User Manual for GZAC’s - Network Rail

21
User Manual for GZAC’s and Planners Section number to go here

Transcript of User Manual for GZAC’s - Network Rail

Page 1: User Manual for GZAC’s - Network Rail

User Manual for GZAC’s and Planners

Section number to go here

Page 2: User Manual for GZAC’s - Network Rail

Date 00.00.00 Presentation title to go here 2

Login To GZAM

Network Rail Domain Users (Intranet)

http://gzam

Non Network Rail Domain Users (Internet)

http:// GZAM.networkrail.co.uk

Page 3: User Manual for GZAC’s - Network Rail

New user click Create a new account

Insert your E-Mail address and password. if you already have an account (system is case-sensitive)

Forgotten password click on link take you to a password Page.

Page 4: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 4

Create New Account

Insert your details to create account once created click create account

Page 5: User Manual for GZAC’s - Network Rail

Date 00.00.00 Presentation title to go here 5

Forgotten Password Page

Insert your E-Mail address already have an account (system is case-sensitive) click submit

Page 6: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 6

Message of the Day

After successfully logging onto the Green Zone Planner Website you will be presented with this screen where messages are posted on a regularly.

Please take time to review the messages as they may be relevant to you. Click continue to proceed to the On Line Booking Form.

Super GZAC’s are able to post messages on the message of the day.

Page 7: User Manual for GZAC’s - Network Rail

Information

Planners must select the GZAC location FIRST, which then restricts them to selecting Signal Boxes from a drop down list which the GZAC deals with applications for.

Contact GZAM Support Team if corrections or alterations are needed to the content of the Signal Boxes.

Once application is completed use the submit button

Or

If you Require to print this use the Print Button.

Page 8: User Manual for GZAC’s - Network Rail

Date 00.00.00 Presentation title to go here 8

Time slots Tab

Clicking on the Time slots button will show what blocks are already in place on any given day. This is useful to see if you are planning work in the same area and will reduce potential clashes.

Input details of GZAC, Signal Box and date in the appropriate fields then click on “Get Applications”

Page 9: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 9

Application Status Tab

If you enter the application Number into this section this will show your current application status if this is Rejected, Accepted or Unprocessed.

Page 10: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 10

Contractor Requests TabClicking on the Contractor Request tab enables the user to view applications submitted.

You can use the filter options to show the range of data require you require.

Page 11: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 11

User Settings Tab

User Settings is used to update your personal details and to change password.

You should keep these details current and accurate so that you can be contacted.

Page 12: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 12

GZAC Users

GZAC Users will be required to select which area they wish to work in from the drop down menu once selected Click ‘Go’

If you require access to more than one area this can be amended. You will need to contact the GZAM Support Team.

Page 13: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 13

New TabThis screen gives a list of ‘new’ applications for the area that has been chosen since you last visited the site. (this will display the same information in the Unprocessed tab.)

Search for a specific application number and click on the binoculars.

Click the application number to view applications history.

By clicking the underlined headings can be sorted by categories within the column.

Application Number sorts by numeric reference (lowest to highest number or highest to lowest).

Blockage Start sorts by date (current to future or future to current)

Work Location sorts by alphabetical (A to Z or Z to A)

Blockage type sorts by Line blockage

Priority sorts by Urgent to Low or Low to Urgent

Click edit is to view or process the application

Clicking on the boxes and hitting return a printer friendly page of the application details can be obtained or using the printer symbol to print application.

Page 14: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 14

Accepted TabThis screen gives a list of ‘accepted’ applications for the area that has been chosen.

Search for a specific application number and click on the binoculars.

Click the application number to view applications history.

Click edit is to view or process the application

Page 15: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 15

All TabThis gives a list of ‘all’ applications (accepted & rejected) for the area that has been chosen.

Search for a specific application number and click on the binoculars.

Click the application number to view applications history.

Click edit is to view or process the application

Page 16: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 16

Daily List Tab

Check these dates are set as required and click Refresh.

An option to print a blank Lineside Request page to send to Signal Boxes has been added within the Daily List tab.

Page 17: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 17

User Settings Tab

User Settings is used to update your personal details and to change password.

You should keep these details current and accurate so that you can be contacted.

Page 18: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 18

Statistics Tab

This screen gives an overview of all stats for each GZAC location.

You are able to select ‘from’ and ‘until’ dates. Make sure you click on the ‘refresh’ button to update the data.

There is options to show stats by Signal box, Contractor Company or Cancelled by Contractor, blockage type and Route.

Page 19: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 19

Blockages Tab

Screen to access screen to record any lineside requests granted.

Page 20: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 20

Blockage Status

This allows you to update the status of all applications for chosen dates. When the applications are updated this is reflected on the stats screen.

Make sure you click on the “Refresh” button to update the data.

If changes are made, click the save button.

To leave this screen choose an option from the tool bar menu.

Page 21: User Manual for GZAC’s - Network Rail

Date 00.00.00 Create your footer by changing copy in the Header and Footer section 21

Line Side Applications

screen to record any lineside requests granted.

Enter details into available fields