VC Presentation - Smartnet · IL & FS and Cisco HPL ... Total Built‐up Area 6,30,000 sqm ......
Transcript of VC Presentation - Smartnet · IL & FS and Cisco HPL ... Total Built‐up Area 6,30,000 sqm ......
22‐11‐2016
1
1. Mobilization of ABD Consultants Knight Frank Pvt Ltd JV REPL, Gurgaon
2. Issue of Smart Parking RFP for O & M on PPP‐basis
3. Issue of Smart Education EOI for Schools in ABD Area
4. Issue of RCC Utility Duct+Cabling RFP for 1.7km Pilot Road
5. Award of GPS‐based VTMS Projectfor Solid Waste Collection Vehicles (pan city)
6. Finalization of Water Supply and Sewerage DPRunder AMRUT, for the ABD Area
7. Preparation of RFP for Selection of Transaction Advisorsfor issue of Municipal Bonds
22‐11‐2016
2
Technical & Administrative Support Unit:Eptisa Servicios De Ingeniera SL, Spain4 Full‐time Experts: Urban Management Expert
Urban Infrastructure ExpertICT Solutions ExpertProcurement & Contract Expert
25 Sector Experts + 4 Full‐time Support Staff
ICT Consultants: KPMG Advisory Services Pvt Ltd, NOIDAfor ICT Master Plan and DPRs
ABD Consultants: Knight Frank Pvt Ltd JV REPL, Gurgaonfor ABD Master Plan and DPRs
HR Agency: PrimeOne Workforce Pvt Ltd, Bhopalfor recruitment of SPV Staff
Architectural/Engineering Consultants for EARLY‐BIRD Projects
Fortress Infrastructure Advisory Services, MumbaiRIVERFRONT DEVELOPMENT PROJECT
Nitin Shrimali & Associates, IndoreCONSERVATION/RESTORATION OF RAJWADA AND CHHATRI BAGH
SNS Associates, IndoreVENDOR MARKET AT JINSI HAAT MAIDAN
Versatile Engineering Services Pvt Ltd, IndoreUG CABLING AND STREET LIGHTING ALONG ABD PILOT ROADS
Arjun Hablani Architects, IndoreCONSERVATION/RESTORATION OF GOPAL MANDIR
22‐11‐2016
3
DEVELOPMENT OF ALL MAIN ROADS UNDER ABD AREAS AS SMART ROADS
• CONSTRUCTION OF CARRIAGE WAY NEARING COMPLETION
• UNDER GROUND CABLING TENDERS RECEIVED AND TECHNICAL EVALUATION COMPLETED
• RFP ISSUED FOR UG DUCT
• RFP ISSUED FOR CENTRAL DIVIDER AND STREET LIGHTING
Mhow Naka
Jinsi
Bada Ganpati Tori Corner
22‐11‐2016
4
XLPE insulated armoured HV and LV cables are planned to be laid in trays within underground RCC duct. From this, connections will be provided to residential, commercial and other uses.
Estimated cost of RCC Duct is Rs. 1.0 Crore per km per direction.
Pilot Project is taken up along Biyabani Road. Expected date of completion is 30 April 2017.
22‐11‐2016
5
REDEVELOPMENT OF STREETS AND JUNCTIONS FOR WHICH DESIGNS HAVE ALREADY BEEN PREPARED
ABD Consultants have been mobilized recently.
Design of Streets and Junctions will be a priority task.
Integration with Water Supply and Sewerage Improvementproject essential, DPR has been finalized.
PERFROMANCE-BASED CONTRACTS FOR MANAGEMENT OF SMART WATER SUPPLY SYSTEMS
22‐11‐2016
6
• Under AMRUT, Rs. 1628 Crores have been allocated for whole City.
• M/s DRA (Nagpur) have been appointed as Consultants by IMC.
• DPR for Phase 1 works has been received on 30 Oct 2016. this has been reviewed by TASU, observations are compiled.
In ABD Area:• Water Supply System
- Feeder Mains = 7.4 kms.- Distribution Network = 69 kms.- Construction OHT & GSR = 2 no.s (3 ML OHT, 6 ML GSR)
• Sewerage System-Collection System = 42 kms.-De-centralised STP = 10 MLD
• Water Reuse-Reuse network = 24 kms-Construction of OHT = 1 nos. (3 ML)
Est. Project Cost = Rs. 175 Crore (CAPEX)Rs. 136 Crore (OPEX)
• Project Components (Priority)
• Smart Meters & Management
• DMA-based distribution system for 24x7 supply & NRW Reduction
• SCADA & Automation
• 100% Sewage collection & Treatment
• Recycling & Reuse for effluent
• Long term Performance Based Contract for O & M to be awarded on PPP-basis
Est. Project Cost = Rs. 175 Crore (CAPEX)
Rs. 136 Crore (OPEX)
22‐11‐2016
7
INTEGRATED CONTROL & COMMAND CENTRE HAVING ALL THE MODULES
Design of the Solution – IOT operational platform
Indore City Network
Field Area Network
Smart Light
Wi‐Fi Application
Video Management &
Analytics
Environmental Application
CCTV Camera Wi‐Fi Access Point Street Light Environmental Sensor
RFP for C4 to be ready by 31/12/2016, to be integrated with other SMART Projects…
22‐11‐2016
8
• EOI and POC process completed.
• RFP will be ready by 05-12-2016.
• EIGHT Companies presented POC:BSNLBharti InfratelEricsson, Usha International and EnergasiaIL & FS and CiscoHPL India Ltd.SmartTech and Philips India Ltd.TechMahindra, Cisco and Neev Energy L& T and Cisco
• Implementation on PPP-mode.
• About 800 Smart Poles and 70,000 LED street-lights planned in Indore.
Smart poles will be used as a wireless infrastructure backbone for getting a telecom and local connectivity. Using this with OFC, multiple applications can be achieved.
22‐11‐2016
9
Street Light Automation
• Connected smart lights – ON / OFF / Dimming and fault detection.• Automatic schedules – All ON / Alternate ON / 1 in 3 ON / motion based ON / OFF.• Stop wastage to save energy – average of 25 – 30% over LED usage.
Key Features
• Internal and vehicle-to-vehiclecommunication systems as wellas collision avoidance andcrash detection systems.
• Central Control Station
• Passenger Information Management System
• Communication Sub System
• Travel Demand Management
• Incident and Emergency Management System
• Fleet Management System
Best Practices/ Benchmarking
22‐11‐2016
10
• It is planned to implement POC in some schools by reputed vendors in Smart Education sector. Some schools are:
• SUBHASH SCHOOL
• GOVT SCHOOL AT MOG LINES
• SHARDA KANYA SCHOOL
• Companies like DELL, ILFS, EDUCOMP have shown interest for POC.
• A workshop was organized on 07 Oct 2016 for School Principals and Teachers to discuss Smart Education approach.
• EOI has been issued, Date of Submission 30 Nov 2016.
GPS‐based Vehicle Tracking Solution for MSW
RFID Tag on
Vehicle
Data Server
Complete tracking of vehicles collecting Solid Waste by Installation of GPS System in more than 700 IMC vehicles.
Introduction of surveillance CCTV Cameras for accurate measurement of solid waste on Landfill site and Trenching Ground.
Contractor appointed, work commenced.
22‐11‐2016
11
Use of GIS Technology for Improving Property Tax Collection
GIS Survey Agency ADCC (Nagpur) is appointed for Detailed Property survey of whole city for collection of accurate and complete data related to Municipal Property Tax.
Consultant has procured satellite Imagery for the whole City .
Physical Survey work for ABD Area under Smart City Mission Completed. By 31 Dec 2016, work for ABD Area to be completed.
After complete survey work of whole City including 29 villages, Collection efficiency of all Corporation taxes will be increased.
OTHER MAJOR PROJECTS
22‐11‐2016
12
Indore is a heritage‐rich and culturally‐vibrant city.
Conservation / adaptive re‐use of erstwhile royal structures isimportant to restore the city’s historic significance.
Heritage conservation can provide impetus to tourism sector.
Structures being taken up for conservation / restoration underSmart City Project are: Rajwada, Chhatri Bagh, Gopal Mandir andKrishnapura Chhatris.
• DPR under preparation, Target Date 10 Dec 2016.
• Shifting of ghumtis in near proximity
• Reconstruction of portion which recently fell in 2016.
• Façade development
22‐11‐2016
13
• DPR ready. RFP to be floated.
• Restoration of Historic Wall, Gate and Bastions, Façade Development of Chhatris
• Development of Garden and monument lighting
• Provision of Parking and Public Conveniences
• Design of Signage + Interpretation
• Work on Gopal Mandir has commenced recently by Architect Arjun Hablani. DPR will be ready by 31 Dec 2016.
Importance of Parking Project due to proposal for pedestrianization of parts of ABD Area.
Survey of lands for New Parking Project is under progress. Identification of government‐owned, under‐utilized land is the emphasis.
In 1st Phase of Project Planning Parking buildings are proposed at ‐1. Veer Savarkar Market2. near Subhash ChaukWater Tank 3. Near Mukeripura Masjid 4. Yashwant Ganj near Malganj Chauraha on IMC Land,5. Open land near Khajuri Bazaar and behind Madhya Pradesh Book Stall
EOI for POC is prepared. Strategy is to implement ‘SMART PARKING’ on PPP‐mode and design revenue‐sharing arrangement.
ISCDL may have to provide VGF / CAPEX for building the parking structure.
RFP for Smart Parking at THREE EXISTING PARKING STRUCTURES issued.
22‐11‐2016
14
KARBALA
LENGTH 3.9 Km RAMBAGH
RIVERFRONT DEVELOPMENT PROJECT
Key Project for Urban Renewal.
Survey of 3.9 km stretch completed.
Phase 1 DPR to be ready by 15-12-2016.
Project Execution to be coordinated with DEWATS.
Project Execution to be coordinated with HFA / PMAY.
RIVERFRONT DEVELOPMENT PROJECT
I. Riverfront Development of Subhash Marg Bridge to Jawahar Marg Bridge, Rehabilitation
of Fruit Market / Sabji Mandi Vendors, Development of Garden and Under‐ground
Parking, Development of Harsiddhi Garden at C.P. Shekhar Nagar – DPR by 20 Dec 2016
II. Riverfront Development of Jawahar Marg to Gangor Ghat – DPR by 10 Dec 2016
III. Riverfront Development of Gangor Ghat to Karbala Bridge
22‐11‐2016
15
RIVERFRONT DEVELOPMENT PROJECT
GARDEN and COMMERCIAL AREA DEVELOPMENT
RIVERFRONT DEVELOPMENT PROJECT
HARSHIDHI CITY PARK ( C.P. SHEKHAR NAGAR )
22‐11‐2016
16
Itwaria and MalharganjHaat Bazaar will alsobe shifted to Jinsi HaatMaidan.
DPR under preparation,to be ready by 30 Nov2016.
INDORE SMART CITY,-ch-Mh- {ks=
xaxoky cl LVsaM
egw ukdk
,-ch-Mh- {ks=
xaxoky cl LVsaM
egw ukdk
Redevelopment of M.O.G. Lines Area ( PPP Mode)
Currently identified land, in 4 pockets is spread over 52 acres.
These comprise existing Residential use (629 units), Commercial use (35 units) and Public / Semi‐public use (39 units).
All these will need to be compensated.
Project Feasibility Report under preparation, Target Date 31 Dec 2016.
22‐11‐2016
17
Total Land Area for
Redevelopment
21 hectares /
52 acres
FAR (incl incentive for rehab
ilitation / compensation)3.00
Total Built‐up Area 6,30,000 sqm
Residential Built‐up
Area @ 65% assumed4,09,500 sqm
Commercial Built‐up
Area @ 30% assumed1,89,000 sqm
Institutional Built‐up
Area @ 5% assumed31,500 sqm
No. of Residential
Units @ 80 sqm5,118
No. of Commercial
Units @ 40 sqm4,725
No. of Institutional
Units @ 500 sqm63
Redevelopment of M.O.G. Lines Area ( PPP Mode)
1.Near Gopal Mandir for – Art & Craft Center Skill Development Center Incubation Center DPR to be ready by 31 Dec 2016.
2.Near Jinsi Bus Stand – Planning finalised & DPR will be received by 30‐11‐2016
3.Near Krishnapura Chhatri – Planning is in progress. DPR to be ready by 31 Dec 2016.
22‐11‐2016
18