URBAN INFRASTRUCTURE: FULLING ECONOMIC DEVELOPMENT AND ADAPTING TO CLIMATE CHANGE
Gabriel Nagy Development Advisor and International Consultant Architect M.Sc.. PMP. Planning and Urban Economics
Quito, May 23, 2016
FINANCIAL MECHANISMS and VALUE CAPTURE STRATEGIESFUNDING and DELIVERING URBAN TRANSFORMATION PROJECTS (INTEGRATED AND
COMPREHENSIVE URBAN OPERATIONS)
1
Alternative delivery model (PPP) delivering goods, services and urban social infrastructure
![Page 2: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/2.jpg)
Index
Urban Transformation Projects (UTP) Concept Financial instruments
Land Value Capture Concept Land Value Capture Strategies Municipal Payout Structure
Project Integrator and Land Readjustment: An Alternative to Land Acquisition for Land Assembly UTP General Structure and Governance
Delivery Models Alternative Supply Model: Public Private Partnership (PPP) PPP regulatory framework and processes ( Colombia ) PPP Best Practices
Action Plan Disclaimer
2
![Page 3: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/3.jpg)
Urban Transformation Projets UTP “TRANSFORMING CITIES has to do with not only their physical features but also
psychological, cultural, and many other factors.”
“Urban acupuncture is an approach to city planning design to make things happen. Don’t start with everything, start somewhere, make things happen, try it out.”
“Just as good medicine depends on the interaction between doctor and patient, successful urban planning involves triggering healthy responses within the city, probing here and there to stimulate improvements and positive chain reactions. Intervention is all about revitalization, an indispensable way of making and organism function and change.”
“Sometimes, a pinpoint urban project leads to broader cultural changes…”
“…sometimes, a simple, focused intervention can create new energy, demonstrating the possibilities of a space in a way that motivates others to engage with their community.”
“One feature common to all good urban acupuncture is the imperative of preserving or restoring the cultural identity of a place or a community.”
Urban Acupuncture by Jaime Lerner
3
![Page 4: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/4.jpg)
Concept Urban Transformation Projets UTP
Assembling developed or underdeveloped land
Increase supply of environmental goods, transport infrastructure , housing and urban services
innovative supply models with greater private sector participation
4
![Page 5: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/5.jpg)
Why Cities Need Urban Transformation Projects?
Manage and control urban sprawl Provision of infrastructure Management densities and public space
Fiscal Sustainability Strengthening local tax base Increasing or retaining local jobs Local economic development Systems and GIS
Social sustainability Improving connectivity for people, places , destinations and means Building social housing Building community facilities safer communities Infill development projects
5
![Page 6: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/6.jpg)
Why Cities Need Urban Transformation Projects?
Environmental sustainability Generating environmental protected areas Addressing environmental issues Mitigating natural hazards Resilience Greenfield development
Sustainability infrastructure and services Building infrastructure Building utilities and basic services Recovering and preserving architectural heritage Systems and GIS
6
![Page 7: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/7.jpg)
Medellin, Colombia
7
![Page 8: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/8.jpg)
Medellin, Colombia
8
![Page 9: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/9.jpg)
Medellin, Colombia
9
![Page 10: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/10.jpg)
Medellin, Colombia
10
![Page 11: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/11.jpg)
Medellin, Colombia
11
![Page 12: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/12.jpg)
Medellin, Colombia
12
![Page 13: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/13.jpg)
Medellin, Colombia
13
![Page 14: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/14.jpg)
Bucaramanga, Colombia
14
![Page 15: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/15.jpg)
Bucaramanga, Colombia
15
![Page 16: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/16.jpg)
Bucaramanga, Colombia
16
![Page 17: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/17.jpg)
Quito, Ecuador
17
![Page 18: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/18.jpg)
Quito, Ecuador
18
![Page 19: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/19.jpg)
Quito, Ecuador
19
![Page 20: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/20.jpg)
General Benefit Financial Instruments *
The general public is the beneficiary and financer of urban transformation projects
Instruments:
Subsidies (transport , housing, energy)
Property Tax
Climate Change related instruments
Note: Sustainable Urban Transport Financing from the Sidewalk to the Subway http://dx.doi.org/10.1596/978-1-4648-0756-5 20
![Page 21: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/21.jpg)
Financial instruments Direct Benefit
Benefits received by an specific group
Instruments:
Rates ( parking, congestion , transportation ) tolls
Expense , Licenses , Assignments and Rights (utilities , roads , construction)
Taxes and surcharges (vehicle , distance , fuel , housing, area)
21
![Page 22: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/22.jpg)
Indirect Benefit Financial Instruments
Benefits charged to players who receive indirect benefits from urban transformation projects investment
Instruments:
Exclusive negotiation rights / concessions
Advertising and urban furniture
Employer contributions ( ' subsidies ' private sector)
22
![Page 23: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/23.jpg)
Land Value Capture Concept
Incorporation of rural land to urban sprawl floor , or consideration of rural land as suburban .
rezoning
The authorization of a better use of use of the building , either by raising the occupancy rate or the rate of construction, or both at once .
Public investment in goods and services.
Increase in private
property value
23Note: Utilizing Value Capture for Transportation Funding. SB Friedman Development Advisors. http://www.sbfriedman.com
![Page 24: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/24.jpg)
Land Value Capture Strategies
Value capture comprise several mechanisms that have the same concept but with important differences in the design and implementation base.
The fundamental principle behind the recovery strategies of capital gains is that those who benefit from improvements through Urban Transformation Projects (whether or not users one or more service) must pay the respective investments.
24
![Page 25: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/25.jpg)
Land Value Capture Strategies
Land Value/Betterment Levies Tax Incremental Finance - TIF Special Assessment Participation in Capital Gains Utility Fees including transportation Acquisition and sale of land under specific conditions Land readjustment schemes Development impact fee Land banks Negotiated exactions Joint development Construction and air rights Rezoning
25Note: Utilizing Value Capture for Transportation Funding. SB Friedman Development Advisors. http://www.sbfriedman.comNote: Sustainable Urban Transport Financing from the Sidewalk to the Subway http://dx.doi.org/10.1596/978-1-4648-0756-5
![Page 26: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/26.jpg)
RECEPTORS
Fig. 1 Land Value Capture Financing Mechanism
GENERATORS
Land Value Capture Strategies Land Value Capture Financing Mechanisms
Land Value Taxes/betterment levies Acquisition and sale of land under specific conditions
Joint development Construction and air rights
Tax increment financing Land readjustment schemes
Rezoning
Special assessment Development impact fee
Utility fees including transportation Land banks
Participation in Capital Gains Negotiated exactions
26
![Page 27: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/27.jpg)
Land Value Capture Strategies
27
![Page 28: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/28.jpg)
Land Value Capture Strategies
28
![Page 29: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/29.jpg)
Land Value Capture Strategies
29
![Page 30: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/30.jpg)
Municipal Payment Structures
Disbursements Debt instruments Compensation funds Construction and Development Rights Participation of Capital Gains Promissory notes Bonds Property Taxes such as the Socio-Economic Stratification Representative titles of Rights Construction TIF
30
![Page 31: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/31.jpg)
Land Integrator (Single Purpose Vehicle)
Conduct Proactive Pre-Development Allows early negotiations on Master Plan and Zoning Activities Predictability of cost and time Economies of scale Performance -oriented efficiency due to their obligation to reward shareholders VxD commitment during the project Leverages on and maximizes limited local resources Captures financial and management capacity facilitates investment Municipality maintains influence Efficiency and lower costs in hiring Generates high residual value
31
![Page 32: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/32.jpg)
GOODS AND SERVICES – SOCIAL INFRASTRUCTUREDELIVERY/SUPPLY MODELS
Land Bank and Urbanism Goods and Services
Deliverables Advantages Model Model Advantages Deliverables
lands Urban works Capital Gains Rights
Predictability of cost and time
VxD commitment during the project
Maximize limited local resources
Capture financial capacity and management of the private sector
It facilitates investment
The municipality maintains influence
Efficiency and lower costs in hiring
Generates high residual value
INTEGRATOR PARTNERSHIPS Collaboration between the public and private sector
Greater assurance that the projects go forward
Health Education Housing Roads Infrastructure Others
Private Developer Scheme
Competitive Partnership
Local Funds Contributions
Incremental Partnership
Private Finance Traditional Public Procurement
32
![Page 33: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/33.jpg)
33
Contratista
Monitoring & Evaluation
Fiduciary
XXXXXXXANIFDN
FINDETER
Shareholder
Shareholder
Shareholder
Shareholder
INCOME
CONTRIBUTIONS
CONTRACTS PAYMENTS
Fig. 3 General Structure – Land Assembly and Urbanization
PTU’s General Structure and Governance
DEBT
DevelopersLots for saleRightsInstruments Direct BenefitIndirect Benefit instruments
MoneylenderLoans and grands from international organizationsClimate Change related instruments
Integrator(Single Purpose Vehicle)URBAN TRANSFORMATION
PROJECT
Land managementMaster Plan and ZoningStructuring project:Pre -feasibilityFeasibility
PAYMENTS
![Page 34: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/34.jpg)
Real Estate Integration (Land Readjustment)Private Initiative in Private and Public Lands
Land Status Valor M2 Area M2 Total Land Value
Input land 100 USD 1000 100,000 USD
Post-development land 200 USD 600 120,000 USD
Compensation + landowner - Municipality 20,000 USD
34
Land Value Capture - Example of Land ReadjustmentRedistribution by Relative Value Method
Note: Levering Land to Enable Urban Transformation. The World Bank. January 2013
![Page 35: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/35.jpg)
Real Estate Integration (Land Readjustment)Private Initiative in Private and Public Lands Centenial Road project
No early negotiations on Master Plan and Zoning No predictability of cost and time
Centenial Road project Early negotiations on Master Plan and Zoning Predictability of cost and time
35
400 Ha988 Acre
![Page 36: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/36.jpg)
Soacha, Ciudad Verde, Colombia
36
![Page 37: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/37.jpg)
Soacha, Ciudad Verde, Colombia
37
![Page 38: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/38.jpg)
Real Estate Integration (Land Readjustment)Private Initiative in Private and Public Lands
38
Lot 11000 M210,764 square
feet
Lot 21000 M210,764 square
feet
Lot 31000 M210,764 square
feet
Lot 41000 M210,764 square
feet
Lot 51000 M210,764 square
feet
40% Negotiated exactions
20% Negotiated exactions
48%
80%
![Page 39: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/39.jpg)
Real Estate Integration (Land Readjustment)Private Initiative in Private and Public Lands
39
Lot 11000 M210,764 square
feet
Lot 21000 M210,764 square
feet
Lot 31000 M210,764 square
feet
Lot 41000 M210,764 square
feet
Lot 51000 M210,764 square
feet
40% Negotiated exactions
20% Negotiated exactions
48%
80%
Land Status Value M2 Net Area M2 Total Land Value
Case 1 200 USD 12,000 2,400,000 USD
Case 2 200 USD 20,000 4,000,000 USD
![Page 40: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/40.jpg)
Real Estate Integration (Land Readjustment)Private Initiative in Private and Public Lands
40
![Page 41: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/41.jpg)
Real Estate Integration (Land Readjustment)Private Initiative in Heritage Site
41
GENERATORS RECEPTORS
![Page 42: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/42.jpg)
Quito, Ecuador
42
![Page 43: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/43.jpg)
Quito, Ecuador
43
![Page 44: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/44.jpg)
Quito, Ecuador
44
![Page 45: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/45.jpg)
Public Private Partnership - PPP
economies of scale, performance -oriented efficiency due to their obligation to reward shareholders
regulatory flexibility
knowledge and extensive experience in complex industrial and commercial activities
combine safety and public sector commitment with the experience and efficiency of the private sector
It distributes the risks and responsibilities between the two parties , according to their capacity to manage them ( World Bank 2013 )
They are not a source of funding, but a way to raise funds
the benefit is general, therefore , who pays is the general public
45
![Page 46: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/46.jpg)
t1
t2t1
Long Term
30 yearsOPEXCAPEX
Short Term
Fig. 2 Law 80/93 and 1150/07 vs. Law 1508/12
30 yearsOPEXCAPEX
Short Term Long Term• RISKS• Operation• Accessibility• Maintenance• Exchange Rate• No payment leasing fee
Future Commitments
46
Public Private Partnership - PPP
RISKSLand AcquisitionDesignTechniciansPurchasesFinancingConstructionLegal
![Page 47: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/47.jpg)
Contractual Process Public and Private Initiative (Colombia)
47
![Page 48: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/48.jpg)
Processes and Timing – Prefeasibility (Colombia)
REGISTRO RUAPP
Registro (5 días)
48
![Page 49: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/49.jpg)
Processes and Timing – Feasibility (Colombia)
REGISTRO RUAPP
Registro (5 días)
Máximo 2 años
PUBLICACION SECOP
Dentro 6 meses desde concepto DNP y por 2 meses máximo 4
49
![Page 50: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/50.jpg)
Best Practices - Public Private Partnerships
Include all stakeholders in planning process
Set priorities Area of intervention Project Type
Set acquisition model
Identify resources and set timing Financial sources Other potential sources and mechanisms
50
![Page 51: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/51.jpg)
Best Practices - Public Private Partnerships Get to know all partners and stakeholders
Assess impact and benefits
Economic feasibility Market analysis Cash flow and projections extraordinary costs Public infrastructure included in private project public goods desired risks
Review financial ‘gap’
Measure risk, returns and income
Assess community goals
51
![Page 52: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/52.jpg)
Real Estate IntegrationPrivate Initiative in Public Lands
SUCCESSFUL DEVELOPMENT
Single Purpose Vehicle Fiduciary Agreement Master Plan Structuring Individual Infrastructure Projects
Address Development Readiness of Site Evaluate Proposal
Prepare Proposal - Feasibility Select
Prioritize and Choose Acquisition Model Unsolicited Proposal -
Prefeasibility
Solicit Proposals
Negotiate Agreement Conduct Community Review
52Note: Utilizing Value Capture for Transportation Funding. SB Friedman Development Advisors. http://www.sbfriedman.com
![Page 53: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/53.jpg)
DISCLAIMER
The opinion and recommendations in this document are exclusive responsibility of the author. This are the author’s notes on Housing Finance, Housing and Community Development issues.
This information sheet is not to be interpreted as an advertisement of a public offering. This briefing is being delivered on a confidential basis. Any reproduction or distribution in whole or in part, or the disclosure of its content, without a prior written content is prohibited and all recipients agree they will keep confidential all information contained herein and not already in public domain.
For more information please contact Gabriel Nagy at [email protected]
53
![Page 54: Value capture strategies and financial models](https://reader035.fdocuments.in/reader035/viewer/2022062412/58a4f4941a28abd8548b6e39/html5/thumbnails/54.jpg)
THANK YOU