Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft...

30
University of the District of Columbia University of the District of Columbia Van Ness Campus Master Plan Van Ness Campus Master Plan Community Open House 3 Community Open House 3 December 8, 2010 December 8, 2010

Transcript of Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft...

Page 1: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

University of the District of Columbia University of the District of Columbia Van Ness Campus Master PlanVan Ness Campus Master PlanCommunity Open House 3Community Open House 3

December 8, 2010December 8, 2010

Page 2: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

IntroductionsIntroductions

Page 3: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

22

Sequence of Work: Campus Master Plan

BE

GIN

: I

NT

RO

DU

CE

AN

D S

TA

RT

WO

RK

Continued Engagement and Input from UDC Steering Committee

Submit Master

Plan Application

Zoning Commission Meeting

Project

Initiation

Team and UDC Contacts and

Schedule

Data

Gathering /

Analysis

Existing SituationAnalysis

Community

Meeting #1

Report of Existing Conditions

Engage Community

Community

Meeting #5

Present

Completed Master Plan(with the

Community’sDraft commentsIncorporated)

PresentationsAnd Hearings

with Zoning

Commission

Refinement

of Master Plan

Receive Final

Approval

Community

Meeting #2

Identify Community

Issues

Develop planningFramework

Responding toCommunity Issues

Community

Meeting #3

Community Issues Dialogue

Today

Coordinate

and MeetWith Agencies

Refine and develop Planning Strategy

Inform communityOf Important

Updates

CommunityMeeting #4

Present DraftMaster Plan

Refine and Document Master Plan

with AgencyCoordination

Next Steps Next Steps

Page 4: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Review

• Community Comments

• Masterplan Framework

• Masterplan Elements / Goals and Objectives

• Next Steps

Agenda

2233

Page 5: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

44Review Community CommentsReview Community Comments

Summary of Community Comments

• Establish pedestrian friendly streetscape on campus and its edges

as per CAPA study

• Encourage ride sharing, public transit and pedestrian life

• Implement traffic patterns and design solutions for pedestrian safety

including the tunnel across Connecticut Avenue

• Introduce community-serving retail along Connecticut Avenue

• Strengthen campus identity, edge conditions, entries, wayfinding

and open space

• Establish comprehensive goals to advance campus sustainability in

tune with the District and Sustainability Task Force

• Design Student Center as a student and community resource

Page 6: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

55Review Community CommentsReview Community Comments

Summary of Community Comments

• Strengthen communications and relationship with neighbors and

institutions

• Facilitate cultural and educational events for neighbors on campus

• Permit local neighbors to use campus sports facilities

• More students on campus and in residence halls

• Address security needs

• Optimize facility utilization

Page 7: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

66

Summary of Community Comments

• Establish campus identity gateway feature across Connecticut Avenue

• Expanding tunnel connections to Giants and other retail across

Connecticut Avenue

• Introduce electronic marquee on Connecticut Avenue

• Build a theatre to attract world-class cultural events and establish

connections with Kennedy Center, Arena Stage, etc.

• Apply sustainability principles and goals as per EO13514 (GHG)

• Aim for the “Living Building Challenge” for overall campus sustainability

• Link the campus to renewable energy sources – solar, wind & green

Review Community CommentsReview Community Comments

Page 8: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

77

Summary of Community Comments

Review Community CommentsReview Community Comments

• Offer senior citizens to audit classes or reduced tuition for continuing

education

• Managing the impact of temporary student housing on local residents

Page 9: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

88Review Review MasterplanMasterplan Framework Framework

8 Chapters & 5 Elements

• Introduction

• Campus Plan Overview

• Existing Campus Conditions

• Plan Elements

- Campus Growth Element

- Transportation Element

- Sustainability Element

- Community Relations Element

- Campus Character Element

• Appendix

Master Plan Framework

Page 10: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

99Review Review MasterplanMasterplan Elements Elements

UDC / Community Goals

• Establishing a Flagship Presence

• Facilities supporting curriculum needs

• Reinforcing Sustainability

OP Comp Plan Goals

• Policy EDU 3.1.1 – Sustaining and Advancing UDC

• Policy EDU 3.1.2 – Strengthen Training and Career Programs

• Policy EDU 3.2.1 – University Partnerships

• Policy EDU 3.2.2 – Corporate Citizenship

• Policy EDU 3.3.4 – Student Housing

Campus Growth Element

Page 11: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Review Review MasterplanMasterplan Elements Elements 1010

Van Ness Campus Population

• Historically campus design was to accommodate 15,000 students

• Current Student Headcount 3183 Van Ness Campus, 2672 CCDC

• Trend tending over time towards:

- Proportionately more full time students

• Projected maximum future enrollment by 2020:

- 10,000 Full Time Equivalent (15,000 Head Count)

Van Ness Campus Facilities

• Campus growth within current footprint

• Curriculum growth supported by academic facility utilization

• On campus residential facilities

Campus Growth Element

Page 12: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Review Review MasterplanMasterplan Elements Elements 1111

Residential Facilities on Van Ness Campus

Program

• 600 students

• 2 buildings with 7 floors each

• A mix of room types generating an average of 360 SF / bed space

Location

• 3 Location / Configuration Options under evaluation

• Selection criteria:

- adjacency to academic core

- future expansion

- least impact on neighbors

Campus Growth ElementOption 1

Option 2

Option 3

Page 13: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Review Review MasterplanMasterplan Elements Elements 1212

Student Center on Van Ness Campus

Program

• Envisioned as an Activity Hub of student services and community resource

• Gross area of 170,380 SF including bookstore, retail and dining, community

spaces and meeting rooms

Location

• 3 location options under evaluation

• Selection criteria:

- visibility

- accessibility / connectivity

- cost

- community benefit

Campus Growth ElementOption 1

Option 2

Option 3

Page 14: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Review Review MasterplanMasterplan Elements Elements 1313

Goals

• DDOT & OP Comp Plan Goals

- T-2.1 Transit Accessibility

- T-2.2 Multi-modal Connections

- T-2.3 Bicycle Access, Facilities & Safety

- T-2.4 Pedestrian Access, Facilities & Safety

- EDU 3.3.5 Transportation Impacts of Colleges

& Universities

• CAPA Goals

- Pedestrian safety

- Pedestrian accessibility

- Pedestrian environments

Transportation Element

Page 15: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Pedestrians & Bikes

• Establish / improve Sidewalks and Building Entrances along

determined Pedestrian Desire Lines

• As per CAPA study for Connecticut Avenue Corridor, introduce:

- pedestrian oriented streetscape / signage

- defined pedestrian zones within R.O.W

- traffic calming measures

- enhanced visibility for motorists and pedestrians

• Enhance tunnel connection across Connecticut Avenue

• Support Capital Bike Share program established at the Metro Station

• Potential for establishing a Bike Station that includes bike parking,

equipment sales and on site bike mechanic

Transportation Element

Review Review MasterplanMasterplan Elements Elements 1414

Page 16: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Metro & Buses

• Consider monetary incentives to encourage metro use by

providing employees with pre-tax SmartBenefits

• Introduce amenities such as shelters, benches, route maps,

real time bus location information, etc.

• Upgrade bus stops along Connecticut Avenue to improve

conditions for waiting passengers

Transportation Element

Review Review MasterplanMasterplan Elements Elements 1515

Page 17: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Cars & Trucks

• Consider carpooling and vanpooling by provision of ride matching

services on UDC’s transportation website / preferred parking

• Consider free or partially subsided Capitol Bikeshare and/or Zipcar

memberships as an incentive / reward to reduce parking needs

• Car Sharing program established near campus to be continued and

expanded (Zipcars)

• Introduce parking disincentives to manage parking demand and the

associated traffic impacts

• Study service vehicular access requirements

Transportation Element

Review Review MasterplanMasterplan Elements Elements 1616

Page 18: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Goals

• OP Comp Plan Goals

- E-1.1 Conserving and Expanding Our Urban Forest

- E-2.1 Water Conservation & E-2.2 Energy Conservation

- E-3.2 Promoting Green Building

• District Green Building Legislation

- Minimum LEED Silver rating for new buildings

• UDC / Community Goals

- Sustainability Task Force

Sustainability

Academics

& Research

Facilities &

Cooperation

Outreach &

Organization

Sustainable Service

Learning Projects in

the DC Community

Cam

pus-

base

d

Res

earc

h

Research

Partnerships

Campus Greening

Projects

Review Review MasterplanMasterplan Elements Elements 1717

Page 19: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Energy, Water & Climate

• Energy Efficiency and Renewable Energy

- Lighting

- HVAC (District System)

- Energy Sources (solar, wind)

• Water Management

- Potable Water

- Non Potable Water

- Storm Water

• Greenhouse Gas Management

Sustainability

Review Review MasterplanMasterplan Elements Elements 1818

Page 20: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Campus Facilities

• Campus Buildings

- District Green Building Regulations

- Green Roof Program

• Open Space

- Tree Canopy Preservation

- Smart Landscapes

Sustainability

Review Review MasterplanMasterplan Elements Elements 1919

Page 21: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Campus Operations

• Material Flows

- Procurement

- Food Production (locally grown & prepared –

DC Central Kitchen contract with Fresh Start)

- Asset Management

- Waste Management, Recycling & Composting

Sustainability

Review Review MasterplanMasterplan Elements Elements 2020

Page 22: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Goals

• OP Comp Plan Goals

- EDU 3.3.A University-Community Task Force

• UDC / Community Goals

- Engage Community in Policy Development

(Sustainability Task Force)

- Build Local Political Support

- Build Federal Support

- Enhance Marketing & Advertising

(online publications, cable channel, re-branding)

Community Relations

Review Review MasterplanMasterplan Elements Elements 2121

Page 23: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Communications

• Intra-university Dialogue/Coordination

- Consortium of Universities of the

Washington Metropolitan Area

• Community / University Dialogue

- University Community Task Force

(Friends of UDC)

- Communication Tools

(Web / Social Media, Event Board,

Electronic Marquee)

Community Relations

Review Review MasterplanMasterplan Elements Elements 2222

Page 24: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Educational Partnerships

• Service Learning (Sustainability)

• Continuing Education

• Online Education

• University Partnerships with Neighboring Educational

and Cultural Institutions

Community Relations

Review Review MasterplanMasterplan Elements Elements 2323

Page 25: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

University Neighbors

• Cultural Events

- Jazz Alive

• Sports & Recreation

- Natatorium

- Tennis Courts

• Community Events & Resources

- Farmers Market

- Community Gardening

• Media Programming

Community Relations

Review Review MasterplanMasterplan Elements Elements 2424

Page 26: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Goals

• OP Comp Plan Goals

- UD 1.4.1- Avenues / Boulevards & Urban Form

- UD 2.1.4 - Architectural Excellence

- UD 2.2 - Designing for Successful Neighborhoods

- UD 3.0 - Improving the Public Realm

• UDC / Community Goals

- Express the Flagship Identity of the Van Ness Campus

- Improve the overall appearance and character of campus

(within Capital Budget Boundaries)

- Connect Community & Campus Population

- Utilize the campus to activate Connecticut Avenue

Campus Character

Review Review MasterplanMasterplan Elements Elements 2525

Page 27: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Place Making Elements

• Campus Identity

- Buildings, Signage & Spaces

- Campus & Connecticut Avenue Interface

- Public Realm

• Campus Perimeter

- Campus Entrances

- Campus Boundaries

• Campus Commercial District

- Mixed-use

Campus Character

Review Review MasterplanMasterplan Elements Elements 2626

Page 28: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Architectural Expression

• Aesthetics & Maintenance

- Building Appearance

- Service Areas

• Urban Design

- Connecticut Avenue

• Graphics & Wayfinding

- Campus Experience

Campus Character

Review Review MasterplanMasterplan Elements Elements 2727

Page 29: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

2828Next Steps Next Steps

Community Meeting #1

Introduction

Community Meeting #5

Community

Input onMasterplan

Community Meeting #2

Identify

Community

Issues

Community Meeting #3

Planning

Framework for Community

Issues

CommunityMeeting #4

Community

Input

on Draft Plan

October 19 November 3 December 8

Time Line

January 15

Page 30: Van Ness Campus UDC Community Meeting 3 2010-12-8files.udc.edu/docs/facilities/Microsoft PowerPoint...Dec 08, 2010  · Receive Final Approval Community Meeting #2 Identify Community

Thank You

2929

Community Open House # 4

Draft Masterplan Plan Presentation

Date - 15 January 2011, Saturday

Time - 10:00 am

Location - Campus Auditorium, Building 44 East

Next Steps Next Steps