Public Hearing Presentation Slide 2
Presentation Overview
Site Context
Development Summary
Requested Variances
Supporting Study
Development Process
Slide 3
Block 26 Bridgwater Town CentreLocation
• Bridgwater Town Center of the Waverly West Ward
• Southeast corner of Centre St. and Park East Dr.
Site Profile
• 1.88 Ac
• Vacant
• Commerical Mixed Use (‘CMU’)
Public Hearing Presentation
Slide 4
Neighbouring Uses
North: Commercial (C2/C3)
South: Public Lane
2-Storey Duplex (RMF-S)
Vacant Parcel (CMU)
East: Park East Drive
2-Storey Duplex (RMF-S)
West: Centre Street
Ironclad ‘s “The Bravado” (CMU)
Public Hearing Presentation
Slide 6
DevelopmentSummary
155 Purpose Built Rental Units
1, 2 and 3 bedroom configurations
will be managed by Ironclad
Properties upon completion.
Two (2) 6-Storey Buildings
Building One (Centre St) includes
ground floor commercial and
residential. Building Two (Park East Dr)
is exclusively residential.
204 Vehicular Parking Stalls
Distributed along the surface and
underground parkade.
Centre Street - West Elevation
Public Lane - South Perspective
Public Hearing Presentation
Slide 7
95 Bicycle Parking Stalls
Along Centre St, north of Park East
Dr, surface & underground parkade.
7 Commercial Units
Residential Amenity Spaces
Fitness Centre, Lounge &
Rooftop Patio
Main Street Urbanization
Plaza’s & landscaping similar to
“The Bravado”
On-Site Amenities
Public Hearing Presentation
Public Hearing Presentation Slide 8
Requested Variances
The Bridgwater Town Centre NASP encourages densities and design guidelines that are not consistent under CMU zoning.
Requested variances to the CMU standards of the Zoning By-law include:
Decreased lot area per dwelling to 524 sq.ft. instead of 800 sq.ft.
Reduced front yard setback of 10.2 ft instead of 25 ft
Front yard balcony projection of 4ft instead of 3.4ft
Reduced corner side yard of 15.3 instead of 20ft
Reduced south side yard of 15 ft instead of 20 ft
Increased building heights of 73ft & 66 ft instead of 60ft
Accessory parking area to permit south side yard of 4.2 ft instead of 8ft
The requested variances are substantially similar to the approved variances for Block 25 “The Bravado”
A
B
C
D
E
F
G
A
B
C
D
E
F
G
F
Public Hearing Presentation Slide 9
Supporting Study:Servicing & Density
• Bridgwater Town Centre NASP encourages higher-densities within the Commercial Mixed Use Policy Area.
• This is required to support local commercial establishments & is not consistent to CMU zoning standards.
• Servicing Study conducted in Jan 2021 compares potential density to the built/proposed densities:
• 2586 potential units
• 1718 proposed/built units
• Town Centre has sufficient servicing capacity for the development proposal of 155 units.
Public Hearing Presentation Slide 10
Assiniboia
Community
Committee
Meetings with Public
Works & Local Councilor
Discussed preliminary
site design
Project Mailers
Distributed To
Adjacent
Neighbours
Delivered to 35
residents & 27
commercial
businesses
Jan
2021
Submitted
DAV-C &
Development
Application
DAV-C Processed
Administratively
May
2021March
2021
Feb
2021
May
2021
Development Process
Public Hearing Presentation Slide 13
Supporting Studies:Shadow Study
• The following diagram analyzes potential shadow impact onto neighbouringland uses
• The study includes the proposed development and “The Bravado” at full build out
• Results indicate minimal shadow impact during the spring and summer equinox
Spring Equinox
Summer Equinox
Public Hearing Presentation Slide 14
Supporting Studies:Shadow Study
• The properties will not be impacted during the Fall Equinox
• The commercial land uses and northern most Townhomes to the North will experience increased shadow during the winter months when the sun is at its lowest (sunrise & sunset)
• The proposed development is anticipated to meet the City’s sunlight requirements & will not adversely impact neighbouring properties
Fall Equinox
Winter Equinox