Uttarakhand a comprehsive report (2013-2015)

34
Uttarakhand Floods A Comprehensive Report (2013-2015)

Transcript of Uttarakhand a comprehsive report (2013-2015)

Page 1: Uttarakhand  a comprehsive report (2013-2015)

Uttarakhand FloodsA Comprehensive Report

(2013-2015)

Page 2: Uttarakhand  a comprehsive report (2013-2015)

Setting a Base Camp

Assessment SurveyNetwork of Locals

Page 3: Uttarakhand  a comprehsive report (2013-2015)

Our Major challenges

Constant rainfalls and landslides.

Small and far flung villages.

Disrupted roads in already tough terrain.

Very large scale devastation,requiring

long term intervention.

Page 4: Uttarakhand  a comprehsive report (2013-2015)

A total of 225 truck-loads of material reached Uttarakhand so far..

Page 5: Uttarakhand  a comprehsive report (2013-2015)

In the initial phase, reached the cut off areas even through mules and porters..

Page 6: Uttarakhand  a comprehsive report (2013-2015)

Regular medical camps organised, reaching medical aid to cut off areas..

Page 7: Uttarakhand  a comprehsive report (2013-2015)

Cloth for Work: Dignifying Relief Work

More than 400 development activities so far..

Page 8: Uttarakhand  a comprehsive report (2013-2015)

Before After

Before After

30 X3.5 ft bridge Village Seku, Bhatwari Block

Developing a bridge at Village Naugaon

Page 9: Uttarakhand  a comprehsive report (2013-2015)

Before After

Before After

Women taking lead in cleanliness activities

Page 10: Uttarakhand  a comprehsive report (2013-2015)

Before After

Before After

Marking the damaged parts of the road for safety.

Making bridge at Vill. Naugaon, Sangam Chatti

Page 11: Uttarakhand  a comprehsive report (2013-2015)

Before After

Before After

Cleaning of Pond in Vill. Ginoti

Making of Dustbin in Vill. Bongadi

Page 12: Uttarakhand  a comprehsive report (2013-2015)

After

Before BeforeAfter

Making of safety wall in Village Jakhol

Page 13: Uttarakhand  a comprehsive report (2013-2015)

Pandals (Tent House): Established 19 so far

Some unconventional approaches..

Page 14: Uttarakhand  a comprehsive report (2013-2015)

Wedding kits:330 marriages supported

Page 15: Uttarakhand  a comprehsive report (2013-2015)

Sujni Centres in Rishikesh and Uttarkashi:A sustained livelihood source for over 100 women

Page 16: Uttarakhand  a comprehsive report (2013-2015)

Approx.23,000 Sujinies made, converting over 90,000 kgs of absolute waste cloth into a daily utility

product..

Page 17: Uttarakhand  a comprehsive report (2013-2015)

Uttarkashi Centre

Page 18: Uttarakhand  a comprehsive report (2013-2015)

Washing of clothes: Another source of employment

Page 19: Uttarakhand  a comprehsive report (2013-2015)

Study Centres for quality education: 9 operational in Uttarakhand

Page 20: Uttarakhand  a comprehsive report (2013-2015)

Initiated/SupportingComputer centres

Page 21: Uttarakhand  a comprehsive report (2013-2015)

11 Stitching Centres

A knitting centre

Page 22: Uttarakhand  a comprehsive report (2013-2015)

Not Just a Piece of ClothAddressing the basic need of women

Over 2,50,000 My Pads (cloth sanitary pads) reached so far

Page 23: Uttarakhand  a comprehsive report (2013-2015)

Up in the hills, silence is being broken and women are curious to know more about good menstrual hygiene practices and are

happily accepting the change..

Page 24: Uttarakhand  a comprehsive report (2013-2015)

Awareness

Learning to make My Pad

Reaching out My Pads

Filling NJPC-A million voices forms

Page 25: Uttarakhand  a comprehsive report (2013-2015)

School to School: Filling material gap, and reviving the education system in the flood affected areas and beyond

Page 26: Uttarakhand  a comprehsive report (2013-2015)

Reached over 520 schools and anganwadies…

Page 27: Uttarakhand  a comprehsive report (2013-2015)

Construction: Repairing of schools

Page 28: Uttarakhand  a comprehsive report (2013-2015)

Construction of toilets with community participation

Page 29: Uttarakhand  a comprehsive report (2013-2015)

Before

After

Repair of Prasuti Greh

Page 30: Uttarakhand  a comprehsive report (2013-2015)

2,300Utensil kits

5,700Labour kits

27,000 Winter kits

Some facts and figures…

Page 31: Uttarakhand  a comprehsive report (2013-2015)

8900School kits

6200Ration Kits

78,000Shoes

Page 32: Uttarakhand  a comprehsive report (2013-2015)

2,50,000My Pads

2,500Solar lights and torch

Page 33: Uttarakhand  a comprehsive report (2013-2015)

Summary and Future Plans• In last two years Goonj has successfully reached over 600 villages with relief

material and much more.

• In phase 1, relief material was reached to cut off areas and medical help was provided by supporting medical camps.

• In phase 2, comprehensive Winter kits were given as a reward for various Cloth for work activities, extensive work was done to improve the condition of schools and aaganwadies.

• We will be continuing the support in terms of labour kits to the Migrant labourers.

• Menstrual hygiene has been an important area of work, since the very beginning and much more work is planned in the same field.

• Employment was generated for women, through Sujni centres, stitching and knitting centres as well as by setting up 3 major Goonj’s offices and processing centres.

• In future apart from carrying forward all these activities, Goonj is also planning to focus on Solar energy as a solution to the village problems.

• Also planning to address the acute need of constructing toilets and repairing damaged structures.

Page 34: Uttarakhand  a comprehsive report (2013-2015)

GOONJ (H.O.)- J-93, Sarita Vihar, New Delhi- 110076Write to us- [email protected] , Web- www.goonj.org

www.facebook.com/goonj.orgwww.twitter.com/goonj

For the detailed report of initial Phase, please refer http://goonj.org/?p=304