UTICA GATHERING SYSTEM OVERVIEW
Asset Summary Asset Cardinal Gas Services
(“CGS”) Utica Gas Services (“UGS”)
Resource Associated Gas (Oil), Wet Gas
Dry Gas
Services Gathering, Compression, Dehydration
Gathering, Compression, Dehydration
Gas Gathering Systems 1 1
Miles of Pipeline 226 N/A
Gas Gathered (net) 233 mmcf/d N/A
Gas Compression (horsepower) 68,830 0
Dedicated Area 1,500,000 acres 140,000 acres
Contract Structure Cost of Service Cost of Service
Contract Term 20 years (2032) 15 Years (2027)
Ownership ACMP – 66%, Operator
TOTAL – 25% EVEP – 9%
100% ACMP owned and operated
Accounting Treatment Consolidated Consolidated
2
LEADING ASSET POSITION WITH A VERTICALLY INTEGRATED SYSTEM ABLE TO SERVE PRODUCERS FROM THE WELLHEAD THROUGH FRACTIONATION
Data as of quarter ended March 31, 2014.
Growing a leadership position in the Utica to $1.8 billion of investment for gathering and processing by 2015
UTICA EAST OHIO PROCESSING OVERVIEW
Project Summary
Current Status In-Service with additional capacity under construction
Processing 1,100 mmcf/d (5 plants x ~220 mmcf/d)
Fractionation 135,000 Bbl/d (C2+)
NGL Storage 1,220,900 Bbls Propane – 630,000 Bbls; Butane – 425,000 Bbls; Natural Gasoline – 123,000 Bbls; Bullet
tanks – 42,900 Bbls
Processing Spine Pipeline 24” processing spine pipeline
NGL Pipeline 12” NGL pipeline
Miles of Pipeline 68
Residue Gas Delivery Points 4
NGL Delivery Points 4
Contract Structure Fixed Fee with capex protection
Contract Term 15 years (2027)
Ownership ACMP – 49% M3 – 30%
EVEP – 21%
Accounting Treatment Equity Investment
3
PROCESSING DEDICATION IN WET GAS WINDOW
Data as of quarter ended March 31, 2014.
Growing a leadership position in the Utica to $1.8 billion of investment for gathering and processing by 2015
UTICA CONSTRUCTION UPDATE
4
In Service • 338 miles of pipeline
• Seven interconnects with approximately 500 MMcfd capacity
• Five Compression Facilities: Augusta Phase 1 & 2, Carrollton, Stock Station , Archer and Kilgore,
Under Construction • 64 miles of pipeline
• 15 Pad connects (43 CWOPL/WOPLS)
• Facilities: Scio CF (10 x 1,775 HP) Carrollton CF expansion (4 x 4,000HP), Archer CF PH 2 (1 x 4,000 HP), Kilgore CF PH 2 (4 x 4,000 HP), Augusta CF PH 3 (4 x 4,000 HP).
ROW and Route Development: • 220 miles of pipeline
UEO: KENSINGTON, NOVEMBER, 2012
5
UEO: KENSINGTON, AUGUST, 2013
Facility Sub-station
Processing Train #1
Processing Train #2
Processing Train #3
Future Processing Train #4
Inlet Metering and Liquid Handling
Facilities
Condensate Stabilizer
Residue Compressors
Inlet Compressors
6
UEO: KENSINGTON, MAY, 2014
7
Facility Sub-station
Processing Train #1
Processing Train #2
Processing Train #3
Future Processing Train #4
Inlet Metering and Liquid Handling
Facilities
High-Pressure Condensate Stabilizer
Residue Compressors
Inlet Compressors
Mid-Pressure Condensate Stabilizer
UEO: HARRISON HUB, NOVEMBER, 2012
8
UEO: HARRISON HUB, AUGUST, 2013
Twenty 90,000 gallon C3 & C4
bullet tanks
Two 60,000 barrel floating roof natural
gasoline tanks
50,000 barrel pressurized C4
sphere
Four 750 barrel C5+tanks
Two 200,000 barrel refrigerated C3 tanks
(2) 125,000 barrel refrigerated C4 tanks
16 total loading racks (8 C3, 4 C4, 4 C5+)
10 total tracks (4 loading tracks, 3
storage tracks, 3 inbound / outbound
/ runaround tracks)
Rail cars on site
Flare Fractionation Trains 2 & 3 site work
Fractionation Train 1
Fire water tank
9
UEO: HARRISON HUB, MAY, 2014
10
Twenty 90,000 gallon C3 & C4
bullet tanks
Two 60,000 barrel floating roof natural
gasoline tanks
50,000 barrel pressurized C4
sphere
Four 750 barrel C5+tanks
Two 200,000 barrel refrigerated C3 tanks
(2) 125,000 barrel refrigerated C4 tanks
16 total loading racks (8 C3, 4 C4, 4 C5+)
10 total tracks (4 loading tracks, 3
storage tracks, 3 inbound / outbound
/ runaround tracks)
Rail cars on site
Flare
Fractionation Train #1
Fire water tank Fractionation
Train #2
Fractionation Train #3
Facility Sub-station
ACCESS IN THE UTICA • CARDINAL GAS SERVICES (CGS) • UTICA EAST OHIO (UEO) • UTICA GAS SERVICES (UGS)
12
CARDINAL GAS SERVICES (CGS) ASSET OVERVIEW
Services Gathering, Compression, Dehydration
Gas Gathering Systems
1
Miles of Pipeline 226
Gas Gathered 233 million cubic feet per day (MMcf/d)
Ownership Access: 66%, Operator TOTAL: 25% EVEP: 9%
Mission • Develop the gathering assets necessary to
transport and condition gas for downstream processing markets
Market • UEO Cryogenic and Fractionation Plants • Blue Racer Hastings Processing Plant • Blue Racer Natrium Processing Plant • Mark West Harrison Processing Plant
Plan • Total of 467 miles of gathering pipeline
infrastructure • Five compressor stations • Liquid handling facility (large-scale stabilization
facility) • Design throughput: 1.2 billion cubic feet (Bcf) of
natural gas
CARDINAL GAS SERVICES: ASSET OVERVIEW
13
CARDINAL GAS SERVICES: COMPRESSION Carrollton Compression Facility
• 110 MMcfd capacity with expansion capabilities
• Ten 3606 units
Augusta Compression Facility • 135 MMcfd capacity with expansion
capabilities • Eight 3606 units • Two 2,000 HP electrics • Two 3516 units
Archer Compression Facility • 145 MMcfd capacity with expansion
capabilities • Eight 3606 units • Two 3516 units
Kilgore Compression Facility • 110 MMcfd capacity with expansion
capabilities • Ten 3606 units
Scio Compression Facility • 110 MMcfd capacity with expansion
capabilities • Ten 3606 units
14
Phase 1 (In Service: 4Q 2012)
• 25 MMcfd capacity @ Ps=125 psig & Pd=700psg
• 2 - Cat 3516’s
• 1 - 48” ID packed dehy train
Phase 2 (In Service: 3Q 2013):
• 110 mmscfd capacity @ Ps=125 psig & Pd=1,100 psig
• 8 - Cat 3606’s
• 2 – 2,000 HP electric units
• 2 - 48” ID packed dehy trains
Phase 3 (In Service: 4Q 2014):
• 108 MMcfd capacity @ Ps=125 psig & Pd=1,100 psig
• 4 – 4000 HP electrics
• 1 – 48” ID packed dehy train
Downstream Pipeline:
• Phase 1: TPL 7 • Phase 2 & 3: UEO 24” HP Spine
CARDINAL GAS SERVICES: AUGUSTA COMPRESSION FACILITY
15
Current • Compression started up 1/29/2013
• Compressor building completed
• Design for UEO 24” HP Spine tie-in completed
Phase 1 Compression (In Service: 1Q
2014) • 110 MMcfd capacity @ Ps=125 Psig &
Pd=1,100 Psig
• 10 - Cat 3606 compressor packages
• 3 - 48” ID packed dehy trains
Phase 2 Compression (In Service: 3Q 2014)
• 108 MMcfd capacity @ Ps=125 psig & Pd=1,100 psig
• 4 – 4,000 HP electrics
Downstream Pipeline • Blue Racer TPL-7 and UEO 24” HP Spine
16
CARDINAL GAS SERVICES: CARROLLTON COMPRESSION FACILITY
Stock CF (In Service: 2Q 2013) • 25 MMcfd capacity @ Ps=125 psig & Pd = 700 psig
• 2 - 3516 compressor packages
• 1 - 48” ID packed dehy trains
Phase 1 (In Service: 3Q 2013) • 75 MMcfd capacity @ Ps=125 Psig & Pd=700 Psig
• 500 Bpd condensate stabilization system
• 5 - Cat 3606 compressor packages
• 2 - 48” ID packed dehy trains
Phase 2A (In Service: 4Q 2013) • 45 MMcfd capacity @ Ps=125 Psig & Pd=700 Psig
• 500 Bpd condensate stabilization system
• 3 - Cat 3606 compressor packages & one 4000 HP electrics
Phase 2B (In Service: 2Q 2014) • 30 MMcfd additional capacity @Ps=125 psig &
Pd=700 psig
• 1 – 4,000 HP electric
• 1 – 48” ID packed dehy train
Downstream Pipeline • Blue Racer TPL-7
CARDINAL GAS SERVICES: ARCHER & STOCK COMPRESSION FACILITIES
17
Phase 1 (In Service: 4Q 2013) • 110 MMscfd @ Ps=125 Psig & 1,100 Psig
• 500 Bpd condensate stabilization system
• 10 - Cat 3606 compressor packages
• 2 - 48” ID packed dehy trains
Phase 2 (In Service: 3Q 2014) • 108 MMcdf additional capacity @Ps=125
psig & Pd=1,100 Psig
• 4 - 4,000 HP electrics
• 1 - 48” ID packed dehy train
Downstream Pipeline • UEO 24” Gathering Spine
CARDINAL GAS SERVICES: KILGORE COMPRESSION FACILITY
18
Current • First flow to sales May 2014 • Compressor building on order
Phase 1 (In Service: 2Q 2014) • 110 mmscfd capacity @ Ps=125 psig &
Pd=1,100 psig
• 500 bpd condensate stabilization system
• 10 - Cat 3606 compressor packages
• 2 - 48” ID packed dehy trains
Downstream Pipeline • UEO 24” Gathering Spine
CARDINAL GAS SERVICES: SCIO COMPRESSION FACILITY
19
20
UTICA EAST OHIO BUCKEYE ASSET OVERVIEW
21
UEO PROJECT SUMMARY UEO SYSTEM MAP Current Status In-Service with additional capacity
under construction
Processing Plants 1,100 mmcf/d (5 plants x ~220 mmcf/d)
Fractionation 135,000 Bbl/d (C2+)
NGL Storage 1,220,900 Bbls Propane – 630,000 Bbls Butane – 425,000 Bbls
Natural Gasoline – 123,000 Bbls; Bullet tanks – 42,900 Bbls
Processing Spine Pipeline 24” processing spine pipeline
NGL Pipeline 12” NGL pipeline
Residue Gas Delivery Points
4
NGL Delivery Points 4
Contract Structure Fixed Fee with capex protection
Ownership Access – 49% M3 – 30%
EVEP – 21%
Accounting Treatment Equity Investment
1,100 MMcfd cryogenic processing under development • ~660 MMcfd located at the
Kensington Plant (Columbiana County, OH)
• ~440 MMcfd located at the Leesville Plant (Carroll County, OH)
• Expansion capabilities at Kensington and Leesville
Multiple residue gas outlets • Tennessee Gas Pipeline (TGP),
Dominion Transmission (DTI), Dominion East Ohio (DEO) and future connection to TETCO Open Project
High Pressure Gathering Pipeline • Links Kensington and Leesville plants
NGL Gathering System • Delivers raw NGLs from the two
processing plants to Harrison Hub
Harrison Hub • Fractionation, storage and rail
terminal 135,000 BPD of C2+ Fractionation
under construction
1,220,900 Bbls of C3+ storage
High capacity rail loading facility on Columbus & Ohio River Railroad
Pipeline connections to Enterprise TE Products and ATEX pipelines
Anticipate future connections to Mariner East project and Bluegrass project
Expansion capabilities
UEO ASSET OVERVIEW CONTINUED
22
UEO CURRENT OPERATIONS Kensington Phase 1 in service
• ~220 MMcfd processing train made commercial deliveries to TGP on July 28, 2013
• Blue Racer Midstream TPL 7 receipt point • TGP residue gas delivery point • DEO TPL 15 residue gas delivery point
Harrison Hub Phase 1 fractionation, storage and rail terminal in-service
• Began fractionating Y grade and loading product on rail cars first week of August 2013
• Loading 8 rail cars per day ~100 rail cars on site
Harrison Phase 2 (45 MBpd) • In Service as of 4/25/2014
Kensington Phase 2 (~220 MMcfd) • In Service as of 12/21/2013
Kensington Phase 3 (~220 MMcfd) construction is underway
• In Service Date – 1h 2014
Leesville Phase 1 (~220 MMcfd) construction is underway
• In Service Date – 2h 2014
Leesville Phase 2 (~220 MMcfd) engineering and conceptual design is underway
• In Service Date – 2015
23
UEO PROCESSING OVERVIEW
PROCESSING TIMELINE (UNDER DEVELOPMENT) Plant Plant Location Capacity In-service Date Cumulative System Capacity
#1 Kensington ~220 MMcfd In-Service 220 MMcfd
#2 Kensington ~220 MMcfd In-Service 440 MMcfd
#3 Kensington ~220 MMcfd 1H 2014 660 MMcfd
#4 Leesville ~220 MMcfd 2H 2014 880 MMcfd
#5 Leesville ~220 MMcfd 2015 1,100 MMcfd
24
PROCESSING CAPCAITY
Available Expansion Capacity
Contracted Firm Capacity
Kensington Train 1
Kensington Train 2
Kensington Train 3
Leesville Train 1
Leesville Train 2
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
Proc
essi
ng C
apac
ity (M
Mcf
d)
Additional Train
Harrison Phase I
Harrison Phase II
Harrison Phase III
Harrison Phase IV
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
Asso
ciat
ed F
ract
iona
tion
Capa
city
(B
PD)
UEO FRACTIONATION OVERVIEW
FRACTIONATION TIMELINE (UNDER DEVELOPMENT)
Plant Plant Location Capacity (C2+) In-service Date Cumulative System Capacity (C2+)
#1 Harrison 45,000 BPD In-Service 45,000 BPD
#2 Harrison 45,000 BPD 1H 2014 90,000 BPD
#3 Harrison 45,000 BPD 2H 2014 135,000 BPD
25
FRACTIONATION CAPCAITY
Available Expansion Capacity
Contracted Firm Capacity
UEO NATURAL GAS LIQUIDS PRODUCT OVERVIEW
PRODUCT STORAGE PIPELINES RAIL/TRUCK
Ethane No storage Connection to Enterprise ATEX Pipeline n/a
Propane 630,000 Bbls Three, ~200,000 Bbl refrigerated
propane tanks One, 30,000 Bbl sphere Ten, 2,140 Bbl bullet tanks
Connection to Enterprise TE Products Pipeline
Future connection to Mariner East project
Two dedicated loading trucks
Eight rail loading racks Two truck loading racks Ability to expand with
volumes
Mixed Butanes
425,000 Bbls Three, 125,000 Bbl refrigerated
butane tanks One 50,000 Bbl sphere Ten 2,140 Bbl bullet tanks
No pipeline connections currently Future connection to Mariner East
project
One dedicated loading truck
Four rail loading racks Ability to expand with
volumes
Natural Gasolines
123,000 Bbls Two 60,000 Bbl floating roof tanks Four 750 Bbl tanks
No pipeline connections currently Future connection to diluent pipeline
with developed
One dedicated loading truck
Four rail loading racks Ability to expand with
volumes
26
UEO HARRISON HUB STORAGE
UEO Storage Photos Storage Type Overview Pressurized propane and
butane storage
27
UEO STORAGE PHOTOS STORAGE TYPE OVERVIEW
Pressurized propane and butane storage
Twenty 90,000 gallon propane/butane storage bullet tanks
All tanks will be in service 2013
Butane pressurized sphere 50,000 Bbl pressurized sphere In service 2013
Natural gasoline/condensate storage tanks
Four 750 Bbl natural gasoline tanks, in service July 2013
Two 60,000 Bbl floating roof natural gasoline tanks, in service 2013
Refrigerated propane and butane tanks
Three 200,000 Bbl propane tanks Three 125,000 Bbl butane tanks In service 2014 & 2015
UEO HARRISON HUB RAIL TERMINAL
28
RAIL TERMINAL DESIGN SPECS Planned track design
7,400 ft. of continuous dual track ~42,000 ft. of total track 4 loading tracks, 3 receipt & delivery tracks
and 3 storage tracks On site storage for ~570 rail cars Facility designed to load 95 cars per day
Load rack design 16 loading racks (8 C3, 4 C4, 4
C5+/Condensate) Accommodate up to 32 additional loading
racks Tracks assigned to handle specific products
Rail yard has three locomotives East side that will be sorting and switching full
rail cars West side that will be sorting and switching
empty rail cars Backup locomotive
Site allows for rail terminal expansion beyond currently design and could transport products by unit train
HARRISON HUB RAIL OVERVIEW
29
UTICA GAS SERVICES (UGS) ASSET OVERVIEW
Services Gathering,
Compression, Dehydration
Gas Gathering Systems 1
Ownership 100% Access owned and operated
Mission • Provide gathering services for the dry gas and oil
window outside of the Cardinal Gas Services dedication area.
• Also, operator of Cardinal Gas Services’ assets and the UEO 24” spine.
Market • DTI TL-400 • DEO TPL 5 • DEO dry gas gathering systems
Plan • 350miles of gathering pipeline infrastructure • Six compressor stations • Design throughput: 1.1 Bcf/d natural gas
UTICA GAS SERVICES: ASSET OVERVIEW
30
Contact:
Dave Shiels Chief Financial Officer [email protected] (405) 727-1740
ACMP Headquarters
525 Central Park Dr. Oklahoma City, OK 73105 (877) 413-1023 Web site: www.accessmidstream.com
CORPORATE INFORMATION