UTTARAKHAND DISASTER RECOVERY PROJECTgbpihedenvis.nic.in/PDFs/Disaster Data/Disaster... · India:...
Transcript of UTTARAKHAND DISASTER RECOVERY PROJECTgbpihedenvis.nic.in/PDFs/Disaster Data/Disaster... · India:...
UTTARAKHAND DISASTER RECOVERY PROJECT
Project ID: P146653
Government of Uttarakhand
The World Bank assisted project
Project Management Unit (PMU)
UDRP-PMU, SIIDCUL Building, 29 IIE (IT PARK), Sahastradhara Road, Dehradun-248001, Uttarakhand
Tel.: +91-135-2708100 Fax: +91-135-2708109
Progress Report
Till Jun 2015
FIRST PROGRESS REPORT
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun i
TABLE OF CONTENTS
I. PROJECT DETAILS ..................................................................................................... 3
II. EXECUTIVE SUMMARY ............................................................................................. 4
III. CONSOLIDATED PHYSICAL ACHIEVEMENT ....................................................... 6
IV. PROJECT COVERAGE, BENEFITS ......................................................................... 7
V. FINANCIAL PERFORMANCE .................................................................................... 7
VI. COMPONENT – 1: RESILIENT INFRASTRUCTURE RECONSTRUCTION ..... 8
VII. COMPONENT – 2: RURAL ROAD CONNECTIVITY............................................ 11
VIII. COMPONENT-3: TA&CBDRM ................................................................................. 22
IX. IMPLEMENTATION SUPPORT ............................................................................... 27
X. MANAGEMENT INFORMATION SYSTEM (MIS) ................................................. 28
XI. COMPREHENSIVE REPORT ON SAFEGUARD COMPLIANCE ...................... 29
XII. APPENDIX 4: MEETINGS ......................................................................................... 32
XIII. APPENDIX 5: SITE PHOTOGRAPHS ..................................................................... 34
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 1
ABBREVIATIONS
ADB : Asian Development Bank
DEA : Department of Economic Affairs
DM : District Magistrate
DMMC : Disaster Mitigation and Management Unit
DPM : Deputy Program Manager
DRM : Disaster Risk Management
DSC : Design and Supervision Consultancy
DSS : Decision Support System
EA : Executing Agency
EMP : Environmental Management Plan
ESA : Environment and Social Assessment
ESMF : Environment and Social Management Framework
EWS : Early Warning Systems
FM : Financial Management
GoI : Government of India
ODCH : Owner Driven Construction of Houses
ODR : Other Districts Roads
OP : Operational Policy
ORAF : Operational Risk Assessment Framework
PDO : Project Development Objective
PIU : Project Implementation Units
PM : Program Manager
PMMGSY : Pradhan Mantri Gram Sadak Yojana – Rural Roads
Project
PMU : Project Management Unit
PSC : Project Sanctioning Committee
RAP : Resettlement Action Plan
RCC : Reinforced Cement and Concrete
SDMA : State Disaster Management Authority
GoUk : Government of Uttarakhand
IA : Implementing Agency
IBRD : International Bank for Reconstruction and Development
IAS : Indian Administrative Service
IDA : International Development Association
IIRS : Indian Institute of Remote Sensing
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 2
IIT : Indian Institute of Technology
JRDNA : Joint Rapid Damage and Needs Assessment
M&E : Monitoring and Evaluation
MDR : Major District Roads
MNREGA : Mahatma Gandhi National Rural Employment Guarantee
Act
MIS : Management Information System
NCB : National Competitive Bidding
NDMA : National Disaster Management Authority
NDRF : National Disaster Response Force
NH : National Highways
SCDGS : Social Community Development- Gender Specialist
SH : State Highways
SUDHA : Society of Uttaranchal Development and Himalayan
Action
TA&CBDRM : Technical Assistance and Capacity Building for Disaster
Risk Management
TSSC : Technical Support and Supervision Consultancy
UDRP : Uttarakhand Disaster Recovery Project
UIDC : Uttarakhand Infrastructure Development Corporation
UKRWSSP : Uttarakhand Rural Water Supply and Sanitation Project
USAC : Uttarakhand Satellite Application Centre
WB : The World Bank
WIHG : Wadia Institute of Himalayan Geology
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 3
I. PROJECT DETAILS
Basic Details
Project ID : P146653
Project Name : Uttarakhand Disaster Recovery Project
Loan Signing Date : 09.01.2014
Project Implementation End Date : 31.12.2017
Borrower : Government of India
Responsible Agency : Government of Uttarakhand
Contact Person : Rakesh Sharma, IAS,
Additional Chief Secretary, GoUk
Program Director, UDRP : Amit Singh Negi, IAS,
Secretary, PWD, GoUk
Project Objective : To restore housing, rural connectivity and build resilience of communities in Uttarakhand and increase the technical capacity of the State entities to respond promptly and effectively to an eligible crisis or emergency.
Project Finance Data (Expected Disbursement US$ Million)
Total Project Cost (US$ Million) : 250
Total Bank Financing (US$ Million) : 250
Financing Source : International Development Association (IDA)
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 4
II. EXECUTIVE SUMMARY
The monsoon in June 2013 arrived almost two weeks earlier than expected in Uttarakhand. From June
15 to 17, 2013, cloud bursts6 and heavy (64.5 - 124.4 mm) to very heavy (124.5 – 244.4 mm) rainfall
hit several parts of the higher reaches of the Himalayas. This unprecedented rainfall resulted in a
sudden increase in water levels, giving rise to flash floods in the Mandakini, Alakananda, Bhagirathi
and other river basins, also causing extensive landslides at various locations. Continuous rains caused
Chorabari Lake to rise and the Lake’s weak moraine barrier gave way and a huge volume of water
along with large boulders came down the channel to the east, devastating the towns of Kedarnath,
Rambara, Gaurikund and others in its wake. According to official sources, over 900,000 people have
been affected by the event in Uttarakhand.
The districts of Bageshwar, Chamoli, Pithoragarh, Rudraprayag and Uttarkashi were most affected.
This region is one of the most important pilgrimage circuits in India. Since disaster coincided with the
peak tourist pilgrimage season, it significantly increased the number of casualties, missing, and
affected population. A total of 580 human lives were lost; over 5,200 people are reported missing7;
4,200 villages were affected; 9,200 cattle/livestock were lost; about 3,320 houses were fully damaged;
about 995 public buildings were damaged; close to 9,000 km of roads were affected; and 85 motor
bridges and 140 bridle bridges were damaged. This event also left over 70,000 tourists and 100,000
local inhabitants stranded in the upper reaches of the State.
Landslides and toe erosion by the sediment loaded rivers damaged roads/highways at many locations
and washed away multiple bridges (steel girder, beam, and suspension/cable bridges). Traffic was
disrupted along all national highways and link roads in the region, along with the disruption of
telecommunication lines, all adding to the impact of the disaster. Many hotels, rest houses and shops
around the temple in Kedarnath were completely destroyed.
The World Bank (the Bank) and the Asian Development Bank (ADB), upon receiving a request from the
Department of Economic Affairs (DEA), GoI, fielded a Joint Rapid Damage and Needs Assessment
(JRDNA) Mission that visited the State from July 29 to August 07, 2013. In collaboration with the
Government of Uttarakhand (GoUk), the JRDNA Mission undertook a multi-sectoral assessment of the
damages and laid the groundwork for an immediate recovery and reconstruction needs framework.
The assessment relied upon the damage and loss assessment carried out by the State government.
The unprecedented event has severely impacted all the communities that are scattered in the
mountainous terrain. The report estimated the cost of damage reconstruction to be about US$661
million. Based on the findings of the JRDNA, the DEA, GoUk, ADB and the Bank agreed on a framework
for assistance in the disaster recovery and future risk reduction.
Implementation Support:
This component will support the incremental operating costs of the Project, including the operation of
the Project Management Unit (PMU) and the respective Project Implementation Units (PIUs). The
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 5
component will also include the creation of small, temporary field implementation offices with
necessary equipment, furniture, etc. In addition, the component will include consultancies required
for the preparation and supervision of specific activities, trainings, exposure visits and knowledge
exchange programs. An agency will be appointed to provide technical and social support to the Owner
Driven Construction of Houses (ODCH).
High Powered Committee (Approving) & Core Committee (Review & monitoring):
A High Powered Committee was constituted to grant approval for new works and a High powered review committee was constituted to review the progress of works in all sectors. The continuous
monitoring of the Project and its achievements are being taken up by the Core Committee. The first HPC was held in November 2013 and a total of 26 HPCs have been conducted since then. • The Minutes of all HPC meetings are available on the project website: www.ukdisasterrecovery.in
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 6
III. CONSOLIDATED PHYSICAL ACHIEVEMENT
Setting up of PMU and Staffing
• The Project Management Units & Project Implementation Units have been set-up under SDMA
for this project vide GO number 1060/XVIII-(2)/F/13-15(31)/2013A & 1634/XXX-1-2013.
Setting up of PIU and Staffing
The Project Implementation Units (PIU) have been set-up for each of the four-project sectoral
programs in UDRP. (Details of Staffing at Annexure I)
• PIU, Roads & Bridges, (R&B), PWD;
• PIU, Resilient Infrastructure Reconstruction (RH&PB) and
• PIU, Technical Assistance and Capacity Building for Disaster Risk Management (TA&CBRM)
Works Contracts
Under Road and Bridges component, contracts have already been signed for 70 packages (66 for Roads, 01 for Bridge and 03 for supply of machineries) worth Rs. 40352.35 lacs and work have been started in 60 packages.
Under Resilient Infrastructure Reconstruction component a total of 2499 beneficiaries have been identified in five disaster affected districts of Uttarakhand i.e. Bageshwar (96 beneficiaries), Chamoli (584 beneficiaries), Pithoragarh (659 beneficiaries), Rudraprayag (861 beneficiaries) and Uttarkashi (299 beneficiaries). A sum of Rs. 9602.50 lacs have been paid to 2497 beneficiaries so far in way of instalments as per the housing policy. Under Public Buildings component out of 14 packages including 19 buildings, designs have been finalised for 8 packages including 12 buildings, tender floated for 6 packages and evaluation of 2 tenders is under process.
Under Technical Assistance & Capacity Building for Disaster Management (TA&CBDRM) program 04 Automatic Weather Station (AWS) worth Rs. 51.81 lacs have already been installed at various locations in four districts of Uttarakhand i.e. (Dehradun, Pithoragarh, Chamoli & Tehri). 05 out of 11 lots of Rescue and safety equipments worth Rs. 641.97 lacs have been procured and handed over to State Disaster Relief Force (SDRF), rest will be delivered during the month of July - August, 2015.
Consultancy Contracts
Under Road & Bridge component 06 Design / Supervision consultancies have been awarded i.e 04 Design & Supervision Consultancies (DSCs) for Road & 01 Design & 1 Supervision Consultancy for Bridges.
Under Resilient Infrastructure Reconstruction component 01 NGO firm was procured to assist in the beneficiary validation, motivation, facilitation of shifting, setting up of bank accounts, facilitating rentals, etc. under the Owner Driven Construction of Houses (ODCH) subcomponent. 01 Design consultancy has been awarded for 2 packages under the Public Building component.
Under Technical Assistance & Capacity Building for Disaster Risk Management component all Five Technical Task force formed. Procurement of Technical consultancies for various studies is under progress.
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 7
Under Project Management Unit (PMU) M/s Parul Goyal & Company have been engaged for assisting the field units of the PIU – Road & Bridge in accounting of UDRP project in tally software. M/s Ansul Agarwal & Co. was engaged to conduct Internal Audit of the project for FY 2013-2014 & FY 2014-2015. The process for engagement of an Independent Environment and Social Auditor is in progress.
IV. PROJECT COVERAGE, BENEFITS
The Primary beneficiaries from the project activities are the local communities in the State. The main benefits of the project : Housing and Public Buildings: Multi hazard resilient houses and up-gradation of public buildings are relevant for the beneficiary households, as they would not only minimize future infrastructural damage costs, but also improve vulnerable households’ ability to secure their belongings during future disasters. Rural Road Connectivity: The benefit of investments to restore rural road connectivity (roads and bridges) is likely to cover both the entire State of Uttarakhand, including households and businesses, and the neighbouring States if between-State trade is a significant part of the local economy. Technical Assistance and Capacity Building for Disaster Risk Management: Early warning infrastructures play a major role in disaster risk reduction. The objective of this component is to strengthen early warning infrastructure in the State including hydro-meteorological services in order to enhance the capabilities of the government entities and others in risk mitigation and response. Further this will lead to establishment of a Decision Support System (DSS) and integration of an integrated hydro-meteorological and early warning system.
V. FINANCIAL PERFORMANCE
Component Name Cost in (US$
Million) as per PAD
Expenditure up to 31st March,
2015 (US$ Million)
Expenditure in Quarter Apr-Jun,
2015 (US$ Million)
Resilient Infrastructure Reconstruction 31.000 7.120 2.460
Rural Road Connectivity 155.000 10.344 7.190
Technical Assistance and Capacity
Building for Disaster Risk Management
38.000 0.000 0.000
Financing Disaster Response Expenses 12.000 8.49 0.000
Implementation Support 14.000 1.563 0.320
Contingency Emergency Response 0.000 0.000 0.000
Total 250.00 27.517 9.970
Total (up to 30th June, 2015) 37.486
Source: PIUs and PMU
Note: CAG Audit completed FY 2013 – 14 for UDRP Project reports received.
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 8
VI. COMPONENT – 1: RESILIENT INFRASTRUCTURE RECONSTRUCTION
a. Resilient Housing: Owner Driven Construction of House (ODCH)
Relocated Cluster Housing and Public Building work will be carried out by the Uttarakhand State
Infrastructure Development Corporation (USIDC), Owner Driven Construction of Houses (ODCH) will
be implemented by the PMU through the office of respective District Magistrate (DMs).
The present status of the installments being paid under the Resilient Housing (ODCH) component is as
follows:
(Status as on 30th June, 2015 (Amount in Rupees Lacs)
S. N
o.
Dis
tric
ts
Tota
l No
. of
Ben
efic
iari
es
1st
Inst
allm
en
t (B
enef
icia
ries
–
No
.)
Am
ou
nt
(@1
.5 la
cs)
2n
d In
stal
lmen
t (B
enef
icia
ries
-
No
)
Am
ou
nt
(@2
.0 la
cs)
3rd
Inst
allm
en
t
(Ben
efic
iari
es -
N
o)
Am
ou
nt
(@1
.0 la
cs)
4th
Inst
allm
en
t
(Ben
efic
iari
es-
No
) A
mo
un
t
(@0
.5 la
cs)
1 Bageshwar 96 96 144.00 89 178.00 36 36.00 17 8.50
2 Chamoli 584 584 876.00 478 956.00 288 288.00 62 31.00
3 Pithoragarh 659 659 988.50 613 1226.00 423 423.00 128 64.00
4 Rudraprayag 861 859 1288.50 720 1440.00 442 442.00 54 27.00
5 Uttarkashi 299 299 448.50 270 540.00 174 174.00 48 24.00
Total 2499 2497 3745.50 2170 4340.00 1363 1363.00 309 154.50
(Rs. In lacs)
Status of Construction of Resilient Houses of Beneficiaries – Total 2406 house construction started by
30th June, 2015.
S. No.
Districts
Site
pre
par
atio
n,
mat
eria
l co
llect
ion
an
d
eart
h w
ork
sta
rte
d
Plin
th L
eve
l
Ho
use
wit
h R
oo
f Le
vel
Tota
l cas
tin
g R
oo
f
Tota
l co
mp
lete
d w
ith
To
ilet
con
stru
ctio
n
Ho
use
in w
hic
h d
isas
ter
resi
lien
t fe
atu
re
avai
lab
le
Ho
use
in w
hic
h d
isas
ter
resi
lien
t fe
atu
re n
eed
s
to b
e e
nsu
re
(ret
rofi
ttin
g m
ay
req
uir
ed)
1 Bageshwar 04 12 46 11 23 91 05
2 Chamoli 69 100 33 234 141 526 45
3 Pithoragarh 09 44 60 336 199 562 86
4 Rudraprayag 20 70 83 380 246 675 124
5 Uttarkashi 10 70 51 101 60 261 31
Total 112 296 273 1062 669 2115 291
Note: The list of the beneficiaries under ODCH program is available at www.ukdisasterrecovery.in
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 9
First installment has been paid to 99.92%. Over 1700 (297+879+538=1714) house beneficiaries have constructed their houses till roof level and completed house which includes 538 completed houses. Insurance of ODCH beneficiaries: Quotations have been received. Committee to finalize the details by end of July, 2015 and insurance activity will start before September, 2015.
DETAILS OF NGO FIRM ENGAGED UNDER - Resilient Housing Component - One
Contract No. NGO Name Category Work
01/PMU/ODCH/C
ONSULTANT/2013
-14
M/s Society of Uttaranchal
Development and Himalayan
Action (SUDHA), Almora
(Uttarakhand)
Project
Management
Consultancy
Facilitation of providing installment
of to beneficiary and help
beneficiary completing formalities.
b. RESILIENT PUBLIC BUILDINGS: Total 14 Packages (19 Sub-Projects)
Reconstruction of damaged public buildings like, Police Station, School, Educational Institute, Health Centers, Food Godown etc. in four districts of Uttarakhand i.e. Rudraprayag, Pithoragarh, Pauri & Chamoli.
Status Packages No. of Buildings
No. of Packages 14 19
Design finalized 08 12
DPR under preparation packages 05 06
Tender Floated 06 09
Tender Under Evaluation 02 03
Land Transfer in progress 01 01
Construction Started 0 0
This component is supporting the reconstruction of damaged public buildings, such as the Panchayati
Raj Institution (PRI), Block and District offices and technical education institutes. It includes the
restoration of partially damaged structures and the reconstruction of fully damaged structures. The
Details of the proposed structures as below:
S. No. sub project name
Pkg. No. Sanctioned Cost (Rs. In
Lakh)
Status as on 30th June, 2015
1 Primary School Gandhari (Chopta), Rudraprayag
01/BC/PIU/USIDC/PB/2015-16
27.59 Technical evaluation done
2 Primary School Chopta (Chopta), Rudraprayag
27.80 Technical evaluation done
3 Primary School Barsu Rudrapryag 02/BC/PIU/USIDC/P
B/2015-16
27.38 Tender floated
4 Primary School Kot Talla Nagrashu, Rudraprayag
27.80 Tender floated
5 Primary School Timili Badma, Rudraprayag
03/BC/PIU/USIDC/PB/2015-16
27.80 Tender floated
6 Primary School Panjana, Rudraprayag
28.42 Tender floated
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 10
7 Primary School Kaviltha (Kalimath), Rudraprayag
04/BC/PIU/USIDC/PB/2015-16
29.05 Tender floated
8 Govt Inter College Parkandi, Rudraprayag
310.17 Tender floated
9 Govt Inter College Ghimtoli, Rudraprayag
05/BC/PIU/USIDCL/PB/2015-16
322.05 Tender received
10 Govt Inter College Kotgi, Rudraprayag
06/BC/PIU/USIDCL/PB/2015-16
291.40 Tender floated
11 Govt Inter College Peera Dhanpura, Rudraprayag
07/BC/PIU/USIDCL/PB/2015-16
309.62 Tender floated
12 Food Godown, Srinagar, Pauri 08/BC/PIU/USIDCL/PB/2015-16
166.00 Financial bid is scheduled to be opened on 10.07.2015
13 Ladies Police Station, Srinagar, Pauri
09/BC/PIU/USIDCL/PB/2015-16
390.00 DPR is under preparation
14 Sub- Center Baluwakot, Pithoragarh
10/BC/PIU/USIDCL/PB/2015-16
68.98 Finalisation of Specification of structure is under progress
15 Police Station Lambagad, Chamoli 11/BC/PIU/USIDCL/PB/2015-16
150.00 Finalisation of Specification of structure is under progress
16 Police Station Govindghat 150.00
17 ITI Srinagar (GRIHA), Pauri 12/BC/PIU/USIDCL/PB/2015-16
780.00 Preparation of DPR is in progress
18 60 seater Hostel Building in Govt PG College Agastmuni, Rudraprayag
13/BC/PIU/USIDCL/PB/2015-16
301.32 Preparation of DPR is in progress
19 State Allopathic Dispensary Pandukeshwar, Chamoli
14/BC/PIU/USIDCL/PB/2015-16
146.00 Land transfer is in progress
Total Estimated Cost (Rs in lacs) 3581.38
Geological investigations completed for all sites.
Social and Environmental screening completed.
DESIGN CONSULTANCY DETAILS (Resilient Public Buildings): Two
Only design work is under the scope of the consultancy firm. Supervision will be done by USIDCL staff.
S.
No. Particulars Contractor Name
Category /
Name Scope of Work
1 02/DC/PIU/USIDCL/PB/
2014 (Package-2)
M/s Technical Consultancy
Services, GMS Road,
Dehradun, Uttarakhand
Design
Consultancy
Providing
Earthquake
resilient Design
for public
buildings. 12
Design have been
finalized and rest
is in progress.
2.
01/DC/PIU/USIDCL/PB
/2014 (Package – 3)
M/s Technical Consultancy
Services, GMS Road,
Dehradun, Uttarakhand
Design
Consultancy
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 11
VII. COMPONENT – 2: RURAL ROAD CONNECTIVITY
The objective of this component is to restore the connectivity lost due to the disaster through the reconstruction of damaged roads and bridges including: village roads, Other District Roads. The roads and bridges are being designed to withstand earthquake and flood forces as per the latest official design guidelines. The affected rural areas are being benefitted by the restored access to the market thereby increasing the economic growth in these areas and timely access to health and education services. Project Implementation Unit (Roads and Bridges) is being executed by the Public Works Department (PWD).
ROADS: Status of Roads under UDRP Projects (as on 30h June, 2015) )
Status Package
(nos.) Roads (nos.)
Length (Km) Cost
(Rs in lacs)
Total Scope - 379 2548 73000.00
Sanctioned by HPC 116 221 1521 67080.00
Procurement Status
Status Package
(nos.) Roads (nos.)
Length (Km) Cost
(Rs in lacs)
Contract Agreement Signed 66 135 1024 39100.00
LOA issued 15 22 113 6200.00
Total 81 157 1137 45300.00
Bid Status
Status Package
(nos.) Roads (nos.)
Length (Km) Cost
(Rs in lacs)
Financial Bid opened 04 07 44 3200.00
Technical Bid opened 09 26 95 5100.00
Total 13 33 139 8300.00
Bid floated 17 216 1493 68400.00
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 12
Details of the Packages in which agreement signed (66 nos.):
S. No.
Package/ Contract Number
Contractor Name Contract Description
Len
gth
of
Ro
ad L
engt
h
Km
/ Sp
an m
ete
r
Aw
ard
Val
ue
(Rs.
In la
cs)
Lett
er o
f A
ccep
tan
ce
Co
ntr
act
Sign
ing
Dat
e C
on
trac
t D
ura
tio
n
(Mo
nth
s)
Ph
ysic
al P
rogr
ess
(%)
1 UDRP/PWD/03/39/RD/00
1 Dated 17/04/2014
M/s R G Buildwell Engineers Ltd., 1449/159-A Durgapuri,
Sahadara, Delhi
Kandai-Kamoldi-Molkhakhal Motor Road (km.1 to 21) 2
0.7
8
34
9.0
0
27
-03
-14
17
/04
/14
15
38
.76
2 UDRP/PWD/03/39/RD/02
0 Dt. 22/04/14
M/s R G Buildwell Engineers Ltd., 1449/159-A Durgapuri,
Sahadara, Delhi
Nagrasu Dhanpur DandaKhal Motor
Road 28
.00
11
83
.68
15
-04
-14
22
/04
/14
15
68
.33
3 UDRP/PWD/02/38/RD/00
9 Dated 26/04/2014
Ram Narayan Contractor Mallgodam, Railway road,
Muzaffarnager, U.P. Contract No. 9927051552
Sonla Kandara Maikhura Motor Road 3
6.0
0
13
09
.32
15
-04
-14
26
/04
/14
15
23
.73
4 UDRP/PWD/10/19/RD/01
4 Dated 15/05/2014
M/s Panchghati Constructions, Pangaria Bhawan, Talli Chanmari,
Lohaghat, Distt, Champawat Uttarakhand
Laluwa Pani Banlekh Motor Road 8
.40
34
8.6
9
03
-05
-14
15
/05
/14
15
77
.61
5 UDRP/PWD/
03/40/RD/021 Dated
22/05/2014
M/s Vijay Builders Near Kali Mandir, Badripur,
Jogiwala, Dehradun- 248001
(Uttarakhand)
Guptkashi-Jakhdar Motor Road
12
.95
641
.81
13
-05
-14
22/
05/1
4
15
51
.96
Guptkashi by pass & Guptkashi Hospital
Motor Road
Guptkashi inspection House approach.
Ukhimath Internal Motor Road.
Ukhimath Temple Motor Road.
Ukhimath I.H. Approch Road.
Ukhimath - Mansoona Motor Road (urben
area)
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 13
6 UDRP/PWD/6/68/RD/007/2014 Dated 27/05/2014
M/s R G Buildwell Engineers Ltd.,1449/ 159-A Durgapuri,
Sahadara, Delhi
Chipalghat - Noutha - Nai Motor Road
13
.50
30
6.0
0
19
-05
-14
27
/05
/14
15
49
.31
Noudi - Badeth Motor Road
Paithani - Chuthani Motor Road
Sakarsain - Barseela - Bagadh Motor Road
Syoli - Teela Motor Road
7 UDRP/PWD/02/36/RD/026/2014 Dt. 12/06/14
M/s Bharat Bhoomi Builders Village Bhattowala, P.O Gumaniwala, Rishikesh-
249201
Panduwakhal-Rohilda Motor Road
30
.68
875
.65
19
-05
-14
12
/06
/14
15
27
.52
Gairsain-Pajiyana Motor Road
8 UDRP/PWD/04/46/RD/00
4 Dated 12/06/2014
M/s Vijay Engineering Associates, Tehri Bypass
Road Chamba Tehri Garhwal Uttarakhand
Bhaldiyana Bend to Kuner motor road
56
.75
378
.00
03
-05
-14
12/
06/2
014
15
73
.12
Ghugti Dhunga Dhamari Maindkhal
Motor road
Indra goan Katkhet Motor road
Kamand Jawarna Motor road
Kamand thouldhar motor road
Laluri Ghiya Koti kayrda challi Motor
road
Laluri Koti Mahoron Ki Manjkhet Motor road
Maindkhal Bangiyal Jawarna Motor road
Maindkhal Gair Nagun Motor road
Syansu pul to Ratwari Nakot Kholi Motor
road
Uniyal goan Nagraja dhar Motor road
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 14
9 UDRP/PWD/04/36/RD/03
9/2014 Dt.12/06/14
M/s Pooran Chandra Ramola & Brothers,Baurari, New
Tehri Distt. Tehri Garhwal.
Jakhanidhar-Garakot-Paurikhal Motor Road
34
.00
13
01
.75
26
-05
-14
12
/06
/20
14
15
84
.78
Anjanisain-Punanu Motor Road.
10 UDRP/PWD/02/36/RD/025/2014 Dt. 12/06/14
M/s Bharat Bhoomi Builders Village Bhattowala, P.O
Gumaniwala Rishikesh- 249201
Batadhar Dhunar Ghat Motor Road 2
0.0
0
94
9.4
9
19
-05
-14
06
-12
-20
14
15
19
.17
11 UDRP/PWD/05/56/RD/04
0/2014 Dt.30/06/14
M/s Dilawar Singh Contractor 89-C, Palm City
Dehra Khas Dehradun 248001 Uttarakhand
Submergance Motor Road
27
.50
56
3.5
5
26
-06
-14
30
/06
/14
15
37
.94
Nagthat Bisoi Motor Road
12 UDRP/PWD/07/16/RD/02
4 Dated 04/07/2014
M/s Dwarika Projects B-7 Sector 36, Noida-201303
Didihaat Dunakot Motor Road
27
.56
10
00
.30
26
-06
-14
04
/07
/20
1
4
15
24
.07
Didihaat-Aadichaura Motor Road
13 UDRP/PWD/01/34/RD/00
3/2014 Dated
11/07/2014
M/s Ram Krishnan Jayara Word No.- 5, New Market
Barkot, Distt. Uttarkashi- UK
Diyari setwade motor road
18
.50
13
6.5
4
06
-06
-14
11
/07
/20
14
15
89
.69
Garh Ambedkar motor road
Naugoan Suri Motor road
Ghanrali Pul to sarbadiyar motor
road
14 UDRP/PWD/07/20/RD/01
2/2014 Dated
13/08/2014
M/s ESAPN Infrastructure Ltd. B-4, Street-7 Shashi
Garden Mayur Vihar-I, Delhi- 110091
Ganai Bankot Motor Road. 1
3.0
0
488
.63
06/
08/1
4
13/
08/2
01
4
15 7
.11
15 UDRP/PWD/11/12/RD/52/2014 Dated 13/08/2014
M/s ESAPN Infrastructure Ltd. B-4, Street-7 Shashi
Garden Mayur Vihar-I, Delhi- 110091
Padam Puri Haida Khand Kathgodam
Motor Road. 30
.00
140
4.4
6
06/
08/1
4
13/
08/2
014
15
34
.62
16 UDRP/PWD/10/19/RD/04
7/2014 Dated
13/08/2014
M/s Panchghati Constructions
Pangaria Bhawan, Talli Chanmari,
Lohaghat, Distt, Champawat Uttarakhand.
Punave Sipty Nayari Motor Road. 8
.00
500
.13
17/
07/1
4
13/
08/2
014
15
27
.99
17 UDRP/PWD/13/59/RD/00
6a/2014 Dated
25/08/2014
M/s Link Enterprises Railway Road, Jwalapur Haridwar
Uttarakhand
Rangharwala to Nangal Motor Road.
15
.94
3.0
9
26/
06/1
4
25/
08/2
014
15
31
.98
Bhagwanpur-Sikhrodha Motor
Road.
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 15
Dada -Jalalpur to Samsaan Ghat Motor
Road.
Bhagwanpur-Imlikhera to Hakimpur
Turra Motor Road.
G.T Road to Jin Mohd. Shaeedpur Motor
Road.
G.T Road to Lawa Road.
G.T Road to Sisona Marg
Hallumajara Dheermajara to
Changa Majari Marg.
18 UDRP/PWD/13/59/RD/00
6b/2014 Dated
25/08/2014
M/s Link Enterprises Railway Road, Jwalapur Haridwar
Uttarakhand
Hasanpur-Madanpur Motor Road.
3.4
6
27
1.0
0
26
/06
/14
25
/08
/14
15
59
.77
Latifpur-Khubbanpur Road.
Raipur Link Motor Road.
19 UDRP/PWD/06/67/RD/04
8/2014 Dated
25/08/2014
M/s Vijay Builders Hotel Vijay Palace Tilwara
Rudraprayag Uttarakhand Satpuli-Marora-
Vyasghat Motor Road. 24
.60
87
4.0
8
10
/07
/14
25
/08
/14
15
42
.05
20 UDRP/PWD/05/53/RD/00
5/2014 Dated
25/08/2014
M/s Vijay Engineering Associates.
Tehri Bypass Road Chamba Tehri Garhwal Uttarakhand
Thano Bhogpur Road.
29
.75
561
.00
10/
07/1
4
25/
08/1
4
15
53
.10
Basantpur Madsi Road.
Bhogpur Gadul Fagsi Motor Road.
Dharkot Talai Motor Road.
Dharkot Tangoli Baderna Motor Road.
Harrawala Nakronda Motor Road.
Kunwala to Sainik Colony Motor Road
Suryadhar Sangaon Motor Road.
21 UDRP/PWD/09/03/RD/02
3/2014 Dt.09/09/14
M/s Trilok Singh Ram Singh Jamnal Kotdwara Road
Lakhan Pur Chowk Ramnagar Uttarakhand.
Chamkhala Querala Dabhra Motor Road
21
.00
750
.91
27/
05/1
4
09
-09
-14
15
89
.57
Paisia Peepna Motor Road.
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 16
22 UDRP/PWD/09/03/RD/022/2014 Dt. 09/09/14
M/s Trilok Singh Ram Singh Jamnal Kotdwara Road
Lakhan Pur Chowk Ramnagar Uttarakhand.
Marchula-Sylede-Deghat Motor Road. 4
4.6
0
11
20
.55
27
/05
/14
09
-09
-14
15
57
.05
23 UDRP/PWD/04/44/RD/01
9/2014 Dt.09/09/14
M/s Shiv Shankar Construction Company
Village-Khedli, Post Bhadrabad Distt. Haridwar
Gaza-Dandachali Motor Road. 1
0.0
0
48
7.0
3
26
/07
/14
09
-09
-14
15
74
.23
24 UDRP/PWD/08/05/RD/01
0/2014 Dt.15/09/14
M/s ESAPN Infrastructure Ltd. B-4, Street-7 Shashi
Garden Mayur Vihar-I, Delhi- 110091
Kanda-Saniudiyar-Rawatsera Motor
Road 20
.00
10
31
.51
25
/08
/14
15
/09
/14
15
25
.41
25 UDRP/PWD/08/06/RD/03
7/2014 Dt.15/09/14
M/s Dwarika Projects B-7 Sector 36, Noida-201303
Bhyun-Ghadra Motor Road.
14
.00
82
9.6
7
25
/08
/14
15
/09
/14
15
20
.68
Bhyun Gulr Motor Road
Kapkot Tehsil to Pooling Motor Road.
26 UDRP/PWD/08/05/RD/038/2014 Dt. 15/09/2014
M/s Dwarika Projects B-7 Sector 36, Noida-201303
Vijaypur Dhapti-Basantoli M.Road
11
.00
60
6.4
2
25
-08
-14
15
/09
/20
1
4 15
22
.16
Kanda-Mantoli Motor Road.
27 UDRP/PWD/07/15/RD/011/2014 Dt. 15/09/14
M/s Rajendra Singh Waldia Contractor Chilkoti Bhawan, Bank Road. Pi-262501 U.K
Acholi Badabe Motor Road.
19
.50
45
9.1
0
26
-06
-14
15
/09
/20
1
4 15
48
.44
Badabei Siligiya Motor Road
28 UDRP/PWD/06/67/RD/04
9/2014 Dt.27/09/14
M/s JDA Construction Badrinath Marg (Opp.
G.G.I.C) Kotdwar (Garhwal) U.K
Byas Chatti-Chheitur-Bhutnisi Motor Road.
15
.50
56
2.8
9
12
-08
-14
27
/09
/20
1
4 15
41
.16
Birsanikhal-Kota-Silsu-Bhutnisi Motor Road.
29 UDRP/PWD/06/67/RD/050/2014 Dt. 27/09/14
M/s JDA Construction Badrinath Marg (Opp.
G.G.I.C) Kotdwar (Garhwal) U.K
Badiyu-Jhakhanoli-Kunkuli Motor Road. 1
0.0
0
342
.78
12
-08
-14
27/
09/2
0
14 15
48
.40
30 UDRP/PWD/13/59/RD/00
6/2014 Dated
17/10/14
M/s Satyam Infratech 38, Shivam Vihar Rawali, Mahdood (SIDCUL)
Haridwar, U.K
Makdoompur Link Road.
8.2
3
242
.00
26
-06
-14
17/
10/2
014
15
57
.39
Rahamatpur to Belda Road
Lahboli to Mannakheri Road.
Mudlana to Harjoli Jatt Road.
Nagla Koyal Link Road.
N.H to Narsan Khurd Road.
N.H to Ulhera Via Khedajatt Road.
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 17
31 UDRP/PWD/07/16/RD/03
5/2014 Dated
27/10/14
M/s Dwarika Projects B-7 Sector 36, Noida-201303
Kqitee Sain-Rathi Motor Road.
11
.25
78
2.1
2
27
-09
-14
27
/10
/20
14
15
30
.49
Shishu Mandir-Nanasen Motor Road.
Shaid Pushker Singh Motor Road.
32 UDRP/PWD/04/49/RD/01
8/2014 Dt 03/11/2014
M/s Shiv Shankar Construction Company
Village-Khedli, Post Bhadrabad Distt. Haridwar
Uttarakhand
Kempti Fall Bypass Motor Road. 5
.75
30
3.2
3
15
-09
-14
11
-03
-20
14
15
90
.83
33 UDRP/PWD/08/06/RD/045/2014 Dt. 13/11/2014
M/s ESAPN Infrastructure Ltd. B-4, Street-7 Shashi
Garden Mayur Vihar-I, Delhi- 110091
Kameridevi-Syalkot Motor Road
17
.50
41
6.0
8
28
-10
-14
13
/11
/20
14
15
27
.30
Dhlam Khunoli Motor Road.
34 UDRP/PWD/03/39/RD/043/2014 Dt. 25/11/14
M/s Sahab Singh Rawat & Brothers Belani,
Rudraprayag, Uttarakhand. Kotkhal-Jagtoli Motor
Road. 7.0
0
45
8.5
8
14
-10
-14
25/
11
/14
15
12
.71
35 UDRP/PWD/07/17/RD/036/2014 Dt. 09/12/2014
M/s Chandri Chand (JV of Pipaliya Engineering and
Construction) M/s Chandri Chand, Siltham Road,
Pithoragarh, U.K
Ogla-Pathakgaon Narath Bhagichoura
Motor Road. 12
.50
51
4.1
6
15
-11
-14
12
-09
-20
14
15
50
.20
36 UDRP/PWD/10/18/RD/046/2014 Dt.
18 /12/2014
M/s Parwatiya Constructions B-7 Bus Station, Lohaghat Champawat Uttarakhand.
Barakot-Simalkhet Motor Road. 2
5.0
0
76
7.2
3
04
-09
-14
18
/12
/14
15
22
.77
37 UDRP/PWD/06/71/RD/05
1/2014 Dt. 31 /01/2015
M/s JDA Construction Badrinath Marg (Opp.
G.G.I.C) Kotdwar (Garhwal) U.K
Kotdwara Pulinda Motor Road. 1
2.0
0
145
.18
18
-09
-14
31/
01/1
5
15 3
.29
38 UDRP/PWD/02/03/RD/03
0/2014 Dt. 20/02/2015
M/s Arya Construction Company 395/2, Jain Nagar
Khautali Muzaffarnagar. Pokhri Harishanker
Motor Road 4.8
0
310
.49
05
-12
-14
20/
02/1
5
15
8.9
4
39 UDRP/PWD/01/32/RD/008/2014 Dt. 20/02/2015
M/s Bharat Construction PPCL Colony, Haridwar
Bypass, Dehradun. Chinyalisaur-Jogath
Motor Road 20
.00
127
5.4
6
29
-11
-14
20/
02/1
5
15
6.5
9
40 UDRP/PWD/03/40/RD/02
8 Dt. 20/02/15
M/s Sanjay Negi Contractor Near T.R.H Kotdwar Road
Pauri, UK. Nagjagai-Fegu Motor
Road 4.0
0
190
.66
22
-12
-14
20/
02/1
5
15
34
.72
41 UDRP/PWD/01/30/RD/03
1 Dated 24/03/15
M/s Kailash Hilways Engineering Associates
Kailash Gate, Muni ki Reti, Distt. Tehri Garhwal
New-Gaon-Sari Shrikakhal Motor
Road 10
.00
544
.95
18
-02
-15
24/
03/1
5
15
5.7
3
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 18
42 UDRP/PWD/04/48/RD/01
7 Dated 27/03/15
M/s Maa Bhagwati Construction Company C-
233, Sector-48, Noida-201301 Distt. Gautam Budh
Nagar (U.P)
Bhaldiyana Bend to Kamand motor road 5
.00
30
.00
31
-12
-14
27
/03
/15
15
0.0
0
43 UDRP/PWD/03/40/RD/02
9 Dated 01/04/15
M/s Star Construction 6/1236, Diwan Villa, Old
Madho Nagar, Saharanpur
Salya Tulanga Motor Raod.
11
.00
61
9.0
1
18
-02
-15
01
/04
/15
15
0.0
0
Chenagadh Uchola Motor Road
44 UDRP/PWD/03/39/RD/04
2 Dated 21/04/2015
M/s Crystal Infrastructure, 2-C/487 A, Sundar Vihar,
Malhpur Road, Saharanpur-247001
Rudraprayag to Gandhar Gadidhar
Dasjula Motor Road 19
.50
52
1.2
2
25
-02
-15
21
/04
/15
15
31
.07
45 UDRP/PWD/06/70/RD/01
5 Dated 13/04/2015
M/s JDA Construction Badrinath Marg (Opp.
G.G.I.C) Kotdwar (Garhwal) U.K
Rikhnikhal-Chanikhal Motor Road
26
.60
62
1.5
3
30
-01
-15
13
/04
/20
15
15
0.0
0
Bunga-Malla Motor Road
Satpuli-Dudharkhal Motor Road
46 UDRP/PWD/05/56/RD/04
1 Dated 06/05/2015
M/s Ajab Singh Rana & Broders, 28 A Kalidas Road,
Dehradun, Uttarakhand
Reconstruction of Ichala Phatao Magti
Motor Road 6
.60
29
6.1
1
04
-04
-15
05
-06
-
20
15
15
0.0
0
47 UDRP/PWD/10/12/RD/05
3/2014 Datad
21/05/2015
M/s Jeena Enterprises Jeolikote, Nainital,
Uttarakhand Talla Ramgarh
Ratighat Motor Road 8.0
0
19
9.6
2
16
/04
/20
15
21
/05
/20
15
15
0.0
0
48 UDRP/PWD/10/12/RD/00
2 Datad 03/06/2015
M/s Vinod Kumar Chauhan Contractor Vill. Nanoor
Khrea, P.O Tapovan, Raipur, Dehradun U.K
Badethi Kawa Motor Road
20
.82
175
.00
13/
04/1
5
06
-03
-15
15
0.0
0
Dunda-Kurah Motor Road from Gangorri N.H to ITBP Motor
Road
Nakuri-Singote Motor Road
Newgaon Sari-Srikakhal Motor Road
49 UDRP/PWD/RD/032 Dt 03/06/2015
M/s Dilawar Singh Contractor 89-C, Palm City
Dehra Khas Dehradun 248001 Uttarakhand
Ranari to Danda Majaf Motor Road
5.3
5
334
.62
04
-04
-
201
5
06
-03
-
201
5
15
0.0
0
Dunda Kurah Motor Road
50 UDRP/PWD/RD/033 Dt 04/06/2015
M/s Arya Construction Company 395/2, Jain Nagar
Khautali Muzaffarnagar.
Saura to sauri Motor Road
6.7
5
296
.28
27/
02/1
5
06
-04
-15
15
0.0
0
Bhukhi Kunjan Tihar Motor Road
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 19
51 UDRP/PWD/RD/072 Dt 04/06/2015
M/s Seema Construction Company R-2/22, Raj Nagar
Ghaziabad. Gagnani to Bhangali
Motor Road 4.6
0
44
4.0
4
13
/04
/15
06
-04
-15
15
0.0
0
52 UDRP/PWD/RD/075 Dt 04/06/2015
M/s PC2SR curt Road Purola Uttrakashi U.K Garh-Deval-Molghat
Motor road 3.8
5
32
8.6
5
05
-12
-15
06
-04
-15
15
0.0
0
53 UDRP/PWD/RD/082 Dt 04/06/2015
M/s Universal Associates, Vill & P.O Gumaniwala
Shyampur Rishikesh Narayanbagar-Kaub
Motor Road 6.3
5
51
3.9
5
05
-08
-15
06
-04
-15
15
0.0
0
54 UDRP/PWD/RD/083 Datad
04/06/2015
M/s Universal Associates, Vill & P.O Gumaniwala
Shyampur Rishikesh Bagoli Koti Motor
Road. 11
.20
51
8.8
3
27
/04
/15
06
-04
-15
15
0.0
0
55 UDRP/PWD/RD/089 Datad
04/06/2015
M/s Surat Singh & Sons, 54 Akashdeep Colony Chakrata
Road, Dehradun, U.K Ghat-Banjbagad Telan
Motor Road. 7.8
0
39
9.7
9
21
/04
/15
06
-04
-15
15
0.0
0
56 UDRP/PWD/RD/068 Datad
05/06/2015
M/s MNR Construction company, 137/100,
Matarani Niwas, Singh at mandi kargi Raod Dehradun
Pokhal-Bhawansi-Mandlu Motor Road. 1
9.0
0
73
2.0
0
30
/04
/15
06
-05
-15
15
0.0
0
57 UDRP/PWD/RD/080 Dt. 05/06/2015
M/s Dream Realinfra Pvt. Ltd. 5, Rochipura Mazara, Dehradun Uttarakhand.
Pursari-Palethi-Sartoli Motor Road. 1
.00
11
4.1
3
30
/04
/15
06
-05
-15
15
0.0
0
58 UDRP/PWD/RD/088 Dt. 05/06/2015
M/s Laxman Singh rawat village Inda, Nakholi Tharali,
District Chamoli Uttarakhand
Sema-Bairon Motor Road. 1
0.5
0
72
2.2
6
26/
05
/15
06
-05
-15
15
0.0
0
59 UDRP/PWD/RD/065 Dt. 16/06/2015
M/s Divya Jyoti Construction Co. 20, Ashiana Apartment, Kashirampur Kotdwar Distt.
Pauri
Uflda Dehal-Chauri Motor Road
12
.70
533
.88
23/
05/1
5
16/
06/1
5
15
0.0
0
Arkani Janasu Khandu Khal Motor Road
60 UDRP/PWD/RD/066 Dt. 16/06/2015
M/s Rajendra Singh Kuldeep Singh, D-604, ALFA Tower Hari Dwar Bypass Road,
D.Dun.
Arkani Khandu Khal Muchyali Dewal
Charakot Motor Road 17
.50
736
.44
30/
04/1
5
16/
06/1
5
15
0.0
0
61 UDRP/PWD/RD/069 Dt 16/06/2015
M/s Baleinder Singh & Co. Shop No. 43-44, Sehaj
Enclave Amritsar-143001
Nathukhal Pokhari Khet Motor Road
15
.00
688
.67
30/
04/1
5
16/
06/1
5
15
0.0
0
Kasyali Khobra Motor Road
62 UDRP/PWD/RD/013a Dt 18/06/2015
M/s Jagat Singh Kanwal Khatyari (Pandhar) P.O Distt.
Almora Khunt Almora Motor
Road 11
.50
107
.95
23/
05/1
5
18/
06/1
5
15
0.0
0
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 20
63 UDRP/PWD/RD/061 Dt 18/06/2015
M/s Gambhir Singh Vill. Basan P.O Kalsi Distt.
Dehradun Sahiya Patan Samlta Panua Motor Road 1
1.0
0
58
1.9
1
25
/05
/15
18
/06
/15
15
0.0
0
64 UDRP/PWD/RD/074 Dt 18/06/2015
M/s Devendra Construction 2- Dharampur Haridwar
Road, D.Dun Bhadrasu-Ramalgaon
Motor Road 2.7
7
23
5.2
3
27
/04
/15
18
/06
/15
15
0.0
0
65 UDRP/PWD/RD/104 Dt 18/06/2015
M/s A.A Cable Layers, Shop No. 10, Adarsh Market, Radha Road, Civil line,
Rampur. U.P
Matiyal Bend Uparitola Motor Road 1
1.7
8
12
04
.69
06
-05
-15
18
/06
/15
15
0.0
0
66 UDRP/PWD/01/31/RD/07
6 Dt 22/06/15
M/s Ram Krishnan Jayara Word No.- 5, New Market
Barkot, Distt. Uttarkashi- UK Paleta-Kansi Motor
Road 3.0
0
24
1.7
4
30
/04
/15
22
/06
/15
15
0.0
0
Issues:
Completion of bidding process of Road work: Bidding process is in progress and
may be completed by 20th August, 2015.
BRIDGGES: Status of Bridges under UDRP Projects (as on 30th June, 2015)
Status Nos. Span
(Meter) Cost
(Rs in lacs)
Total Scope 60 4201 13800.00
Sanctioned by HPC 19 1438 8500.00
Procurement Status
Status Nos. Span
(Meter) Cost
(Rs in lacs)
Contract Agreement Signed 01 100 600.00
LOA issued 02 260 1700.00
Total 03 360 2300.00
Bid Status
Status Nos. Span
(Meter) Cost
(Rs in lacs)
Financial Bid opened 06 500 2600.00
Technical Bid opened 03 185 1500.00
Total 09 685 4100.00
Bid floated 03 286 1900.00
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 21
Bridges: Details of the Packages in which agreement signed (01 nos.):
Contract Bond No.
Name of the Contractor Details of Bridge
Aw
ard
Val
ue
(Rs.
in la
cs)
LOA
Issu
ed
Co
ntr
act
Sign
Dat
e
Du
rati
on
(M
on
ths)
Pro
gres
s (%
)
UDRP/PWD/01/31/BR/04 Dt24/06/15
M/s V.K. Gupta & Associates, SCO - 263, Sector
-14, Panchkula (Haryana)
Construction of 100m Span Pedestrian Bridge at Didsari on Bhagirathi
River
63
3.8
3
06
-03
-15
24
/06
/15
15
0.0
0
MACHINES: Status of Procurement of Machines UDRP Projects (as on 30th June, 2015)
Procurement Status
Item Nos. Cost
(Rs in lacs)
Total Scope - 1300.00
Sanctioned by HPC - 1300.00
Excavator Backhoe Loaders 07 160.21
Supply of Tracked Excavator 10 342.75
Road Rollers 11 149.39
Total 652.35
Agreement Signed for supply of machines 03 652.35
DESIGN AND SUPERVISION CONSULTANCY/ DESIGN CONSTULTANCY DETAILS (Road and Bridge): Six
(06) DSCs:
Total 06 DSC/DC are engaged by the PIU (Road and Bridge) out of them 04 DSC are for Roads and rest
of 02 DC are for Bridges. Details are as follows: -
S. No.
Contract Number
Contractor Name Scope of
work Date of
Procurement Contract Period
1 UDRP/PWD/C/ DSC/01
DSC-1: M/s Sheladia Associate. USA Design & Supervision
25.06.2014 20 months
2. UDRP/PWD/C/ DSC/02
DSC-2: M/s Egis International Lane no.-5 Rochiprua, Niranjanpur, Dehradun
Design & Supervision
15.12.2014 19 months
3. UDRP/PWD/C/ DSC/04
DSC-4: M/s Yongma Engineering Co Ltd. 4th Floor, arbora Tarla Nangal, Dehradun.
Design & Supervision
11.03.2014 19 months
4. UDRP/PWD/C/ DSC/05
DSC-5: M/s Royal Haskoning House No.4, Vasantkunj-ii Near Sethi Market, Kanwali Road, Dehradun.
Design & Supervision
11.05.2014 21 months
5. UDRP/PWD/ B/DSC/01
Yooshin Engineering Corporation DC- Bridge, Hotel Star
Bridge - Design
07.11.2014 12 months
6. UDRP/PWD/ B/SC/01
Yongma Engineering Co. Ltd Supervision Consultancy - Bridge4th Floor, arbora Tarla Nangal, Dehradun.
Bridge- Supervision
30.03.2015 16 months
Source: PIUs
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 22
VIII. COMPONENT-3: TA&CBDRM
Technical Assistance and Capacity Building for Disaster Risk Management (TA&CBDRM): The objective of this component is to enhance the capabilities of government entities and others in
risk mitigation and response.
Technical Assistance and Capacity Building for Disaster Risk Management will augment government
agencies, institutions and others to develop, set-up and manage risk assessment tools and models,
and set up DSS and communication systems in risk mitigation and response. Staffing of the agency,
capacity augmentation, initiating technical work of risk assessment targeted towards decision making
and risk financing will be taken up under the Project. The GoUk has already initiated the process of
operationalizing the USDMA.
The Physical Progress Details under TA&CBDRM as on 30th June, 2015:
(as on 30th June, 2015)
Details Total Achieved Status
Disaster related equipments 11 lots 05 lots The procurement of the rest 06 lots is also finalized and will be
delivered by 30th July, 2015
Automatic Weather Station (AWS) 04 nos. 04 nos. Established at Chamoli, Dehradun, Pithoragarh & Tehri
Doppler Radar (DR) 02 nos. 01 no. 01 Doppler radar location is finalized and for 2nd Doppler radar
location yet to be finalized.
Establishment of Technical Task Force 05 nos. 05 nos. Established through various Government Orders by GoUk.
Lot-wise detail of Disaster Related Equipments
S.No. Package no./Lots Name of the Contractor Category Status
1 01/SDRF /TA-CBDRM,
Lot No. 1
M/s P.K.Kansil & Co, New Delhi Equipments Delivered
2 01/SDRF/TA-CBDRM,
Lot No. 3
M/s Jyotech Engineering &
Marketing Consultant, Noida, UP
Equipments Delivered
3 01/SDRF/TA-CBDRM,
Lot No. 5
M/s Jyotech Engineering &
Marketing Consultant, Noida, UP
Equipments Delivered
4 01/SDRF/TA-CBDRM,
Lot No. 10
M/s Jyotech Engineering &
Marketing Consultant, Noida, UP
Equipments Delivered
5 01/SDRF/TA-CBDRM,
Lot No. 22
M/s Jyotech Engineering &
Marketing Consultant, Noida, UP
Equipments Delivered
6 01/SDRF/TA-CBDRM,
Lot No. 4
M/s Brijbasi Fire Safety System
Pvt. Ltd, New Delhi
Equipments Procured, delivery
by 30th July, 2015
7 01/SDRF/TA-CBDRM,
Lot No. 7
M/s Machinery Marketing
Associates Pvt. Ltd, New Delhi
Equipments Procured, delivery
by 30th July, 2015
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 23
8 01/SDRF/TA-CBDRM,
Lot No. 11
M/s Machinery Marketing
Associates Pvt. Ltd, New Delhi
Equipments Procured, delivery
by 30th July, 2015
9 01/SDRF/TA-CBDRM,
Lot No. 20
M/s Cattie Camps, Haridwar Equipments Procured, delivery
by 30th July, 2015
10 01/SDRF/TA-CBDRM,
Lot No. 21
M/s Atlas Comnet Pvt. Ltd, New
Delhi
Equipments Procured, delivery
by 30th July, 2015
11 01/SDRF/TA-CBDRM,
Lot No. 24
M/s Atlas Comnet Pvt Ltd, New
Delhi
Equipments Procured, delivery
by 30th July, 2015
Status of Technical Consultancies to be procured under PIU (TA&CBDRM)
S.
No.
Name of the
consultancy
Scope of the Consultancy Status as on 31st
March, 2015
Status as on 30th June, 2015
1. Appointment of
Consultancy for
slope stabilization
and river training
work at TOE
Five drastically affected
locations for geo-technical
investigation & design solutions
between Rudraprayag to
Kedarnath on NH 109.
The NOL on
Technical
Evaluation Report
was received on 6th
April, 2015
The final contract will
be done in July 2015
2. Appointment of
Consultancy for
developing multi
hazard early
warning system
This will review existing hydro-
meteorological capabilities at
the State and National level,
and will develop and
implement a hydro-
meteorological modernization
plan for Uttarakhand. This will
also review existing EWS,
identify gaps and establish a
robust, fail safe EWS in the
State including optimum use of
strengthened networks and
facilities.
Pre-bid held on
dated 11th Mar,
2015
MoM was sent
to the Bank on
18th Mar, 2015
The NOL from
the WB has
been received
on 8th April,
2015 with
suggestions
The technical
evaluation report
will be sent to
Bank in 1st Week
of July.
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 24
3. River
Morphological
Analysis and
Design of River
Training and Bank
Protection work in
Uttarakhand
To identify vulnerable areas
where rivers pose threat from
morphological changes that has
resulted over a period of time
and those from episodic events
such as excessive rains, cloud
bursts and large landslides. The
study would also try to
understand the river
morphology setting so as to
prepare for changes that may
result in future particularly
after episodic events
The MoM was sent
to the Bank for
NOL on 27th Mar,
2015
The reply and
amendment was
sent to the bank
on 25th June 2015
A email received
from Mr. Jurminla
on 30th June 2015.
4. Disaster Risk
Assessment of
Uttarakhand
This will provide technical
assistance to institutions to
plan, set-up and implement a
multi-hazard risk assessment of
Uttarakhand.
The NOL for re-
advertisement
was sent to WB
on 6th April
2015
The pre bid
meeting was held
on 30th June 2015.
The MoM is being
prepared and will
be submitted to
the bank by 10th
July 2015.
5. Design,
Development and
Deployment of a
Decision Support
System
This will entail setting up a
Decision Support System (DSS)
that will integrate and analyze
information from multiple
sources in an integrated geo-
spatial system. The system will
be designed to display
information and provide access
in a user-friendly manner
All bids were
opened and
evaluated.
Only 4 firms
out of 10 have
scored to be
issued RFP.
The letter to
WB was sent
for NOL.
The pre bid
meeting was held
on 29th June 2015.
The MoM is being
prepared and will
be sent to the
bank by 15th July
2015.
Source: PIUs
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 25
Formation of Technical Task Force Team: Five Technical Task Force Team were formed comprises of technical expert in respective field for supporting the PIU (TA&CBDRM):
S. No.
Technical Task Force for Members
1. Slope Stabilization Office Order No. 99/PIU (TA&CBDRM)/UDRP-2014 dated 26.06.2014
1. Secretary, PWD/PD, UDRP, GoUk (Chair person) 2. Deputy Director General, Geological Survey of India 3. Officer nominated by Director, Wadia Institute of Himalayan
Geology, Dehradun 4. General Manager, Tehri Hydro Development Corporation Ltd 5. Officer nominated by Director, Indian Institute for Remote Sensing
(IIRS), Dehradun 6. Chief Engineer, Public Works Department (Garhwal Division),
Uttarakhand 7. Chief Engineer, Irrigation Department, Dehradun 8. Senior Geologist, PWD, Dehradun 9. Executive Director, DMMC, Dehradun 10. Officer nominated by Director, IIT, Roorkee 11. Deputy Director, Geological & Mining, Uttarakhand 12. Program Manager/Deputy Program Manager, PIU (TA&CBDRM)
2. River Morphology and River Training Works Office Order No. 144/PIU (TA&CBDRM)/ UDRP-2014 dated 26.08.2014
1. Secretary, Irrigation, Government of Uttarakhand (Chairman) 2. Secretary, PWD/Program Director, UDRP, GoUk (Vice-Chairman) 3. Officer nominated by Director, IIT, Roorkee 4. Officer nominated by Director, Indian Institute for Remote Sensing
(IIRS), Dehradun 5. Superintending Engineer, Central Water Commission, Dehradun 6. Superintending Engineer, Irrigation Research Institute, Roorkee 7. Chief Engineer, Irrigation Department, Government of Uttarakhand,
Dehradun 8. Officer nominated by Director, Central Water and Soil Conservation
Institute, Dehradun 9. Program Manager/Deputy Program Manager, PIU (TA&CBDRM)
[Coordinator]
3. Multi Hazard Early Warning System (MHEW) & Modernization of Hydro-Met Observation in the State Office Order No. 295/PIU (TA&CBDRM)/UDRP-2014 dated 31.03.2015
1. Secretary, PWD/Program Director, UDRP, GoUk (Chairman) 2. Secretary, Disaster Management & Rehabilitation, Government of
Uttarakhand 3. Additional Secretary/Program Manager, PIU, TA&CBDRM 4. Officer nominated by Director, Uttarakhand Space Application
(USAC), Dehradun 5. Director, Indian Metrological Department, Dehradun 6. Superintending Engineer, Central Water Commission, Dehradun
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 26
4. Technical Task Force for Disaster Risk Assessment under Office Order No. 294/PIU (TA&CBDRM)/ UDRP-2014 dated 31.03.2015
1. Secretary, PWD/Program Director, UDRP, GoUk (Chairman) 2. Secretary, Disaster Management & Rehabilitation, Government of
Uttarakhand 3. Additional Secretary/Program Manager, PIU, TA&CBDRM 4. Dr P.K. Champati Rai, Principal Geologist, Indian Institute of Remote
Sensing (IIRS), Dehradun 5. Officer nominated by the Director, IIT, Roorkee 6. Officer nominated by Director, Wadia Institute of Himalayan
Geology, Dehradun 7. Member nominated by Director, Geological Survey of India,
Dehradun
5. Technical Task Force for Decision Support System Office Order No. 373/PIU (TA&CBDRM)/UDRP-2015 dated 11.06.2015
1. Secretary, PWD/Program Director, UDRP, GoUk (Chairman) 2. Secretary, Disaster Management & Rehabilitation, Government of
Uttarakhand 3. Additional Secretary/Program Manager, PIU, TA&CBDRM 4. Dr P.K. Champati Rai, Principal Geologist, Indian Institute of Remote
Sensing (IIRS), Dehradun 5. Member nominated by Director, Information Technology
Development Agency, Dehradun
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 27
IX. IMPLEMENTATION SUPPORT
This component will support the incremental operating costs of the Project, including the operation of the Project Management Unit (PMU) and the respective Project Implementation Units (PIUs). The component will also include the creation of small, temporary field implementation offices with necessary equipment, furniture, etc. In addition, the component will include consultancies required for the preparation and supervision of specific activities, trainings, exposure visits and knowledge exchange programs. An agency will be appointed to provide technical and social support to the Owner Driven Construction of Houses (ODCH).
Executing Agency at State Level: (As on 30th June, 2015) Executing Agency at State-level: State Disaster Management Authority (SDMA), Government of Uttarakhand (GoUk)
Chief Secretary & Chairman, HPC (Monitoring)
: N Ravi Shankar, IAS
Additional Chief Secretary & Chairman, HPC (Approval)
: Rakesh Sharma, IAS
Secretary, Disaster Management & Member Secretary, HPC
: Meenakshi R Sundaram, IAS
Address : Uttarakhand Secretariat, 4 Subhash Road, Dehradun - 248171, Uttarakhand, India
Project Management Unit
Project Director : Amit Singh Negi, IAS Secretary, PWD, GoUk
Deputy Program Director : Sanjay Mathur (Officiating)
Address : SIIDCUL Building, 29 IIE (IT PARK, Sahastradhara Road, Dehradun – 248001, Uttarakhand, India
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 28
Implementation Agency (PIUs): (As on 30th June, 2015)
Program Implementation Unit (R&B), PWD
Program Manager : A.S. Hyanki, IAS
Address : 2nd Floor Tax Commissioner Building, Jogiwala-Mussoorie Byepass road (Near Pulia no.6), Dehradun - 248001
Program Implementation Unit (Resilient Housing and Public Buildings)
Program Manager : Sowjanya, IAS Addl Secretary, GoUk
Address : 1, Bhagirathi Puram, Doon Vihar, Jakhan, Dehradun-248001, Uttarakhand, India
Program Implementation Unit (Technical Assistance and Capacity Building for Disaster Risk Management)
Program Manager : C. Ravi Shankar, IAS
Address : SIIDCUL Building, 29 IIE (IT PARK, Sahastradhara Road, Dehradun – 248001, Uttarakhand, India
X. MANAGEMENT INFORMATION SYSTEM (MIS)
A MIS has been developed by the project team for monitoring of works and compliance on social and environmental aspects. The PMU/PIU is strengthening the existing MIS and regularly improvising it on need basis for the management of the information database, which is an online tool for gathering updates by the implementing units. This database is also available on the Project website http://www.ukdisasterrecovery.in as part of regularly sharing information with the public. The Project Performance Monitoring System is managed by Mr. Manoj Kumar Bisht, Monitoring & Evaluation Expert (Executive Engineer, PWD), at PIU (R&B), PWD, UDRP.
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 29
XI. COMPREHENSIVE REPORT ON SAFEGUARD COMPLIANCE
In the past 17 months of implementation of UDRP several steps have been taken to ensure that all
project activities comply with the social and environment policies of the World Bank, as elucidated in
the ESMF. Compliance in this case does not just mean following a set of rules. The question here is
much bigger. Social and environment safeguards as expounded in the ESMF aim for social and
behavioural changes; expecting the engineers, contractors, and government officials to be wary of the
costs of development and do their best to minimize this cost. It takes sensitization, dialogue and
sensitive support to all stakeholders for this behaviour change to occur.
The social and environment safeguards specialists appointed at the PMU conducted several trainings
and workshops for UDRP staff, Field PIU officials, Design and Supervision Consultants (DSC), Engineers,
Contractors and beneficiaries. Regular field visits were also undertaken by the team and more than
50% of all project sites have been visited so far. Attempts were made to visit most sites when work
was in full swing and conduct surprise checks so as to capture the ground reality. All stakeholders were
also contacted during each visit and a debrief session held at the end to ensure all gaps, queries and
clarifications are addressed. Copies (both Hindi and English) of the ESMF were given to all PIU’s, field
PIUs and DSCs for reference. Simple handouts in Hindi and English were also prepared for contractors
and their staff to make them aware of the Do’s and Dont’s of in compliance with the ESMF.
The compliance on social and environmental safeguards is also captured in all Monthly Progress reports submitted by the DSCs as well as the UDRP MIS. Below is a snapshot of the progress on various social and environment indicators as captured in the MIS. For comparison purposes we have provided a snapshot up to March 2015 and up to June 2015 respectively.
Overview – Social and Environment Safeguards as on March 31st,2015 & as on 30th June, 2015
*out of 66 packages,20 packages were recently awarded in the month of June
Contractual Requirements Packages found compliant (out of total 40 packages awarded till 31st
March, 2015)
Found compliant (out of 66* packages awarded till 30th June,
2015)
Name of designated senior member
(ECOPs) (Contractor) 35 37
Environmental Management Plan 9 50
PUC Vehicles 12 12
Labour license 3 14 (3 applied for)
Workmen compensation Insurance 19 9
Land owner consent for establishment
of Plant site, labour camps 8 27
Hard Hats (Helmet) 24 27
Safety Jackets 24 27
Boots 16 21
Gloves 13 15
Safety Signs 18 23
Toilets provided 23 (4 Local Labour) 27 (4 Local Labour)
Project Information Boards 29 35
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 30
UDRP is the first project of its kind where such emphasis has been laid on socially and environmentally
sustainable reconstruction practices. The entire team of UDRP had been sensitized about this and
encouraged to question any practices or activities going against the basic principles as outlines in the
ESMF. However, the implementation of social and environment safeguards in UDRP has still been
sluggish for primarily the following reasons:
1) The need for speedy physical progress – It has been observed that since this is a disaster
recovery project, often times the need for physical progress takes precedence over
compliance of social and environment safeguards. More efforts are required to balance this.
2) Lack of awareness of the contractors – Even though several rounds of trainings have been held
so far, there has been some resistance on the part of the contractors in ensuring 100%
compliance on social and environment safeguards. Legal issues such as labour license and
insurance were easier to address than safety and sanitation facilities for workers. The PMU’s
approach in this regard has also evolved through the project and more stringent monitoring
has been adopted.
The social and environmental experts at the PMU, through trainings, workshops and field visits have
tried to educate the project staff as well as contractors about how these safeguards have to be
perceived as an integral part of the reconstruction process. This is not an add on responsibility but the
basic principles only on the basis of which negative fallouts of development can be avoided and/or
mitigated.
Project ID: P146653 QPR-1 India: Uttarakhand Disaster Recovery Project Apr-Jun 2015
UDRP-PMU, Dehradun Page 31
Project ID: P146653 Progress Report - 1 India: Uttarakhand Disaster Recovery Project Till June 2015
UDRP-PMU, Dehradun Page 32
XII. APPENDIX 4: MEETINGS
A. HPC Meetings till June, 2015
S.
No. HPC Minutes of Meeting Issued
Meeting
Date
1 R&B Program and Resilient Housing Program: Letter No.
54/USDMA/2013/PS-ACS/2014 dated 27.01.2014
06.01.2014
2 R&B Program: Letter No. 55/USDMA/2013/PS-ACS/2014 dated
21.01.2014
21.01.2014
3 R&B Program: Letter No. 72/UDRP-UEAP/2014 dated 10.02.2014 06.02.2014
4 R&B Program: Letter No. 88/USDMA/2013/PS-ACS/2014 dated
20.02.2014
14.02.2014
5 Public Buildings Program: Letter No. 90/USDMA/2013/PS-ACS/2014
dated 21.02.2014
19.02.2014
6 R&B Program: Letter No. 99/USDMA/2013/PS-ACS/2014 dated
04.03.2014
03.03.2014
7 R&B Program: Letter No.98/USDMA/2013/PS-ACS/2014 dated
04.03.2014
04.03.2014
8 General Issues: Letter No. 117/USDMA/2014 dated 24 April, 2014 17.04.2014
9 Resilient Housing: Letter No. 123/USDMA/2014 dated 16.05.2014 06.05.2014
10 R&B Program: Letter No. 143/USDMA/2014 dated 08.07.014 25.05.2014
11 R&B Program, TA&CBDRM & General Issues: Letter No. 153/ USDMA
/2014 / PS-ACS/2014 dated 31.07.2014
28.07.2014
12 Housing Sector: Letter No. 182/USDMA/2014 dated 16.09.2014 08.09.2014
13 R&B Program: Letter No. 203/USDMA/2014 dated 10.10.2014 09.10.2014
14 R&B Program & Issues related to DSCs: Letter No. 1910/USDMA/2014
dated 20.10.2014
20.10.2014
15 R&B and DSCs related issues: Letter No. 227/USDMA/2013/PS-
ACS/2014 dated 17.11.2014
12.11.2014
16. R&B Program and Resilient Housing: Letter No. 283/USDMA/2013/PS-
ACS/2014 dated 10.12.2014
02.12.2014
17 R&B Program & TA&CBDRM Program: Letter No. 295/USDMA/2014/PS-
ACS/2014 dated 27.12.2014
23.12.2014
18 R&B Program and DSCs related issues: Letter No. 126/USDMA/2013/PS-
ACS/2015 dated 07.02.2015
30.01.2015
19. PIU (TA&CBDRM): Letter No. 135/USDMA/2015 dated 31.01.2015 30.01.2015
20. All sectors: Letter No. 237/USDMA/2015 dated 11.02.2015 05.02.2015
Project ID: P146653 Progress Report - 1 India: Uttarakhand Disaster Recovery Project Till June 2015
UDRP-PMU, Dehradun Page 33
S.
No. HPC Minutes of Meeting Issued
Meeting
Date
21 PIU (TA&CBDRM) related issues: Letter No. 134/USDMA/2015 dated
10.02.2015
07.02.2015
23 R&B Program, TA&CBDRM and Resilient Housing Program: Letter No.
156/USDMA/2015/PS-ACS/2015 dated 26.03.2015
25.03.2015
24 PIU (TA&CBDRM): Letter No. 202/USDMA/2015-16/PS-ACS/2015 dated
12 May, 2015
07.05.2015
25 General Issues: Letter No. 78/USDMA/2015-16/PS-ACS/2015 dated
15.05.2015
14.05.2015
26 R&B Program and Resilient Housing : Letter No. 253/USDMA/2013/PA-
ACS/2015 dated 25.06.2015
01.06.2015
Project ID: P146653 Progress Report - 1 India: Uttarakhand Disaster Recovery Project Till June 2015
UDRP-PMU, Dehradun Page 34
XIII. APPENDIX 5: SITE PHOTOGRAPHS
Roads & Bridges Program
Retaining Wall Pkg. UDRP/PWD/05/56/RD/040 at
Chakrata, Dehradun
Soling Pkg. No. UDRP/PWD/07/15/RD/011
Badabe-Seligya Motor Road, Pithoragarh
Drum Mix Plant for Bituninous work for Pkg.
UDRP/PWD/08/05/RD/010 at Bageshwar
Construction at Ghanrali Pul- sarbadiyar
M.Road, UDRP/PWD/01/34/RD/003 Uttarkashi
Silt Content Test (Kameridevi-Syakot Moter Road)
at Bageshwar UDRP-PWD-08-06-RD-045
Slab steel bind complete Panduwakhan Rohilda
Motor Road Pkg. No. UDRP/PWD/02/36/RD/026
Chamoli
Project ID: P146653 Progress Report - 1 India: Uttarakhand Disaster Recovery Project Till June 2015
UDRP-PMU, Dehradun Page 35
Resilient Housing
Plinth view of house of Deewan Singh, Beneficiary
(Pithoragarh), Code P112
Roof Level View of house of Bhagirathi Devi,
Beneficiary (Pithoragarh), Code P358
Front view of house of Mohan Lal, Beneficiary
(Uttarakashi), Code U5
Front view of house of Raj Singh, Beneficiary
(Uttarkashi), Code U247
Front view of house of Bir Singh Rawat, Beneficiary
(Rudraprayag), Code R125
Front view of house of Kalpeshwari Devi, Beneficiary
(Chamoli), Code C149
R125
Project ID: P146653 Progress Report - 1 India: Uttarakhand Disaster Recovery Project Till June 2015
UDRP-PMU, Dehradun Page 36
Public Buildings
Proposed site for Government Inter College,
Parkandi, Rudrprayag
Consultation for Public Building Government Inter
College works at Parkandi, Rudraprayag
Consultation with stakeholders for construction of
Police Station at Govindghat, Chamoli
Damaged State Auyurvedic Dispensary at
Pandukeshwar, Chamoli
Consultation for construction of State Auyyervedic
Dispensary at Pandukeshwar, Chamoli
Proposed site for Industrial Training Institute,
Srinagar (Pauri)
Project ID: P146653 Progress Report - 1 India: Uttarakhand Disaster Recovery Project Till June 2015
UDRP-PMU, Dehradun Page 37
TA&CBDRM
Automatic Weather Station at Tyuni (Dehradun) Automatic Weather Station at Munsyari (Pithoragarh)
`
SDRF equipments received at SDRF Battalion
warehouse, Jollygrant, Dehradun
SDRF equipments received at SDRF Battalion
warehouse, Jollygrant, Dehradun
`
Automatic Weather Station at Ghanshali (Tehri) Automatic Weather Station at Gairsen (Chamoli)