V · BOQ nor tisfy himse wastage an ding wasta Quantities. ntractor. ll of Quanti ... ded in the...
Transcript of V · BOQ nor tisfy himse wastage an ding wasta Quantities. ntractor. ll of Quanti ... ded in the...
2
PROJEC
EMPLO
FUNDIN
DESIGN
DOCUM
DOCUM
REFERE
Docum
Issue
No.
1
2
3
Distribu
E
E
E
CT:
YER:
NG AGENCY
N CONSULT
MENT TITLE
MENT
ENCE:
ent Issue, S
Issue Date
02.01.2018
26.02.2018
07.03.2018
ution - Docu
Nam
Eng. MUKUKUM
Eng. MUKUKUM
Eng. MUKUKUM
DO
SUKH
Af
Y: Af
ANT: Co(E
: VoSc
Status and
Issue
Status
Final
Final
Final
ument has
e
MIRA, SNOTT
MIRA, SNOTT
MIRA, SNOTT
OCUMENT I
UDAN RELOHARTOUM -
frican Devel
frican Devel
onsortium Ngypt)
olume VIII –chedules
Approvals:
Document
by
Eng. Eman
Eng. Eman
Eng. Eman
been distri
P
P
P
SSUE CON
OCATION AN-SUDAN
opment Ban
opment Ban
Newtech Co
–Preamble,
:
Prepared
y
D
n Albadri E
n Albadri En
n Albadri En
buted to:
Title
Project Manage
Project Manage
Project Manage
Afr R
NTROL SHE
ND OUTFITT
nk
nk
onsulting G
Bills of Qua
Document Che
by
Eng. Shadia El S
ng. Iman Malik
ng. Iman Malik
Iss
er 02.
er 26.
er 07.
ican DevelopRelocation a
Preamble
EET
TING PROJE
Group (Suda
antities, & D
ecked A
Sayed Eng. S
Eng. S
Eng. S
ue Date
01.2018
02.2018
03.2018
pment Bank and Outfitting
to Bills of Qu
ECT - LOCA
an) / VitalKo
Day Work
Authorized for
by
Shadia El Saye
Shadia El Saye
Shadia El Saye
Versio
0
1
2
–Sudan g Project
uantities
ATION /
onzept
Issue
d
d
d
n
African
PART 1
PART 2
PART 3
Developme
PREA
BILLS
GRAN
BILL N
Bill No
APPE
SCHE
SCHE
SCHE
ent Bank –Su
AMBLE TO B
S OF QUANT
ND SUMMAR
NO. (0) – PR
o. (1) – SUDA
NDIX (A) TO
EDULE 1 – LA
EDULE 2 - BA
EDULE 3 – S
udan Reloca
BILLS OF QU
TITIES
RY.
ROJECT PRE
AN RELOCA
O BILLS OF
ABOUR.
ASIC MATER
UPERINTEN
ation and O
INDEX
UANTITIES
ELIMINARIES
ATION AND O
QUANTITIE
RIAL.
NDENCE.
Afr R
Outfitting Pro
S AND GEN
OUTFITTING
ES - PROJEC
ican DevelopRelocation a
Preamble
oject
ERAL ITEMS
G PROJECT
CT DAY WO
pment Bank and Outfitting
to Bills of Qu
S.
T.
RK SCHEDU
–Sudan g Project
uantities
ULE
PAR
RT 1: PRREAMBLE
E TO BIL
Afr R
LLS OF Q
ican DevelopRelocation a
Preamble
QUANTIT
pment Bank and Outfitting
to Bills of Qu
TIES
–Sudan g Project
uantities
1. Gen 1.1 This
Qua 1.2 Bills
TenDrawConConcom
1.3 As tchecmisu
1.4 It is
eacrespcomactuesca
1.5 It is
allowitem
1.6 Theshomusthe erro
1.7 The
ratetypeby tand
1.8 Prov
or in
1.9 TheDrawhigh
1.10 Whdocumeequipme
neral Princi
s Contract antities, and
s of Quantitderers, Gewings. Thes
ntractor’s rantract. The Cmply with the
this Contracck all Drawiunderstandi
the Contrach item in thponsibility f
mpleteness. ual quantitiealation.
s the Contrwances etc.
ms or incorre
e Contractoruld any be fst notify the Tender is s
ors in their of
e Contractor es associatee of works, sthe Enginee/or for the e
visional Sumn part at the
ese Preamblwings and Shlighting cert
here ever ments this is oent of simila
PR
ples
shall be a Specificatio
ties shall beneral and Pse documenates shall bContractor she aforesaid p
ct is a lump ings, Bills ofng of scope
ctor’s responhe quantity for the accIt is the co
es that is
ractor's res., against ea
ectly inserted
r is obliged found missiEmployer a
submitted. Nffer resulting
shall providd to the Lumshall be provr. Such ratestablishmen
ms (if applicadirection an
e clauses shSpecificationtain points.
anufacturer’only for indicar quality.
REAMBLE T
Lump Sumons.
e read in cParticular C
nts shall be be inserted hall not be eprovision.
sum contraf Quantities
e or missed i
nsibility to ccolumn of
curacy of tontractor resrequired to
sponsibility tach item in td rates shall
to check thng or duplicand or the E
No liability wg from failure
de together wmp Sum Itemvided before
es and breaknt of new rat
able), includnd discretion
hall be readn, and they
’s name for ative purpos
TO BILLS OF
m fixed pric
conjunction Conditions otaken as maccordingly
entitled for c
act, Contracand specifi
tems.
check the cothe Bills of
the quantitsponsibility t complete
to insert ththe unit rate be the sole
he number cated or the Engineer at
whatsoever we to comply
with the tenms. The dete the issuankdown mightes if found b
ded in the Bn of the Emp
d in conjunctshall not b
any equipmses and the
Afr R
F QUANTIT
ces contract
with these of Contract,utually explay against thclaims or var
tor to confirication. The
orrectness of Quantitiesies indicateto verify, chthe Works
he correct e column of e responsibil
of the pagefigures or wonce and h
will be accepwith the afo
ndered ratesailed breakd
nce of letter ht be used foby the Engin
ill of Quantitployer.
tion with thee considere
ment is menticontractor i
ican DevelopRelocation a
Preamble
TIES
t based on
Preambles,, Technical anatory of ohe full scoriations due
rm full scopeClient will n
f the quantits. Engineer ed in the heck and sa
including
rates, incluthe Bills of ity of the Co
es of the Biwriting indishave the mapted in resporesaid prov
s; the analysdown of rateof acceptanor the assesneer realistic
ties shall be
Conditions ed as exhau
ioned in Cons free to pro
pment Bank and Outfitting
to Bills of Qu
Drawings,
the InstrucSpecificatio
one another pe coveredto his own f
e after site not pay any
ties inserteddoes not tBOQ nor
atisfy himsewastage an
ding wastaQuantities.
ontractor.
ill of Quantitinct, the Coatter rectifiepect of any cision.
sis/breakdowes, for each nce all uponssment of vc.
e expended
of Contractustive but m
ntract ovide alterna
–Sudan g Project
uantities
Bills of
ctions to ons and r and the d by the failure to
visit and y cost for
d against take any to their
elf to the nd price
age and, Omitted
ities and ontractor d before claim for
wn of the different
n request ariations
in whole
t, Tender merely as
ative
2. Met
TheMeaInstSW
Thepaypay
3. Unit
All uexce TheInte
Ab
mm
cm
m
m²
m³
kg
T
nr/
LS
Hr
wk
US
BS
AS
Min
Ma
Qty
DW
dia
Sp
HV
thod of Mea
e Bills of Quasurement (itution of C1P 3AD, Un
e Method of ment only. Ament less de
ts of Measu
units of meaept where o
e metric terrnational Sy
bbreviation
m
m
²
/no.
S
k
SD
S
STM
n.
ax.
y.
WG.
a. or ϕ
pec.
VAC
asurement
uantities hav(Internationa
Chartered Snited Kingdo
MeasuremeAs the contreduction spe
urement an
asurement sther units ar
ms and symystem of Uni
ve been preal) for Worksurveyors, 1m, amended
ent describeract is Lumpecified in co
d Abbrevia
hall be basere specifical
mbols occuits (French:
Definition
millimeter
centimeter
linear mete
square me
cubic mete
kilogram
Ton
number
Lump Sum
Hour
Week
United Sta
British Sta
American
Minimum
Maximum
Quantity
Drawing(s
Diameter
Specificati
Heating, V
epared genes of Constru2 Great Ged to suit loca
ed for the pp Sum the reontract.
tions
ed on the Mely mentione
urring in theSystème Int
n
r
er
eter
er
m
ates Dollar
ndard
Society for T
)
on
Ventilation an
Afr R
erally in accuction, Juneeorge Streeal practice a
purpose of cemaining co
etric Systemd for standa
e Contract ternational d
Testing and
nd Air condi
ican DevelopRelocation a
Preamble
cordance we 1979, pubet, Parliameand condition
checking of ontract balan
m of weightsard products
Documentsd'Unités) SI
Materials S
tioning
pment Bank and Outfitting
to Bills of Qu
ith the Princblished by thent Square, ns.
Contractor’snce will be w
and measu.
are basedSystem.
Standards
–Sudan g Project
uantities
ciples of he Royal
London
s interim with final
urements
d on the
4. Des
DesneceandBills ConinseincluagaThe AnyEng Unleinclulengor th
5. Mat
All mEngman
Exeava
Itemtakeappequsubtype
6. Pric
TheandandWorthe Rate
a)
b)
scription of
scription of essarily rep drawings fo
s but shall be
ntractor has erted by theuded in theinst any item
e Contractor
y discrepancgineer prior t
ess otherwisuding cuttinggths, circulahe execution
terial and Ex
materials usgineer appronufactured a
ecution also ilable comm
ms that contaen as indicaroval, the Civalent qualmit a descri
e and addres
cing Genera
e Contractor rates insert all items nrks. And whrates and pr
es shall inc
Guarantees All expenseelse stipulat
Items
work and eated in theor this informe held to ap
to insert pre Contractore remainingm in the Bilshall submi
cy betweento tender su
se describeg and fittingr work, and n of the Wor
xecution
sed are to beoval, and of according to
is subject tomon practice
ain materialsation of whaContractor mity of the spption and/orss of Manufa
ally
shall satisfyted shall be necessary foere no ratesrices entere
clude but no
s, bonds, an
es required fted in the Co
materials e Bills of Qumation. Tradply througho
ice against r against ang items elsels of Quantt only one o
the contrabmittal, whic
ed, descriptiog, notching,
the like as rks.
e of the bestdurable natapproved S
o approval oin engineer
s/products oat will be remay, at his pecified matr drawings sacturer, etc.
y himself asdeemed to or the props are providd for the rela
ot be limite
d warranties
for insurancontract;
given in thantities. Refde preambleout the Docu
each item ony item of wewhere. Coities. Such
offer as per t
act documench shall be c
on shall beforming or shown on D
t new availature, guaranStandards.
of Employerring at the tim
of special mquired. Subdiscretion, oterials is guashowing all ., of the mat
s to the meacover all his
per construcded, the cosated items o
d to:
s except wh
ce of the Wo
Afr R
he Specificaference shaes are not numents.
of work indicwork, it shalontractor shoinclusion matender docum
nts shall beclarified as a
deemed tocutting holeDrawings, o
able and subnteed, not lia
r and or the me of execu
ake with nabject to the offer similararanteed. Intechnical coerials offere
aning of eves contractuaction, complst shall be dof Work.
ere else stip
orks and Co
ican DevelopRelocation a
Preamble
ations and all be made necessarily r
cated in thell be considould not inay subject tments.
e brought toaddendum.
o include foes, chasing, r required b
bject to the Eable to any
Engineer aution.
mes of manEmployer a
r products on this case, onditions, ched as alterna
ry item in thal obligationsetion, and eemed to b
pulated in th
ontractor’s p
pment Bank and Outfitting
to Bills of Qu
Drawings to the specirestricted to
BOQ. If noered as covsert "Not Inthe bid for r
o the notice
r all sundryangles, end
by the Speci
Employer anbase excha
nd shall be
nufacturers aand or the Eof other mathe Contrac
haracteristicsatives.
he Bills of Qs under the maintenance distributed
e contract.
plant, excep
–Sudan g Project
uantities
are not ifications
o specific
o price is vered or ncluded" rejection.
e of the
y labours ds, short ifications
nd or the ange and
the best
are to be Engineer ke if the
ctor shall s, make,
Quantities Contract
ce of the d among
pt where
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
p)
Fees requir Payment ofduties, harbother local cof incorpora Any local ta The cost of
The cost of The cost of and storage The cost of
The Contrac Engagemenquarters, aiany other ferecruitment Payment o(includingagtimekeepersleave, indeother incide
Rates shallprovision anshifting, altethe progresdisturbed. Tall costs ascharges andfor any erro Unit prices,installationscost of instacommission The Contraat different r The prices shall apply location andEngineer an
red for work
f all governbour wharfacharges or dating the sam
axes / duties
site service
survey equi
material, trae;
tests and re
ctor’s overh
nt of expatrr travel, insuee or duty a.
of wages agents, engins, clerks, mmnities, bon
ental paymen
l also includnd use of alering and adss of the WThe unit ratessociated wd on-costs o
or or misunde
, for mechas, included aallation, fixinning;
ctor is to enrates.
and rates ethroughout d, except whnd /or the Em
permits, exc
nment duesage and pordues applicame into the W
required to
s (water and
ipment and
ansportation
etests (if req
ead & profit
riate staff (urances, ind
applicable on
nd salariesneers, surveymechanics, enus, social nts pertinent
de for, but ll plant requdapting such
Works and rees shall be dwith the prepof whatever erstanding b
nical, electras part of thng, and re-fi
nsure that id
entered by tthe durationhere otherwmployer.
cept where e
, duties, feert dues, lanable on all pWorks.
be paid to t
d electricity
setting out;
n charges/ fe
quired);
;
if required) demnities, nn their salar
s for skilledyors, technicetc.), and fosecurity inst to the work
not be limiired for carr
h temporary emoving at deemed to iparation of nature. No c
by the Contr
rical, plumphe scope ofxing of all e
dentical item
the Contracn of the Con
wise provided
Afr R
else stipulat
es and chanding, quay lant and ma
the local aut
required for
ees, tools, e
including totices, leaveies, repatria
d and unskcians, geneor all officiasurances, inks.
ited to, all rying out theworks and pcompletion nclude for ththe final ac
claim for addractor in this
ing, drainagf this Contra
elements, tes
ms occurring
ctor against ntract to the d for, to any
ican DevelopRelocation a
Preamble
ted in the Co
arges, custoand storag
aterials impo
thorities;
r execution o
quipment an
their accomes, sickness
ation of expa
killed laboural and otheal holidays ncluding all
temporary we works in itplant as mayand making
he cost of pccount, all oditional paym
s respect.
ge system, aact, are deesting, retest
in separate
items in theexecution o
y additional w
pment Bank and Outfitting
to Bills of Qu
ontract.
oms or othege charges orted for the
of the job).
nd plants, ha
mmodation ases, incomeatriates to co
r, supervisoer foremen, gand vacatioremunerati
works requits proper sey be requireg good any
preparing theother estabment will be
and instrumemed to incting (if requi
e bills are no
e Bills of Qof these itemwork ordere
–Sudan g Project
uantities
er import and any purpose
andling,
and food e tax and ountry of
ory staff gangers, ons, sick ons and
ired, the equence, ed during y surface e tender,
blishment e allowed
mentation clude the red) and
ot priced
Quantities ms in any ed by the
q)
r)
7. Day
7.1
WorEngSchDayitem 7.2
In clabopartexclworThemea
Theemp1: LCon
7.3
Thefor detaMatove
The prices afire alarm maintenanc The rates Payments.
ywork Sche General rk shall not
gineer. The edule attac
ywork instrum of daywork
Daywork L
calculating pour will be rticular item luding mealk ordered by
e time of gasured but n
e Contractorployed on daLabour, togentractor’s ove
a) The basnot limitsubsistebenefitspayable
b) The addcosts inoverheatimekeelighting,stores, staff, foforegoin
Daywork M
e Contractor materials foailed in the terials, togetrhead charg
and rates shsystem, do
ce of any suc
inserted wil
edule
t be executContractor
ched to the cted by thek.
abour
payments dureckoned fro
of daywork breaks andy the Engineangers (ch
not the time
r shall be eaywork, calcether with anerheads and
sic rates for ted to) the ence allowas in accordae in local cur
ditional percncurred undads, superineping, and c, and poweportable poworemen, andng.
Materials
shall be enor which the
foregoing), ther with anges and prof
hall include oor access ch equipmen
ll be used
ted on the r shall hav
Tender Do Engineer.
ue to the Com the timek to the timd rest perioeer and for warge handsof foremen o
entitled to culated at thn additionald profit, as d
labour shalamount of nces, and a
ance with thrrency only.
centage payder (a) abovntendence, clerical and
er; the use wer tools, md other sup
titled to paye cost is inc
at the basn additionafit, as follows
maintenanccontrol …
nt during de
to determin
Daywork be entered ocuments; sNominal qu
Contractor foe of arrival ome of returods. Only thwhich they as) actually or other sup
payment inhe basic rate percentage
described be
l cover all dwages paid
any sums pae country o
yment to beve shall be liabilities, a office worand repair
manual plantpervisory p
yment in rescluded in th
sic rates enl percentags:
Afr R
e of all equietc. The E
efect liability
ne the amo
basis excepbasic rates
such rates uantities hav
or the execuof the laboun to the or
he time of care competedoing work
pervisory per
n respect ofes entered be payment oelow:
irect costs tod to such laaid to or on bof Employer
e quoted by deemed to
nd insuranck, the use of staging
and tools, sersonnel, a
spect of mathe percentatered by hi
ge payment
ican DevelopRelocation a
Preamble
pment suchEmployer w
period.
unt of the
pt by writtens in the apshall apply
ve been ind
ution of dayr at the jobriginal placeclasses of laent to perfork with the rsonnel.
f the total by him in theon basic rat
o the Contrabour, transpbehalf of su’s law. The
the Contra cover the
ces and alloof consuma, scaffoldingsupervision and charges
erials used age additionm in the Dat on the ba
pment Bank and Outfitting
to Bills of Qu
h as UPS, gewill not pay
Contractors
n instructionppropriate D
to any quicated again
ywork, the h site to exee of departabour directm will be megangs will
time that lae Daywork Stes represen
actor, includportation, ovch labour fobasic rates
ctor and apContractor’s
owances to able storesg, workshopby the Cont
s incidental
for daywork to labour caywork Schasic rates t
–Sudan g Project
uantities
enerator, for the
s Interim
n of the Daywork antity of nst each
hours for ecute the ture, but tly doing easured. also be
abour is Schedule nting the
ing (but vertime, or social s will be
pplied to s profit, labour,
, water, ps, and tractor’s to the
k (except costs as edule 2: to cover
7.4
TheSiteSchcommaiadmassi In cdaywwhewheemp If ththe simiat ththe
a) The basfreight, delivery
b) The addcosts inand supincident
c) The coDayworwill be Contrac
Daywork C
e Contractor e and emploedule 3: C
mplete allowntenance, s
ministrative cistants will b
calculating thwork, only t
ere applicabere the Conployed on da
he ContractoDaywork S
ilar but not lhe rate of thuse of the e
sic rates forinsurance,
y to store forditional perc
ncurred undeperintendenctal to the forst of haulin
rk from the spaid in ac
ctor’s Equipm
Contractor’s
shall be entoyed on da
Contractor’s wance for upplies, fue
costs relatedbe paid for s
he paymentthe actual nle and agrentractor’s Eaywork and
or’s EquipmeSchedule press capacity
he equipmenequipment of
r materials shandling ex
r stockpiling centage payer paragrapce; liabilitiesegoing; andng materialsstore or stoccordance wment.
s Equipmen
titled to payaywork at th
Equipmentdepreciati
el, lubricantsd to the use eparately us
t due to thenumber of weed with theEquipment wthe time for
ent brought riced by they to carry ount listed in thf greater cap
shall be calcxpenses, daat the Site;
yment to beph (a) aboves and insurand s for use ockpile on thwith the te
nt
ments in reshe basic rent. Such rateion, interes
s, and other of such equ
sing Daywor
e Contractorworking houe Engineer, twas locatedreturn journ
to the Site e Contractout any Daywhe Schedulepacity.
Afr R
culated on tamage, loss
e quoted by e, shall covences; clerica
on work inshe Site to therms for Da
spect of Conntal rates e
es shall be st, indemnconsumable
uipment. Therk Schedule
r for Contrars will be ethe travelingd when ordney thereto s
is different or, the Contwork instructe. No additio
ican DevelopRelocation a
Preamble
the basis of ses, etc., an
the Contraer Contractoal and office
structed to e place wheaywork Lab
ntractor’s Eqentered by
deemed tonity and ies, and all oe cost of driv 1 – Labour
actor’s Equipligible for pag time from dered by thshall be inclu
in capacity tractor shallted and payonal paymen
pment Bank and Outfitting
to Bills of Qu
the invoicend shall pro
ctor and apor’s profit, oe work; and c
be carried ere it is to bbour and D
quipment alrhim in the Do include dinsurance, overhead, prvers, operat.
pment emplayment, excthe part of
he Engineeuded for pay
to the equipl use equip
yment shall bnt shall be m
–Sudan g Project
uantities
ed price, vide for
pplied to on costs charges
out as be used Daywork
ready on Daywork due and
repairs, rofit, and tors, and
oyed on cept that the Site
er to be yment.
pment in pment of be made made for
8. PRE Measur 8.1 The
contgrou
Payof Qanditemsite agrewheEng
Payof Qitem Paycalcfacilitemand Payof Qthe for pbeespec
8.2 Theadju
9. SITE
ELIMINARIE
rement & Pa
e Items inctractor’s genuped as follo
a) Fixed Sb) Fixed Sc) Time-red) Time-re
yment, for IteQuantities fo found in co
m refer to a fby the end
eed percenten the faciligineer.
yment, for IteQuantities fom which has
yment, for Iteculated by dlity is require
m or facility standard sp
yment, for IteQuantities fo
actual quanpayment. Thn fully provcified by the
e Preliminariusted in the
E WORK
NOTE
ES
ayment Prin
cluded in thneral obligaows:
um Items – um Items –
elated Items elated items
ems classifieor provision ompliance wfacility or anof the Con
age (to be aty or tempo
ems classifieor provision been provid
ems classifiividing the sed as per thhas been fupecified by t
ems classifieor provision ontities of an his type of pvided, inspee Contract.
es are applevent of any
ES ON MEA
nciples
his section tions under
Lump Sum Rate items;– Lump Sum– Rate Item
ed under a) of the item,
with the quany type of tetract, paym
agreed befoorary constr
ed under b) of the item
ded to get th
ed under c)sum insertede Contract. ully providedthe Contract
ed under d) of the item witem which
payment alsected and
licable to thy changes to
ASUREMENT
generally the provisio
Items; m Items;
ms.
above, shal after such
ality and stamporary conent will be mre signing thruction has
above, shal. The rate s
he total amou
) above, shad in the Bill This type ofd, inspectedt.
above, shalwithin the Chas been p
o will only bfound in co
he whole of o the Contra
Afr R
T AND PAY
reflect thosons of the C
l be made uitem has bendard specinstruction wmade at thehe Contract)
been remo
ll be made ushall multiplunt applicab
all be madeof Quantitief payment wd and found
ll be made uContract duraprovided to be commencompliance w
the works.act Price due
ican DevelopRelocation a
Preamble
YMENT
se activitiesContract. Th
using the sumeen inspecteified by the
which shall be sum insert), such percoved to the
using the ratly by execuble for paym
by way of es by the duwill only be cd in complia
using the ratation. The rget the totaced after thewith the qu
Preliminarye to variation
pment Bank and Outfitting
to Bills of Qu
s correlatedhese items c
m inserted ined by the EContract. W
be removed ted in the Bentage beco
e satisfactio
te inserted inted quantitieent.
incrementalration of theommenced nce with the
te inserted inate shall mu
al amount ape item or facuality and s
y prices shans.
–Sudan g Project
uantities
d to the could be
n the Bill Engineer, Where an
from the BOQ less ome due n of the
n the Bill es of an
l amount e item or after the e quality
n the Bill ultiply by pplicable cility has standard
ll not be
Demolit 9.1 Mea
dem
Rates fo 9.2 All e
9.3 Rem
9.4 Any
9.5 Safe
9.6 Stor 10. BRI 10.1 M
ma 10.2 D
size
Rates fo 10.3 T
hoisand
10.4 A
angformme
10.5 R
as
10.6 F
10.7 ma
10.8
and
10.9 P
10.10 11. Wat
tion
asurement omolished.
or Demoliti
equipment, t
moval, dispo
y bracing nee ety consider rage of dem
CK WORK&
Measuremende for voids
Double wallses. or Brick Wo
The supply sting, scaffod as specifie
All rough angles, inter-sming openinmbers and m
Raking out jorequired.
Forming gro
Forming caterials and l
Providing sod for all open
Providing so
Providing ex
ter-Proofing
of demolish
on shall inc
tools and lab
osal and tran
eded for sup
ration for oth
olished mat
& INTERNA
nt of brick/ bs less than 0
s (other tha
ork & Intern
of all neceolding, erected.
d fair cuttingections andngs, chasesmaking good
oints as the
oves for flas
avities includabour for clo
olid block inning jambs a
olid block ins
xpanded me
g and Damp
hing works
clude for:
bour require
nsport of dem
pporting the
her parts of t
terials for re-
AL PARTITIO
block works .5m² in area
n cavity wa
nal Partition
essary mateion and curi
g and wasted ends, bons, mortices,d.
work proce
shings, etc.
ding wall tieosing cavitie
stead of holand sills.
stead of hollo
etal lath at ju
p-Proofing
shall be m
ed for comple
molished ma
building dur
the building
-use if so de
ONS
shall be maa.
lls) have be
nsshall incl
erials, manng of brick w
e, cutting annding with w, leaving te
eeds to form
and leaving
es and insues at sills, ja
llow blocks a
ow in the firs
unctions of b
Works
Afr R
made per ite
eting the de
aterials to th
ring demolit
not required
escribed.
ade of the n
een measure
lude for:
ufacture, sawork to the d
d pinning towall ties to emporary op
m a key for p
weep holes
lation matembs, etc.
at junction b
st course of
brick/ block w
ican DevelopRelocation a
Preamble
em of work
molition wor
he approved
ion works.
d to be dem
net area. No
ed as single
ampling andimensions
o soffits, cuttreinforced
penings in
lastering (re
s.
rials as spe
between cei
f all block wa
work and co
pment Bank and Outfitting
to Bills of Qu
k that need
rks.
location.
olished.
o deduction
e walls of re
d testing, hshown on D
ting to and pconcrete mwalls for s
endering) or
ecified and
ling soffits a
alls.
oncrete.
–Sudan g Project
uantities
ds to be
shall be
espective
haulage, Drawings
plumbing members, structural
pointing
all extra
and walls
11.1 withded
Rates fo 11.2 P
11.3
obs
11.4 roo
11.5
up
12. CAR 12.1
size
12.2 winenu
12.3 des
Rates fo 12.4
labooperecitem
12.5
rem
12.6 F
Rates fo 12.7 P
12.8
bef
12.9 S
12.10
12.11
Water-proofh no allowaducted.
or Water-Pr
Preparation
Rates shallstructions.
Forming colof slab.
Rates for wawalls to 150
RPENTRY &
All carpentres after fixin
Timber doondows, togeumerated by Timber sha
scribed. or carpentr
Framing inour, notchinenings, formceive finishems of a like n
Protecting amoving on co
For providing or doors sh
Painting bac
Ironmongerfore painting
Sub-frame a
Fitting and h
Preparing a
fing and Dance made f
roofing and
of surfaces
include for
llars and wa
aterproofing0mm above
& JOINERY
ry and joineng in position
rs, windowsether with ty stating the
all be deeme
ry and joine
the best mng, cutting
ming chamfs, plugging nature as re
all work liabompletion.
g cramps, sc
hall include
cks of frames
ry including g and then re
as specified.
hanging.
and painting
amp-proofingfor overlaps,
d Damp-Pro
to be covere
r laps, strai
atertight joint
g to wet areafinished floo
ery work han.
s and the liktheir framestype and di
ed to be wr
ery items sh
manner and and waste
fers, grooveto concrete
equired.
ble to be da
crews, nails
e for:
s with prime
matching fixefixing.
or polishing
g materials , and openin
oofing Work
ed.
ight and cu
ts around ro
as are deemor level and
as been me
ke have bees shall be mensions.
rought, i.e.
hall include
in accordane, halvings,es, rebates,e and brick
amaged or
s and other f
er before fixi
xing screws
g/varnishing
Afr R
have been ngs less tha
ksshall incl
urved cutting
oof outlets, p
med to includup to 150mm
asured and
en enumeratmade of th
planed (pol
e:
nce with the, morticing, rounded s/block work
as may be
fixing device
ng in positio
, etc. and s
as indicated
ican DevelopRelocation a
Preamble
measured nan 0.5 m² in
ude for:
g, waste an
pipes and du
de for carryinm above the
d described
ted. Measurhe list of d
lished) finis
e detailed D, tenoning, shapes, pre
k, making go
required by
es.
on.
hall include
d.
pment Bank and Outfitting
to Bills of Qu
net in squarn area has n
nd for fitting
ucts passing
ng the watere edge of ba
as the net
rement of dodoors and w
h, unless o
Drawings, anwedging,
eparing surfood all othe
y the Engin
for fixing, r
–Sudan g Project
uantities
re meter not been
g around
g through
rproofing athtubs.
finished
oors and windows
otherwise
nd for all scribing, faces to
er sundry
neer and
removing
12.12
12.13 wor
13. MET 13.1
doowin
13.2 M
stat Rates fo 13.3 A
rive
13.4 S
13.5 ma
13.6
13.7
fixin
13.8
13.9
13.10 of ppro
13.11 exte
Glazed 13.12
13.13
holeproleav
13.14
13.15
app
Rates for gl The rates ark. TAL WORK
Aluminum / ors and winndows enum
Measurementing the type
or metal wo
Assembling,eting.
Shop coating Aluminum sstic, groutin
Inspection o
Ironmongeng, removing
Approved d
Preparation
Submitting panels, windoposed extru The rates ernal work.
Units
Rates for g
Rates for ges, supplyin
otection of aving all work
Rates of gla
Rates for alproval.
azed doors
lso shall inc
K & GLAZIN
Steel doorsndows, toge
merated by st
nt of partitioe and dimen
ork shall inc
cutting and
g with rust in
sub-frames ig mortices w
of metal wor
ry as requirg before pai
esign and q
n and submi
detailed ded load, weighuded section
also shall
glazed units
glazing worng and fixinall glass fromk in perfect c
azed work sh
ll glazing wo
shall includ
clude for the
G
s, windows ether with ttating the ty
ns shall be nsions.
clude for:
d waste, wel
nhibitive prim
if and wherewith cement
rk at worksh
red includininting and th
uality weath
ission of sho
esign criteriaht of glazing
ns and thickn
include for
shall include
k shall inclung all requirm damage, condition.
hall include
ork shall inc
e glass and
cost of wor
and the likeheir framespe and dime
made by are
lding and gr
mer, haulage
e required, hand sand g
op by the En
g matchinghen refixing.
her and drou
op drawings
a and calculag, etc. to subness of glas
the cost of
e glass, glaz
ude for cuttired gaskets
replacing d
for the treat
lude the sub
Afr R
beads.
rking to or at
e have beens shall be mensions.
ea or by the
rinding, drilli
e, protection
hoisting andgrout.
ngineer if ne
, fixing scre
ught seals.
s and sample
ations allowbstantiate thss.
f working to
zing accesso
ing to requi, clips, beadamaged pa
tment of cut
bmission of
ican DevelopRelocation a
Preamble
t any height
n enumeratemade of the
e list of partit
ng, counter
n and storag
d fixing in po
ecessary.
ews, etc., a
es for Engin
wing for factohe size, stren
o or at any
ories and be
red sizes aads, points, anels, clean
ends, etc., a
detailed wo
pment Bank and Outfitting
to Bills of Qu
t; internal or
ed. Measuree list of do
tions enume
sinking, bo
ge.
osition, caulk
nd shall inc
eer's approv
ors such as ngth & desig
y height; int
eads as requ
and shapes,metallic pu
ning through
as required.
orkshop draw
–Sudan g Project
uantities
external
ement of oors and
erated by
lting and
king with
clude for
val.
the size gn of the
ternal or
uired.
forming tty, etc.,
hout and
.
wings for
14. FLO Genera 14.1 F
14.2 S
14.3 sofftheded
Rates s 14.4 S
scapro
14.5 P
16.1
reve
14.6 Tile Fin Rates fo 14.7
the
14.8 pur
14.9 W
14.10
app
14.11
14.12 finis
14.13 Suspen 14.14
inclmo
OOR, WALL
al
Floor, wall (i
Skirting and Rendering (fit of slab. W soffit of the
duction shal
shall includ
Supplying aaffolding, acoper executio
Preparing an
Working to eals, sills, so Attending a
nishes
or tile, slab
Straight and satisfaction
Cutting to srpose made
Work to falls
The preparproval prior t
Providing sp
Providing reshed floor le Rates for til
nded Ceiling
Suspended lude for aluldings, ligh
L & CEILING
nternal & ex
sills have b
(Plastering) Where theree suspendedl be made fo
e for:
all materialscessories, fon of the fin
nd submittin
or at any offits of linte
and making
b and sheet
d curved cutn of the Engi
shape arountiles and sla
s and cross f
ration and fto commenc
pecial tiles f
equired appevels.
es to include
g Finishing
ceilings arell stepping,
ht coves, etc
G FINISHING
xternal), and
een measur
and wall tilie are suspend ceiling pluor voids less
s, haulagefixing, mixingishing to the
g samples f
height (intels, sides and
good all wo
finishings
tting, waste,ineer.
nd fittings, cabs (e.g. rou
falls.
furnishing, tcement of w
for rounded
proved sand
e mortar und
g
e measured bulkheads
c.
GS
d ceiling finis
red in linear
ng have beended ceiling
us 100 mm s than 0.5 m
, protectiong and curinge Engineer's
for approval
ernal or extd soffits of b
rk after othe
shall includ
, grouting, p
chamfering, unded edges
to the Engiork and/or o
edges, inter
fills below
der tiles or b
d flat. Rates s of all he
Afr R
shes have b
length.
en measuregs, wall tilingunless othe
m².
n, storage, g and all inc
s satisfaction
.
ternal work)beams, kerbs
er trades to t
de for:
ointing and
levelling ans, coves, etc
neer, of deordering of m
rnal and exte
tile or slab
back the tile
for suspeneights, edg
ican DevelopRelocation a
Preamble
een measur
ed from top g measurem
erwise indica
plant, equcidental worn.
), narrow ws, upstands
the Enginee
the like to e
nd the like ac.).
etailed workmaterials.
ernal angles
mortar to br
(wall).
ded ceiling e trims/mo
pment Bank and Outfitting
to Bills of Qu
red net in m²
of skirting (iments were ated on draw
uipment anrk necessar
widths and jaand making
r's satisfacti
execute the
and shall inc
shop draw
s, edge tiles,
ring-up leve
shall be deouldings, de
–Sudan g Project
uantities
².
f any) to taken to
wing. No
d tools, ry for the
ambs or g good.
ion.
works to
clude for
wings for
, etc.
els to the
eemed to ecorative
Rates fo
14.15
14.16 gril
14.17
rep
14.18 wer
14.19
prio
14.20
14.21 15. PAI 15.1 P
15.2 O Rates fo
15.3
stoinci
15.4
pro
15.5 sideres
15.6
15.7 M
15.8
steeall etc
15.9 R
befetc
16. PLU
or suspend
Submitting s
Forming cirles, access
Cleaning aplacement of
On completre executed
Preparationor to comme Providing ac
Providing eq
NTING & D
Painting and
Openings ex
or all paint
Supplying arage and pidental requ
Cleaning looperly keyed
Narrow wides and top fpective mai
Painting in m
Making good
Rates for pael wire brusunexposed . shall includ
Rates for pafore painting. shall receiv
UMBING AN
ded ceilings
samples of t
rcular, rectanpanels and
any soiled f units which
tion of the i, of all waste
n and furnishencement of
ccess openi
qual margin
ECORATIO
d decoration
xceeding 0.5
work shall
all necessarprotection, airements for
ose plaster to existing
ths and in faces of curbn items, unle
multicolour a
d all paint wo
aint work onshes or scrasurfaces of de for applyi
aint work fog. All exposeve two coats
ND MECHAN
s shall inclu
the system t
ngular or sqfor straight
or discolorh are damag
installation, e, cuttings, e
hing, to the f work and/o
ings, doors/c
s when sett
ON
works have
50 m² have b
include for
ry materialsadditives, mr the proper
(render) anand sand-pa
short lengthbs, panels aess otherwis
as required.
ork to the sa
n ferrous andping as mayferrous and
ing two coat
or timber woed surfaces s of approve
NICAL ENG
ude for the
to the Engin
quare openincutting, curv
red surfaceged or impro
cleaning ofetc.
Engineer, oor ordering o
closure pan
ing out grid
e been meas
been deduct
r:
s, machinesmixing, hoist
execution o
nd repairing apering smo
hs to apertuand strips, etse stated.
atisfaction of
d non-ferrouy be necessd non-ferrouts of rust inh
orks shall inof wood wo
ed wood pre
GINEERING
Afr R
following:
neer for appr
ngs for elecved cutting a
es of unitsoperly install
f all areas w
of detailed wf materials.
els to the ap
and for all s
sured net in
ted.
, tools, brusting, sampl
of paint work
all cracks aooth.
ures, jambs,tc. All such a
f the Engine
us metalworsary to remos metalwork
hibiting prime
nclude for rork coveredservative as
INSTALLA
ican DevelopRelocation a
Preamble
roval prior to
ctric light fixtand waste.
s, includinged.
where suspe
workshop dr
pproval of th
standard edg
m².
shes, etc. sing and tes
k as specifie
and holes w
, sills, reveaareas to be
eer.
rk shall incluove all loosek in false ceer.
rubbing dow with plywo
s specified.
ATIONS
pment Bank and Outfitting
to Bills of Qu
o order.
tures, AC du
the remo
ended ceilin
rawings for a
he Engineer.
ge trim deta
scaffolding, sting, and ad.
with patching
als, soffits oincluded wit
ude for cleane scale and eilings, attics
wn with glasod lining, ve
–Sudan g Project
uantities
ucts and
oval and
ng works
approval
.
ils.
ladders, all other
g render
of lintels, thin their
ning with rust and
s, shafts,
ss paper eneered,
All the
16.1
laiddew
16.2
etcpai
16.3
to aisol
16.4
spe
16.5 air
16.6 R
16.7 R
16.8 andthe
16.9 R
16.10
16.11 cuttcovor cin plu
16.12
to; bric
16.13 sleeworair
16.14
repdur
works shalle Engineer.
Pipe work ld undergrouwatering, ba
Rates for pi.) made benting.
Rates for piany backgrolators, flexib
Rates for piecifications.
Rates for pchambers a
Rates shall a
Rates shall a Rates for sa
d fixing in po like. Rates
Rates for all Rates for m
Builders woting or form
vers, etc. in casting in pconnection mbing insta
Builder's woforming or
ck/ block wo Rates for Aeves, clamprks, making conditioning
Rates shallpresentative ring or on co
l be comple
engths meaund shall i
ackfilling and
ipe work shands, cutting
ipe work shound, hangeble coupling.
iping shall in
iping shall iand vacuum
allow for wa
allow for thru
anitary fixtuosition comshall also in
plumbing w
mechanical in
ork in conneming holes,brick/ block ipe sleevesshall includ
llation.
ork in connecutting hole
orks.
Air Conditiops, brackets
good aroung and ventila
include forincluding a
ompletion of
te as specif
asured are mnclude all
d disposal of
all include jog, short leng
all include fers, support
nclude for cl
nclude for pbreakers.
ter hammer
ust blocks a
res and accplete with a
nclude for co
work shall inc
nstallations s
ction with p chases, cwork, concr
, clamps, brde for mak
ection with mes, chases,
oning and V, hangers, s
nd any otheration system
r testing theany modifica
the test, all
fied, as show
mean lengthexcavation
f surplus soi
oints in the rgths and wa
for pipe clipsts, guides, e
leaning, flus
provision of
and stress
nd anchors.
cessories shll taps, mixe
onnection to
clude for ma
shall include
lumbing inschannels, rerete, timber rackets, han
king good o
mechanical channels, e
Ventilation Ssupports, toor incidental r
m in accordan
e equipmenations, adjus
as required
Afr R
wn on the d
hs as fixed , concrete l.
running lengaste. Rates
s, holderbatexpansion jo
shing, and d
automatic a
analysis of t
.
hall include ers, valves, service pip
arking out po
e all related
tallation shaecessed pipand other m
ngers, holdfaon completio
installation etc., in rein
System shaols, ladders,requirementsnce with the
nt under thestments, or d and to the
ican DevelopRelocation a
Preamble
drawings an
in position. encaseme
gth, fittings (s for pipewo
ts, insulationoints, unions
isinfection o
air vents, dr
the piping n
for supply, traps, cistees.
ositions.
builders and
all include, bpes enclosumaterials, prasts and theon all work
shall includforced conc
all include f, scaffoldings for the pro
e Drawings.
e supervisiorepairs whicsatisfaction
pment Bank and Outfitting
to Bills of Qu
d to the app
Rates for pnt, sand s
(e.g. tees, juork shall inc
n, and laggis, flanges, d
of all system
rain valves o
etwork.
assemblingrns, flush pi
d civil works
but not be limure with reroviding ande like. Buildeks disturbed
e but not becrete structu
for providing, etc. paintinoper executio
n of the Ench may be of the Engin
–Sudan g Project
uantities
proval of
pipework surround,
unctions, clude for
ng fixing dielectric
ms as per
of risers,
, jointing ipes and
s.
mited to, movable building ers work
d by the
e limited ures and
g pipes, ng metal on of the
ngineer's required
neer.
16.15 and
16.16
instas prio
16.17
ceilstru
16.18
and
16.19
17. ELE Rates fo 17.1 P
cap
17.2 F
17.3 Sinhrubasp
17.4
exp
17.5 befEngto t
17.6
speof t
17.7
17.8
17.9
as sup
17.10
junc
Rates shall d additional
Rates for atallations shindicated in
or to comme
Rates for plings in Techuctural steel
Rates shall d basement
Rates shall
ECTRICAL I
or Electrica
Plugs, drawpping ends o
Factory rust
Supplying anibiting "Galv
bber paint, phalt.
Laying all cposed all as
Providing afore putting gineer, also the satisfact
Preparationecifications, the works an
Sealing ope
Sealing duc
Rates for feapplicable),
pport, etc.
Rates for cction and te
include for work.
all plumbinghall include n the specifencement of
lumbing andhnical Floor supports to
include for wto the appro
include for t
INSTALLAT
al Works sh
wing wires aof cables, co
inhibiting pr
nd painting vafroid" primand paintin
conduits coindicated on
ll testing deinto operatifor carrying
ion of the En
and furnand/or the d
nd/or the ord
enings, etc.,
cts and pipes
eeders shallconduits if
onduits sharminal boxe
duct, sleeve
, air conditifor the prep
fications andf the works a
d air conditir shafts with o Engineer's
walkway to oval of the E
the provision
TIONS
hall include
and cables, onnections to
rimer, includ
all exposedmer or appro
g conceale
ncealed in n Drawings.
evices, equipion the comg out any mngineer.
ishing of drawings fordering of ma
with fire pro
s with water
l include cabany, cable c
all include ales, conduit st
es, flexible c
ioning and paration andd/or in the dand or the or
oning and veither strucapproval.
cross-oversEngineer.
n of instruct
for:
sinking eno equipmen
ding storage
surfaces ofoved equivaed surfaces
reinforced
pment and mpleted elecodification o
detailed wr the approv
aterials.
oofing mater
r sealant com
bles (single cleats at eve
ll fittings antraps, etc.
Afr R
connections
ventilation sd furnishing drawings fordering of m
ventilation syctural concre
s across pipe
ion and mai
ds of cablet with cable
and protect
f electrical mlent and twoof panel b
concrete sl
any electricctrical systemor repairs ne
workshop drval of the En
rial, if not inc
mpound, if n
core or mulery meter ru
d accessori
ican DevelopRelocation a
Preamble
s and expan
systems anof detailed r the appro
materials.
ystems shalete slab or c
es at roof lev
ntenance m
es to exposglands, etc
tion of all Ele
metal work wo coats of aboard cabin
abs, column
cal power nem under theecessary on
rawings asngineer prio
cluded elsew
not included
lticore armoun, cable gla
es, expansi
pment Bank and Outfitting
to Bills of Qu
sion joints, w
d other meworkshop d
oval of the E
ll include fochequered p
vels, technic
manual as sp
sed conduct.
ectrical Wor
with one coaapproved chnets with em
ns, walls, f
ecessary fore supervision completion
s indicated r to comme
where.
elsewhere.
ured or unaands, cable
ion joint fitti
–Sudan g Project
uantities
with civil
echanical drawings Engineer
r closing plates on
cal floors
pecified.
tors and
rks.
at of rust lorinated mulsified
loors, or
r testing, on of the n of tests
in the ncement
armoured tray and
ngs, pull
17.11
17.12
17.13
17.14
17.15 formbricscrecabaro
17.16
asscom
Rates for ca
Rates for de
Rates for du Rates for el
Builders woming or cuck/block woews, bolts a
ble duct banound all trade
Civil works sociated wormpletion and
ables and w
evices and e
ucts and con
ectrical insta
ork in connetting holes,
ork and alsoand nuts, exnks and direes disturbed
in connectirks, not alred commissio
ires shall inc
equipment s
nduit lead-in
allations sha
ection with e chases, co for providxcavating anctly buried c
d by the exe
ion with eleady included
oning of the
clude earthin
shall include
ns and cross
all include a
electrical inschannels, etding sleevesnd dewatericables. Buildcution of ele
ectrical instad elsewhereElectrical W
Afr R
ng wires and
nameplates
sings shall in
ll related bu
stallation shatc. in reinfos, clamps, ng of trenchder’s works ectrical insta
allation shalle in Electrica
Works.
ican DevelopRelocation a
Preamble
d/or cables.
s and engrav
nclude fire p
ilders and c
all include borced concrbrackets, h
hes, backfillshall also in
allations.
l include foral Bill, for the
pment Bank and Outfitting
to Bills of Qu
ving.
roof filling m
ivil works.
but not be lirete structu
hangers, hoing for undenclude maki
r all incidene proper ins
–Sudan g Project
uantities
material.
imited to ures and old fasts, erground ing good
ntals and stallation,
PARRT 2: BIL
LLS OF Q
Afr R
QUANTIT
ican DevelopRelocation a
TIES
pment Bank and Outfitting
Bills of Qu
–Sudan g Project
uantities
African Development Bank
Sudan Relocation and
Outfitting Project
Preamble, Bills of Quantities
and Daywork Schedules
ITEM DESCRIPTIONTOTAL AMOUNT
(USD)
1 BILL NO. 0: PRELIMINARIES
2 BILL NO. 1:SUDAN RELOCATION AND OUTFITTING PROJECT
# 10% CONTENGENCY
TOTAL OF BILLS
BOQ CONTENTS AND GRAND SUMMARY SHEET
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
Item DescriptionCountry of Origin
Unit Qty. Unit Rate (USD)Total Amount
(USD)
A THE EMPLOYER AND THE ENGINEER SITE OFFICES
A.1IT Equipment for the Employer and the Engineer (Rental Base)
A.1.1
Provide laptop Toshiba or Lenovo or equivalent models, wide screen, processor core i7 2.2GHz,12 GB RAM, HDD, 1TB, network card, DVD Writer, complete with original restore CD, cables, manuals, wireless mouse and other accessories.
no. 2
A.1.2Provide one internet connection for the Engineer office during contract period.
Month 3
A.1.3Provide and commission multi-function colour laser-jet printer/scanner/photocopier, for paper size A4 .
no. 1
A.2Furniture, Equipment and consumables for the Engineer Site Offices - (Rental Base)
A.2.1Provision of office desks size 80*170 cm with 3 lockable drawers .
no. 2
A.2.2Provision of revolving type office chairs with black/grey fabric .
no. 2
A.2.3Provision of fixed type guest chairs with black/grey fabric .
no. 2
A.2.4Provision of five drawers steel filing cabinet, inclusive of locks .
no. 1
A.2.5 Provision of table 90 * 170 cm for printing room. no. 1
A.2.6 Provide and maintain water cooler dispenser. no. 1
A.2.7
Provide site office stationery for 2 persons during the Contract period including but not limited to paper A4/A3 size, notice boards, box files, writing white board, punchers, staplers, pens, pencils, colour sets of pens and colour markers to the approval of the Engineer.
Month 3
A.2.8Allow lump sum for office hospitality (tea, coffee, & potable water including necessary kitchen utensils) during the contract period.
Month 3
A.2.9Allow lump sum for offices cleaning during contract period.
Month 3
TOTAL CARRIED TO GRAND SUMMARY
BILL NO. (0)
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. Contractor to secure part of space to be used as an Engineer office during contract period, this space to be considered for both wings without affecting Employer's daily activities
PRELIMINARIES
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
BoQ No. BoQ DescriptionTotal Amounts
(USD)%
DistributionTotal by Group
Total % By Group
1.1 DEMOLITION WORKS
1.2 SUPER-STRUCTURE CONCRETE WORKS
1.3 PLASTERING & PAINTING WORKS
1.4 INTERNAL DECORATIVE WORKS
1.5 TILING WORKS
1.6 DOORS AND PARTITION WORK
1.7 SPECIALTIES
1.8 POWER & ELECTRICAL WORKS
1.9 HVAC INSTALATION
1.10 INSTRUMENTATION & CONTROL WORKS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
BOQ CONTENTS AND GRAND SUMMARY SHEET
BILL NO.(1.0)
TOTAL VALUE OF BOQ
ST
RU
CT
UR
AL
E
LE
ME
NT
S
BU
ILD
ING
SE
RV
ICE
S E
LE
ME
NT
S
(ME
CH
AN
ICA
L,
EL
EC
TR
ICA
L A
ND
P
LU
MB
ING
)F
INIS
HIN
G E
LE
ME
NT
S
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
BoQ Item No.
DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
DEMOLITION WORKS
Demolish, dismantle and cart away not exceed than 50 km from site as directed by Engineer:
A Brick Wall
A.1
‐ Dismantle any electrical items (lamps, sockets,fans, etc...)All elements to be handed to the Client representative as per drawings.
‐ Demolish existing (219 m2)brick wall and cart away as directed by Engineer as per drawings.
job 1
B Ceiling
B.1
‐ Dismantle any electrical items (lamps, sockets,fans, etc...)All elements to be handed to the Client representative as per drawings.
‐ Dismantle existing ceiling (Area;32 m2) (safely in good condition) and handed to Client Representative as per drawings .
job 1
BILL NO. (1.1)
DEMOLITION WORKS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.Contractor to consider that the demolition , transportation of debris to be done after working hours (i.e. from 5 PM up to 6 AM next day)
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
BoQ Item No.
DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
BILL NO. (1.1)
DEMOLITION WORKS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.Contractor to consider that the demolition , transportation of debris to be done after working hours (i.e. from 5 PM up to 6 AM next day)
CWall Paper and Wood Floor Tiles at IT Department Area
C.1
- Dismantle existing wall paper (46.5 M.L) preparing wall surface for painting work as per drawings. -Dismantle existing laminate wood floor tiles(area;62m2) (safely in good condition) and handed to Client Representative and to be cleaning of ceramic tiles as per drawings.
job 1
D DOORS
D.1Dismantle existing doors (single leaf door ) to be handed (safely in good condition) to the Client Representative as per drawings.
NO. 7
D.2 Ditto but double leaf NO. 2
TOTAL CARRIED TO GRAND SUMMARY
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
A Concrete Work
A.1 Lintel Beam
Supply and cast In-sute reinforced concrete (Grade 30N/mm²), rate to include forms, shuttering, scaffolding and reinforcement:
A.1.1 Doors lintel; 200mm thick. ML 6.0
TOTAL CARRIED TO GRAND SUMMARY
BILL NO. (1.2)
SUPER-STRUCTURE CONCRETE WORKS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
A Plaster
Supply and apply cement(portland) plaster not less than 20 mm thick , rate includes corner beads, metal lath, surface preparation and all required materials and accessories to complete work according to drawings and specification. Shop drawings and samples shall be submitted by the contractor and approved by the engineer for the followings:
A.1 Plaster for internal walls m2 16.5
B Paints
Supply and apply acrylic paints for walls , according to manufacturer instructions and recommended system. Work include clean the surface, repair hair cracks, primary coat, two or three basic coats and two final coats with approved materials, all materials and accessories required to complete according to drawings and specification. Type, color and samples shall be submitted by the contractor and approved by the engineer.
B.1 Acrylic paint for interior walls m2 1652.0
TOTAL CARRIED TO GRAND SUMMARY
BILL NO. (1.3)
PLASTERING & PAINTING WORKS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
A GYPSUM WORK
A.1 Gypsum board Assemblies
Supply and install painted gypsum board for ceiling 12.5 mm thick, including suspension system, edge trim, opening access panels, expansion joint, fixing and all accessories and materials required to complete all work according to drawings and specifications. Shop drawings and samples shall be submitted by the contractor and approved by the engineer.
A.1.1 Gypsum board for ceiling m2 43.5
BILL NO. (1.4)
INTERNAL DECORATIVE WORKS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
TOTAL CARRIED TO GRAND SUMMARY
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
A INTERNAL TILING WORK
A.1 Laminate Tiles
Supply and install laminated wood floors. Rate include skirting, all accessories and materials required to complete all work according to drawings and specifications. Shop drawings and samples shall be submitted by the Contractor and approved by the Engineer
A.1.1 In Waiting area and Reception(thick; 8 mm) m2 87.0
A.2 CERAMIC TILES
Supply and install Floor Ceramic tiles on mortar, all materials and accessories required to complete according to drawings and specification. Type, white color and samples shall be submitted by the contractor and approved by the engineer.
A.2.1 Floor Ceramic Tiles (size; 300 x 300 mm) m2 9.0
A.2.2Skirting to match flooring tile (type: ceramic, height:100mm)
M.L 4.5
A.3 RUBBER TILES
Supply and install Rubber Floor Tiles on raised floor Metal supporting system. Shop drawings and samples shall be submitted by the contractor and approved by the engineer
A.3.1 Rubber floor tiles on metal supporting system. m2 15.0
TOTAL CARRIED TO GRAND SUMMARY
BILL NO. (1.5)
TILING WORKS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
A DOORS
A.1 Wooden Doors
Wooden Doors with veneer finish
Provide and lay door (1hour fire rated 44mm thick single leaf semi-solid core yellow pine flush door,1.6mm HPL laminated on both sides, mechanically pressed and adhered to 6mm beech plywood, complete with lipping, hardwood frames,architraves,stainless steel ironmongery-manufactured by Intersteel and Hager or approved equal.
A.1.1Type (N2A) 900 x 2200 mm. - single hinged leaf (frame thickness; 12.54cm)
NO. 8
A.1.2Type (N2D) 900 x 2160 mm. - single hinged leaf (frame thickness; 12.54cm)
NO. 1
A.1.3Type (N2E) 900 x 2170 mm. - single hinged leaf (frame thickness; 12.54cm)
NO. 2
A.1.4Type (N2B) 900 x 2200 mm. - single hinged leaf (frame thickness; 22.54cm)
NO. 1
A.1.5Type (N2C) 800 x 2200 mm. - single hinged leaf (frame thickness; 12.54cm)
NO. 1
BILL NO. (1.6)
DOORS AND PARTITION WORK
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
BILL NO. (1.6)
DOORS AND PARTITION WORK
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
A.2 Glass Doors
Supply and fix 10mm thickness security tempered glass doors, all accessories and any material or activity required to finish the work according to drawings and specification. Shop drawings and samples shall be submitted by the contractor and approved by the engineer .
A.2.1Type (SL1) 1800 x 2200 mm, single leaf, Sliding Glass Door
NO. 2
A.2.2Type (SL4) 900 x 2200 mm, single leaf, Sliding Glass Door
NO. 1
Supply and fix 10mm thickness security tempered glass doors including Electromagnetic Lock should holding force 540 KGS and dual voltage with both lock and door sensor.It also features a built-in voltage spike suppressor ,UL Listed ,CE approved and has a 2 hours fire rating, all accessories and any material or activity required to finish the work according to drawings and specification. Shop drawings and samples shall be submitted by the contractor and approved by the engineer .
A.2.3Type (SL1) 1800 x 2200 mm, single leaf, Sliding Glass Door
NO. 3
A.2.4Type (SL3) 1200 x 2200 mm, single leaf, Sliding Glass Door
NO. 1
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
BILL NO. (1.6)
DOORS AND PARTITION WORK
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
B PARTITION
B.1
Supply and install Security partition 10mm thick tempered glass include as per detail drawings, work include fixation, hardware sets, all accessories and any material or activity required to finish the work. Shop drawings and samples shall be submitted by the contractor and approved by the engineer.
B.1.1 10mm thickness Security glass partition with door m2 73.0
B.1.2 10mm thickness Security glass partition m2 62.5
B.2
Supply and install gypsum board partition with C section aluminum studs(12mm Gypsum board) with sound insualtion wall include as per detail drawings, work include fixation, hardware sets, all accessories and any material or activity required to finish the work. Shop drawings and samples shall be submitted by the contractor and approved by the engineer.
B.2.1 10mm thickness Accoustic stud wall partition m2 137.0
B.2.2 20mm thickness Accoustic stud wall partition m2 21.5
TOTAL CARRIED TO GRAND SUMMARY
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
A Office Window blinds
Supply, Delivery and installation of blinds for external windows of offices, work include(site visit) fixation, hardware sets, all accessories and any material or activity required to finish the work. Shop drawings and samples shall be submitted by the contractor and approved by the engineer.
A.1 For Windows Job 1.0
TOTAL CARRIED TO GRAND SUMMARY
BILL NO. (1.7)
SPECIALTIES WORKS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
A MAIN DISTRIBUTION BOARD
Supply/ Relocate, install & test distribution panel switchboard enclosure, , IP 44, including circuits breakers, wires, connections, earthing, glands & all necessary accessories as specified & as per SLD:
A.1Sub Main distribution board panel, (SMDB-4), 5ways complete with 125A MCCB TPN+E
JOB 1.0
A.2Distribution board panel, (DB-1), 8ways complete with 63A MCCB TPN+E (RELOCATE&CHECK)
JOB 1.0
A.3Distribution board panel, (SDB-F3), 8ways complete with 63A MCCB TPN+E (CHECK)
JOB 1.0
A.4Distribution board panel, (DB-L&P-1)(BD-2), 6ways complete with 63A MCCB TPN+E (RELOCATE&CHECK)
JOB 1.0
A.5Distribution board panel, (DB-VAC-2)(BD-3), 6ways complete with 63A MCCB TPN+E (RELOCATE&CHECK)
JOB 1.0
B UPS SYSTEM
Supply, install & test UPS UNITS, including battaries, circuit breakers, wires, connections, earthing, glands & all necessary accessories as specified & as per SLD:
B.1 Uninterruptile Power supply 30K VA no. 1.0
BILL NO. (1.8)
POWER & ELECTRICAL WORKS
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
BILL NO. (1.8)
POWER & ELECTRICAL WORKS
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
B.2Distribution board panel, (DB-UPS-1) (DB-4), 4ways complete with 32A MCCB TPN+E (RELOCATE & CHECK)
JOB 1.0
B.3Distribution board panel, (DB-UPS-2), 4ways complete with 32A MCCB TPN+E (NEW)
no. 1.0
C POWER CABLES
Supply, install, test & terminate LV power cables, CU/XLPE/SWA/PVC, cable markers, cable tiles, truncks, and conduits, tagging, lugs, glands and all necessary accessories as specified and drawings as per SLD:
C.1 4Cx16 mm² CU + 1Cx10 mm² E ML 10.0
C.2 4Cx6 mm² CU + 1Cx4 mm² E ML 30.0
D CABLE TRAY
Coordinate existing cable tray with other services & if requred Supply, install, test & commission cable tray with fittings including all necessary accessories as specified and indicated in the drawings :
D.1 Cable tray 200 x 100 mm JOB 1.0
E POWER SOCKETS
Supply, install & test switched outlet sockets, with boxes in walls, supports, wires and conduits including all necessary accessories as specified and indicated in the drawings:
E.1 SINGLE MULTI PURPOSE SWITCH SOCKET 13 A no. 11.0
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
BILL NO. (1.8)
POWER & ELECTRICAL WORKS
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
E.2 Single Switch Socket 13 A (NEW) no. 1.0
E.3 Single Switch Socket 13 A (RELOCATE) no. 3.0
E.4 Twin Switch Socket 13A (NEW) no. 4.0
E.5 Single Switch Socket 16 A (NEW) no. 1.0
E.6 Single Switch Socket 16 A (RELOCATE) no. 3.0
E.7 Single Switch Socket ( UPS ) (NEW) no. 0.0
E.8 Twin Switch Socket ( UPS ) (NEW) no. 74.0
E.9 Twin Switch Socket for Projectors ( UPS ) (NEW) no. 3.0
E.10 Isolator for Split Units (NEW) no. 2.0
F LIGHTING SYSTEM
Supply, install & test lighting outlet & fixtures, rosace, pendant cables, conduits, wiring, junction boxes & all necessary accessories for new one & Check exciting lighting and replace damaged one ( lighting & switches & accessories ) , as specified and as per drawings:
F.1 Recessed Scone Light 30 W (NEW) no. 6.0
F.2 Recessed Plain 60X60 Lighting 4 X 18 W (NEW) no. 4.0
F.3Recessed Plain 60X60 Lighting 4 X 18 W (RELOCATE)
job 27.0
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
BILL NO. (1.8)
POWER & ELECTRICAL WORKS
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
F.4 Exit Sign Lighting no. 6.0
F.5 One Gang One Way Switch no. 5.0
F.6 Two Gang Two Way Switch no. 5.0
F.7 Three Gang One Three Switch no. 5.0
F.8Ceiling mounted motion (OCCUPANCY) detector 6-8 meter covarage IP 42
no. 35.0
G FIRE ALARM SYSTEM
Supply/relocate, install and test the following fire alarm devices including boxes, conduits, heat resistant/flame retardent wires in between and to fire alarm control panel
G.1 Fire extinguish control panel No 1.0
G.2Addressable fire alarm panel with tow loop & 2 relays for interface with the main building panel(from same excisting panel brand)
No 1.0
G.3 Manual release. No 1.0
G.4 Manual call station No 7.0
G.5 Alarm sounder No 7.0
G.6 Indicator lamp. No 10.0
G.7 Heat detector No 1.0
G.8 Smoke detector (NEW) No 13.0
G.9 Smoke detector (RELOCATE) No 3.0
TOTAL CARRIED TO GRAND SUMMARY
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
HEATING VENTILATION AND AIR CONDITINING
Supply , Install , testing & commssioning of Complete Air Conditioning system as detailed and shown on the drawing and as specified including all equipment as shown on drawings ductwork, insulation, piping insulation, drills, diffusers, attenuates, supports, machine bases, anti-vibration melting's, drainage system, dampers connection to electrical switch gears, electrical panels boards connection to the isolators, automatic controls, testing and commissioning and leaving in a safe and a perfect working order and including all builders work and making good in all trades and to the satisfaction of the consultant.
1 AIR CONDITIONING SYSTEM :
A WALL MOUNTED SPLIT UNITS :
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
BILL No.(1.9)
HVAC INSTALATION
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
BILL No.(1.9)
HVAC INSTALATION
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
Supply , Install Testing & Commissioning of Wall mounted Split Units . the unit shall be ARI certified and shall operates with friendly to O-zone refrigerant (R407-C). The rate shall include copper pipes, support, wiring, fittings, insulations, 2 inch aluminum washable filters, control, circuit breaker, disconnect switch, wired type space thermostat, flexible connection , electric connection, condensate drain) with all required devices & accessories to protect the A/C units from electrical & mechanical damages. All should be done according to the drawings, specifications & Approval of the Engineers.
A.1DX - Wall monted -I.W.M / O.W.M - 02 ( 1.5 TOR @ 45 C ambient tempreture )
NO 1
A.2DX - Wall monted -I.W.M / O.W.M - 01 ( 2.0 TOR @ 45 C ambient tempreture )
NO 1
B AIR DUCTS :
B.1
Supply, Install, Testing and commissioning of G.I.sheet metal ( G-90 ) factory fabricated duct for Supply air complete with neuperene rubber gaskets, slip on flanges, vanes,Linklevers, Volume Control dampers where needed , GI thread rod and perforated 'C' channel supports etc. in accordance with the approved shop drawings and specifications.
M.L 20.0
B.2Supply & Install fiber glass insulation minimum thickness 25 mm , density 24kg/m3 for indoor applications
M.L 20.0
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
BILL No.(1.9)
HVAC INSTALATION
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
C AIR OUTLETS :
C.1 Supply Air Outlets
Supply, install, testing and commissioning of Powder coated Aluminium extruded squire Diffusser for supply with GI Plenum insulated internally with sound liner insulation thickness 25 mm , volume control damper , supports & required air flexible ducts as per specification
C.1.1 Ditto squair diffuser neck size 15 inchX15 inch NO. 2.0
C.2 Return Air Outlets
Supply, install, testing and commissioning of Powder coated Aluminium extruded squire Diffusser for Return with supports & required air flexible ducts as per drawings & specification
C.2.1 Ditto squair diffuser neck size 15 inchX15 inch NO. 2.0
D CONDENSATE DRAIN SYSTEM :
D.1
Supply ,install, testing and commissioning of Rigid heavy class UPVC piping for AC units condenstae water drainage complete with fittings, supports as per specifications and duly insulated with 6 mm thick closed cell crosslinked polyethylene (XLPE) tubular insulation.
Job 1.0
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
BILL No.(1.9)
HVAC INSTALATION
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
E DUCT REPAIRING WORK :
E.1
Repair, Testing and commissioning of G.I.sheet metal ( G-90 ) factory fabricated duct for Supply air complete with neuperene rubber gaskets, slip on flanges, vanes,Linklevers, Volume Control dampers where needed , GI thread rod and perforated 'C' channel supports etc. in accordance with the approved shop drawings and specifications.
M.L 40.0
E.2Supply & Install fiber glass insulation minimum thickness 25 mm , density 24kg/m3 for indoor applications
M.L 40.0
F AIR OUTLETS RELOCATING WORK :
F.1
Relocating , testing and commissioning of Powder coated Aluminium extruded squire Diffusser for supply with GI Plenum insulated internally with sound liner insulation thickness 25 mm , volume control damper , supports , false cieling opening & required air flexible ducts as per specification
No. 60.0
F.2
Relocating , testing and commissioning of Powder coated Aluminium extruded squire Diffusser for Return with supports & required air flexible ducts as per drawings & specification
No. 60.0
G AC THERMOSTATS RELOCATION :
G.1Relocating , testing & commissioning of AC thermostats as per final arch drawings & client requirements
No. 10.0
TOTAL CARRIED TO GRAND SUMMARY
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
ATELECOMMUNICATIONS (DATA AND VOICE) INSTALLATIONS & TV POINT.
Supply install and test the following data & telephone devices & equipment's, including boxes, conduits, cables in between and to data/telephone cabinet Brand should be approved by Owner/Consultant
A.1 IT rack 42U 80x43x24 No 3.00
A.2 IT rack 24U 42x19x24 No 1.00
A.3 Gigabit Switch 16 Ports with 2 Uplink 10Gb Fiber No 1.00
A.4 Patch Panel Cat6 24 Ports No 10.00
A.5 Cable manager Cat6 No 10.00
A.6
Supply and install of Cat6 Patch Cords 1 Mtr and 0.5 Mtr, RJ45 manufactured from the patch panel to the data switches as per the Owner/Consultant advise. Trunk should be different color than Redundant Line and end device
No 160.00
A.7Supply and install of Cat6 Patch Cords 5 Mtr, 3 Mtr and 1.5 Mtr from the system Point to the end device as per the Owner/Consultant advise.
No 160.00
A.8
Server 16 core min dual processor @ 2.4GHz Intel® Xeon processor, dual power supply, 64 GB DDR4 Smart Memory, Smart Array storage controller, fiber optics/lan card, min 4 ethernet port, cable kit, 1 storage SSD+4storage SATA , enterprise protection, mount kit and server acceleration
No 2.00
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
BILL NO. (1.10)
INSTRUMENTATION & CONTROL WORKS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
BILL NO. (1.10)
INSTRUMENTATION & CONTROL WORKS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
A.9 Dual Wall Face Plate (Data+ Voice) No 76.00
A.10 Single Wall Face Plate No 25.00
A.11 Single Ceiling Face Plate No 16.00
A.12 Wall Face Plate UPS Power outlet No 117.00
A.13
ID Card printer Direct to Card Printing, Double-sided, can print authentication information and access control information at same time, USB, Ethernet Interfaces, Magnetic Stripe Encoder
No 1.00
B TV-SOUND SYSTEM
Supply install and test the following TV/Sound Software, TVs, Speakers including boxes, conduits wires in Meeting Rooms
B.1 Digital Video and Music Solution Software No 1.00
B.2 Ceiling projector with motorize screen No 2.00
B.3TV 65", Quad-Core Processor, Built-in Ethernet port, HDMI Inputs and DirecTV Ready
No 3.00
B.4 Ceiling Speaker No 6.00
B.5 Wall Indoor Speaker No 3.00
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
BoQ Item No.
BoQ Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
"IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
BILL NO. (1.10)
INSTRUMENTATION & CONTROL WORKS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
C CCTV SYSTEM ,SECURITY SYSTEM&SPEAKER
Supply, install, and test all closed circuit CCTV system, Security Software including boxes, conduits, wires, Door Locks, Door Readers and All necessary accessories as specified in the drawings with full backup plan and device using redundant 2 servers . Security system should be compatible with the Bank standard security system
C.1 Integrated Security Solution Software No 1.00
C.2 Indoor Fish Eye camera No 7.00
C.3 Indoor BTZ camera No 4.00
C.4 Access control reader No 10.00
C.5 Magnetic door lock at Server Room No 1.00
TOTAL CARRIED TO GRAND SUMMARY
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
PART
T 3: APPPROJ
PENDIX (JECT DA
(A) TO BAY WORK
Afr R
ILLS OF K SCHED
ican DevelopRelocation a
D
QUANTIDULE
pment Bank and Outfitting
Day work Sc
ITIES
–Sudan g Project
hedules
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantitiesand Daywork Schedules
Item DescriptionCountry of Origin
Unit Qty.Operational Time
Unit Rate (USD)
Idle Time Unit Rate
(USD)
D1.1 Bricklayer Work Day 1
D1.2 Mason Work Day 1
D1.3 Mechanic Work Day 1
D1.4 Vehicle Driver Work Day 1
D1.5 Ganger Work Day 1
D1.6 Skilled Labour Work Day 1
D1.7 Unskilled Labour Work Day 1
APPENDIX (A)
SCHEDULE 1 - LABOUR
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. Day work schedule is for reference only. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
Item DescriptionCountry of Origin
Unit Qty.Unit Rate
(USD)Total Amount
(USD)
D2.1 Ordinary Portland Cement T 1
D2.2Fine Sand for Block work / Plastering (free of clay, silt, etc.) m3 1
D2.3 Brick No. 1
D2.4 Diesel Fuel Litre 1
D2.5 Benzene Fuel Litre 1
APPENDIX (A)
SCHEDULE 2 - BASIC MATERIALS
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. Day work schedule is for reference only. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2
African Development Bank
Sudan Relocation andOutfitting Project
Preamble, Bills of Quantities and Daywork Schedules
Item DescriptionCountry of Origin
Unit Qty.Operational Time
Unit Rate (USD)
Idle Time Unit Rate
(USD)
D3.1 Project Manager (Site / Office) Work Day 1
D3.2 Site Project Engineer - Architect Work Day 1
D3.3 Site Project Engineer - Civil Engineer Work Day 1
D3.4Site Project Engineer - Electrical Engineer
Work Day 1
D3.5 Site Project Engineer - Mech Engineer Work Day 1
D3.6Site Project Engineer - Planner / Scheduler
Work Day 1
D3.7Site Project Engineer - Quantity Surveyor
Work Day 1
D3.8Site Technician / Junior Engineer (Any Discipline)
Work Day 1
D3.9 Site H&S Officer Work Day 1
D3.10 Site CAD Drafter Work Day 1
D3.11 Site Document Controller Work Day 1
D3.12 Site Office Bell-boy Work Day 1
D3.13 Site Inspector (All Disciplines / Trades) Work Day 1
* Work Day is based on a standard 8 hrs/ day, 6 days/ week working
APPENDIX (A)
SCHEDULE 3 - SUPERINTENDENCE
SUDAN RELOCATION AND OUTFITTING PROJECT - LOCATION / KHARTOUM -SUDAN
IMPORTANT NOTES: By populating and pricing the BOQ items below, the Tenderer certifies and confirms his complete acquaintance with and understanding of the Site Conditions, Work Scope, Designs, Specifications, BoQ Preamble, the Conditions of Contract, the prevailing market conditions and the local laws and regulations. The Price Sufficiency Clause in the Conditions of Contract shall apply. All and any other items not priced hereunder shall be deemed part of the Unit Rate Pricing. Day work schedule is for reference only. The contractor is advised to visit the site before pricing, since the building is already occupied. The Construction shall be conducted in two stages without disturbance of day works. The floor under scope of contract includes two parts ,northern wing which is already occupied by the Employer, therefore the Contractor to start outfitting works in southern wing of the buildings including all required service and IT installation , the Employer will then shift to the southern wing then the contractor can start work in northern wing . This is to be considered in contractor's time frame for completion of all works under Contract. Where ever manufacturer’s name for any equipment is mentioned in Contract documents this is only for indicative purposes and the contractor is free to provide alternative equipment of similar quality.
Notes:
BOQ Status: finalBoQ Issue Date: March 2018
BoQ Rev No.: 2