Photo 121 was taken at 1:10 PM shooting north along west side of main pluton
glacial erosion.
Photo 122 was taken at 1:18 PM of the eroded diorite west face travelling north on
trip out.
10
APPENDIX 2 - CLAIM REPORT Log 1230992 MARCH 29, 2009 -Chief Yvonne Fulton-Bell. License #C39037, Client # 393261
Photo 123 was taken at 1 :25 Pm of the secondary ridge west of main ridge.
Photo 124 was taken at 1 :37 PM of the exposure north along west secondary ridge of
pegmatite.
Photo 125 was taken at 1 :45 PM of more pegmatite exposed along ridge of diorite.
Photo 126 was taken at 1 :55 Pm of more pegmatite.
Photo 127 was taken at 2:10PM of the west ridge as it slopes up to main ridge on
way out to the north.
Photo 128 was taken at 3:00 PM on way out of the claim unit large spin rock from
glaciations.
Photo 129 was taken at 3:15 PM along the ridge on the way out of more pegmatite.
Prospector Chief Yvonne and chief Wabiska left the claim units at 3:30 PM arrived at
the truck at 4:10 PM and arrived back at Minden at 5:10 PM.
Report by Chief Wabiska Mukwa (Zane Bell), License # C390038, Client Number 393262
March 29, 2009 tv<-~
For Claim Holder
Chief Yvonne Fulton-Bell, License # C39037, Client Number 393261
March 29, 2009
11
•
. '/[2.1 P f'';~ 2. -: '3 2 0 0q ~ l <c ... L.U "2-v D\.
ANMJ~()( ¥ ~~~
( L<lT 4. CON 3 •
/ LOT 5. CON 3 j
\ LOT 2.CON 2
LOT 7. CON 3
OON LOT 3.CON2
LOT S, CON 2
lOT 3. CON 1
lON
672000E
lone 17