7 Design of underwater embankment of soft soil W.F. Van Impe & R. D. Ver´ astegui Flores Laboratory of Geotechnics, Ghent University, Belgium J. Van Mieghem Maritime Access Division, Ministry of Flanders, Belgium 7.1 Overview The present chapter illustrates the design of the underwater sand embankment on soft soil (dredged material). The water depth to the sediments level is about 20m. As detailed in the previous chapter, the soil profile at the site consists of an upper soft layer overlying sand and a deep tertiary clay layer. Several alternatives have been evaluated. More details one these alterna- tives can be found elsewhere (Ver´ astegui, 2001). Figure 7.1 illustrates a scheme of each of the options already studied: Alternative A: The embankment implements full improvement at the toe of the slope on the open river side while no improvement is specified for the toe at the dry dock side. Alternative B: The embankment comprises full improvement at the open river side and partial improvement at the dry dock side. Alternative C: In this configuration, the geometry slightly changes, partial improvement of the soft material is considered on both toes. Alternative D: The embankment has the same configuration as Alternative C except for the absence of improvement at the toe on the dry dock side. Alternative E: All the soft material is removed and the sand embankment is directly founded on the Boom clay (figure 7.1). Technically this could be qualified as a good solution, however, one must take into account that the removal and new disposal of huge volumes of dredged material may be a serious environmental issue. The characteristics of the problem and the conditions of the foundation soil demanded improvement of the foundation (by deep mixing techniques) soil on the one hand and construction in stages on the other hand in order to prevent early instability. Moreover, restrictions imposed on the total time of construction led to adopt extra reinforcement elements such as geotextiles in the embankment body.

description

van-impe

Transcript of van-impe

  • 7Design of underwater embankment of soft soilW.F. Van Impe & R. D. Verastegui FloresLaboratory of Geotechnics, Ghent University, Belgium

    J. Van MieghemMaritime Access Division, Ministry of Flanders, Belgium

    7.1 Overview

    The present chapter illustrates the design of the underwater sand embankmenton soft soil (dredged material). The water depth to the sediments level is about20m. As detailed in the previous chapter, the soil profile at the site consistsof an upper soft layer overlying sand and a deep tertiary clay layer.

    Several alternatives have been evaluated. More details one these alterna-tives can be found elsewhere (Verastegui, 2001). Figure 7.1 illustrates a schemeof each of the options already studied:

    Alternative A: The embankment implements full improvement at the toeof the slope on the open river side while no improvement is specified forthe toe at the dry dock side.

    Alternative B: The embankment comprises full improvement at the openriver side and partial improvement at the dry dock side.

    Alternative C: In this configuration, the geometry slightly changes, partialimprovement of the soft material is considered on both toes.

    Alternative D: The embankment has the same configuration as AlternativeC except for the absence of improvement at the toe on the dry dock side.

    Alternative E: All the soft material is removed and the sand embankmentis directly founded on the Boom clay (figure 7.1). Technically this couldbe qualified as a good solution, however, one must take into account thatthe removal and new disposal of huge volumes of dredged material may bea serious environmental issue.

    The characteristics of the problem and the conditions of the foundationsoil demanded improvement of the foundation (by deep mixing techniques)soil on the one hand and construction in stages on the other hand in order toprevent early instability. Moreover, restrictions imposed on the total time ofconstruction led to adopt extra reinforcement elements such as geotextiles inthe embankment body.

  • 90 7 Design of underwater embankment of soft soil

    Boom clay

    Natural sand Dredged sludgeF.I.Sand embankment Sand Backfill

    Open river side Dry dock side

    Sand embankment

    Natural sand F.I.

    Sand Backfill

    Dredged sludge

    Boom clay

    Partial Improvement

    Partial ImprovementPartial Improvement Dredged sludge

    Boom clay

    Sand BackfillSand embankment

    Partial Improvement

    Sand embankment

    Boom clay

    Dredged sludgeSand Backfill

    Sand embankmentSand Backfill

    Dredged sludge

    Boom clay

    a) Alternative A

    b) Alternative B

    c) Alternative C

    d) Alternative D

    e) Alternative E

    Fig. 7.1. Previously studied design options