Eventuele voettekst 1 29 September 2015 (public) Procurement Circular Procurement Cuno van Geet Senior policy advisor Sustainability Circular Economy 2 The Netherlands 16.930.437 Inhabitants (28 sept 2015) 41.526 km2 393 Municipalities 22 water boards 12 provinces 1 national government 50-60 billion public procurement

Transcript of van Geet 2015 09 28 Closing the loop Brussels (2)...

Page 1: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 1

29 September 2015

(public) Procurement

Circular Procurement

Cuno van Geet

Senior policy advisor

Sustainability

CircularEconomy

2

The Netherlands

•16.930.437 Inhabitants

(28 sept 2015)

•41.526 km2

•393 Municipalities

•22 water boards

•12 provinces

•1 national government

•50-60 billion public procurement

Page 2: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 2

3

320 March 2014

3 10-05-2012

Rijkswaterstaat

Main road network3102 km

Main waterways8000 km

Main watersystem 65000 km2

founded in 1798

4

420 March 2014

Page 3: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 3

5

5

+

=?

6

Sustainability inProcurement policy

Page 4: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 4

7

Green Public Procurement as driver(showing % of green contracts)

Green PublicProcurement

8 20 March 2014

Public procurementFacilities

Page 5: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 5

9 20 March 2014

Construction

10

Production

Sell

Use

End of 1st use

Recycling

Material

CircularProcurement

Design for Reuse, Recycling, Refurbish, …

PROCUREMENT

REPAIRMAINTAIN

DURABILITYREFURBISH

RE-USE

Sustainable sourcing/materials

Recycling for design

WASTE CONTRACTS

Page 6: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 6

11

1. Green DealCircular Procurement1. Green DealCircular Procurement

38 public and private procuring partners

2 pilots, Share insights and experience

Discover and learn together

Unique cooperation between public and private sectorExperience from 76 pilots

38 public and private procuring partners

2 pilots, Share insights and experience

Discover and learn together

Unique cooperation between public and private sectorExperience from 76 pilots

2. REBUS, EU Life+ funding (2013-2016)Resource efficient business models

30 pilots (supply & demand)

2. REBUS, EU Life+ funding (2013-2016)Resource efficient business models

30 pilots (supply & demand)

Sustainable PublicProcurement

3. UNEP, 10YFP SCP working groupCases, technical report, training3. UNEP, 10YFP SCP working groupCases, technical report, training

12

Page 7: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 7

13

14

Waste contracts

Confidential documents

Waste contracts

Confidential documents

Page 8: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 8

15

Confidential documentsConfidential documents

Central GovernmentTotal costs of disposal confidential documents: - € 750.000

Change: Selling waste

- High quality 100% clean white paper= raw material for new white paper

- guarantee of confidential disposal

Total income on disposal of white paper: + € 750.000

Earnings: + € 1.500.000

16

Textiles

• Defense/Public sector, 85.000 customers, 22M/yr, 1200 types of clothing

(National Police, 60.000 customers , Fire Fighters 28.000 customers, Parking & Traffic Police, 30.000 customers)

• Burning: ≈ - 500.000/yr

• Selling (expected) +750.000

Asking for recycled content, towels

Hospital Utrecht, 67.000 employees: White corporate wear, protective clothing

Construction: Personal protectiionequipment

Page 9: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 9

17

Office interior design

Furniture

Floor Coverings

Office interior design

Furniture

Floor Coverings

18

Railroad traffic centre- Utrecht- furniture & carpeting, just one floor- Leasing only if cleaning is included

Utrecht Hospital: 1 M€ /yearExpected big win: start with inventory of existing furniture for reuse and refurbishment

Province of Utrecht, City of Amsterdam, Amersfoort

Office Furniture + floor coverings

Page 10: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 10

19

2. ICT

hardware

2. ICT

hardware

20

ICT hardwareICT hardware

Reuse: National IT (Ministry of Finance)Total costs for shreddering IT: - € 25 /PC- Software for data wipe (Blancco)- Selling for reuse, refurbish, recycle + € 5 /PC

Earnings: + € 30 / PCExpected about 50.000 PC’s * 30 = € 1.500.000

ProcurementProvince of Utrecht, 800 working placesNational government framework contract 150.000 working places

Big win: Logistics/track & trace: extending life-time+ standardisation, cables, etc

Ecodesign impacts?

Page 11: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 11

21

Construction

City of Brummen

Town hall for 20 years

- Build for reuse,

- Resource passport

City of Amsterdam

- Reusing/leasing concrete elements / bricks (expected)

22

Circular =

• Not difficult, just start doing it

• New ways in cooperation, also in EU, National & Local policy

• Starting from practise

• Focus on local, regional, companies

Page 12: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 12

23

What is needed?

• Facilitating, knowledge management

• Cooperation and cutting the red tape

• Public – Private cooperation: we need more partners on board for the whole chain

24

Sources and invitation

• ProcuraPlus, conference 11/12 Nov Barcelona, http://www.procuraplus.org

• Netherlands 21/22 April 2016

• UNEP working group, training

[email protected]

Page 13: van Geet 2015 09 28 Closing the loop Brussels (2) [Read-Only]cor.europa.eu/en/events/Documents/enveclosingtheloop/van Geet 2015... · 8 20 March 2014 Public procurement ... Share

Eventuele voettekst 13

25

Netherlands• https://www.pianoo.nl/public-procurement-in-the-netherlands

EU• Public Procurement EU: http://ec.europa.eu/growth/single-market/public-procurement/index_en.htm

• Green Public Procurement EU: http://ec.europa.eu/environment/gpp/index_en.htm

• Resource Centre ICLEI, http://www.sustainable-procurement.org/

• Public Procurement forum EU: https://procurement-forum.eu

• Ecolabel: http://www.europeesecolabel.nl/28/home.html

• Public International cooperation on procurement:

Global / UNEP• Programma SPP UNEP:

http://www.unep.org/10yfp/Programmes/ProgrammeConsultationandCurrentStatus/Sustainablepublicprocurement/tabid/106267/Default.aspx

• And the UNEP clearing house with publications: http://www.scpclearinghouse.org/c/5-sustainable-public-procurement/e-library.html

• Standards and labels: http://www.isealalliance.org/

• OECD Procurement Toolbox http://www.oecd.org/governance/procurement/toolbox/

• World Trade Organisation: https://www.wto.org/english/tratop_e/gproc_e/gp_gpa_e.htm

More Sources

26

You don't have to see the whole staircase,just take the first step.

Martin Luther King

You don't have to see the whole staircase,just take the first step.

Martin Luther King